Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4167585B2 - Clip mounting device - Google Patents
[go: Go Back, main page]

JP4167585B2 - Clip mounting device - Google Patents

Clip mounting device Download PDF

Info

Publication number
JP4167585B2
JP4167585B2 JP2003388933A JP2003388933A JP4167585B2 JP 4167585 B2 JP4167585 B2 JP 4167585B2 JP 2003388933 A JP2003388933 A JP 2003388933A JP 2003388933 A JP2003388933 A JP 2003388933A JP 4167585 B2 JP4167585 B2 JP 4167585B2
Authority
JP
Japan
Prior art keywords
clip
clips
clip mounting
mounting apparatus
predetermined number
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003388933A
Other languages
Japanese (ja)
Other versions
JP2005144636A (en
Inventor
真佐志 長谷川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEC Engineering Ltd
Original Assignee
NEC Engineering Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEC Engineering Ltd filed Critical NEC Engineering Ltd
Priority to JP2003388933A priority Critical patent/JP4167585B2/en
Publication of JP2005144636A publication Critical patent/JP2005144636A/en
Application granted granted Critical
Publication of JP4167585B2 publication Critical patent/JP4167585B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Automatic Assembly (AREA)
  • Manufacture Of Electron Tubes, Discharge Lamp Vessels, Lead-In Wires, And The Like (AREA)
  • Gas-Filled Discharge Tubes (AREA)

Description

本発明は、クリップ装着装置に関し、特に、プラズマディスプレイパネル(以下、「PDP」という)を製造するにあたって、前面パネル基板と背面パネル基板とを重ね合わせて封着する際等に用いられるクリップ装着装置に関する。   The present invention relates to a clip mounting apparatus, and in particular, when manufacturing a plasma display panel (hereinafter referred to as “PDP”), a clip mounting apparatus used when a front panel substrate and a rear panel substrate are overlapped and sealed. About.

従来、PDPを製造する際の、前面パネル基板と背面パネル基板とを重ね合わせて封着する工程において、重ね合わせた2枚のパネル基板を仮固定するため、クリップ状の固定金具が用いられている。   Conventionally, in the process of overlaying and sealing the front panel substrate and the back panel substrate when manufacturing a PDP, a clip-shaped fixing bracket is used to temporarily fix the two stacked panel substrates. Yes.

図6は、2枚のパネル基板2、3にクリップ4を装着してパネル基板1を形成した状態を示す。このクリップ4は、パネル基板2、3の4辺に略々均等に配置されるが、パネル基板1の大きさ(35型、42型、50型等)により、クリップ4の装着ピッチ(間隔)や、個数を変化させてパネル基板2、3の4辺に装着しなければならない。   FIG. 6 shows a state in which the panel substrate 1 is formed by attaching the clip 4 to the two panel substrates 2 and 3. The clips 4 are arranged substantially evenly on the four sides of the panel substrates 2 and 3, but the mounting pitch (interval) of the clips 4 depends on the size of the panel substrate 1 (35 type, 42 type, 50 type, etc.). Or, the number must be changed and mounted on the four sides of the panel substrates 2 and 3.

このようなクリップ4の装着を行うにあたって、クリップ供給機構と、クリップ開口機構と被接続物(パネル基板等)の移動機構からなるクリップ装着装置が提案されている(例えば、特許文献1参照)。   In mounting such a clip 4, a clip mounting apparatus including a clip supply mechanism, a clip opening mechanism, and a moving mechanism for an object to be connected (panel substrate or the like) has been proposed (for example, see Patent Document 1).

特開平5−245725号公報(図1)JP-A-5-245725 (FIG. 1)

しかし、上記従来のクリップ装着装置においては、クリップ供給機構に配列冶具を用いているため、クリップの装着ピッチや、装着個数を自由に変更することができず、パネル基板の寸法が変更され、クリップの装着ピッチや、装着個数を変更する必要が生じた場合には、治具の交換等の段取り替えが必要になって煩雑であるという問題があった。   However, in the above conventional clip mounting device, since the arrangement jig is used for the clip supply mechanism, the mounting pitch of the clips and the number of mounted clips cannot be freely changed, and the dimensions of the panel substrate are changed. When it becomes necessary to change the mounting pitch or the number of mountings, there is a problem that setup change such as replacement of a jig is required, which is complicated.

そこで、本発明は、上記従来のクリップ装着装置における問題点に鑑みてなされたものであって、パネル基板等の寸法が変化し、クリップの装着ピッチや、装着個数の変更が必要となった場合でも、段取り替えが不要なクリップ装着装置を提供することを目的とする。   Therefore, the present invention has been made in view of the problems in the conventional clip mounting device described above, where the dimensions of the panel substrate or the like have changed, and it is necessary to change the clip mounting pitch or the number of mounted clips. However, it aims at providing the clip mounting apparatus which does not require setup change.

