Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4182254B2 - Floating ladder sleeper, floating ladder track and laying method thereof - Google Patents
[go: Go Back, main page]

JP4182254B2 - Floating ladder sleeper, floating ladder track and laying method thereof - Google Patents

Floating ladder sleeper, floating ladder track and laying method thereof Download PDF

Info

Publication number
JP4182254B2
JP4182254B2 JP2003121046A JP2003121046A JP4182254B2 JP 4182254 B2 JP4182254 B2 JP 4182254B2 JP 2003121046 A JP2003121046 A JP 2003121046A JP 2003121046 A JP2003121046 A JP 2003121046A JP 4182254 B2 JP4182254 B2 JP 4182254B2
Authority
JP
Japan
Prior art keywords
floating ladder
vertical
pair
vibration
sleeper
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003121046A
Other languages
Japanese (ja)
Other versions
JP2004324245A5 (en
JP2004324245A (en
Inventor
健 川口
賢一 宮原
Original Assignee
小田急電鉄株式会社
小田急設備株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 小田急電鉄株式会社, 小田急設備株式会社 filed Critical 小田急電鉄株式会社
Priority to JP2003121046A priority Critical patent/JP4182254B2/en
Publication of JP2004324245A publication Critical patent/JP2004324245A/en
Publication of JP2004324245A5 publication Critical patent/JP2004324245A5/ja
Application granted granted Critical
Publication of JP4182254B2 publication Critical patent/JP4182254B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Railway Tracks (AREA)

Description

【0001】
【発明の属する技術分野】
本発明はフローティングラダーマクラギ、フローティングラダー軌道及びその敷設方法に関する。
【0002】
【従来の技術】
従来の横マクラギを用いた軌道では、レールを間欠的に支持するためバラスト緩衝圧力が局部的に大きくなる。そのため、列車荷重による車輪毎の繰り返しの影響を大きく受けて軌道狂いが生じるおそれがあった。
【0003】
この軌道狂いが大きくなると、列車の動揺が増大し乗り心地を低下させる。このため、比較的短期間で定期的に保守作業を行わなければならないという問題があった。
【0004】
そこで、列車荷重の分散性を向上させると共に、列車による衝撃力や振動を効率よく吸収するラダーマクラギ軌道が提案されている。
【0005】
このラダーマクラギ軌道は、一対のレールの下に横マクラギに代えてラダーマクラギを敷設したものである。ラダーマクラギには、路盤上に敷設されたバラスト上に設置するバラストラダーマクラギと、バラストを用いずに路盤上に設置するフローティングラダーマクラギとがある。
【0006】
図15は、フローティングラダーマクラギ1を示す(例えば、特許文献1参照。)。このフローティングラダーマクラギ1は、一対のレールの長手方向に沿って延びる一対のコンクリート製の縦梁6と、これらの縦梁6を連結する複数の継材9とを備えている。
【0007】
また、このフローティングラダーマクラギ1は、縦梁6の下面に所定間隔で間欠的に配置された弾性材からなるポリウレタン29と、縦梁6の外軌側又は内軌側の少なくとも一方、本例では外軌側に突出するマクラギ突起30と、マクラギ突起30の近傍に設けられた路盤突起31と縦梁6間、及び路盤突起31とマクラギ突起30間に設けられた弾性材からなるポリウレタン32とを備えている。
【0008】
このフローティングラダーマクラギ1の縦梁6は、図16に示すように、路盤上に設けられた台座(モルタルベース)28上にポリウレタン29を介して設置される。フローティングラダーマクラギ1の縦梁6と台座28間には、間隔d1が形成されている。すなわち、フローティングラダーマクラギ1全体がポリウレタン29のみによって支持されている。
【0009】
図17は、上記の台座28及び路盤突起31に代えて、フローティングラダーマクラギ1の全長に沿って断面L字状の台座33を設けた例である。
【0010】
この台座33は、図18に示すように、縦梁6の下面を支持する水平部分33aと、縦梁6の側面を支持する垂直部分33bを有している。縦梁6と台座33の水平部分33aとの間には、間隔d1が設けられている。また、この間隔d1内には、ポリウレタン29が間欠的に設けられている。
【0011】
図17に示すように、台座33の垂直部分33bは、マクラギ突起30を避けて設けられている。つまり、台座33の垂直部分33bがマクラギ突起30を挟んでその両側に設けられている。
【0012】
そして、マクラギ突起30の両側が、ポリウレタン32を介して両側の台座33の垂直部分33bによって支持されている。
【0013】
また、縦梁6の側面と台座33の垂直部分33bとの間には、間隔d2が設けられている。この間隔d2内には、継材9に対応する部分にポリウレタン34が設けられている。間隔d2内におけるマクラギ突起30の根元部分にもポリウレタン32が設けられている。
【0014】
このようなフローティングラダーマクラギ1を用いたフローティングラダー軌道は、横マクラギを用いた軌道に比較して保守に要する時間を大幅に短縮できる。また、列車の荷重分散性に優れ、騒音、振動の低減効果がある。
【0015】
ところで、上記のフローティングラダー軌道(図16及び図18参照)を施工する際は、路盤上における台座28,33の鉄筋の組み立て、フローティングラダーマクラギ1及びレールの設置、計画レールレベルの設定、台座28,33形成用の木製型枠の組み立て、コンクリート打ち込み、養生、脱型、最終的な計画レールレベルの調整の順に行われる。
【0016】
このように、フローティングラダーマクラギ1を設置した後、台座28,33を現場打ちで形成する場合、フローティングラダーマクラギ1の縦梁6と台座33に間隔d1,d2を形成し、これらの間隔d1,d2内にポリウレタン29,32,34を設けるためには、木製型枠を組み立てる際に、間隔d1,d2に相当する部分に中子を設けておき、コンクリートを打設した後、中子を除去する必要がある。
【0017】
ところが、フローティングラダーマクラギ1の下方及び側方には、狭隘な隙間しかないのが普通であり、コンクリート打設後に縦梁6と台座28,33間に設けた中子を外部から除去するのは困難である。
【0018】
そこで、従来は、コンクリートを打設する前に、フローティングラダーマクラギ1の下面及び側面に、発泡スチロール製の中子を設け、コンクリート打設後に、この中子をリモネン液で溶かすことによって除去していた。
【0019】
コンクリート打設後に発泡スチロールの中子を除去する理由は、中子をそのまま残しておくと、軌道完成後にレール上を車両が走行する際に、中子によってポリウレタン29,32,34の変形が妨害され、防振機能を有効に発揮できないからである。
【0020】
なお、リモネンとは、周知のようにミカンやレモンなどの柑橘類の皮に含まれているオレンジ油の主成分である。このリモネンはスチロールを溶かす性質を有している。
【0021】
【特許文献1】
特開2001−214402号公報
【0022】
【発明が解決しようとする課題】
しかしながら、従来のフローティングラダー軌道の敷設方法では、発泡スチロール製の中子をリモネン液で完全に溶かして除去することが困難であり、発泡スチロールが一部残ってしまうという問題があった。
【0023】
この場合には、残留した発泡スチロールがポリウレタン29,32,34の防振機能を妨害するおそれがある。そのため、発泡スチロールを完全に除去する必要があるが、そのためには多くの作業工数が必要であり、コストアップになるという問題があった。
【0024】
また、リモネン液によって熔解された発泡スチロールが液状化し、この液状化した発泡スチロールが、外部に流出するおそれがあった。
【0025】
一方、PC(Prestressed Concrete)桁を用いた橋梁上にフローティングラダー軌道を敷設する要請がある。この場合には、フローティングラダー軌道の台座をPC桁に定着させる必要がある。
【0026】
しかしながら、PC桁の上には排水勾配コンクリートなどの仕上げコンクリートが打設されるのが普通であり、この仕上げコンクリートは厚さが薄いため、台座内の鉄筋を定着させることができない。
【0027】
また、PC桁にはプレストレスがかけられているため、PC桁に台座内の鉄筋を固定するアンカーなどを設けることも好ましくない。工場でPC桁を製造する際に予めアンカーなどを設けることも考えられるが、この場合には、アンカーの位置が固定されているため、現場でフローティングラダー軌道を敷設する際に、自由度が少なくなるという問題が発生する。
【0028】
そこで、フローティングラダー軌道の台座をPC桁以外の部分を用いて、簡単に定着させることが要望されている。
【0029】
本発明は、このような問題に鑑みてなされたもので、敷設時の作業工数を低減できると共に、PC桁に影響を与えずに橋梁上に簡単に定着できるフローティングラダーマクラギ、フローティングラダー軌道及びその敷設方法の提供を課題とする。
【0030】
【課題を解決するための手段】
本発明は、前記課題を解決するため、以下の手段を採用した。
【0031】
すなわち、本発明は、一対のレールの下に前記レールの全長に亘って配置される一対の縦梁と、前記一対の縦梁を連結する継材と、前記縦梁の下面に間欠的に設けられた防振材と、前記縦梁の外側の側面に間欠的に設けられた緩衝材とを備えたフローティングラダーマクラギにおいて、前記縦梁の下面のうち前記防振材を除いた部分、及び前記縦梁の側面のうち前記緩衝材を除いた部分に略隙間なく設けられた捨型枠を備え、前記捨型枠は、ポリウレタンフォームと発泡ポリエチレンフォームとが二層に積層され、前記レール上を走行する車両の重量で変形する際に、前記防振材又は前記緩衝材の変形量以上に変形することを特徴とする。
【0032】
また、本発明は、路盤上に設けられたコンクリート製の台座と、前記台座上に設置されたフローティングラダーマクラギと、前記フローティングラダーマクラギ上に設置された一対のレールとを有するフローティングラダー軌道の敷設構造において、前記フローティングラダーマクラギは、前記一対のレールの下に前記レールの全長に亘って配置された一対の縦梁と、前記一対の縦梁を連結する継材とを有し、前記台座は前記縦梁の下に間隔を空けて設けられた水平部分と、前記縦梁の側面に間隔を空けて設けられた垂直部分とを有し、前記縦梁と前記水平部分間の間隔に間欠的に設けられた防振材と、前記縦梁と前記垂直部分間の間隔に間欠的に設けられた緩衝材と、前記縦梁と前記水平部分間の間隔のうち前記防振材を除いた部分に設けられた捨型枠と、前記縦梁と前記垂直部分間の間隔のうち前記緩衝材を除いた部分に設けられた捨型枠とを備え、前記捨型枠は、ポリウレタンフォームと発泡ポリエチレンフォームとが二層に積層され、前記レール上を走行する車両の重量で変形する際に前記防振材又は前記緩衝材の変形量以上に変形することを特徴とする。
【0034】
また、本発明は、一対のレールの下に設置される一対の縦梁と、前記一対の縦梁を連結する継材とを有するフローティングラダーマクラギを路盤上に設置し、記縦梁の下面に間欠的に防振材を設け、前記縦梁の側面に間欠的に緩衝材を設け、前記フローティングラダーマクラギの周囲に型枠を設け、前記型枠内にコンクリートを打設して、前記フローティングラダーマクラギを支持する台座を形成するフローティングラダー軌道の敷設方法において、記縦梁の下面のうち前記防振材を除いた部分、及び前記縦梁の側面のうち前記緩衝材を除いた部分に、ポリウレタンフォームと発泡ポリエチレンフォームとが二層に積層され、前記レール上を走行する車両の重量で変形する際に、前記防振材又は前記緩衝材の変形量以上に変形する捨型枠を隙間なく設け、前記型枠、前記捨型枠及び前記防振材又は前記緩衝材に囲まれた空間内に前記コンクリートを打設し、所定期間経過後に前記捨型枠を残したまま前記型枠を除去することを特徴とする。
【0038】
本発明では、フローティングラダーマクラギの縦梁の下面と側面に、防振材と緩衝材を設け、これらの防振材を除いた部分に捨型枠を隙間なく設けたので、フローティングラダー軌道を施工する際、台座を形成するためのコンクリートを打設するときに、縦梁と台座間に間隔を設けるための中子を設ける必要がない。
【0040】
軌道完成後にレール上を車両が走行するときには、捨型枠が防振材又は緩衝材の変形量以上に変形するので、防振材及び緩衝材が捨型枠の影響を受けることなく防振機能を発揮できる。
更に、捨型枠がポリウレタンフォームと発泡ポリエチレンフォームの二層で形成された場合は、これらの材料を市場から簡単に入手できるので、コストダウンが可能になる。
【0042】
なお、以上述べた各構成要素及び各工程は、本発明の趣旨を逸脱しない限り、互いに組み合わせることが可能である。
【0043】
【発明の実施の形態】
以下、本発明の実施の形態を添付した図1から図14に基づいて説明する。
【0044】
(第1の実施形態)
【0045】
図1は、本発明に係る実施形態のフローティングラダーマクラギ5を示す。このフローティングラダーマクラギ5は、一対のレール50の下に、レール50の全長に亘って配置される一対の縦梁51と、これらの縦梁51からその外軌側又は内軌側、本例では外軌側に突出するマクラギ突起52と、上記一対の縦梁51を連結する継材53とを有している。なお、図1中の符号81は、レール50を縦梁51に固定する固定具である。
【0046】
図2に示すように、上記の縦梁51の下面54には、間欠的に設けられた防振材55が設けられている。本例では、防振材55は、ポリウレタンで成形されているが、弾性ゴムなどポリウレタン以外の弾性部材を使用することもできる。
【0047】
また、図3にも示すように、縦梁51の下面54のうち上記の防振材55を除いた部分には、捨型枠61が隙間なく設けられている。
【0048】
この捨型枠61は、レール50上を走行する車両の重量で変形する際には、防振材55の変形量以上に変形する部材によって形成されている。
【0049】
本例では、捨型枠61は、図4に示すように、ポリウレタンフォーム62と発泡ポリエチレンフォーム63とが二層に積層されている。本例では、30倍程度に発泡した発泡ポリエチレンフォーム63を用いている。
【0050】
これらのポリウレタンフォーム62及び発泡ポリエチレンフォーム63は、市場で簡単に入手できるので、コストダウンが可能になる。
【0051】
図1に示すように、上記の縦梁51における外軌側すなわちマクラギ突起52側の側面56には、緩衝材57が間欠的に設けられている。
【0052】
また、マクラギ突起52の縦梁51長手方向における両側面58,59には、緩衝材60が設けられている。
【0053】
これらの緩衝部材57,60も、ポリウレタンによって成形されているが、ポリウレタン以外の弾性部材を使用することもできる。
【0054】
また、図5に示すように、上記の縦梁51のマクラギ突起52側の側面のうち、緩衝材57を除いた部分には、捨型枠61が略隙間なく設けられている。
【0055】
この捨型枠61も、上述と同様にポリウレタンフォーム62と発泡ポリエチレンフォーム63とが二層に積層されている(図4参照)。
【0056】
このように、本発明のフローティングラダーマクラギ5は、縦梁51の下面54と側面56に、防振材55と緩衝材57を設け、これらの防振材55及び緩衝材57を除いた部分に、捨型枠61を隙間なく設けた。
【0057】
このため、フローティングラダー軌道7(図6参照)を敷設する際、台座71を形成するためのコンクリートを打設するときに、縦梁51と台座71間に間隔d3,d4を形成するための中子を設ける必要がない。従って、フローティングラダー軌道7の施工が容易になる。
【0058】
(第2の実施形態)
【0059】
次に、図6以降を参照して、上記のフローティングラダーマクラギ5を用いたフローティングラダー軌道7について説明する。なお、図1〜図5と同一の部分には同一の符号を付けて詳細な説明省略した。
【0060】
図6は、本発明に係る第2の実施形態のフローティングラダー軌道7を示す。このフローティングラダー軌道7は、路盤70上に設けられたコンクリート製の台座71と、この台座71上に設置されたフローティングラダーマクラギ5と、このフローティングラダーマクラギ5上に設置された一対のレール50(図7参照)とを有している。
【0061】
フローティングラダーマクラギ5は、図1と同様の構成を有している。また、台座71は、図7にも示すように、フローティングラダーマクラギ5の一対の縦梁51,51の下にそれぞれ設けられている。
【0062】
この台座71は、軌道の全長に亘って設けられている。また、台座71は、縦梁51の下に間隔d3をあけて設けられた水平部分72と、縦梁51の側面に対して間隔d4をあけて設けられた垂直部分73とを有している。上記の水平部分72と垂直部分73は、略L字状に形成されている。
【0063】
本例では、図8に示すように、台座71の水平部分72上面に、凸部74及び凹部75が設けられている。そして、この凸部74と縦梁51間の間隔d5内に、縦梁51の下面54に設けられた防振材55が挿入されている。
【0064】
また、縦梁51の下面54に設けられた捨型枠61は、台座71の凸部74,74間に形成された凹部75と、縦梁51間の間隔d3内に挿入されている。
【0065】
図6に示すように、台座71の垂直部分73と、縦梁51間の間隔d4内には、縦梁51の側面に間欠的に設けられた緩衝材57と、第2の捨型枠61とが挿入されている。
【0066】
なお、本例では、垂直部分73と縦梁51間の間隔d4内には、マクラギ突起52の根元部分に設けられた緩衝材57が挿入されている。
【0067】
フローティングラダーマクラギ5の縦梁51に形成されたマクラギ突起52は、台座71の垂直部分73に形成された隙間d6内に挿入されている。マクラギ突起52の両側面に設けられた緩衝材60,60は、マクラギ突起52と、垂直部分73との間に挿入されている。
【0068】
フローティングラダー軌道7を車両が走行する際に、上下方向の振動は防振材55(図8参照)によって吸収され、左右方向の振動は緩衝材57(図6参照)によって吸収される。また、前後方向の振動は、緩衝材60(図6参照)によって吸収される。
【0069】
このように、本発明のフローティングラダー軌道7は、フローティングラダーマクラギ5の縦梁51と台座71の水平部分72間の隙間d3内に、防振材55が間欠的に設けられると共に、防振材55を除いた部分に捨型枠61が設けられている。
【0070】
更に、捨型枠61は、ポリウレタンフォーム62と発泡ポリエチレンフォーム63とが二層に積層されて形成されている(図3参照)。
【0071】
そして、後述のように台座71を形成する際、コンクリートを打設するときには、捨型枠61が変形することなく、捨型枠61の型枠としての機能が保持される。
【0072】
また、フローティングラダー軌道7の完成後に、レール50上を車両が走行するときには、捨型枠61が防振材55及び緩衝材57の変形量以上に変形する。
【0073】
従って、防振材55及び緩衝材57が、捨型枠61の影響を受けることなく防振機能及び緩衝機能を確実に発揮できる。
【0074】
すなわち、捨型枠61は、台座71の形成時には型枠としての機能し、車両走行時には防振材55の防振機能及び緩衝材57の緩衝機能を妨害しない程度の強度を有している。なお、本例では、捨型枠61を二層62,63にしたが、上記の機能を有する材料であれば一層又は三層以上で成形することができる。
【0075】
(第3の実施形態)
【0076】
次に、上記のフローティングラダー軌道7の敷設方法を、図9を参照して説明する。
【0077】
ここでは、まず、台座71(図7参照)などに埋設される鉄筋を配筋する(ステップ1)。次に、フローティングラダーマクラギ5を所定の位置に設置し、その上にレール50を設置する(ステップ2)。
【0078】
次に、計画レールレベルの設定を行い(ステップ3)、フローティングラダーマクラギ5の周囲に、例えば木製の型枠を組み立てる(ステップ4)。
【0079】
図10は、木製型枠76を示す。この木製型枠76は、台座71を形成するためのものであり、フローティングラダーマクラギ5における縦梁51の内規側に設けられる内型枠77と、外軌側に設けられる外型枠78とを有している。
【0080】
これらの内外型枠77,78は、図11に示すように、レール50の略全長に亘って設ける。
【0081】
次に、図9に示すように、フローティングラダーマクラギ5に設けられた防振材55及び緩衝材57、捨型枠61、内外型枠77,78によって囲まれた空間79内に、コンクリート80(図10及び図11参照)を打設する(ステップ5)。
【0082】
次に、コンクリートの養生を行い、木製型枠76の内外型枠77,78を脱型する。このとき、捨型枠61はそのまま残しておく(ステップ6)。この後、最終的な計画レールレベル調整を行う(ステップ7)。
【0083】
このように、本発明のフローティングラダー軌道7の敷設方法では、捨型枠61を最後まで残しておくので、従来のように捨型枠61をリモネン液などで溶かして除去する必要がない。
【0084】
従って、作業工数の短縮化が可能になると共に、リモネン液で溶かされた液状物が外部に流出するのを防止できる。
【0085】
(第4の実施形態)
【0086】
図12は、本発明に係る第4の実施形態を示す。なお、上記のフローティングラダーマクラギ5(図1参照)及び上記のフローティングラダー軌道7(図6参照)と同一の部分には、同一の符号を付けて詳細な説明を省略した。
【0087】
本発明では、PC(Prestressed Concrete)桁85を用いた橋梁86上に上記のフローティングラダー軌道7(図6参照)が敷設されている。PC桁85は、複数個、本例では3個用いられている。
【0088】
これらのPC桁85は、レール50の長手方向X(図14参照)に交差する方向Yに対して並列に配置されている。PC桁85は、工場などで製造されて現場に搬送される。
【0089】
PC桁85上には、仕上げコンクリートである排水勾配コンクリート87が設けられている。この排水勾配コンクリート87は、その中間部分から両側に下り勾配が設けられている。
【0090】
また、両側のPC桁85の外測には、通路88及び欄干89が設けられている。本例では通路88が片側に設けられている。これらの通路88及び欄干89は、現場でコンクリートを打設することによって形成される。上記の排水勾配コンクリート87は、通路88及び欄干89まで延びている。
【0091】
互いに隣接するPC桁85,85の間には、図13に示すように、レール50の長手方向X(図14参照)に沿って延びる隙間91が設けられている。この隙間91内には、間詰めコンクリート92が充填されている。
【0092】
この間詰めコンクリート92には、アンカー93が設けられている。アンカー93の上部側は、排水勾配コンクリート87上に突出している。
【0093】
図12に示すように、上記のフローティングラダー軌道7の台座71には、レール50の長手方向Xと交差する方向Yに突出する定着用の梁部材95が設けられている。この梁部材95は、台座71と共にコンクリートの現場打ちによって形成される。また、梁部材95は、台座71の水平部分72(図7参照)と略同一高さに形成されている。
【0094】
本例では、梁部材95が両方の台座71の外軌側及び内軌側に突出している。台座71,71の内軌側に設けられた梁部材95は、左右一体化されている。梁部材95の一方の端部(図12中の右端部)は、PC桁85間の間詰めコンクリート92上に配置されている。
【0095】
梁部材95の他方の端部(図12中の左端部)は、通路88上に配置されている。通路88にはアンカー93が設けられている。このアンカー93は、梁部材95内に埋設されている。
【0096】
台座71及び梁部材95内には、共通の水平鉄筋96が配筋されている。この鉄筋96は、間詰めコンクリート92及び通路88に設けられたアンカー93に溶着されている。
【0097】
本例では、図14に示すように、レール50が橋梁86の中心線86aに対して斜めに延びている。従って、フローティングラダーマクラギ5の縦梁51及び台座71も、レール50と平行に設置されている。台座71から突出している梁部材95は、橋梁86の中心線86aと直角に配置されている。
【0098】
このように、本発明では、フローティングラダー軌道7の台座71に設けられた梁部材95に鉄筋96が設けられ、この鉄筋96がPC桁85間の隙間91内に充填された間詰めコンクリート92及び通路88に設けられたアンカー93に固定されている。
【0099】
間詰めコンクリート92及び通路88は厚さが十分にあるので、アンカー93を確実に保持できる。
【0100】
従って、PC桁85にアンカー93を設けるなど後加工をする必要がないので、PC桁85に悪影響を与えることなくフローティングラダー軌道7を固定できる。
【0101】
なお、本例では、間詰めコンクリート92及び通路88にアンカー93を設けたが、PC桁85の個数及びフローティングラダー軌道7の設置位置に応じて、梁部材95の両側に間詰めコンクリート92が配置されている場合には、間詰めコンクリート92のみに設けられたアンカー93に鉄筋96を溶着することもできる。
【0102】
【発明の効果】
本発明では、フローティングラダーマクラギの縦梁の下面に間欠的に防振材を設け、縦梁の側面に緩衝材を間欠的に設け、これらの防振材及び緩衝材を除いた部分に捨型枠を隙間なく設けたので、フローティングラダー軌道を施工する際、台座を形成するためのコンクリートを打設するときに、縦梁と台座間に間隔を設けるための中子を設ける必要がない。従って、作業工数を低減できる。
【0103】
この、捨型枠は、台座を形成するためにコンクリートを打設するときには、捨型枠が型枠としての機能を発揮する。
【0104】
また、コンクリート打設後に脱型するとき、捨型枠をそのまま残すので、作業工数を低減できる。一方、フローティングラダー軌道の完成後にレール上を車両が走行するときには、捨型枠が防振材及び緩衝材の変形量以上に変形するので、防振材及び緩衝材が捨型枠の影響を受けることなく防振機能及び緩衝機能を発揮できる。
捨型枠をポリウレタンフォームと発泡ポリエチレンフォームの二層に形成した場合は、これらの材料を市場から簡単に入手できるので、コストダウンが可能になる。
【0105】
また、PC桁間の隙間に間詰め材を設け、この間詰め材に設けたアンカーに、フローティングラダー軌道の台座及び台座から突出する梁部材内の鉄筋を接続したので、PC桁に追加工による悪影響を与えることなくフローティングラダー軌道を固定できる。
【図面の簡単な説明】
【図1】本発明に係る第1の実施形態のフローティングラダーマクラギを示す平面図である。
【図2】図1のA−A断面図である。
【図3】本発明に係る第1の実施形態の防振材及び捨型枠を示す図である。
【図4】図3のB−B断面図である。
【図5】本発明に係る第1の実施形態の緩衝材及び捨型枠を示す平面図である。
【図6】本発明に係る第2の実施形態のフローティングラダー軌道を示す平面図である。
【図7】図6のC−C断面図である。
【図8】図7のD−D断面図である。
【図9】本発明に係る第3の実施形態のフローティングラダー軌道の敷設方法を説明するフローチャートである。
【図10】本発明に係る第3の実施形態の型枠を組み立てた状態を示す平面図である。
【図11】図10のE−E断面図である。
【図12】本発明に係る第4の実施形態のPC桁を用いた橋梁及びフローティングラダー軌道を示す断面図である。
【図13】本発明に係る第4の実施形態のPC桁間に充填された間詰めコンクリート及びアンカーを示す断面図である。
【図14】本発明に係る第4の実施形態のフローティングラダーマクラギ及び梁部材を示す平面図である。
【図15】従来例を示す平面図である。
【図16】図15のF−F断面図である。
【図17】別の従来例を示す平面図である。
【図18】図17のG−G断面図である。
【符号の説明】
1 フローティングラダーマクラギ
5 フローティングラダーマクラギ
6 縦梁
7 フローティングラダー軌道
9 継材
28 台座
29 ポリウレタン
30 マクラギ突起
31 路盤突起
32 ポリウレタン
33 台座
33a 水平部分
33b 垂直部分
34 ポリウレタン
50 レール
51 縦梁
52 マクラギ突起
53 継材
54 縦梁の下面
55 防振材
56 縦梁の側面
57 緩衝材
58 マクラギ突起の側面
59 マクラギ突起の側面
60 緩衝材
61 捨型枠
62 ポリウレタンフォーム
63 発泡ポリエチレンフォーム
70 路盤
71 台座
72 台座の水平部分
73 台座の垂直部分
74 台座の凸部
75 台座の凹部凹部
76 木製型枠
77 内型枠
78 外型枠
79 空間
80 コンクリート
81 固定具
85 PC桁
86 橋梁
86a 橋梁の中心線
87 排水勾配コンクリート
88 通路
89 欄干
91 隙間
92 間詰めコンクリート
93 アンカー
95 梁部材
96 鉄筋
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a floating ladder sleeper, a floating ladder track, and a laying method thereof.
[0002]
[Prior art]
In a conventional track using a lateral sleeper, the ballast buffer pressure locally increases because the rail is intermittently supported. For this reason, there is a possibility that a track error may occur due to a large influence of each wheel due to the train load.
[0003]
When this track deviation becomes large, the train shake increases and the ride quality decreases. For this reason, there has been a problem that maintenance work must be performed periodically in a relatively short period of time.
[0004]
Therefore, a ladder sleeper track that improves the dispersibility of the train load and efficiently absorbs the impact force and vibration caused by the train has been proposed.
[0005]
In this ladder sleeper track, a ladder sleeper is laid under a pair of rails instead of a horizontal sleeper. There are two types of ladder sleepers: a ballast ladder sleeper installed on a ballast laid on the roadbed, and a floating ladder sleeper installed on the roadbed without using ballast.
[0006]
FIG. 15 shows a floating ladder sleeper 1 (see, for example, Patent Document 1). The floating ladder sleeper 1 includes a pair of concrete longitudinal beams 6 extending along the longitudinal direction of the pair of rails, and a plurality of joint members 9 that connect the longitudinal beams 6.
[0007]
The floating ladder sleeper 1 includes a polyurethane 29 made of an elastic material that is intermittently disposed on the lower surface of the vertical beam 6 at a predetermined interval, and at least one of the outer rail side or the inner rail side of the vertical beam 6, A sleeper protrusion 30 protruding toward the outer track side, a polyurethane 32 made of an elastic material provided between the roadbed protrusion 31 and the longitudinal beam 6 provided in the vicinity of the sleeper protrusion 30 and between the roadbed protrusion 31 and the sleeper protrusion 30. I have.
[0008]
As shown in FIG. 16, the vertical beam 6 of the floating ladder sleeper 1 is installed on a pedestal (mortar base) 28 provided on the roadbed via polyurethane 29. A space d <b> 1 is formed between the vertical beam 6 and the pedestal 28 of the floating ladder sleeper 1. That is, the entire floating ladder sleeper 1 is supported only by the polyurethane 29.
[0009]
FIG. 17 is an example in which a pedestal 33 having an L-shaped cross section is provided along the entire length of the floating ladder sleeper 1 instead of the pedestal 28 and the roadbed protrusion 31.
[0010]
As shown in FIG. 18, the pedestal 33 has a horizontal portion 33 a that supports the lower surface of the vertical beam 6 and a vertical portion 33 b that supports the side surface of the vertical beam 6. A space d <b> 1 is provided between the vertical beam 6 and the horizontal portion 33 a of the pedestal 33. In addition, polyurethane 29 is intermittently provided in the interval d1.
[0011]
As shown in FIG. 17, the vertical portion 33 b of the pedestal 33 is provided to avoid the sleeper protrusion 30. That is, the vertical portion 33 b of the pedestal 33 is provided on both sides of the sleeper projection 30.
[0012]
And both sides of sleeper projection 30 are supported by vertical portions 33b of pedestals 33 on both sides via polyurethane 32.
[0013]
Further, a gap d <b> 2 is provided between the side surface of the vertical beam 6 and the vertical portion 33 b of the pedestal 33. Within this distance d2, polyurethane 34 is provided at a portion corresponding to the joint material 9. Polyurethane 32 is also provided at the root portion of sleeper protrusion 30 within the interval d2.
[0014]
The floating ladder track using such a floating ladder sleeper 1 can greatly reduce the time required for maintenance compared to a track using a horizontal sleeper. In addition, it has excellent load dispersibility of trains and has the effect of reducing noise and vibration.
[0015]
By the way, when constructing the above floating ladder track (see FIGS. 16 and 18), assembling the reinforcing bars of the pedestals 28 and 33 on the roadbed, installing the floating ladder sleeper 1 and rails, setting the planned rail level, and the pedestal 28 , 33 is formed in the order of assembling wooden formwork for forming, concrete placing, curing, demolding, and final adjustment of planned rail level.
[0016]
As described above, when the pedestals 28 and 33 are formed on the spot after the floating ladder sleeper 1 is installed, the distances d1 and d2 are formed in the vertical beam 6 and the pedestal 33 of the floating ladder sleeper 1 and the distances d1 and d2 are formed. In order to provide polyurethane 29, 32, and 34 in d2, when assembling the wooden formwork, a core is provided in a portion corresponding to the distances d1 and d2, and after placing concrete, the core is removed. There is a need to.
[0017]
However, it is normal that there are only narrow gaps below and on the side of the floating ladder sleeper 1, and the core provided between the longitudinal beam 6 and the bases 28 and 33 is removed from the outside after the concrete is placed. Have difficulty.
[0018]
Therefore, conventionally, before placing concrete, a foamed polystyrene core is provided on the lower and side surfaces of the floating ladder sleeper 1, and after the concrete is placed, the core is removed by melting with limonene liquid. .
[0019]
The reason for removing the foam core after placing the concrete is that if the core is left as it is, the deformation of the polyurethane 29, 32, 34 is obstructed by the core when the vehicle travels on the rail after the completion of the track. This is because the anti-vibration function cannot be exhibited effectively.
[0020]
Limonene is a main component of orange oil contained in citrus peels such as mandarin orange and lemon as is well known. This limonene has the property of dissolving styrene.
[0021]
[Patent Document 1]
JP 2001-214402 A
[0022]
[Problems to be solved by the invention]
However, the conventional floating ladder track laying method has a problem that it is difficult to completely remove and remove the foamed styrene core with limonene liquid, and a part of the foamed polystyrene remains.
[0023]
In this case, the remaining polystyrene foam may interfere with the vibration isolating function of the polyurethane 29, 32, 34. For this reason, it is necessary to completely remove the expanded polystyrene. For this purpose, a large number of work steps are required, which increases the cost.
[0024]
Moreover, the foamed styrene melt | dissolved by the limonene liquid liquefied, and there existed a possibility that this liquefied foamed styrene might flow out outside.
[0025]
On the other hand, there is a demand for laying a floating ladder track on a bridge using a PC (Prestressed Concrete) girder. In this case, it is necessary to fix the base of the floating ladder track to the PC girder.
[0026]
However, finish concrete such as drainage gradient concrete is usually placed on the PC girder, and since this finish concrete is thin, the reinforcing bars in the pedestal cannot be fixed.
[0027]
Further, since prestress is applied to the PC girder, it is not preferable to provide an anchor or the like for fixing the reinforcing bar in the base to the PC girder. It is conceivable to provide an anchor or the like in advance when manufacturing a PC girder at the factory, but in this case, since the position of the anchor is fixed, the degree of freedom is low when laying the floating ladder track at the site. Problem arises.
[0028]
Therefore, there is a demand for easily fixing the base of the floating ladder track by using a portion other than the PC girder.
[0029]
The present invention has been made in view of such problems, and can reduce the work man-hours during laying, and can easily be fixed on a bridge without affecting the PC girder, a floating ladder sleeper, a floating ladder track, and its The issue is to provide a laying method.
[0030]
[Means for Solving the Problems]
The present invention employs the following means in order to solve the above problems.
[0031]
That is, the present invention provides a pair of longitudinal beams disposed under the pair of rails over the entire length of the rails, a joint material connecting the pair of longitudinal beams, and intermittently provided on a lower surface of the longitudinal beams. Anti-vibration material and the longitudinal beam Outside In a floating ladder sleeper provided with a cushioning material provided intermittently on the side surface of the vertical beam, a portion of the lower surface of the vertical beam excluding the vibration isolating material and a side surface of the vertical beam excluding the cushioning material It is provided with a discard frame provided in a portion with almost no gap, Polyurethane foam and foamed polyethylene foam are laminated in two layers, Weight of vehicle traveling on the rail Deformation In doing so, the deformation is greater than the deformation amount of the vibration-proof material or the cushioning material.
[0032]
Further, the present invention provides a floating ladder track having a concrete pedestal provided on a roadbed, a floating ladder sleeper installed on the pedestal, and a pair of rails installed on the floating ladder sleeper. In the structure, the floating ladder sleeper has a pair of vertical beams disposed under the pair of rails over the entire length of the rails, and a joint material connecting the pair of vertical beams, and the pedestal is A horizontal portion provided below the vertical beam with a space; and a vertical portion provided on the side surface of the vertical beam with a space between the vertical beam and the horizontal portion. A vibration-isolating material provided in the space, a shock-absorbing material provided intermittently in the space between the vertical beam and the vertical portion, and a portion excluding the vibration-proof material in the space between the vertical beam and the horizontal portion Provided in And 捨型 frame that, the longitudinal beams and a 捨型 frame provided in a portion excluding the buffer material of the spacing between the vertical portion, the 捨型 frame, Polyurethane foam and foamed polyethylene foam are laminated in two layers, Weight of vehicle traveling on the rail Deformation When , The deformation is greater than the deformation amount of the vibration-proof material or the buffer material.
[0034]
Further, the present invention is a floating ladder sleeper having a pair of vertical beams installed under a pair of rails and a joint material connecting the pair of vertical beams on the roadbed, in front An anti-vibration material is intermittently provided on the lower surface of the vertical beam, a buffer material is intermittently provided on the side surface of the vertical beam, a formwork is provided around the floating ladder sleeper, and concrete is placed in the formwork. In the method of laying a floating ladder track that forms a pedestal that supports the floating ladder sleeper, in front The portion of the lower surface of the vertical beam excluding the vibration-proof material, and the portion of the side surface of the vertical beam excluding the buffer material, Polyurethane foam and foamed polyethylene foam are laminated in two layers, Weight of vehicle traveling on the rail Deformation Before Defense Vibration material Or the cushioning material Provided with a clearance frame that deforms more than the deformation amount of the above, there is no gap, the mold frame, the disposal frame and the anti-vibration material Or the cushioning material In the space surrounded by Above Concrete is cast, and the mold is removed while leaving the discarded mold after a predetermined period.
[0038]
In the present invention, the anti-vibration material and the cushioning material are provided on the lower and side surfaces of the vertical beam of the floating ladder sleeper, and the partless frame is provided in the portion excluding these anti-vibration materials. In doing so, when placing concrete for forming the pedestal, there is no need to provide a core for providing a space between the vertical beam and the pedestal.
[0040]
When the vehicle travels on the rail after completion of the track, the scraping frame will be deformed more than the deformation amount of the damping material or cushioning material, so that the damping material and cushioning material will not be affected by the discarding frame. Can be demonstrated.
Furthermore, when the discard frame is formed of two layers of polyurethane foam and foamed polyethylene foam, these materials can be easily obtained from the market, so that the cost can be reduced.
[0042]
It should be noted that the components and steps described above can be combined with each other without departing from the spirit of the present invention.
[0043]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to FIGS.
[0044]
(First embodiment)
[0045]
FIG. 1 shows a floating ladder sleeper 5 according to an embodiment of the present invention. The floating ladder sleeper 5 includes a pair of vertical beams 51 disposed under the pair of rails 50 over the entire length of the rails 50, and the vertical or negative side of the vertical beams 51, in this example, A sleeper protrusion 52 protruding toward the outer track side and a joint material 53 connecting the pair of vertical beams 51 are provided. In addition, the code | symbol 81 in FIG. 1 is a fixing tool which fixes the rail 50 to the vertical beam 51. FIG.
[0046]
As shown in FIG. 2, an anti-vibration material 55 provided intermittently is provided on the lower surface 54 of the vertical beam 51. In this example, the vibration isolator 55 is formed of polyurethane, but an elastic member other than polyurethane, such as elastic rubber, can also be used.
[0047]
Further, as shown in FIG. 3, a parting frame 61 is provided on the lower surface 54 of the vertical beam 51 excluding the vibration isolating material 55 without any gap.
[0048]
This discard frame 61 The Weight of the vehicle traveling on the wheel 50 Deformation In doing so, it is formed by a member that deforms more than the deformation amount of the vibration isolator 55.
[0049]
In this example, as shown in FIG. 4, the discard frame 61 has a polyurethane foam 62 and a foamed polyethylene foam 63 laminated in two layers. In this example, a foamed polyethylene foam 63 foamed about 30 times is used.
[0050]
Since the polyurethane foam 62 and the foamed polyethylene foam 63 can be easily obtained in the market, the cost can be reduced.
[0051]
As shown in FIG. 1, a buffer material 57 is intermittently provided on a side surface 56 on the outer rail side of the vertical beam 51, that is, on the sleeper projection 52 side.
[0052]
Further, cushioning materials 60 are provided on both side surfaces 58 and 59 in the longitudinal direction of the longitudinal beam 51 of the sleeper projection 52.
[0053]
These buffer members 57 and 60 are also formed of polyurethane, but elastic members other than polyurethane can also be used.
[0054]
Further, as shown in FIG. 5, a discard frame 61 is provided substantially without any gap on the side surface of the vertical beam 51 on the sleeper projection 52 side, excluding the buffer material 57.
[0055]
The discard frame 61 is also formed by laminating a polyurethane foam 62 and a foamed polyethylene foam 63 in two layers as described above (see FIG. 4).
[0056]
As described above, the floating ladder sleeper 5 of the present invention is provided with the vibration isolating material 55 and the shock absorbing material 57 on the lower surface 54 and the side surface 56 of the longitudinal beam 51, and the vibration isolating material 55 and the shock absorbing material 57 are removed from the portion. The disposal frame 61 was provided without a gap.
[0057]
Therefore, when laying the floating ladder track 7 (see FIG. 6), when placing concrete for forming the pedestal 71, it is necessary to form spaces d3 and d4 between the vertical beam 51 and the pedestal 71. There is no need to provide a child. Therefore, the construction of the floating ladder track 7 is facilitated.
[0058]
(Second Embodiment)
[0059]
Next, the floating ladder track 7 using the floating ladder sleeper 5 will be described with reference to FIG. In addition, the same code | symbol was attached | subjected to the part same as FIGS. 1-5, and detailed description was abbreviate | omitted.
[0060]
FIG. 6 shows a floating ladder track 7 according to the second embodiment of the present invention. The floating ladder track 7 includes a concrete pedestal 71 provided on the roadbed 70, a floating ladder sleeper 5 installed on the pedestal 71, and a pair of rails 50 ( (See FIG. 7).
[0061]
The floating ladder sleeper 5 has a configuration similar to that shown in FIG. Further, as shown in FIG. 7, the pedestal 71 is provided below the pair of vertical beams 51, 51 of the floating ladder sleeper 5.
[0062]
This pedestal 71 is provided over the entire length of the track. The pedestal 71 has a horizontal portion 72 provided below the vertical beam 51 with an interval d3 and a vertical portion 73 provided with an interval d4 with respect to the side surface of the vertical beam 51. . The horizontal portion 72 and the vertical portion 73 are formed in a substantially L shape.
[0063]
In this example, as shown in FIG. 8, a convex portion 74 and a concave portion 75 are provided on the upper surface of the horizontal portion 72 of the pedestal 71. And the vibration isolator 55 provided in the lower surface 54 of the vertical beam 51 is inserted in the space | interval d5 between this convex part 74 and the vertical beam 51. FIG.
[0064]
Further, the discard frame 61 provided on the lower surface 54 of the vertical beam 51 is inserted into a gap d <b> 3 between the concave portion 75 formed between the convex portions 74 of the pedestal 71 and the vertical beam 51.
[0065]
As shown in FIG. 6, in the space d <b> 4 between the vertical portion 73 of the pedestal 71 and the vertical beam 51, the cushioning material 57 provided intermittently on the side surface of the vertical beam 51, and the second discard frame 61. And are inserted.
[0066]
In this example, a cushioning material 57 provided at the root portion of the sleeper protrusion 52 is inserted in the interval d4 between the vertical portion 73 and the vertical beam 51.
[0067]
A sleeper protrusion 52 formed on the vertical beam 51 of the floating ladder sleeper 5 is inserted into a gap d6 formed on a vertical portion 73 of the base 71. The cushioning materials 60, 60 provided on both side surfaces of the sleeper protrusion 52 are inserted between the sleeper protrusion 52 and the vertical portion 73.
[0068]
When the vehicle travels on the floating ladder track 7, the vertical vibration is absorbed by the vibration isolating material 55 (see FIG. 8), and the horizontal vibration is absorbed by the shock absorbing material 57 (see FIG. 6). Moreover, the vibration in the front-rear direction is absorbed by the cushioning material 60 (see FIG. 6).
[0069]
As described above, the floating ladder track 7 of the present invention is provided with the vibration isolating material 55 intermittently provided in the gap d3 between the vertical beam 51 of the floating ladder sleeper 5 and the horizontal portion 72 of the base 71, and the vibration isolating material. A discard frame 61 is provided in a portion excluding 55.
[0070]
Further, the discard frame 61 is formed by laminating a polyurethane foam 62 and a foamed polyethylene foam 63 in two layers (see FIG. 3).
[0071]
So After When forming the pedestal 71 as described above, when placing concrete, the discard frame 61 is not deformed, and the function of the discard frame 61 as a mold is maintained.
[0072]
In addition, when the vehicle travels on the rail 50 after the completion of the floating ladder track 7, the scraping frame 61 is deformed more than the deformation amount of the vibration isolating material 55 and the buffer material 57.
[0073]
Therefore, the anti-vibration material 55 and the shock-absorbing material 57 can reliably exhibit the anti-vibration function and the shock-absorbing function without being affected by the discard frame 61.
[0074]
That is, the discard frame 61 functions as a mold when the pedestal 71 is formed, and has a strength that does not interfere with the vibration isolation function of the vibration isolation material 55 and the buffer function of the shock absorber 57 when the vehicle travels. In addition, in this example, the discard frame 61 is made into the two layers 62 and 63, However, If it is a material which has said function, it can shape | mold by one layer or three layers or more.
[0075]
(Third embodiment)
[0076]
Next, a method of laying the floating ladder track 7 will be described with reference to FIG.
[0077]
Here, first, reinforcing bars embedded in the pedestal 71 (see FIG. 7) are arranged (step 1). Next, the floating ladder sleeper 5 is installed at a predetermined position, and the rail 50 is installed thereon (step 2).
[0078]
Next, the planned rail level is set (step 3), and, for example, a wooden formwork is assembled around the floating ladder sleeper 5 (step 4).
[0079]
FIG. 10 shows a wooden formwork 76. This wooden formwork 76 is for forming the pedestal 71, and includes an inner formwork 77 provided on the inner ruler side of the vertical beam 51 in the floating ladder sleeper 5 and an outer formwork 78 provided on the outer track side. Have.
[0080]
These inner and outer molds 77 and 78 are provided over substantially the entire length of the rail 50 as shown in FIG.
[0081]
Next, as shown in FIG. 9, the concrete 80 (in the space 79 surrounded by the vibration isolating material 55 and the shock absorbing material 57 provided in the floating ladder sleeper 5, the discard frame 61, and the inner and outer mold frames 77, 78). (See FIGS. 10 and 11) (Step 5).
[0082]
Next, the concrete is cured, and the inner and outer molds 77 and 78 of the wooden mold 76 are removed. At this time, the discard frame 61 is left as it is (step 6). Thereafter, final planned rail level adjustment is performed (step 7).
[0083]
As described above, in the method for laying the floating ladder track 7 of the present invention, the discard frame 61 is left to the end, so that it is not necessary to dissolve and remove the discard frame 61 with limonene liquid or the like as in the prior art.
[0084]
Accordingly, it is possible to reduce the number of work steps and to prevent the liquid material dissolved in the limonene liquid from flowing out to the outside.
[0085]
(Fourth embodiment)
[0086]
FIG. 12 shows a fourth embodiment according to the present invention. In addition, the same code | symbol was attached | subjected to the same part as said floating ladder sleeper 5 (refer FIG. 1) and said floating ladder track | orbit 7 (refer FIG. 6), and detailed description was abbreviate | omitted.
[0087]
In the present invention, the floating ladder track 7 (see FIG. 6) is laid on a bridge 86 using a PC (Prestressed Concrete) girder 85. A plurality of PC girders 85, three in this example, are used.
[0088]
These PC girders 85 are arranged in parallel with respect to a direction Y that intersects the longitudinal direction X of the rail 50 (see FIG. 14). The PC girder 85 is manufactured in a factory or the like and transported to the site.
[0089]
On the PC girder 85, drainage gradient concrete 87 which is finished concrete is provided. The drainage gradient concrete 87 is provided with a downward gradient on both sides from the intermediate portion.
[0090]
Further, a path 88 and a balustrade 89 are provided for external measurement of the PC girders 85 on both sides. In this example, a passage 88 is provided on one side. These passages 88 and balustrades 89 are formed by placing concrete on site. The drainage gradient concrete 87 extends to the passage 88 and the balustrade 89.
[0091]
A gap 91 extending along the longitudinal direction X of the rail 50 (see FIG. 14) is provided between the PC girders 85 and 85 adjacent to each other, as shown in FIG. This gap 91 is filled with interstitial concrete 92.
[0092]
An anchor 93 is provided on the padded concrete 92. The upper side of the anchor 93 protrudes on the drainage gradient concrete 87.
[0093]
As shown in FIG. 12, a fixing beam member 95 protruding in the direction Y intersecting the longitudinal direction X of the rail 50 is provided on the base 71 of the floating ladder track 7. The beam member 95 is formed together with the pedestal 71 by spotting concrete. Further, the beam member 95 is formed at substantially the same height as the horizontal portion 72 (see FIG. 7) of the base 71.
[0094]
In this example, the beam member 95 protrudes to the outer track side and the inner track side of both pedestals 71. The beam members 95 provided on the inner rail side of the pedestals 71 and 71 are integrated on the left and right. One end portion (right end portion in FIG. 12) of the beam member 95 is disposed on the concrete concrete 92 between the PC girders 85.
[0095]
The other end (left end in FIG. 12) of the beam member 95 is disposed on the passage 88. An anchor 93 is provided in the passage 88. The anchor 93 is embedded in the beam member 95.
[0096]
A common horizontal reinforcing bar 96 is arranged in the base 71 and the beam member 95. The reinforcing bars 96 are welded to the anchoring concrete 92 and the anchor 93 provided in the passage 88.
[0097]
In this example, as shown in FIG. 14, the rail 50 extends obliquely with respect to the center line 86 a of the bridge 86. Therefore, the vertical beam 51 and the pedestal 71 of the floating ladder sleeper 5 are also installed in parallel with the rail 50. The beam member 95 protruding from the pedestal 71 is disposed at a right angle to the center line 86 a of the bridge 86.
[0098]
As described above, in the present invention, the reinforcing member 96 is provided on the beam member 95 provided on the base 71 of the floating ladder track 7, and the reinforcing concrete 96 is filled in the gap 91 between the PC girders 85, It is fixed to an anchor 93 provided in the passage 88.
[0099]
Since the interstitial concrete 92 and the passage 88 are sufficiently thick, the anchor 93 can be securely held.
[0100]
Therefore, there is no need to perform post-processing such as providing an anchor 93 on the PC beam 85, so that the floating ladder track 7 can be fixed without adversely affecting the PC beam 85.
[0101]
In this example, the anchor concrete 93 is provided in the gap concrete 92 and the passage 88. However, the gap concrete 92 is disposed on both sides of the beam member 95 according to the number of PC girders 85 and the installation position of the floating ladder track 7. If it is, the reinforcing bars 96 can be welded to the anchors 93 provided only on the interstitial concrete 92.
[0102]
【The invention's effect】
In the present invention, a vibration isolator is intermittently provided on the lower surface of the vertical beam of the floating ladder sleeper, a buffer material is intermittently provided on the side surface of the vertical beam, and the vibration isolating material and the buffer material are removed in a portion other than the vibration isolator. Since the frame is provided without a gap, it is not necessary to provide a core for providing a gap between the vertical beam and the pedestal when placing the concrete for forming the pedestal when constructing the floating ladder track. Therefore, work man-hours can be reduced.
[0103]
This rounding frame The stand When concrete is placed to form a seat, the discard frame functions as a mold frame.
[0104]
Further, when removing the mold after placing the concrete, the discard frame is left as it is, so that the number of work steps can be reduced. On the other hand, when the vehicle travels on the rail after the completion of the floating ladder track, the discard frame deforms more than the deformation amount of the vibration isolator and the shock absorber, so that the vibration isolator and the shock absorber are affected by the discard frame. The vibration-proof function and the buffer function can be exhibited without any problems.
When the discard frame is formed in two layers of polyurethane foam and foamed polyethylene foam, these materials can be easily obtained from the market, so that the cost can be reduced.
[0105]
In addition, a padding material is provided in the gap between the PC girders, and the anchors provided in the padding material are connected to the pedestal of the floating ladder track and the reinforcing bar in the beam member protruding from the pedestal. Floating ladder track can be fixed without giving
[Brief description of the drawings]
FIG. 1 is a plan view showing a floating ladder sleeper according to a first embodiment of the present invention.
FIG. 2 is a cross-sectional view taken along the line AA of FIG.
FIG. 3 is a diagram showing a vibration isolator and a discard frame according to the first embodiment of the present invention.
4 is a cross-sectional view taken along the line BB in FIG.
FIG. 5 is a plan view showing the cushioning material and the discard frame according to the first embodiment of the present invention.
FIG. 6 is a plan view showing a floating ladder track of a second embodiment according to the present invention.
7 is a cross-sectional view taken along the line CC of FIG.
8 is a cross-sectional view taken along the line DD of FIG.
FIG. 9 is a flowchart illustrating a method for laying a floating ladder track according to a third embodiment of the present invention.
FIG. 10 is a plan view showing the assembled state of the mold according to the third embodiment of the present invention.
11 is a cross-sectional view taken along the line E-E in FIG. 10;
FIG. 12 is a cross-sectional view showing a bridge and a floating ladder track using a PC girder according to a fourth embodiment of the present invention.
FIG. 13 is a cross-sectional view showing interstitial concrete and an anchor filled between PC girders according to a fourth embodiment of the present invention.
FIG. 14 is a plan view showing a floating ladder sleeper and a beam member according to a fourth embodiment of the present invention.
FIG. 15 is a plan view showing a conventional example.
16 is a cross-sectional view taken along line FF in FIG.
FIG. 17 is a plan view showing another conventional example.
18 is a cross-sectional view taken along the line GG in FIG.
[Explanation of symbols]
1 Floating ladder sleeper
5 Floating ladder sleeper
6 Longitudinal beam
7 Floating ladder track
9 Joint material
28 pedestal
29 polyurethane
30 sleeper protrusion
31 Roadbed protrusion
32 polyurethane
33 pedestal
33a Horizontal part
33b Vertical part
34 polyurethane
50 rails
51 Longitudinal beam
52 sleeper protrusion
53 Joint material
54 Underside of vertical beam
55 Anti-vibration material
56 Side of longitudinal beam
57 cushioning material
58 Sides of sleeper protrusion
59 Side surface of sleeper protrusion
60 cushioning material
61 Discarding frame
62 Polyurethane foam
63 Foamed polyethylene foam
70 roadbed
71 pedestal
72 Horizontal part of pedestal
73 Vertical part of pedestal
74 Projection of pedestal
75 Recessed recess in pedestal
76 wooden formwork
77 Inside formwork
78 Outer formwork
79 space
80 concrete
81 Fixing tool
85 PC digits
86 Bridge
86a Bridge centerline
87 Drainage concrete
88 passage
89 Parapet
91 gap
92 Filled concrete
93 Anchor
95 Beam members
96 rebar

Claims (4)

一対のレールの下に前記レールの全長に亘って配置される一対の縦梁と、前記一対の縦梁を連結する継材と、前記縦梁の下面に間欠的に設けられた防振材と、前記縦梁の外側の側面に間欠的に設けられた緩衝材とを備えたフローティングラダーマクラギにおいて、
前記縦梁の下面のうち前記防振材を除いた部分、及び前記縦梁の側面のうち前記緩衝材を除いた部分に略隙間なく設けられた捨型枠を備え、
前記捨型枠は、ポリウレタンフォームと発泡ポリエチレンフォームとが二層に積層され、前記レール上を走行する車両の重量で変形する際に、前記防振材又は前記緩衝材の変形量以上に変形することを特徴とするフローティングラダーマクラギ。
A pair of vertical beams disposed under the pair of rails over the entire length of the rails, a joint material connecting the pair of vertical beams, and a vibration isolating material provided intermittently on the lower surface of the vertical beams; In a floating ladder sleeper comprising a cushioning material provided intermittently on the outer side surface of the longitudinal beam,
A portion of the lower surface of the vertical beam excluding the anti-vibration material, and a portion of the side surface of the vertical beam that is provided without any gaps in the portion excluding the buffer material,
The discard frame is formed by laminating polyurethane foam and foamed polyethylene foam in two layers, and when deformed by the weight of the vehicle traveling on the rail, it deforms more than the deformation amount of the vibration-proof material or the cushioning material. This is a floating ladder sleeper.
路盤上に設けられたコンクリート製の台座と、前記台座上に設置されたフローティングラダーマクラギと、前記フローティングラダーマクラギ上に設置された一対のレールとを有するフローティングラダー軌道の敷設構造において、
前記フローティングラダーマクラギは、前記一対のレールの下に前記レールの全長に亘って配置された一対の縦梁と、前記一対の縦梁を連結する継材とを有し、
前記台座は前記縦梁の下に間隔を空けて設けられた水平部分と、前記縦梁の側面に間隔を空けて設けられた垂直部分とを有し、
前記縦梁と前記水平部分間の間隔に間欠的に設けられた防振材と、
前記縦梁と前記垂直部分間の間隔に間欠的に設けられた緩衝材と、
前記縦梁と前記水平部分間の間隔のうち前記防振材を除いた部分に設けられた捨型枠と、
前記縦梁と前記垂直部分間の間隔のうち前記緩衝材を除いた部分に設けられた捨型枠とを備え、
前記捨型枠は、ポリウレタンフォームと発泡ポリエチレンフォームとが二層に積層され、前記レール上を走行する車両の重量で変形する際に前記防振材又は前記緩衝材の変形量以上に変形することを特徴とするフローティングラダー軌道。
In a laying structure of a floating ladder track having a concrete pedestal provided on a roadbed, a floating ladder sleeper installed on the pedestal, and a pair of rails installed on the floating ladder sleeper,
The floating ladder sleeper has a pair of vertical beams arranged over the entire length of the rails under the pair of rails, and a joint material connecting the pair of vertical beams,
The pedestal has a horizontal portion provided below the vertical beam with a space therebetween, and a vertical portion provided on the side surface of the vertical beam with a space therebetween,
Anti-vibration material provided intermittently in the interval between the vertical beam and the horizontal portion;
Cushioning material provided intermittently in the interval between the vertical beam and the vertical portion;
A disposal frame provided in a portion excluding the vibration isolating material in the interval between the vertical beam and the horizontal portion,
A discard frame provided in a portion excluding the cushioning material in the interval between the vertical beam and the vertical portion;
The捨型frame, polyurethane foam and polyethylene foam are laminated in two layers, when deformed by the weight of the vehicle traveling on the rail is deformed beyond the amount of deformation of the vibration proof material or the cushioning material Floating ladder track characterized by that.
一対のレールの下に設置される一対の縦梁と、前記一対の縦梁を連結する継材とを有するフローティングラダーマクラギを路盤上に設置し、
記縦梁の下面に間欠的に防振材を設け、前記縦梁の側面に間欠的に緩衝材を設け、
前記フローティングラダーマクラギの周囲に型枠を設け、
前記型枠内にコンクリートを打設して、前記フローティングラダーマクラギを支持する台座を形成するフローティングラダー軌道の敷設方法において、
記縦梁の下面のうち前記防振材を除いた部分、及び前記縦梁の側面のうち前記緩衝材を除いた部分に、ポリウレタンフォームと発泡ポリエチレンフォームとが二層に積層され、前記レール上を走行する車両の重量で変形する際に、前記防振材又は前記緩衝材の変形量以上に変形する捨型枠を隙間なく設け、
前記型枠、前記捨型枠及び前記防振材又は前記緩衝材に囲まれた空間内に前記コンクリートを打設し、
所定期間経過後に前記捨型枠を残したまま前記型枠を除去することを特徴とするフローティングラダー軌道の敷設方法。
A floating ladder sleeper having a pair of vertical beams installed under the pair of rails and a joint material connecting the pair of vertical beams is installed on the roadbed,
Before Kitatehari lower surface intermittently provided an anti-vibration material, intermittently provided cushioning material on the side surfaces of the longitudinal beams,
A mold is provided around the floating ladder sleeper,
In the method of laying a floating ladder track, in which concrete is placed in the formwork to form a pedestal that supports the floating ladder sleeper,
Front portion excluding the vibration-proof material of the lower surface of Kitatehari, and the portion excluding the buffer material of the side surfaces of the longitudinal beams, and polyurethane foam and polyethylene foam are laminated in two layers, said rail When deformed by the weight of the vehicle traveling on the top, a disposal frame that deforms more than the deformation amount of the vibration isolator or the cushioning material is provided without a gap,
Said mold, and Da設the concrete to the捨型frame and the vibration proof material or the enclosed buffer material the space,
A method for laying a floating ladder track, wherein the formwork is removed while leaving the discarded formwork after a predetermined period.
一対のレールの下に前記レールの全長に亘って配置される一対の縦梁と、前記一対の縦梁を連結する継材と、前記縦梁の下面に間欠的に設けられた防振材と、前記縦梁の外側の側面に間欠的に設けられた緩衝材とを備えたフローティングラダーマクラギにおける前記縦梁の下面のうち、前記防振材を除いた部分、又は前記縦梁の側面のうち前記緩衝材を除いた部分に設けられる捨型枠であって、  A pair of vertical beams disposed under the pair of rails over the entire length of the rails, a joint material connecting the pair of vertical beams, and a vibration isolating material provided intermittently on the lower surface of the vertical beams; Of the lower surface of the vertical beam in a floating ladder sleeper provided with a buffer material provided intermittently on the outer side surface of the vertical beam, the portion excluding the vibration isolating material, or the side surface of the vertical beam A disposal frame provided in a portion excluding the cushioning material,
ポリウレタンフォームと発泡ポリエチレンフォームとが二層に積層され、前記レール上を走行する車両の重量で変形する際に、前記防振材又は前記緩衝材の変形量以上に変形す  When polyurethane foam and foamed polyethylene foam are laminated in two layers and deformed by the weight of the vehicle traveling on the rail, it deforms more than the amount of deformation of the vibration isolating material or the cushioning material. ることを特徴とする捨型枠。Discarding frame characterized by that.
JP2003121046A 2003-04-25 2003-04-25 Floating ladder sleeper, floating ladder track and laying method thereof Expired - Fee Related JP4182254B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003121046A JP4182254B2 (en) 2003-04-25 2003-04-25 Floating ladder sleeper, floating ladder track and laying method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003121046A JP4182254B2 (en) 2003-04-25 2003-04-25 Floating ladder sleeper, floating ladder track and laying method thereof

Publications (3)

Publication Number Publication Date
JP2004324245A JP2004324245A (en) 2004-11-18
JP2004324245A5 JP2004324245A5 (en) 2006-06-08
JP4182254B2 true JP4182254B2 (en) 2008-11-19

Family

ID=33499721

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003121046A Expired - Fee Related JP4182254B2 (en) 2003-04-25 2003-04-25 Floating ladder sleeper, floating ladder track and laying method thereof

Country Status (1)

Country Link
JP (1) JP4182254B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AT8456U1 (en) * 2005-02-09 2006-08-15 Gmundner Fertigteile Gmbh RAILWAY TRANSFER
JP2007051457A (en) * 2005-08-17 2007-03-01 Getzner Werkstoffe Holding Gmbh Sleepers
JP4852484B2 (en) * 2007-07-05 2012-01-11 公益財団法人鉄道総合技術研究所 Method for manufacturing bridge track
CN101967782A (en) * 2010-09-30 2011-02-09 中铁四局集团有限公司 Construction method of ladder-shaped track in urban rail transit
JP6438722B2 (en) * 2014-09-26 2018-12-19 株式会社竹中工務店 Construction method of foundation structure
CN110424191A (en) * 2019-07-24 2019-11-08 中铁第四勘察设计院集团有限公司 The anti-detachment design of the concrete filled steel tubular member and sleeper block of non-fragment orbit
CN111549583B (en) * 2020-05-28 2024-12-03 中铁四院集团西南勘察设计有限公司 Level crossing structure for rail transit
CN113417173B (en) * 2021-08-04 2022-11-01 杨清福 Track structure suitable for super-high-speed train

Also Published As

Publication number Publication date
JP2004324245A (en) 2004-11-18

Similar Documents

Publication Publication Date Title
JP4182254B2 (en) Floating ladder sleeper, floating ladder track and laying method thereof
JP2010506065A (en) Elastic support block assembly for rail
RU2755804C1 (en) Ballast-free railway track for cargo and passenger high-speed traffic and method for construction thereof
KR102413972B1 (en) Interlocking precast concrete rail track
KR100603901B1 (en) Structure and construction method of plate girder bridge using part of existing girder
JP2008531871A (en) Fixed track for rail vehicles
KR101272472B1 (en) Low-vibration Railroad Bridge of Elastic Resin Fixing Method
JP3566704B2 (en) Reinforcement structure of existing railway bridge
JP3788774B2 (en) Railroad track structure and railroad track construction method
KR20070001411A (en) Bridge structure with half section precast deck
JP4162291B2 (en) Railway work girder cradle and rail work girder cradle construction method
JPH07259001A (en) Strengthening construction method for existing ballast roadbed track
JP5041481B2 (en) Updating method and structure of existing bearing device
KR101996601B1 (en) Mono-block for improving metrology and method of the same
JP2001164504A (en) Repair execution method of joint section for viaduct
JP2004316170A (en) Bridge expansion and contraction device
KR101426547B1 (en) Temporary Bridge construction is possible Long span
JPH05287701A (en) Labor-saving elastic cross-tie directly coupled track structure
KR102730230B1 (en) Construction method of road in air
JP3814286B2 (en) Formwork support structure
JP3984433B2 (en) Rail bearing support structure and vehicle track
JP3864164B2 (en) Vibration isolation structure and construction method for viaduct
JP4846278B2 (en) Track construction method
KR20220109841A (en) Protection for the rail buried track
KR102801366B1 (en) Concrete structure of intrusion protection facility for railway, and construction method for the same

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060418

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060418

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071228

TRDD Decision of grant or rejection written
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20080725

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080729

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080812

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20080725

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110912

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4182254

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110912

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110912

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120912

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130912

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees