Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4427209B2 - Kibble changer for shaft excavation equipment - Google Patents
[go: Go Back, main page]

JP4427209B2 - Kibble changer for shaft excavation equipment - Google Patents

Kibble changer for shaft excavation equipment Download PDF

Info

Publication number
JP4427209B2
JP4427209B2 JP2001181713A JP2001181713A JP4427209B2 JP 4427209 B2 JP4427209 B2 JP 4427209B2 JP 2001181713 A JP2001181713 A JP 2001181713A JP 2001181713 A JP2001181713 A JP 2001181713A JP 4427209 B2 JP4427209 B2 JP 4427209B2
Authority
JP
Japan
Prior art keywords
kibble
rope
suspension
end side
tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2001181713A
Other languages
Japanese (ja)
Other versions
JP2002371784A (en
Inventor
雅孝 魚住
祐司 長野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sumitomo Mitsui Construction Co Ltd
Original Assignee
Sumitomo Mitsui Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sumitomo Mitsui Construction Co Ltd filed Critical Sumitomo Mitsui Construction Co Ltd
Priority to JP2001181713A priority Critical patent/JP4427209B2/en
Publication of JP2002371784A publication Critical patent/JP2002371784A/en
Application granted granted Critical
Publication of JP4427209B2 publication Critical patent/JP4427209B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Description

【0001】
【発明の属する技術分野】
本発明は、掘削したずりを立坑内から搬出するために装備した複数のキブルを、スカフォード上から操作して交互に交換して使用するキブル交換装置であって、特にキブルの交換作業をスカフォード上で容易且つ安全に行うことを可能にしたキブル交換装置に関する。
【0002】
【従来の技術】
キブルを用いてずり出しする従来技術としては、一方のキブルがずり出し作業中に他方のキブルでずり積み作業を行うように、複数(通常は2台)のキブルを交互に入れ替えて使用するキブル交換方式と、容量の大きい1台の大型キブルを使用してキブル交換を行わない1キブル方式とがある。
【0003】
【発明が解決しようとする課題】
キブル交換方式の場合には、ずり積み作業の中断が少なく継続的に行われて作業能率が良い利点を有するが、キブル交換を行うための装置が必要であること、キブル交換作業には熟練作業者を必要とするなどの問題点があった。
【0004】
特に、スカフォード上でキブルロープを横移動させて懸吊位置を移動させたり、坑底に降りてキブルに対する吊りフックの吊り替え作業を人力で行うことは、作業能率の向上や安全作業の確保の点からも改善が望まれていた。
【0005】
1キブル方式の場合には、キブル交換を行うための装置が不要であること、キブル操作には熟練作業者を必要としないなどの利点を有するが、キブル巻上機などの諸設備が大型化して設備費が嵩むこと、立坑の深度が増すごとにずり積み作業の中断時間が長くなり、作業能率を低下させるなどの問題点があった。
【0006】
そこで本発明では、従来技術によるキブル交換方式の利点を生かしつつ前記した課題を改善し、熟練作業者でなくてもスカフォード上からキブル交換作業を容易且つ安全に行うことができる立坑掘削設備のキブル交換装置を提供する。
【0007】
【課題を解決するための手段】
本発明による立坑掘削設備のキブル交換装置は、ずり出し通路上の交換位置と坑底部に設定した第1又は第2のずり積み位置の上方との間を、キブルロープに係合して懸吊位置を移動させるロープ移動手段及び、先端に吊りフックを装着したキブルロープの途中に着脱可能な連結具と連結受け具を設けたキブル懸吊手段とを備え、前記連結具側は吊りフックを介して予め交換する各キブルに連結すると共に、当該連結具と連結受け具の間にはスカフォード上から制御ロープを操作して連結又は連結解除を行う着脱制御部を設けた。
【0008】
このキブル交換装置では、一方のキブルでずり出し作業を行っている間に、他方のキブルでずり積み作業が継続的に行われるので、前記した従来のキブル交換方式の場合と同様に、作業能率が良いことその他の効果を発揮すると共に、スカフォード上からキブルロープによるキブルの懸吊位置を、ずり出し通路上の交換位置とずり積み位置との間を容易に移動させることができる。
【0009】
特に、作業者が坑底部へ降りて交換作業を行わずに、キブル交換作業の全てがスカフォード上での操作で行われるので、作業能率の向上と安全作業の確保ができると共に、スカフォード上に実キブルを載置したり移動することがないので、大きな載荷重が掛からずスカフォード巻上機を小型化でき、スカフォード上での作業者の作業スペースも広く確保できる。
【0010】
前記キブル交換装置におけるキブル懸吊手段は、下端側が次第に縮径する円筒状で内周には昇降移動で拡縮するスライドコッターを装着した連結受け具と、連結受け具内に嵌合してスライドコッターと着脱する紡錘形の連結具と、巻上げ装置で懸吊する一方の制御ロープを連結具の上端側に繋着すると共に、巻上げ装置又は手動で引き上げ操作する他方の制御ロープをスライドコッターの上端側に繋着した着脱制御部とを備え、一方の制御ロープの途中には当該ロープを上下に分離する着脱具を設けた形態を採ることができる。
【0011】
このキブル交換装置では、スカフォード上で着脱制御部に設けた各制御ロープを操作することで、熟練作業者でなくても連結受け具から連結具を迅速且つ確実に着脱させ、空キブルと実キブルの交換作業を容易に行うことができると共に、キブル懸吊手段が簡単な構成で安価に提供することができる。
【0012】
前記キブル交換装置におけるロープ移動手段は、先端にキブルロープと係合するロープ案内部を設け、基端側をスカフォード上に枢支した旋回アームと、旋回アームの基端側に一端が連結され、ロッドの伸縮で旋回アームを旋回させる旋回用ジャッキと、旋回アームの先端側に装着したロープ案内部を起伏させ、吊り点の移動方向に適合させる起伏用ジャッキとを設けた形態を採ることができる。
【0013】
このキブル交換装置では、スカフォード上における旋回用ジャッキと起伏用ジャッキの操作によって、キブルロープの吊り点(懸吊位置)を交換位置と各ずり積み位置の間を容易且つ安全に移動させることができると共に、ロープ移動手段が簡単な構成で安価に提供することができる。
【0014】
【発明の実施の形態】
以下に、本発明による立坑掘削設備のキブル交換装置を、好適な実施形態を示す添付図面に基づき詳細に説明するが、図1は本発明を適用した立坑掘削設備の正面図、図2は同右側面図、図3〜5は要部であるキブル懸吊手段の動作説明図、図6〜7は要部であるロープ移動手段の動作説明図、図8〜10は本発明の装置を用いて実施するキブル交換の操作説明図である。
【0015】
立坑掘削設備は、シーブ1に巻装したロープ2で立坑3内に懸吊したスカフォード4を、地上の巻上機の操作で昇降移動可能にすると共に、移動型枠5を用いて掘削内面に打設した覆工コンクリート6に対して、水平方向に伸縮する複数のグリッパー7で係止保持できるようにし、スカフォード4は、上段デッキ8と中段デッキ9及び下段デッキ10の3段デッキで構成されている。
【0016】
スカフォード4上には、地上から懸吊した作業者用のエレベータ11に対する昇降プラットフォーム12、各デッキの間及び坑底部へ作業者が移動する梯子13、コンクリートの打設作業を行うホッパ14や旋回シュート15、ずり積込機16であるシャフトマッカー、などの必要な機材が搭載されている。
【0017】
ずり出し用のキブル17は2台(17A,17B)が用意され、キブル17A,17Bが地上との間を往復するずり出し通路を確保するために、スカフォード4の各デッキに切欠状のキブル用通孔18を設け、坑底部には各キブル17A,17Bが交互に載置される第1及び第2ずり積み位置Y,Zが、ずり出し通路上の交換位置Xの両側に予め設定されている。
【0018】
キブル17は、キブル懸吊手段19でずり出し通路上の交換位置Xに懸吊されるが、キブル17の懸吊位置(吊り点)を交換位置Xと第1ずり積み位置Y上又は第2ずり積み位置Z上に移動させるために、下段デッキ10にはロープ移動手段20が設けられ、このキブル懸吊手段19とロープ移動手段20によってキブル交換装置の主要部が構成される。
【0019】
キブル懸吊手段19は、キブル17の吊り柄21に係止保持させる吊りフック22の上端側と、地上から懸吊されたキブルロープ24の下端側を、雄形の連結具25と雌形の連結受け具26で着脱可能に連結できるようにし、連結具25は中継ロープ27とロープ固着具28を介して吊りフック22に取付け、連結受け具26はロープ固着具29を介してキブルロープ24に取付ける。
【0020】
連結具25は、中間部が膨出された紡錘形で上端側には、電動ホイストなどの巻上げ装置23(23A)で懸吊される制御ロープ30が繋着され、巻上げ装置23Aの操作で連結具25を昇降移動でき、制御ロープ30,32の途中には着脱具31,40を設け、制御ロープ30,32を上下に分離して連結具25及び連結受け具26から切り離しできるようにしている。
【0021】
連結受け具26は、下端側が次第に縮径する円筒状の受け具本体26aと、複数に分割された(図面では3分割)円弧状の楔片で形成したスライドコッター26bと、受け具本体26a上端の両側に設けた連結部26cを備え、スライドコッター26bの各楔片には電動ホイストなどの巻上げ装置23(23B)又は手動で引き上げ操作される制御ロープ32が繋着され、連結部26cはロープ固着具29に連結されている。
【0022】
キブル懸吊手段19は、連結部26cを介してロープ固着具29に連結されると共に、ロープ固着具29に嵌合するライダー受け33で振れ止めされたキブルロープ24に連結受け具26が取り付けられ、この連結受け具26内に収容された連結具25は、下降位置で縮径状態にあるスライドコッター26bの各楔片に狭持されて係止保持される。(図3)
【0023】
図3の状態から、巻上げ装置23Aを巻上げ操作して制御ロープ30を緊張させて連結具25を引き上げると共に、巻上げ装置23Bの巻上げ操作又は手動操作で制御ロープ32を引き上げると、受け具本体26a内のテーパー面に沿ってスライドコッター26bが引き上げられ、スライドコッター26bが上昇位置で拡径状態になる。(図4)
【0024】
図4の状態から、巻上げ装置23Aを巻き戻し操作して制御ロープ30のみを緩めると、連結具25は連結受け具26内から脱落する(図5)構造であり、これらの着脱具31を含む制御ロープ30と巻上げ装置23A及び、巻上げ装置23B又は手動で引き上げ操作して連結受け具26のスライドコッター26bを拡縮させる制御ロープ32とによって、連結具25と連結受け具26の着脱制御部が構成される。
【0025】
ロープ移動手段20は、先端にキブルロープ24に対するロープ案内部34をリンク機構35を介して装着すると共に、基端側が下段デッキ10上に回転支持台36で枢支された旋回アーム37と、伸縮ロッドを旋回アーム37の基端側に連結した旋回用ジャッキ38と、旋回アーム37の先端側に装着してリンク機構35でロープ案内部34を起伏させる起伏用ジャッキ39とを備えている。
【0026】
ロープ案内部34には、旋回アーム37の延長線上に沿って配置された第1ガイドローラ41及び、第1ガイドローラ41と直交状に配置された第2ガイドローラ42を取付け台43の上下に設け、実線で図示した状態で各ガイドローラ41,42をキブルロープ24に係合させ、旋回用ジャッキ38による旋回アーム37の旋回操作でキブル17の懸吊位置を、第1ずり積み位置Y上又は第2ずり積み位置Z上に移動させる。
【0027】
懸吊位置を移動させる際には、旋回アーム37を旋回操作すると各ガイドローラ41,42がキブルロープ24を取り込んで係合し、キブルロープ24を押し出し又は押し戻しできるように、キブルロープ24に対してロープ案内部34を懸吊位置の移動方向とは反対側に隣接配置できるようにしている。
【0028】
すなわち、交換位置Xと第1ずり積み位置Y上間での懸吊位置移動に適合するようにロープ案内部34を設定すると、旋回方向が逆の交換位置X上と第2ずり積み位置Z上間での懸吊位置移動を行った際に、各ガイドローラ41,42がキブルロープ24に係合できないので、起伏用ジャッキ39の操作で一旦仮想線の状態にロープ案内部34を折り畳んで、キブルロープ24とロープ案内部34の位置関係を入れ替えた後に、ロープ案内部34を実線位置に戻す。
【0029】
以上のように、キブル懸吊手段19とロープ移動手段20を要部としてキブル交換装置が構成され、このキブル交換装置を用いて2台のキブル17(17A,17B)を、スカフォード4上で操作してキブル交換を行いながらずり出し作業は実施されるが、その施工手順を図8〜10で説明する。
【0030】