上記目的を達成するため、本発明は、クリップ装着装置であって、所定の個数のクリップを搬送手段に供給するクリップ供給手段と、前記搬送手段によって搬送された前記所定の個数のクリップの各々の開口部を、重ね合わせた2枚の板状部材に挿入し、該開口部を閉じることにより前記2枚の板状部材を接合するクリップ装着手段とを備え、前記クリップ供給手段は、所定の配列で並べられた複数のクリップのうちから前記所定の個数のクリップを把持し、前記搬送手段に供給する複数の取り出しハンドラと、隣り合う前記取り出しハンドラ間の間隔を調節するピッチ変換機構とを有し、前記所定の個数のクリップを所定の間隔に調節して前記搬送手段に供給することを特徴とする。 In order to achieve the above object, the present invention provides a clip mounting device, a clip supply unit that supplies a predetermined number of clips to a transport unit, and each of the predetermined number of clips transported by the transport unit. Clip mounting means for inserting the opening into the two stacked plate-like members and closing the opening to join the two plate-like members , the clip supply means having a predetermined arrangement A plurality of take-out handlers for gripping the predetermined number of clips from among the plurality of clips arranged in a row and supplying the clips to the conveying means, and a pitch conversion mechanism for adjusting the interval between the take-out handlers adjacent to each other. The predetermined number of clips are adjusted to a predetermined interval and supplied to the conveying means .

そして、本発明によれば、クリップ供給手段によって、所定の個数のクリップを所定の間隔に調節して搬送手段に供給することができるため、接合すべき板状部材の寸法が変化しても、従来のように冶具の交換等の段取り替えをせずに、板状部材にクリップを装着することができる。   And according to the present invention, the clip supplying means can adjust a predetermined number of clips to a predetermined interval and supply them to the conveying means, so even if the dimensions of the plate-like members to be joined change, The clip can be attached to the plate-like member without changing the setup such as replacing the jig as in the prior art.

前記クリップ装着装置において、前記クリップは、弾性的に開閉するスリット状の開口部を有する所定長さに形成され、前記複数のクリップは、長手方向に隙間なく並べられように構成することができる。 In the clip attachment apparatus, the clip is formed in a predetermined length having a slit-shaped opening for resiliently opening, wherein the plurality of clips may be configured to Ru arranged without gaps in the longitudinal direction .

また、前記複数の取り出しハンドラは、前記所定の個数のクリップを同時に把持するように構成することができる。 The plurality of take-out handlers can be configured to simultaneously hold the predetermined number of clips .

さらに、前記搬送手段は、前記クリップの開口部によって把持されることによって該クリップを保持する保持部を備えたチェーンコンベアとすることができる。   Furthermore, the said conveyance means can be made into the chain conveyor provided with the holding part which hold | maintains this clip by being hold | gripped by the opening part of the said clip.

前記クリップ供給手段及び前記クリップ装着手段を、接合される前記2枚の板状部材を挟んで対称的に2セット備えるように構成することができる。2セットのクリップ供給手段及びクリップ装着手段を同時に動作させることにより、矩形状の板状部材の2辺に同時にクリップを装着することができる。   The clip supply means and the clip mounting means may be configured to have two sets symmetrically across the two plate-like members to be joined. By simultaneously operating the two sets of clip supply means and clip attachment means, the clips can be attached simultaneously to two sides of the rectangular plate-like member.

前記2枚の板状部材は、プラズマディスプレイパネルを構成する前面パネル基板と背面パネル基板とすることができ、本発明にかかるクリップ装着装置をプラズマディスプレイパネルの製造工程に適用することができる。   The two plate-like members can be a front panel substrate and a rear panel substrate constituting the plasma display panel, and the clip mounting apparatus according to the present invention can be applied to the manufacturing process of the plasma display panel.

以上説明したように、本発明によれば、パネル基板等の寸法が変化してクリップの装着ピッチ、装着個数の変更が必要となっても、段取り替えが不要で効率的なクリップ装着装置を提供することができる。   As described above, according to the present invention, even if the dimensions of the panel substrate or the like change to change the clip mounting pitch and the number of mounted clips, it is possible to provide an efficient clip mounting apparatus that does not require setup change. can do.

次に、本発明の実施の形態について、図面を参照しながら説明する。尚、以下の説明においては、本発明にかかるクリップ装着装置を、PDP製造工程において、前面パネル基板と背面パネル基板とを重ね合わせて封着する際に用いるものとする。   Next, embodiments of the present invention will be described with reference to the drawings. In the following description, the clip mounting device according to the present invention is used when the front panel substrate and the back panel substrate are overlapped and sealed in the PDP manufacturing process.

図1乃至図5は、本発明にかかるクリップ装着装置の一実施の形態を示し、このクリップ装着装置は、大別して、所定の個数のクリップ4を所定の間隔に調節して搬送手段としてのチェーンコンベア7に供給するクリップ供給ユニット(クリップ供給手段)11と、チェーンコンベア7によって搬送された所定の個数のクリップ4の各々の開口部を、重ね合わせた2枚のパネル基板1に挿入し、この開口部を閉じることによって2枚のパネル基板1を接合するクリップ装着ユニット(クリップ装着手段)21とで構成される。   1 to 5 show an embodiment of a clip mounting device according to the present invention. This clip mounting device is roughly divided into a chain as a conveying means by adjusting a predetermined number of clips 4 to a predetermined interval. The clip supply unit (clip supply means) 11 to be supplied to the conveyor 7 and the openings of each of the predetermined number of clips 4 conveyed by the chain conveyor 7 are inserted into two superimposed panel substrates 1. It comprises a clip mounting unit (clip mounting means) 21 that joins two panel substrates 1 by closing the opening.

