JP4190932B2 - Secondary lining method and secondary lining formwork apparatus - Google Patents
[go: Go Back, main page]

JP4190932B2 - Secondary lining method and secondary lining formwork apparatus - Google Patents

Secondary lining method and secondary lining formwork apparatus Download PDF

Info

Publication number
JP4190932B2
JP4190932B2 JP2003098350A JP2003098350A JP4190932B2 JP 4190932 B2 JP4190932 B2 JP 4190932B2 JP 2003098350 A JP2003098350 A JP 2003098350A JP 2003098350 A JP2003098350 A JP 2003098350A JP 4190932 B2 JP4190932 B2 JP 4190932B2
Authority
JP
Japan
Prior art keywords
secondary lining
plate
formwork
separation
mold plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2003098350A
Other languages
Japanese (ja)
Other versions
JP2004300893A (en
Inventor
義貞 吉田
勉 北川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2003098350A priority Critical patent/JP4190932B2/en
Publication of JP2004300893A publication Critical patent/JP2004300893A/en
Application granted granted Critical
Publication of JP4190932B2 publication Critical patent/JP4190932B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

【0001】
【発明の属する技術分野】
この発明は、セグメントの内面に覆工コンクリート層を形成する二次覆工工法および二次覆工用型枠装置の改良技術に関するものである。
【0002】
【従来の技術】
シールドトンネルの構築工事においては、掘削壁面にセグメントを環状に設置した後に、セグメントの内面に鉄筋コンクリートからなる二次覆工層を形成している。
【0003】
このような二次覆工層は、例えば、非特許文献1に開示されているように、セグメントの内面側にセントルと呼ばれる移動式型枠装置を設置して、型枠とセグメントとの間にコンクリートを打設して形成している。
【0004】
図7は、この種の移動式型枠装置で二次覆工層を形成する際の要部を示している。同図において、1は、移動式型枠板であり、この型枠板1は、複数に分割された曲板を、ヒンジを介して、環状に連結したものであって、セグメント2の内面から内方に所定の間隔を隔てて設置される。
【0005】
また、同図において、符号3で示した部分は、トンネルの切羽側にあって、既に形成された先行二次覆工層であり、この先行二次覆工層3の側方に、後行二次覆工層5を新設形成する際の状態が示されている。
【0006】
後行二次覆工層5を新設形成する際には、型枠板1が設置され、型枠板1の切羽側には、一部が先行二次覆工層3上に載置されるラップライナー6を設置する。このラップライナー6は、例えば、アングルなどを分解可能な環状に組立たものであって、型枠板1の側面に、ボルトなどにより固定される。
【0007】
また、型枠板1の坑口側には、妻板7が設置されて、コンクリートを打設して、後行二次覆工層5を形成するための密閉空間8が隔成される。そして、密閉空間8内にコンクリートを打設して、所定強度が発現されて、後行二次覆工層5が形成されると、妻板7とラップライナー6とを分解撤去して、その後に、型枠板1を内方側に縮小させて、坑口側に移動させる。
【0008】
坑口側に移動させた型枠板1は、拡径させて、セグメント2の内面から内方に所定の間隔を隔てて設置され、再びラップライナー6を環状に組立てて、その端部を型枠板1に固設し、妻板7を設置して、次の後行二次覆工層を形成することになる。
【0009】
しかしながら、このような従来の二次覆工工法および二次覆工用型枠装置には、以下に説明する課題があった。
【0010】
【非特許文献】
「シールドトンネルの新技術」平成13年10月10日株式会社土木工学社発行p72〜76
【0011】
【発明が解決しようとする課題】
すなわち、図7に示した二次覆工用型枠装置では、ラップライナー6は、同じ部材を使用して、環状に組立てたり、あるいは、分解するが、後行二次覆工層5を形成する際には、一部が既に形成されている先行二次覆工層3の内面側に載置されるようにして環状に組立てられる。
【0012】
ところが、ラップライナー6の環状組立外径と先行覆工層3の内径とは、常時、これらが完全に一致することが非常に少なく、既に固化している先行二次覆工層3に、環状のラップライナー6を当接すると、ラップライナー6と先行覆工層3とが完全に密着しないで、打継ぎ目地に段差が生じる。
【0013】
実際の施工現場では、このような段差が発生すると、その部分をV字状にカットして、モルタルなどを充填することにより、仕上げ処理を行っているが、多大な費用が掛かっていた。
【0014】
本発明は、このような従来の問題点に鑑みてなされたものであって、その目的とするところは、覆工層間の打継ぎ目地に段差の発生しない二次覆工工法および二次覆工工法用型枠装置を提供することにある。
【0015】
【課題を解決するための手段】
上記目的を達成するために、本発明は、セグメントの内周面に沿って、所定の間隔を隔てて環状の移動式型枠板を設置し、前記移動式型枠板の後端側に妻板を設置し、前記移動式型枠板および妻板で、先行二次覆工層の側方に閉塞された空間部を隔成し、当該空間部内にコンクリートを打設して後行二次覆工層を順次連結形成する二次覆工工法において、前記移動式型枠板は、その長手方向の両端に一対の分離型枠を備え、前記分離型枠の一方は、前記移動式型枠板を脱型後に移動させる際に、直前に形成された前記先行二次覆工層の後端部に残置させ、前記移動式型枠板を移動させた後に、その前端側に固定され、前記分離型枠の他方は、前記移動式型枠板を移動させた後に、その後端側に固定し、このような手順を順次繰り返す二次覆工工法であって、前記移動式型枠板と前記分離型枠との間に外方に向けて厚みが収縮する楔状のスペーサを介装し、前記分離型枠を前記型枠板から離間する前に、前記スペーサを除去するようにした。
【0017】
また、本発明は、セグメントの内周面に沿って、所定の間隔を隔てて設置される環状の移動式型枠板と、前記移動式型枠板の後端側に設置される妻板とを備え、前記型枠板および妻板で、先行二次覆工層の側方に閉塞された空間部を隔成し、当該空間部内にコンクリートを打設して後行二次覆工層を順次連結形成する二次覆工用型枠装置において、前記移動式型枠板は、その長手方向の両端に一対の分離型枠を備え、前記分離型枠の一方は、前記移動式型枠板を脱型後に移動させる際に、直前に形成された前記先行二次覆工層の後端部に残置させて、前記移動式型枠板を移動させた後に、その前端側に固定され、前記分離型枠の他方は、前記移動式型枠板を移動させた後に、その後端側に固定する二次覆工用型枠装置であって、前記二次覆工型枠装置は、前記前記移動式型枠板と前記分離型枠との間に設けられ、外方に向けて厚みが収縮する楔状のスペーサを有し、前記分離型枠を前記移動式型枠板から離間する前に、前記スペーサを除去するようにした。
【0018】
本発明の二次覆工用型枠装置では、前記分離型枠は、同一形状に形成することができる。
【0020】
上記構成の二次覆工工法および二次覆工用型枠装置によれば、移動式型枠板は、その長手方向の両端に一対の分離型枠を備え、分離型枠の一方は、移動式型枠板を脱型後に移動させる際に、直前に形成された先行二次覆工層の後端部に残置させて、移動式型枠板を移動させた後に、その前端側に固定され、分離型枠の他方は、移動式型枠板を移動させた後に、その後端側に固定するように構成している。
【0021】
このような構成によれば、これからコンクリートを打設して、後行二次覆工層を形成するための空間部の前端側には、先に形成された先行二次覆工層の後端部に残置された一方の分離型枠が設けられており、この分離型枠は、先行二次覆工層を形成する際には、コンクリートを打設する前に、環状に組立てられて、移動式型枠板の後端部に固定されるので、従来のライナープレートのように打継ぎ目地に段差が発生しない。
【0022】
【発明の実施の形態】
以下、本発明の好適な実施の形態について、添付図面に基づいて詳細に説明する。図1から図6は、本発明にかかる二次覆工工法および二次覆工用型枠装置の一実施例を示している。
【0023】
図1から図4は、本発明に掛かる二次覆工工法の工程を順に示したものであり、本発明の工法では、図5に要部を示す二次覆工用型枠装置10が用いられる。同図に示した型枠装置10は、移動式型枠板12と、妻板14とを備えている。
【0024】
移動式型枠板12は、トンネル掘削面に沿って環状に組立てられたセグメント16の内周面に沿って、環状に組立てられ、移動させる際には、環状状態から内方に縮められる。図5は、移動式型枠板12を内方に縮めた場合を図示していて、移動式型枠板12は、複数の曲板から構成され、トンネルの上部側に配置される天井部12aと、一対のサイド部12b,12cと、一対のインバート部12d,12eとから構成されている。
【0025】
天井部12aは、門型支持部12fにより支持され、この天井部12aの周方向の両端に一対のサイド部12b,12cがヒンジ12gを介して、回動自在に結合されている。
【0026】
そして、サイド部12b,12cの端部に、インバート部12d,12eがヒンジ12gを介して、回動自在に結合されている。なお、図5に符号12hで示した部材は、一端側が門型支持部12fに固設された伸縮ジャッキであって、これらの伸縮ジャッキ12hを収縮ないしは伸長駆動することにより、移動式型枠板12は、図5に示した内方への収縮状態と、トンネル内で環状になる拡開状態てとのいずれかの状態にセットすることができる。
【0027】
また、図5に符号12iで示した部材は、型枠板12を収縮させて移動する際に、各部の移動を規制するために介装されるサポートジャッキであり、このサポートジャッキ12iは、複数使用される。
【0028】
本実施例の型枠装置10は、図1に示すように、移動式型枠板12の長手方向の両端に設けられた一対の第1および第2分離型枠20,22を備えている。本実施例の場合、第1および第2分離型枠20,22は、同一形状のものが用いられていて、各分離型枠20,22の切羽側の側面は、内側から外側に向けて傾斜するテーパ面20a,22aとなっている。
【0029】
一方の第1分離型枠20は、移動式型枠板10を移動させる際に、直前に形成された先行二次覆工層Aの後端部に残置させられ、型枠板12を移動させた後に、その前端側に固定される。
【0030】
また、他方の第2分離型枠22は、移動式型枠板10を移動させた後に、当該移動式型枠板12の後端側に、スペーサ24を介して、固定される。スペーサ24は、移動式型枠板12と第2分離型枠22との間に介装されていて、外方に向けて厚みが小さくなっていて、先細状に形成されている。(図6参照)
