JP4265066B2 - Multiple power system interchange control means - Google Patents
[go: Go Back, main page]

JP4265066B2 - Multiple power system interchange control means - Google Patents

Multiple power system interchange control means Download PDF

Info

Publication number
JP4265066B2
JP4265066B2 JP2000025182A JP2000025182A JP4265066B2 JP 4265066 B2 JP4265066 B2 JP 4265066B2 JP 2000025182 A JP2000025182 A JP 2000025182A JP 2000025182 A JP2000025182 A JP 2000025182A JP 4265066 B2 JP4265066 B2 JP 4265066B2
Authority
JP
Japan
Prior art keywords
power
systems
power system
control means
lighting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2000025182A
Other languages
Japanese (ja)
Other versions
JP2001218370A (en
Inventor
文雄 松岡
雅裕 井上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsubishi Electric Corp
Original Assignee
Mitsubishi Electric Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsubishi Electric Corp filed Critical Mitsubishi Electric Corp
Priority to JP2000025182A priority Critical patent/JP4265066B2/en
Publication of JP2001218370A publication Critical patent/JP2001218370A/en
Application granted granted Critical
Publication of JP4265066B2 publication Critical patent/JP4265066B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、コンビニエンスストアなど複数の電力系統に対して個別に最大使用契約電力を契約する一契約者において、系統間で電力を融通することによって経済的な電力運用を図る融通制御手段に関するものである。
【0002】
【従来の技術】
現在、日本における電力料金は、各契約者が電力会社との間で結ぶ最大使用契約電力と使用した電力量によって設定されている。契約者はこの契約電力を越えない範囲で使用が許され、基本料金と呼ばれる契約電力に対応した固定の契約電力料金に、電力の使用量に対応した電力料金を加えた電力料金を支払っている。
【0003】
電力の使用量は時間帯、曜日、季節などによって変動する他、電力系統によってピークを迎える時間帯や季節などが異なっている。このため複数の電力系統に対して個別に最大使用契約電力を契約している一契約者においては、ピークの時間帯のズレなどによってある時間帯、系統間で契約電力の余裕にアンバランスを生じる。このような場合、系統間で契約電力の余裕分を融通し合うことは、法的には認められておらず、また近い将来、認められたとしても電力仕様が異なったり、切り替えのタイミングの同期がとれない等の技術課題が残されている。このような理由から複数の電力系統の中から余裕分を見付け、相互に融通し合って経済的な電力運用を図る手段についてはほとんど検討されていなかった。
【0004】
この点につきコンビニエンスストアを具体例に取り上げ、詳しく説明する。
通常、コンビニエンスストアでは、複数の電力系統に対してそれぞれ異なる契約を結んでいる。例えば冷凍機分電盤、空調機分電盤などは低圧電力系統(以下、動力系統と呼称)、また照明分電盤などは時間帯別電灯系統で契約しており、それぞれの系統毎に最大使用契約電力が決められている。
【0005】
図5はこのような電力系統とこれに繋がる分電盤回路名の一例を示したものである。動力系統に接続された分電盤回路は空調機、小型冷凍機、冷凍ストッカー、リーチインショーケース、多段ショーケース、アイスショーケース、カウンター内冷蔵庫、ショーケース照明である。また電灯系統に接続された分電盤回路は、売り場照明、カウンターバックヤード照明、サイン看板・駐車場照明、店頭看板電源、保温ケース、その他電灯及びコンセントである。
【0006】
また、図6はこのようなコンビニエンスストアの夏季のある一日における電灯系統に接続された四つの分電盤に対する電力消費の推移を示したものである。図において、(1)、(2)、(3)、(4)はそれぞれ売り場照明、カウンター・バックヤード照明、サイン看板・駐車場照明、店頭看板照明を示している。
【0007】
図から明らかなように、(1)の売り場照明と(2)のカウンター・バックヤード照明は24時間ほぼ一定の電力消費で推移しており、(3)のサイン看板・駐車場照明と(4)の店頭看板照明は夜間にのみ電力消費が発生する。(1)と(2)をあわせた消費電力は約3kW、また(3)と(4)の特定分電盤をあわせた夜間の消費電力は約3kWである。したがって電灯系統の契約電力はこれらを合算した値6kWより大きくなければならず、昼間は約3kW以上の契約電力の余裕を生じている。
【0008】
また、図7は同じ日における動力盤に接続された空調機分電盤の消費電力の推移を示したものである。外気温度は夜間に23℃まで下がり、昼間に32℃まで上昇した。これに対応して空調機の冷房用入力も夜間に2kWまで下がり、昼間に7kWまで上昇した。したがって動力系統の契約電力は7kWより大きくなければならず、夜間には約5kW以上の契約電力の余裕を生じている。
【0009】
これら二つの図を比較して分かるように、契約電力に余裕ができる時間帯は略逆位相になっており、電力を融通することができれば、契約電力全体を低減することが可能である。しかしながらこの点については前述の通り、法的な認可が下りておらず、また認可されたとしても、動力系統が3相200Vであるのに対して電灯系統は単相200Vと電力仕様が異なる他、それぞれが切り替わるタイミングも完全に一致していない等の課題が残されている。このため契約者は個別に高い最大使用契約電力を契約して不経済的な運用をしていた。
【0010】
【発明が解決しようとする課題】
本発明は、各系統毎の電力種別(動力と電灯)の契約電力の最大値を、過剰に設定している事、及び動力と電灯のランニングコストが異なることに着目し、動力系統から電灯系統へと、同一系統内に電力の余裕がある場合、他系統の特定分電盤に電力を融通し、契約電力の低減とランニングコストの低減を図ろうとするものである。
【0011】
【課題を解決するための手段】
個別に最大使用契約電力を契約した複数の電力系統と、電力系統のそれぞれに繋がる複数の分電盤回路と、電力系統間で電力を融通する融通手段とを備え、時間帯により電力負荷が集中する特定電力系統に対し、適宜、電力余裕のある他の電力系統からの電力を融通する制御手段を設けるように構成したものである。
【0012】
電力余裕のある複数の電力系統の中から、その時間帯で最も料金単価の安い電力系統を判別し、電力負荷が集中している特定電力系統に対して安い他の電力系統からの電力を融通する制御手段を設けるように構成したものである。
【0013】
各電力系統の出力を略直流電圧に変換し、インバータ回路を介して負荷に供給するとともに、電力余裕のある料金単価の安い時間帯において電力を蓄え、電力負荷が集中する特定電力系統の特定時間帯に対し、蓄えられた電力と電力余裕のある複数の電力系統の中から、最も料金単価の安い系統を判別し、最も安い系統から特定電力系統に対して電力を融通する制御手段を設けるように構成したものである。
【0014】
低圧電力系統と都市ガスの二系統の熱源機を有す空調機器において、その時間帯で最も料金単価の安い系統を判別し、この系統の熱源機を利用する制御手段を設けるように構成したものである。
【0015】
【発明の実施の形態】
太陽光発電住宅における余剰電力を電力会社へ販売することが認可されるなど、近い将来、複数の電力系統の間で余裕分が融通されることが認可されるものと考えられる。ここではこのような展望に基づき、本発明の実施の形態について図面を参照して説明する。
【0016】
実施の形態1
図1は本発明の実施の形態1による複数電力系統の融通制御手段をコンビニエンスストアの電力系統別分電盤回路に適用した場合を示すブロック図である。
図において1は融通制御手段、2は動力系統の使用電力検知手段、3は電灯系統の使用電力検知手段である。動力系統の使用電力検知手段2と電灯系統の使用電力検知手段3はそれぞれの系統における使用電力を常時検知しており、これら信号は融通制御手段1へと送信される。
【0017】
次に動作を説明する。
前述のように夏季の場合、昼から夜へと時間が経つにつれて外気温度は下がり、動力系統の空調機の使用電力は急にダウンする。このダウンしたタイミングを融通制御手段1は使用電力検知手段2から送られた信号をもとに判別する。そしてこのタイミングに基づき融通制御手段1は、動力系統に生じた3相200Vの契約電力の余裕分から単相200Vを作り出す。この出力は電灯系統の店頭看板照明とサイン看板・駐車場照明の分電盤に繋がれ、それぞれに供給される。
【0018】
ここで従来例で説明したように動力系統の余裕電力は約5kW以上であり、店頭看板照明とサイン看板・駐車場照明を合せた消費電力は約3kWである。したがって動力系統の余裕分に店頭看板照明とサイン看板・駐車場照明を合せた電力を含ませることが可能になる。即ち、タイミングを捕らえて動力系統の電力を電灯系統の電力に変換すれば、動力系統の契約電力をそのままにして電灯系統の店頭看板照明とサイン看板・駐車場照明の分の契約電力をそっくり動力系統に切り替えることができる。これによって電灯系統の契約電力を低減する経済的な運用が可能になる。
【0019】
実施の形態2
図2は本発明の実施の形態2による融通制御手段の構成要素を示す機能ブロック図である。図において4、5はそれぞれ系統1、2における使用電力検知手段、6は系統別契約電力記憶手段、7は余裕電力演算手段、8は従量料金記憶手段、9は室外照明点灯許可申請記憶手段、10は電力融通判定手段、11は電力系統切り替え手段、12は電力変換手段である。
【0020】
次に動作を説明する。
電力系統1、2における使用電力は使用電力検知手段4、5によって検知される。これら検知信号は余裕電力演算手段7に入力し、系統別契約電力記憶手段6からの情報を参照しながら余裕電力系統、余裕電力が算出される。この演算結果は電力融通判定手段10に入力し、従量料金記憶手段8と室外照明点灯許可申請記憶手段9からの情報を参照しながらこの時間において電力料金が最少となる電力系統が選択される。