これらの各図では、一方のキブル17Aは空の状態(以下、空キブル17Aという)で、他方のキブル17Bはずりが積み込まれた状態(以下、実キブル17Bという)であり、各キブル17の吊り柄21には予め吊りフック22及び連結具25を含む制御ロープ30の下部側(30b)が連結されている。
【0031】
図8(a)の手順1では、空キブル17Aはキブル懸吊手段19を介してキブルロープ24で懸吊されると共に、ロープ移動手段20によって懸吊位置がずり出し通路上の交換位置Xにあり、実キブル17Bは第2ずり積み位置Zにある状態を示しており、作業者44が着脱具31の連結操作を行って、制御ロープ30の上部側(30a)と下部側(30b)を連結する。
【0032】
図8(b)の手順2では、作業者44がロープ移動手段20の旋回用ジャッキ38を作動させ、旋回アーム37の旋回操作で空キブル17Aの懸吊位置を交換位置Xから第1ずり積み位置Y上に移動させた後に、キブルロープ24の巻き戻し操作を行って空キブル17Aを吊り降ろし、坑底部の第1ずり積み位置Yに着地させた状態を示している。
【0033】
図8(c)の手順3では、空キブル17Aが着地した後に更にキブルロープ24の巻き戻し操作を行って吊り柄21を横倒し状態にすると共に、巻上げ装置23A,23Bの巻上げ操作で制御ロープ30,32を緊張させた状態を示すが、これによってキブルロープ24側に取り付けた連結受け具26から、吊りフック22側に取り付けた連結具25が離脱可能な状態になる。
【0034】
図9(a)の手順4では、制御ロープ32の緊張を維持した状態で巻上げ装置23Aを巻き戻し操作し、制御ロープ30を緩めて連結具25を連結受け具26から脱落させた状態(図5を参照)を示すが、この後に着脱具31の連結を解除して制御ロープ30の下部側(30b)を連結受け具26から取り外す。
【0035】
図9(b)の手順5では、旋回用ジャッキ38で旋回アーム37を操作し、キブルロープ24の懸吊位置を交換位置Xに移動させた後に、実キブル17Bの吊り柄21に連結されている制御ロープ30の下部側(30b)を、連結受け具26に挿通させて着脱具31の連結で上部側(30a)と一連にすると共に、キブルロープ24とロープ案内部34の位置関係(キブルロープ24の右側にロープ案内部34)を入れ替える。
【0036】
図9(c)の手順6では、旋回用ジャッキ38で旋回アーム37を操作し、キブルロープ24の懸吊位置を交換位置Xから第2ずり積み位置Z上に移動させた状態を示すが、この時のキブル懸吊手段は図5の状態である。
【0037】
図10(a)の手順7では、キブルロープ24を一旦巻き戻して緩めた状態にすると共に、巻上げ装置23A,23Bを巻上げ操作して制御ロープ30,32を緊張させると、キブルロープ24側に取り付けた連結受け具26に連結具25が嵌合できる状態(図4を参照)となる。
【0038】
その後に、キブルロープ24を巻き上げて緊張させると共に、制御ロープ30,32を緩めて連結受け具26に連結具25を緊結状態(図3を参照)で連結させ、図10(b)の手順8では、キブルロープ24を巻き上げ操作して実キブル17Bを第2ずり積み位置Z上に吊り上げるが、その際には制御ロープ30,32は緩めた状態にする。
【0039】
図10(c)の手順9では、旋回用ジャッキ38で旋回アーム37を操作し、キブルロープ24の懸吊位置を交換位置Xに移動させた後に、制御ロープ30,32の着脱具31,40の連結解除によって上下に分離させ、連結具25及び連結受け具26から制御ロープ30,32を切り離した後に、キブル用通孔18を含むずり出し通路を介して実キブル17Bを地上へ移送する。
【0040】
第1ずり積み位置Yに載置した空キブル17Aには、ずり積込機16によるずり積み作業が開始されるが、その間に地上へ移送した実キブル17Bは、ずりを排出した後に再度ずり出し通路を介して交換位置Xに搬入され、その後は手順1〜9と同様の操作でずり積み及びずり出し作業が順次繰り返される。
【0041】
その際には、第1ずり積み位置Yに載置したキブルが新たな実キブル17Bになると共に、交換位置Xに搬入されたキブルが新たな空キブル17Aとなり、新たな空キブル17Aは交換位置Xから第2ずり積み位置Zに載置され、新たな実キブル17Bは第1ずり積み位置Yから交換位置Xを経て、ずり出し通路から地上へ移送される。
【図面の簡単な説明】
【図1】本発明によるキブル交換装置を装備した立坑掘削設備の正面図を示す。
【図2】本発明によるキブル交換装置を装備した立坑掘削設備の側面図を示す。
【図3】本発明の要部となるキブル懸吊手段の動作説明図で、連結受け具に対して連結具が連結状態時を示す。
【図4】本発明の要部となるキブル懸吊手段の動作説明図で、連結受け具に対して連結具が脱落可能状態時を示す。
【図5】本発明の要部となるキブル懸吊手段の動作説明図で、連結受け具に対して連結具が脱落状態時を示す。
【図6】本発明の要部となるロープ移動手段の動作説明図で、全体を平面図で示す。
【図7】本発明の要部となるロープ移動手段の動作説明図で、要部を拡大した側面図で示す。
【図8】本発明によるキブル交換装置を用いて実施するキブル交換の操作説明図で、操作手順1〜3の説明図を示す。
【図9】本発明によるキブル交換装置を用いて実施するキブル交換の操作説明図で、操作手順4〜6の説明図を示す。
【図10】本発明によるキブル交換装置を用いて実施するキブル交換の操作説明図で、操作手順7〜9の説明図を示す。
【符号の説明】
1 シープ
2 ロープ
3 立坑
4 スカフォード
5 移動型枠
6 覆工コンクリート
7 グリッパー
8 上段デッキ
9 中段デッキ
10 下段デッキ
11 エレベータ
12 昇降プラットフォーム
13 梯子
14 ホッパ
15 旋回シュート
16 ずり積込機(シャフトマッカー)
17 キブル(17A,17B)
18 キブル用通孔
19 キブル懸吊手段
20 ロープ移動手段
21 吊り柄
22 吊りフック
23 巻上げ装置(23A,23B)
24 キブルロープ
25 連結具(雄形の)
26 連結受け具(雌形の)
27 中継ロープ
28 ロープ固着具
29 ロープ固着具
30 制御ロープ
31,40 着脱具
32 制御ロープ
33 ライダー受け
34 ロープ案内部
35 リンク機構
36 回転支持台
37 旋回アーム
38 旋回用ジャッキ
39 起伏用ジャッキ
41,42 ガイドローラ
43 取付け台
X 交換位置
Y 第1ずり積み位置
Z 第2ずり積み位置
[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a kibble exchanging apparatus that uses a plurality of kibbles equipped for carrying out excavated shears from a shaft and alternately exchanging them by operating on a scaffold. The present invention relates to a kibble changer which can be easily and safely performed on Ford.
[0002]
[Prior art]
As a conventional technique for projecting using a kibble, a kibble in which multiple (usually two) kibbles are used alternately is used so that one kibble performs the stacking operation with the other kibble during the projecting operation. There are an exchange method and a one-kibble method in which one large-sized kibble having a large capacity is not used to replace the kibble.
[0003]
[Problems to be solved by the invention]
In the case of the kibble exchange method, there is an advantage that the work efficiency is good because it is continuously carried out with few interruptions of the stacking work, but the equipment for performing the kibble exchange is necessary, and the kibble exchange work is a skillful work. There was a problem such as requiring an expert.
[0004]
In particular, moving the kibble rope laterally on the scaffold and moving the suspension position, or descending to the bottom of the well and manually changing the hanging hook to the kibble, will improve work efficiency and ensure safety work. Improvement was also desired from this point.
[0005]
In the case of the 1 kibble system, there is an advantage that an apparatus for exchanging the kibble is unnecessary, and there is an advantage that a skilled worker is not required for the kibble operation. However, there are problems such as an increase in equipment costs and an increase in the suspension time for each pile as the shaft depth increases, resulting in a reduction in work efficiency.
[0006]
Therefore, the present invention improves the above-mentioned problems while taking advantage of the conventional kibble exchanging method, and is a shaft excavation facility that can easily and safely perform kibble exchanging work on the scaffold even if it is not a skilled worker. Provide a kibble changer.
[0007]
[Means for Solving the Problems]
A kibble exchanging device for a shaft excavation facility according to the present invention engages with a kibble rope between the exchanging position on the projecting passage and the upper side of the first or second shearing position set at the bottom of the shaft. And a kibble suspension means provided with a connection receiver in the middle of the kibble rope having a suspension hook attached to the tip, and the connection side is previously provided via the suspension hook. In addition to connecting to each kibble to be exchanged, an attachment / detachment control unit is provided between the connection tool and the connection receiver for operating or disconnecting the control rope from above the scaffold.
[0008]
In this kibble exchanging device, while the extruding operation is continuously performed with one kibble, the accumulating operation is continuously performed with the other kibble, so that the work efficiency is the same as in the case of the conventional kibble exchanging method described above. In addition to exerting other effects, it is possible to easily move the position where the kibble is suspended by the kibble rope from above the scaffold between the exchange position and the stacking position on the sliding path.
[0009]
In particular, since all of the kibble replacement work is performed on the scaffolding without the operator getting down to the bottom of the well and performing the replacement work, the work efficiency can be improved and the safety work can be secured. Since the actual kibble is not placed or moved, a large load is not applied, the scaffold winding machine can be downsized, and the operator's work space on the scaffold can be secured widely.
[0010]
The kibble suspending means in the kibble exchanging device has a cylindrical shape in which the lower end side is gradually reduced in diameter, and a connection receiver fitted with a slide cotter that expands and contracts by moving up and down on the inner periphery, and a slide cotter fitted in the connection receiver A spindle-shaped coupling tool to be attached and detached, and one control rope suspended by a hoisting device are connected to the upper end side of the coupling tool, and the other control rope to be manually pulled up is connected to the upper end side of the slide cotter. The attachment / detachment control unit is provided, and an attachment / detachment tool for separating the rope up and down is provided in the middle of one control rope.
[0011]
In this kibble changer, by operating each control rope provided on the attachment / detachment control unit on the scaffold, the connection tool can be quickly and reliably detached from the connection receiver even if it is not a skilled worker. The kibble can be exchanged easily, and the kibble suspension means can be provided at a low cost with a simple configuration.
[0012]
The rope moving means in the kibble exchanging device is provided with a rope guide portion that engages with the kibble rope at the distal end, a pivot arm pivotally supported on the scaffold on one end, and one end connected to the proximal end side of the pivot arm, It is possible to adopt a form provided with a turning jack for turning the turning arm by extending and retracting the rod, and a raising / lowering jack for raising and lowering the rope guide portion attached to the distal end side of the turning arm and adapting to the moving direction of the suspension point. .
[0013]
In this kibble changer, the suspension point (suspension position) of the kibble rope can be easily and safely moved between the exchange position and each stacking position by operating the turning jack and the raising and lowering jack on the scaffold. In addition, the rope moving means can be provided at a low cost with a simple configuration.
[0014]
DETAILED DESCRIPTION OF THE INVENTION
Below, the kibble exchanging device for shaft excavation equipment according to the present invention will be described in detail with reference to the accompanying drawings showing a preferred embodiment. FIG. 1 is a front view of the shaft excavation equipment to which the present invention is applied, and FIG. FIGS. 3 to 5 are diagrams for explaining the operation of the kibble suspension means as the main part, FIGS. 6 to 7 are diagrams for explaining the operation of the rope moving means as the main part, and FIGS. 8 to 10 use the apparatus of the present invention. It is operation explanatory drawing of the kibble exchange implemented.
[0015]
The shaft excavation equipment allows the scaffold 4 suspended in the shaft 3 with the rope 2 wound around the sheave 1 to be moved up and down by operating the hoist on the ground, and the inner surface of the excavation using the movable mold 5 The lining concrete 6 placed on the upper side can be locked and held by a plurality of grippers 7 extending and contracting in the horizontal direction. The scaffold 4 is a three-stage deck of an upper deck 8, a middle deck 9, and a lower deck 10. It is configured.
[0016]
On the scaffold 4, an elevator platform 12 for an elevator 11 for a worker suspended from the ground, a ladder 13 for moving the worker between the decks and to the bottom of the deck, a hopper 14 for performing concrete placing work, and turning Necessary equipment such as a chute 15 and a shaft macker which is a shear loader 16 are mounted.
[0017]
Two kibbles 17 (17A and 17B) are prepared for sliding out, and in order to secure a protruding path where the kibbles 17A and 17B reciprocate between the ground and the ground, notch-shaped kibbles are provided on each deck of the scaffold 4. The first and second stacking positions Y and Z on which the kibbles 17A and 17B are alternately mounted are set in advance on both sides of the replacement position X on the protruding passage. ing.
[0018]
The kibble 17 is suspended by the kibble suspension means 19 at the exchange position X on the slide-out passage, and the suspension position (hanging point) of the kibble 17 is set at the exchange position X and the first stacking position Y or the second position. In order to move to the stacking position Z, the lower deck 10 is provided with a rope moving means 20, and the kibble suspension means 19 and the rope moving means 20 constitute the main part of the kibble changer.
[0019]
The kibble suspending means 19 has a male connector 25 and a female connector on the upper end side of the suspension hook 22 to be held and held by the suspension handle 21 of the kibble 17 and the lower end side of the kibble rope 24 suspended from the ground. The connecting tool 25 is attached to the suspension hook 22 via a relay rope 27 and a rope fixing tool 28, and the connecting receiver 26 is attached to the kibble rope 24 via a rope fixing tool 29.
[0020]
The connecting tool 25 has a spindle shape with a bulged middle portion, and a control rope 30 suspended by a hoisting device 23 (23A) such as an electric hoist is attached to the upper end side of the connecting tool 25, and the connecting tool is operated by operating the hoisting device 23A. 25 can be moved up and down, and attachment / detachment tools 31 and 40 are provided in the middle of the control ropes 30 and 32 so that the control ropes 30 and 32 can be separated vertically from the connection tool 25 and the connection receiver 26.
[0021]
The connecting receptacle 26 includes a cylindrical receptacle body 26a whose lower end side is gradually reduced in diameter, a slide cotter 26b formed by a plurality of (in the drawing, three divisions) arcuate wedge pieces, and an upper end of the receptacle body 26a. Are connected to each wedge piece of the slide cotter 26b by a hoisting device 23 (23B) such as an electric hoist or a control rope 32 that is manually pulled up, and the connecting portion 26c is a rope. It is connected to the fixing tool 29.
[0022]
The kibble suspending means 19 is connected to the rope fixing tool 29 through the connecting part 26c, and the connection receiving tool 26 is attached to the kibble rope 24 which is supported by the rider receiver 33 fitted to the rope fixing tool 29. The connector 25 accommodated in the connector receiver 26 is nipped and held by each wedge piece of the slide cotter 26b which is in a reduced diameter state at the lowered position. (Figure 3)
[0023]
From the state shown in FIG. 3, when the hoisting device 23A is hoisted and the control rope 30 is tensioned to pull up the connector 25, and when the control rope 32 is pulled up by the hoisting operation or manual operation of the hoisting device 23B, The slide cotter 26b is pulled up along the taper surface, and the diameter of the slide cotter 26b is expanded at the raised position. (Fig. 4)
[0024]
From the state of FIG. 4, when the hoisting device 23 </ b> A is rewound to loosen only the control rope 30, the connector 25 is structured to drop out from the connector receiver 26 (FIG. 5), and includes these detachable tools 31. The control rope 30 and the hoisting device 23A, and the hoisting device 23B or the control rope 32 for manually expanding and contracting the slide cotter 26b of the connection receiver 26 constitute a connection tool 25 and an attachment / detachment control unit for the connection receiver 26. Is done.
