Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4151944B2 - Lead frame transfer device - Google Patents
[go: Go Back, main page]

JP4151944B2 - Lead frame transfer device - Google Patents

Lead frame transfer device Download PDF

Info

Publication number
JP4151944B2
JP4151944B2 JP2002288142A JP2002288142A JP4151944B2 JP 4151944 B2 JP4151944 B2 JP 4151944B2 JP 2002288142 A JP2002288142 A JP 2002288142A JP 2002288142 A JP2002288142 A JP 2002288142A JP 4151944 B2 JP4151944 B2 JP 4151944B2
Authority
JP
Japan
Prior art keywords
feed
lead frame
pin
guide rail
spring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2002288142A
Other languages
Japanese (ja)
Other versions
JP2004128097A (en
Inventor
敏郎 白石
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shibaura Mechatronics Corp
Original Assignee
Shibaura Mechatronics Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shibaura Mechatronics Corp filed Critical Shibaura Mechatronics Corp
Priority to JP2002288142A priority Critical patent/JP4151944B2/en
Publication of JP2004128097A publication Critical patent/JP2004128097A/en
Application granted granted Critical
Publication of JP4151944B2 publication Critical patent/JP4151944B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H10SEMICONDUCTOR DEVICES; ELECTRIC SOLID-STATE DEVICES NOT OTHERWISE PROVIDED FOR
    • H10WGENERIC PACKAGES, INTERCONNECTIONS, CONNECTORS OR OTHER CONSTRUCTIONAL DETAILS OF DEVICES COVERED BY CLASS H10
    • H10W90/00Package configurations
    • H10W90/701Package configurations characterised by the relative positions of pads or connectors relative to package parts
    • H10W90/751Package configurations characterised by the relative positions of pads or connectors relative to package parts of bond wires
    • H10W90/756Package configurations characterised by the relative positions of pads or connectors relative to package parts of bond wires between a chip and a stacked lead frame, conducting package substrate or heat sink

Landscapes

  • Wire Bonding (AREA)
  • Die Bonding (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、リードフレーム搬送装置に関する。
【0002】
【従来の技術】
半導体の製造工程の1つに、半導体ペレット(以下単に「ペレット」という)を基板にボンディングする工程があり、この工程では、ペレットボンディング装置が用いられる。
【0003】
この装置は、ウェハがスクライビングされることにより形成された格子状配列の複数のペレットの中より、1個ずつペレットをピックアップし、リードフレーム等の基板上にボンディングするものであるが、1個のペレットがボンディングされる毎にリードフレームは定ピッチで間欠的に搬送される。
【0004】
ここで従来のリードフレーム搬送装置について、その平面図を示す図6、側面図を示す図7を用いて説明する。リードフレーム搬送装置100は、リードフレーム1をその搬送方向(図6で右方向)に沿ってガイドするガイドレール2と、このガイドレール2におけるリードフレーム搬送面より上方に設けられた送りピン3とを有する。リードフレーム1の縁に沿っては、ペレット載置部1Aと対向して送り穴1Bが設けられる。送りピン3はリードフレーム1の搬送方向に複数個設けられ、各送りピン3は、ピンホルダ4を介して、ガイドレール後端に位置する移送軸5に固定支持され、移送軸5を中心として上下方向に円弧状に揺動自在とされる。6は、送りピン3を上下動させるシリンダ等の送り上下装置6である。
【0005】
また、移送軸5と並行してスライドガイド8が固定配置され、このスライドガイド8には、移送軸5と搬送方向において一体化された連結板7がスライド自在とされる。そして、スライドガイド8と並行して回転自在に配置されたネジ軸9が送りモータ10によって適宜正転あるいは逆転させられ、この回転動により移動する送り板11により、連結板7はスライドガイド8に沿ってスライドさせられる。このスライドにより、送りピン3はガイドレールに沿って移動する。
【0006】
次に、このリードフレーム搬送装置による一連のリードフレームの定ピッチでの間欠搬送動作について説明する。
【0007】
まず送り上下装置6によって各送りピン3を下動させ、送りピン3をリードフレーム1に設けられた送り穴1Bに挿入する。次に送りモータ10の回転により、連結板7を搬送方向に送り穴1B1個分の距離(1ピッチ)分移動させる。この動作により、送りピン3は、搬送方向に1ピッチ移動し、リードフレーム1も1ピッチ搬送される。次に、送り上下装置6により各送りピン3を上動させる。この動作により、送りピン3は送り穴1Bから抜け出る。最後に送りモータ10を逆転させ、送りピン3を元位置に復帰させる。以後はこの繰り返し動作となる。なお、リードフレーム1の定ピッチ搬送によりペレツト載置部1Aがボンディング位置に順次位置付けられると、図示しないクランプ機構によりリードフレーム1はガイドレール2に固定され、この状態下でペレット載置部1Aに対しペレットがボンディングされる。
【0008】
【発明が解決しようとする課題】
ところで、従来用いられていたリードフレーム搬送装置100においては、複数個の送りピン3が1本の移送軸5に各ピンホルダ4を介して固定支持されているため、次のような問題点があった。すなわち、各送りピン3をリードフレーム1の送り穴1Bに係合させるために、リードフレーム1の形状が変わるとネジ軸9におけるピンホルダ4の位置等を変更して送りピン3の配置間隔、位置を変更しなければならないが、リードフレーム1を加熱する時の熱で移送軸5やガイドレール2が熱膨張で長手方向に膨張すると、すべての送りピン3を確実に対応する送り穴1Bに係合させるためには、熱膨張後に調整をしなければならなかった。このため、リードフレーム1の形状が変わることによる送りピン3の配置替えに多数の手数と時間を必要とした。また、ピンホルダ4の形状が複雑となるため、部品の価格が高く装置の価格も大幅にアップするという問題点があった。
【0009】
そこで本発明は上記問題点を鑑み上記不具合をなくしたリードフレーム搬送装置を提供することにある。
【0010】
【課題を解決するための手段】
上記課題を解決するために請求項1に係わる発明は、リードフレームをガイドするガイドレールと、ガイドレールによるリードフレーム送り面の上に設けられる複数の送りピンを前記ガイドレールの長手方向に適宜間隔で配置し、これらの送りピンを上下させてリードフレームの送り穴に係合させる送り上下手段と、これらの送りピンをガイドレールに沿って水平方向に往復移動させる送り手段と、前記送り上下手段と送り手段を制御する制御手段とを有するリードフレーム搬送装置において、おのおのの送りピンをガイドレールに沿って移動させるために帯状部材にて連結すると共に、この帯状部材を円柱体に巻回させて、おのおのの送りピンを帯状部材を介して送り手段にて移動可能なようにスライド手段を設け、このスライド手段をおのおのの送りピン毎に配置したことを特徴とする。
【0011】
また、請求項2に係わる発明は、前記円柱体をおのおの送りピン毎に配置し、帯状部材を巻回した円柱体を回転自在とし、この円柱体に円弧状の長穴を設け、その長穴に回転規制用のピンを嵌合し、この回転規制用のピンに円柱体の長穴端部を接当させ、円柱体からスプリングを帯状部材の送り方向と逆に弾性力が作用するように張設し、その弾性力により回転方向に付勢させ、このスプリングの伸びを検知することで過負荷を検出するようにした過負荷検出器を有することを特徴とする。
【0012】
また、請求項3に係わる発明は、前記過負荷検出器は円柱体をスプリングの弾性力により回転方向に付勢させる荷重手段と、前記スプリングが伸長変形し前記円柱体が回転したことをセンサ及び遮光板で検出させる検出手段とからなり、前記荷重手段のスプリングの弾性力と検出手段のセンサ及び遮光板の位置が送りピンの位置を水平方向に沿って移動させても同じとなるように配置されたことを特徴とする。
【0013】
本発明には次の作用がある。おのおのの送りピン毎にスライド手段を配置したことにより、リードフレームの形状が変わることによるピンホルダの形状変更は単純化され、そのため部品の価格は安くでき、すなわち、装置価格が安くできる。また、位置決めピンの配置替えが簡単となり、短時間で調整ができる。
【0014】
【発明の実施の形態】
以下、本発明の実施の一形態を図面に基づいて説明するが本発明はこれに限定されるものでないことは言うまでもない。
【0015】
図1は本発明を適応してなるリードフレーム搬送装置の概略構成を示す平面図、図2は図1における送りピン部の側面図、図3は本発明を適応してなる送りピン上下動作と水平動作の動作説明図、図4は本発明を適用してなる過負荷検出器の平面図、図5は図4における側面図をそれぞれ示す。
【0016】
本実施の形態におけるリードフレーム搬送装置を、図1乃至図5を用いて説明する。なお、以下の説明ではペレットボンディング装置のリードフレーム搬送装置に適用した例で説明する。
【0017】
まず、図1と図2を用いてリードフレーム搬送装置の構成について説明する。
【0018】
リードフレーム搬送装置はガイドレール12と、送りピン13と、送りピン上下ユニット14と、送りピン上下駆動装置15と、送り駆動装置16と、制御装置17から構成されている。
【0019】
図において、リードフレーム1は適宜長さの短冊状に形成され、このリードフレーム1には長手方向に沿って多数のペレットを載置するペレット載置部1Aのピッチの間隔でその長手方向の端部に送り穴1Bが形成されている。
【0020】
ガイドレール12は図示しないベース板に一体的に取り付けられており、リードフレーム1をガイドする搬送レールである。この搬送レールには長手方向に沿って溝が形成されており、その溝を案内としてリードフレームを長手方向に移送される。また、ガイドレールには図示しないヒータが内蔵されている。
【0021】
送りピン13はガイドレールによるリードフレーム送り面より上に配置され、適宜長さの短冊状に形成されたリードフレームの長手方向の端部に沿って、多数のペレットを載置するペレット載置部のピッチの間隔で、その長手方向の端部に形成された送り穴に嵌り係合してリードフレームを移送する。送りピンの長手方向の配置はリードフレームに送りピンが1本嵌り係合するように適宜間隔で配置されている。
【0022】
送りピン上下ユニット14はガイドレールの後端にガイドレールの長手方向に沿って所定の間隔で配置されている。すなわち図2に示すようにガイドレール後端にスペーサ18を介し水平ブロック19に水平方向に移動する水平スライドガイド20が送りピン毎に取り付けられている。また、水平スライドガイドには水平ベース21を介し上下方向に移動する上下スライドガイド22が取り付けられている。上下スライドガイドには上下ベース23が取り付けられ、この先端に送りピン取り付け用のピンホルダ24が取り付けられる様にガイドレールの後端から前端に位置するように略L字状に形成されている。また、水平ベースには水平方向に移動可能にするタイミングベルト25と連結させるために連結板26が構成されている。また、上下ベースの下部に上下駆動用の板カム27に追従するカムフォロア28を軸支し、上下ベースと水平ベース間に張設したスプリング29の弾性力により前記カムフォロアを板カムに接当させている。
【0023】
送りピン上下駆動装置15はガイドレール後端に送り上下ユニットと同様にスペーサ18Aと水平ブロック19Aを介し水平スライドガイド20Aが配置されている。水平スライドガイドはスライドプレート30ですべて一体的に動くように固定され、前記上下ベースに軸支されたカムフォロアに接当するように板カムがそれぞれの位置にスライドプレートに固定されている。前記スライドプレートは回転自在に軸支されたプーリ31A、31Bに巻き掛けたタイミングベルト32に固定金具33で固定し、一方のプーリ31Aに送りピン上下駆動用のサーボモータ34を組み込み、両プーリ間をタイミングベルトにて連結させる。
【0024】
送り駆動装置16は前記水平ベースの連結板の回転しないプーリ36に回転自在に軸支されたプーリ35A、35Bに巻き掛けたタイミングベルト25に巻き掛け固定し、一方のプーリ35Aに送り駆動用のサーボモータ37を組み込み、両プーリ間をタイミングベルトで連結する。また、
制御装置17は前記送りピン上下駆動用のサーボモータと送り駆動用のサーボモータを制御して送りピンの上下動作と水平移動動作を制御する。
【0025】
また、図2に示すように、送りピン13ごとに設けられた連結板26にはそれぞれセンサ26Aが固定支持され、一方、対応するそれぞれの上下ベース23には、送りピン13がリードフレーム1の送り穴1Bに挿入されたときにセンサ26Aを遮るようなドグ23Aがそれぞれ固定支持される。そして、後述するように板カム27によって送りピン13が下降させられたとき、もし送りピン13が対応する送り穴1Bに挿入されなかったときには、その挿入されなかった送りピン13に対応するセンサ26Aはドグ23Aによって遮られないことから、制御装置17においては、各センサ26Aからの信号に基づき、すべての送りピン13が正常に対応する送り穴1Bに挿入されたか、あるいはどの送りピン13が正常に挿入されなかったかを判別することができ、不図示の表示装置に表示するようになっている。
【0026】
さらに本リードフレーム搬送装置には、ガイドレール上のリードフレームをボンディング位置で位置決め後クランプする図示しないクランプ装置を有している。
【0027】
次に上述したリードフレーム搬送装置の送りピン上下動作と送りピン水平移動動作からなる一連のリードフレームの定ピッチで間欠的な移送動作を図3を用いて説明する。
【0028】
送りピンは上昇し、後退した位置で待機している(図中▲1▼)。まず、送りピン上下駆動装置15のサーボモータ34が所定量正回転することにより、プーリ31A,31Bに巻き掛けられたタイミングベルト32を周回させ、そのタイミングベルトに固定されているスライドプレート30が前進する。このスライドプレートには送りピン上下用の板カム27が送りピン毎に取り付けられている。すなわち、板カムが前進すると板カムに設けられたカムの傾斜形状に応じたタイミングで、板カムに接当した上下ベースに軸支したカムフォロア28に作動する。カムフォロアは上下ベースに張接されたスプリングの弾性力にて常時下側に付勢されている。上下ベースには上下スライドガイドが組み込まれているので上下自在に動くことができる。このためカムの傾斜形状を下ることによりカムフォロアが板カムに追従して下降する(図中▲2▼)。すなわち上下ベースに組み込まれたピンホルダとその先端に組み込まれた送りピンが下降する。このことはリードフレームの送り穴に送りピンを嵌め係合させことになる。
【0029】
次に送り駆動装置16のサーボモータ37が所定量正回転することにより、プーリ35A、35Bに巻き掛けられたタイミングベルト25を周回させ、そのタイミングベルトに固定されている連結板26が前進する。この連結板は水平ベース21からの張出し部であり、この水平ベースが送りピン毎に水平スライドガイド20に固定されている。この水平スライドガイドは水平方向に自在に動くことができ、水平スライドガイドに組み込まれた水平ベースの張出し部の連結板を介してタイミングベルトに固定されている。また、水平ベースには上下スライドガイドが組み込まれており、上下スライドベースには上下ベースを介して送りピンが組み込まれている。すなわち、送りピンがガイドレールの長手方向に沿って前進する。なお、この時送りピン上下駆動用のサーボモータも同時に所定量正回転し、送り駆動装置のサーボモータによる水平方向の移動量と等しい距離をプーリに巻き掛けられたタイミングベルトを周回させ、そのタイミングベルトに固定されているスライドプレートの板カムを移動させる。すなわち上下ベースに軸支したカムフォロアは板カムの下死点に位置したまま移動する(図中▲3▼)。そのため送りピンは下降したままの状態で移動する。このことはリードフレームの送り穴に送りピンが係合されたまま移動することで、すなわち、リードフレームが1ピッチ搬送されたこととなる。
【0030】
次に送りピン上下駆動装置のサーボモータが所定量逆回転し、プーリに巻き掛けられたタイミングベルトを周回させ、そのタイミングベルトに固定されているスライドプレートが後進する。このスライドプレートには送りピン上下用の板カムが送りピン毎に取り付けられているので、板カムが後進すると板カムに設けられた板カムの傾斜形状に応じたタイミングで、板カムに接当した上下ベースに軸支したカムフォロアに作動する。カムフォロアは、上下ベースに張接されたスプリングの弾性力にて常時下側に付勢されている。上下ベースには上下スライドガイドが組み込まれているので、上下自在に動くことができる。このためカムの傾斜形状を上ることによりカムフォロアがカムに強制されて上昇する(図中▲4▼)。すなわち上下ベースに組み込まれたピンホルダとその先端に組み込まれた送りピンが上昇する。このことはリードフレームの送り穴から送りピンを抜くことになる。
【0031】
次に送り駆動装置のサーボモータが所定量逆回転することにより、プーリに巻き掛けられたタイミングベルトを周回させ、そのタイミングベルトに固定されている連結板が後進する。この連結板は水平ベースからの張出し部であり、この水平ベースがおのおのの送りピン毎に水平スライドガイドに固定されているので、この水平スライドガイドは水平方向に自在に動くことができ、水平スライドガイドに組み込まれた水平ベースの張出し部を介してタイミングベルトに固定されている。また、水平ベースには上下スライドガイドが組み込まれており、上下スライドベースには上下ベースを介して送りピンが組み込まれている。すなわち、送りピンが後進する。なお、この時送りピン上下駆動用のサーボモータも同時に所定量逆回転し、送り駆動モータによる水平方向の移動量と等しい距離板カムを移動させる。すなわち上下ベースに軸支したカムフォロアは板カムの上死点に位置したまま移動する(図中▲5▼)。そのため送りピンは上昇したままの状態で移動する。このことは送りピンを元の位置に後退することである。この一連の動作を繰り返すことによりリードフレームが定ピッチで間欠的に移送される。なお、定ピッチで間欠的に移送されたリードフレームはボンディング位置に位置付けられて図示しないクランパにて押圧されて固定後、ペレットをボンディングする。
【0032】
なお、上記実施の形態では送りピンの水平方向の搬送は送り駆動装置のタイミングベルトに送りピン上下駆動装置の水平スライドガイドに組み込まれた水平ベースの連結板を固定した内容で説明したが、ここに過負荷検出器を設けても良い。
【0033】
図4、図5を用いて過負荷検出器について説明する。過負荷検出器40は、主にプーリ41と、荷重装置42と、検出装置43で構成されている。
【0034】
プーリ41は送り駆動装置16のタイミングベルト25を巻回し、回転自在とし、外周近辺にプーリの回転中心と同心となる円弧状の長穴44が形成されている。この長穴に回転を規制するピン45を嵌合し、この回転規制用のピンに長穴の端部を接当させ、プーリを回転方向にスプリング46の弾性力にて付勢させている。また、プーリには過負荷を検出させる遮光板47とプーリをスプリングの弾性力にて付勢させるに必要なスプリングポスト48が設けられている。