【0021】
ここで、この選択された電力系統からの余裕電力は電力系統切り替え手段11によって各系統に分配される。この際、異なる系統については電力仕様が異なるため、電力変換手段12によって適合する電力仕様に変換される。
【0022】
このように本実施の形態は、時間帯によって電力料金が異なる特定電力系統がある点に着目し、余裕電力と料金単価を勘案しながら料金面で、その時間帯に最も適した電力系統を選択することにより経済的な電力運用を図ろうとするものである。
【0023】
この点につき前述のコンビニエンスストアを例に取り上げて詳しく説明する。時間帯別電灯の電灯契約の価格は図6に示すように、昼間に対応する朝7時から夜23時までの時間帯では従量料金が32.25円/kWhであり、夜間に対応する夜23時から朝7時までの時間帯では従量料金が6.15円/kWhである。
【0024】
したがって屋外照明の店頭看板照明とサイン看板・駐車場照明については23時から6時までの時間帯では安い従量料金で使用できる。しかし、夕方17時から深夜23時までの時間帯は高い料金32.25円/kWhを使用しなければならず、電灯料金は割高となっている。
【0025】
一方、動力系統の夏季従量料金は図7に示すように24時間、常時11.55円/kWhになっている。この料金単価は昼間の電灯従量料金(32.25円/kWh)より安くなっているが、夜間の電灯従量料金(6.15円/kWh)より高くなっている。
【0026】
したがって17時から23時までの時間帯では、屋外照明用分電盤2個に、動力系統の電源を投入すれば経済的であることが分かる。この時の、従量料金の月当たりの低減額は、
4時間/日×(32.25円/kWh―11.55円/kWh)×3kW×30日/月=7000円/月 式(1)
となり、年間では84000円の経済効果が期待される。
【0027】
このように電力料金が最少の電力系統を判定し、負荷が集中している特定電力系統へ電力の融通を実施すれば、経済的な電力運用が可能になることが分かる。
【0028】
なお、図では二つの系統で説明したが、これ以上の数であっても同様である。また3相200Vの動力系統を単相200Vの電灯系統に変換するには3相200Vの3線から適当な2線をスイッチング手段で選択すれば簡単に出来る。
【0029】
実施の形態3
これまでの実施の形態1、2は複数の電力系統間で契約電力を融通しあうことを前提にしたが、実施の形態3では現行法に近い適用例について示す。
図3は本発明の実施の形態3による構成を示す機能ブロック図である。
【0030】
図において、20は動力系統の3相200Vの電源、21は電灯系統の単相200Vの電源、22、23はそれぞれスイッチ回路、24は3相200V電源を直流電圧に変換するための整流回路、25はインバータ回路、26は負荷である空調機、27は充放電回路、28は蓄電池、29はスイッチ回路、30は電気機器、31は整流回路、32はインバータ回路、33は負荷の照明器である。
【0031】
次に動作を説明する。
まず通常動作について説明する。スイッチ回路22とスイッチ回路23はOFFの状態にあり、3相200Vの電源20からの電圧は整流回路24によって略直流電圧に変換される。この略直流電圧はインバータ回路25に入力され、負荷である空調機26を駆動する。この時、電力の一部は充放電回路27によって蓄電池28に蓄えられる。
【0032】
またこの時スイッチ回路29はONの状態にあり、電灯系統の単相200Vの電源21からの電圧は負荷の電気機器30に直接入力され、これを駆動する他、スイッチ回路29を介して整流回路31に入力され、略直流電圧に変換された後、インバータ回路32に入力され、負荷の照明器33を駆動する。
【0033】
次に、動力系統の3相200Vの電源20に余裕があり、これを電灯系統に融通する場合について説明する。
スイッチ回路29はOFFの状態となり、照明器33は単相200Vから遮断される。この時、同時にスイッチ回路22とスイッチ回路23はONの状態になり、3相200Vの整流して得られた略直流電圧は、インバータ回路32に入力され、照明器33を駆動する。
【0034】
ここで、前述の蓄電池28に蓄えられた電力は、例えば電灯系統が高い料金単価となる時間帯において充放電回路27によって放電され、経済的な電力運用のために使用される。このように3相200V、単相200Vを一旦、略直流電圧に変換することにより系統間の電力融通が簡単になる他、電力料金単価の安い時間帯を利用して電力を蓄え、電力料金単価の高い時間帯を安い電力でまかなうことができるので、一層経済的な運用が可能となる。
【0035】
実施の形態4
本発明の実施の形態4は動力系統の電力と都市ガスを併用して運用する場合について示す。実施の形態2と比較すると、運用の対象になる系統が電力にとどまらず、都市ガスまで含めたものに拡張されている。つまり電力系統、都市ガスの中からその時間帯で料金単価の最も安い系統を選択して経済的な運用を図ることを目的にしている。
【0036】
図4に実施の形態4における構成要素のブロック図である。図おいて制御回路40からの信号に基づき分流機41よって動力系統の3相200Vの電源による電気熱源機42もしくは都市ガスによるガス熱源機43のいずれかが選択されて空調機が経済的に運用される。
【0037】
【発明の効果】
本発明は、以上説明したように構成されているので、以下に記載されるような効果を奏する。
【0038】
複数の電力系統と個別に最大使用契約電力を契約する一契約者において、電力系統間で電力を融通する融通手段を設け、時間帯により電力負荷が集中している特定電力系統に対し、適宜、電力余裕のある他の電力系統からの電力を融通するように構成したのでトータルの契約電力の低減ができる。
【0039】
また、電力余裕のある複数の電力系統の中から、その時点で最も料金単価の安い電力系統を判定し、この電力系統からの電力を電力負荷が集中している特定電力系統に対して融通するように構成したので、トータルの契約電力を低減できると共に、ランニングコストを低減できる。
【0040】
また、各電力系統の出力を略直流電圧に変換して負荷に供給し、かつ電力余裕のある料金単価の安い時間帯において電力を蓄え、電力負荷が集中する特定電力系統の特定時間帯に対し、蓄えられた電力と電力余裕のある複数の電力系統の中から最も料金単価の安い系統を判別し、この系統から特定電力系統に対して電力を融通するように構成したので、トータルの契約電力を低減できると共に、ランニングコストを低減できる。
【0041】
また、低圧電力系統と都市ガスの二系統の熱源機を有す空調機器において、その時間帯で最も料金単価の安い系統を判別し、その系統の熱源機を利用するようにしたので、ランニングコストを低減できる。
【図面の簡単な説明】
【図1】 本発明の実施の形態1に係わる融通制御手段をコンビニエンスストアの電力系統に適用した場合の構成を示したブロック図である。
【図2】 本発明の実施の形態2に係わる融通制御手段の構成を示した機能ブロック図である。
【図3】 本発明の実施の形態3に係わる融通制御手段をコンビニエンスストアの電力系統に適用した場合の構成を示したブロック図である。
【図4】 本発明の実施の形態4に係わる構成要素のブロック図である。
【図5】 従来のコンビニエンスストアにおける電力種別と分電盤回路名を示したブロック図である。
【図6】 従来のコンビニエンスストアにおいて、夏季のある一日の電灯系統における各分電盤の消費電力の推移と時間帯別電灯の電灯契約の価格を示した図である。
【図7】 従来のコンビニエンスストアにおいて、夏季のある一日の動力系統における各分電盤の消費電力の推移と夏季従量料金を示した図である。
【符号の説明】
1 融通制御手段、2 動力系統の使用電力検知手段、3 電灯系統の使用電力検知手段、4 系統1における使用電力検知手段、5 系統2における使用電力検知手段、6 系統別契約電力記憶手段、7 余裕電力演算手段、8 従量料金記憶手段、9 室外照明点灯許可申請記憶手段、10 電力融通判定手段、11電力系統切り替え手段、12 電力変換手段、20 3相200Vの電源、21 単相200Vの電源、22 スイッチ回路、23 スイッチ回路、24 整流回路、25 インバータ回路、26 空調機、27 充放電回路、28 蓄電池、29 スイッチ回路、30 電気機器、31 整流回路、32 インバータ回路、33 照明器、40 制御回路、41 分流機、42 電気熱源機、43ガス熱源機
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an accommodation control means for achieving economical power operation by allowing power to be interchanged between systems in a contractor who individually contracts the maximum usage contract power for a plurality of power systems such as convenience stores. is there.
[0002]
[Prior art]
Currently, the electricity rate in Japan is set based on the maximum contracted power that each contractor ties with the power company and the amount of power used. The contractor is allowed to use within the range not exceeding the contracted power, and pays a power charge that is a fixed contracted power charge corresponding to the contracted power called the basic charge plus the power charge corresponding to the amount of power used. .
[0003]
The amount of power used varies depending on the time of day, day of the week, season, etc., and the time of day and season of peaking differ depending on the power system. For this reason, in a contractor who has contracted the maximum contracted power usage for multiple power grids individually, there is an imbalance in the contract power margin between grids due to a shift in the peak time zone. . In such a case, it is not legally allowed to allow contract power reserves between systems, and even if it is approved in the near future, the power specifications will be different or the timing of switching will be synchronized. Technical issues such as inability to remove. For these reasons, there have been little studies on means for finding an allowance from among a plurality of power systems and mutually economically operating economical power operations.
[0004]
This point will be explained in detail, taking a convenience store as a specific example.
Normally, convenience stores have different contracts for a plurality of power systems. For example, refrigeration distribution boards and air conditioner distribution boards are contracted with low-voltage power systems (hereinafter referred to as power systems), and lighting distribution boards are contracted with time-dependent lamp systems. Contract power used is determined.
[0005]
FIG. 5 shows an example of such a power system and a distribution board circuit name connected to the power system. Distribution board circuits connected to the power system are air conditioners, small refrigerators, refrigeration stockers, reach-in showcases, multistage showcases, ice showcases, refrigerators in counters, and showcase lighting. The distribution board circuit connected to the electric light system is sales floor lighting, counter backyard lighting, signboard / parking lot lighting, store signage power supply, heat insulation case, other lamps and outlets.
[0006]
FIG. 6 shows the transition of power consumption with respect to four distribution boards connected to the lamp system in one day in the summer of such a convenience store. In the figure, (1), (2), (3), and (4) respectively indicate sales floor lighting, counter / backyard lighting, signboard / parking lot lighting, and storefront lighting.
[0007]
As is clear from the figure, the sales floor lighting in (1) and counter / backyard lighting in (2) have remained at a constant power consumption for 24 hours. ) Store signage lighting consumes electricity only at night. The total power consumption of (1) and (2) is about 3 kW, and the total nighttime power consumption of the specific distribution boards (3) and (4) is about 3 kW. Therefore, the contract power of the electric power system must be larger than the sum of these values of 6 kW, and there is a margin of contract power of about 3 kW or more in the daytime.
[0008]
FIG. 7 shows the transition of power consumption of the air conditioner distribution board connected to the power panel on the same day. The outside air temperature dropped to 23 ° C at night and rose to 32 ° C during the day. Correspondingly, the cooling input of the air conditioner also dropped to 2 kW at night and rose to 7 kW in the daytime. Therefore, the contract power of the power system must be larger than 7 kW, and there is a margin of contract power of about 5 kW or more at night.
[0009]
As can be seen by comparing these two figures, the time zone in which the contract power can be afforded is substantially in opposite phase, and if the power can be accommodated, the contract power as a whole can be reduced. However, as mentioned above, there is no legal approval for this point, and even if it is approved, the power system is three-phase 200V, while the lamp system has different power specifications from single-phase 200V. However, there are still problems such as the timing at which each switch does not completely match. For this reason, the contractors individually contracted a high maximum use contract electric power to operate uneconomically.
[0010]
[Problems to be solved by the invention]
The present invention pays attention to the fact that the maximum value of the contract power for each power system (power and light) is set excessively and that the running cost of power and light is different. However, when there is a margin of power in the same system, the power is supplied to a specific distribution board in another system to reduce contract power and running costs.
[0011]
[Means for Solving the Problems]
Equipped with multiple power systems that have contracted the maximum usage contract power individually, multiple distribution board circuits connected to each of the power systems, and an interchange means for accommodating power between the power systems, and power load is concentrated by time zone The specific power system is configured so as to be provided with control means for accommodating power from other power systems having a power margin as appropriate.
[0012]
The power system with the lowest unit price is identified from the multiple power systems that have power margins, and power from other power systems that are cheaper for the specific power system where the power load is concentrated can be accommodated. It is comprised so that the control means to perform may be provided.
[0013]
Converts the output of each power system to a substantially DC voltage, supplies it to the load via the inverter circuit, stores power in a time zone where the unit price is low and the power unit is cheap, and the specific time of the specific power system where the power load is concentrated For the belt, a system that discriminates the system with the lowest unit price from the stored power and a plurality of power systems with power margins, and provides a control means for accommodating power from the cheapest system to the specific power system. It is configured.
[0014]
An air conditioner that has two heat source units, a low-voltage power system and city gas, which is configured to determine the system with the lowest unit price in that time zone and to provide a control means that uses the heat source unit of this system It is.
[0015]
DETAILED DESCRIPTION OF THE INVENTION
In the near future, it is considered that it will be approved to allow for a margin to be accommodated among multiple power systems, such as being authorized to sell surplus power in photovoltaic power generation houses to power companies. Here, based on this perspective, embodiments of the present invention will be described with reference to the drawings.
[0016]
Embodiment 1
FIG. 1 is a block diagram showing a case where the interchange control means for a plurality of power systems according to Embodiment 1 of the present invention is applied to a power distribution board circuit for each power system of a convenience store.
In the figure, 1 is an interchange control means, 2 is a power system use power detection means, and 3 is a power system use power detection means. The power system usage power detection means 2 and the lamp system power usage detection means 3 constantly detect power usage in each system, and these signals are transmitted to the accommodation control means 1.
[0017]
Next, the operation will be described.
As described above, in the summer, the outside air temperature decreases as time passes from day to night, and the power consumption of the air conditioner of the power system suddenly decreases. The interchange control means 1 determines the down timing based on the signal sent from the used power detection means 2. Based on this timing, the accommodation control means 1 creates a single-phase 200 V from the margin of the 3-phase 200 V contract power generated in the power system. This output is connected to the distribution board of the lighting signage and the signboard / parking lot lighting, and is supplied to each.
[0018]
Here, as described in the conventional example, the surplus power of the power system is about 5 kW or more, and the combined power consumption of the store signboard illumination and the signboard / parking lot illumination is about 3 kW. Therefore, it is possible to include the electric power of the store signage lighting and the signboard / parking lot lighting in the margin of the power system. In other words, if the timing is captured and the power system power is converted to the power system power, the contract power of the power system is left as it is, and the contract power for the store signage lighting and the signboard / parking lot lighting of the light system is completely powered. It can be switched to the system. This makes it possible to operate economically to reduce the contract power of the light system.
[0019]
Embodiment 2
FIG. 2 is a functional block diagram showing components of the accommodation control means according to the second embodiment of the present invention. In the figure, 4 and 5 are used power detection means in systems 1 and 2, 6 is contract power storage means for each system, 7 is margin power calculation means, 8 is a metered charge storage means, 9 is an outdoor lighting lighting permission application storage means, Reference numeral 10 denotes power interchange determining means, 11 denotes power system switching means, and 12 denotes power conversion means.
[0020]
Next, the operation will be described.
The used power in the power systems 1 and 2 is detected by the used power detection means 4 and 5. These detection signals are input to the marginal power calculation means 7 and the marginal power system and marginal power are calculated while referring to the information from the system-specific contract power storage means 6. This calculation result is input to the power interchange determining means 10, and the power system that minimizes the power charge at this time is selected while referring to the information from the metered charge storage means 8 and the outdoor lighting lighting permission application storage means 9.
[0021]
Here, the surplus power from the selected power system is distributed to each system by the power system switching means 11. At this time, since the power specifications of the different systems are different, the power conversion means 12 converts the power specifications into a suitable power specification.
[0022]
In this way, this embodiment pays attention to the fact that there is a specific power system with different power charges depending on the time zone, and selects the most suitable power system for that time zone in terms of charges, taking into account the surplus power and the unit price of charges. By doing so, it aims to achieve economical power operation.
[0023]
This point will be described in detail by taking the convenience store described above as an example. As shown in Fig. 6, the price of the electric light contract for hourly electric lights is 32.25 yen / kWh in the time zone from 7:00 am to 23:00 pm corresponding to the daytime. In the time zone from 23:00 to 7:00 in the morning, the pay-as-you-go fee is 6.15 yen / kWh.
[0024]
Therefore, outdoor billboard lighting and signboard / parking lot lighting for outdoor lighting can be used at a low metered rate in the time zone from 23:00 to 6:00. However, in the time zone from 17:00 in the evening to 23:00 in the evening, a high charge of 32.25 yen / kWh must be used, and the lamp charge is expensive.
[0025]
On the other hand, the summer usage fee of the power system is always 11.55 yen / kWh for 24 hours as shown in FIG. This unit price is lower than the daytime electric charge (32.25 yen / kWh), but higher than the nighttime electric charge (6.15 yen / kWh).
[0026]
Therefore, in the time zone from 17:00 to 23:00, it turns out that it is economical if the power distribution system is turned on to the two distribution boards for outdoor lighting. At this time, the monthly reduction of the pay-as-you-go fee is
4 hours / day x (32.25 yen / kWh-11.55 yen / kWh) x 3 kW x 30 days / month = 7000 yen / month Formula (1)
Therefore, an economic effect of 84,000 yen is expected annually.
[0027]
It can be seen that economical power operation can be achieved by determining the power system with the least power charge in this way and conducting power interchange to the specific power system where the load is concentrated.
[0028]
In addition, although it demonstrated in two figures by two systems, it is the same even if it is a number beyond this. In addition, converting a three-phase 200V power system into a single-phase 200V electric power system can be easily performed by selecting two appropriate wires from the three-phase 200V three wires using switching means.
[0029]
Embodiment 3
While the first and second embodiments are based on the assumption that contract power is interchanged between a plurality of power systems, the third embodiment shows an application example close to the current method.
FIG. 3 is a functional block diagram showing a configuration according to the third embodiment of the present invention.
[0030]
In the figure, 20 is a three-phase 200V power source for the power system, 21 is a single-phase 200V power source for the lamp system, 22 and 23 are switch circuits, 24 is a rectifier circuit for converting the three-phase 200V power source into a DC voltage, 25 is an inverter circuit, 26 is a load air conditioner, 27 is a charge / discharge circuit, 28 is a storage battery, 29 is a switch circuit, 30 is an electrical device, 31 is a rectifier circuit, 32 is an inverter circuit, and 33 is a load illuminator. is there.
[0031]
Next, the operation will be described.
First, the normal operation will be described. The switch circuit 22 and the switch circuit 23 are in an OFF state, and the voltage from the three-phase 200 V power source 20 is converted into a substantially DC voltage by the rectifier circuit 24. This substantially DC voltage is input to the inverter circuit 25 and drives the air conditioner 26 as a load. At this time, a part of the electric power is stored in the storage battery 28 by the charge / discharge circuit 27.
[0032]
At this time, the switch circuit 29 is in an ON state, and the voltage from the single-phase 200 V power source 21 of the lamp system is directly input to the electric device 30 of the load to drive it, and the rectifier circuit via the switch circuit 29 After being input to 31 and converted into a substantially DC voltage, it is input to the inverter circuit 32 to drive the load illuminator 33.
[0033]
Next, a description will be given of a case where there is a margin in the three-phase 200V power source 20 of the power system and this can be accommodated in the lamp system.
The switch circuit 29 is turned off, and the illuminator 33 is disconnected from the single phase 200V. At this time, the switch circuit 22 and the switch circuit 23 are simultaneously turned on, and the substantially DC voltage obtained by rectifying the three-phase 200V is input to the inverter circuit 32 and drives the illuminator 33.
[0034]
Here, the electric power stored in the above-described storage battery 28 is discharged by the charge / discharge circuit 27 in a time zone where the electric power system has a high unit price, for example, and is used for economical power operation. In this way, once the three-phase 200V and single-phase 200V are converted to approximately DC voltage, power interchange between systems is simplified, and power is stored using a time zone where the power unit price is low. Because it is possible to cover high time periods with cheap power, more economical operation is possible.
[0035]
Embodiment 4
Embodiment 4 of the present invention shows a case where the power of the power system and city gas are used in combination. Compared with Embodiment 2, the system to be operated is not limited to electric power, but has been expanded to include city gas. In other words, the purpose is to select the system with the lowest unit price in the time zone from the power system and city gas, and to achieve economical operation.
[0036]
FIG. 4 is a block diagram of components in the fourth embodiment. In the figure, based on the signal from the control circuit 40, the shunt 41 selects either the electric heat source 42 by the three-phase 200V power source of the power system or the gas heat source 43 by the city gas, thereby operating the air conditioner economically. Is done.
[0037]
【The invention's effect】
Since the present invention is configured as described above, the following effects can be obtained.
[0038]
In one contractor who contracts the maximum usage contract power individually with a plurality of power systems, an interchange means for accommodating power between the power systems is provided, and for the specific power system where the power load is concentrated depending on the time zone, Since it is configured to accommodate power from other power systems with sufficient power margin, the total contract power can be reduced.
[0039]
In addition, the power system with the lowest unit price is determined from among a plurality of power systems with sufficient power margin, and the power from this power system is accommodated to the specific power system where the power load is concentrated. Since it comprised so, a total contract electric power can be reduced and a running cost can be reduced.
[0040]
In addition, the output of each power system is converted to a substantially DC voltage and supplied to the load, and the power is stored in a time zone where the power unit price is low and the unit price is low. Since the system with the lowest unit price is identified from the stored power and multiple power systems that have power margins, the total contracted power And the running cost can be reduced.
[0041]
In addition, in air conditioning equipment that has two heat source units, a low-voltage power system and city gas, the system with the lowest unit price in the time zone was identified and the heat source unit of that system was used, so the running cost Can be reduced.
[Brief description of the drawings]
FIG. 1 is a block diagram showing a configuration in a case where an accommodation control unit according to Embodiment 1 of the present invention is applied to a convenience store power system.
FIG. 2 is a functional block diagram showing a configuration of accommodation control means according to Embodiment 2 of the present invention.
FIG. 3 is a block diagram showing a configuration when the accommodation control means according to the third embodiment of the present invention is applied to a power system of a convenience store.
FIG. 4 is a block diagram of components according to Embodiment 4 of the present invention.
FIG. 5 is a block diagram showing power types and distribution board circuit names in a conventional convenience store.
FIG. 6 is a diagram showing a transition of power consumption of each distribution board and a price of a lamp contract of lamps according to time of day in a lamp system of a day in summer in a conventional convenience store.
FIG. 7 is a diagram showing a transition of power consumption of each distribution board and a summer usage fee in a daily power system in a summer at a conventional convenience store.
[Explanation of symbols]
1 interchange control means, 2 power system use power detection means, 3 power system use power detection means, 4 system 1 use power detection means, 5 system 2 use power detection means, 6 system-specific contract power storage means, 7 Surplus power calculation means, 8 Pay-per-charge storage means, 9 Outdoor lighting lighting permission application storage means, 10 Power interchange determination means, 11 Power system switching means, 12 Power conversion means, 20 3-phase 200V power supply, 21 Single-phase 200V power supply , 22 switch circuit, 23 switch circuit, 24 rectifier circuit, 25 inverter circuit, 26 air conditioner, 27 charge / discharge circuit, 28 storage battery, 29 switch circuit, 30 electrical equipment, 31 rectifier circuit, 32 inverter circuit, 33 illuminator, 40 Control circuit, 41 shunt machine, 42 electric heat source machine, 43 gas heat source machine

Claims (2)

個別に使用契約電力を契約した複数の電力系統と、前記複数の電力系統に接続され前記電力系統間で電力を融通する融通手段と、前記複数の電力系統の電力を検出し余裕電力を演算するとともに、時間帯および季節に応じた電力料金を記憶させる料金記憶手段からの情報に基づき融通電力を判定する判定手段と、を備え、前記判定手段の判定に基づき室外照明用電力に前記融通電力を使用することを特徴とする制御手段。A plurality of power systems with contracted power contracts for use individually, an interchange means connected to the plurality of power systems for accommodating power between the power systems, and detecting the power of the plurality of power systems and calculating margin power And determining means for determining the accommodation power based on the information from the charge storage means for storing the electricity charge according to the time zone and the season, and based on the determination of the determination means, the accommodation power is added to the outdoor lighting power. Control means characterized by being used. 前記判定手段は、室外照明点灯許可申請の情報に基づき判定する請求項1記載の制御手段。2. The control means according to claim 1, wherein the determination means makes a determination based on information on an application for permission to turn on outdoor lighting.
JP2000025182A 2000-02-02 2000-02-02 Multiple power system interchange control means Expired - Lifetime JP4265066B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000025182A JP4265066B2 (en) 2000-02-02 2000-02-02 Multiple power system interchange control means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000025182A JP4265066B2 (en) 2000-02-02 2000-02-02 Multiple power system interchange control means

Publications (2)

Publication Number Publication Date
JP2001218370A JP2001218370A (en) 2001-08-10
JP4265066B2 true JP4265066B2 (en) 2009-05-20

Family

ID=18551075

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000025182A Expired - Lifetime JP4265066B2 (en) 2000-02-02 2000-02-02 Multiple power system interchange control means

Country Status (1)

Country Link
JP (1) JP4265066B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5239796B2 (en) * 2008-12-03 2013-07-17 日本電気株式会社 Rack mount system, rack apparatus, and rack apparatus control method
TWI464271B (en) * 2011-12-20 2014-12-11 Univ Nat Cheng Kung A metallurgical method by adding mg-al to modify the inclusions and grain refinement of steel
JP2023097529A (en) * 2021-12-28 2023-07-10 Link T&B株式会社 Power supply system and three-phase to single-phase inverter used in the system
JP2023158442A (en) * 2022-04-18 2023-10-30 Link T&B株式会社 charging system

Also Published As

Publication number Publication date
JP2001218370A (en) 2001-08-10

Similar Documents

Publication Publication Date Title
US6680547B1 (en) Power sharing system including rechargeable power source
CN109995083B (en) Hybrid inverter power control system for PV strings, batteries, grids and backup loads
US7830038B2 (en) Single chip solution for solar-based systems
CN102498636B (en) Power distribution system
US20070145952A1 (en) Efficient power system
US9360903B2 (en) System for controlling electric power supply to devices
JP6800353B2 (en) Lighting power system and method
JP2000224769A (en) Distributed power storage system
JP2011250605A (en) Power conversion apparatus
JPH09294334A (en) Grid-connected generator
JP2010016999A (en) Power supplying device for store
JP7222873B2 (en) charge/discharge system
Chauhan et al. DC distribution system for energy efficient buildings
JP2013106483A (en) Power supply system
Kivaisi Installation and use of a 3 kWp PV plant at Umbuji village in Zanzibar
JP4265066B2 (en) Multiple power system interchange control means
JP2011097795A (en) Power supply system
JP2005287132A (en) Cogeneration system
JP2003299247A (en) Ac power supply system
JP6307125B2 (en) Power management system
JP2006230147A (en) Power storage and power reduction system
JP5990767B2 (en) Power conversion system
JP2001231169A (en) Compensating device for unbalanced load in distribution system and building facility
Van der Plas Solar energy answer to rural power in Africa
JP3149024U7 (en)

Legal Events

Date Code Title Description
RD01 Notification of change of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7421

Effective date: 20040629

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20060724

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20071207

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20071218

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080218

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080610

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080730

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090127

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090209

R151 Written notification of patent or utility model registration

Ref document number: 4265066

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120227

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130227

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130227

Year of fee payment: 4

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140227

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term