まず、クリップ供給ユニット11について、図1及び図2を中心に参照しながら説明する。   First, the clip supply unit 11 will be described with reference to FIGS. 1 and 2.

クリップ4は、図6に示したように、弾性的に開閉するスリット状の開口部を有する所定長さに形成される。トレー5は、このクリップ4を垂直方向に複数列整列させて保持するため設けられ、クリップ4の長手方向にクリップ4を隙間なく並べることができる。尚、図1では、クリップ4は、7行×6列に整列している。また、図示しないオートチェンジャにより、複数個のトレー5を連続して所定の高さのトレー台6に供給してセットすることができるように構成される。   As shown in FIG. 6, the clip 4 is formed in a predetermined length having a slit-like opening that opens and closes elastically. The tray 5 is provided to hold the clips 4 in a plurality of rows aligned in the vertical direction, and the clips 4 can be arranged in the longitudinal direction of the clips 4 without a gap. In FIG. 1, the clips 4 are arranged in 7 rows × 6 columns. In addition, a plurality of trays 5 can be continuously supplied to a tray table 6 having a predetermined height and set by an auto changer (not shown).

クリップ供給ロボット12は、Y軸ステージ13上にピッチ変換機構14を有する。ピッチ変換機構14は、図示しない制御部と、各々の取り出しハンドラ15の移動手段と、位置決め手段とを備え、このピッチ変換機構14によって、隣接する取り出しハンドラ15の間隔を所定の間隔に変更することができる。   The clip supply robot 12 has a pitch conversion mechanism 14 on the Y-axis stage 13. The pitch conversion mechanism 14 includes a control unit (not shown), a moving unit for each take-out handler 15, and a positioning unit. The pitch change mechanism 14 changes the interval between adjacent take-out handlers 15 to a predetermined interval. Can do.

取り出しハンドラ15(15a〜15g)の各々は、図2に示すように、上下アクチュエータ16と、チャック開閉アクチュエータ17と、クリップチャック18とを備え、トレー5上のクリップ4を把持してチェーンコンベア7に搬送し、チェーンコンベア7のアタッチメント(保持部)8にクリップ4を挟み込むとができる。ここで、取り出しハンドラ15の個数(図1では7個)は、トレー4に整列されているクリップ4の行数(図1では7行)と同数であることが望ましい。   As shown in FIG. 2, each of the take-out handlers 15 (15 a to 15 g) includes a vertical actuator 16, a chuck opening / closing actuator 17, and a clip chuck 18, and holds the clip 4 on the tray 5 to hold the chain conveyor 7. And the clip 4 can be sandwiched between the attachment (holding portion) 8 of the chain conveyor 7. Here, the number of take-out handlers 15 (seven in FIG. 1) is preferably the same as the number of clips 4 arranged in the tray 4 (seven in FIG. 1).

チェーンコンベア7は、図1に示すように、クリップ4をクリップ供給ユニット11からクリップ装着ユニット21に搬送するために設けられ、図2に示すように、チェーンコンベア7には、板状のアタッチメント8が取り付けられ、クリップ4をアタッチメント8に挟み、パルスモータ9によってクリップ4を所定の距離だけ搬送することができる。   As shown in FIG. 1, the chain conveyor 7 is provided to convey the clip 4 from the clip supply unit 11 to the clip mounting unit 21. As shown in FIG. 2, the chain conveyor 7 has a plate-like attachment 8 on it. Is attached, the clip 4 is sandwiched between the attachments 8, and the clip 4 can be conveyed by a predetermined distance by the pulse motor 9.

次に、クリップ装着ユニット21について、図1乃至図4を参照しながら説明する。   Next, the clip mounting unit 21 will be described with reference to FIGS.

図1に示すように、クリップ装着ロボット22は、重ね合わせユニット31に対して前後方向に移動するY軸ステージ23と、上下方向に移動するZ軸ステージ24とで構成される。Z軸ステージ24の先端には、装着ハンドラ25が取り付けられ、図3及び図4に示すように、装着ハンドラ25には、クリップ4を把持するためのクリップチャック26が備えられる。クリップチャック26は、チャック開閉機構27により開閉することができる。また、装着ハンドラ25は、回転用アクチュエータ28により、垂直面内で90度回転することができ、チェーンコンベア7からクリップ4を把持した後、クリップ4の姿勢を垂直状態から水平状態に移行させることができる。   As shown in FIG. 1, the clip mounting robot 22 includes a Y-axis stage 23 that moves in the front-rear direction with respect to the overlapping unit 31 and a Z-axis stage 24 that moves in the up-down direction. A mounting handler 25 is attached to the tip of the Z-axis stage 24, and the mounting handler 25 is provided with a clip chuck 26 for gripping the clip 4 as shown in FIGS. The clip chuck 26 can be opened and closed by a chuck opening / closing mechanism 27. The mounting handler 25 can be rotated 90 degrees in the vertical plane by the rotation actuator 28, and after the clip 4 is gripped from the chain conveyor 7, the posture of the clip 4 is changed from the vertical state to the horizontal state. Can do.

重ね合わせユニット31は、パネル基板1を真空吸着により固定し、2枚のパネル基板1を所定の精度で重ね合わせることができるように構成される。   The overlapping unit 31 is configured to fix the panel substrate 1 by vacuum suction and to overlap the two panel substrates 1 with a predetermined accuracy.

図1に示すように、上記クリップ供給ユニット11、チェーンコンベア7、クリップ装着ユニット21は、重ね合わせユニット31を挟んで各々1セットずつ対称(同図の上下方向)に配置されパネル基板1の2辺に対して同時にクリップ4を装着できるように構成される。 As shown in FIG. 1, the clip supply unit 11, a chain conveyor 7, the clip mounting unit 21 is disposed in each one set of symmetry (vertical direction in drawing) across the overlay unit 31, the panel substrate 1 It is comprised so that the clip 4 can be mounted | worn simultaneously with respect to 2 sides.

次に、上記構成を有するクリップ装着装置の動作について図面を参照しながら説明する。   Next, the operation of the clip mounting apparatus having the above configuration will be described with reference to the drawings.

クリップ4をパネル基板1に装着する際には、パネル基板1の大きさ(35型、42型、50型等)に応じて、クリップ4の個数や間隔(ピッチ)を変更してパネル基板1に装着しなければならない。以下の動作説明では、パネル基板1の1辺に5個のクリップ4を装着する場合を例にとって説明する。   When the clip 4 is mounted on the panel substrate 1, the number and interval (pitch) of the clips 4 are changed according to the size of the panel substrate 1 (35 type, 42 type, 50 type, etc.). Must be attached to. In the following description of the operation, a case where five clips 4 are attached to one side of the panel substrate 1 will be described as an example.

まず、図1に示すように、トレー5にクリップ4を垂直方向に複数列整列させて並べる。クリップ4は、長手方向に隙間なく並べられ、図1では、7行×6列のクリップ4が整列している。トレー5は、図示しないオートチェンジャによって、所定の高さのトレー台6にセットされる。   First, as shown in FIG. 1, the clips 4 are arranged in a plurality of rows in the vertical direction on the tray 5. The clips 4 are arranged without gaps in the longitudinal direction. In FIG. 1, the clips 4 of 7 rows × 6 columns are arranged. The tray 5 is set on a tray table 6 having a predetermined height by an auto changer (not shown).

次に、クリップ供給ユニット11のクリップ供給ロボット12によって、クリップ4をトレー5の1列目の1行目から、順番に所定個数取り出し、ピッチ変換機構14によって各々の取り出しハンドラ15の間隔を調整した後、チェーンコンベア7に所定の間隔で5個セットし、セット完了後、チェーンコンベア7によってクリップ装着ユニット21までクリップ4を搬送する。   Next, the clip supply robot 12 of the clip supply unit 11 takes out a predetermined number of clips 4 from the first row of the first row of the tray 5 in order, and the pitch conversion mechanism 14 adjusts the interval between the take-out handlers 15. Thereafter, five pieces are set on the chain conveyor 7 at a predetermined interval, and after the setting is completed, the clip 4 is conveyed to the clip mounting unit 21 by the chain conveyor 7.

このとき、供給する回数(パネル基板1の供給回数)により、トレー5内のクリップ4の残量が変化する。これに伴い、クリップ供給ロボット12と、チェーンコンベア7の動作も変化するため、この点について順次説明する。   At this time, the remaining amount of the clip 4 in the tray 5 changes depending on the number of times of supply (the number of times of supply of the panel substrate 1). Along with this, the operations of the clip supply robot 12 and the chain conveyor 7 also change, and this point will be described sequentially.

図5は、クリップ供給ロボット12によるチェーンコンベア7へのクリップ4の供給状態と、チェーンコンベア7の動作を示す。   FIG. 5 shows the supply state of the clip 4 to the chain conveyor 7 by the clip supply robot 12 and the operation of the chain conveyor 7.

まず、1枚目のパネル基板1に対するクリップ4の取り出し動作について説明する。1枚目のパネル基板1に対しては、トレー5内の1列目の1行目から5行目までの合計5個のクリップ4を取り出す。   First, the operation of taking out the clip 4 from the first panel substrate 1 will be described. For the first panel substrate 1, a total of five clips 4 from the first row to the fifth row of the first column in the tray 5 are taken out.

クリップ供給ロボット12の動作としては、Y軸ステージ13によって、取り出しハンドラ15全体をトレー内のクリップ4の1列目の上方まで移動させる。7個の取り出しハンドラ15のうち、5個の取り出しハンドラ15(15a〜15e)の上下アクチュエータ16を下降させ、チャック開閉アクチュエータ17を開放し、クリップチャック18にて5個のクリップ4を把持する。上下アクチュエータ16を上昇させ、Y軸ステージ13にて、チェーンコンベア7の上方まで、取り出しハンドラ15全体を移動させる。ピッチ変換機構14によって、取り出しハンドラ15を所定の間隔に変換することにより、クリップ4を所定の間隔に設定する。   As the operation of the clip supply robot 12, the entire take-out handler 15 is moved to the upper side of the first row of the clips 4 in the tray by the Y-axis stage 13. Of the seven takeout handlers 15, the vertical actuators 16 of the five takeout handlers 15 (15 a to 15 e) are lowered, the chuck opening / closing actuator 17 is opened, and the five clips 4 are held by the clip chuck 18. The vertical actuator 16 is raised, and the entire take-out handler 15 is moved to the upper side of the chain conveyor 7 by the Y-axis stage 13. The clip 4 is set to a predetermined interval by converting the take-out handler 15 to a predetermined interval by the pitch conversion mechanism 14.

次に、7個の取り出しハンドラ15のうち、5個の取り出しハンドラ15(15a〜15e)の上下アクチュエータ16を下降させ、チャック開閉アクチュエータ17を閉じ、チェーンコンベア7のアタッチメント8にクリップ4を挟み込む。これによって、図5(a)の状態となる。   Next, among the seven take-out handlers 15, the vertical actuators 16 of the five take-out handlers 15 (15 a to 15 e) are lowered, the chuck opening / closing actuator 17 is closed, and the clip 4 is sandwiched between the attachment 8 of the chain conveyor 7. As a result, the state shown in FIG.

以上の動作により、5個のクリップ4が所定の間隔でチェーンコンベア7にセットされたので、パルスモータ9にてクリップ4をクリップ装着ユニット21まで搬送する。   As a result of the above operation, the five clips 4 are set on the chain conveyor 7 at a predetermined interval, so that the clip 4 is conveyed to the clip mounting unit 21 by the pulse motor 9.

次に、2枚目のパネル基板1に対するクリップ4の取り出し動作について説明する。2枚目のパネル基板1に対しては、トレー5内の1列目の6行目と7行目の2個のクリップ4と、2列目の1行目から3行目の3個のクリップ4の合計5個のクリップ4を取り出す。   Next, an operation of taking out the clip 4 from the second panel substrate 1 will be described. For the second panel substrate 1, two clips 4 in the first and sixth rows in the tray 5 and three clips in the first to third rows in the second column are provided. A total of five clips 4 of the clips 4 are taken out.

クリップ供給ロボット12の動作としては、Y軸ステージ13にて取り出しハンドラ15全体をトレー5内のクリップ4の1列目の上方まで移動させる。7個の取り出しハンドラ15のうち、2個の取り出しハンドラ15(15fと15g)の上下アクチュエータ16を下降させ、チャック開閉アクチュエータ17を開放し、クリップチャック18にて、2個のクリップ4を把持する。上下アクチュエータ16を上昇させ、Y軸ステージ13にて、チェーンコンベア7の上方まで取り出しハンドラ15全体を移動させる。次に、ピッチ変換機構14で取り出しハンドラ15を所定の間隔に変換する。7個の取り出しハンドラ15のうち、2個の取り出しハンドラ15(15fと15g)の上下アクチュエータ16を下降させ、チャック開閉アクチュエータ17を閉じ、チェーンコンベア7のアタッチメント8にクリップ4を挟み込む。これによって、図5(b)の状態となる。以上の動作により、2個のクリップ4がチェーンコンベア7にセットされる。   As the operation of the clip supply robot 12, the entire take-out handler 15 is moved to the upper side of the first row of the clips 4 in the tray 5 by the Y-axis stage 13. Of the seven takeout handlers 15, the vertical actuators 16 of the two takeout handlers 15 (15 f and 15 g) are lowered, the chuck opening / closing actuator 17 is opened, and the two clips 4 are gripped by the clip chuck 18. . The vertical actuator 16 is raised, the Y-axis stage 13 is taken out above the chain conveyor 7 and the entire handler 15 is moved. Next, the take-out handler 15 is converted into a predetermined interval by the pitch conversion mechanism 14. Of the seven takeout handlers 15, the vertical actuators 16 of the two takeout handlers 15 (15 f and 15 g) are lowered, the chuck opening / closing actuator 17 is closed, and the clip 4 is sandwiched between the attachments 8 of the chain conveyor 7. As a result, the state shown in FIG. By the above operation, the two clips 4 are set on the chain conveyor 7.

次に、図5(b)、(c)に示すように、パルスモータ9にてクリップ4をL寸法だけ搬送し、残り3個のクリップ4をチェーンコンベア7にセットした時に、5個のクリップ4が等間隔になる状態にする。   Next, as shown in FIGS. 5 (b) and 5 (c), when the clip 4 is conveyed by the L dimension by the pulse motor 9 and the remaining three clips 4 are set on the chain conveyor 7, the five clips 4 is set at equal intervals.

次に、Y軸ステージ13にて、取り出しハンドラ15全体をトレー5内のクリップ4の2列目の上方まで移動させる。7個の取り出しハンドラ15のうち、3個の取り出しハンドラ15(15a〜15c)の上下アクチュエータ16を下降させ、チャック開閉アクチュエータ17を開放し、クリップチャック18にて、3個のクリップ4を把持する。上下アクチュエータ16を上昇させ、Y軸ステージ13にて、チェーンコンベア7の上方まで取り出しハンドラ15全体を移動させる。ピッチ変換機構14により、取り出しハンドラ15を所定の間隔に変換し、クリップ4を所定の間隔にする。7個の取り出しハンドラ15のうち、3個の取り出しハンドラ15(15a〜15c)の上下アクチュエータ16を下降させ、チャック開閉アクチュエータ17を閉じ、チェーンコンベア7のアタッチメント8にクリップ4を挟み込む。これによって、図5(d)の状態となる。   Next, on the Y-axis stage 13, the entire take-out handler 15 is moved above the second row of the clips 4 in the tray 5. Of the seven takeout handlers 15, the vertical actuators 16 of the three takeout handlers 15 (15 a to 15 c) are lowered, the chuck opening / closing actuator 17 is opened, and the three clips 4 are held by the clip chuck 18. . The vertical actuator 16 is raised, the Y-axis stage 13 is taken out above the chain conveyor 7 and the entire handler 15 is moved. The take-out handler 15 is converted to a predetermined interval by the pitch conversion mechanism 14 and the clip 4 is set to a predetermined interval. Of the seven takeout handlers 15, the vertical actuators 16 of the three takeout handlers 15 (15 a to 15 c) are lowered, the chuck opening / closing actuator 17 is closed, and the clip 4 is sandwiched between the attachments 8 of the chain conveyor 7. As a result, the state shown in FIG.

以上の動作により、5個のクリップ4が所定の間隔でチェーンコンベア7にセットされたので、パルスモータ9にてクリップ4をクリップ装着ユニット21まで搬送する。   As a result of the above operation, the five clips 4 are set on the chain conveyor 7 at a predetermined interval, so that the clip 4 is conveyed to the clip mounting unit 21 by the pulse motor 9.

以上のように、トレー5内に残されたクリップ4の状態により、取り出しハンドラ15を選択し、チェーンコンベア7に所定の個数、所定の間隔でセットした後、クリップ装着ユニット21までクリップ4を搬送する。   As described above, the take-out handler 15 is selected according to the state of the clip 4 remaining in the tray 5, and a predetermined number and a predetermined interval are set on the chain conveyor 7, and then the clip 4 is conveyed to the clip mounting unit 21. To do.

次に、クリップ装着ユニット21の動作について、図1乃至図4を参照しながら説明する。   Next, the operation of the clip mounting unit 21 will be described with reference to FIGS.

まず、重ね合わせユニット31でパネル基板1を真空吸着により固定し、パネル基板1を所定の精度で重ね合わせる。   First, the panel substrate 1 is fixed by vacuum suction by the overlay unit 31, and the panel substrate 1 is overlapped with a predetermined accuracy.

クリップ4は、所定の個数(本動作説明では5個)、所定の間隔でクリップ供給ユニット11からクリップ装着ユニット21にチェーンコンベア7で搬送される。そこで、Y軸ステージ23にて装着ハンドラ25をチェーンコンベア7の上方まで移動させる。Z軸ステージ24で装着ハンドラ25を下降させ、チャック開閉機構27にてクリップチャック26を開放し、図3に示すように、クリップチャック26にてクリップ4を把持する。   The clip 4 is conveyed by the chain conveyor 7 from the clip supply unit 11 to the clip mounting unit 21 at a predetermined number (five in this operation description) and at a predetermined interval. Therefore, the mounting handler 25 is moved to above the chain conveyor 7 by the Y-axis stage 23. The mounting handler 25 is lowered by the Z-axis stage 24, the clip chuck 26 is opened by the chuck opening / closing mechanism 27, and the clip 4 is gripped by the clip chuck 26 as shown in FIG.

次に、Z軸ステージ24で装着ハンドラ25を上昇させ、回転用アクチュエータ28で装着ハンドラ25を90度回転させ、図4に示すように、クリップ4の姿勢を垂直状態から水平状態に移行させる。Y軸ステージ23により、装着ハンドラ25をチェーンコンベア7とパネル基板1の中間に下降することのできる位置まで移動させ、さらに、Z軸ステージ24を下降させ、クリップ4とパネル基板1の高さを一致させる。Y軸ステージ23で、クリップ4をパネル基板1に装着する位置まで移動させ、チャック開閉機構27にてクリップチャック26を閉じ、クリップ4をパネル基板1に装着する。   Next, the mounting handler 25 is raised by the Z-axis stage 24, and the mounting handler 25 is rotated 90 degrees by the rotation actuator 28, so that the posture of the clip 4 is shifted from the vertical state to the horizontal state as shown in FIG. With the Y-axis stage 23, the mounting handler 25 is moved to a position where it can be lowered between the chain conveyor 7 and the panel substrate 1, and the Z-axis stage 24 is further lowered so that the height of the clip 4 and the panel substrate 1 is increased. Match. The clip 4 is moved to the position for mounting the panel substrate 1 on the Y-axis stage 23, the clip chuck 26 is closed by the chuck opening / closing mechanism 27, and the clip 4 is mounted on the panel substrate 1.

以上の動作で、所定の間隔で、所定の個数のクリップ4をパネル基板1の1辺に装着することができる。   With the above operation, a predetermined number of clips 4 can be mounted on one side of the panel substrate 1 at predetermined intervals.

さらに、これらの動作は、重ね合わせユニット31を挟んで、対称に配置されたクリップ供給ユニット11、チェーンコンベア7、クリップ装着ユニット21を、同時に動作させることにより、パネル基板1の2辺(図1の上下の辺)に、同時にクリップ4を装着することができる。   Furthermore, these operations are performed by simultaneously operating the clip supply unit 11, the chain conveyor 7, and the clip mounting unit 21 that are arranged symmetrically with the overlapping unit 31 interposed therebetween (FIG. 1). The clip 4 can be simultaneously mounted on the upper and lower sides of the frame.

また、パネル基板1の残り2辺(左右の辺)にクリップ4を装着するには、重ね合わせユニット31で、パネル基板1を水平に90度回転させた後、前述した動作を行うか、図示しない搬送機構にてパネル基板1を次の装着ステージに搬送して装着動作を行うことができる。   Further, in order to attach the clip 4 to the remaining two sides (left and right sides) of the panel substrate 1, the overlapping unit 31 rotates the panel substrate 1 horizontally by 90 degrees, and then performs the above-described operation. The panel substrate 1 can be transported to the next mounting stage by the transport mechanism that does not perform the mounting operation.

本発明にかかるクリップ装着装置の一実施の形態を示す平面図である。It is a top view which shows one Embodiment of the clip mounting apparatus concerning this invention. 図1のA−A矢視図である。It is an AA arrow line view of FIG. 図1のB−B矢視図であって、装着ハンドラがチェーンコンベア上のクリップを把持した状態を示す。It is a BB arrow line view of Drawing 1, and shows the state where a mounting handler grasped a clip on a chain conveyor. 図1のB−B矢視図であって、装着ハンドラがパネル基板にクリップを装着した状態を示す。It is a BB arrow line view of FIG. 1, Comprising: The mounting handler has shown the state which mounted | wore the panel board | substrate with the clip. 本発明にかかるクリップ装着装置のクリップ供給ユニットにおける、クリップの供給とチェーンコンベアの動作を示す図であって、(a)は、1枚目のパネル基板に対する動作、(b)(c)(d)は、2枚目のパネル基板に対する動作を示す。It is a figure which shows the supply of a clip, and operation | movement of a chain conveyor in the clip supply unit of the clip mounting apparatus concerning this invention, Comprising: (a) is operation | movement with respect to the 1st panel board | substrate, (b) (c) (d ) Shows the operation on the second panel substrate. パネル基板にクリップを装着した状態を示す概略図である。It is the schematic which shows the state which mounted | wore the panel board | substrate with the clip.

符号の説明Explanation of symbols

1 パネル基板
2 前面パネル基板
3 背面パネル基板
4 クリップ
5 トレー
6 トレー台
7 チェーンコンベア
8 アタッチメント
9 パルスモータ
11 クリップ供給ユニット
12 クリップ供給ロボット
13 Y軸ステージ
14 ピッチ変換機構
15 取り出しハンドラ
16 上下アクチュエータ
17 チャック開閉アクチュエータ
18 クリップチャック
21 クリップ装着ユニット
22 クリップ装着ロボット
23 Y軸ステージ
24 Z軸ステージ
25 装着ハンドラ
26 クリップチャック
27 チャック開閉機構
28 回転用アクチュエータ
31 重ね合わせユニット
DESCRIPTION OF SYMBOLS 1 Panel board | substrate 2 Front panel board | substrate 3 Back panel board | substrate 4 Clip 5 Tray 6 Tray stand 7 Chain conveyor 8 Attachment 9 Pulse motor 11 Clip supply unit 12 Clip supply robot 13 Y-axis stage 14 Pitch conversion mechanism 15 Extraction handler 16 Vertical actuator 17 Chuck Open / close actuator 18 Clip chuck 21 Clip mounting unit 22 Clip mounting robot 23 Y-axis stage 24 Z-axis stage 25 Mounting handler 26 Clip chuck 27 Chuck opening / closing mechanism 28 Actuator for rotation 31 Overlay unit

Claims (6)

