JP4098296B2 - Open shield machine and open shield method using it - Google Patents
[go: Go Back, main page]

JP4098296B2 - Open shield machine and open shield method using it - Google Patents

Open shield machine and open shield method using it Download PDF

Info

Publication number
JP4098296B2
JP4098296B2 JP2004299666A JP2004299666A JP4098296B2 JP 4098296 B2 JP4098296 B2 JP 4098296B2 JP 2004299666 A JP2004299666 A JP 2004299666A JP 2004299666 A JP2004299666 A JP 2004299666A JP 4098296 B2 JP4098296 B2 JP 4098296B2
Authority
JP
Japan
Prior art keywords
shield machine
open shield
concrete box
open
frame
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2004299666A
Other languages
Japanese (ja)
Other versions
JP2006112101A (en
Inventor
誠 植村
賢治郎 植村
廣明 竹川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2004299666A priority Critical patent/JP4098296B2/en
Publication of JP2006112101A publication Critical patent/JP2006112101A/en
Application granted granted Critical
Publication of JP4098296B2 publication Critical patent/JP4098296B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

本発明は、上下水道、共同溝、電信・電話などの付設地下道や、乗用車専用道路等の地下構造物を構築するためのオープンシールド機およびこれを使用するオープンシールド工法に関するものである。   TECHNICAL FIELD The present invention relates to an open shield machine for constructing underground structures such as water and sewage systems, common ditches, telegraph / telephone, and other underground structures, and an open shield method using the open shield machine.

オープンシールド工法は開削工法(オープンカット工法)とシールド工法の長所を活かした合理性に富む工法である。図2にその概略を示すと、図中1はオープンシールド機で、これは左右の側壁板1aと、これら側壁板1aに連結する底板1bとからなる前面、後面および上面を開口したシールド機である。   The open shield method is a highly rational method that utilizes the advantages of the open cut method (open cut method) and the shield method. 2 schematically shows an open shield machine, which is a shield machine having front, rear, and top surfaces each including left and right side wall plates 1a and a bottom plate 1b connected to the side wall plates 1a. is there.

このオープンシールド機1は、前記側壁板1aと底板1bの先端を刃口11として形成し、また側壁板1aの中央または後端近くに推進ジャッキ2を後方に向け上下に並べて配設する。図中3は隔壁を示す。   In this open shield machine 1, the front ends of the side wall plate 1a and the bottom plate 1b are formed as blade edges 11, and the propulsion jacks 2 are arranged in the vertical direction in the center or near the rear end of the side wall plate 1a. In the figure, 3 indicates a partition wall.

かかるオープンシールド機1を使用して施工するオープンシールド工法は、図示は省略するが、発進坑内にこのオープンシールド機1を設置して、オープンシールド機1の推進ジャッキ2を伸長して発進坑内の反力壁に反力をとってオープンシールド機1を前進させ、地下構造物を形成する第1番目のコンクリート函体4を上方から吊り降ろし、オープンシールド機1のテール部1c内で縮めた推進ジャッキ2の後方にセットする。推進ジャッキ2と反力壁との間にはストラットを配設して適宜間隔調整をする。   The open shield method to be constructed using such an open shield machine 1 is not shown in the figure, but this open shield machine 1 is installed in the start pit, and the propulsion jack 2 of the open shield machine 1 is extended so that the The open shield machine 1 is moved forward with the reaction force against the reaction wall, the first concrete box 4 forming the underground structure is suspended from above, and the propulsion is shrunk in the tail portion 1c of the open shield machine 1 Set behind jack 2. A strut is disposed between the propulsion jack 2 and the reaction wall to adjust the distance appropriately.

また、発進坑は土留壁で構成し、オープンシールド機1を発進させるにはこの土留壁を一部鏡切りするが、必要に応じて薬液注入などで発進坑の前方部分に地盤改良を施しておくこともある。   In addition, the start pit is made up of a retaining wall, and in order to start the open shield machine 1, a part of this retaining wall is mirror-cut. If necessary, the ground is improved at the front part of the starting pit by chemical injection or the like. Sometimes it is left.

ショベル等の掘削機9でオープンシールド機1の前面または上面から土砂を掘削しかつ排土する。この排土工程と同時またはその後に推進ジャッキ2を伸長してオープンシールド機1を前進させる。この前進工程の場合、コンクリート函体4の前にはボックス鋼材または型鋼を用いた枠体よりなる押角8を配設し、オープンシールド機1は後方にセットされたコンクリート函体4から反力をとる。   Excavator 9 such as an excavator excavates and removes soil from the front or top surface of open shield machine 1. At the same time as or after this earth removal step, the propulsion jack 2 is extended to advance the open shield machine 1. In the case of this forward process, a pushing angle 8 made of a frame made of box steel or mold steel is arranged in front of the concrete box 4, and the open shield machine 1 receives a reaction force from the concrete box 4 set rearward. Take.

そして第1番目のコンクリート函体4の前に第2番目のコンクリート函体4をオープンシールド機1のテール部1c内で吊り降ろす。以下、同様の排土工程、前進工程、コンクリート函体4のセット工程を適宜繰り返して、順次コンクリート函体4をオープンシールド機1の前進に伴い縦列に地中に残置し、さらにこのコンクリート函体4の上面に埋戻土5を入れる。   Then, the second concrete box 4 is suspended in the tail part 1 c of the open shield machine 1 in front of the first concrete box 4. Thereafter, the same soil removal process, advance process, and setting process of the concrete box 4 are repeated as appropriate, and the concrete boxes 4 are sequentially left in the ground in line with the advancement of the open shield machine 1, and further this concrete box. Put backfill 5 on the upper surface of 4.

なお、コンクリート函体4をオープンシールド機1のテール部1c内に吊り降ろす際には、コンクリートブロック等による高さ調整材7をコンクリート函体4下に配設し、このテール部1c内でコンクリート函体4の左右および下部の空隙にグラウト材6を充填する。   When the concrete box 4 is suspended in the tail part 1c of the open shield machine 1, a height adjusting material 7 such as a concrete block is disposed under the concrete box 4, and the concrete part 4 is placed in the tail part 1c. The grout material 6 is filled in the left and right and lower spaces of the box 4.

このようにして、オープンシールド機1が到達坑まで達したならばこれを撤去して工事を完了する。   In this way, if the open shield machine 1 reaches the reaching mine, it is removed and the construction is completed.

このようなオープンシールド工法では、前記のごとくコンクリート函体4をオープンシールド機1の前進に伴い縦列に地中に残置し、コンクリート函体4は、オープンシールド機1のテール部1c内に吊り降ろされ、オープンシールド機1の前進とともに該テール部1cから出て地中に残されていくものであり、オープンシールド機1はこのように地中に残置したコンクリート函体4に反力をとって前進する。   In such an open shield construction method, as described above, the concrete box 4 is left in the ground in a column as the open shield machine 1 advances, and the concrete box 4 is suspended in the tail portion 1c of the open shield machine 1. As the open shield machine 1 moves forward, it leaves the tail portion 1c and remains in the ground. The open shield machine 1 takes a reaction force on the concrete box 4 left in the ground in this way. Advance.

コンクリート函体4は鉄筋コンクリート製で、図3に示すように左側板4a、右側板4bと上床板4cと下床板4dとからなる一体のもので、前後面が開口10として開放されている。   The concrete box 4 is made of reinforced concrete. As shown in FIG. 3, the concrete box 4 is an integrated body composed of a left side plate 4 a, a right side plate 4 b, an upper floor plate 4 c and a lower floor plate 4 d, and the front and rear surfaces are opened as openings 10.

前記先行技術は当業者間で一般的に行なわれているものであり、文献公知発明にかかるものではない。   The prior art is generally performed by those skilled in the art, and is not related to a known invention.

このようなオープンシールド工法によるコンクリート函体4の埋設は、オープンシールド機のテール部で地中に残置した後、前記のようにこの上に埋戻土を入れるが、この場合、例えばダンプトラックなどの車両で搬入して埋戻土をコンクリート函体の上に投入し、その後、ブルドーザーなどの重機で表面を敷き均している。   In the burying of the concrete box 4 by such an open shield construction method, after leaving it in the ground at the tail part of the open shield machine, the backfill is put on this as described above. In this case, for example, a dump truck or the like It is carried in with a vehicle and the backfill is put on the concrete box, and then the surface is spread and leveled with a heavy machine such as a bulldozer.

このため、施工場所に搬入する機械の種類や数が多くなり、作業の進行の妨げになることもあり、また、地中に残置したコンクリート函体に対して埋戻土を投入するタイミングを図ることも必要となり作業がスムーズに進行しないこともある。   For this reason, the type and number of machines to be carried into the construction site increase, which may hinder the progress of work, and the timing for putting backfill soil into the concrete box left in the ground is planned. Work may not be performed smoothly.

本発明の目的は前記従来例の不都合を解消し、オープンシールド機のテール部で地中に残置したコンクリート函体の上に埋戻土を投入するに際し、オープンシールド機の前進に伴い自動的に投入でき、さらに敷き均しも自動的に行えて施工性の向上を図れるオープンシールド機およびこれを使用するオープンシールド工法を提供することにある。   The object of the present invention is to eliminate the inconvenience of the conventional example, and automatically put back soil on the concrete box left in the ground at the tail part of the open shield machine as the open shield machine advances. The object of the present invention is to provide an open shield machine that can be thrown in and that can automatically spread and improve workability, and an open shield method using the open shield machine.

本発明は前記目的を達成するため、請求項1記載の発明は、オープンシールド機として、オープンシールド機の前面または上面開口より前方の土砂を掘削機で掘削・排土する工程と、推進ジャッキを伸長してコンクリート函体を反力にしてシールド機を前進させる工程と、シールド機のテール部内で縮めた推進ジャッキの後方に新たなコンクリート函体をセットする工程とを適宜繰り返して順次コンクリート函体を縦列に埋設し、コンクリート函体の上に埋戻土を入れるオープンシールド工法で使用するオープンシールド機において、オープンシールド機のテール部には後方土留板と側方土留板とを取り付けるとともに、テール部の上部の地表レベルに埋戻土の敷き均し設備を設け、この敷き均し設備は平面コ字型の枠体で構成する埋戻土の収納枠とこの収納枠の後端に取付けられ該収納枠から吐出する埋戻土の均しバーとで構成することを要旨とするものである。 In order to achieve the above-mentioned object, the invention according to claim 1 is an open shield machine comprising a step of excavating and discharging earth and sand in front of the front or top opening of the open shield machine with an excavator, and a propulsion jack. The process of extending the shield machine with the reaction force of the concrete box by stretching and the process of setting a new concrete box behind the propulsion jack shrunk in the tail part of the shield machine is repeated as appropriate. In the open shield machine used in the open shield construction method, in which backfill soil is put on the concrete box, the rear shield plate and the lateral soil plate are attached to the tail part of the open shield machine. part spread leveling provided facilities refilling soil to ground level at the top of, the spread leveling equipment of Mododo embedding constituting a frame of the flat U-shaped It is an Abstract that constituted by paying frame and leveling bar Mododo embedding discharged from mounted the receiving frame to the rear end of the housing frame.

請求項1記載の本発明によれば、オープンシールド機に付設の敷き均し設備で地中に残置したコンクリート函体の上に埋戻土を敷き均すことができるから、別途、敷き均しのためのブルドーザーなどを搬入して使用する必要がなく、施工のための設備を全体としてコンパクトにできる。   According to the first aspect of the present invention, the backfill soil can be spread and leveled on the concrete box left in the ground with the leveling equipment attached to the open shield machine. It is not necessary to carry in and use a bulldozer for the construction, and the construction equipment can be made compact as a whole.

請求項2記載の発明は、オープンシールド工法として、オープンシールド機の前面または上面開口より前方の土砂を掘削機で掘削・排土する工程と、推進ジャッキを伸長してコンクリート函体を反力にしてシールド機を前進させる工程と、シールド機のテール部内で縮めた推進ジャッキの後方に新たなコンクリート函体をセットする工程とを適宜繰り返して順次コンクリート函体を縦列に埋設し、コンクリート函体の上に埋戻土を入れるオープンシールド工法において、前記オープンシールド機のテール部には後方土留板と側方土留板とを取り付けるとともに、テール部の上部の地表レベルに平面コ字型の枠体で構成する埋戻土の収納枠とこの収納枠の後端に取付けられ該収納枠から吐出する埋戻土の均しバーとで構成する埋戻土の敷き均し設備を設け、オープンシールド機の前進に伴い、収納枠からこぼれて流出する埋戻土を、オープンシールド機の前進により前方に移動する均しバーで敷き均すことを要旨とするものである。 The invention according to claim 2 is an open shield construction method in which an excavator excavates and removes soil in front of the front or top opening of the open shield machine, and the propulsion jack is extended to make the concrete box a reaction force. The process of advancing the shield machine and the process of setting a new concrete box behind the propulsion jack shrunk in the tail part of the shield machine are repeated as appropriate, and the concrete boxes are successively embedded in tandem. In the open shield method of putting backfill on top, the rear shield plate and the lateral soil plate are attached to the tail part of the open shield machine, and a plane U-shaped frame is attached to the ground level above the tail part. laying leveling of embedding constituted by accommodating frame of the configuration for implantation Mododo and leveling bar Mododo embedding discharged from the storage frame attached to a rear end of the housing frame Mododo The Bei provided, along with the advancement of the open shield machine, the Mododo embedding flows spilling from housing frame, it is an Abstract that leveled laying in leveling bar is moved forward by the forward open shield machine.

請求項2記載の本発明によれば、オープンシールド機が前進すれば、これに追随して地中に残置されたコンクリート函体の上に埋戻土が自動的に投入され、さらに自動的に敷き均しされる。よって、オープンシールド機の前進、コンクリート函体の布設、および埋戻土の投入・敷き均しが自動的に連携してなされるから、施工性が向上する。   According to the second aspect of the present invention, when the open shield machine moves forward, the backfill is automatically put on the concrete box left in the ground following this, and further automatically. The floor is smoothed. Therefore, since the advancement of the open shield machine, the laying of the concrete box, and the input / laying of the backfill soil are automatically performed in cooperation, the workability is improved.

本発明のオープンシールド機およびこれを使用するオープンシールド工法は、オープンシールド機のテール部で地中に残置したコンクリート函体の上に埋戻土を投入するに際し、オープンシールド機の前進に伴い該オープンシールド機に付設の設備で自動的に投入でき、さらに敷き均しも自動的に行えるだけでなく、ブルドーザーなどの機械を別途格別に使用せずにすみ、施工性の向上を図れるものである。   The open shield machine according to the present invention and the open shield method using the open shield machine, when throwing back soil on the concrete box left in the ground at the tail part of the open shield machine, Not only can the automatic installation with the equipment attached to the open shield machine, and the automatic leveling can be done automatically, but it is also possible to improve the workability by eliminating the need to use a machine such as a bulldozer. .

以下、図面について本発明の実施形態を詳細に説明する。図1は本発明のオープンシールド工法およびこれに使用するオープンシールド機の要部の実施形態を示す縦断側面図で、オープンシールド機およびオープンシールド工法の基本構成は従来と同様であるからここでの詳細な説明は省略する。   Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings. FIG. 1 is a longitudinal side view showing an embodiment of the main part of the open shield method of the present invention and the open shield machine used therefor. Since the basic configuration of the open shield machine and the open shield machine is the same as that of the prior art, Detailed description is omitted.

本発明は、特にオープンシールド機1のテール部に残置したコンクリート函体4の上に投入して敷均す埋戻土5の敷き均し方法に関するものであり、そのための設備としてオープンシールド機1のテール部1cの上部に敷き均し設備13を設ける。   In particular, the present invention relates to a method for leveling backfill soil 5 that is placed on a concrete box 4 left in the tail portion of the open shield machine 1 and spreads, and the open shield machine 1 is used as equipment for that purpose. The leveling equipment 13 is provided on the top of the tail part 1c.

この敷き均し設備13は、地表レベルに配設されるもので、平面コ字型の枠体14cで構成する埋戻土5の収納部14と、この収納部14の後端に設けられ、地表レベルに配置される敷き均しバー15とで構成する。   The spread leveling equipment 13 is disposed at the ground level, and is provided at the storage portion 14 of the backfill 5 constituted by a planar U-shaped frame body 14c and the rear end of the storage portion 14. It consists of a leveling bar 15 arranged at the ground level.

前記収納部14は枠体の内部に後方に向かって下降する傾斜板14aを備え、下方は埋戻土5の吐出口14bが開口してある。   The storage portion 14 includes an inclined plate 14a that descends toward the rear inside the frame body, and a discharge port 14b for the backfill soil 5 is open below.

また、敷き均しバー15は例えばH型鋼などを使用し、枠体14cの後端に固定する。   Further, the spread leveling bar 15 uses, for example, H-shaped steel and is fixed to the rear end of the frame body 14c.

図中16はテール部1cに取り付けた後方土留板、17は側方土留板を示す。   In the figure, 16 is a rear retaining plate attached to the tail portion 1c, and 17 is a lateral retaining plate.

次に、かかる敷き均し設備13を使用して、テール部1cにおいて地中に残置したコンクリート函体4の上に土砂を埋め戻す方法を説明する。地中に設置され残置されたコンクリート函体4の上方はこの状態では開放されている。   Next, a method for refilling the earth and sand on the concrete box 4 left in the ground in the tail portion 1c using the spread leveling equipment 13 will be described. In this state, the upper part of the concrete box 4 installed and left in the ground is open.

この状態でダンプトラックなどの車両18で埋戻土5を投入場所に搬入し、敷き均し設備13の収納部14の枠体14cの内部で傾斜板14aの上に落下させれば、埋戻土5は傾斜板14aに添ってすべり落ち、吐出口14bから下方のコンクリート函体4の上方に自動的に投入される。   In this state, if the backfill 5 is carried into the input place by a vehicle 18 such as a dump truck and dropped onto the inclined plate 14a inside the frame body 14c of the storage unit 14 of the leveling equipment 13, the backfill is performed. The soil 5 slides down along the inclined plate 14a, and is automatically charged above the concrete box 4 below from the discharge port 14b.

このとき、コンクリート函体4の前方および側方は後方土留板16と側方土留板17とで囲われているから、コンクリート函体4の上に投入された埋戻土が周囲に飛散することはない。   At this time, since the front and sides of the concrete box 4 are surrounded by the rear earth retaining plate 16 and the side earth retaining plate 17, the back-filled soil thrown on the concrete box 4 is scattered around. There is no.

このようにして収納部14内に埋戻土5を投入しながら、オープンシールド機1を前進させれば、順次地中に残置した前方のコンクリート函体4の上に埋戻土5が自動的に順次投入され続けるとともに、オープンシールド機1の前進移動に伴いこれに一体に取り付けた敷き均しバー15も前進移動する。そして、敷き均しバー15は地表レベルで移動するから、コンクリート函体4の上に先に投入された埋戻土5の上面が敷き均しバー15で掻き均されて、地表レベルで平らになる。   If the open shield machine 1 is advanced while the backfill 5 is put into the storage portion 14 in this way, the backfill 5 is automatically placed on the concrete box 4 in the front that is left behind in the ground. And the leveling bar 15 attached integrally therewith moves forward as the open shield machine 1 moves forward. Since the leveling bar 15 moves at the ground level, the upper surface of the backfill 5 previously put on the concrete box 4 is scraped and leveled by the leveling bar 15 and leveled at the ground level. Become.

以上のようにしてオープンシールド機1に付設した敷き均し設備13の収納部14に埋戻土5を投入するだけで、オープンシールド機1の前進に追随して、地中に残置したコンクリート函体4の上に埋戻土5を自動的に敷き均すことができる。   The concrete box left behind in the ground following the advance of the open shield machine 1 simply by putting the backfill 5 into the storage section 14 of the leveling equipment 13 attached to the open shield machine 1 as described above. The backfill 5 can be automatically spread on the body 4 and leveled.

本発明のオープンシールド機およびこれを使用するオープンシールド工法の実施形態を示す縦断側面図である。It is a vertical side view which shows embodiment of the open shield machine of this invention and the open shield construction method using this. オープンシールド工法の概略を示す縦断側面図である。It is a vertical side view which shows the outline of an open shield construction method. コンクリート函体の斜視図である。It is a perspective view of a concrete box.

符号の説明Explanation of symbols

1 オープンシールド機 1a 側壁板
1b 底板 1c テール部
2 推進ジャッキ 3 隔壁
4 コンクリート函体
4a 左側板 4b 右側板
4c 上床板 4d 下床板
5 埋戻土 6 グラウト材
7 高さ調整材 8 押角
9 掘削機
10 開口 11 刃口
13 敷き均し設備 14 収納部
14a 傾斜板 14b 吐出口
14c 枠体 15 敷き均しバー
16 後方土留板 17 側方土留板
DESCRIPTION OF SYMBOLS 1 Open shield machine 1a Side wall plate 1b Bottom plate 1c Tail part 2 Propulsion jack 3 Bulkhead 4 Concrete box 4a Left side plate 4b Right side plate 4c Upper floor plate 4d Lower floor plate 5 Backfill soil 6 Grout material 7 Height adjustment material 8 Pushing angle 9 Excavator DESCRIPTION OF SYMBOLS 10 Opening 11 Blade edge 13 Spreading leveling equipment 14 Storage part 14a Inclined plate 14b Discharge port 14c Frame 15 Spreading level bar 16 Rear earth retaining plate 17 Side earth retaining plate

Claims (2)

オープンシールド機の前面または上面開口より前方の土砂を掘削機で掘削・排土する工程と、推進ジャッキを伸長してコンクリート函体を反力にしてシールド機を前進させる工程と、シールド機のテール部内で縮めた推進ジャッキの後方に新たなコンクリート函体をセットする工程とを適宜繰り返して順次コンクリート函体を縦列に埋設し、コンクリート函体の上に埋戻土を入れるオープンシールド工法で使用するオープンシールド機において、オープンシールド機のテール部には後方土留板と側方土留板とを取り付けるとともに、テール部の上部の地表レベルに埋戻土の敷き均し設備を設け、この敷き均し設備は平面コ字型の枠体で構成する埋戻土の収納枠とこの収納枠の後端に取付けられ該収納枠から吐出する埋戻土の均しバーとで構成することを特徴とするオープンシールド機。 The process of excavating and discharging the earth and sand in front of the front or top opening of the open shield machine with the excavator, the process of extending the propulsion jack and moving the shield machine forward with the reaction of the concrete box, and the tail of the shield machine The process of setting a new concrete box behind the propulsion jack shrunk inside the section is repeated as appropriate to embed concrete boxes in tandem and use with an open shield method in which backfill is put on the concrete box. In the open shield machine, a rear earth retaining plate and a side earth retaining plate are attached to the tail part of the open shield machine, and a backfill soil leveling equipment is provided on the surface level above the tail part. constituted by a smoothing bar Mododo embedding discharged from attached the storage frame at a rear end of the housing frame and receiving frame of Mododo embedding constituting a frame of the flat U-shape Open shield machine which is characterized in Rukoto. オープンシールド機の前面または上面開口より前方の土砂を掘削機で掘削・排土する工程と、推進ジャッキを伸長してコンクリート函体を反力にしてシールド機を前進させる工程と、シールド機のテール部内で縮めた推進ジャッキの後方に新たなコンクリート函体をセットする工程とを適宜繰り返して順次コンクリート函体を縦列に埋設し、コンクリート函体の上に埋戻土を入れるオープンシールド工法において、前記オープンシールド機のテール部には後方土留板と側方土留板とを取り付けるとともに、テール部の上部の地表レベルに平面コ字型の枠体で構成する埋戻土の収納枠とこの収納枠の後端に取付けられ該収納枠から吐出する埋戻土の均しバーとで構成する埋戻土の敷き均し設備を設け、オープンシールド機の前進に伴い、収納枠からこぼれて流出する埋戻土を、オープンシールド機の前進により前方に移動する均しバーで敷き均すことを特徴とするオープンシールド工法。 The process of excavating and discharging the earth and sand in front of the front or top opening of the open shield machine with the excavator, the process of extending the propulsion jack and moving the shield machine forward with the reaction of the concrete box, and the tail of the shield machine In the open shield construction method in which the concrete box is sequentially embedded in columns by repeating the process of setting a new concrete box behind the propulsion jack shrunk in the section, and backfilling soil is put on the concrete box, A rear earth retaining plate and a side earth retaining plate are attached to the tail part of the open shield machine, and a backfill soil storage frame composed of a plane U-shaped frame is formed on the surface level above the tail part . rear end attachment provided a leveling flooring Mododo embedding constituting facilities and smoothing bars of the discharge for embedding Mododo from said housing frame, with the advancement of the open shield machine, storage frame The Mododo embedding flowing Te Rakobore, open shield tunneling, wherein a leveled laying in leveling bar is moved forward by the forward open shield machine.
JP2004299666A 2004-10-14 2004-10-14 Open shield machine and open shield method using it Expired - Fee Related JP4098296B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004299666A JP4098296B2 (en) 2004-10-14 2004-10-14 Open shield machine and open shield method using it

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004299666A JP4098296B2 (en) 2004-10-14 2004-10-14 Open shield machine and open shield method using it

Publications (2)

Publication Number Publication Date
JP2006112101A JP2006112101A (en) 2006-04-27
JP4098296B2 true JP4098296B2 (en) 2008-06-11

Family

ID=36380852

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004299666A Expired - Fee Related JP4098296B2 (en) 2004-10-14 2004-10-14 Open shield machine and open shield method using it

Country Status (1)

Country Link
JP (1) JP4098296B2 (en)

Also Published As

Publication number Publication date
JP2006112101A (en) 2006-04-27

Similar Documents

Publication Publication Date Title
JP6629825B2 (en) Road lining method in open shield method
JP5155237B2 (en) Open shield machine and open shield method using this open shield machine
JP5204063B2 (en) Box foundation construction method in open shield method
JP3917146B2 (en) Laying method and removing method of lining plate in open shield method
JP5155236B2 (en) Installation method of lining board in open shield method
JP4098296B2 (en) Open shield machine and open shield method using it
JP3996597B2 (en) Open shield machine and open shield method using it
JP6194388B1 (en) Open shield method
JP5639213B2 (en) Open shield method
JP4148047B2 (en) Open shield machine
JP4436401B2 (en) Open shield method and open shield machine
JP3923973B2 (en) Open shield machine
JP2668648B2 (en) Construction method of underground structure and starting pit used for it
JP2009114640A (en) Open shield machine
JP3926818B2 (en) Installation method of concrete box
JP3581332B2 (en) Earth retaining equipment and open-cutting method using it
JP4402640B2 (en) Open shield method
JP4279441B2 (en) Open shield machine and open shield method using this open shield machine
JP3868959B2 (en) Waterway construction method
JP5015809B2 (en) Open shield machine
JP2005030061A (en) Open shield construction method
JP4279818B2 (en) Open shield method
JP5389869B2 (en) Open shield method
JP3646984B2 (en) Open shield method
JPH06158993A (en) Method of open shield construction and open shielding machine

Legal Events

Date Code Title Description
A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061219

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070215

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20070605

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20070731

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080311

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080312

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4098296

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110321

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110321

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120321

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130321

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130321

Year of fee payment: 5

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140321

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees