JP4087985B2 - Building unit and unit building - Google Patents
Building unit and unit building Download PDFInfo
- Publication number
- JP4087985B2 JP4087985B2 JP10439599A JP10439599A JP4087985B2 JP 4087985 B2 JP4087985 B2 JP 4087985B2 JP 10439599 A JP10439599 A JP 10439599A JP 10439599 A JP10439599 A JP 10439599A JP 4087985 B2 JP4087985 B2 JP 4087985B2
- Authority
- JP
- Japan
- Prior art keywords
- ceiling
- ceiling panel
- building unit
- hole
- panel assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
【0001】
【発明の属する技術分野】
この発明は、建物ユニットに関し、特にユニット建物として使用される骨組構造の建物ユニットに関するものである。
【0002】
【従来の技術】
工場で生産されるユニット建物用の建物ユニットとして、四隅に配置された柱と、隣接する柱の下部間に掛け渡されて両端を各々柱に剛接合された床梁とにより骨組構造をなし、上部に天井パネルを配置される建物ユニットが知られている。
【0003】
従来の建物ユニットは、柱の上面よりも天井パネルの上面の位置が低く、出荷時において、建物ユニットに直接保護シートを掛けると、窪みができ、該窪みに雨水が溜まってしまう。そこで、建物ユニットの天井パネル上には仮屋根梁(野縁)を渡し、その上に仮屋根合板を設置して保護シートを掛けた状態で出荷し、保護シート上に雨水が溜まらないようにしている。
【0004】
また、従来の建物ユニットには、天井パネルの四隅を柱の上部(柱頭)に固定した型式のものがあり、この天井パネルの柱頭固定は、天井パネルと柱頭の各々に取り付けられた孔付きの取付け金具の孔を合わせて、リベットを打ち込むことにより行われている(特開平10−2018号公報参照)。
さらに、従来の建物ユニットは、天井高さの調整を行える構造になっておらず、ユニット繋ぎ部には、天井面の高さ調整をせずにそのまま石膏ボードを貼ることが行われている。
【0005】
【発明が解決しようとする課題】
ところで、従来の建物ユニットでは、上記のように出荷時には保護シート上に雨水が溜まらないように、天井パネル上に仮屋根梁を渡し、その上に仮屋根合板を設置している。一方、据付け時には、仮屋根梁及び仮屋根合板は回収品として既に取り外されているため、施工休止時のような保護シートのみが掛けられた状態では、保護シートに窪みができ、雨水が溜まる。このため、雨天後の作業時には、保護シートの窪みに溜まった雨水をホース等を使用して排水しなければならないという不都合がある。
【0006】
また、従来の建物ユニットにおける天井パネルの柱頭固定は、上記のように、天井パネルと柱頭の各々に取り付けられた孔付きの取付け金具の孔を合わせてリベットを打ち込むことにより行われているため、取付け金具の孔合わせする作業が大変で、リベットを打ち込むまで天井パネルの支持が安定せず、作業性が悪いという問題がある。
【0007】
さらに、従来の建物ユニットでは、天井高さの調整を行える構造になっておらず、ユニット繋ぎ部に、そのまま石膏ボードを貼ることが行われているため、天井面に段差が生じる可能があり、また、鉄骨製の天井梁と上階の床梁とが金属同士で接しているため、上階床を歩く時にはカタカタと云うような金属接触音が生じるという不都合がある。
【0008】
この発明は、上述の如き問題点を解消するためになされたもので、仮屋根梁、仮屋根合板が不要で、据付け時に保護シートの窪みに雨水が溜まることがなく、また天井パネルの柱頭固定の作業性に優れ、しかも天井高さの微調整を作業性よく行うことができる建物ユニット、及び該建物ユニットを連結したユニット建物を提供することを目的としている。
【0009】
【課題を解決するための手段】
上述の目的を達成するために、請求項1に記載の発明による建物ユニットは、四隅に配置された柱と、隣接する柱の下部間に掛け渡されて両端を各々柱に剛接合された床梁と、天井パネル組立体とを有する建物ユニットにおいて、前記柱と前記天井パネル組立体とに該両者を固定接続するための柱側固定金具と天井パネル側固定金具とが固定され、前記柱側固定金具と前記天井パネル側固定金具の一方にはねじ受入孔付きの筒状突部が形成され、他方には前記筒状突部を受け入れる貫通孔が形成され、前記貫通孔より挿入したねじが当該貫通孔に嵌合している前記筒状突部のねじ受入孔にねじ込まれることにより天井パネル組立体と柱との接合が行われるものである。
【0012】
この構成によれば、柱側固定金具あるいは天井パネル側固定金具の一方に設けられている筒状突部が他方の固定金具の貫通孔に挿入されることで、柱頭に対する天井パネル組立体の仮止めが行われ、その後、貫通孔より挿入したねじが当該貫通孔に嵌合している前記筒状突部のねじ受入孔にねじ込まれることにより、柱頭に対する天井パネル組立体の本固定が行われる。
【0013】
請求項2に記載の発明による建物ユニットは、前記筒状突部は半割り形状とされ、初期状態では当該筒状突部の外径が前記貫通孔の内径より小さく、前記ねじ受入孔にねじがねじ込まれることにより前記筒状突部が拡開されるものである。この構成によれば、ねじ受入孔にねじがねじ込まれることにより筒状突部が拡開し、ねじ受入孔と筒状突部との間のクリアランスが無くなり、同時にねじ受入孔と筒状突部との心出しを行うことができる。
【0014】
請求項3に記載の発明による建物ユニットは、前記筒状突部のねじ受入孔に、前記筒状突部と前記貫通孔との嵌合の案内を行う案内部材が取り外し可能に装着されるものである。この構成によれば、筒状突部のねじ受入孔に案内部材が装着されることで、案内部材に案内されながら、筒状突部と貫通孔との嵌合を容易に行うことができる。
【0015】
請求項4に記載の発明によるユニット建物は、四隅に配置された柱と、隣接する柱の下部間に掛け渡されて両端を各々柱に剛接合された床梁と、前記天井パネル組立体とを有する建物ユニットが、それぞれ上下左右に連結して構成されるユニット建物において、前記天井パネル組立体は、横転溝形鋼製の端野縁が方形に形成された天井フレームと前記端野縁の下面に取り付けられた天井パネルとを有し、連結された前記上階の建物ユニットの前記床梁に取付け高さ位置調整可能に天井吊り金具が取り付けられ、前記天井吊り金具は横転溝形鋼製の端野縁の片部を受け入れる水平方向のスリット溝が形成されているものである。
【0016】
この構成によれば、天井吊り金具のスリット溝に横転溝形鋼製の端野縁の片部が差し込まれることによって天井吊り金具を介して天井パネル組立体が上階の床梁より吊り下げ式に支持されるので、天井吊り金具の床梁に対する取付け高さ位置の調整により、天井パネルの高さ調整を行うことができる。
【0017】
請求項5に記載の発明によるユニット建物は、前記天井吊り金具は、連結された前記上階の建物ユニットの前記床梁に取り付けられ、当該天井吊り金具にねじ止めされた高さ調整ねじが前記床梁に当接し、当該高さ調整ねじにより前記床梁に対する取付け高さを調整可能に設定されるものである。この構成によれば、高さ調整ねじにより天井吊り金具の床梁に対する取付け高さを調整でき、天井面の段差をなくすことができる。
【0018】
【発明の実施の形態】
以下に添付の図を参照してこの発明の実施の形態を詳細に説明する。
図1、図2はこの発明による建物ユニットの骨組構造を示している。建物ユニットは、四隅に配置された円形断面の鋼管製の4個の柱1と、隣接する柱1の下部間に掛け渡されて両端を各々柱1に剛接合された鋼鉄製の4個の床梁2とによる骨組構造をなし、床梁2には根太3が掛け渡され、根太3上に床パネル4が設置されている。そして、上部には天井パネル組立体5が設けられている。
【0019】
また、図3は、前記建物ユニットにおける天井パネル組立体5の柱頭固定部の要部を示しており、該天井パネル組立体5は、溝形鋼を外向きに横転した状態で配置された四角枠状の天井フレームである端野縁6と、該端野縁6の下面側に固定された石膏ボード等による天井パネル7と、端野縁6の上面側に固定されたOSB等による足場板8とにより構成されている。そして、端野縁6は柱1の周辺に位置し、また、柱1の上端には蓋部材1aが固定されており、足場板8の上面8aは柱1の最上端1bとほぼ同じ高さ位置にある。
【0020】
この構成により、仮屋根梁や仮屋根合板が不要になるとともに、建物ユニットの上面全体がフラットになり、据付け時にシート掛けが行われても、雨水が溜まるような窪みは生じない。また、上記した従来の建物ユニットにおける仮屋根梁及び仮屋根合板は仮固定であるため、据付け作業時に仮屋根合板が、ずれたり、段差が生じる虞れがあったが、本実施形態の足場板8は天井パネル組立体5として端野縁6にしっかりと固定されているので、足場板8が、ずれたり、段差が生じることがなく、据付け作業の安全性が向上する。
【0021】
次に、図3〜図6を参照して天井パネル組立体5の柱頭固定構造について説明する。
柱1の上端近傍には柱側固定金具10が、天井パネル組立体5の角部近傍には天井パネル側固定金具20が各々固定されている。
柱側固定金具10は、取付け片部11と筒状突部14等からなり、該筒状突部14は、前記取付け片部11の上部に備えられている。該取付け片部11は、ブラインドボルト12によって中空円筒状の柱1の外側面にねじ止めされ、また、筒状突部14は、半割り形状のねじ受入孔13を有するとともに、面取りにより尖った形状の上端部14aを有している(図4,5参照)。