【0035】
荷重装置42はスプリング46の弾性力によりプーリ41に形成された長穴44の端部とプーリの回転を規制するピン45を送りピン駆動装置のタイミングベルト25が進む方向と逆に弾性力が作用するようにプーリに設けられたスプリングポストと位置調整板49に設けられたスプリングポスト50間に張設されている。このスプリングの弾性力は所要に応じて、適宜に選択することができるものとし、スライドユニット51が送り駆動装置のタイミングベルトにて、移動させた状態下でも、プーリに設けた長穴の端部に回転制御用のピンが接当させ得る弾性力を有するものとする。しかるに送りピンに作用するリードフレーム搬送力が定常移送時より増加した時、スプリング46は伸長変形する。
【0036】
検出装置43は位置調整板49に検出センサ52を設け、また、プーリに設けた遮光板47が検出センサをOFFしている位置を初期位置とする。
【0037】
以上のように構成したところにおいて、ガイドレールに沿ったリードフレームの移送は、送りピンを送りピン上下駆動装置により、リードフレームの送り穴に係合し、送り駆動装置のサーボモータによりプーリ31Aを回転させタイミングベルトを前進させることにより行われる。この時、リードフレームのガイドレールに沿った円滑に移動する定常移送時には、送りピンすなわち水平スライドガイド20はスプリングの作用下でプーリに設けた長穴の端部に送り規制用のピンを付勢させて、スプリングの伸長変形なしで、送り駆動装置のタイミングベルトと等しい速度で前進する。すなわち、この定常移送時には検出センサの投光部53から照射された光は遮光板により、遮光され受光部54には到達しない。
【0038】
これに対し、リードフレームに過負荷がかかった場合、リードフレームはガイドレールに沿っての前進が束縛される。このことはリードフレームの送り穴に係合した送りピンの前進も束縛されることになる。結果として、搬送装置のタイミングベルトは前進し、送りピンは停止した状態、すなわち、スプリングが伸長変形し、そのためプーリが回転したこととなる。また、プーリに設けられた遮光板も回転することになる。遮光板が回転すれば検出センサから遠ざかることとなり、検出センサ投光部から常時照射されている光は受光部に到着することになる。ここで、検出センサから制御装置へ信号を伝送し、これに基づき制御装置は送り駆動用のサーボモータの回転を即座に停止させることで送りピンの前進を停止させ、送りピンと係合しているリードフレームに作用する過負荷を未然に防止することができる。
【0039】
また、本過負荷検出器では、検出センサとスプリングの張設用スプリングポストを位置調整板上にお互い取り付けられていることから、位置調整板をプーリの回転中心に沿って回転させて送りピンを前進、または後退させたにも係わらず過負荷検出器に作用するスプリングの弾性力はいつも一定となる。また、検出センサと遮光板の位置関係も同じである。このため送りピン位置を調整しても、常に過負荷検出器に作用する力は一定のままで、検出センサの位置調整がいらない、過負荷検出を行うことができる。
【0040】
以上、リードフレームを例にした実施の形態について述べたが本発明はリードフレーム以外の短冊状薄板の移送に適応可能である。また、ペレットボンディング工程で使用されるダイボンダのリードフレーム搬送装置に適応した実施の形態で説明したが他の搬送装置例えばフリップチップボンダ等にも適応可能である。
【0041】
【発明の効果】
以上のように、本発明に係わるリードフレーム搬送装置によれば、送りピン毎にスライド手段を設けたので、リードフレームの形状が変わることによるピンホルダの形状変更は単純化され、そのため部品の価格は安くでき、すなわち、装置価格が安くできる。また、位置決めピンの配置替えが簡単となり、短時間で調整ができる。また、過負荷検出器をおのおのの送りピン毎に設けたので、リードフレームに過負荷がかかった時、装置はただちに停止する。そのため、過負荷時に送りピンに大きな力が作用しないので送りピンは破損し難くなる。また、過負荷検出器に張設したスプリングのスプリングポストと検出センサを位置調整板上にお互い配置したので、位置調整板を用いて送りピンの位置を長手方向に調整してもスプリングの長さが変わらず、その弾性力は同じのため過負荷が作動する力を同じにできる。また、検出センサと遮光板も同じに動くので、遮光板の調整がいらない。
【0042】
【図面の簡単な説明】
【図1】本発明を適用してなるリードフレーム搬送装置の概略構成を示す平面図。
【図2】図1における送りピン部の側面図。
【図3】本発明を適用してなる送りピン上下動作と水平動作の動作説明図。
【図4】本発明を適応してなる過負荷検出器の平面図。
【図5】図4における側面図。
【図6】従来のリードフレーム搬送装置の概略構成を示す平面図。
【図7】図6における送りピン部の側面図。
【符号の説明】
1 リードフレーム
1A ペレット載置部
1B 送り穴
2 ガイドレール
3 送りピン
4 ピンホルダ
5 移送軸
6 送り上下装置
7 連結板
8 スライドガイド
9 ネジ軸
10 送りモータ
11 送り板
12 ガイドレール
13 送りピン
14 送りピン上下ユニット
15 送りピン上下駆動装置
16 送り駆動装置
17 制御装置
18 スペーサ
18Aスペーサ
19 水平ブロック
19A水平ブロック
20 水平スライドガイド
20A水平スライドガイド
21 水平ベース
22 上下スライドガイド
23 上下ベース
23Aドグ
24 ピンホルダ
25 タイミングベルト
26 連結板
26Aセンサ
27 板カム
28 カムフォロア
29 スプリング
30 スライドプレート
31Aプーリ
31Bプーリ
32 タイミングベルト
33 固定金具
34 サーボモータ
35Aプーリ
35Bプーリ
36 プーリ
37 サーボモータ
40 過負荷検出器
41 プーリ
42 荷重装置
43 検出装置
44 長穴
45 ピン
46 スプリング
47 遮光板
48 スプリングポスト
49 位置調整板
50 スプリングポスト
51 スライドユニット
52 検出センサ
53 投光部
54 受光部
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a lead frame transport device.
[0002]
[Prior art]
One of the semiconductor manufacturing processes is a process of bonding a semiconductor pellet (hereinafter simply referred to as “pellet”) to a substrate. In this process, a pellet bonding apparatus is used.
[0003]
This apparatus picks up pellets one by one from a plurality of pellets in a grid-like arrangement formed by scribing a wafer and bonds them onto a substrate such as a lead frame. Each time the pellets are bonded, the lead frame is intermittently conveyed at a constant pitch.
[0004]
Here, a conventional lead frame conveying apparatus will be described with reference to FIG. 6 showing a plan view and FIG. 7 showing a side view. The lead frame transport device 100 includes a guide rail 2 that guides the lead frame 1 along its transport direction (right direction in FIG. 6), and a feed pin 3 provided above the lead frame transport surface of the guide rail 2. Have Along the edge of the lead frame 1, a feed hole 1 </ b> B is provided to face the pellet placement portion 1 </ b> A. A plurality of feed pins 3 are provided in the conveying direction of the lead frame 1, and each feed pin 3 is fixedly supported by a transfer shaft 5 located at the rear end of the guide rail via a pin holder 4, and is vertically moved around the transfer shaft 5. It can be swung in an arc shape in the direction. Reference numeral 6 denotes a feed up / down device 6 such as a cylinder for moving the feed pin 3 up and down.
[0005]
A slide guide 8 is fixedly disposed in parallel with the transfer shaft 5, and a connecting plate 7 integrated with the transfer shaft 5 in the transport direction is slidable on the slide guide 8. A screw shaft 9 that is rotatably arranged in parallel with the slide guide 8 is appropriately rotated forward or reverse by a feed motor 10, and the connecting plate 7 is moved to the slide guide 8 by a feed plate 11 that is moved by this rotational movement. Slide along. By this slide, the feed pin 3 moves along the guide rail.
[0006]
Next, an intermittent conveyance operation at a constant pitch of a series of lead frames by the lead frame conveyance device will be described.
[0007]
First, each feed pin 3 is moved downward by the feed lifting device 6, and the feed pin 3 is inserted into a feed hole 1 </ b> B provided in the lead frame 1. Next, by rotation of the feed motor 10, the connecting plate 7 is moved in the transport direction by a distance (one pitch) corresponding to one feed hole 1B. By this operation, the feed pin 3 moves one pitch in the transport direction, and the lead frame 1 is also transported by one pitch. Next, each feed pin 3 is moved up by the feed lifting device 6. By this operation, the feed pin 3 comes out of the feed hole 1B. Finally, the feed motor 10 is reversely rotated to return the feed pin 3 to the original position. Thereafter, this operation is repeated. When the pellet mounting unit 1A is sequentially positioned at the bonding position by the constant pitch conveyance of the lead frame 1, the lead frame 1 is fixed to the guide rail 2 by a clamping mechanism (not shown), and in this state, the pellet mounting unit 1A is placed on the pellet mounting unit 1A. On the other hand, the pellet is bonded.
[0008]
[Problems to be solved by the invention]
Incidentally, in the lead frame transport apparatus 100 used conventionally, a plurality of feed pins 3 are fixedly supported by one transfer shaft 5 via each pin holder 4, so that there are the following problems. It was. That is, in order to engage each feed pin 3 with the feed hole 1B of the lead frame 1, when the shape of the lead frame 1 is changed, the position of the pin holder 4 on the screw shaft 9 is changed to change the arrangement interval and position of the feed pins 3. the Although Kere should not change, when the transfer shaft 5 and guide rail 2 by the heat at the time of heating the lead frame 1 expands longitudinally thermal expansion, all the feed pin 3 to the feed hole 1B to reliably correspond In order to engage, adjustment had to be made after thermal expansion. For this reason, a large number of steps and time are required for rearranging the feed pins 3 due to the change in the shape of the lead frame 1. Further, since the shape of the pin holder 4 is complicated, there is a problem that the price of the parts is high and the price of the device is greatly increased.
[0009]
In view of the above problems, it is an object of the present invention to provide a lead frame transport apparatus that eliminates the above-mentioned problems.
[0010]
[Means for Solving the Problems]
In order to solve the above-mentioned problems, the invention according to claim 1 is characterized in that a guide rail for guiding the lead frame and a plurality of feed pins provided on the lead frame feed surface by the guide rail are appropriately spaced in the longitudinal direction of the guide rail. The feed up / down means for moving the feed pins up and down to engage with the feed holes of the lead frame, the feed means for reciprocating these feed pins in the horizontal direction along the guide rail, and the feed up / down means And a control means for controlling the feeding means, each lead pin is connected by a belt-like member to move along the guide rail, and the belt-like member is wound around a cylindrical body. The slide means is provided so that each feed pin can be moved by the feed means through the belt-like member. Characterized in that arranged in each feed pin of the ax.
[0011]
Further, in the invention according to claim 2, the cylindrical body is arranged for each feed pin, the cylindrical body around which the belt-like member is wound is rotatable, an arc-shaped elongated hole is provided in the cylindrical body, and the elongated hole is provided. Fit the rotation restricting pin to the rotation restricting pin, and contact the end of the long hole of the cylindrical body with this rotation restricting pin so that the spring acts from the cylindrical body in the direction opposite to the feeding direction of the strip member. It has an overload detector which is stretched and biased in the rotational direction by its elastic force and detects the overload by detecting the extension of the spring.
[0012]
According to a third aspect of the present invention, the overload detector includes a load unit that urges the cylindrical body in the rotational direction by the elastic force of the spring, a sensor that detects that the cylindrical body is rotated due to the extension of the spring. The detecting means for detecting by the light shielding plate is arranged so that the elastic force of the spring of the load means and the position of the sensor of the detecting means and the light shielding plate are the same even if the position of the feed pin is moved in the horizontal direction. It is characterized by that.
[0013]
The present invention has the following effects. By arranging the sliding means for each feed pin, the shape change of the pin holder due to the change of the shape of the lead frame is simplified, so that the price of the parts can be reduced, that is, the device price can be reduced. Further, the positioning pins can be easily rearranged and can be adjusted in a short time.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, although one embodiment of the present invention is described based on a drawing, it cannot be overemphasized that the present invention is not limited to this.
[0015]
FIG. 1 is a plan view showing a schematic configuration of a lead frame transport apparatus to which the present invention is applied, FIG. 2 is a side view of a feed pin portion in FIG. 1, and FIG. FIG. 4 is a plan view of an overload detector to which the present invention is applied, and FIG. 5 is a side view of FIG.
[0016]
A lead frame conveying apparatus according to the present embodiment will be described with reference to FIGS. In the following description, an example applied to a lead frame conveying device of a pellet bonding apparatus will be described.
[0017]
First, the configuration of the lead frame transfer device will be described with reference to FIGS. 1 and 2.
[0018]
The lead frame transport device includes a guide rail 12, a feed pin 13, a feed pin vertical unit 14, a feed pin vertical drive device 15, a feed drive device 16, and a control device 17.
[0019]
In the drawing, a lead frame 1 is formed in a strip shape having an appropriate length, and the lead frame 1 has an end in the longitudinal direction at a pitch interval of a pellet placing portion 1A for placing a number of pellets along the longitudinal direction. hole 1B feeding the parts are formed Ru Empire.
[0020]
Guide rail 12 is integrally attached to the base plate (not shown), a transfer rail that guides the lead frame 1. Grooves are formed in the transport rail along the longitudinal direction, and the lead frame is transported in the longitudinal direction using the groove as a guide. Further, a heater (not shown) is built in the guide rail.
[0021]
The feed pin 13 is disposed above the lead frame feed surface by the guide rail, and a pellet placing portion for placing a large number of pellets along the longitudinal end portion of the lead frame formed in a strip shape having an appropriate length. The lead frame is transferred by being fitted into and engaged with a feed hole formed at the end portion in the longitudinal direction at intervals of the pitch. The feed pins are arranged at appropriate intervals in the longitudinal direction so that one feed pin is fitted and engaged with the lead frame.
[0022]
The feed pin vertical unit 14 is disposed at a predetermined interval along the longitudinal direction of the guide rail at the rear end of the guide rail. That is, as shown in FIG. 2, a horizontal slide guide 20 that moves in the horizontal direction is attached to the horizontal block 19 via the spacer 18 at the rear end of the guide rail for each feed pin. In addition, a vertical slide guide 22 that moves in the vertical direction via a horizontal base 21 is attached to the horizontal slide guide. An upper and lower base 23 is attached to the upper and lower slide guides, and is formed in an approximately L shape so as to be positioned from the rear end to the front end of the guide rail so that a pin holder 24 for attaching a feed pin is attached to the tip. Further, a connecting plate 26 is formed on the horizontal base so as to be connected to a timing belt 25 that can move in the horizontal direction. Further, a cam follower 28 that follows the plate cam 27 for vertical driving is pivotally supported at the lower part of the vertical base, and the cam follower is brought into contact with the plate cam by the elastic force of a spring 29 stretched between the vertical base and the horizontal base. Yes.
[0023]
In the feed pin vertical drive device 15, a horizontal slide guide 20A is disposed at the rear end of the guide rail via a spacer 18A and a horizontal block 19A in the same manner as the feed vertical unit. The horizontal slide guides are all fixed by the slide plate 30 so as to move integrally, and the plate cams are fixed to the slide plates at respective positions so as to contact the cam followers pivotally supported by the upper and lower bases. The slide plate is fixed to a timing belt 32 wound around pulleys 31A and 31B rotatably supported by a fixing bracket 33. A servo motor 34 for feed pin up / down drive is incorporated in one pulley 31A, and between the two pulleys. Are connected by a timing belt.
[0024]
The feed driving device 16 is wound around and fixed to a timing belt 25 wound around pulleys 35A and 35B rotatably supported on a pulley 36 that does not rotate on the connecting plate of the horizontal base, and is fed to one pulley 35A for feed driving. A servo motor 37 is incorporated, and both pulleys are connected by a timing belt. Also,
The controller 17 controls the feed pin vertical drive servomotor and the feed drive servomotor to control the vertical movement and horizontal movement of the feed pin.
[0025]
Further, as shown in FIG. 2, sensors 26 </ b> A are fixedly supported on the connecting plates 26 provided for the respective feed pins 13, while the feed pins 13 are connected to the corresponding upper and lower bases 23. The dogs 23A that block the sensor 26A when inserted into the feed hole 1B are fixedly supported. As will be described later, when the feed pin 13 is lowered by the plate cam 27, if the feed pin 13 is not inserted into the corresponding feed hole 1B, the sensor 26A corresponding to the feed pin 13 not inserted. Is not obstructed by the dog 23A, in the control device 17, all the feed pins 13 are normally inserted into the corresponding feed holes 1B based on the signals from the sensors 26A, or which feed pins 13 are normal. It is possible to determine whether it has been inserted into the display device, and display it on a display device (not shown).
[0026]
Furthermore, this lead frame transport device has a clamp device (not shown) for clamping the lead frame on the guide rail after positioning at the bonding position.
[0027]
Next, an intermittent transfer operation at a constant pitch of a series of lead frames composed of the feed pin up-and-down operation and the feed pin horizontal movement operation of the lead frame conveying apparatus described above will be described with reference to FIG.
[0028]
The feed pin is raised and stands by at the retracted position ((1) in the figure). First, when the servo motor 34 of the feed pin vertical drive device 15 rotates forward by a predetermined amount, the timing belt 32 wound around the pulleys 31A and 31B is rotated, and the slide plate 30 fixed to the timing belt advances. To do. A plate cam 27 for feeding pins up and down is attached to the slide plate for each feeding pin. That is, when the plate cam advances, the cam follower 28 pivotally supported by the upper and lower bases that are in contact with the plate cam is operated at a timing corresponding to the inclined shape of the cam provided on the plate cam. The cam follower is always urged downward by the elastic force of a spring stretched between the upper and lower bases. A vertical slide guide is built in the vertical base so that it can move freely. For this reason, the cam follower descends following the plate cam by descending the inclined shape of the cam ((2) in the figure). That is, the pin holder incorporated in the upper and lower bases and the feed pin incorporated at the tip thereof are lowered. This means that the feed pin is fitted and engaged with the feed hole of the lead frame.
[0029]
Next, when the servo motor 37 of the feed driving device 16 is rotated forward by a predetermined amount, the timing belt 25 wound around the pulleys 35A and 35B is rotated, and the connecting plate 26 fixed to the timing belt advances. The connecting plate is a protruding portion from the horizontal base 21, and the horizontal base is fixed to the horizontal slide guide 20 for each feed pin. The horizontal slide guide can move freely in the horizontal direction, and is fixed to the timing belt via a connecting plate of a protruding portion of the horizontal base incorporated in the horizontal slide guide. In addition, a vertical slide guide is incorporated in the horizontal base, and a feed pin is incorporated in the vertical slide base via the vertical base. That is, the feed pin moves forward along the longitudinal direction of the guide rail. At this time, the servo motor for driving the feed pin up and down also simultaneously rotates forward by a predetermined amount, and the timing belt wound around the pulley is rotated around a distance equal to the horizontal movement amount by the servo motor of the feed drive device. Move the plate cam of the slide plate fixed to the belt. That is, the cam follower pivotally supported by the upper and lower bases moves while being located at the bottom dead center of the plate cam ((3) in the figure). Therefore, the feed pin moves while being lowered. This means that the lead frame is moved while being engaged with the feed hole of the lead frame, that is, the lead frame is conveyed by one pitch.
[0030]
Next, the servo motor of the feed pin vertical drive device rotates reverse by a predetermined amount, rotates the timing belt wound around the pulley, and the slide plate fixed to the timing belt moves backward. A plate cam for moving the feed pin up and down is attached to this slide plate for each feed pin. When the plate cam moves backward, it contacts the plate cam at a timing corresponding to the inclined shape of the plate cam provided on the plate cam. The cam follower is pivotally supported by the upper and lower bases. The cam follower is always urged downward by the elastic force of a spring stretched between the upper and lower bases. Since the vertical slide guide is built in the vertical base, it can move freely up and down. For this reason, the cam follower is forced up by the cam and moves up (indicated by (4) in the figure). That is, the pin holder incorporated in the upper and lower bases and the feed pin incorporated at the tip thereof are raised. This means that the feed pin is pulled out from the feed hole of the lead frame.
[0031]
Next, the servo motor of the feed driving device rotates reverse by a predetermined amount, so that the timing belt wound around the pulley is rotated, and the connecting plate fixed to the timing belt moves backward. This connecting plate is a protruding portion from the horizontal base, and since this horizontal base is fixed to the horizontal slide guide for each feed pin, this horizontal slide guide can move freely in the horizontal direction, and the horizontal slide It is fixed to the timing belt through a protruding portion of a horizontal base incorporated in the guide. In addition, a vertical slide guide is incorporated in the horizontal base, and a feed pin is incorporated in the vertical slide base via the vertical base. That is, the feed pin moves backward. At this time, the servo motor for driving the feed pin up and down also rotates in the reverse direction by a predetermined amount at the same time, and moves the distance plate cam equal to the horizontal movement amount by the feed drive motor. That is, the cam follower pivotally supported on the upper and lower bases moves while being located at the top dead center of the plate cam ((5) in the figure). Therefore, the feed pin moves in a state where it is raised. This is to retract the feed pin to its original position. By repeating this series of operations, the lead frame is intermittently transferred at a constant pitch. The lead frame intermittently transferred at a constant pitch is positioned at a bonding position, pressed by a clamper (not shown), fixed, and then pellets are bonded.
[0032]
In the above embodiment, the conveyance of the feed pin in the horizontal direction has been described with the content that the horizontal base connecting plate incorporated in the horizontal slide guide of the feed pin vertical drive device is fixed to the timing belt of the feed drive device. An overload detector may be provided.
[0033]
The overload detector will be described with reference to FIGS. The overload detector 40 mainly includes a pulley 41, a load device 42, and a detection device 43.
[0034]
The pulley 41 is wound around the timing belt 25 of the feed driving device 16 so as to be rotatable, and an arcuate slot 44 concentric with the rotation center of the pulley is formed in the vicinity of the outer periphery. A pin 45 for restricting rotation is fitted into the elongated hole, the end of the elongated hole is brought into contact with the rotation restricting pin, and the pulley is biased by the elastic force of the spring 46 in the rotational direction. Further, the pulley is provided with a light shielding plate 47 for detecting overload and a spring post 48 necessary for biasing the pulley by the elastic force of the spring.
[0035]
The load device 42 feeds the end of the long hole 44 formed in the pulley 41 by the elastic force of the spring 46 and the pin 45 for restricting the rotation of the pulley, and the elastic force acts in the direction opposite to the direction in which the timing belt 25 of the pin drive device advances. Thus, the spring post provided on the pulley and the spring post 50 provided on the position adjusting plate 49 are stretched. The elastic force of the spring can be appropriately selected as required, and the end of the long hole provided in the pulley even when the slide unit 51 is moved by the timing belt of the feed driving device. It has an elastic force that can be brought into contact with the rotation control pin. However, when the lead frame conveying force acting on the feed pin is increased from that during the steady transfer, the spring 46 is extended and deformed.
[0036]
The detection device 43 is provided with the detection sensor 52 on the position adjustment plate 49, and the position where the light shielding plate 47 provided on the pulley turns off the detection sensor is set as the initial position.
[0037]
In the configuration as described above, the lead frame is transferred along the guide rail by engaging the feed pin with the feed hole of the lead frame by the feed pin vertical drive device, and the pulley 31A by the servo motor of the feed drive device. This is done by rotating and advancing the timing belt. At this time, at the time of steady transfer that moves smoothly along the guide rail of the lead frame, the feed pin, that is, the horizontal slide guide 20 urges the feed regulating pin to the end of the long hole provided in the pulley under the action of the spring. Thus, it moves forward at a speed equal to that of the timing belt of the feed driving device without the extension deformation of the spring. In other words, the light emitted from the light projecting unit 53 of the detection sensor is blocked by the light shielding plate and does not reach the light receiving unit 54 during the steady transfer.
[0038]
On the other hand, when the lead frame is overloaded, the lead frame is restricted from moving forward along the guide rail. This also restricts the advance of the feed pin engaged with the feed hole of the lead frame. As a result, the timing belt of the transport device moves forward and the feed pin is stopped, that is, the spring is extended and deformed, so that the pulley is rotated. Further, the light shielding plate provided on the pulley also rotates. If the light shielding plate rotates, it moves away from the detection sensor, and the light constantly irradiated from the detection sensor light projecting unit reaches the light receiving unit. Here, a signal is transmitted from the detection sensor to the control device, and based on this, the control device immediately stops the rotation of the servo motor for driving the feed, thereby stopping the advance of the feed pin and engaging with the feed pin. An overload acting on the lead frame can be prevented beforehand.
[0039]
In this overload detector, since the detection sensor and the spring post for tensioning the spring are attached to the position adjustment plate, the position adjustment plate is rotated along the rotation center of the pulley and the feed pin is moved. The elastic force of the spring acting on the overload detector is always constant regardless of whether it is moved forward or backward. The positional relationship between the detection sensor and the light shielding plate is also the same. For this reason, even if the position of the feed pin is adjusted, the force acting on the overload detector always remains constant, and overload detection can be performed without adjusting the position of the detection sensor.
[0040]
As mentioned above, although the embodiment taking the lead frame as an example has been described, the present invention is applicable to the transfer of strip-shaped thin plates other than the lead frame. In addition, although the embodiment has been described with reference to the die bonder lead frame transport device used in the pellet bonding process, the present invention can also be applied to other transport devices such as flip chip bonders.
[0041]
【The invention's effect】
As described above, according to the lead frame conveying apparatus according to the present invention, since the slide means is provided for each feed pin, the change of the shape of the pin holder due to the change of the shape of the lead frame is simplified. It can be reduced, that is, the device price can be reduced. Further, the positioning pins can be easily rearranged and can be adjusted in a short time. In addition, since an overload detector is provided for each feed pin, the apparatus immediately stops when the lead frame is overloaded. For this reason, since a large force does not act on the feed pin at the time of overload, the feed pin is hardly damaged. In addition, since the spring post of the spring stretched over the overload detector and the detection sensor are arranged on the position adjustment plate, the length of the spring can be adjusted even if the position of the feed pin is adjusted in the longitudinal direction using the position adjustment plate. Since the elastic force is the same, the force at which the overload is activated can be made the same. Further, since the detection sensor and the light shielding plate move in the same manner, it is not necessary to adjust the light shielding plate.
[0042]
[Brief description of the drawings]
FIG. 1 is a plan view showing a schematic configuration of a lead frame transport apparatus to which the present invention is applied.
FIG. 2 is a side view of a feed pin portion in FIG.
FIG. 3 is an operation explanatory view of a feed pin up / down operation and a horizontal operation to which the present invention is applied.
FIG. 4 is a plan view of an overload detector adapted to the present invention.
FIG. 5 is a side view of FIG. 4;
FIG. 6 is a plan view showing a schematic configuration of a conventional lead frame transport apparatus.
7 is a side view of the feed pin portion in FIG. 6. FIG.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Lead frame 1A Pellet mounting part 1B Feed hole 2 Guide rail 3 Feed pin 4 Pin holder 5 Transfer shaft 6 Feed up-and-down apparatus 7 Connecting plate 8 Slide guide 9 Screw shaft 10 Feed motor 11 Feed plate 12 Guide rail 13 Feed pin 14 Feed pin Vertical unit 15 Feed pin vertical drive device 16 Feed drive device 17 Control device 18 Spacer 18A Spacer 19 Horizontal block 19A Horizontal block 20 Horizontal slide guide 20A Horizontal slide guide 21 Horizontal base 22 Vertical slide guide 23 Vertical base 23A Dog 24 Pin holder 25 Timing belt 26 connecting plate 26A sensor 27 plate cam 28 cam follower 29 spring 30 slide plate 31A pulley 31B pulley 32 timing belt 33 fixing bracket 34 servo motor 35A pulley 35B pulley 36 37 servomotor 40 Overload detector 41 pulley 42 load device 43 detector 44 slot 45 pin 46 spring 47 shielding plate 48 spring post 49 position adjustment plate 50 the spring posts 51 slide unit 52 sensor 53 light emitting portion 54 receiving portion

Claims (3)

リードフレームをガイドするガイドレールと、ガイドレールによるリードフレーム送り面の上に設けられる複数の送りピンを前記ガイドレールの長手方向に適宜間隔で配置し、これらの送りピンを上下させてリードフレームの送り穴に係合させる送り上下手段と、これらの送りピンをガイドレールに沿って水平方向に往復移動させる送り手段と、前記送り上下手段と送り手段を制御する制御手段とを有するリードフレーム搬送装置において、おのおのの送りピンをガイドレールに沿って移動させるために帯状部材にて連結すると共に、この帯状部材を円柱体に巻回させて、おのおのの送りピンを帯状部材を介して送り手段にて移動可能なようにスライド手段を設け、このスライド手段をおのおのの送りピン毎に配置したことを特徴とするリードフレーム搬送装置。A guide rail that guides the lead frame and a plurality of feed pins provided on the lead frame feed surface by the guide rail are arranged at appropriate intervals in the longitudinal direction of the guide rail, and these feed pins are moved up and down to move the lead frame. Lead frame conveying apparatus having feed up / down means engaged with the feed hole, feed means for reciprocating these feed pins in the horizontal direction along the guide rail, and control means for controlling the feed up / down means and the feed means In order to move each feed pin along the guide rail with a belt-like member, the belt-like member is wound around a cylindrical body, and each feed pin is fed by the feeding means via the belt-like member. A slide means is provided so as to be movable, and the slide means is arranged for each feed pin. Frame transport apparatus. 前記円柱体をおのおの送りピン毎に配置し、帯状部材を巻回した円柱体を回転自在とし、この円柱体に円弧状の長穴を設け、その長穴に回転規制用のピンを嵌合し、この回転規制用のピンに円柱体の長穴端部を接当させ、円柱体からスプリングを帯状部材の送り方向と逆に弾性力が作用するように張設し、その弾性力により回転方向に付勢させ、このスプリングの伸びを検知することで過負荷を検出するようにした過負荷検出器を有することを特徴とする請求項1記載のリードフレーム搬送装置。The cylindrical body is arranged for each feed pin, the cylindrical body around which the belt-shaped member is wound is rotatable, an arc-shaped elongated hole is provided in the cylindrical body, and a rotation regulating pin is fitted into the elongated hole. The end of the long hole of the cylindrical body is brought into contact with this rotation restricting pin, and a spring is stretched from the cylindrical body so that an elastic force acts in the direction opposite to the feeding direction of the belt-shaped member. 2. The lead frame conveying device according to claim 1, further comprising an overload detector which is urged to detect overload by detecting the extension of the spring. 前記過負荷検出器は円柱体をスプリングの弾性力により回転方向に付勢させる荷重手段と、前記スプリングが伸長変形し前記円柱体が回転したことをセンサ及び遮光板で検出させる検出手段とからなり、前記荷重手段のスプリングの弾性力と検出手段のセンサ及び遮光板の位置が送りピンの位置を水平方向に沿って移動させても同じとなるように配置されたことを特徴とする請求項2記載のリードフレーム搬送装置。The overload detector comprises a load means for urging the cylinder body in the rotational direction by the elastic force of the spring, and a detection means for detecting that the spring is extended and deformed and the cylinder body is rotated by a sensor and a light shielding plate. , claim 2, characterized in that the position of the sensor and the light shielding plate of the elastic force detecting means of the spring of said load means is arranged so as to have the same be moved along the position of the feed pin horizontally The lead frame conveying apparatus as described.
JP2002288142A 2002-09-30 2002-09-30 Lead frame transfer device Expired - Fee Related JP4151944B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002288142A JP4151944B2 (en) 2002-09-30 2002-09-30 Lead frame transfer device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002288142A JP4151944B2 (en) 2002-09-30 2002-09-30 Lead frame transfer device

Publications (2)

Publication Number Publication Date
JP2004128097A JP2004128097A (en) 2004-04-22
JP4151944B2 true JP4151944B2 (en) 2008-09-17

Family

ID=32280721

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002288142A Expired - Fee Related JP4151944B2 (en) 2002-09-30 2002-09-30 Lead frame transfer device

Country Status (1)

Country Link
JP (1) JP4151944B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114121692B (en) * 2021-11-06 2026-02-03 中国航空工业集团公司洛阳电光设备研究所 CBGA column planting device and column planting method
CN115083980B (en) * 2022-07-21 2022-11-11 四川明泰微电子有限公司 Lead frame conveying device for bonding of multi-base-island lead frame and chip

Also Published As

Publication number Publication date
JP2004128097A (en) 2004-04-22

Similar Documents

Publication Publication Date Title
KR100244688B1 (en) Wafer Transfer Device
CN101632162B (en) Apparatus and method for punching out electronic component
JP4151944B2 (en) Lead frame transfer device
US5142765A (en) Lead mounting apparatus
JP3015243B2 (en) Bonding apparatus having two or more bonding heads
JP3288555B2 (en) Transfer device
JP3242486B2 (en) Semiconductor molding equipment
CN215845965U (en) Chip frame fixed length cutting device
JP3167173B2 (en) Method and apparatus for transporting band-shaped member
JP2627007B2 (en) Automatic magazine feeder
JPH085952Y2 (en) Magazine guide device
JP2806722B2 (en) Substrate transfer device
JP2802198B2 (en) Semiconductor component position correction device
US5285943A (en) Tape feeding apparatus
JP2770098B2 (en) Automatic bonding equipment
JP2587842Y2 (en) Mount structure of wafer ring in bonding equipment
JP4017719B2 (en) Circuit component mounting system
JPH0746692B2 (en) Bonding device
KR940001268Y1 (en) Feeding device of lead frame of die bonder
JP2538800B2 (en) Frame transport switching mechanism and switching method thereof
KR0119242Y1 (en) Lead frame&#39;s transferring device
JPH04137037U (en) Package conveyance device in bonding equipment
JP2854452B2 (en) Cure device
JP2510600Y2 (en) Tape bonding device
JPH11233999A (en) Substrate transferring device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050920

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080514

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080602

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080625

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080630

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110711

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110711

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120711

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120711

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130711

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees