JP4092801B2 - Pile head management device for joint pile type granular material pile - Google Patents
Pile head management device for joint pile type granular material pile Download PDFInfo
- Publication number
- JP4092801B2 JP4092801B2 JP36119498A JP36119498A JP4092801B2 JP 4092801 B2 JP4092801 B2 JP 4092801B2 JP 36119498 A JP36119498 A JP 36119498A JP 36119498 A JP36119498 A JP 36119498A JP 4092801 B2 JP4092801 B2 JP 4092801B2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- depth
- pile head
- casing
- head
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000008187 granular material Substances 0.000 title claims description 10
- 238000005259 measurement Methods 0.000 claims description 26
- 238000010276 construction Methods 0.000 claims description 10
- 230000007935 neutral effect Effects 0.000 claims description 10
- 238000000034 method Methods 0.000 claims description 3
- 239000000843 powder Substances 0.000 claims description 3
- 238000005520 cutting process Methods 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 7
- 230000000149 penetrating effect Effects 0.000 description 4
- 239000000463 material Substances 0.000 description 2
- 235000008733 Citrus aurantifolia Nutrition 0.000 description 1
- 235000011941 Tilia x europaea Nutrition 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000004571 lime Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000004826 seaming Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
- 230000002194 synthesizing effect Effects 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Description
【0001】
【発明の属する技術分野】
この発明はケーシングを2本継ぎ足して杭体を造成するいわゆる、継ぎ杭方式の施工法において、造成する杭体が石灰杭、砂杭、グラベル杭(砂利杭)等の長尺の粉粒体パイルで、それらの杭体の造成の際に生じる杭頭のバラツキを適正にするための杭頭を管理する継ぎ杭式粉粒体パイルの杭頭管理装置に関する。
【0002】
【従来の技術】
従来、粉粒体パイルにおける杭頭管理は、ケーシング1本に対し、杭頭計1台で行っている。長尺の粉粒体杭の造成において、ケーシング2本の継ぎを行う場合は、ケーシングの各々に杭頭計を配備し計2台で行わなければならない。
【0003】
【発明が解決しようとする課題】
しかし、上記従来の杭頭計は、継ぎ杭対応の機能がないため、杭頭計を2台装備しても、次の問題が生じ継ぎ杭施工の優位性が発揮できないという問題があった。
▲1▼ 杭頭を管理するための重錘を吊下げるワイヤは、ケーシング長より長いワイヤが必要であり、ケーシング内部にこのワイヤが存在するため、継ぎ切り作業に支障をきたすとともに、このワイヤを移動処理するために触れると、杭頭測定値が変化し杭頭を管理できない状態となる。
▲2▼ 深度杭頭制御記録盤の入力は、杭頭検出器と深度検出器の各1点のみであり杭頭と深度信号の継続的測定、すなわち、各測定値の合成管理ができない。
▲3▼ 継ぎ作業の都度、不使用となるオーガを上下すると深度測定値が変化してしまう。
▲4▼ 継ぎ作業の都度、不使用となる杭頭計の重錘ワイヤを巻き上げ回収すると杭頭測定値が変化してしまう。
▲5▼ 各杭頭計を計測開始する毎に、杭頭と深度の測定値が自動的にゼロリセットされ計測した以前の測定値を失う。
これらの課題を解決するためには、2台の杭頭計の信号を処理、合成し杭頭を管理状態にする制御装置を開発製作しなければならないという問題が生じる。
【0004】
【課題を解決するための手段】
本発明は1本の杭をケーシング2本の継ぎで造成する時に用いる継ぎ杭式粉粒体パイルの杭頭管理装置を、深度杭頭制御記録盤と深度杭頭操作盤及び継ぎ杭制御盤と継ぎ杭操作盤とからなる継ぎ杭式粉粒体パイルの杭頭管理装置に構成したことである。
【0005】
また、前記深度杭頭制御記録盤が、重錘ワイヤの巻上巻下制御機能と深度信号及び杭頭信号の信号変換機能と、杭頭値演算機能と深度信号及び杭頭信号の記録機能とを有する継ぎ杭式粉粒体パイルの杭頭管理装置としたことである。
【0006】
また、前記深度杭頭操作盤が、深度杭頭制御記録盤の深度信号と杭頭信号を表示する指示計と深度杭頭制御記録盤を遠隔制御する操作スイッチを有する継ぎ杭式粉粒体パイルの杭頭管理装置としたことである。
【0007】
さらに、前記継ぎ杭制御盤が、継ぎ切り時に深度検出器と杭頭検出器の選択を行うと同時に、深度計測値と杭頭計測値を保持する計測信号の選択制御機能を有する継ぎ杭式粉粒体パイルの杭頭管理装置としたことである。
【0008】
また、前記継ぎ杭操作盤が、継ぎ杭制御盤を遠隔制御する操作スイッチを有する継ぎ杭式粉粒体パイルの杭頭管理装置としたことである。
【0009】
【発明の実施の形態】
本発明は1本の杭をケーシング2本の継ぎで施工する際に用いる杭頭管理の継ぎ杭制御装置であって、杭頭計(深度と杭頭)をケーシングにそれぞれ1台、計2台を装備して計測する際に、この杭頭計ワイヤ長さがケーシング長より長くならないように、ケーシング長スパンでワイヤ長さを管理できるように、信号処理する制御盤と操作盤を有する構成とした。
また、操作盤はどこにでも取り付けできるマグネットを装着したもので構成する。
【0010】
以下本発明の実施の形態を図面を参照して説明する。
図1は、本発明の継ぎ杭式粉粒体パイルの杭頭管理装置の正面図で、図2は図1のAーA線断面図である。図1および図2において下杭造成用備品は、回転リーダ7に併設した下杭造成用ケーシング10の内部にワイヤにより上下動する重錘2cを配設し、該重錘2cの位置を感知する下杭用杭頭検出器2及び、下杭用深度検出器1をケーシング10の上方及び下方にそれぞれ配設し、また、ケーシング10を吊持する吊りシーブ8、及びケーシング10を貫入するオーガ9、上杭造成用ケーシング17と係合するピン継ぎ手10a、造成材の放出口を3枚シュー10bとした構成からなっている。
また、上杭造成用装備品は吊りシーブ13、オーガ14、サイドホッパ15、テーブルホッパ16、ケーシング17、ピン継ぎ手17a、ピン継ぎ手17bと上杭用深度検出器11と上杭用杭頭検出器12とをそれぞれ装備し、これらにより上杭と下杭の深度及び杭頭を計測可能とした。なお、18はバックステイである。
【0011】
図3は、本発明の杭頭計を構成する下杭用杭頭検出器2,上杭用杭頭検出器12、下杭用深度検出器1,上杭用深度検出器11の配置側面図を示している。
下杭用の重錘2cの上限、下限リミットスイッチの設定は、下杭用ケーシング10の上端及び下端とし、ワイヤ2bがケーシングの長さ以上に巻き出さないようにした。上杭用重錘12cの上限リミットスイッチの設定は、上杭用ケーシング17の上端とし下限リミットスイッチの設定は設計杭頭値を設定して、必要以上にワイヤ12bを巻き出さないようにした。
図中1a,11aはワイヤ、1b,11bは滑車であり、また1c,11cはスプリング、2a,12aはワイヤ支持部材である。
【0012】
図4は、本発明に用いる杭頭計の深度杭頭制御記録盤4の外形図で、重錘ワイヤスパン設定デジタルスイッチS3により、杭頭計を装備している図1に示すケーシング10、17の合計長さ(cm)を設定してワイヤ長さを管理できるようにした。なお、図4中S1は杭頭演算器であり、S2は杭頭深度記録計である。
【0013】
図5は、この発明に用いる杭頭計の深度杭頭操作盤5の正面図を示し、この深度杭頭操作盤5は、杭頭・深度指示計01、重錘上限ランプ02、重錘下限ランプ03、準備ランプ04、ケーシング速度計05、運転スイッチ06、スタートスイッチ07、杭頭スタートスイッチ08、重錘設定スイッチ09、上昇−下降スイッチ010などを有しているものである。
【0014】
図6は、この発明に用いる継ぎ杭制御盤3の外形図で、図6の(A)は該継ぎ杭制御盤の一側面で、該一側面に杭頭巻上機の出入力端子S09、杭頭計検出器出力端子S08、深度検出器出力端子S07及び継ぎ杭操作盤入力端子S010が設けられている。また、図6の(B)は前記継ぎ杭制御盤の他側面で該他側面には下杭用深度検出器入力端子S01、下杭用杭頭計検出器入力端子S02、下杭用杭頭計巻上機端子S03及び上杭用深度検出器入力端子S04、上杭用杭頭計検出器入力端子S05、上杭用杭頭計巻上機端子S06がそれぞれ設けられている。
図7の継ぎ杭操作盤6は巻上機選択スイッチ004と深度杭頭選択スイッチ005の選択操作(下杭または上杭)による制御信号を受けたとき、図3の下杭造成用の杭頭検出器2と深度検出器1または、上杭造成用の杭頭検出器12と深度検出器11の計測信号を選択して図4の深度杭頭制御記録盤4に出力する機能がある。
深度杭頭選択スイッチ005を中立に選択したときの制御信号を受けると、下杭用杭頭検出器2、上杭用杭頭検出器12、下杭用深度検出器1、上杭用深度検出器11の計4点の計測信号の選択がOFFとなり、直前の計測信号(深度と杭頭)を深度杭頭制御記録盤4に保持させる制御機能を有する。
また、深度杭頭選択スイッチ005を中立に選択して、巻上機選択スイッチ004を任意の杭側に選択すると、直前の計測信号(深度と杭頭)を深度杭頭制御記録盤4に保持させたまま、選択された下杭用杭頭検出器2、上杭用杭頭検出器12の重錘が、図5の深度杭頭操作盤5の上昇―下降スイッチ010を上昇にすると、巻き上げ回収できる機能を有する。
また、このときはオーガ2台も任意の位置に、上げ、下げ、回転、待避ができる制御機能とした。
【0015】
図7は、この発明の継ぎ杭操作盤6の外形図である。施工する杭別(上杭、下杭の別)を巻上機選択スイッチ004と深度杭頭選択スイッチ005で選択することにより、下杭用杭頭検出器2と下杭用深度検出器1、又は、上杭用杭頭検出器12と上杭用深度検出器11の計測信号を選択するための、制御信号を図6の継ぎ杭制御盤3の継ぎ杭制御盤入力端子S010に与え遠隔制御する機能を有する。
深度杭頭選択スイッチ005を中立に選択すると下杭用杭頭検出器2、上杭用杭頭検出器12、下杭用深度検出器1、上杭用深度検出器11の計4点の計測信号をOFFとする制御信号を出力する。また、巻上機選択スイッチ004のみを任意の杭側に選択すると、計測信号(深度と杭頭)に影響を与えずに、その選択した杭の重錘巻上機のみを単独運転可能とする制御信号を出力する機能とした。
なお、図中001は電源ランプ、002は上杭ランプ、003は下杭ランプ、006は制御用ケーブルコネクタ、007は電源コード、008は電源スイッチである。
【0016】
図8は、この発明の継ぎ杭管理装置の盤間接続図である。継ぎ杭制御盤3に入力した下杭用杭頭検出器2、上杭用杭頭検出器12及び下杭用深度検出器1、上杭深度検出器11からの計測信号5P(深度)、6P(杭頭)を、また、深度杭頭操作盤5からの指示信号8P及び操作信号20Pを深度杭頭]制御記録盤4へ入力し、一方継ぎ杭操作盤6より深度信号5Pを継ぎ杭制御盤3に送り杭頭を管理する。
なお、16pは巻上機の操作信号である。
【0017】
図9は、この発明の継ぎ杭管理装置の制御機能図の一例で、下杭用深度検出器2と上杭用深度検出器12の2台の深度検出器と下杭用杭頭検出器1と上杭用杭頭検出器11との2台の杭頭検出器を使用し、それらの検出器からの深度計測値及び杭頭計測値を継ぎ杭制御盤3,深度制御記録盤4、深度杭頭操作盤5及び継ぎ杭操作盤6により上杭、下杭の両杭頭管理を行うものである。
上杭及び下杭の両杭の杭頭の管理装置の操作方法の一例について以下説明をする。
(1)初期設定として、図4の重錘ワイヤスパン設定デジスイッチS3により図1の下杭ケーシング10,上杭ケーシング17の合計長さ(cm)を設定する。図5の重錘設定スイッチ09をONにする。図7の深度杭頭選択スイッチ005、巻上機選択スイッチ004を下杭ケーシング10に選択する。
(2)図1の3枚シュー10bを杭芯にセットの後、図5の運転スイッチ06をONにしてスタートスイッチ07を押す。(深度、杭頭をゼロリセットする。)
(3)下杭を継ぎ作業深度まで貫入後、図7の深度杭頭選択スイッチ005を中立に選択して深度計測値を保持する。その後継ぎ作業を行う。
(4)図7の深度杭頭選択スイッチ005と巻上機選択スイッチ004を上杭に選択する。
(5)上杭ケーシング17を所定深度まで貫入後、材料をテーブルホッパ16より投入してエアで加圧する。
(6)図5の重錘設定スイッチ09をOFFとして、杭頭スタートスイッチ08を押す。(重錘が杭頭レベルに着底し、以後同レベルに追従する。)
(7)上杭ケーシング17を継ぎ切り作業深度まで引き抜き、図7の深度杭頭選択スイッチ005を中立に選択して深度、杭頭計測値を保持する。その後、継ぎ切り作業を行う。
(8)図7の巻上機選択スイッチ004を下杭ケーシング10に選択する。
(9)図5の杭頭スタートスイッチ08を再び押す。(重錘が杭頭レベルに着底する。)
(10)図7の深度杭頭選択スイッチ005を下杭ケーシング10に選択する。(重錘が杭頭レベルに再び追従する。)
(11)図5の杭頭、深度指示計を見ながら所定杭頭値になるように下杭ケーシング10を引き抜く。
以上の操作で1本の継ぎ杭の杭頭管理が可能である。
【0018】
図10はこの発明の継ぎ杭管理装置の制御機能図の他の例で下杭用深度検出器1と上杭用深度検出器11の2台の深度検出器と1台の下杭用杭頭検出器2を配備しての杭頭管理をおこなうものである。
以下操作方法の説明をする。
(1)初期設定として、図4の重錘ワイヤスパン設定デジタルスイッチS3により図1の下杭ケーシング10の長さ(cm)を設定する。図5の重錘設定スイッチ09をONにする。図7の深度杭頭選択スイッチ005と、巻上機選択スイッチ004を下杭用ケーシング10に選択する。
(2)図1の3枚シュー10bを杭芯にセットの後、図5の深度杭頭操作盤の運転スイッチ07を押す。(深度、杭頭をゼロリセットする。)
(3)下杭を継ぎ作業深度まで貫入後、図7の深度杭頭選択スイッチ005を中立に選択して深度計測値を保持する。その後、継ぎ作業を行う。
(4)図7の深度杭頭選択スイッチ005と巻上機選択スイッチ004を上杭に選択する。
(5)上杭を所定深度まで貫入後、テーブルホツパ16より材料を投入してエアで加圧する。
(6)上杭用ケーシング17を継ぎ切り作業深度まで引き抜き、図7の深度杭頭選択スイッチ005を中立に選択して深度計測値を保持する。その後継ぎ切り作業を行う。
(7)図7の深度杭頭選択スイッチ005と巻上機選択スイッチ004を下杭用ケーシング10に選択する。
(8)図5の重錘設定スイッチ09をOFFとして、杭頭スタートスイッチ08を押す。(重錘が杭頭レベルに定着し、以後同レベルに追従する。)
(9)図5の杭頭、深度指示計を見ながら所定杭頭値になるように下杭ケーシング10を引き抜く。
以上の操作で1本の継ぎ杭の杭頭管理が可能である。
【0019】
【発明の効果】
この発明は上記のとおりの構成としたので、継ぎ杭施工の杭頭信号(深度及び杭頭)の管理が容易にできる。また、杭頭計ワイヤがケーシング長さ以上にならない。さらに、長尺リーダのベースマシーンを必要とせず、軟弱地盤施工時のマシーンの安定性に優れ、また高さ制限のある現場の施工に対応可能となった。
【図面の簡単な説明】
【図1】この発明に用いる地盤改良機本体の正面図である。
【図2】図1に示す地盤改良機本体のA−A線断面図である。
【図3】この発明に用いる杭頭計の杭頭検出器及び深度検出器の配置側面図である。
【図4】この発明に用いる杭頭計の深度杭頭制御記録盤の外形図である。
【図5】この発明に用いる杭頭計の深度杭頭操作盤の正面図である。
【図6】この発明の継ぎ杭制御盤の外形図である。
【図7】この発明の継ぎ杭操作盤の外形図である。
【図8】この発明に用いる継ぎ杭管理装置の盤間接続図である。
【図9】この発明の継ぎ杭管理装置の制御機能図である。
【図10】この発明の継ぎ杭管理装置装置の制御機能図の他の例を示す図である。
【符号の説明】
1 下杭用深度検出器
2 下杭用杭頭検出器
3 継ぎ杭制御盤
4 深度杭頭制御記録盤
5 深度杭頭操作盤
6 継ぎ杭操作盤
11 上杭用深度検出器
12 上杭用杭頭検出器[0001]
BACKGROUND OF THE INVENTION
This invention is a so-called joint pile construction method in which two casings are added to form a pile body, and the pile body to be created is a long pile of lime, sand, gravel (gravel) piles, etc. Thus, the present invention relates to a pile head management device for a joint pile type granular material pile that manages a pile head for making the variation of the pile heads generated when the pile bodies are created properly.
[0002]
[Prior art]
Conventionally, pile head management in a granular pile has been carried out with a single pile head for one casing. In the creation of a long granular pile, when two casings are joined, a pile head meter must be provided for each casing, and the total must be done with two units.
[0003]
[Problems to be solved by the invention]
However, since the conventional pile head meter does not have a function for joint piles, even if two pile head meters are equipped, the following problem occurs and the advantage of joint pile construction cannot be exhibited.
(1) The wire that suspends the weight for managing the pile head needs to be longer than the casing length, and this wire is present inside the casing. When touched to move, the pile head measurement changes and the pile head cannot be managed.
(2) The input of the depth pile head control record board is only one point each of the pile head detector and the depth detector, and continuous measurement of the pile head and depth signals, that is, synthesis management of each measurement value cannot be performed.
(3) The depth measurement value changes if the auger that is not used is moved up and down each time a splicing operation is performed.
(4) The pile head measurement value will change if the weight wire of the pile head meter that is not used is wound up and collected each time a joint operation is performed.
(5) Each time the measurement of each pile head meter is started, the pile head and depth measurement values are automatically reset to zero and the previous measurement values are lost.
In order to solve these problems, there arises a problem that a control device for processing and synthesizing signals of the two pile head gauges to bring the pile head into a managed state has to be developed and manufactured.
[0004]
[Means for Solving the Problems]
The present invention relates to a pile head management device for a pile pile granule pile used when a single pile is constructed by joining two casings, a depth pile head control recording board, a depth pile head control panel, a joint pile control board, This is the construction of a pile head management device for a pile pile granular pile consisting of a pile pile operation panel.
[0005]
In addition, the depth pile head control recording board has a weight wire hoisting and lowering control function, a depth signal and a pile head signal conversion function, a pile head value calculation function, a depth signal and a pile head signal recording function. It is a pile head management device for the joint pile type granular material pile.
[0006]
Further, the depth pile head operation panel includes a depth pile head control recording board depth signal and an indicator for displaying the pile head signal and a joint pile type powder pile having an operation switch for remotely controlling the depth pile head control recording board. This is a pile head management device.
[0007]
Further, the joint pile control panel selects a depth detector and a pile head detector at the time of joint cutting, and at the same time has a selection control function of a measurement signal for holding a depth measurement value and a pile head measurement value. It is a pile head management device for granular piles.
[0008]
Further, the joint pile operation panel is a pile head management device for a joint pile type granular material pile having an operation switch for remotely controlling the joint pile control panel.
[0009]
DETAILED DESCRIPTION OF THE INVENTION
The present invention is a pile head management joint pile control device used when constructing one pile with two casing joints, one pile head meter (depth and pile head) each in the casing, two in total In order to control the wire length in the casing length span so that this pile head gauge wire length is not longer than the casing length when measuring with did.
The operation panel is composed of a magnet that can be installed anywhere.
[0010]
Embodiments of the present invention will be described below with reference to the drawings.
FIG. 1 is a front view of a pile head management device for a joint pile type granular material pile according to the present invention, and FIG. 2 is a cross-sectional view taken along line AA of FIG. In FIG. 1 and FIG. 2, the lower pile building fixture is provided with a
The upper pile building equipment includes a suspended
[0011]
FIG. 3 is an arrangement side view of a
The upper and lower limit switches of the
In the figure, 1a and 11a are wires, 1b and 11b are pulleys, 1c and 11c are springs, and 2a and 12a are wire support members.
[0012]
FIG. 4 is an outline drawing of the pile head
[0013]
FIG. 5 shows a front view of the depth pile
[0014]
FIG. 6 is an external view of the joint
When the control signal accepted by splicing
When the control signal when the depth pile
Moreover, when the depth pile
At this time, the two augers are also controlled so that they can be raised, lowered, rotated, and retracted to arbitrary positions.
[0015]
FIG. 7 is an external view of the joint
When the depth pile
In the figure, 001 is a power lamp, 002 is an upper pile lamp, 003 is a lower pile lamp, 006 is a control cable connector, 007 is a power cord, and 008 is a power switch.
[0016]
FIG. 8 is an inter-panel connection diagram of the joint pile management device of the present invention.
Note that 16p is an operation signal for the hoisting machine.
[0017]
FIG. 9 is an example of a control function diagram of the joint pile management device of the present invention. Two depth detectors, a lower
An example of the operation method of the pile head management device for both the upper pile and the lower pile will be described below.
(1) As an initial setting, the total length (cm) of the
(2) After setting the three
(3) After penetrating the lower pile to the joining work depth, the depth pile
(4) Select the depth pile
(5) After penetrating the upper pile casing 17 to a predetermined depth, the material is introduced from the
(6) The
(7) The
(8) Select the hoisting
(9) Press the pile
(10) Select the depth pile
(11) Pulling out the
Pile head management of one joint pile is possible by the above operation.
[0018]
FIG. 10 is another example of the control function diagram of the joint pile management device of the present invention. The
The operation method will be described below.
(1) As an initial setting, the length (cm) of the
(2) After setting the three
(3) After penetrating the lower pile to the joining work depth, the depth pile
(4) Select the depth pile
(5) After penetrating the upper pile to a predetermined depth, the material is introduced from the
(6) The
(7) The depth pile
(8) The
(9) Pulling out the
Pile head management of one joint pile is possible by the above operation.
[0019]
【The invention's effect】
Since this invention was set as the above-mentioned, management of the pile head signal (depth and pile head) of joint pile construction can be performed easily. In addition, the pile head gauge wire does not exceed the casing length. In addition, it does not require a long leader base machine, has excellent machine stability during soft ground construction, and can be used for construction on site with height restrictions.
[Brief description of the drawings]
FIG. 1 is a front view of a ground improvement machine main body used in the present invention.
2 is a cross-sectional view taken along line AA of the ground improvement machine main body shown in FIG. 1. FIG.
FIG. 3 is an arrangement side view of a pile head detector and a depth detector of a pile head meter used in the present invention.
FIG. 4 is an external view of a depth pile head control recording board of a pile head meter used in the present invention.
FIG. 5 is a front view of a depth pile head operation panel of a pile head meter used in the present invention.
FIG. 6 is an external view of a joint pile control panel according to the present invention.
FIG. 7 is an external view of a joint pile operating panel according to the present invention.
FIG. 8 is an inter-panel connection diagram of the joint pile management device used in the present invention.
FIG. 9 is a control function diagram of the joint pile management device of the present invention.
FIG. 10 is a diagram showing another example of the control function diagram of the joint pile management device of the present invention.
[Explanation of symbols]
1 Depth detector for
Claims (4)
前記下杭造成用及び上杭造成用ケーシングに設けられ、該ケーシング内の杭頭レベルを計測する重錘ワイヤを有する杭頭検出器と、前記下杭造成用ケーシングに設けられ、該ケーシングの先端の位置を計測する深度検出器と、を備えた杭頭計と、
前記深度検出器によりケーシング先端位置を計測した深度信号及び杭頭検出器によりケーシング内の杭頭レベルを計測した杭頭信号を入力し、前記信号を計測値に演算する杭頭演算器と、前記計測値を記録する杭頭深度記録計と、を備えた深度杭頭制御記録盤と、
前記深度杭頭制御記録盤から出力される前記計測値を表示する杭頭・深度指示計と、前記深度杭頭制御記録盤を遠隔制御する操作スイッチと、を有する深度杭頭操作盤と、
前記杭頭計に接続され、該杭頭計の深度信号及び杭頭信号が入力されるとともに、前記信号を前記深度杭頭制御記録盤に出力する継ぎ杭制御盤と、
前記継ぎ杭制御盤に接続され、前記下杭造成用ケーシング、前記上杭造成用ケーシング、又は、中立、の何れかを選択する深度杭頭選択スイッチと、前記重錘ワイヤを巻上巻下制御する巻上げ機選択スイッチと、を有する継ぎ杭操作盤であって、前記深度杭頭選択スイッチを前記中立に選択することにより、該選択直前の杭頭計の計測値を前記深度杭頭制御記録盤に保持させる継ぎ杭操作盤と、
を備えていることを特徴とする継ぎ杭式粉粒体パイルの杭頭管理装置。Pile head management unit for joint pile type powder pile that manages the pile head of the powder pile constructed by the joint pile method, which creates a single pile by joining the lower pile construction casing and the upper pile construction casing In
A pile head detector provided in the lower pile building casing and the upper pile building casing and having a weight wire for measuring a pile head level in the casing; and a lower end of the casing provided in the lower pile building casing A pile head meter equipped with a depth detector for measuring the position of
A pile head calculator that inputs a depth signal that measures the casing tip position by the depth detector and a pile head signal that measures a pile head level in the casing by the pile head detector, and calculates the signal to a measurement value; A depth pile head control recording board equipped with a pile head depth recorder for recording measured values ;
Depth pile head operation panel having a pile head / depth indicator for displaying the measurement value output from the depth pile head control recording board, and an operation switch for remotely controlling the depth pile head control recording board ,
A pile control panel connected to the pile head gauge, the depth signal of the pile head gauge and the pile head signal being input, and outputting the signal to the depth pile head control recording board ;
A depth pile head selection switch that is connected to the joint pile control panel and selects one of the casing for forming the lower pile, the casing for forming the upper pile, or neutral, and controls the hoisting and lowering of the weight wire A pile-pick operation panel having a hoisting machine selection switch, and by selecting the depth pile head selection switch to the neutral, the measured value of the pile head meter immediately before the selection is stored in the depth pile head control recording board. A splice control panel to be held,
A pile head management device for joint pile type granular material piles.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP36119498A JP4092801B2 (en) | 1998-12-18 | 1998-12-18 | Pile head management device for joint pile type granular material pile |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP36119498A JP4092801B2 (en) | 1998-12-18 | 1998-12-18 | Pile head management device for joint pile type granular material pile |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2000178968A JP2000178968A (en) | 2000-06-27 |
| JP4092801B2 true JP4092801B2 (en) | 2008-05-28 |
Family
ID=18472580
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP36119498A Expired - Fee Related JP4092801B2 (en) | 1998-12-18 | 1998-12-18 | Pile head management device for joint pile type granular material pile |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4092801B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104727358A (en) * | 2015-04-02 | 2015-06-24 | 北京天兴环宇科技有限公司 | 360-degree stereo imaging underground pile hole wall detection instrument |
-
1998
- 1998-12-18 JP JP36119498A patent/JP4092801B2/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104727358A (en) * | 2015-04-02 | 2015-06-24 | 北京天兴环宇科技有限公司 | 360-degree stereo imaging underground pile hole wall detection instrument |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2000178968A (en) | 2000-06-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP3044428B2 (en) | How to check lap placement of solidified pile | |
| CN111307130B (en) | Engineering survey pay-off | |
| JP4092801B2 (en) | Pile head management device for joint pile type granular material pile | |
| JPH06108456A (en) | Position measuring device for excavator for underground wall construction method | |
| JP2735733B2 (en) | Pile support layer detection device | |
| JP2869604B2 (en) | Top measuring device for cast concrete | |
| JP2735734B2 (en) | Pile support layer detection method | |
| JP2829539B2 (en) | Automatic drilling equipment for cast-in-place pile construction | |
| JPH0371558B2 (en) | ||
| KR102322221B1 (en) | engine combined use electric excavator | |
| CN114658414A (en) | Hole descending detection method of borehole television control system and borehole television monitoring equipment | |
| CN121519477B (en) | Robot for detecting the bottom support force of cast-in-place piles and its control method | |
| JPH03180720A (en) | Warning monitoring device for landslide or the like | |
| CN119551565B (en) | Crane rope position calibration method and system and crane | |
| US4865393A (en) | Method and apparatus for braking a derrick winch | |
| CN218121459U (en) | Water conservancy earthwork is backfilled with compaction degree sampling device | |
| CN222617881U (en) | Intelligent electric control type deep displacement monitoring device | |
| JP3059700B2 (en) | Ground density measuring device | |
| JP3761839B2 (en) | Ground improvement vehicle recording device | |
| JPS5933740B2 (en) | sand pile creation equipment | |
| JPH0224993B2 (en) | ||
| JPS61266724A (en) | Borer for pile driving | |
| JPS63524A (en) | Sensor for opening degree of bucket for excavator of bottom-expanded pit | |
| JPH102728A (en) | Sidewall measuring apparatus | |
| JPS6326239B2 (en) |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20050810 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20070510 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20070710 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20070910 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20080205 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20080225 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110314 Year of fee payment: 3 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130314 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140314 Year of fee payment: 6 |
|
| LAPS | Cancellation because of no payment of annual fees |