JP6438722B2 - Construction method of foundation structure - Google Patents
[go: Go Back, main page]

JP6438722B2 - Construction method of foundation structure - Google Patents

Construction method of foundation structure Download PDF

Info

Publication number
JP6438722B2
JP6438722B2 JP2014196718A JP2014196718A JP6438722B2 JP 6438722 B2 JP6438722 B2 JP 6438722B2 JP 2014196718 A JP2014196718 A JP 2014196718A JP 2014196718 A JP2014196718 A JP 2014196718A JP 6438722 B2 JP6438722 B2 JP 6438722B2
Authority
JP
Japan
Prior art keywords
ground
construction method
concrete
supply pipe
structural slab
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2014196718A
Other languages
Japanese (ja)
Other versions
JP2016069802A (en
Inventor
英樹 古川
英樹 古川
裕一 境田
裕一 境田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP2014196718A priority Critical patent/JP6438722B2/en
Publication of JP2016069802A publication Critical patent/JP2016069802A/en
Application granted granted Critical
Publication of JP6438722B2 publication Critical patent/JP6438722B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Description

本発明は、地盤に支持された第1部位と、前記第1部位どうしの間に亘らせた第2部位と、を備えたコンクリート造の基礎構造の施工方法に関する。 The present invention includes a first portion supported on the ground, the second and part to a method for construction of Concrete foundation structure having a that has Watarura between each other said first portion.

コンクリート造の基礎構造として、構造スラブ等の第2部位を、地盤に支持された基礎梁(地中梁)等の第1部位どうしの間に亘らせたものが知られている(例えば、特許文献1,2を参照。)。
かかる従来の基礎構造において、構造スラブ等は、砕石の敷き込みや均しコンクリートの打設等が施された整地後の地盤上に、直接又は適宜捨て型枠等を介してコンクリートを打設して造成される。即ち、このように造成される構造スラブ等は、直接又は捨て型枠等を介して地盤側に接触している状態となる。
As a concrete foundation structure, a structure in which a second part such as a structural slab is spanned between first parts such as a foundation beam (underground beam) supported by the ground (for example, (See Patent Documents 1 and 2.)
In such a conventional foundation structure, a structural slab, etc., is made by placing concrete directly or appropriately through a discarded formwork on the ground after leveling, where crushed stone is laid or leveled concrete is placed. Is created. That is, the structural slab and the like thus constructed are in contact with the ground side directly or through a discarded formwork or the like.

特開2007−262854号公報JP 2007-262854 A 特開平05−247947号公報JP 05-247947 A

上記のような基礎構造において、構造スラブ等が地盤側に接触していると、当該構造スラブ等の振動が接触部を介して直接的に地盤側に伝達されやすくなる。
特に、多目的ホールのように、比較的広い構造スラブ上でロックコンサート等の各種公演が行われるような建物では、観客が音楽に合わせて頭を縦に振ったり飛び跳ねたりする所謂「タテノリ」現象により、構造スラブ等が比較的大きく振動する場合がある。そして、その大きな振動が接触部を介して直接的に地盤側に伝達されてしまうと、その振動による近隣住民へ影響が懸念される。
In the basic structure as described above, when the structural slab or the like is in contact with the ground side, vibration of the structural slab or the like is easily transmitted directly to the ground side through the contact portion.
Especially in buildings where various performances such as rock concerts are performed on a relatively wide structure slab, such as a multipurpose hall, the so-called “tateori” phenomenon in which the audience shakes their heads and jumps to the music. A structural slab or the like may vibrate relatively greatly. And if the big vibration is directly transmitted to the ground side through the contact portion, there is a concern about the influence on the neighboring residents due to the vibration.

この実情に鑑み、本発明の主たる課題は、地盤に支持された第1部位と、前記第1部位どうしの間に亘らせた第2部位と、を備えたコンクリート造の基礎構造の施工方法において、第2部位から地盤側への直接的な振動の伝達を防止して、当該振動による近隣住民への影響を回避することができる技術を提供する点にある。 In view of this situation, the main object of the present invention includes a first portion supported on the ground, Concrete foundation structure construction having a second portion which has Watarura, a between each other said first portion In the method, the present invention is to provide a technique capable of preventing the direct vibration from the second part to the ground side and avoiding the influence of the vibration on the neighboring residents.

本基礎構造の特徴構成は、地盤に支持された第1部位と、前記第1部位どうしの間に亘らせた第2部位と、を備えたコンクリート造の基礎構造であって、
前記第2部位が地盤側に対して浮かせた非接触状態で構成されている点にある。
The basic structure of this foundation structure is a concrete foundation structure comprising a first part supported by the ground, and a second part spanned between the first parts,
It exists in the point comprised by the said 2nd site | part in the non-contact state floated with respect to the ground side.

本特徴構成を有する基礎構造によれば、構造スラブ等の上記第2部位が、地盤側に対して浮かせた非接触状態で構成されるので、上記第2部位は、地盤側に対して、全体に亘って空洞が間に介在する所謂縁切りされた状態となり、第2部位の振動が直接的に地盤に伝達されなくなる。
したがって、本発明により、第2部位から地盤側への直接的な振動の伝達を防止して、当該振動による近隣住民への影響を回避することができる基礎構造を提供することができる。
According to the basic structure having this characteristic configuration, the second part such as the structural slab is configured in a non-contact state floated with respect to the ground side. In other words, a so-called edged state in which a cavity is interposed is provided, and the vibration of the second part is not directly transmitted to the ground.
Therefore, according to the present invention, it is possible to provide a foundation structure that can prevent direct vibration transmission from the second part to the ground side and avoid the influence of the vibration on neighboring residents.

本発明の第特徴構成は、地盤に支持された第1部位と、前記第1部位どうしの間に亘らせた第2部位と、を備えたコンクリート造の基礎構造の施工方法であって、
前記第2部位の形成空間にコンクリートを打設するにあたり、前記地盤側との間に設ける支保工を、溶解により除去可能な発泡樹脂で構成すると共に、当該支保工に向かう方向に開口する噴射孔が側壁に穿設された供給管を前記地盤側との間における前記支保工の側部に配置し、
前記第2部位の形成空間に打設したコンクリートの強度発現後に、前記供給管に対して前記発泡樹脂を溶解する溶剤を圧送することで、当該供給管の側壁に設けられた噴射孔から前記溶剤を前記支保工に噴射して、当該支保工を溶解させて除去する点にある。
A first characteristic configuration of the present invention is a method for constructing a concrete foundation structure including a first part supported by the ground and a second part spanned between the first parts. ,
Upon that concrete is a forming space of the second portion, the支保Engineering provided between the ground side, thereby constituting a more removable foam resin dissolve, open in a direction toward to the shoring A supply pipe having an injection hole drilled in a side wall is disposed on the side of the support work between the ground side and
After expressing the strength of the concrete cast in the formation space of the second part, the solvent is dissolved from the injection hole provided in the side wall of the supply pipe by pumping a solvent that dissolves the foamed resin into the supply pipe. the was injected into the shoring lies in the removal by construed dissolve the支保Engineering.

本特徴構成を有する基礎構造の施工方法によれば、構造スラブ等の上記第2部位の形成空間と地盤側との間に設けた所定の材料からなる支保工を、当該形成空間に打設したコンクリートの強度発現後に溶解又は生分解させて除去するというような合理的且つ簡単な方法で、上記第2部位を、地盤側に対して浮かせた非接触状態又は地盤に対する接触面積を低減させた状態で構成して、上記第2部位と地盤側との間に、全体に亘って空洞を形成するこができる。   According to the construction method of the foundation structure having this characteristic configuration, a supporting work made of a predetermined material provided between the formation space of the second part such as the structural slab and the ground side is placed in the formation space. In a non-contact state where the second part is floated with respect to the ground side or a contact area with respect to the ground is reduced by a rational and simple method such as dissolution or biodegradation after the concrete has developed its strength. It can comprise and a cavity can be formed over the whole between the said 2nd site | part and the ground side.

即ち、このように構成された上記第2部位は、地盤側に対して、全体に亘って上記空洞を間に介在させて縁切りされた状態となるので、例え上記第2部位が大きく振動した場合でも、その振動が直接的に地盤に伝達されることを好適に防止することができる。
したがって、本発明により、第2部位から地盤側への直接的な振動の伝達を防止して、当該振動による近隣住民への影響を回避することができる基礎構造の施工方法を提供することができる。
That is, since the second part configured in this way is in a state of being edge-cut with the cavity interposed between the entire ground side, for example, when the second part vibrates greatly. However, the vibration can be suitably prevented from being directly transmitted to the ground.
Therefore, according to the present invention, it is possible to provide a construction method for a foundation structure that can prevent direct vibration transmission from the second part to the ground side and avoid the influence of the vibration on neighboring residents. .

更に、この基礎構造の施工方法では、コンクリート打設後の第2部位と地盤側との間の空間において、支保工を撤去するために作業員が潜り込む必要がないので、地盤の掘削量を最小限にするなどして、コストダウンや施工工数の削減を図ることができる。   In addition, this foundation construction method minimizes the amount of excavation of the ground, since it is not necessary for an operator to sink into the space between the second part after placing the concrete and the ground side in order to remove the support work. For example, the cost can be reduced and the number of construction steps can be reduced.

