JPH0224993B2
JPH0224993B2 JP57117946A JP11794682A JPH0224993B2 JP H0224993 B2 JPH0224993 B2 JP H0224993B2 JP 57117946 A JP57117946 A JP 57117946A JP 11794682 A JP11794682 A JP 11794682A JP H0224993 B2 JPH0224993 B2 JP H0224993B2
Authority
JP
Japan
Prior art keywords
wire
auger
excavation
winch
control device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP57117946A
Other languages
Japanese (ja)
Other versions
JPS598896A (en
Inventor
Tsutomu Takaoka
Kojiro Ooiwa
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Sanwa Kizai Co Ltd
Original Assignee
Kubota Corp
Sanwa Kizai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp, Sanwa Kizai Co Ltd filed Critical Kubota Corp
Priority to JP11794682A priority Critical patent/JPS598896A/en
Publication of JPS598896A publication Critical patent/JPS598896A/en
Publication of JPH0224993B2 publication Critical patent/JPH0224993B2/ja
Granted legal-status Critical Current

Links

Landscapes

  • Earth Drilling (AREA)

Description

【発明の詳細な説明】 本発明は、アースオーガ機における掘作制御方
法に関するものである。
DETAILED DESCRIPTION OF THE INVENTION The present invention relates to an excavation control method in an earth auger machine.

アースオーガ機は、1例として第1図に示すよ
うに、先端に刃口1aを有するケーシングからな
る外側オーガ1とこの外側オーガ1内に貫挿され
たオーガスクリユーからなる内側オーガ2とから
構成され、外側オーガ1の根元端に連結した外側
オーガ用駆動部3上に一端を固着したシリンダ
4,4′で内側オーガ用駆動部5が該外側オーガ
用駆動部3に対して上下動自在に支承されてい
る。なお、上記駆動部3,5には図示しないが駆
動用モータが配設されている。
As shown in FIG. 1 as an example, the earth auger machine includes an outer auger 1 consisting of a casing having a cutting edge 1a at its tip, and an inner auger 2 consisting of an auger screw inserted into the outer auger 1. The inner auger drive part 5 is movable up and down with respect to the outer auger drive part 3 by means of cylinders 4 and 4' having one end fixed on the outer auger drive part 3 connected to the root end of the outer auger 1. is supported by. Incidentally, although not shown in the drawings, a driving motor is provided in the driving sections 3 and 5.

これら両オーガ1,2及び駆動部3,5は、リ
ーダマストなどの支持体6に一端を固着し、他端
を昇降ウインチ7で巻取り可能としたワイヤー8
によりシープ9を介して昇降自在に吊下されてい
る。
These augers 1, 2 and drive parts 3, 5 are connected to a wire 8 whose one end is fixed to a support 6 such as a leader mast, and whose other end can be wound up by an elevating winch 7.
It is suspended via a sheep 9 so that it can be raised and lowered freely.

なお、掘削時には両オーガ1,2は自重で地中
へ挿入されて行くが、転石層あるいは岩盤層など
に突き当り自重のみでは掘削力が不足する場合に
強制的に引込み力を加えるため、サードウインチ
10からの引込みワイヤー11をガイドシーブ1
2を介して外側オーガ用駆動部3の下面に連結し
てある。
During excavation, both augers 1 and 2 are inserted into the ground by their own weight, but if they hit a boulder layer or bedrock layer and the digging force is insufficient with their own weight alone, a third winch is used to forcibly apply retraction force. Guide wire 11 from 10 to guide sheave 1
2 to the lower surface of the outer auger drive section 3.

図中、13,13′は上記ワイヤー8のガイド
シーブ、2aはオーガ2の先端刃口、14は掘削
深度及び掘削速度を検出するためのワイヤーで、
上下の固定滑車15,15′に掛け回した無端体
からなり、その一部を例えば外側オーガ用駆動部
3の背面等に固定してオーガ1,2とともに移動
する。
In the figure, 13 and 13' are the guide sheaves of the wire 8, 2a is the cutting edge of the auger 2, and 14 is a wire for detecting the excavation depth and excavation speed.
It consists of an endless body that is hung around upper and lower fixed pulleys 15, 15', and a part of it is fixed, for example, to the back of the outer auger drive unit 3, and moves together with the augers 1, 2.

このように構成された二重オーガ掘削機は、外
側オーガ1と内側オーガ2の両方を同時に回転さ
せて掘削を行ない、掘削土砂は内側オーガ2のス
クリユー部で上方に搬送されて機外に排出され
る。
The double auger excavator configured in this way excavates by rotating both the outer auger 1 and the inner auger 2 at the same time, and the excavated soil is transported upward by the screw part of the inner auger 2 and discharged outside the machine. be done.

また、セツトしたオーガ1,2をすべて地中に
挿入したときは、これと駆動部3,5との連結を
解き、昇降ウインチ7でワイヤー8を巻き取るこ
とにより駆動部3,5のみを上昇させ、しかる後
新たなオーガ1′,2′を継ぎ足し更に掘削する。
Moreover, when all the set augers 1 and 2 are inserted into the ground, the connection between them and the drive parts 3 and 5 is released, and only the drive parts 3 and 5 are raised by winding up the wire 8 with the lifting winch 7. Then, new augers 1' and 2' are added and further excavation is carried out.

所望深さまで掘削した後は、オーガ1はこのま
まこれを鋼管杭として使用することもできる。
After excavating to a desired depth, the auger 1 can be used as a steel pipe pile.

従来、かかるアースオーガ機を使用するのに各
部の制御は、単純な計器を目測しながら手操作に
より行なわれており頗る煩雑となるものであつ
た。
Conventionally, when using such an earth auger machine, each part was controlled manually using a simple instrument, which was extremely complicated.

さらに、吊り下げワイヤーと引込みワイヤーの
作動は圧入機の掘削状態に見合つたものが要求さ
れる。
Furthermore, the operation of the suspension wire and lead-in wire is required to match the excavation conditions of the press-in machine.

本発明の目的はこれらの制御をすべて自動化し
て作業性を高めるようにし、中でも特に引込みワ
イヤーの動作を掘削機の掘削状態に応じて自動的
に制御して掘削効率を最善に保つことができるよ
うにしたアースオーガ機の掘削制御方法を提供す
ることにある。
The purpose of the present invention is to automate all of these controls to improve work efficiency, and in particular, to maintain optimal excavation efficiency by automatically controlling the operation of the lead-in wire according to the excavation state of the excavator. An object of the present invention is to provide an excavation control method for an earth auger machine.

以下、図面について本発明の実施例を詳細に説
明する。
Embodiments of the present invention will be described in detail below with reference to the drawings.

第1図中、16は昇降ウインチ7の駆動モー
タ、17はサードウインチ10の駆動モータ、1
8,19はそれぞれ上記駆動モータ16,17の
モータ制御回路であり、20はシリンダ4,4′
を伸縮作動させるための制御機構である。
In FIG. 1, 16 is the drive motor of the lifting winch 7, 17 is the drive motor of the third winch 10, 1
Reference numerals 8 and 19 are motor control circuits for the drive motors 16 and 17, respectively, and 20 is a motor control circuit for the cylinders 4 and 4'.
This is a control mechanism for operating the telescopic system.

また、21はワイヤー8に設けた荷重計で、両
オーガ1,2の先端刃口1a,2aに加わる負荷
を計測する。22は上記シリンダ4又は4′に設
けられ、シリンダ4,4′の伸縮長さによつて外
側オーガ1と内側オーガ2との距離、正確には刃
口1aと2aとのオーガ軸方向の距離を計測する
距離計である。23は外側オーガ用駆動部3の駆
動モータへの給電回路に配設され、該モータの消
費電流を測定する電流計、24は内側オーガ用駆
動部5の駆動モータへの給電回路に配設され、該
モータの消費電流を測定する電流計である。25
は引込みワイヤー11中に設けられ、サードウイ
ンチ10の引込み力を測定する引込力計、26,
27はワイヤー14又は固定滑車15若しくは1
5′に設けられた掘削深度計及び速度計である。
これら速度計27及び深度計26は、例えば固定
滑車15′にこれと連動するカムスイツチを設け、
このカムスイツチからの出力信号の間隔によつて
測定することにより掘削速度を知り、また出力信
号をカウントして掘削深度を知るようにしても良
い。
Moreover, 21 is a load meter provided on the wire 8, and measures the load applied to the cutting edge openings 1a and 2a of both the augers 1 and 2. 22 is provided in the cylinder 4 or 4', and the distance between the outer auger 1 and the inner auger 2, more precisely the distance in the auger axial direction between the cutting edges 1a and 2a, depends on the length of the cylinders 4 and 4'. It is a distance meter that measures the distance. Reference numeral 23 is arranged in a power supply circuit to the drive motor of the outer auger drive unit 3, and is an ammeter for measuring the current consumption of the motor, and 24 is arranged in a power supply circuit to the drive motor of the inner auger drive unit 5. , an ammeter that measures the current consumption of the motor. 25
is a retracting force meter, 26, which is provided in the retracting wire 11 and measures the retracting force of the third winch 10;
27 is the wire 14 or the fixed pulley 15 or 1
5' is an excavation depth gauge and speedometer.
These speedometer 27 and depth gauge 26 are provided with a cam switch interlocked with the fixed pulley 15', for example.
The excavation speed may be determined by measuring the interval of output signals from the cam switch, and the excavation depth may be determined by counting the output signals.

図中28はプログラマブルシーケンサーやマイ
クロコンピユーターからなる制御装置で、この制
御装置28はモータ制御回路18,19及び制御
機構20と接続し、制御装置28からの出力信号
Aをモータ制御回路18に、同じく出力信号Bを
モータ制御回路19に、同じく出力信号Cを制御
機構20に伝達する。
In the figure, 28 is a control device consisting of a programmable sequencer or a microcomputer. This control device 28 is connected to the motor control circuits 18, 19 and the control mechanism 20, and the output signal A from the control device 28 is sent to the motor control circuit 18. The output signal B is transmitted to the motor control circuit 19, and the output signal C is similarly transmitted to the control mechanism 20.

一方、上記荷重計21、距離計22、電流計2
3,24、引込力計25、深度計26、及び速度
計27からは、入力信号D,E,F,G,H,
I,Jとして入力される。
On the other hand, the load meter 21, distance meter 22, ammeter 2
Input signals D, E, F, G, H,
Input as I, J.

第2図はフローチヤートを示し、まず自動掘削
釦を押せば外側オーガ用駆動部3及び内側オーガ
用駆動部5の各駆動モータに通電され、外側オー
ガ1と内側オーガ2が同時に互に反対方向に回転
して掘削が開始される。
Figure 2 shows a flowchart. First, when the automatic digging button is pressed, the drive motors of the outer auger drive section 3 and the inner auger drive section 5 are energized, and the outer auger 1 and the inner auger 2 are simultaneously moved in opposite directions. The machine rotates and excavation begins.

掘削中、掘削機は自重で沈降し、これに伴なつ
て昇降ウインチ7からはワイヤー8が繰り出さ
れ、サードウインチ10にはワイヤー11が巻込
まれる。なお、停止釦を押せば昇降ウインチ7及
びサードウインチ10は停止する。
During excavation, the excavator sinks due to its own weight, and as a result, the wire 8 is let out from the lifting winch 7, and the wire 11 is wound around the third winch 10. Note that when the stop button is pressed, the lifting winch 7 and the third winch 10 are stopped.

一方、掘削機の進行とともにワイヤー14及び
固定滑車15,15′が動き、この動きとともに
深度計26によつて掘削深度が計測され、深度信
号を制御装置28に入力する。
On the other hand, as the excavator advances, the wire 14 and the fixed pulleys 15, 15' move, and along with this movement, the excavation depth is measured by the depth gauge 26, and a depth signal is input to the control device 28.

制御装置28では、設定深度と測定掘削深度と
を比較し、両者が一致した場合にはOFF指令を
内容とする信号A,Bをモータ制御回路18,1
9に出力し、その結果モータ16,17は停止し
て昇降ウインチ7及びサードウインチ10も停止
する。掘削深度が設定深度に致らない場合、制御
装置28からのON指令を内容とする信号A,B
がモータ制御回路18,19に出力され、モータ
16,17を介して昇降ウインチ7及びサードウ
インチ10が作動する。
The control device 28 compares the set depth and the measured excavation depth, and if they match, sends signals A and B containing OFF commands to the motor control circuits 18 and 1.
As a result, the motors 16 and 17 are stopped, and the lifting winch 7 and third winch 10 are also stopped. If the excavation depth does not reach the set depth, signals A and B containing ON commands from the control device 28 are sent.
is output to the motor control circuits 18 and 19, and the lifting winch 7 and the third winch 10 are operated via the motors 16 and 17.

このように昇降ウインチ7からワイヤー8が繰
り出されて行くのは、オーガ1,2が地中に挿入
して行く状態の場合であるが、その際、荷重計2
1より荷重信号Dが制御装置28に導入され、設
定値と荷重計の測定値とが比較演算される。
The wire 8 is fed out from the lifting winch 7 in this way when the augers 1 and 2 are inserted into the ground.
1, the load signal D is introduced into the control device 28, and the set value and the measured value of the load meter are compared and calculated.

荷重計の測定値が設定値より大きいことは、ワ
イヤー8に必要以上に掘削機の全体重量がかかつ
ていることであり、逆に両オーガ1,2の先端刃
口1a,2aは地盤の面圧を不足気味に保持され
て掘削を行なつていることを示す。
If the measured value of the load cell is larger than the set value, it means that the entire weight of the excavator is being applied to the wire 8 more than necessary, and conversely, the tips 1a and 2a of both augers 1 and 2 are on the surface of the ground. Indicates that excavation is being carried out with insufficient pressure.

荷重計の測定値が設定値よりも大きい場合、次
に引込力計25からワイヤー11の引込力を計測
した信号Hが制御装置28に入力され、該制御装
置28でこの実際引込力計の計測値と設定引込力
範囲の下限設定値とを比較する。なお、設定引込
力範囲は4t〜20tまでの幅がある。
If the measured value of the load meter is larger than the set value, then the signal H that measures the retracting force of the wire 11 from the retracting force meter 25 is input to the control device 28, and the control device 28 measures the actual retracting force meter. Compare the value with the lower limit set value of the set retraction force range. The setting retraction force range is from 4t to 20t.

実際引込力が上記下限設定値の4tよりも小さい
場合には、制御装置28よりもモータ制御回路1
9にオン指令を内容とする駆動信号Bが発せら
れ、モータ17及びサードウインチ10が回転し
てワイヤー11に引張力を与える。
If the actual retraction force is smaller than the lower limit set value of 4t, the motor control circuit 1
A drive signal B containing an ON command is issued to the wire 11, and the motor 17 and the third winch 10 rotate to apply a tensile force to the wire 11.

その結果、アースオーガ機は下方に引つぱら
れ、先端刃口1a,2aに地盤の面圧がかかるよ
うになる。実際引込力が設定引込力範囲の下限設
定値を越している場合は制御装置28よりモータ
制御回路19にオフ指令を内容とする駆動信号B
が発せられモータ17及びサードウインチ10は
停止する。
As a result, the earth auger machine is pulled downward, and surface pressure from the ground is applied to the cutting edge openings 1a and 2a. If the actual retraction force exceeds the lower limit set value of the set retraction force range, the control device 28 sends a drive signal B to the motor control circuit 19 containing an OFF command.
is issued, and the motor 17 and third winch 10 stop.

一方、荷重計の測定値が設定値に達していない
場合、電流計23,24からの消費電流信号F,
Gが制御装置28に入力され該制御装置28で加
算された両モータの実際合計消費電流値は設定消
費電流値と比較される。
On the other hand, if the measured value of the load cell does not reach the set value, the current consumption signal F from the ammeters 23 and 24,
G is input to the control device 28, and the actual total current consumption value of both motors added by the control device 28 is compared with the set current consumption value.

実際合計消費電流値が設定消費電流値よりも大
きい場合は、制御装置28よりオフ指令を内容と
する駆動信号Aがモータ制御回路18に出力さ
れ、モータ16が停止して昇降ウインチ7も停止
する。
If the actual total current consumption value is larger than the set current consumption value, the control device 28 outputs a drive signal A containing an OFF command to the motor control circuit 18, the motor 16 stops, and the lifting winch 7 also stops. .

昇降ウインチ7の停止によりワイヤー8の繰り
出しも止まり、アースオーガ機はその状態にとど
まつて掘削し続ける。
When the lifting winch 7 stops, the wire 8 also stops being fed out, and the earth auger machine remains in that state and continues digging.

上記実際合計消費電流値が設定消費電流値より
も小さい場合は、外側オーガ1及び内側オーガ2
に掘削の負荷が充分かかつてないことを意味す
る。この場合は、サードウインチ10を駆動して
ワイヤー11に引張力を与え、アースオーガ機自
体を引込むようにすれば両オーガ1,2に充分掘
削負荷がかかることになる。
If the above actual total current consumption value is smaller than the set current consumption value, outer auger 1 and inner auger 2
This means that the excavation load is sufficient or never before. In this case, if the third winch 10 is driven to apply a tensile force to the wire 11 and the earth auger machine itself is retracted, a sufficient digging load will be applied to both augers 1 and 2.

このようにワイヤー11に引張力を与えている
時に、ワイヤー11に設けた引込力計25からの
計測信号Hを制御装置28に導入し、該信号Hの
実際引込力と設定引込力範囲の上限設定値とを比
較する。
While applying a tensile force to the wire 11 in this way, the measurement signal H from the retracting force meter 25 provided on the wire 11 is introduced into the control device 28, and the actual retracting force of the signal H and the upper limit of the set retracting force range are input. Compare with the set value.

実際引込力が設定引込力の上限設定値(20t)
を越した場合は、制御装置28はオフ指令を内容
とする駆動信号Bをモータ制御回路19に発して
モータ17及びサードウインチ10は停止する。
その結果、ワイヤ11に無理な引帳力が加わるこ
とを防止できる。
The actual retraction force is the set upper limit of the retraction force (20t)
If it exceeds the limit, the control device 28 issues a drive signal B containing an off command to the motor control circuit 19, and the motor 17 and the third winch 10 are stopped.
As a result, it is possible to prevent excessive tension from being applied to the wire 11.

以上述べたように、本発明の掘削制御方法は、
アースオーガ機の掘削状態に応じて引込みワイヤ
ーの動作を自動的に制御して掘削効率を最善に維
持するようにしたものである。
As described above, the excavation control method of the present invention
The operation of the lead-in wire is automatically controlled according to the excavation status of the earth auger machine to maintain the best excavation efficiency.

【図面の簡単な説明】[Brief explanation of drawings]

第1図は本発明の制御方法の実施例を示す説明
図、第2図はフローチヤートである。 1……外側オーガ、1a……刃口、2……内側
オーガ、2a……刃口、3……外側オーガ用駆動
部、4,4′……シリンダ、5……内側オーガ用
駆動部、6……支持体、7……昇降ウインチ、8
……ワイヤー、9……動滑車、10……サードウ
インチ、11……引込みワイヤー、12,13,
13′……ガイドローラー、14……ワイヤー、
15,15′……固定滑車、16,17……駆動
モータ、18,19……モータ制御回路、20…
…制御機構、21……荷重計、22……距離計、
23,24……電流計、25……引込力計、26
……深度計、27……速度計、28……制御装
置。
FIG. 1 is an explanatory diagram showing an embodiment of the control method of the present invention, and FIG. 2 is a flowchart. 1... Outer auger, 1a... Blade mouth, 2... Inner auger, 2a... Blade mouth, 3... Outer auger drive section, 4, 4'... Cylinder, 5... Inner auger drive section, 6... Support body, 7... Lifting winch, 8
...Wire, 9...Moving pulley, 10...Third winch, 11...Leading wire, 12,13,
13'...Guide roller, 14...Wire,
15, 15'... Fixed pulley, 16, 17... Drive motor, 18, 19... Motor control circuit, 20...
...Control mechanism, 21...Load cell, 22...Distance meter,
23, 24...Ammeter, 25...Retraction force meter, 26
...depth gauge, 27...speed meter, 28...control device.

Claims (1)

【特許請求の範囲】 1 リーダーマストなどの支持体に、吊下げワイ
ヤーと引込みワイヤーによつて昇降自在に吊下さ
れた駆動部に、オーガスクリユーを連結してなる
アースオーガ機における掘削制御方法であつて、 吊下げワイヤーには荷重計を、引込みワイヤー
には引込力計を設け、これら荷重計及び引込力計
の出力信号を制御装置に導入し、荷重計及び引込
力計の計測値とそれぞれの設定値を比較し、その
比較結果に応じて制御装置からの信号を吊下げワ
イヤーのウインチの駆動モータ制御回路と引込み
ワイヤーのウインチの駆動モータ制御回路に導入
し、これらウインチの動作を自動的にかつ連動す
るように制御することを特徴とするアースオーガ
機における掘削制御方法。
[Scope of Claims] 1. Excavation control method in an earth auger machine in which an auger screw is connected to a drive unit that is suspended from a support such as a leader mast so that it can be raised and lowered by a suspension wire and a lead-in wire. A load meter is installed on the hanging wire, and a retraction force meter is installed on the pull-in wire, and the output signals of these load cells and retraction force meter are introduced into the control device, and the measured values of the load cell and retraction force meter are combined with each other. Each set value is compared, and according to the comparison result, a signal from the control device is introduced into the drive motor control circuit of the suspension wire winch and the drive motor control circuit of the drop wire winch, and the operation of these winches is automatically performed. An excavation control method for an earth auger machine, characterized by controlling the earth auger in a controlled and interlocking manner.
JP11794682A 1982-07-07 1982-07-07 Drilling control in earth auger machine Granted JPS598896A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11794682A JPS598896A (en) 1982-07-07 1982-07-07 Drilling control in earth auger machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11794682A JPS598896A (en) 1982-07-07 1982-07-07 Drilling control in earth auger machine

Publications (2)

Publication Number Publication Date
JPS598896A JPS598896A (en) 1984-01-18
JPH0224993B2 true JPH0224993B2 (en) 1990-05-31

Family

ID=14724138

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11794682A Granted JPS598896A (en) 1982-07-07 1982-07-07 Drilling control in earth auger machine

Country Status (1)

Country Link
JP (1) JPS598896A (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5025404A (en) * 1973-07-09 1975-03-18
JPS5222691B2 (en) * 1974-06-21 1977-06-18
JPS5428281A (en) * 1977-08-04 1979-03-02 Canon Inc Vacuum treating apparatus

Also Published As

Publication number Publication date
JPS598896A (en) 1984-01-18

Similar Documents

Publication Publication Date Title
JP3821538B2 (en) Tunneling machine excavation control method
JPH0224993B2 (en)
JP4340209B2 (en) Pile driver depth measuring device
EP3921477B1 (en) Excavating machine with control system of the combined drive of two winches
JPS6326238B2 (en)
JP2735733B2 (en) Pile support layer detection device
JP2735734B2 (en) Pile support layer detection method
JPH07119473B2 (en) Automatic excavation equipment for trenches for underground walls
JPS6326239B2 (en)
US743751A (en) Dredger.
JPH10205263A (en) Earth-removing device for excavator
JPH09328985A (en) Auger drilling control method
JPS6195197A (en) Automatic drilling control apparatus
JP2656742B2 (en) Bucket type excavator and its excavation method
JPS622111B2 (en)
JPS6168992A (en) Automatic excavation controller
CN111485548B (en) Novel soil lifting equipment for manual hole digging pile construction and construction method thereof
CN218596005U (en) Mining excavator lifting mechanism
JP2871250B2 (en) Excavator control equipment
CN116605779A (en) Work machine and method for operating a work machine
JP2519950B2 (en) Method and apparatus for supplying sand to hollow pipe for sand pile construction
SU380160A1 (en) Trenching machine
JPH05272289A (en) Shaft drilling device and method
JP4092801B2 (en) Pile head management device for joint pile type granular material pile
JPH07158056A (en) Control device for soil improvement machine