JP4419456B2 - Method of joining reinforced concrete member and steel pipe concrete - Google Patents
Method of joining reinforced concrete member and steel pipe concrete Download PDFInfo
- Publication number
- JP4419456B2 JP4419456B2 JP2003188032A JP2003188032A JP4419456B2 JP 4419456 B2 JP4419456 B2 JP 4419456B2 JP 2003188032 A JP2003188032 A JP 2003188032A JP 2003188032 A JP2003188032 A JP 2003188032A JP 4419456 B2 JP4419456 B2 JP 4419456B2
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- concrete
- reinforced concrete
- joining
- reinforcing bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims description 57
- 239000010959 steel Substances 0.000 title claims description 57
- 239000004567 concrete Substances 0.000 title claims description 40
- 239000011150 reinforced concrete Substances 0.000 title claims description 15
- 238000005304 joining Methods 0.000 title claims description 11
- 238000000034 method Methods 0.000 title claims description 11
- 230000003014 reinforcing effect Effects 0.000 claims description 10
- 238000009412 basement excavation Methods 0.000 claims description 8
- 238000005520 cutting process Methods 0.000 claims description 2
- 238000010276 construction Methods 0.000 description 9
- 238000003466 welding Methods 0.000 description 4
- 238000004804 winding Methods 0.000 description 4
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 230000000669 biting effect Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 230000002093 peripheral effect Effects 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 229910000975 Carbon steel Inorganic materials 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Foundations (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、鉄筋コンクリート部材と鋼管コンクリートとの接合方法に関する。
【0002】
【従来の技術】
例えばフーチングや地中梁を設けずに、一柱一杭基礎構造の中高層建物を構築する工法は、例えば線路を横切ったりや、プラットホーム上での施工など、地中工事に制約を受ける場合に好適であり、また杭基礎工事の後、直ちに鉄骨工事に着手できるため工期も短縮できる利点がある。
【0003】
この構造において、杭基礎は、現場打ちされるコンクリート杭基礎の上部外周を杭頭補強鋼管により覆い、この補強鋼管の内部に鉄骨柱の下端を埋込状態に一体化することで、杭頭と柱との剛接合を図ることができる。
【0004】
ところで、コンクリート杭基礎の上部を前記鋼管で覆う場合、比較的厚みが薄く、内面平滑なリブ無し普通鋼管を用いたのでは、コンクリートと鋼管内面との間の付着が期待できないため、例えば、鋼管内部全域に杭鉄筋を通し、コンクリートに対する付着を確保することが必要であり、施工が煩雑となる(参考文献1)。
【0005】
これに対し、内面リブ付き鋼管を用いた場合には、内面の凹凸による食い付き効果により、コンクリート杭の基礎側に建て込まれている杭鉄筋をその径の45倍程度鋼管側に延長し、コンクリートで一体化すれば、充分な定着性が得られるとされている(参考文献2)。
【0006】
【参考文献1】
建築技術性能証明評価概要報告書
(財団法人日本建築総合試験所、2001年5月8日)
【0007】
【参考文献2】
NKTB・SKTB・KKTB・SMTB場所打鋼管コンクリート杭
(耐震杭協会)
【0008】
【発明が解決しようとする課題】
しかしながら、内面リブ付き鋼管は、圧延によりリブを設けた鋼帯をスパイラル造成法によって製造するものであるため、一般市場の流通品ではなく、入手が困難であるとともに、そのもの自体が極めて高コストである一方で、実質的に付着を生じさせたい箇所あるいは接合剛性を確保したい箇所は、コンクリート杭基礎との接合位置のみであるため、リブ付鋼管を使用することは過剰品質につながり、無駄なコストを掛けるものともなっていた。
【0009】
本発明は、以上の課題を解決するもので、その目的は、市場流通品で安価な内面にリブの無い普通鋼管を用いても、予め簡単な加工を付加するだけで、コンクリートの付着を良好に行え、また鉄筋工事なども省力化できるようにした鉄筋コンクリート部材と鋼管コンクリートとの接合方法を提供するものである。
【0010】
【課題を解決するための手段】
前記目的を達成するために本発明は、地盤を掘削し、この掘削孔に鉄筋を建て込むと共に、該掘削孔の上部に、内面にリブの無い普通鋼管を挿入し、前記掘削孔にコンクリートを前記普通鋼管の内部まで連続打設することにより、鉄筋コンクリート部材と鋼管コンクリートとを一体に接合する方法であって、前記鋼管の鉄筋コンクリート構造物に対する接合端部内周に予め、鋼製の棒材をコイル状に巻き、このコイルを一巻きあたり1カ所で切断して製作したリングの切断端部同士を違いに引き寄せて同一面内でとじ合わせてなる支圧リングを固定しておくことを特徴とする。従って、本発明では、支圧リングがコンクリートに対する引っかかりとなって、鉄筋コンクリート部材と鋼管コンクリートとの定着を図ることができる。
【0011】
本発明において、前記支圧リングを、前記鋼管の前記接合端より所定間隔をおいた位置に固定することにより、リングの上下両側にて施工の容易な隅肉溶接をすることができる。
【0012】
また、前記鉄筋の鋼管内部に対する突出長さが鉄筋の直径の約45倍であることにより、内面リブ付き鋼管を用いたのと同様な定着性を得ることができる。
【0013】
【発明の実施の形態】
以下、本発明の好ましい実施の形態につき、添付図面を参照して詳細に説明する。図1は本発明に係る接合方法により接合した接合構造を示す。同図において、地盤E中には現場打コンクリートによる鉄筋コンクリート杭基礎1が造成され、このコンクリート杭基礎1の上部には同一軸上に杭頭補強鋼管2が建て込まれ、その内部にコンクリート杭基礎1内に建て込まれた籠状の鉄筋3を突出させた状態でコンクリート4によりコンクリート杭基礎1の上部に連続して一体に接合される。
【0014】
コンクリート杭基礎1は、一般に泥水を用いて地盤E中を掘削し、この掘削孔内に籠状の鉄筋3を建て込んだ後、トレミー管などを用いてコンクリート4を打設し、泥水と置換えることによって得られるものであり、鉄筋3はその高さ方向に直径の45倍程度の長さで鋼管2側に突出配置されている。
【0015】
また、前記鋼管2は鉄筋3の建込みと同時に掘削孔内の上部側に建て込まれるもので、コンクリート4を鋼管2の内部まで連続打設することによって、鋼管コンクリート部材として杭基礎1の上部に一体化される。
【0016】
この鋼管2は通常の厚みの薄い内面リブの無いJIS鋼管であるが、その底部内周壁には、予め支圧リング5が溶接または接着剤による接着等により固定されている。この支圧リング5は、例えば断面25mm角程度の曲成された角棒であり、図2(a)に示すように、角形断面の鋼材をベンダー及び巻付け治具などを用いてコイル状に巻き、そのコイル5’の一巻き方向1カ所で切離することにより、複数のリング5”を製作し、次いでリング5”の切断端部同士を互いに引寄せて同一面内でとじ合せることで、ほぼ真円のものが形成される。
【0017】
そして、巻付け治具の径及び角形鋼材の幅に応じて、リング5の外径を鋼管10の内周径に一致させ、これを(b)に示すように鋼管10の底部よりやや上部位置(例えば25mm〜50mm)に嵌合し、次いで、(c)及び、図3に一部拡大して示すように、リング5の上下周囲と鋼管10の内周部とを施工の容易な隅肉溶接6により一体化したものであり、これら一連の作業は、施工現場などでも簡単な器具を用いて容易かつ安価に実施できる。
【0018】
以上の加工を予め鋼管2に施しておくことにより、支圧リング5が鋼管2内に打設されたコンクリート4に対する引っかかりとなって、鋼管2とコンクリート4の付着とともに上下方向に応力伝達がなされる。したがって、内面リブ付き鋼管を用いた場合と同様に、コンクリート杭基礎1の鉄筋3を前述のごとくその直径の45倍程度鋼管1内に突出させておくことで、充分な応力伝達が可能となるのである。
【0019】
なお、前記実施形態では、支圧リング5として角形断面のものを用いたが、鉄筋用鋼棒などを利用した断面丸形や、その他断面台形状、断面三角形状、断面コ字形のチャンネル形状またはL形のアングル形状、断面扁平な長方形状など各種断面形状を選択でき、それぞれの断面寸法及び断面形状は、鋼管コンクリートの接合部に要求される曲げモーメントや、コンクリートとの食い付き性に最も適合した設計とすることができる。
【0020】
また、前記実施形態では、コンクリート杭基礎の上部を杭頭補強鋼管により一体に覆った場合を示したが、その上下逆であってもよいし、柱、梁などの躯体一般に適用できることも勿論である。
【0021】
【発明の効果】
以上の説明により明らかなように、本発明による鉄筋コンクリート部材と鋼管コンクリートとの接合方法にあっては、市場流通品で安価な内面にリブの無いJIS普通鋼管を用いても、予め簡単な加工を付加するだけでコンクリートの付着を良好に行え、鉄筋工事なども省力化できる。
【図面の簡単な説明】
【図1】本発明を杭基礎に適用した場合を示す断面図及びそのA−A線〜C−C線における平断面図である。
【図2】(a)〜(c)は同鋼管に支圧リングを取付ける手順を示す部分斜視図である。
【図3】図2(c)のD部拡大断面図である。
【符号の説明】
1 鉄筋コンクリート杭基礎(鉄筋コンクリート部材)
2 鋼管
3 鉄筋
4 コンクリート
5 支圧リング
6 溶接[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a method for joining a reinforced concrete member and steel pipe concrete.
[0002]
[Prior art]
For example, a construction method that constructs a medium- and high-rise building with one pillar and one pile foundation structure without providing footings or underground beams is suitable for cases where there are restrictions on underground work such as crossing tracks or construction on platforms. In addition, the steel construction work can be started immediately after the pile foundation work, so the construction period can be shortened.
[0003]
In this structure, the pile foundation is constructed by covering the upper outer periphery of the concrete pile foundation cast in the field with a pile head reinforcing steel pipe and integrating the lower end of the steel column into the embedded state inside the reinforcing steel pipe. A rigid connection with the column can be achieved.
[0004]
By the way, when the upper part of the concrete pile foundation is covered with the steel pipe, since it is not possible to expect adhesion between the concrete and the inner surface of the steel pipe by using a relatively thin ribless plain steel pipe with a smooth inner surface, for example, the steel pipe It is necessary to pass pile rebars throughout the interior to ensure adhesion to the concrete, and the construction becomes complicated (Reference 1).
[0005]
On the other hand, when using a steel pipe with an internal rib, the pile reinforcement built in the foundation side of the concrete pile is extended to the steel pipe side by about 45 times its diameter due to the biting effect due to the unevenness of the internal surface, It is said that sufficient fixing properties can be obtained by integrating with concrete (Reference Document 2).
[0006]
[Reference 1]
Building Technology Performance Certification Evaluation Summary Report (Japan Architecture Research Institute, May 8, 2001)
[0007]
[Reference 2]
NKTB / SKTB / KKTB / SMTB cast-in-place steel pipe concrete piles
[0008]
[Problems to be solved by the invention]
However, steel pipes with inner ribs are manufactured by spiral forming a steel strip provided with ribs by rolling, so they are not available on the general market, are difficult to obtain, and themselves are extremely expensive. On the other hand, the only place where you want to cause adhesion or to secure joint rigidity is the joint position with the concrete pile foundation, so the use of ribbed steel pipes leads to excessive quality and wasted cost. It was supposed to be multiplied.
[0009]
The present invention solves the above problems, and its purpose is to improve the adhesion of concrete by simply adding simple processing in advance even when using an ordinary steel pipe without ribs on the inner surface, which is a commercially available product. The present invention provides a method for joining a reinforced concrete member and steel pipe concrete, which can be carried out easily and can also save labor in rebar construction.
[0010]
[Means for Solving the Problems]
In order to achieve the above object, the present invention excavates the ground and builds a reinforcing bar in the excavation hole, and inserts a normal steel pipe without ribs on the inner surface into the excavation hole, and puts concrete in the excavation hole. wherein by continuously hitting set to the inside of the common steel, a reinforced concrete member and the steel pipe concrete a method of joining together, the coil advance, a steel rod in the joint end portion periphery for reinforced concrete structures of the steel pipe It is characterized in that the bearing ring is fixed by pulling the cut ends of the ring produced by cutting the coil at one place per turn and binding them in the same plane. . Therefore, in the present invention, the bearing ring is caught on the concrete, so that the reinforced concrete member and the steel pipe concrete can be fixed.
[0011]
In the present invention, it is possible to perform fillet welding that is easy to construct on both the upper and lower sides of the ring by fixing the bearing ring at a position spaced a predetermined distance from the joint end of the steel pipe.
[0012]
Further, since the protruding length of the reinforcing bar with respect to the inside of the steel pipe is about 45 times the diameter of the reinforcing bar, the same fixing ability as that using the steel pipe with the inner rib can be obtained.
[0013]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, preferred embodiments of the present invention will be described in detail with reference to the accompanying drawings. FIG. 1 shows a joining structure joined by a joining method according to the present invention. In the figure, a reinforced
[0014]
The
[0015]
The steel pipe 2 is built on the upper side of the excavation hole at the same time as the
[0016]
The steel pipe 2 is a normal JIS steel pipe having no thin inner ribs, and a
[0017]
Then, according to the diameter of the winding jig and the width of the square steel material, the outer diameter of the
[0018]
By applying the above processing to the steel pipe 2 in advance, the
[0019]
In the above embodiment, the
[0020]
Moreover, in the said embodiment, although the case where the upper part of the concrete pile foundation was integrally covered with the pile head reinforcement steel pipe was shown, it may be the upside-down, and of course it is applicable to general frame bodies, such as a column and a beam. is there.
[0021]
【The invention's effect】
As is clear from the above description, in the method for joining reinforced concrete members and steel pipe concrete according to the present invention, even if a JIS ordinary steel pipe without ribs on the inner surface which is a commercially available product and is inexpensive, simple processing is performed in advance. By simply adding it, the adhesion of concrete can be performed well, and labor can be saved in rebar construction.
[Brief description of the drawings]
FIG. 1 is a cross-sectional view showing a case where the present invention is applied to a pile foundation, and a plan cross-sectional view taken along the lines AA to CC.
FIGS. 2A to 2C are partial perspective views showing a procedure for attaching a bearing ring to the steel pipe.
FIG. 3 is an enlarged cross-sectional view of a D part in FIG.
[Explanation of symbols]
1 Reinforced concrete pile foundation (reinforced concrete member)
2
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003188032A JP4419456B2 (en) | 2003-06-30 | 2003-06-30 | Method of joining reinforced concrete member and steel pipe concrete |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2003188032A JP4419456B2 (en) | 2003-06-30 | 2003-06-30 | Method of joining reinforced concrete member and steel pipe concrete |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2005023573A JP2005023573A (en) | 2005-01-27 |
| JP4419456B2 true JP4419456B2 (en) | 2010-02-24 |
Family
ID=34186701
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2003188032A Expired - Fee Related JP4419456B2 (en) | 2003-06-30 | 2003-06-30 | Method of joining reinforced concrete member and steel pipe concrete |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4419456B2 (en) |
Families Citing this family (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5073640B2 (en) * | 2008-12-08 | 2012-11-14 | 新日本製鐵株式会社 | Temporary fixing device and temporary fixing method for steel pipe rod |
| JP5521557B2 (en) * | 2010-01-05 | 2014-06-18 | 株式会社大林組 | Steel pipe manufacturing method, steel pipe, and steel pipe concrete |
| CN110616706B (en) * | 2019-09-28 | 2021-03-16 | 中建三局集团有限公司 | Construction method for layering binding in large-diameter pile foundation reinforcing steel bar hole |
| CN114934442A (en) * | 2022-03-11 | 2022-08-23 | 中建三局集团有限公司 | Cast-in-place pile and steel pipe pile combined foundation construction method suitable for underwater temporary pier |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS5810936U (en) * | 1981-07-13 | 1983-01-24 | 川崎製鉄株式会社 | steel pipe pile |
| JPH0393923A (en) * | 1989-09-06 | 1991-04-18 | Mitsui Constr Co Ltd | Connection method of steel pillar of cast-in-place pile and connection structure |
| JP4351323B2 (en) * | 1999-03-30 | 2009-10-28 | 新日本製鐵株式会社 | Pile head steel pipe concrete pile and its pile head structure |
| JP3637530B2 (en) * | 2000-03-08 | 2005-04-13 | 清水建設株式会社 | Column and pile connection structure |
| JP2002021096A (en) * | 2000-07-04 | 2002-01-23 | Shimizu Corp | Building and its construction method |
| JP4684479B2 (en) * | 2001-07-06 | 2011-05-18 | 大成建設株式会社 | Structure of the connection between the pile and the pile head structure |
-
2003
- 2003-06-30 JP JP2003188032A patent/JP4419456B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2005023573A (en) | 2005-01-27 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5900885B2 (en) | Column connection structure | |
| JP3756385B2 (en) | Composite pile and its construction method | |
| JP2012067585A (en) | Lining reinforcing bar | |
| JP2008223339A (en) | Pile head strengthening method for hollow pile and pile head strengthening reinforcement material | |
| JPH08284159A (en) | Pile head joint structure | |
| JP4835918B2 (en) | Pile-column connection structure and method | |
| JP4419456B2 (en) | Method of joining reinforced concrete member and steel pipe concrete | |
| JP2001303584A (en) | Connection structure between foundation pile head and footing | |
| JP5480744B2 (en) | Foundation for structure and its construction method | |
| JP4430496B2 (en) | Pile head joint structure and construction method | |
| JP6866980B2 (en) | Joining cap and pile head joining structure | |
| JP4503387B2 (en) | Pile head joint structure and construction method | |
| JP3362019B2 (en) | Earth retaining wall and RC composite structure | |
| JP4473400B2 (en) | Foundation of construction and construction method | |
| JP2009019362A (en) | Pile-column connection structure | |
| JP4561051B2 (en) | Connection structure of steel members and steel pipe concrete | |
| JP2009102981A (en) | Prestressed concrete structure | |
| JP4649283B2 (en) | Columnar structure, pier or foundation pile using shape steel, and manufacturing method thereof | |
| JP2013002047A (en) | Steel pipe concrete composite pile | |
| JP5480745B2 (en) | Reinforcement method for existing foundations for structures | |
| JP2010095907A (en) | Reinforcing structure and reinforcing method for existing foundation | |
| JP2004244844A (en) | High section performance pile | |
| JP4716216B2 (en) | Pile head joint structure | |
| JP6865009B2 (en) | Building foundation construction method and building foundation structure | |
| JP3171042B2 (en) | Steel cage |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060523 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080808 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20081014 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20081211 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20090811 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20090925 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20091110 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20091123 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121211 Year of fee payment: 3 |
|
| R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121211 Year of fee payment: 3 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121211 Year of fee payment: 3 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20121211 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131211 Year of fee payment: 4 |
|
| LAPS | Cancellation because of no payment of annual fees |