本特徴構成を有する基礎構造の施工方法によれば、第2部位の形成空間と地盤側との間に設ける支保工を溶剤に接触させて溶解可能な発泡樹脂で構成する場合には、その溶剤を支保工に供給するための供給管を予め配置しておくので、第2部位の形成空間に打設したコンクリートの強度発現後に、その供給管を利用して簡単に溶剤を支保工に供給し、当該支保工を溶解除去することができる。
本発明の第2特徴構成は、前記支保工が、発泡樹脂製の角材で構成されていると共に、長手方向が平行になる姿勢で地盤上に複数配置され、
前記供給管が、前記噴射孔を所定間隔で複数穿設して構成されている点にある。
According to the construction method of the foundation structure having this characteristic configuration, when the support provided between the formation space of the second part and the ground side is made of a foamed resin that can be dissolved by contacting the solvent, the solvent Since the supply pipe for supplying the support to the support is arranged in advance, after the strength of the concrete placed in the formation space of the second part is developed, the solvent is simply supplied to the support using the supply pipe. The supporting work can be dissolved and removed.
As for the 2nd characteristic composition of the present invention, the above-mentioned support work is constituted by a foam resin square material, and a plurality of the support works are arranged on the ground in a posture in which the longitudinal direction is parallel,
The supply pipe is configured by forming a plurality of the injection holes at predetermined intervals.

本実施形態の基礎構造の施工方法において第2部位の形成空間に対するコンクリート打設前の状態を示す立断面図In the construction method of the foundation structure of this embodiment, the elevation sectional view which shows the state before concrete placement with respect to the formation space of the 2nd part 本実施形態の基礎構造の施工方法において第2部位の形成空間に対するコンクリート打設後の状態を示す立断面図In the construction method of the foundation structure of this embodiment, the elevation sectional view which shows the state after concrete placement with respect to the formation space of the 2nd part 本実施形態の基礎構造の施工方法において支保工の溶解途中の状態を示す拡大図The enlarged view which shows the state in the middle of the melting | dissolving of a support work in the construction method of the foundation structure of this embodiment 本実施形態の施工方法に構築された基礎構造の概略構成を示す立断面図Elevated sectional view showing a schematic configuration of the foundation structure constructed in the construction method of the present embodiment

本発明の実施形態としての基礎構造及びその施工方法について図面に基づいて説明する。
先ず、基礎構造の構成について、図4に基づいて説明する。
本実施形態の基礎構造は、地盤1側に支持された基礎梁10(第1部位の一例)と、その基礎梁10どうしの間に亘らせた構造スラブ15(第2部位の一例)とを備えたコンクリート造の基礎構造として構成されている。更に、図示は省略するが、建物の四隅などに独立式のフーチングが複数配置されており、この基礎梁10は、それら複数のフーチングどうしの間に亘らせた状態で構築されているので、建物荷重が基礎梁10及びフーチングを介して地盤1に伝達されることになる。
A basic structure and its construction method as an embodiment of the present invention will be described with reference to the drawings.
First, the structure of the foundation structure will be described with reference to FIG.
The foundation structure of the present embodiment includes a foundation beam 10 (an example of a first part) supported on the ground 1 side, and a structural slab 15 (an example of a second part) spanned between the foundation beams 10. It is constructed as a concrete foundation structure with Further, although not shown in the figure, a plurality of independent footings are arranged at the four corners of the building, and the foundation beam 10 is constructed in a state extending between the plurality of footings. The building load is transmitted to the ground 1 through the foundation beam 10 and the footing.

ここで、基礎梁10は、いわゆる布基礎において地中に埋設される地中梁を示し、構造スラブ15は、その基礎梁10の上面に載置された状態で構築される最下階スラブを示す。更に、図示は省略するが、構造スラブ15の配筋は、基礎梁10の上部に突出させた配筋7に連結されており、これにより、構造スラブ15は、基礎梁10に連結支持された状態となる。   Here, the foundation beam 10 indicates an underground beam embedded in the ground in a so-called cloth foundation, and the structural slab 15 indicates a lowermost slab constructed in a state of being placed on the upper surface of the foundation beam 10. Show. Furthermore, although illustration is omitted, the reinforcing bar of the structural slab 15 is connected to the reinforcing bar 7 protruding above the foundation beam 10, whereby the structural slab 15 is connected to and supported by the foundation beam 10. It becomes a state.

構造スラブ15は、当該構造スラブ15から地盤1側への直接的な振動の伝達を防止するために、地盤1側に対して浮かせた非接触状態で構成されている。即ち、構造スラブ15と地盤1側との間には、全体に亘って直接又は型枠などを介してそれらを接触させる接触部が存在しない空洞40が形成されている。すると、構造スラブ15は、地盤1側に対して、全体に亘って間に空洞40が介在する所謂縁切りされた状態となり、構造スラブ15の振動が直接的に地盤1に伝達されなくなる。   The structural slab 15 is configured in a non-contact state floating with respect to the ground 1 side in order to prevent direct vibration transmission from the structural slab 15 to the ground 1 side. That is, between the structural slab 15 and the ground 1 side, a cavity 40 is formed that does not have a contact portion that contacts them directly or via a formwork or the like. Then, the structural slab 15 is in a so-called edge-cut state in which the cavity 40 is interposed in the whole with respect to the ground 1 side, and the vibration of the structural slab 15 is not directly transmitted to the ground 1.

例えば、このような基礎構造を、多目的ホールのように、比較的広い構造スラブ15上でロックコンサート等の各種公演が行われるような建物の基礎構造に適用した場合には、観客が音楽に合わせて頭を縦に振ったり飛び跳ねたりする所謂「タテノリ」現象により、構造スラブ15が比較的大きく振動する場合がある。
しかし、このように構造スラブ15が大きく振動した場合でも、構造スラブ15が地盤1側に対して全体に亘って間に空洞40が介在する縁切りされた状態であるので、その大きな振動が地盤1に直接的に伝達されることが防止されており、結果、当該振動による近隣住民への影響が回避されている。
For example, when such a basic structure is applied to a basic structure of a building where various performances such as rock concerts are performed on a relatively wide structural slab 15 such as a multipurpose hall, the audience can adjust to the music. The structural slab 15 may vibrate relatively greatly due to a so-called “tateori” phenomenon in which the head is swung vertically or jumped.
However, even when the structural slab 15 vibrates greatly as described above, the structural slab 15 is in a state where the cavity 40 is interposed between the ground 1 and the ground 1 so that the large vibration is generated in the ground 1. As a result, the influence of the vibration on neighboring residents is avoided.

次に、このような基礎構造を構築するための施工方法について、図1〜図4に基づいて説明する。尚、図1〜図4は、基礎構造の施工方法において、基礎構造の根切り部分の状態変化を順に表したものである。   Next, a construction method for constructing such a basic structure will be described with reference to FIGS. In addition, FIGS. 1-4 shows the state change of the root cutting part of a foundation structure in order in the construction method of a foundation structure.

敷地内の根切りやフーチングの構築方法等については、公知の各種工法を採用することができ、その詳細な説明は割愛する。
また、基礎梁10の構築方法についても、公知の各種工法を採用することができるが、例えば以下のように構築することができる。
即ち、図1に示すように、根切り、砕石2の敷き込み、均しコンクリート3の打設等を施して整地された地盤1上に、底型枠としてのスパンクリートと呼ばれるコンクリートパネル4を、地盤1に支持されたフーチングに両端を架設させた状態で敷設し、その上に、捨て型枠5を立設する。そして、コンクリートパネル4と捨て型枠5内とで形成された空間に、適宜配筋7を施した上で、コンクリートを打設することで、基礎梁10が構築される。
尚、コンクリートパネル4の下方の地盤1は予め掘削され、コンクリートパネル4の下面と地盤1側との間に空間が形成されている。これにより、基礎梁10についても、地盤側に対して浮かせた非接触状態で構成されることになり、基礎梁10の振動が直接的に地盤に伝達され難くなる。
Various methods known in the art can be adopted for the root cutting in the site and the footing construction method, and the detailed description thereof is omitted.
Also, as a method for constructing the foundation beam 10, various known construction methods can be employed. For example, the foundation beam 10 can be constructed as follows.
That is, as shown in FIG. 1, a concrete panel 4 called a spun cleat as a bottom mold is formed on the ground 1 that has been leveled by root cutting, laying crushed stone 2, and placing leveling concrete 3. A footing supported by the ground 1 is laid in a state where both ends are erected, and a discarded form 5 is erected thereon. And the foundation beam 10 is constructed | assembled by placing concrete appropriately in the space formed by the concrete panel 4 and the inside of the discard mold 5 and placing concrete.
The ground 1 below the concrete panel 4 is excavated in advance, and a space is formed between the lower surface of the concrete panel 4 and the ground 1 side. Thereby, also about the foundation beam 10, it will be comprised in the non-contact state floated with respect to the ground side, and it becomes difficult to transmit the vibration of the foundation beam 10 directly to the ground.

基礎梁10が構築された後に、構造スラブ15を構築するのであるが、その手順について以下に説明を加える。
先ず、図1に示すように、砕石2の敷き込み、均しコンクリート3の打設等を施して整地された地盤1上に、適宜支保工20を配置する。
ここで、支保工20は、溶解により除去可能な材料で構成されており、具体的には、ポリスチレンフォーム、ポリウレタンフォーム、ポリエチレンフォーム等の発泡樹脂製の角材が用いられている。
After the foundation beam 10 is constructed, the structural slab 15 is constructed. The procedure will be described below.
First, as shown in FIG. 1, a support 20 is appropriately disposed on the ground 1 that has been leveled by laying crushed stones 2 and placing leveling concrete 3.
Here, the support work 20 is made of a material that can be removed by dissolution, and specifically, a square member made of foamed resin such as polystyrene foam, polyurethane foam, or polyethylene foam is used.

発泡樹脂製の角材からなる支保工20は、両側に配置された基礎梁10の間において、当該基礎梁10に対して長手方向が平行になる姿勢で地盤1上に配置される。
更に、その支保工20の側部には、当該支保工20に対して後述する溶剤A(図3参照)を供給するための供給管30を配置する。供給管30としては、通常の可撓性のホースや塩化ビニル樹脂製パイプ等を利用することができ、その供給管30の側壁には、支保工20に向かう方向に開口する噴射孔30aが所定間隔で複数穿設されている。
The support 20 made of foamed resin squares is arranged on the ground 1 in a posture in which the longitudinal direction is parallel to the foundation beam 10 between the foundation beams 10 arranged on both sides.
Furthermore, a supply pipe 30 for supplying a solvent A (see FIG. 3) described later to the support work 20 is disposed on the side of the support work 20. As the supply pipe 30, a normal flexible hose, a pipe made of vinyl chloride resin, or the like can be used, and an injection hole 30 a that opens in a direction toward the support work 20 is provided on the side wall of the supply pipe 30. A plurality of holes are formed at intervals.

支保工20及び供給管30等を地盤1側に配置した後に、支保工20上に、安定性を確保するための押え板21を載置した上で、デッキプレート11を載置する。尚、図示は省略するが、このデッキプレート11上に形成される構造スラブ15の形成空間にはスラブ筋が配置されている。   After the support work 20 and the supply pipe 30 are arranged on the ground 1 side, the deck plate 11 is placed on the support work 20 after placing a presser plate 21 for ensuring stability. Although illustration is omitted, slab bars are arranged in the formation space of the structural slab 15 formed on the deck plate 11.

尚、このデッキプレート11の両端部は、基礎梁10又はその捨て型枠5の上面に架設されているので、そのデッキプレート11の幅が狭く撓みが問題にならない場合には、上記支保工20を省略することができる。しかし、本実施形態では、デッキプレート11の幅が比較的広いため、デッキプレート11の下面が支保工20により支保されている。   Since both ends of the deck plate 11 are installed on the upper surface of the foundation beam 10 or the discarding form 5 thereof, when the deck plate 11 is narrow and bending does not become a problem, the support 20 Can be omitted. However, in this embodiment, since the deck plate 11 is relatively wide, the lower surface of the deck plate 11 is supported by the supporter 20.

支保工20上にデッキプレート11を載置した後に、当該デッキプレート11の上部に形成された構造スラブ15の形成空間にコンクリートを打設する。すると、図2に示すように、基礎梁10どうしの間に亘る姿勢で構造スラブ15が構築されることになる。
尚、この段階では、構造スラブ15は支保工20等を介して地盤1側に接触している状態となっている。
After placing the deck plate 11 on the support 20, concrete is placed in the formation space of the structural slab 15 formed on the upper portion of the deck plate 11. Then, as shown in FIG. 2, the structural slab 15 is constructed in a posture extending between the foundation beams 10.
At this stage, the structural slab 15 is in contact with the ground 1 side via the support 20 or the like.

更に、図3に示すように、構造スラブ15の形成空間に打設したコンクリートの強度が発現された後に、支保工20を溶解除去して、構造スラブ15を地盤1側に対して浮かせた非接触状態とする。   Further, as shown in FIG. 3, after the strength of the concrete placed in the formation space of the structural slab 15 is expressed, the support 20 is dissolved and removed, and the structural slab 15 is lifted from the ground 1 side. Keep in contact.

即ち、支保工20を構成する発泡樹脂は、所定の溶剤A、具体的には、ベンゼン,トルエン、アセトン、キシレン等の有機溶剤や、柑橘の皮から採れる芳香精油成分リモネン(d−リモネン)等の溶剤に接触させることで溶解除去可能な材料といえる。
そして、供給管30の基端側に設けた接続部31にポンプ32を接続し、当該ポンプ32により供給管30に溶剤Aを圧送することで、供給管30の側壁に設けられた噴射孔30aから溶剤Aが支保工20に向けて噴射されることになる。
That is, the foamed resin constituting the support 20 is a predetermined solvent A, specifically, an organic solvent such as benzene, toluene, acetone, xylene, an aromatic oil component limonene (d-limonene) that can be taken from citrus peel, and the like. It can be said that it is a material that can be dissolved and removed by contacting with a solvent.
Then, a pump 32 is connected to the connection portion 31 provided on the proximal end side of the supply pipe 30, and the solvent A is pumped to the supply pipe 30 by the pump 32, whereby the injection hole 30 a provided in the side wall of the supply pipe 30. Thus, the solvent A is sprayed toward the support 20.

すると、図3に示すように、発泡樹脂で構成された支保工20が溶剤Aの接触により徐々に溶解され、結果、図4に示すように、支保工20が完全に除去された状態となる。
尚、支保工20を除去した後は、供給管30は不要となるため、例えば、この供給管30については、露出部を適宜撤去し、裏あて板や詰めゴム等の落下防止措置を施して、モルタル等で埋設し隠すことが望ましい。
Then, as shown in FIG. 3, the support work 20 made of the foamed resin is gradually dissolved by the contact of the solvent A, and as a result, the support work 20 is completely removed as shown in FIG. .
Since the supply pipe 30 is not required after the support work 20 is removed, for example, the exposed portion of the supply pipe 30 is removed as appropriate, and a fall prevention measure such as a backing plate or stuffed rubber is applied. It is desirable to embed and hide with mortar.

以上のような施工方法により、構造スラブ15を地盤1側に対して浮かせた非接触状態で構成し、構造スラブ15と地盤1側との間に、全体に亘って直接又は型枠などを介してそれらを接触させる接触部が存在しない空洞40を形成することができる。よって、上述したように、構造スラブ15の振動が地盤1に直接的に伝達されることを防止でき、当該振動による近隣住民への影響を回避できる。   By the construction method as described above, the structural slab 15 is configured in a non-contact state in which the structural slab 15 is floated with respect to the ground 1 side, and directly between the structural slab 15 and the ground 1 side or directly via a formwork or the like. Thus, it is possible to form the cavity 40 in which there is no contact portion for contacting them. Therefore, as described above, the vibration of the structural slab 15 can be prevented from being directly transmitted to the ground 1 and the influence of the vibration on neighboring residents can be avoided.

また、この基礎構造の施工方法では、コンクリート打設後の構造スラブ15と地盤1側との間の空間において、支保工20を撤去するために作業員が潜り込む必要がないので、地盤1側の上面に対する構造スラブ15側の下面(デッキプレート11の下面)の空間高さが比較的低く設定されている。これにより、地盤1の掘削量が削減され、コストダウンや施工工数の縮小が図られている。   Moreover, in this foundation construction method, since it is not necessary for an operator to sink into the space between the structure slab 15 after the concrete placement and the ground 1 side in order to remove the support 20, The space height of the lower surface (the lower surface of the deck plate 11) on the structural slab 15 side with respect to the upper surface is set to be relatively low. Thereby, the amount of excavation of the ground 1 is reduced, and cost reduction and construction man-hours are reduced.

また、本実施形態では、支保工20として発泡樹脂を利用し、その発泡樹脂の溶解除去により構造スラブ15と地盤1側との間に空間を形成したが、このように発泡樹脂の溶解除去による空間形成の技術は、土間スラブの一時的な目地の形成や建物の外壁の耐震スリットの形成等にも好適に利用することができる。   In this embodiment, a foamed resin is used as the support work 20 and a space is formed between the structural slab 15 and the ground 1 side by dissolving and removing the foamed resin. The space formation technique can be suitably used for the formation of temporary joints for soil slabs and the formation of seismic slits on the outer walls of buildings.

〔別実施形態〕
(1)上記実施形態の基礎構造では、基礎梁10を地盤に支持された第1部位とし、構造スラブ15を第1部位どうしの間に亘らせた第2部位として、当該構造スラブ15を地盤1側に対して浮かせた非接触状態で構成したが、別の部位を第1部位及び第2部位として設定しても構わない。
例えば、建物の四隅などに配置されるフーチングを第1部位とし、そのフーチング同士の間に亘らせた基礎梁を第2部位として、当該基礎梁を地盤側に対して浮かせた非接触状態で構成したり、耐圧盤基礎(ベタ基礎)において、底盤部分の一部を第1部位として、底盤部分の他部を第2部位として、当該底盤部分の他部を地盤側に対して浮かせた非接触状態で構成しても構わない。
[Another embodiment]
(1) In the basic structure of the above embodiment, the structural slab 15 is defined as a first part supported by the ground as the first part and the second part in which the structural slab 15 extends between the first parts. Although it comprised in the non-contact state floated with respect to the ground 1 side, you may set another site | part as a 1st site | part and a 2nd site | part.
For example, in a non-contact state where the footings placed at the four corners of the building are the first part and the foundation beam spanned between the footings is the second part, the foundation beam is floated with respect to the ground side. In a pressure-resistant board foundation (solid foundation), a part of the bottom board part is used as the first part, the other part of the bottom board part is used as the second part, and the other part of the bottom board part is floated with respect to the ground side. You may comprise in a contact state.

(2)上記実施形態の基礎構造では、第2部位である構造スラブ15を地盤1側に対して浮かせた非接触状態で構成するための基礎構造の施工方法として、構造スラブ15と地盤1側との間に設ける支保工20を、構造スラブ15の形成空間に打設したコンクリートの強度発現後に溶解させて除去する施工方法を採用したが、別の施工方法を採用しても構わない。例えば、コンクリートパネルなどで構成された第2部位の底型枠を、一対の第1部位に両端を架設させた状態で敷設し、その底型枠の下方の地盤を予め掘削しておくことで、第2部位を地盤側に対して浮かせた非接触状態とすることができる。 (2) In the foundation structure of the above embodiment, as a construction method of the foundation structure for constructing the structure slab 15 as the second part in a non-contact state in which the structure slab 15 is floated with respect to the ground 1 side, the structural slab 15 and the ground 1 side Although the construction method which dissolves and removes after the strength expression of the concrete cast | placed in the formation space of the structure slab 15 was employ | adopted for the support work 20 provided between these, another construction method may be employ | adopted. For example, by laying the bottom mold frame of the second part composed of concrete panels or the like in a state where both ends are erected on the pair of first parts, and excavating the ground below the bottom mold frame in advance The second part can be brought into a non-contact state where the second part is floated with respect to the ground side.

(3)上記実施形態の基礎構造の施工方法では、支保工20を、所定の溶剤Aにより溶解除去可能な発泡樹脂で構成したが、生分解により除去可能な材料を利用しても構わない。例えば、生分解により除去可能な材料としては、ポリ−3−ヒドロキシ酪酸やポリヒドロキシアルカノエート等の微生物生産系、ポリ乳酸やポリビニルアルコール等の化学合成系、エステル化澱粉、酢酸セルロース等の天然物質系等の各種生分解性材料を使用できる。 (3) In the construction method of the basic structure of the above embodiment, the supporting work 20 is made of a foamed resin that can be dissolved and removed by the predetermined solvent A, but a material that can be removed by biodegradation may be used. Examples of materials that can be removed by biodegradation include microbial production systems such as poly-3-hydroxybutyric acid and polyhydroxyalkanoates, chemical synthesis systems such as polylactic acid and polyvinyl alcohol, natural substances such as esterified starch and cellulose acetate. Various biodegradable materials such as systems can be used.

1 地盤
10 基礎梁(第1部位)
15 構造スラブ(第2部位)
20 支保工
30 供給管
A 溶剤
1 Ground 10 Foundation beam (first part)
15 Structure slab (second part)
20 Support 30 Supply pipe A Solvent

Claims (2)

地盤に支持された第1部位と、前記第1部位どうしの間に亘らせた第2部位と、を備えたコンクリート造の基礎構造の施工方法であって、
前記第2部位の形成空間にコンクリートを打設するにあたり、前記地盤側との間に設ける支保工を、溶解により除去可能な発泡樹脂で構成すると共に、当該支保工に向かう方向に開口する噴射孔が側壁に穿設された供給管を前記地盤側との間における前記支保工の側部に配置し、
前記第2部位の形成空間に打設したコンクリートの強度発現後に、前記供給管に対して前記発泡樹脂を溶解する溶剤を圧送することで、当該供給管の側壁に設けられた噴射孔から前記溶剤を前記支保工に噴射して、当該支保工を溶解させて除去する基礎構造の施工方法。
A construction method for a concrete foundation structure comprising a first part supported on the ground and a second part spanned between the first parts,
Upon that concrete is a forming space of the second portion, the支保Engineering provided between the ground side, thereby constituting a more removable foam resin dissolve, open in a direction toward to the shoring A supply pipe having an injection hole drilled in a side wall is disposed on the side of the support work between the ground side and
After expressing the strength of the concrete cast in the formation space of the second part, the solvent is dissolved from the injection hole provided in the side wall of the supply pipe by pumping a solvent that dissolves the foamed resin into the supply pipe. the was injected into the shoring, the construction method of the substructure to be removed by construed dissolve the支保Engineering.
前記支保工が、発泡樹脂製の角材で構成されていると共に、長手方向が平行になる姿勢で地盤上に複数配置され、
前記供給管が、前記噴射孔を所定間隔で複数穿設して構成されている請求項1に記載の基礎構造の施工方法。
The support work is made of foam resin square material, and a plurality of the support works are arranged on the ground in a posture in which the longitudinal direction is parallel,
The construction method of the foundation structure according to claim 1, wherein the supply pipe is configured by perforating a plurality of the injection holes at a predetermined interval .
JP2014196718A 2014-09-26 2014-09-26 Construction method of foundation structure Active JP6438722B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014196718A JP6438722B2 (en) 2014-09-26 2014-09-26 Construction method of foundation structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014196718A JP6438722B2 (en) 2014-09-26 2014-09-26 Construction method of foundation structure

Publications (2)

Publication Number Publication Date
JP2016069802A JP2016069802A (en) 2016-05-09
JP6438722B2 true JP6438722B2 (en) 2018-12-19

Family

ID=55866300

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014196718A Active JP6438722B2 (en) 2014-09-26 2014-09-26 Construction method of foundation structure

Country Status (1)

Country Link
JP (1) JP6438722B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7385849B2 (en) * 2021-11-05 2023-11-24 強化土エンジニヤリング株式会社 Ground improvement method
JP2026013497A (en) * 2024-07-17 2026-01-29 オリエンタル白石株式会社 Caisson support structure and caisson construction method

Family Cites Families (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54161726A (en) * 1978-06-12 1979-12-21 Kazuhiro Kawase Placing method of concrete that utilize foaming body
JPS61294237A (en) * 1985-06-21 1986-12-25 Kumagai Gumi Ltd Vibration isolating device
JPH03295932A (en) * 1990-04-13 1991-12-26 Shimizu Corp Underground beam-free construction
JP2977678B2 (en) * 1992-09-18 1999-11-15 株式会社竹中工務店 Foundation construction method
JPH07216914A (en) * 1994-01-31 1995-08-15 Takenaka Komuten Co Ltd Supporting work such as floor formwork in the reverse construction method
US5934036A (en) * 1996-11-01 1999-08-10 Gallagher, Jr.; Daniel P. Insulated concrete slab assembly
JPH10280379A (en) * 1997-03-31 1998-10-20 Takenaka Komuten Co Ltd Foundation construction method of expansible ground
JPH1193409A (en) * 1997-09-17 1999-04-06 Dow Kakoh Kk Execution method of slab formwork
JPH11286952A (en) * 1998-04-03 1999-10-19 Dow Kakoh Kk Construction method for slab
JP2980604B1 (en) * 1998-11-19 1999-11-22 中村物産有限会社 Vibration isolation foundation structure of building and its construction method
JP4182254B2 (en) * 2003-04-25 2008-11-19 小田急電鉄株式会社 Floating ladder sleeper, floating ladder track and laying method thereof
JP2006037461A (en) * 2004-07-26 2006-02-09 Bridgestone Corp Construction method of base isolation artificial ground
JP3909081B1 (en) * 2006-04-18 2007-04-25 大成建設株式会社 Method for producing concrete structure and formwork structure
JP2011094313A (en) * 2009-10-27 2011-05-12 Takenaka Komuten Co Ltd Method for separately placing concrete in column-beam joint portion
JP5876785B2 (en) * 2012-07-26 2016-03-02 鹿島建設株式会社 Concrete jointing method

Also Published As

Publication number Publication date
JP2016069802A (en) 2016-05-09

Similar Documents

Publication Publication Date Title
KR20120093547A (en) Top-down construction method of basement
KR101743758B1 (en) Downward construction method for vertical extension of building using base block
JP2015124587A (en) Construction method of new underground structure with dismantling of existing underground structure
KR20130006420A (en) Method of constructing underground structure to be newly built
JP2009235809A (en) Construction method for dismantlement and removal of underground structure having foundation pile
JP6438722B2 (en) Construction method of foundation structure
JP5937488B2 (en) Temporary support method for foundation
JP2017096063A (en) Yamadome excavation method and frame construction method
KR100803921B1 (en) Joint construction method for elevator basement extension
JP5465086B2 (en) Construction method of underground structure
JP5351125B2 (en) Open shield machine start method of open shield method
JP6252860B2 (en) Construction method of seismic isolation building
JP2013032684A (en) Foundation form changing method for existing building
GB2404934A (en) Method of constructing a concrete slab
JP4228308B2 (en) Reinforcement method for existing floors and seismic isolation method for existing buildings
JP2012026250A (en) Reinforcement structure and reinforcement method of existing retaining wall
JP4997207B2 (en) Construction method for underground structures
JP2015183366A (en) Structure and construction method for banking structure
KR20160009386A (en) Precast concrete pile with sheath and the construction method therewith
JP6639006B1 (en) Architectural solid foundation and its construction method.
US9611615B2 (en) Apparatus and method for stabilizing a slab foundation
KR102322702B1 (en) Construction method of ground-penetrating concrete building
JP6302222B2 (en) Horizontal force support structure and method for constructing horizontal force support structure
JP5830068B2 (en) Slope reinforcement method
JP2013124511A (en) Building foundation structure, and building foundation construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170627

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180322

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180411

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180601

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20181024

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20181119

R150 Certificate of patent or registration of utility model

Ref document number: 6438722

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150