所定の個数のクリップを搬送手段に供給するクリップ供給手段と、
前記搬送手段によって搬送された前記所定の個数のクリップの各々の開口部を、重ね合わせた2枚の板状部材に挿入し、該開口部を閉じることにより前記2枚の板状部材を接合するクリップ装着手段とを備え
前記クリップ供給手段は、所定の配列で並べられた複数のクリップのうちから前記所定の個数のクリップを把持し、前記搬送手段に供給する複数の取り出しハンドラと、隣り合う前記取り出しハンドラ間の間隔を調節するピッチ変換機構とを有し、前記所定の個数のクリップを所定の間隔に調節して前記搬送手段に供給することを特徴とするクリップ装着装置。
Clip supplying means for supplying a predetermined number of clips to the conveying means ;
The openings of each of the predetermined number of clips conveyed by the conveying means are inserted into the two overlapped plate-like members, and the two plate-like members are joined by closing the openings. Clip mounting means ,
The clip supply means grips the predetermined number of clips out of a plurality of clips arranged in a predetermined arrangement, and sets a gap between the plurality of take-out handlers to be supplied to the transport means and the adjacent take-out handlers. And a pitch converting mechanism for adjusting the clip mounting apparatus , wherein the predetermined number of clips are adjusted to a predetermined interval and supplied to the conveying means .
前記クリップは、弾性的に開閉するスリット状の開口部を有する所定長さに形成され、前記複数のクリップは、長手方向に隙間なく並べられことを特徴とする請求項1記載のクリップ装着装置。 The clip is formed in a predetermined length having a slit-shaped opening for resiliently opening, said plurality of clips, a clip mounting apparatus according to claim 1, wherein the Ru arranged without gaps in the longitudinal direction . 前記複数の取り出しハンドラは、前記所定の個数のクリップを同時に把持することを特徴とする請求項1または2記載のクリップ装着装置。 The clip mounting apparatus according to claim 1 or 2, wherein the plurality of take-out handlers simultaneously grip the predetermined number of clips . 前記搬送手段は、前記クリップの開口部によって把持されることによって該クリップを保持する保持部を備えたチェーンコンベアであることを特徴とする請求項1、2または3記載のクリップ装着装置。   The clip mounting apparatus according to claim 1, 2 or 3, wherein the transport means is a chain conveyor provided with a holding portion that holds the clip by being gripped by the opening of the clip. 請求項1乃至4のいずれかに記載された前記クリップ供給手段及び前記クリップ装着手段を、接合される前記2枚の板状部材を挟んで対称的に2セット備えることを特徴とするクリップ装着装置。   5. A clip mounting apparatus comprising two sets of the clip supply unit and the clip mounting unit according to claim 1 symmetrically across the two plate-like members to be joined. . 前記2枚の板状部材は、プラズマディスプレイパネルを構成する前面パネル基板と背面パネル基板であることを特徴とする請求項1乃至5のいずれかに記載のクリップ装着装置。   6. The clip mounting apparatus according to claim 1, wherein the two plate-like members are a front panel substrate and a rear panel substrate that constitute a plasma display panel.
JP2003388933A 2003-11-19 2003-11-19 Clip mounting device Expired - Fee Related JP4167585B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003388933A JP4167585B2 (en) 2003-11-19 2003-11-19 Clip mounting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003388933A JP4167585B2 (en) 2003-11-19 2003-11-19 Clip mounting device

Publications (2)

Publication Number Publication Date
JP2005144636A JP2005144636A (en) 2005-06-09
JP4167585B2 true JP4167585B2 (en) 2008-10-15

Family

ID=34695825

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003388933A Expired - Fee Related JP4167585B2 (en) 2003-11-19 2003-11-19 Clip mounting device

Country Status (1)

Country Link
JP (1) JP4167585B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100906004B1 (en) * 2007-12-24 2009-07-06 우영산업 주식회사 Car clip mounting device
JP6389155B2 (en) * 2015-09-04 2018-09-12 しげる工業株式会社 Automatic clip mounting device
KR102475049B1 (en) * 2020-11-26 2022-12-07 전남대학교 산학협력단 Apparatus for connecting long line clip
JP7632872B2 (en) 2021-02-22 2025-02-19 島田 雅貴 Speed nut automatic supply and assembly device

Also Published As

Publication number Publication date
JP2005144636A (en) 2005-06-09

Similar Documents

Publication Publication Date Title
CN107851603B (en) Substrate mounting method, film forming method, and method for manufacturing electronic device
JP5324439B2 (en) Pick and place equipment
JP5922284B2 (en) Transfer robot
TWI417822B (en) Panel substrate transfer device and display panel module assembly device
JP4167585B2 (en) Clip mounting device
JP6312717B2 (en) Substrate transport device and substrate-to-substrate working system including the same
JP2006297564A (en) Multi-type bush press-fitting device
CN105794332A (en) Electronic-circuit-component pickup-instruction-data creation device and electronic-circuit-component mounter
CN106104786A (en) Substrate transfer system and method
TW201804565A (en) Robot, robot control method, teaching tool, and robot teaching method
JP6496913B2 (en) Component mounting system and component mounting method
CN109081104B (en) Feeding method and device
JP7029187B2 (en) Board reversing device and dividing system
JPH06262446A (en) Assembling cell and aggregate thereof capable of mounting/removing part supplier
JP2000323894A (en) Semiconductor device
JP4985634B2 (en) Screen printing apparatus and screen printing method
JP6890249B2 (en) Coating device and coating method
JP2016063166A (en) Substrate processing device
CN101641008A (en) Automatic assembling machine for assembling component for substrate
US20250393461A1 (en) Electrostatic chuck, laser lift-off apparatus including electrostatic chuck, and method of manufacturing display device
JP2019123057A (en) Production system and assembly method of components using the same
WO2015029142A1 (en) Assembly system and production method for assembled product
JP4933507B2 (en) Mounting method of electronic parts
CN109081082B (en) Conveying method and device
JP6496914B2 (en) Component mounting system and component mounting method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20061003

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080409

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080526

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080714

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080801

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110808

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110808

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120808

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130808

Year of fee payment: 5

LAPS Cancellation because of no payment of annual fees