【0031】
妻板14は、第2分離型枠22の側面にボルトにより固定され、外周面がセグメント16の内面に当接している。このように構成された型枠装置10では、図1に示すように、先行二次覆工層Aの側方に、閉塞された空間部18が隔成される。
【0032】
この空間部18は、セグメント16の内周面と、この内周面と対向する型枠板12の外周面(第1および第2分離型枠20,22の外周面とスペーサ24の外周面を含む)とで周方向の内外面が隔成され、軸方向の前後面は、切羽側が先行二次覆工Aで、また、坑口側が妻板14でそれぞれ隔成される。
【0033】
そして、この空間部18内にコンクリートを打設することで、後行二次覆工層B1,B2…が順次連結形成される。
【0034】
次に、上記構成の二次覆工型枠装置10を使用して、セグメント16の内面に二次覆工層を形成する方法について説明する。二次覆工層を形成する際には、まず、移動式型枠板12が、伸縮ジャッキ12hを伸縮させて、セグメント16の内周面に沿って、所定の間隔を隔てて設置され、環状に組立てられる。
【0035】
図1には、既に形成されている先行二次覆工層Aの側方に、後行二次覆工層B1を新たに形成する場合の型枠装置10の要部が示されており、同図では、切羽側から坑口側に向けて、順次後行覆工層B1,B2…を形成する場合を例示している。
【0036】
図1において、型枠板12は、環状に組立てられ、セグメント16の内周面から所定の間隔Lを隔てて設置され、この間隔Lが、形成される後行二次覆工層B1,B2……の厚みとなる。
【0037】
本実施例の型枠装置10は、型枠板12の長手方向の両端に配置される一対の第1および第2分離型枠20,22を有しており、一対の第1および第2分離型枠20,22は、同一形状に形成されていて、各分離型枠20,22は、型枠板12と同様に環状に組立てられる。
【0038】
なお、本実施例の分離型枠20,22は、例えば、型枠板12の天井部12a,サイド部12b,12,インバート部12d,12eと同様に、ヒンジ12gを介在させて、回動可能に構成しておくと、型枠板12の収縮,伸長動作に伴って、型枠板12と同期させて、環状に形成したり、あるいは、収縮させて、トンネル内での移動を可能にすることもできし、また、型枠板12の挙動と全く別個に環状組立などを可能にすることもできる。
【0039】
第1分離型枠20は、型枠板12の切羽側の側面にボルトにより分離可能に固定されている。第2分離型枠22は、図6にもその詳細を示すように、楔状のスペーサ24を介装して、型枠板12の坑口側の側面に配置されている。
【0040】
楔状のスペーサ24は、環状に組立てられ、一方の端面が、型枠板12の坑口側の側面にボルトにより分離可能に固定され、他方の端面は、第2分離型枠22のテーパ面22aに、ボルトにより分離可能に固定されている。
【0041】
なお、この場合、スペーサ24とテーパ面22aとの間に、例えば、グリスなどの粘稠物質を介在させておくと、スペーサ24を引き抜く際の作業が容易に行える。
【0042】
第2分離型枠22の坑口側の端部には、妻板14がボルトにより分離可能に固定されている。妻板14は、型枠板12と同様に環状に組立てられるものであって、環状に組立てられた妻板14の外周面は、セグメント16の表面に当接するように設置される。
【0043】
以上のようにして型枠装置10を設置すると、先行二次覆工層Aの側方に、閉塞された空間部18が隔成され、このような空間部18が形成されると、この空間部18内にコンクリートを打設して、二次覆工層B1を形成することになる。
【0044】
そして、空間部18内に打設されたコンクリートが固化して、その強度が発現されると、図2に示すように、後行二次覆工B1の形成が終了するので、次の後行二次覆工B2を形成するために型枠板12の坑口側への移動が行われる。
【0045】
この際には、まず、スペーサ24のボルトを外して、環状の組立を分解しながら、内方に引き抜いて、これを撤去する作業が行われる。この場合、スペーサ24は、外方側の厚みが小さくなっているので、内方側に簡単に引き抜くことができる。
【0046】
次に、型枠板12を内方側に縮めて、後行覆工層B1の内面側から脱型させて、その後に坑口側に移動する。この際に、第1分離型枠20を型枠板12の天井部12a,サイド部12b,12,インバート部12d,12eと同様に、ヒンジ12gを介在させて、回動可能に構成しておくと、この段階で第1分離型枠16を分解することなく、型枠板12とともに移動させることができる。
【0047】
型枠板12を坑口側に移動させた後に、第1分離型枠20を型枠板12から分離して、分解する。なお、第1分離型枠20は、型枠板12を移動させる前に、型枠板12から分離して、分解することもできる。
【0048】
このようにして、型枠板12を第1分離型枠20とともに脱型移動させると、図3に示すように、直前に形成された後行二次覆工層B1の後端部には、第2分離型枠22が残置された状態になる。
【0049】
このような形態で第2分離型枠22を後行二次覆工層B1Aの後端部に残置させておくと、移動式型枠板12を坑口側に移動させる際に、型枠板12の一部が後行二次覆工層B1に接触して、後行二次覆工層B1に損傷を与えることも防止することができる。
【0050】
なお、妻板14の分離撤去は、移動式型枠板12の脱型移動の前後の適当な時期に行えばよい。次に、図4に示すように、移動式型枠板12を坑口側に移動させた後に、移動式型枠板12の前端側に第2分離型枠22をボルトにより固定する。
【0051】
そして、移動式型枠板12の後端側にスペーサ24,第1分離型枠20,妻板14を順に組立てると、後行二次覆工層B1の側方に、閉塞した空間部18aが隔成され、図1に示した状態と実質的に同じ状態が創り出され、空間部18a内にコンクリートを打設して後行二次覆工層B2が形成される。
【0052】
後行二次覆工層B2の形成後に移動式型枠板12を移動させる際には、今度は、移動式型枠板12の後部側には、第1分離型枠20が配置されているので、この第1分離型枠20が後行二次覆工層B2の後端側に残置させられる。これ以後は、前述した工程が順次繰り返されることで、セグメント16の内面に二次覆工層が形成される。
【0053】
さて、以上のように構成した二次覆工工法および二次覆工用型枠装置10によれば、移動式型枠板12は、その長手方向の両端に一対の分離型枠20,22を備え、分離型枠20,22の一方は、移動式型枠板12を脱型後に移動させる際に、先行二次覆工層Aの後端部に残置させて、移動式型枠板12を移動させた後に、その前端側に固定され、分離型枠20,22の他方は、移動式型枠板12を移動させた後に、その後端側に固定するように構成している。
【0054】
このような構成によれば、これからコンクリートを打設して、後行二次覆工層B1,B2…を形成するための空間部18の前端側には、先に形成された先行二次覆工層Aの後端部に残置された一方の分離型枠20,22が設けられており、この分離型枠20,22は、先行二次覆工層Aを形成する際には、コンクリートを打設する前に、環状に組立てられて、移動式型枠板12の後端部に固定されるので、環状外径と二次覆工層の内径との差に基づき打継ぎ目地に段差が発生することがなくなる。
【0055】
二次覆工層を形成する際に、打継ぎ目地の部分に段差の発生がなくなると、V字状のカット作業や、モルタル充填などの仕上げ処理もなくなり、多大な費用をカットすることが可能になる。
【0056】
【発明の効果】
以上、詳細に説明したように、本発明にかかる二次覆工工法および二次覆工用型枠装置によれば、覆工層間の打継ぎ目地に段差が発生しない。
【図面の簡単な説明】
【図1】本発明にかかる二次覆工工法の初期工程の要部断面説明図である。
【図2】図1の工程に引き続いて行われる工程の要部断面説明図である。
【図3】図2の工程に引き続いて行われる工程の要部断面説明図である。。
【図4】図3の工程に引き続いて行われる工程の要部断面説明図である。。
【図5】本発明にかかる二次覆工用型枠装置の要部側面図である。。
【図6】図1の要部拡大図である。
【図7】従来の二次覆工工法の型枠設置状態の説明図である。
【符号の説明】
10 二次覆工用型枠装置
12 移動式型枠板
14 妻板
16 セグメント
18 空間部
20 第1分離型枠
22 第2分離型枠
24 スペーサ
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a secondary lining method for forming a lining concrete layer on the inner surface of a segment and a technique for improving a secondary lining formwork apparatus.
[0002]
[Prior art]
In the construction work of the shield tunnel, a secondary lining layer made of reinforced concrete is formed on the inner surface of the segment after the segment is annularly installed on the excavation wall surface.
[0003]
For example, as disclosed in Non-Patent Document 1, such a secondary lining layer is provided with a mobile formwork device called a centle on the inner surface side of a segment, and between the formwork and the segment. It is formed by placing concrete.
[0004]
FIG. 7 shows a main part when the secondary lining layer is formed by this type of mobile formwork apparatus. In the figure, reference numeral 1 denotes a movable form plate, and this form plate 1 is obtained by connecting a plurality of divided curved plates in a ring shape via a hinge, and from the inner surface of the segment 2. It is installed inward at a predetermined interval.
[0005]
Further, in the same figure, the portion indicated by reference numeral 3 is the leading secondary lining layer already formed on the face side of the tunnel, and on the side of this leading secondary lining layer 3, The state at the time of newly forming the secondary lining layer 5 is shown.
[0006]
When the subsequent secondary lining layer 5 is newly formed, the formwork plate 1 is installed, and a part thereof is placed on the leading secondary lining layer 3 on the face side of the formwork plate 1. A wrap liner 6 is installed. The wrap liner 6 is, for example, assembled in an annular shape in which an angle or the like can be disassembled.
[0007]
Further, on the wellhead side of the mold plate 1, a gable plate 7 is installed, and a sealed space 8 for forming a secondary secondary lining layer 5 is formed by placing concrete. Then, when concrete is placed in the sealed space 8 and a predetermined secondary strength is developed and the secondary secondary lining layer 5 is formed, the end plate 7 and the lap liner 6 are disassembled and removed. Then, the mold plate 1 is reduced inward and moved to the wellhead side.
[0008]
The formwork plate 1 moved to the wellhead side is expanded in diameter and installed inward from the inner surface of the segment 2 at a predetermined interval, and the lap liner 6 is assembled in an annular shape again, and its end is used as the formwork. It is fixed to the plate 1 and the end plate 7 is installed to form the next succeeding secondary lining layer.
[0009]
However, the conventional secondary lining method and the secondary lining formwork apparatus have problems described below.
[0010]
[Non-patent literature]
"New technology of shield tunnel" October 10, 2001, published by Civil Engineering Co., Ltd. p72-76
[0011]
[Problems to be solved by the invention]
That is, in the secondary lining formwork apparatus shown in FIG. 7, the wrap liner 6 is annularly assembled or disassembled using the same member, but the subsequent secondary lining layer 5 is formed. In doing so, it is assembled in an annular shape so as to be placed on the inner surface side of the preceding secondary lining layer 3 that has been partially formed.
[0012]
However, the outer diameter of the annular assembly 6 of the wrap liner 6 and the inner diameter of the preceding lining layer 3 are always very little coincident with each other. When the lap liner 6 is brought into contact, the lap liner 6 and the preceding lining layer 3 are not completely brought into close contact with each other, and a step is generated in the joint joint.
[0013]
In an actual construction site, when such a level difference occurs, a finishing process is performed by cutting the portion into a V shape and filling with mortar or the like, but it is very expensive.
[0014]
The present invention has been made in view of such conventional problems, and the object of the present invention is to provide a secondary lining method and a secondary lining method in which no step is generated in the joint between the lining layers. It is in providing the formwork apparatus for construction methods.
[0015]
[Means for Solving the Problems]
In order to achieve the above object, according to the present invention, an annular movable form plate is installed at a predetermined interval along an inner peripheral surface of a segment, and a tread plate is provided on the rear end side of the movable form plate. And the movable formwork plate and the end plate separate the space part closed to the side of the preceding secondary lining layer, and the concrete is placed in the space part and the secondary secondary lining work. In the secondary lining method in which the layers are sequentially connected and formed, the movable mold plate includes a pair of separation molds at both ends in the longitudinal direction, and one of the separation molds includes the movable mold plate. When moving after demolding, it is left at the rear end of the preceding secondary lining layer formed immediately before, the movable mold plate is moved, and then fixed to the front end side, and the separation mold The other side of the frame, after moving the movable mold plate, is fixed to the rear end side, and the secondary lining which repeats such a procedure sequentially A law, before the wedge-shaped spacer thickness is contracted outwardly between mobile mold plate and said separation formwork interposed and spaced said separating formwork from the mold plate In addition, the spacer was removed.
[0017]
In addition, the present invention includes an annular movable mold plate installed at a predetermined interval along the inner peripheral surface of the segment, and a wife plate installed on the rear end side of the movable mold plate. The formwork plate and the end plate separate the space part closed to the side of the preceding secondary lining layer, and concrete is placed in the space part to sequentially connect the subsequent secondary lining layer. In the secondary lining mold apparatus to be formed, the movable mold plate is provided with a pair of separation molds at both longitudinal ends thereof, and one of the separation molds removes the movable mold plate. When moving after the mold, it is left at the rear end of the preceding secondary lining layer formed immediately before, and the movable mold plate is moved, then fixed to the front end side, and the separation mold other frame are, after moving the movable mold plate, a secondary lining for mold device for fixing the rear end side thereof, the secondary lining The frame device includes a wedge-shaped spacer that is provided between the movable mold plate and the separation mold, and whose thickness shrinks outward, and the separation mold is used as the movable mold plate. The spacer was removed before being separated from .
[0018]
In the secondary lining formwork apparatus of the present invention, the separation formwork can be formed in the same shape.
[0020]
According to the secondary lining method and the secondary lining mold apparatus of the above configuration, the movable mold plate is provided with a pair of separation molds at both ends in the longitudinal direction, and one of the separation molds is moved. When moving the formwork plate after demolding, it is left at the rear end of the preceding secondary lining layer formed immediately before, and the mobile formwork plate is moved and then fixed to the front end side. The other of the separation molds is configured to be fixed to the rear end side after the movable mold plate is moved.
[0021]
According to such a configuration, the rear end of the preceding secondary lining layer previously formed on the front end side of the space portion for placing concrete from now on and forming the subsequent secondary lining layer One separation mold left behind in the section is provided, and this separation mold is assembled and moved in an annular shape before placing concrete when forming the preceding secondary lining layer. Since it is fixed to the rear end portion of the type mold plate, there is no level difference in the joint joint as in the conventional liner plate.
[0022]
DETAILED DESCRIPTION OF THE INVENTION
DESCRIPTION OF EXEMPLARY EMBODIMENTS Hereinafter, preferred embodiments of the invention will be described in detail with reference to the accompanying drawings. 1 to 6 show an embodiment of a secondary lining method and a secondary lining mold apparatus according to the present invention.
[0023]
FIGS. 1 to 4 sequentially show the steps of the secondary lining method according to the present invention. In the method of the present invention, the mold apparatus 10 for secondary lining whose main part is shown in FIG. 5 is used. It is done. The formwork apparatus 10 shown in the figure includes a movable formwork plate 12 and a end plate 14.
[0024]
The movable form plate 12 is assembled in an annular shape along the inner peripheral surface of the segment 16 assembled in an annular shape along the tunnel excavation surface, and is contracted inward from the annular state when moved. FIG. 5 illustrates a case where the movable mold plate 12 is contracted inward, and the movable mold plate 12 is composed of a plurality of curved plates, and is a ceiling portion 12a disposed on the upper side of the tunnel. And a pair of side portions 12b and 12c and a pair of invert portions 12d and 12e.
[0025]
The ceiling portion 12a is supported by a gate-type support portion 12f, and a pair of side portions 12b and 12c are rotatably coupled to both ends in the circumferential direction of the ceiling portion 12a via hinges 12g.
[0026]
Invert portions 12d and 12e are rotatably coupled to end portions of the side portions 12b and 12c via hinges 12g. The member indicated by reference numeral 12h in FIG. 5 is an expansion / contraction jack whose one end is fixed to the gate-type support portion 12f, and by moving the expansion / contraction jack 12h to contract or extend, the movable form plate No. 12 can be set to either the inwardly contracted state shown in FIG. 5 or the expanded state that becomes an annular shape in the tunnel.
[0027]
5 is a support jack that is interposed to restrict the movement of each part when the formwork plate 12 is contracted and moved. The support jack 12i includes a plurality of support jacks 12i. used.
[0028]
As shown in FIG. 1, the mold apparatus 10 according to the present embodiment includes a pair of first and second separation molds 20 and 22 provided at both ends of the movable mold plate 12 in the longitudinal direction. In the case of the present embodiment, the first and second separation molds 20 and 22 have the same shape, and the side surfaces on the face side of the separation molds 20 and 22 are inclined from the inside to the outside. Tapered surfaces 20a and 22a are formed.
[0029]
One first separation mold 20 is left at the rear end portion of the preceding secondary lining layer A formed immediately before moving the movable mold board 10 and moves the mold board 12. After that, it is fixed to the front end side.
[0030]
The other second separation mold 22 is fixed to the rear end side of the movable mold plate 12 via a spacer 24 after the movable mold plate 10 is moved. The spacer 24 is interposed between the movable mold plate 12 and the second separation mold 22, has a thickness that decreases toward the outside, and is formed in a tapered shape. (See Figure 6)
[0031]
The end plate 14 is fixed to the side surface of the second separation mold 22 by bolts, and the outer peripheral surface is in contact with the inner surface of the segment 16. In the formwork apparatus 10 configured as described above, as shown in FIG. 1, a closed space portion 18 is formed on the side of the preceding secondary lining layer A.
[0032]
The space 18 includes an inner peripheral surface of the segment 16 and an outer peripheral surface of the mold plate 12 facing the inner peripheral surface (the outer peripheral surface of the first and second separation molds 20 and 22 and the outer peripheral surface of the spacer 24. The inner and outer surfaces in the circumferential direction are separated from each other, and the front and rear surfaces in the axial direction are separated by the leading secondary lining A on the face side and the end plate 14 on the wellhead side.
[0033]
Then, by placing concrete in the space 18, the subsequent secondary lining layers B1, B2,.
[0034]
Next, a method of forming a secondary lining layer on the inner surface of the segment 16 using the secondary lining mold apparatus 10 having the above-described configuration will be described. When forming the secondary lining layer, first, the movable mold plate 12 is installed at predetermined intervals along the inner peripheral surface of the segment 16 by expanding and contracting the telescopic jack 12h. Assembled.
[0035]
In FIG. 1, the main part of the formwork apparatus 10 in the case where a subsequent secondary lining layer B1 is newly formed on the side of the previously formed preceding secondary lining layer A is shown. In the figure, the case where the subsequent lining layers B1, B2,... Are sequentially formed from the face side toward the wellhead side is illustrated.
[0036]
In FIG. 1, the mold plate 12 is assembled in an annular shape and installed at a predetermined interval L from the inner peripheral surface of the segment 16, and this interval L is formed in the subsequent secondary lining layers B <b> 1 and B <b> 2. The thickness is.
[0037]
The mold apparatus 10 of the present embodiment has a pair of first and second separation molds 20 and 22 disposed at both ends in the longitudinal direction of the mold plate 12, and a pair of first and second separations. The molds 20 and 22 are formed in the same shape, and the separation molds 20 and 22 are assembled in an annular shape in the same manner as the mold plate 12.
[0038]
The separation molds 20 and 22 of the present embodiment can be rotated with a hinge 12g interposed, for example, similarly to the ceiling part 12a, side parts 12b and 12 and invert parts 12d and 12e of the mold plate 12. If it is configured, it is possible to move in the tunnel by forming or contracting in synchronization with the mold plate 12 in accordance with the contraction and extension operations of the mold plate 12. It is also possible to make an annular assembly or the like completely independent of the behavior of the mold plate 12.
[0039]
The first separation mold 20 is fixed to the side surface on the face side of the mold plate 12 so as to be separable by bolts. As shown in detail in FIG. 6, the second separation mold 22 is disposed on the side surface of the mold plate 12 on the wellhead side with a wedge-shaped spacer 24 interposed therebetween.
[0040]
The wedge-shaped spacer 24 is assembled in an annular shape, and one end surface is fixed to the side surface on the wellhead side of the mold plate 12 so as to be separable by bolts, and the other end surface is attached to the tapered surface 22 a of the second separation mold 22. , And is detachably fixed by bolts.
[0041]
In this case, if a viscous substance such as grease is interposed between the spacer 24 and the tapered surface 22a, the work for pulling out the spacer 24 can be easily performed.
[0042]
The end plate 14 is fixed to the end of the second separation form 22 on the wellhead side so as to be separable by bolts. The end plate 14 is assembled in an annular shape like the mold plate 12, and the outer peripheral surface of the end plate 14 assembled in an annular shape is installed so as to contact the surface of the segment 16.
[0043]
When the formwork device 10 is installed as described above, the closed space portion 18 is separated on the side of the preceding secondary lining layer A, and when such a space portion 18 is formed, this space Concrete is cast in the portion 18 to form the secondary lining layer B1.
[0044]
Then, when the concrete placed in the space portion 18 is solidified and the strength is expressed, as shown in FIG. 2, the formation of the subsequent secondary lining B1 is completed, so that the next subsequent In order to form the secondary lining B2, the mold plate 12 is moved to the wellhead side.
[0045]
In this case, first, the bolts of the spacer 24 are removed, and the annular assembly is disassembled and pulled out inward to remove it. In this case, since the spacer 24 has a smaller thickness on the outer side, it can be easily pulled out on the inner side.
[0046]
Next, the formwork plate 12 is contracted inward, removed from the inner surface side of the subsequent lining layer B1, and then moved to the wellhead side. At this time, similarly to the ceiling part 12a, side parts 12b and 12, and invert parts 12d and 12e of the mold plate 12, the first separation mold 20 is configured to be rotatable by interposing a hinge 12g. At this stage, the first separation mold 16 can be moved together with the mold plate 12 without disassembling.
[0047]
After the mold plate 12 is moved to the wellhead side, the first separation mold 20 is separated from the mold plate 12 and disassembled. The first separation form 20 can be separated from the form plate 12 and disassembled before the form plate 12 is moved.
[0048]
In this way, when the mold plate 12 is demolded and moved together with the first separation mold 20, as shown in FIG. 3, at the rear end portion of the subsequent secondary lining layer B1 formed immediately before, It will be in the state in which the 2nd isolation | separation form 22 was left behind.
[0049]
If the second separation mold 22 is left at the rear end of the subsequent secondary lining layer B1A in such a form, the mold plate 12 is moved when the movable mold plate 12 is moved to the wellhead side. It is also possible to prevent a part of the contact with the subsequent secondary lining layer B1 from damaging the subsequent secondary lining layer B1.
[0050]
Note that the separation and removal of the end plate 14 may be performed at an appropriate time before and after the movable mold plate 12 is removed. Next, as shown in FIG. 4, after the movable mold plate 12 is moved to the wellhead side, the second separation mold 22 is fixed to the front end side of the movable mold plate 12 with bolts.
[0051]
When the spacer 24, the first separation mold 20, and the end plate 14 are assembled in this order on the rear end side of the movable mold plate 12, the closed space 18a is separated from the side of the subsequent secondary lining layer B1. Thus, a state substantially the same as the state shown in FIG. 1 is created, and concrete is placed in the space 18a to form the secondary secondary lining layer B2.
[0052]
When the movable mold plate 12 is moved after the formation of the subsequent secondary lining layer B2, the first separation mold 20 is arranged on the rear side of the movable mold plate 12 this time. Therefore, the first separation mold 20 is left on the rear end side of the subsequent secondary lining layer B2. Thereafter, the above-described steps are sequentially repeated to form a secondary lining layer on the inner surface of the segment 16.
[0053]
Now, according to the secondary lining method and the secondary lining formwork apparatus 10 configured as described above, the movable formwork plate 12 has a pair of separation formwork 20 and 22 at both ends in its longitudinal direction. One of the separation molds 20 and 22 is left at the rear end of the preceding secondary lining layer A when the movable mold plate 12 is moved after demolding. After moving, it is fixed to the front end side, and the other of the separation molds 20 and 22 is configured to be fixed to the rear end side after moving the movable mold plate 12.
[0054]
According to such a configuration, the preceding secondary covering previously formed on the front end side of the space 18 for placing concrete from now on and forming the subsequent secondary lining layers B1, B2,... One separation mold 20, 22 left at the rear end of the work layer A is provided, and the separation mold 20, 22 is made of concrete when the preceding secondary lining layer A is formed. Before being placed, it is assembled in an annular shape and fixed to the rear end of the movable mold plate 12, so that there is a step in the joint joint based on the difference between the annular outer diameter and the inner diameter of the secondary lining layer. It will not occur.
[0055]
When forming the secondary lining layer, if there is no step in the joint area, there is no need for V-shaped cutting work and finishing treatment such as mortar filling, which can cut a great deal of cost. become.
[0056]
【The invention's effect】
As described above in detail, according to the secondary lining method and the secondary lining mold apparatus according to the present invention, no step is generated at the joint between the lining layers.
[Brief description of the drawings]
FIG. 1 is an explanatory cross-sectional view of a main part of an initial process of a secondary lining method according to the present invention.
2 is an explanatory cross-sectional view of a main part of a step performed subsequent to the step of FIG. 1. FIG.
3 is an explanatory cross-sectional view of a main part of a step performed subsequent to the step of FIG. 2. FIG. .
4 is an explanatory cross-sectional view of a main part of a step performed subsequent to the step of FIG. 3. FIG. .
FIG. 5 is a side view of the main part of the formwork device for secondary lining according to the present invention. .
6 is an enlarged view of a main part of FIG. 1. FIG.
FIG. 7 is an explanatory diagram of a state where a formwork is installed in a conventional secondary lining method.
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 10 Secondary lining formwork apparatus 12 Mobile mold plate 14 End plate 16 Segment 18 Space part 20 1st separation mold 22 2nd separation mold 24 Spacer

Claims (3)

セグメントの内周面に沿って、所定の間隔を隔てて環状の移動式型枠板を設置し、
前記移動式型枠板の後端側に妻板を設置し、
前記移動式型枠板および妻板で、先行二次覆工層の側方に閉塞された空間部を隔成し、当該空間部内にコンクリートを打設して後行二次覆工層を順次連結形成する二次覆工工法において、
前記移動式型枠板は、その長手方向の両端に一対の分離型枠を備え、
前記分離型枠の一方は、前記移動式型枠板を脱型後に移動させる際に、直前に形成された前記先行二次覆工層の後端部に残置させ、前記移動式型枠板を移動させた後に、その前端側に固定され、
前記分離型枠の他方は、前記移動式型枠板を移動させた後に、その後端側に固定し、
このような手順を順次繰り返す二次覆工工法であって、
前記移動式型枠板と前記分離型枠との間に外方に向けて厚みが収縮する楔状のスペーサを介装し、
前記分離型枠を前記型枠板から離間する前に、前記スペーサを除去することを特徴とする二次覆工工法。
Along the inner peripheral surface of the segment, an annular movable form plate is installed at a predetermined interval,
Install the end plate on the rear end side of the movable formwork plate,
The movable mold plate and the end plate separate the space closed to the side of the preceding secondary lining layer, and concrete is placed in the space to sequentially connect the subsequent secondary lining layers. In the secondary lining method to be formed,
The movable mold plate is provided with a pair of separation molds at both ends in the longitudinal direction,
When the movable mold plate is moved after demolding, one of the separation molds is left behind at the rear end of the preceding secondary lining layer formed immediately before, and the movable mold plate is After moving, it is fixed to the front end side,
The other of the separation molds is fixed to the rear end side after moving the movable mold plate,
It is a secondary lining method that repeats these steps sequentially ,
A wedge-shaped spacer whose thickness shrinks outward is interposed between the movable mold plate and the separation mold,
The secondary lining method , wherein the spacer is removed before the separation mold is separated from the mold plate .
セグメントの内周面に沿って、所定の間隔を隔てて設置される環状の移動式型枠板と、A ring-shaped movable form plate installed at a predetermined interval along the inner peripheral surface of the segment;
前記移動式型枠板の後端側に設置される妻板とを備え、A wife plate installed on the rear end side of the movable mold plate,
前記型枠板および妻板で、先行二次覆工層の側方に閉塞された空間部を隔成し、当該空間部内にコンクリートを打設して後行二次覆工層を順次連結形成する二次覆工用型枠装置において、The form plate and the end plate separate the space portion closed to the side of the preceding secondary lining layer, and concrete is placed in the space portion, and the subsequent secondary lining layer is sequentially connected and formed. In the secondary lining formwork device,
前記移動式型枠板は、その長手方向の両端に一対の分離型枠を備え、The movable mold plate is provided with a pair of separation molds at both ends in the longitudinal direction,
前記分離型枠の一方は、前記移動式型枠板を脱型後に移動させる際に、直前に形成された前記先行二次覆工層の後端部に残置させて、前記移動式型枠板を移動させた後に、その前端側に固定され、When the movable mold plate is moved after demolding, one of the separation molds is left at the rear end of the preceding secondary lining layer formed immediately before, and the movable mold plate is Is moved to the front end side,
前記分離型枠の他方は、前記型枠板を移動させた後に、その後端側に固定する二次覆工用型枠装置であって、The other side of the separation formwork is a formwork device for secondary lining, which is fixed to the rear end side after moving the formwork plate,
前記二次覆工型枠装置は、前記前記移動式型枠板と前記分離型枠との間に設けられ、外方に向けて厚みが収縮する楔状のスペーサを有し、The secondary lining formwork apparatus is provided between the movable formwork plate and the separation formwork, and has a wedge-shaped spacer whose thickness shrinks outward.
前記分離型枠を前記移動式型枠板から離間する前に、前記スペーサを除去することを特徴とする二次覆工用型枠装置。The secondary lining formwork apparatus, wherein the spacer is removed before the separation formwork is separated from the movable formwork plate.
前記分離型枠は、同一形状に形成することを特徴とする請求項2記載の二次覆工用型枠装置。The formwork apparatus for secondary lining according to claim 2, wherein the separation formwork is formed in the same shape.
JP2003098350A 2003-04-01 2003-04-01 Secondary lining method and secondary lining formwork apparatus Expired - Fee Related JP4190932B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2003098350A JP4190932B2 (en) 2003-04-01 2003-04-01 Secondary lining method and secondary lining formwork apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2003098350A JP4190932B2 (en) 2003-04-01 2003-04-01 Secondary lining method and secondary lining formwork apparatus

Publications (2)

Publication Number Publication Date
JP2004300893A JP2004300893A (en) 2004-10-28
JP4190932B2 true JP4190932B2 (en) 2008-12-03

Family

ID=33409901

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2003098350A Expired - Fee Related JP4190932B2 (en) 2003-04-01 2003-04-01 Secondary lining method and secondary lining formwork apparatus

Country Status (1)

Country Link
JP (1) JP4190932B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6213957B2 (en) * 2013-09-09 2017-10-18 大成建設株式会社 How to use tunnel formwork equipment
JP7671624B2 (en) * 2021-05-18 2025-05-02 鹿島建設株式会社 Tunnel lining method and tunnel lining structure

Also Published As

Publication number Publication date
JP2004300893A (en) 2004-10-28

Similar Documents

Publication Publication Date Title
JP2008308855A (en) Construction method for lining concrete, and lining concrete structure
JP6213957B2 (en) How to use tunnel formwork equipment
JP3188342B2 (en) Tunnel construction method
JP4190932B2 (en) Secondary lining method and secondary lining formwork apparatus
JP5623788B2 (en) How to build a tunnel
JPS5829917A (en) Reinforcing rod arranging method for expanding bottom part of pit with expanding bottom
JP2799624B2 (en) Formwork equipment and tunnel lining method
JP5524718B2 (en) Centile device for cross-sectional shape change tunnel, and lining concrete placement method for cross-sectional shape change tunnel
JP5401400B2 (en) Excavator start method and excavator start structure
JP6577726B2 (en) How to build a tunnel with straight and curved sections
US2547946A (en) Inside form for casting elongated hollow concrete structures
JPH0952215A (en) Core for form for manufacturing concrete block of common-use cable tunnel
JP4549990B2 (en) Shield machine
JP3220059B2 (en) Method and apparatus for placing concrete for tunnel using formwork with variable cross section
CN209162652U (en) A kind of beam sections duct splicing reservation device
CN113586088B (en) Tunnel chamber lining trolley and lining pouring trolley system
JP2691472B2 (en) Tunnel lining concrete continuous pouring equipment
JP3913525B2 (en) Branch tunnel construction method and branch tunnel branch part structure
JP3289150B2 (en) Wife formwork and its construction method in tunnel lining
JP4397797B2 (en) Construction method of underground structure
JP2691473B2 (en) Tunnel lining Concrete continuous pouring method
JP3069619B2 (en) Shield machine
JP2501072Y2 (en) Shield pressure machine for shield machine
JP2920430B2 (en) Inner formwork used for cast-in-place lining method
JPH0374693A (en) Mounting method for flexible coupling

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060201

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20070823

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080610

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080731

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080909

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080917

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110926

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120926

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120926

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130926

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees