Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4334553B2 - Cavity closing method - Google Patents
[go: Go Back, main page]

JP4334553B2 - Cavity closing method - Google Patents

Cavity closing method Download PDF

Info

Publication number
JP4334553B2
JP4334553B2 JP2006182675A JP2006182675A JP4334553B2 JP 4334553 B2 JP4334553 B2 JP 4334553B2 JP 2006182675 A JP2006182675 A JP 2006182675A JP 2006182675 A JP2006182675 A JP 2006182675A JP 4334553 B2 JP4334553 B2 JP 4334553B2
Authority
JP
Japan
Prior art keywords
filler
underground cavity
water
underground
closing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2006182675A
Other languages
Japanese (ja)
Other versions
JP2008013910A (en
Inventor
雅志 桜沢
明彦 神田
勝義 佐藤
一充 菱沼
憲児 渕上
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Onoda Chemico Co Ltd
Original Assignee
Onoda Chemico Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Onoda Chemico Co Ltd filed Critical Onoda Chemico Co Ltd
Priority to JP2006182675A priority Critical patent/JP4334553B2/en
Publication of JP2008013910A publication Critical patent/JP2008013910A/en
Application granted granted Critical
Publication of JP4334553B2 publication Critical patent/JP4334553B2/en
Anticipated expiration legal-status Critical
Active legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Description

本発明は、地下空洞閉塞方法に関するものである。 The present invention relates to an underground cavity closing method .

地中には、例えば、廃棄された排水路トンネルや導水路トンネル等の地下用水路、石炭や金属等の資源採掘場の廃坑、戦中に作られた防空壕や石灰岩の溶食洞窟等の自然洞窟等、種々の地下空洞が存在する。   In the underground, for example, underground drainage channels such as discarded drainage tunnels and headrace tunnels, abandoned mines of coal and metal resources mining pits, natural caves such as air defenses and limestone erosion caves made during the war, etc. There are various underground cavities.

これら地下空洞は、放置しておくと地盤陥没の原因となるため、充填材を充填することで閉塞する措置が採られることが多いが、地下空洞の多くには水が充満しているため、より効率的な充填材の充填方法が要望されている。   Since these underground cavities can cause ground collapse if left untreated, measures are often taken to close them by filling with fillers, but because many of the underground cavities are filled with water, There is a need for a more efficient method of filling the filler.

そこで、例えば、特許文献1には、水のある地下空洞に所定間隔で水に近い比重の第一充填材を充填して該第一充填材から成る隔壁を所定間隔で形成した後、該隔壁間に、第一充填材より比重の大きな第二充填材を充填して該地下空洞を閉塞する地下空洞閉塞方法が開示されている。 Therefore, for example, in Patent Document 1, a first filler having a specific gravity close to water is filled in an underground cavity with water at a predetermined interval to form a partition made of the first filler at a predetermined interval. In the meantime, an underground cavity closing method is disclosed in which a second filler having a higher specific gravity than the first filler is filled to close the underground cavity .

特許第3682554号公報Japanese Patent No. 3682554

しかしながら、上記特許文献1においては、隔壁を構築する第一充填材の流動性を比重のみによって制御しようとするものであり、流動性の調整が難しく、水中での挙動が予測し難く、材料のロスも不明である。   However, in the above-mentioned Patent Document 1, the fluidity of the first filler constituting the partition wall is to be controlled only by specific gravity, it is difficult to adjust the fluidity, and the behavior in water is difficult to predict. Loss is unknown.

本発明は、上述のような現状に鑑みなされたもので、充填材の流動性を適宜設定調整可能で、充填材を効率良く使用可能な極めて実用性に秀れた地下空洞閉塞方法を提供するものである。 The present invention has been made in view of the present situation as described above, and provides a method for closing an underground cavity that is capable of appropriately setting and adjusting the fluidity of the filler and that can use the filler efficiently and that is excellent in practicality. Is.

添付図面を参照して本発明の要旨を説明する。   The gist of the present invention will be described with reference to the accompanying drawings.

水のある地下空洞1に所定間隔で第一充填材2を充填して該第一充填材2により隔壁を形成した後、この隔壁間に第二充填材3を充填して前記地下空洞1を閉塞する地下空洞閉塞方法であって、地上から前記地下空洞1に向かって孔4を所定間隔で複数穿設し、続いて、少なくとも土砂及びセメントを含む硬化剤と水とから成るソイルセメントで構成される前記第一充填材2を該第一充填材2に急結材を混入することで該第一充填材2の水中での流動性を制御しつつ前記孔4を通じて前記地下空洞1に導入し前記隔壁を所定間隔で形成し、続いて、少なくとも土砂及びセメントを含む硬化剤と水とから成るソイルセメントで構成される前記第二充填材3を該第二充填材3に遅延材を混入することで該第二充填材3の水中での流動性を制御しつつ前記隔壁間に位置する前記孔4を通じて前記地下空洞1に導入し、この第二充填材3を前記一方の隔壁側の孔4から導入し、前記地下空洞1中の水をその余の前記孔4から排出し、この第二充填材3を導入する前記孔4を順次他方の隔壁側の孔4へ変更することで前記地下空洞1中の水を排出しつつ前記第一充填材2及び第二充填材3を前記地下空洞1に充填し該地下空洞1を閉塞することを特徴とする地下空洞閉塞方法に係るものである。 After filling the underground cavity 1 with water with the first filler 2 at a predetermined interval and forming partition walls with the first filler 2 , the second filler 3 is filled between the partition walls to form the underground cavity 1. a subterranean cavity occlusion method for closing the hole 4 and a plurality bored at predetermined intervals toward the ground to the underground cavity 1, followed by construction with soil cement comprising a curing agent and water containing at least sand and cement introduced into the underground cavity 1 through the hole 4 while controlling the flow of the water of the first filling material 2 the first filling material 2 by the incorporation of quick-setting material to the first filling material 2 to be The partition walls are formed at predetermined intervals, and then the second filler 3 composed of a soil cement composed of at least a hardener containing earth and sand and cement and water is mixed into the second filler 3 with a delay material. By controlling the fluidity of the second filler 3 in water It introduce | transduces into the said underground cavity 1 through the said hole 4 located between the said partition walls, this 2nd filler 3 is introduce | transduced from the hole 4 of the said one partition wall side, and the water in the said underground cavity 1 is left to the said other hole 4, and the holes 4 for introducing the second filler 3 are sequentially changed to holes 4 on the other partition wall side, thereby discharging the water in the underground cavity 1 and the first filler 2 and the second filler 4. The present invention relates to an underground cavity closing method characterized by filling the underground cavity 1 with two fillers 3 and closing the underground cavity 1 .

また、請求項1記載の地下空洞閉塞方法において、前記急結剤として、カルシウムアルミネート系のものが採用されていることを特徴とする地下空洞閉塞方法に係るものである。 Furthermore, in an underground cavity blockage method according to claim 1, wherein the quick-setting admixture, are those of the underground cavity occlusion method characterized in that those of calcium aluminate is employed.

また、請求項1,2いずれか1項に記載の地下空洞閉塞方法において、前記第一充填材2に、重量調整材を混入することで、この第一充填材2の水中での流動性を制御することを特徴とする地下空洞閉塞方法に係るものである。 Moreover, in the underground cavity closing method according to any one of claims 1 and 2, by mixing a weight adjusting material into the first filler 2, the fluidity of the first filler 2 in water can be increased. The present invention relates to a method for closing an underground cavity characterized by controlling.

また、請求項3記載の地下空洞閉塞方法において、前記重量調整材として、発泡スチロール若しくは鉱砕スラグが採用されていることを特徴とする地下空洞閉塞方法に係るものである。 The underground cavity closing method according to claim 3, wherein foamed polystyrene or crushed slag is adopted as the weight adjusting material .

また、請求項1〜いずれか1項に記載の地下空洞閉塞方法において、前記第一充填材2に、有機繊維若しくは無機繊維を混入することで、この第一充填材2の水中での流動性を制御することを特徴とする地下空洞閉塞方法に係るものである。 In addition, in the underground cavity closing method according to any one of claims 1 to 4 , by mixing organic fibers or inorganic fibers into the first filler 2, the flow of the first filler 2 in water. The present invention relates to a method for closing an underground cavity characterized by controlling the property.

また、請求項5記載の地下空洞閉塞方法において、前記有機繊維として、パルプ繊維、アラミド繊維、ビニロン繊維若しくはポリプロピレン繊維が採用されていることを特徴とする地下空洞閉塞方法に係るものである。 6. The underground cavity closing method according to claim 5, wherein pulp fibers, aramid fibers, vinylon fibers, or polypropylene fibers are employed as the organic fibers .

また、請求項5記載の地下空洞閉塞方法において、前記無機繊維として、鋼繊維若しくはガラス繊維が採用されていることを特徴とする地下空洞閉塞方法に係るものである。 6. The underground cavity closing method according to claim 5, wherein steel fiber or glass fiber is employed as the inorganic fiber.

また、請求項1〜いずれか1項に記載の地下空洞閉塞方法において、前記第一充填材2を、可撓性素材から成る筒袋状体に収納した状態で前記地下空洞1に充填することを特徴とする地下空洞閉塞方法に係るものである。 In addition, in the underground cavity closing method according to any one of claims 1 to 7 , the first filler 2 is filled in the underground cavity 1 in a state of being housed in a cylindrical bag-like body made of a flexible material. The present invention relates to a method for closing an underground cavity .

また、請求項1〜8いずれか1項に記載の地下空洞閉塞方法において、前記第二充填材3に、流動化剤と遅延剤とを混入することで該第二充填材3の水中での流動性を制御することを特徴とする地下空洞閉塞方法に係るものである。 Moreover, in the underground cavity closing method according to any one of claims 1 to 8, the second filler 3 is mixed with a fluidizing agent and a retarder in the second filler 3 in water. The present invention relates to a method for closing an underground cavity characterized by controlling fluidity .

また、請求項1〜いずれか1項に記載の地下空洞閉塞方法において、前記土砂は建設発生土であることを特徴とする地下空洞閉塞方法に係るものである。 Furthermore, in an underground cavity blockage method according to any one of claims 1-9, wherein the soil is intended according to the underground cavity occlusion method, which is a construction waste soil.

本発明は上述のように構成したから、充填材の流動性を適宜設定調整可能で、充填材を効率良く使用可能な極めて実用性に秀れた地下空洞閉塞方法となる。 Since the present invention is configured as described above, the fluidity of the filler can be set and adjusted as appropriate, and the underground cavity closing method is excellent in practicality and enables efficient use of the filler.

好適と考える本発明の実施形態を、図面に基づいて本発明の作用を示して簡単に説明する。   An embodiment of the present invention which is considered to be suitable will be briefly described with reference to the drawings showing the operation of the present invention.

地下空洞1に所定間隔で第一充填材2を充填して該第一充填材2から成る隔壁を所定間隔で形成する。   A first filler 2 is filled into the underground cavity 1 at a predetermined interval, and a partition wall made of the first filler 2 is formed at a predetermined interval.

この際、例えば予め種々の急結剤を任意の量混合した第一充填材2の流動性を測定・記録しておき、この記録に基づいて地下空洞1の状態や使用する土砂の種類に応じて急結剤の種類や量を設定することで流動性を設定調整することができるから、第一充填材2の水中での挙動を予測することができ、それだけ第一充填材2を無駄なく効率的に使用して隔壁を形成することが可能となる。   At this time, for example, the fluidity of the first filler 2 in which various amounts of quick-setting agents are mixed in advance is measured and recorded, and based on this record, depending on the state of the underground cavity 1 and the type of earth and sand used. Since the fluidity can be set and adjusted by setting the type and amount of the quick setting agent, the behavior of the first filler 2 in water can be predicted, and the first filler 2 can be used without waste. It is possible to form the partition wall by using it efficiently.

また、隔壁間に第二充填材3を充填しつつ地下空洞1内の水を効率良く排出して良好に該地下空洞1を閉塞可能となる。Further, the water in the underground cavity 1 can be efficiently discharged while filling the second filler 3 between the partition walls, and the underground cavity 1 can be closed well.

本発明の具体的な実施例について図面に基づいて説明する。   Specific embodiments of the present invention will be described with reference to the drawings.

本実施例は、水のある地下空洞1に所定間隔で第一充填材2を充填して該第一充填材2により隔壁を所定間隔で形成した後、該隔壁間に、第二充填材3を充填する地下空洞充填方法により、地下空洞1を閉塞する場合であって、前記第一充填材2として、少なくとも土砂及びセメントを含む硬化剤と水とから成るソイルセメントが採用され、この第一充填材2に急結剤を混入することで、この第一充填材2の水中での流動性を制御するものである。   In this embodiment, the first filler 2 is filled in the underground cavity 1 with water at a predetermined interval, and the partition walls are formed at the predetermined interval by the first filler 2. In the case of closing the underground cavity 1 by the underground cavity filling method of filling the soil, a soil cement composed of a hardener containing at least earth and sand and cement and water is adopted as the first filler 2. By mixing a quick setting agent into the filler 2, the fluidity of the first filler 2 in water is controlled.

第一充填材2及び第二充填材3としては、土砂,セメント及び水から成る同様のソイルセメントが採用されている。従って、隔壁と第二充填材3がなじみ易く、更に、材料の調達等が容易でそれだけコスト安となる。   As the 1st filler 2 and the 2nd filler 3, the same soil cement which consists of earth and sand, cement, and water is employ | adopted. Therefore, the partition wall and the second filler 3 are easily compatible, and further, the procurement of the material is easy and the cost is reduced accordingly.

土砂としては、建設発生土を用いるのが環境性・コスト性の面から好ましい。尚、土砂には、細粒分として、シルト及び粘土(粒径75μm未満)があり、粗粒分として砂(粒径75μm以上2mm未満)及び礫(粒径2mm以上)があるが、細粒分が少ないと、水中で材料分離を起こす場合があるため、その場合にはベントナイトやセルロース系等の増粘剤を添加して水中分離性を制御する。また、本実施例でいうソイルセメントは、流動化処理土を含む概念である。   As the earth and sand, it is preferable to use construction-generated earth from the viewpoint of environment and cost. The earth and sand include silt and clay (particle size less than 75 μm) as fine particles, and sand (particle size 75 μm or more and less than 2 mm) and gravel (particle size 2 mm or more) as coarse particles. If the content is small, material separation may occur in water. In that case, a thickener such as bentonite or cellulose is added to control the water separation property. Moreover, the soil cement as used in a present Example is the concept containing fluidized soil.

本実施例は、上記ソイルセメントを基本材とし、このソイルセメントの水中での流動性を、以下のa〜fのうちの1つ若しくは複数を適宜使用することで制御している。   In this embodiment, the soil cement is used as a basic material, and the fluidity of the soil cement in water is controlled by appropriately using one or more of the following a to f.

a 空気中フローと水中フローとの関連付け
平滑な盤上においたφ8cm,高さ8cmの円筒シリンダーに充填材を満たしてシリンダーを引き上げ、広がった充填材の直径((JHS A 313)に基づくフロー値)が、空気中及び水中のそれぞれでどのような相関関係を有するかを材料(配合)毎に測定して、現場の状況に応じて予め測定したデータに基づいて、空気中フローから水中フローを予測して適宜な材料(配合)を用いることができるようにしておく。例えば、セメント量や遅延剤・流動化剤の配合量を変えた各サンプルの空気中フロー及び水中フローを測定して、空気中フローと水中フローの相関関係(最小二乗法を用いて得られた直線等)を把握しておく。
a Correlation between in-air flow and underwater flow Filling a cylindrical cylinder with a diameter of 8cm and height 8cm on a smooth board, filling the filler, lifting the cylinder, and the flow value based on the expanded filler diameter ((JHS A 313) ) Measure for each material (formulation) what kind of correlation each has in the air and in water, and based on the data measured in advance according to the situation at the site, An appropriate material (formulation) can be used in anticipation. For example, the air flow and underwater flow of each sample with varying amounts of cement and retarder / fluidizing agent were measured, and the correlation between the air flow and the underwater flow (obtained using the least squares method) Keep track of straight lines).

これにより、空気中フローから、水中フローを予測でき、目視が困難な地下空洞1の水中での大まかな挙動を推測することができ、必要な材料量等をある程度予測することが可能となる。   As a result, the underwater flow can be predicted from the air flow, the rough behavior of the underground cavity 1 that is difficult to visually observe can be estimated, and the necessary amount of material and the like can be predicted to some extent.

また、第一充填材2においては、安息角(平均した安定勾配)もあわせて測定しておき、安息角が好ましくは30°〜60°となるような材料(配合)を用いるようにする。   Moreover, in the 1st filler 2, the angle of repose (average stable gradient) is also measured, and the material (formulation) in which the angle of repose is preferably 30 ° to 60 ° is used.

b 急結剤及び凝結調整剤
急結剤は、充填材の流動性を確保しつつ、より短時間で固化させるために混入されるものであり、凝結調整剤は急結剤の固化作用を遅らせるために混入させるものである。急結剤と凝結調整剤の量及び種類により、固化時間を制御する。尚、急結剤及び凝結調整剤も、上記フロー値と同様、予め種々のデータを採取しておき、現場の状況(地下空洞1内の水の量や建設発生土の性状)に応じて適宜な混入量を設定できるようにしておく(以下c,dにおいても同様)。
b. Quick setting agent and setting agent The setting agent is mixed in order to solidify in a shorter time while ensuring the fluidity of the filler, and the setting agent delays the setting action of the setting agent. It is to be mixed for this purpose. The solidification time is controlled by the amount and type of the rapid setting agent and the setting modifier. As for the quick setting agent and the setting adjuster, various data are collected in advance in the same manner as the above flow value, and are appropriately selected according to the situation at the site (the amount of water in the underground cavity 1 and the properties of the soil generated by construction). It is possible to set an appropriate mixing amount (hereinafter the same applies to c and d).

急結剤としては、例えば、アルミン酸ナトリウム,炭酸ナトリウム,カルシウムアルミネート,ケイ酸ナトリウム(水ガラス)を用いることができる。特にカルシウムアルミネート系を主材とするのが好ましい。本実施例においては、特に流動性を小さくして材料のロスを抑制できるように第一充填材2にはカルシウムアルミネート系の急結剤とオキシカルボン酸系の凝結調整剤が混入されている。尚、第一充填材2に急結剤のみを混入して流動性を制御しても良い。   As the quick setting agent, for example, sodium aluminate, sodium carbonate, calcium aluminate, sodium silicate (water glass) can be used. In particular, it is preferable to use a calcium aluminate system as a main material. In the present embodiment, a calcium aluminate-based rapid setting agent and an oxycarboxylic acid-based setting modifier are mixed in the first filler 2 so as to reduce the loss of material by reducing the fluidity. . Note that the fluidity may be controlled by mixing only the rapid setting agent into the first filler 2.

c 流動化剤及び遅延剤
流動化剤は充填材の流動性をより大きくするものであり、遅延剤はその流動性を長時間維持するために混入されるものである。混入する流動化剤及び遅延剤の量及び種類により、充填材の流動性とその保持時間を制御する。
c Fluidizer and retarder The fluidizer increases the fluidity of the filler, and the retarder is mixed to maintain the fluidity for a long time. The fluidity and retention time of the filler are controlled by the amount and type of the fluidizing agent and retarder to be mixed.

流動化剤及び遅延剤としては、例えば、ポリオール複合体,アルキルアルルスルホン酸塩,メラミンスルホン酸塩,ナフタリンスルホン酸塩,リグニンスルホン酸及びその誘導体若しくはオキシカルボン酸塩等を主成分とするものを用いることができる。本実施例においては、特に流動性を大きくして地下空洞1の奥まで充填されるように第二充填材3にはオキシカルボン酸塩から成る流動化剤と高縮合芳香族スルホン酸塩を主成分とする遅延剤が混入されている。尚、第二充填材3に遅延剤のみを混入して流動性を制御しても良い。   As the fluidizing agent and retarder, for example, those mainly composed of a polyol complex, an alkyl allyl sulfonate, a melamine sulfonate, a naphthalene sulfonate, a lignin sulfonic acid and a derivative thereof, or an oxycarboxylate are used. Can be used. In this example, the second filler 3 is mainly composed of a fluidizing agent composed of an oxycarboxylate and a highly condensed aromatic sulfonate so as to increase the fluidity and fill the depth of the underground cavity 1. A retarder as a component is mixed. Note that the fluidity may be controlled by mixing only the retarder into the second filler 3.

d 重量調整材
重量調整材は、充填材に混入(組成材を置換)することで、例えば軽量材料を混入した場合には、充填材全体を軽量化して重量に基づく流動性を小さくし、重量材料を混入した場合には、充填材全体を重量化して重量に基づく流動性を大きくする(更に、地下空洞1内壁への密着性及び外力への抵抗性を大きくする)ために用いられる。
d Weight adjusting material The weight adjusting material is mixed into the filler (replaces the composition material). For example, when a lightweight material is mixed, the weight of the entire filler is reduced and the fluidity based on the weight is reduced. When the material is mixed, it is used to increase the fluidity based on the weight by increasing the weight of the entire filler (further increasing the adhesion to the inner wall of the underground cavity 1 and the resistance to external force).

軽量材料としては、発泡スチロール(球状ビーズ)や軽量骨材等を用いることができる。また、重量材料としては、鉱砕スラグ等を用いることができる。   As a lightweight material, a polystyrene foam (spherical bead), a lightweight aggregate, etc. can be used. Further, as the heavy material, crushed slag or the like can be used.

e 繊維
繊維を充填材に混入してせん断抵抗を付加することで、流動性を抑えることができる。
e Fiber Fluidity can be suppressed by adding fiber to the filler and adding shear resistance.

繊維としては、鋼繊維,ガラス繊維,パルプ繊維若しくは樹脂系繊維(アラミド繊維,ビニロン繊維若しくはポリプロピレン繊維等)を用いることができる。尚、混合割合は、充填材100重量部(繊維材料を除く)に対して、1.0〜10重量%が好適である。1%以下では求める効果が期待できず、10%以上では、繊維凝集物(ダマ)ができやすく、混練作業の効率が悪くなる。また、材質の均一性も確保しにくくなるからである。   As the fiber, steel fiber, glass fiber, pulp fiber, or resin fiber (aramid fiber, vinylon fiber, polypropylene fiber, or the like) can be used. The mixing ratio is preferably 1.0 to 10% by weight with respect to 100 parts by weight of the filler (excluding the fiber material). If it is 1% or less, the desired effect cannot be expected, and if it is 10% or more, fiber aggregates (dama) are easily formed, and the efficiency of the kneading work is deteriorated. In addition, it is difficult to ensure the uniformity of the material.

f 筒袋状体
筒袋状体は、第一充填材2にのみ使用されるもので、型枠代わりとして第一充填材2の流動性を抑制するものである。また、鋼材等の高強度の材料で形成した場合には隔壁全体を外骨格として包むことで強度を向上させることができる。
f Tubular bag-shaped body The tubular bag-shaped body is used only for the first filler 2 and suppresses the fluidity of the first filler 2 as a substitute for the mold. In addition, when formed of a high-strength material such as steel, the strength can be improved by wrapping the entire partition wall as an exoskeleton.

筒袋状体としては、第一充填材2を充填し得る可撓性素材からなる筒状(有底でも無底でも良い)の袋(型枠)であり、樹脂材若しくは鋼材をメッシュ状に形成したものや、ゴム素材を風船状に形成したものなどを用いることができる。   The cylindrical bag-like body is a cylindrical bag (form frame) made of a flexible material that can be filled with the first filler 2, and a resin material or a steel material is meshed. A formed one or a rubber material formed in a balloon shape can be used.

以上の手法を用いて流動性を制御した第一充填材2及び第二充填材3を用いて地下空洞1を閉塞する具体的方法について説明する。   A specific method for closing the underground cavity 1 using the first filler 2 and the second filler 3 whose fluidity is controlled using the above-described method will be described.

図1に図示したように、例えば過去に地下用水路として用いられていた廃地下用水路から成る水10が溜まった地下空洞1を閉塞する場合、先ず、地上から廃地下用水路に向かって略垂直に孔4を複数穿設すると共に、必要により孔壁を保持するために、この孔4に金属製(若しくは樹脂製)の管体5を挿入する。尚、図中、符号6は材料充填用車両、7は材料充填用の配管及びホースである。   As shown in FIG. 1, when closing the underground cavity 1 in which the water 10 made up of a waste underground water channel that has been used as an underground water channel in the past, for example, is closed, first, a hole is formed substantially vertically from the ground toward the waste underground water channel. A plurality of holes 4 are formed, and a metal (or resin) tube 5 is inserted into the hole 4 in order to hold the hole wall if necessary. In the figure, reference numeral 6 denotes a material filling vehicle, and 7 denotes a material filling pipe and hose.

この孔4(管体5)を通じて、第一充填材2を隔壁を設置したい所定間隔で充填した後、該隔壁間に第二充填材3を充填する。尚、第一充填材2の流動性が小さく且つ重量が大きい程、第二充填材3からの外力に対する抵抗性が向上するため、より広い間隔で隔壁を形成することが可能となり、より少ない作業工程・作業時間で地下空洞1を閉塞することが可能となるが、流動性を小さくするためには重量を小さくする必要があり、両性質は相反する関係にある。この点、本実施例においては、第一充填材2に急結剤を混入することで、材料の重量を大きくしても流動性を抑えることが可能となり、従って、流動性が小さく且つ重量が大きい第一充填材2を得ることが可能となる。   The first filler 2 is filled through the holes 4 (tubes 5) at predetermined intervals where the partition walls are desired to be installed, and then the second filler 3 is filled between the partition walls. In addition, since the resistance to the external force from the second filler 3 is improved as the fluidity of the first filler 2 is smaller and the weight is larger, the partition walls can be formed at wider intervals, and less work is required. Although the underground cavity 1 can be closed in the process / working time, it is necessary to reduce the weight in order to reduce the fluidity, and both properties are in a contradictory relationship. In this regard, in this embodiment, by mixing the quick setting agent into the first filler 2, it becomes possible to suppress the fluidity even if the weight of the material is increased, and therefore the fluidity is small and the weight is small. A large first filler 2 can be obtained.

具体的には、第一充填材2を充填して地下空洞1の所定位置に隔壁を形成した後、一方の隔壁側の孔4から他方の隔壁に向かって第二充填材3を充填していき、第二充填材3を充填する孔4を順次移動させていく。尚、図中符号3aは第一回目に充填された第二充填材3、3bは第二回目に充填された第二充填材3である(従って、図1においては第二充填材3の第三回目の充填を示している。)。   Specifically, after filling the first filler 2 to form a partition at a predetermined position in the underground cavity 1, the second filler 3 is filled from the hole 4 on one partition side toward the other partition. Then, the holes 4 filled with the second filler 3 are sequentially moved. In the figure, reference numeral 3a denotes a second filler 3 and 3b filled in the first time, and reference numeral 3b denotes a second filler 3 filled in the second time (therefore, in FIG. Shows the third filling.)

この際、第二充填材3を充填していない他の孔4からは、地下空洞1に溜まった水10が押し出されることになる。即ち、前記孔4は、充填材を充填するための充填孔であり且つ地下空洞1内の水を排出する排水孔でもある。   At this time, the water 10 accumulated in the underground cavity 1 is pushed out from the other holes 4 not filled with the second filler 3. That is, the hole 4 is a filling hole for filling the filler and is also a drainage hole for discharging the water in the underground cavity 1.

尚、第二充填材3を充填する際には、該第二充填材3の流動性に応じて、前記隔壁側の孔4から順次充填しても良いし、流動性が大きい場合には、1つおきに充填する等、適宜充填していく。例えば、第二充填材3の流動性が大きく且つ重量が小さい程、少ない孔で地下空洞1に隅々まで第二充填材3を充填することができ、より少ない作業工程・作業時間で地下空洞1を閉塞することが可能となるが、流動性を大きくするためには重量を大きくする必要があり、両性質は相反する関係にある。この点、本実施例においては、第二充填材3に流動化剤及び遅延剤を混入することで、材料の重量が小さくても流動性が大きく、流動性を長時間にわたり維持することが可能となり、従って、流動性が大きく且つ重量が小さい第二充填材3を得ることが可能となる。   In addition, when filling the second filler 3, depending on the fluidity of the second filler 3, it may be sequentially filled from the holes 4 on the partition wall side, or if the fluidity is large, Fill every other time. For example, the larger the fluidity and the smaller the weight of the second filler 3 are, the more the second filler 3 can be filled into the underground cavity 1 with fewer holes, and the underground cavity can be filled with fewer work steps and work time. 1 can be closed, but in order to increase fluidity, it is necessary to increase the weight, and both properties are in a contradictory relationship. In this respect, in this embodiment, by mixing the fluidizing agent and retarder into the second filler 3, the fluidity is large even if the weight of the material is small, and the fluidity can be maintained for a long time. Therefore, it is possible to obtain the second filler 3 having high fluidity and low weight.

以上の工程を繰り返し、地下空洞1内の水が全て抜け、地下空洞1内が全て第二充填材3で置換されることで施工終了となる。   By repeating the above steps, all of the water in the underground cavity 1 is drained, and the entire interior of the underground cavity 1 is replaced with the second filler 3 to complete the construction.

尚、本実施例においては、上述のように第一充填材2により地下空洞1に隔壁を形成した後、該隔壁間に第二充填材3を充填する方法について説明したが、例えば第一充填材2と同様の充填材を、図2に図示したような短い間隔で地下空洞1に充填して多数の隔壁Xを形成し、該隔壁Xにより地下空洞1による地盤陥没を阻止しても良い。更に、この場合には地下水の動き(地下空洞1中の水10の動き)を止めることができる。   In the present embodiment, the method of filling the second filler 3 between the partition walls after forming the partition walls in the underground cavity 1 with the first filler 2 as described above has been described. A filler similar to the material 2 may be filled into the underground cavity 1 at short intervals as shown in FIG. 2 to form a large number of partition walls X, and the partition X may prevent the subsidence of the ground due to the underground cavity 1. . Furthermore, in this case, the movement of the groundwater (the movement of the water 10 in the underground cavity 1) can be stopped.

本実施例は上述のようにするから、地下空洞1に所定間隔で第一充填材2を充填して該第一充填材2から成る隔壁を所定間隔で形成した後、該隔壁間に第二充填材3を充填する際、第一充填材2の比重は第二充填材3と同等であり、従って、特許文献1に比し隔壁と地下空洞1内壁との摩擦抵抗が向上し、第二充填材3を充填した状態でも安定的に第二充填材3からの圧力を受けることができ、それだけ安定性が向上する。   Since the present embodiment is as described above, after filling the underground cavity 1 with the first filler 2 at a predetermined interval to form a partition made of the first filler 2 at a predetermined interval, When filling the filler 3, the specific gravity of the first filler 2 is equal to that of the second filler 3, and therefore, the frictional resistance between the partition wall and the inner wall of the underground cavity 1 is improved as compared with Patent Document 1, and the second Even in a state where the filler 3 is filled, the pressure from the second filler 3 can be stably received, and the stability is improved accordingly.

また、第一充填材2を充填する際、例えば予め種々の急結剤を任意の量混合した第一充填材2の流動性を測定・記録しておき、地下空洞1の状態に応じて適宜流動性を設定調整することができるから、第一充填材2の水中での挙動を予測することができ、それだけ第一充填材2を無駄なく効率的に使用して隔壁を形成することができる。   In addition, when filling the first filler 2, for example, the fluidity of the first filler 2 in which various amounts of quick setting agents are mixed in advance is measured and recorded, and the fluidity of the first filler 2 is appropriately determined according to the state of the underground cavity 1. Since the fluidity can be set and adjusted, the behavior of the first filler 2 in water can be predicted, and the partition wall can be formed by using the first filler 2 efficiently without waste. .

更に、水中フロー及び空気中フローや、重量調整材若しくは繊維による流動性の変化も同様に予め測定・記録しておき、適宜流動性を設定調整することができ、極めて柔軟に第一充填材2及び第二充填材3の流動性等を設定でき、現場の状況に応じて最適な流動性に設定調整可能となる。   Furthermore, underwater flow and in-air flow, and the change in fluidity due to the weight adjusting material or fiber can be similarly measured and recorded in advance, and the fluidity can be set and adjusted as appropriate, allowing the first filler 2 to be very flexible. And the fluidity etc. of the 2nd filler 3 can be set, and it becomes possible to set and adjust to the optimal fluidity according to the situation of the field.

従って、本実施例は、隔壁の強度及び安定性を向上させることができ、且つ、この隔壁を形成する第一充填材を効率良く使用可能な極めて実用性に秀れたものとなる。   Therefore, the present embodiment can improve the strength and stability of the partition wall, and is extremely practical in that the first filler forming the partition wall can be used efficiently.

本実施例の概略説明断面図である。It is a schematic explanatory sectional drawing of a present Example. 別例の概略説明断面図である。It is general | schematic explanatory sectional drawing of another example.

符号の説明Explanation of symbols

1 地下空洞
2 第一充填材
3 第二充填材
4 孔
1 underground cavity 2 first filler 3 second filler 4 hole

Claims (10)

水のある地下空洞に所定間隔で第一充填材を充填して該第一充填材により隔壁を形成した後、この隔壁間に第二充填材を充填して前記地下空洞を閉塞する地下空洞閉塞方法であって、地上から前記地下空洞に向かって孔を所定間隔で複数穿設し、続いて、少なくとも土砂及びセメントを含む硬化剤と水とから成るソイルセメントで構成される前記第一充填材を該第一充填材に急結材を混入することで該第一充填材の水中での流動性を制御しつつ前記孔を通じて前記地下空洞に導入し前記隔壁を所定間隔で形成し、続いて、少なくとも土砂及びセメントを含む硬化剤と水とから成るソイルセメントで構成される前記第二充填材を該第二充填材に遅延材を混入することで該第二充填材の水中での流動性を制御しつつ前記隔壁間に位置する前記孔を通じて前記地下空洞に導入し、この第二充填材を前記一方の隔壁側の孔から導入し、前記地下空洞中の水をその余の前記孔から排出し、この第二充填材を導入する前記孔を順次他方の隔壁側の孔へ変更することで前記地下空洞中の水を排出しつつ前記第一充填材及び第二充填材を前記地下空洞に充填し該地下空洞を閉塞することを特徴とする地下空洞閉塞方法。 Filling the underground cavity with water with the first filler at a predetermined interval and forming a partition with the first filler, then filling the second filler between the partitions and closing the underground cavity A first filling material comprising a soil cement comprising a plurality of holes at predetermined intervals from the ground toward the underground cavity, and subsequently comprising a hardener containing at least earth and sand and cement and water. the form of the partition wall is introduced into the underground cavity through said hole while controlling the flow of the water that in the first filling material to incorporate quick-material to the first filler at predetermined intervals, followed by The fluidity of the second filler in water by mixing the second filler with the second filler composed of a soil cement composed of at least a hardener containing earth and sand and cement and water. While controlling the hole located between the partition walls The second filler is introduced from the hole on the one partition wall side, the water in the underground cavity is discharged from the remaining hole, and the second filler is introduced. By sequentially changing the hole to the hole on the other partition wall side, discharging the water in the underground cavity, filling the underground cavity with the first filler and the second filler, and closing the underground cavity A characteristic underground clogging method. 請求項1記載の地下空洞閉塞方法において、前記急結剤として、カルシウムアルミネート系のものが採用されていることを特徴とする地下空洞閉塞方法。 In Cavern blockage method according to claim 1, wherein the quick-setting admixture, underground cavity occlusion method characterized in that those of calcium aluminate is employed. 請求項1,2いずれか1項に記載の地下空洞閉塞方法において、前記第一充填材に、重量調整材を混入することで、この第一充填材の水中での流動性を制御することを特徴とする地下空洞閉塞方法。 The underground cavity closing method according to any one of claims 1 and 2, wherein the fluidity of the first filler in water is controlled by mixing a weight adjusting material into the first filler. A characteristic underground clogging method. 請求項3記載の地下空洞閉塞方法において、前記重量調整材として、発泡スチロール若しくは鉱砕スラグが採用されていることを特徴とする地下空洞閉塞方法。4. The underground cavity closing method according to claim 3, wherein foamed polystyrene or crushed slag is adopted as the weight adjusting material. 請求項1〜いずれか1項に記載の地下空洞閉塞方法において、前記第一充填材に、有機繊維若しくは無機繊維を混入することで、この第一充填材の水中での流動性を制御することを特徴とする地下空洞閉塞方法。 The underground cavity closing method according to any one of claims 1 to 4 , wherein the fluidity of the first filler in water is controlled by mixing organic fibers or inorganic fibers into the first filler. A method of closing an underground cavity characterized by the above . 請求項5記載の地下空洞閉塞方法において、前記有機繊維として、パルプ繊維、アラミド繊維、ビニロン繊維若しくはポリプロピレン繊維が採用されていることを特徴とする地下空洞閉塞方法。6. The underground cavity closing method according to claim 5, wherein pulp fibers, aramid fibers, vinylon fibers or polypropylene fibers are employed as the organic fibers. 請求項5記載の地下空洞閉塞方法において、前記無機繊維として、鋼繊維若しくはガラス繊維が採用されていることを特徴とする地下空洞閉塞方法。6. The underground cavity closing method according to claim 5, wherein steel fibers or glass fibers are employed as the inorganic fibers. 請求項1〜いずれか1項に記載の地下空洞閉塞方法において、前記第一充填材2を、可撓性素材から成る筒袋状体に収納した状態で前記地下空洞に充填することを特徴とする地下空洞閉塞方法。 The underground cavity closing method according to any one of claims 1 to 7 , wherein the first filler 2 is filled in the underground cavity in a state of being housed in a cylindrical bag-like body made of a flexible material. And the underground cavity closing method. 請求項1〜8いずれか1項に記載の地下空洞閉塞方法において、前記第二充填材に、流動化剤と遅延剤とを混入することで該第二充填材の水中での流動性を制御することを特徴とする地下空洞閉塞方法。The underground cavity closing method according to any one of claims 1 to 8, wherein the fluidity of the second filler in water is controlled by mixing the second filler with a fluidizing agent and a retarder. A method of closing an underground cavity, characterized by: 請求項1〜いずれか1項に記載の地下空洞閉塞方法において、前記土砂は建設発生土であることを特徴とする地下空洞閉塞方法。 In Cavern blockage method according to any one of claims 1-9, underground cavity occlusion wherein said soil is construction waste soil.
JP2006182675A 2006-06-30 2006-06-30 Cavity closing method Active JP4334553B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006182675A JP4334553B2 (en) 2006-06-30 2006-06-30 Cavity closing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006182675A JP4334553B2 (en) 2006-06-30 2006-06-30 Cavity closing method

Publications (2)

Publication Number Publication Date
JP2008013910A JP2008013910A (en) 2008-01-24
JP4334553B2 true JP4334553B2 (en) 2009-09-30

Family

ID=39071196

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006182675A Active JP4334553B2 (en) 2006-06-30 2006-06-30 Cavity closing method

Country Status (1)

Country Link
JP (1) JP4334553B2 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5166132B2 (en) * 2008-06-13 2013-03-21 エースコン工業株式会社 Underground cavity filling method
JP5478386B2 (en) * 2010-07-02 2014-04-23 株式会社不動テトラ Improving method for ground with underground cavity
JP6230883B2 (en) * 2013-11-19 2017-11-15 徳倉建設株式会社 Delay hardening type fluidized soil and filling method of underground cavities
JP6424060B2 (en) * 2014-10-10 2018-11-14 株式会社竹中工務店 How to rebuild a structure
KR101938460B1 (en) * 2016-12-21 2019-01-14 한국광해관리공단 Stabilization method of mine cavern
JP6635603B2 (en) * 2017-07-07 2020-01-29 飛島建設株式会社 Underground cavity filling method
JP6936720B2 (en) * 2017-12-12 2021-09-22 ケミカルグラウト株式会社 Underground pipeline filling method
JP7492846B2 (en) * 2020-04-10 2024-05-30 徳倉建設株式会社 Reinforcement structure and method for underground cavity
CN114320457A (en) * 2022-01-10 2022-04-12 安徽马钢张庄矿业有限责任公司 Underground goaf multipoint filling and goaf water filtering and draining method
CN116876502A (en) * 2023-07-24 2023-10-13 河南绿岩工程科技有限公司 Method for disposing waste civil air defense engineering by using fluid filling material

Also Published As

Publication number Publication date
JP2008013910A (en) 2008-01-24

Similar Documents

Publication Publication Date Title
Sivakugan et al. Underground mine backfilling in Australia using paste fills and hydraulic fills
JP4334553B2 (en) Cavity closing method
CN103889918B (en) The foamed cement composition comprising metal silicide in missile silo operation can be used in
JP6006381B1 (en) Ready-made pile embedding method
KR101589298B1 (en) Permeable compacting grouting method using real-time optimization auto grouting system
KR20210111018A (en) Tunnel grouting reinforcement method
Pusch et al. A talc-based cement-poor concrete for sealing boreholes in rock
JP4972661B2 (en) Ground injection method
KR101235797B1 (en) Light weight fill materials with fluidity and resistance to segregation
CA2827111A1 (en) Submerged void filling
JP5294109B2 (en) Radioactive waste disposal tunnel
JP4762200B2 (en) Ground strengthening method by simultaneous multi-point injection
KR102127121B1 (en) Co-repair unit for on-site pouring of filling material
JP2015045188A (en) Underground seismic isolation wall structure and construction method
KR102393263B1 (en) Method for filling cavity formed under road using low flowrate filler
JP2008002076A (en) Ground strengthening method and press-fit management method
JP4074570B2 (en) Vibration isolation wall and its construction method
JP7492846B2 (en) Reinforcement structure and method for underground cavity
JP2016204959A (en) Construction method of underground base-isolation wall
CN108076650B (en) Construction elements for constructing tunnels, tunnels including such elements and methods for constructing such elements and such tunnels
KR100565866B1 (en) Internal cavity filling system for waste structure and filling method using same
KR101991203B1 (en) extensive grout material
JP4977818B1 (en) Filler, method for producing the same, and filling method using the filler
KR20200056834A (en) Apparatus and method for ground reinforced grouting with expandable steel pipe
JP4994492B2 (en) Aggregate for filling mortar and method for producing the same

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20081010

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20081023

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20081222

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20090528

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20090623

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120703

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4334553

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130703

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250