【0022】
天井パネル側固定金具20は、取付け片部21と貫通孔22とからなり、該取付け片部21がねじ(図示省略)によって天井パネル組立体5の角部近傍にねじ止めされる。また、貫通孔22は、前記筒状突部14を受け入れる孔であり、該筒状突部14の外径は、初期状態では貫通孔22の内径より小さくなっている(図4,5参照)。
【0023】
天井パネル組立体5の柱頭固定作業は、図4〜図6に示すように、まず、天井パネル組立体5に固定されている天井パネル側固定金具20を柱側固定金具10の上方より近付け、貫通孔22に筒状突部14を差し込んで貫通孔22と筒状突部14とを嵌合させる。なお、この嵌合作業は筒状突部14の上端部14aが尖った形状になっているから、容易に行われる。
【0024】
また、この嵌合作業が、より容易に行われるべく、図7に示されている筒状突部14のねじ受入孔13に案内部材としてピアノ線30を差し込み、その後、貫通孔22にピアノ線30を通して案内させて、筒状突部14と貫通孔22との嵌合を行うこともできる。
【0025】
そして、貫通孔22と筒状突部14との嵌合により、柱頭に対する天井パネル組立体5の仮止めが行われる。
仮止め完了後には、タッピンねじ31が貫通孔22から、該貫通孔22に嵌合している筒状突部14のねじ受入孔13に挿入・ねじ込まれ、柱頭に対する天井パネル5の本固定を行う。
【0026】
このように、ねじ受入孔13にタッピンねじ31がねじ込まれることにより、筒状突部14が拡開し、ねじ受入孔13と筒状突部14との間のクリアランスが無くなってかしめられ、同時にねじ受入孔13と筒状突部14との心出しを行うことができる(図5(b)参照)。
次に、天井パネル組立体5等による天井吊り構造について図8〜図10を参照して説明する。
【0027】
図8に示すように、該天井吊り構造は、天井パネル組立体5と、天井吊り金具40等からなり、該天井吊り金具40が、上階の建物ユニットの床梁2の略中間部の下端に取り付けられている。該天井吊り金具40は、溝形鋼状をなし、天井パネル組立体5の端野縁6の片部6aを受け入れるスリット溝42が水平方向に形成され、該スリット溝42の溝幅は、端野縁6の片部6aの板厚より少し大きく設定されている(図9参照)。
また、天井吊り金具40には高さ調整ねじ43がねじ止めされており、該高さ調整ねじ43は先端にて床梁2に当接し、高さ調整ねじ43のねじ込み量により床梁2に対する取付け高さを調整可能に設定される。
【0028】
前記天井吊り金具40による天井パネル組立体5の支持は、図10(a)に示されているように、端野縁6の片部6aに天井吊り金具40のスリット溝42を差し込み、この後に、ボルト41によって天井吊り金具40を上階の建物ユニットの床梁2に固定して行われる。そして、前記高さ調整ねじ43のねじ込みにより、天井吊り金具40が上階の建物ユニットの床梁2側に持ち上がり、この持ち上がりによって、図10(b)に示されているように、端野縁6の片部6aが撓むとともに、天井吊り金具40と端野縁6の片部6aとがしっかりと噛み合って固定される。これにより、振動しても、金属同士の衝突による衝突音が発生しないようになる。
【0029】
そして、前記高さ調整ねじ43のねじ込み量により、天井吊り金具40の床梁2に対する取付け高さが調整されるので、この高さが調整により、天井吊り金具40と接続されている天井パネル組立体5の高さ位置の微調整ができ、隣接する建物ユニット同士の天井パネル7の段差を無くし、隣接する建物ユニットに亙って天井面を面一にすることができる。
【0030】
上述のような構成によるユニット建物では、図11(a)に示されているように、工場出荷段階では、内壁仕切50を有しない桁面側に仮支柱51を設置し、図11(b)に示されているように、作業員の荷重を支えられるようにする。そして、上述のように、上階の床梁2に前記天井吊り金具40を使用して、天井パネル組立体5の吊り固定が完了した後、下階の建物ユニットの仮支柱51を取り外している。
【0031】
【発明の効果】
以上の説明から理解される如く、この発明による請求項1に記載の発明による建物ユニットによれば、四隅に配置された柱と、隣接する柱の下部間に掛け渡されて両端を各々柱に剛接合された床梁と、天井パネル組立体とを有する建物ユニットにおいて、前柱と天井パネル組立体とに該両者を固定接続するための柱側固定金具と天井パネル側固定金具とが固定され、柱側固定金具と天井パネル側固定金具の一方にはねじ受入孔付きの筒状突部が形成され、他方には筒状突部を受け入れる貫通孔が形成され、貫通孔より挿入したねじが当該貫通孔に嵌合している前記筒状突部のねじ受入孔にねじ込まれることにより天井パネル組立体と柱との接合が行われる構成としたので、柱側固定金具あるいは天井パネル側固定金具の一方に設けられている筒状突部が他方の固定金具の貫通孔に挿入されることで、柱頭に対する天井パネル組立体の仮止めが行われ、貫通孔より挿入したねじが当該貫通孔に嵌合している前記筒状突部のねじ受入孔にねじ込まれることにより、柱頭に対する天井パネル組立体の本固定が行われ、柱頭に対する天井パネル組立体の固定を作業性よく行うことができる。
【0034】
請求項2に記載の発明による建物ユニットによれば、筒状突部は半割り形状とされ、初期状態では当該筒状突部の外径が前記貫通孔の内径より小さく、ねじ受入孔に、ねじがねじ込まれることにより筒状突部が拡開される構成としたので、ねじ受入孔と筒状突部との間のクリアランスが無くなってかしめられ、同時にねじ受入孔と筒状突部との心出しが的確に行われる。
【0035】
請求項3に記載の発明による建物ユニットによれば、筒状突部のねじ受入孔に、筒状突部と貫通孔との嵌合の案内を行う案内部材が取り外し可能に装着される構成としたので、筒状突部のねじ受入孔に案内部材が装着されることで、案内部材に案内されながら、筒状突部と貫通孔との嵌合を容易に行うことができ、柱頭に対する天井パネル組立体の固定作業の作業性のより一層の向上を図ることができる。
【0036】
請求項4に記載の発明によるユニット建物によれば、四隅に配置された柱と、隣接する柱の下部間に掛け渡されて両端を各々柱に剛接合された床梁と、天井パネル組立体とを有する建物ユニットが、上下左右に連結して構成されるユニット建物において、天井パネル組立体は、横転溝形鋼製の端野縁が方形に形成された天井パネルと前記端野縁の下面に取り付けられた天井パネルとを有し、連結された前記上階の建物ユニットの床梁には、取付け高さ位置調整可能に天井吊り金具が取り付けられ、天井吊り金具は横転溝形鋼製の端野縁の片部を受け入れる水平方向のスリット溝が形成されている構成としたので、天井吊り金具のスリット溝に横転溝形鋼製の端野縁の片部が差し込まれることによって天井吊り金具を介して天井パネル組立体が上階の床梁より吊り下げ式に支持され、天井吊り金具の床梁に対する取付け高さ位置の調整により、天井パネルの高さ調整が行われ、隣接する建物ユニット同士の天井パネルの段差を無くして隣接する建物ユニットに亙って天井面を面一にすることができる。
【0037】
請求項5に記載の発明によるユニット建物は、天井吊り金具は、連結された前記上階の建物ユニットの床梁に取り付けられ、当該天井吊り金具にねじ止めされた高さ調整ねじが床梁に当接し、当該高さ調整ねじにより床梁に対する取付け高さを調整可能に設定される構成としたので、高さ調整ねじにより天井吊り金具の床梁に対する取付け高さが調整され、この取付け高さ調整が作業性を良好に、かつ容易に行われるようになる。
【図面の簡単な説明】
【図1】この発明による建物ユニットの一実施形態の骨組構造を示す斜視図である。
【図2】図1の建物ユニットの骨組構造を示す立面図である。
【図3】図1の建物ユニットにおける天井パネル組立体の柱頭固定部を示す要部の立面図である。
【図4】(a)、(b)は図1の建物ユニットにおける天井パネル組立体の柱頭固定部を示す立面図である。
【図5】(a)、(b)は図1の建物ユニットにおける天井パネル組立体の柱頭固定部を示す平面図である。
【図6】図1の建物ユニットにおける天井パネル組立体の柱頭固定部を示す斜視図である。
【図7】図1の建物ユニットにおける天井パネル組立体の柱頭固定部の他の実施例を示す斜視図である。
【図8】(a)、(b)は図1の建物ユニットにおける天井パネル組立体の吊り構造部を示す立面図である。
【図9】図1の建物ユニットにおける天井パネル組立体の吊り構造部を示す斜視図である。
【図10】(a)、(b)は図1の建物ユニットにおける天井パネル組立体の吊り構造部の要部を示す立面図である。
【図11】(a)、(b)は図1の建物ユニットの施工手順を示す斜視図である。
【符号の説明】
1 柱
2 床梁
3 根太
4 床パネル
5 天井パネル組立体
6 端野縁(天井フレーム)
7 天井パネル
8 足場板
10 柱側固定金具
13 ねじ受入孔
14 筒状突部
20 天井パネル側固定金具
22 貫通孔
30 ピアノ線
31 タッピンねじ
40 天井吊り金具
41 ボルト
42 スリット溝
51 仮支柱[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a building unit, and more particularly to a building unit having a frame structure used as a unit building.
[0002]
[Prior art]
As a building unit for a unit building produced at the factory, a framework structure is made up of pillars arranged at the four corners and floor beams spanned between the lower parts of adjacent pillars and both ends rigidly joined to each pillar, Building units with a ceiling panel on top are known.
[0003]
In the conventional building unit, the position of the upper surface of the ceiling panel is lower than the upper surface of the pillar, and when the protective sheet is hung directly on the building unit at the time of shipment, a recess is formed, and rainwater accumulates in the recess. Therefore, a temporary roof beam (field edge) is handed over the ceiling panel of the building unit, a temporary roof plywood is installed on the ceiling panel, and the product is shipped with a protective sheet hung so that rainwater does not collect on the protective sheet. ing.
[0004]
In addition, the conventional building unit has a type in which the four corners of the ceiling panel are fixed to the upper part (pillar) of the column. The ceiling of the ceiling panel is fixed with a hole attached to each of the ceiling panel and the column head. This is done by aligning the holes of the mounting bracket and driving rivets (see Japanese Patent Laid-Open No. 10-2018).
Furthermore, the conventional building unit does not have a structure capable of adjusting the ceiling height, and a gypsum board is directly attached to the unit connecting portion without adjusting the height of the ceiling surface.
[0005]
[Problems to be solved by the invention]
By the way, in the conventional building unit, the temporary roof beam is passed on the ceiling panel and the temporary roof plywood is installed on the ceiling panel so that rainwater does not collect on the protective sheet at the time of shipment as described above. On the other hand, since the temporary roof beams and the temporary roof plywood have already been removed as collected items at the time of installation, in the state where only the protective sheet is hung, such as when the construction is suspended, the protective sheet is depressed and rainwater is accumulated. For this reason, at the time of work after rainy weather, there is an inconvenience that rainwater collected in the depression of the protective sheet must be drained using a hose or the like.
[0006]
Moreover, because the stigma fixing of the ceiling panel in the conventional building unit is performed by driving the rivets together with the holes of the mounting bracket with holes attached to each of the ceiling panel and the stigma as described above, There is a problem that the work of aligning the holes of the mounting bracket is difficult, and the support of the ceiling panel is not stable until the rivet is driven, and the workability is poor.
[0007]
Furthermore, in the conventional building unit, it is not a structure that can adjust the ceiling height, and the gypsum board is pasted as it is to the unit connecting part, so there is a possibility that a step will occur on the ceiling surface, In addition, since the steel-made ceiling beam and the floor beam on the upper floor are in contact with each other, there is an inconvenience that a metal contact sound such as rattling occurs when walking on the upper floor.
[0008]
The present invention was made to solve the above-described problems, does not require a temporary roof beam or temporary roof plywood, does not collect rainwater in the recess of the protective sheet during installation, and fixes the top of the ceiling panel It is an object of the present invention to provide a building unit that is excellent in workability and can finely adjust the ceiling height with good workability, and a unit building that connects the building units.
[0009]
[Means for Solving the Problems]
In order to achieve the above-mentioned object, a building unit according to the invention described in
[0012]
According to this configuration, the cylindrical protrusion provided on one of the column-side fixing bracket or the ceiling panel-side fixing bracket is inserted into the through hole of the other fixing bracket, so that the ceiling panel assembly is temporarily mounted on the column head. After that, the screw inserted through the through hole is screwed into the screw receiving hole of the cylindrical protrusion fitted in the through hole, so that the ceiling panel assembly is permanently fixed to the capital. .
[0013]
In the building unit according to a second aspect of the present invention, the cylindrical projection is halved, and in an initial state, the outer diameter of the cylindrical projection is smaller than the inner diameter of the through hole, and the screw receiving hole is screwed. When the screw is screwed, the cylindrical protrusion is expanded. According to this configuration, when the screw is screwed into the screw receiving hole, the cylindrical protrusion is expanded, and there is no clearance between the screw receiving hole and the cylindrical protrusion, and at the same time, the screw receiving hole and the cylindrical protrusion are And can be centered.
[0014]
In the building unit according to the third aspect of the present invention, a guide member for guiding the fitting between the cylindrical protrusion and the through hole is detachably attached to the screw receiving hole of the cylindrical protrusion. It is. According to this configuration, the guide member is attached to the screw receiving hole of the cylindrical protrusion, so that the cylindrical protrusion and the through hole can be easily fitted while being guided by the guide member.
[0015]
A unit building according to a fourth aspect of the present invention includes a column disposed at four corners, a floor beam spanned between lower portions of adjacent columns and rigidly joined to each column at both ends, and the ceiling panel assembly. In the unit building in which the building unit is connected to each other in the vertical and horizontal directions, the ceiling panel assembly has a ceiling frame in which the edge field edges made of rollover groove steel are formed in a square shape and a lower surface of the edge field edges. A ceiling hanger is attached to the floor beam of the connected upper floor building unit so that the height position can be adjusted. A horizontal slit groove for receiving a piece of the edge is formed.
[0016]
According to this structure, the ceiling panel assembly can be suspended from the floor beam of the upper floor via the ceiling hanging bracket by inserting a part of the end groove edge made of rollover grooved steel into the slit groove of the ceiling hanging bracket. Since it is supported, the height of the ceiling panel can be adjusted by adjusting the mounting height position of the ceiling hanging bracket with respect to the floor beam.
[0017]
In the unit building according to the invention described in
[0018]
DETAILED DESCRIPTION OF THE INVENTION
Embodiments of the present invention will be described below in detail with reference to the accompanying drawings.
1 and 2 show a frame structure of a building unit according to the present invention. The building unit is composed of four steel-made
[0019]
FIG. 3 shows the main part of the stigma fixing portion of the
[0020]
With this configuration, a temporary roof beam and a temporary roof plywood are not required, and the entire upper surface of the building unit is flat, and even if seating is performed during installation, a depression that accumulates rainwater does not occur. In addition, since the temporary roof beams and temporary roof plywood in the conventional building unit described above are temporarily fixed, the temporary roof plywood may be displaced or have a step during installation work. Since 8 is firmly fixed to the
[0021]
Next, the stigma fixing structure of the
A column
The column-
[0022]
The ceiling panel
[0023]
As shown in FIG. 4 to FIG. 6, first, the ceiling panel
[0024]
Further, in order to perform this fitting work more easily, a
[0025]
Then, the
After the temporary fixing is completed, the tapping
[0026]
Thus, when the tapping
Next, a ceiling suspension structure using the
[0027]
As shown in FIG. 8, the ceiling suspension structure includes a
Further, a
[0028]
As shown in FIG. 10 (a), the
[0029]
The height of the
[0030]
In the unit building having the above-described configuration, as shown in FIG. 11A, at the factory shipment stage, the
[0031]
【The invention's effect】
As can be understood from the above description, according to the building unit according to the first aspect of the present invention, the pillars arranged at the four corners and the lower part of the adjacent pillars are spanned, and both ends are respectively pillars. In a building unit having a rigidly-bonded floor beam and a ceiling panel assembly, a column-side fixing bracket and a ceiling panel-side fixing bracket for fixing and connecting the two to the front column and the ceiling panel assembly are fixed. One of the column side fixing bracket and the ceiling panel side fixing bracket is formed with a cylindrical protrusion with a screw receiving hole, and the other is formed with a through hole for receiving the cylindrical protrusion, and the screw inserted from the through hole is Since the ceiling panel assembly and the column are joined by being screwed into the screw receiving hole of the cylindrical protrusion fitted in the through hole, the column side fixing bracket or the ceiling panel side fixing bracket Is provided on one side The cylindrical protrusion is inserted into the through hole of the other fixing bracket, whereby the ceiling panel assembly is temporarily fixed to the stigma, and the screw inserted from the through hole is fitted into the through hole. By screwing into the screw receiving holes of the protrusions, the ceiling panel assembly is permanently fixed to the stigma, and the ceiling panel assembly can be fixed to the stigma with good workability .
[0034]
According to the building unit of the invention described in
[0035]
According to the building unit of the invention described in
[0036]
According to the unit building of the invention described in
[0037]
In the unit building according to the invention described in
[Brief description of the drawings]
FIG. 1 is a perspective view showing a framework structure of an embodiment of a building unit according to the present invention.
FIG. 2 is an elevational view showing a framework structure of the building unit of FIG. 1;
FIG. 3 is an elevation view of a principal part showing a stigma fixing part of a ceiling panel assembly in the building unit of FIG. 1;
FIGS. 4A and 4B are elevational views showing the stigma fixing portion of the ceiling panel assembly in the building unit of FIG.
5A and 5B are plan views showing a stigma fixing portion of a ceiling panel assembly in the building unit of FIG.
6 is a perspective view showing a stigma fixing portion of a ceiling panel assembly in the building unit of FIG. 1. FIG.
7 is a perspective view showing another embodiment of the stigma fixing portion of the ceiling panel assembly in the building unit of FIG. 1. FIG.
8A and 8B are elevational views showing a suspension structure portion of a ceiling panel assembly in the building unit of FIG.
9 is a perspective view showing a suspension structure portion of a ceiling panel assembly in the building unit of FIG. 1. FIG.
FIGS. 10A and 10B are elevational views showing a main part of a suspension structure portion of a ceiling panel assembly in the building unit of FIG. 1;
11A and 11B are perspective views showing a construction procedure of the building unit of FIG.
[Explanation of symbols]
1
7
Claims (5)
前記柱と前記天井パネル組立体とは、該両者を固定接続するための柱側固定金具と天井パネル側固定金具により固定され、前記柱側固定金具又は前記天井パネル側固定金具の一方にはねじ受入孔付きの筒状突部が形成され、他方には前記筒状突部を受け入れる貫通孔が形成され、該貫通孔に挿入したねじが、該貫通孔に嵌合する前記筒状突部のねじ受入孔に挿入されて前記天井パネル組立体と前記柱との接合を行うことを特徴とする建物ユニット。In a building unit having pillars arranged at four corners, floor beams spanned between lower parts of adjacent pillars and rigidly joined to the pillars at both ends, and a ceiling panel assembly at the upper part of the pillars,
The column and the ceiling panel assembly are fixed by a column side fixing bracket and a ceiling panel side fixing bracket for fixing and connecting the pillar and the ceiling panel assembly, and one of the column side fixing bracket and the ceiling panel side fixing bracket is screwed. A cylindrical projection with a receiving hole is formed, and on the other side, a through-hole for receiving the cylindrical projection is formed, and a screw inserted into the through-hole is inserted into the through-hole. A building unit which is inserted into a screw receiving hole and joins the ceiling panel assembly and the pillar.
前記天井パネル組立体は、横転溝形鋼製の端野縁が方形に形成された天井フレームと、前記端野縁の下面に取り付けられた天井パネルとを有し、連結された前記上階の建物ユニットの前記床梁には、取付け高さ位置調整可能に天井吊り金具が取り付けられ、該天井吊り金具には、前記横転溝形鋼製の端野縁の片部を受け入れる水平方向のスリット溝が形成されていることを特徴とするユニット建物。A building unit comprising columns arranged at four corners, floor beams spanned between lower portions of adjacent columns and rigidly joined to the columns at both ends, and a ceiling panel assembly at the upper portion of the columns, In unit buildings that are connected vertically and horizontally,
The ceiling panel assembly has a ceiling frame in which the end edge of the roll grooved steel is formed in a square shape, and a ceiling panel attached to the lower surface of the end edge, and is connected to the upper floor building unit. A ceiling hanging bracket is attached to the floor beam so that the height of the mounting can be adjusted, and a horizontal slit groove is formed on the ceiling hanging bracket for receiving a part of the end edge of the rollover grooved steel. A unit building characterized by
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP10439599A JP4087985B2 (en) | 1999-04-12 | 1999-04-12 | Building unit and unit building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP10439599A JP4087985B2 (en) | 1999-04-12 | 1999-04-12 | Building unit and unit building |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2000291153A JP2000291153A (en) | 2000-10-17 |
| JP4087985B2 true JP4087985B2 (en) | 2008-05-21 |
Family
ID=14379557
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP10439599A Expired - Lifetime JP4087985B2 (en) | 1999-04-12 | 1999-04-12 | Building unit and unit building |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4087985B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0662185U (en) * | 1993-02-08 | 1994-09-02 | ナショナル住宅産業株式会社 | Shoji equipment |
-
1999
- 1999-04-12 JP JP10439599A patent/JP4087985B2/en not_active Expired - Lifetime
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0662185U (en) * | 1993-02-08 | 1994-09-02 | ナショナル住宅産業株式会社 | Shoji equipment |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2000291153A (en) | 2000-10-17 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CA2355529A1 (en) | Fastening member and siding boards attachment structure | |
| JP3431790B2 (en) | Outdoor unit fixture for separation type air conditioner | |
| JP4087985B2 (en) | Building unit and unit building | |
| JP4653280B2 (en) | Building unit | |
| JPH1046668A (en) | Unit substance mounting construction of unit building | |
| JP2695755B2 (en) | Construction method of ceiling panel | |
| JP3649806B2 (en) | Steel ceiling frame connecting bracket | |
| CN114908880B (en) | Quick-assembly partition and partition door thereof | |
| JPH0413309Y2 (en) | ||
| JPH0633059Y2 (en) | Structure of the reinforcing frame of the outer wall opening | |
| KR200339870Y1 (en) | support to uphold a slab mold | |
| JP3505632B2 (en) | Closet suspension structure | |
| JP2686059B2 (en) | Building with built-in elevator | |
| JPH11343662A (en) | Exterior wall panel mounting device for balconies | |
| JPH1018410A (en) | Veranda handrail wall structure and wall panel mounting bracket | |
| JPH078697Y2 (en) | Eaves girder makeup mounting structure | |
| JP6705665B2 (en) | Pressing material | |
| JPH0224849Y2 (en) | ||
| JPH11343690A (en) | Exterior wall support device | |
| JPH1181650A (en) | Scaffold support | |
| JP4166740B2 (en) | Balcony joisting mounting structure | |
| JP3013456U (en) | Building equipment for scaffolding for construction | |
| JPH0543127Y2 (en) | ||
| JP2001132336A (en) | Installation structure for vertical and lateral frames | |
| JPH07100953B2 (en) | Building unit |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060119 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20071107 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20071114 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20071212 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080130 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080222 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110228 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110228 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120229 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130228 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140228 Year of fee payment: 6 |
|
| EXPY | Cancellation because of completion of term |