[0025]
The rope moving means 20 is provided with a rope guide portion 34 for the kibble rope 24 at its distal end via a link mechanism 35, a pivot arm 37 whose proximal end is pivotally supported on the lower deck 10 by a rotation support base 36, and a telescopic rod Is connected to the base end side of the swivel arm 37, and a hoisting jack 39 that is attached to the distal end side of the swivel arm 37 and causes the rope guide portion 34 to be raised and lowered by the link mechanism 35.
[0026]
In the rope guide portion 34, a first guide roller 41 disposed along an extension line of the swivel arm 37 and a second guide roller 42 disposed orthogonal to the first guide roller 41 are provided above and below the mounting base 43. In the state shown by the solid line, the guide rollers 41 and 42 are engaged with the kibble rope 24, and the suspension position of the kibble 17 by the turning operation of the turning arm 37 by the turning jack 38 is set on the first pile position Y or Move to the second stacking position Z.
[0027]
When moving the suspension position, when the swing arm 37 is swung, the guide rollers 41 and 42 take in and engage the kibble rope 24 so that the kibble rope 24 can be pushed out or pushed back. The portion 34 can be disposed adjacent to the side opposite to the moving direction of the suspension position.
[0028]
That is, when the rope guide portion 34 is set so as to be adapted to the suspension position movement between the exchange position X and the first pile position Y, the exchange position X and the second pile position Z are opposite in the turning direction. Since the guide rollers 41 and 42 cannot be engaged with the kibble rope 24 when the suspension position is moved between them, the rope guide unit 34 is temporarily folded into a virtual line state by operating the hoisting jack 39, and the kibble rope After the positional relationship between 24 and the rope guide portion 34 is changed, the rope guide portion 34 is returned to the solid line position.
[0029]
As described above, the kibble exchanging device is configured with the kibble suspending means 19 and the rope moving means 20 as main parts, and two kibbles 17 (17A and 17B) are mounted on the scaffold 4 using the kibble exchanging device. The operation is carried out while the kibble is changed by operation, and the construction procedure will be described with reference to FIGS.
[0030]
In each of these drawings, one kibble 17A is in an empty state (hereinafter referred to as empty kibble 17A), and the other kibble 17B is loaded (hereinafter referred to as actual kibble 17B). The lower part (30b) of the control rope 30 including the hanging hook 22 and the connecting tool 25 is connected to the hanging handle 21 in advance.
[0031]
In the procedure 1 of FIG. 8A, the empty kibble 17A is suspended by the kibble rope 24 via the kibble suspension means 19, and the suspension position is at the exchange position X on the protruding passage by the rope moving means 20. The actual kibble 17B shows a state in the second stacking position Z, and the operator 44 connects the attachment / detachment tool 31 to connect the upper side (30a) and the lower side (30b) of the control rope 30. To do.
[0032]
8B, the operator 44 operates the turning jack 38 of the rope moving means 20, and the swiveling operation of the turning arm 37 moves the suspension position of the empty kibble 17A from the replacement position X to the first sliding position. After moving to the position Y, the unwinding operation of the kibble rope 24 is performed to suspend the empty kibble 17A and land at the first pile position Y at the bottom of the well.
[0033]
In step 3 of FIG. 8 (c), after the empty kibble 17A has landed, the kibble rope 24 is further rewound to bring the hanging handle 21 into a lying state, and the hoisting operation of the hoisting devices 23A and 23B causes the control rope 30, Although the state which showed the tension | tensile_strength 32 is shown, the connection tool 25 attached to the hanging hook 22 side will be in the state which can detach | leave from the connection receptacle 26 attached to the kibble rope 24 side by this.
[0034]
9A, in the state where the tension of the control rope 32 is maintained, the hoisting device 23A is rewound, the control rope 30 is loosened, and the connection tool 25 is dropped from the connection receiver 26 (FIG. 9). 5), after this, the connection of the attachment / detachment tool 31 is released and the lower side (30b) of the control rope 30 is removed from the connection receiver 26.
[0035]
In step 5 of FIG. 9B, the swivel arm 37 is operated with the swivel jack 38 to move the suspension position of the kibble rope 24 to the replacement position X, and then connected to the suspension handle 21 of the actual kibble 17B. The lower side (30b) of the control rope 30 is inserted into the connection receptacle 26 and connected to the upper side (30a) by connecting the attachment / detachment tool 31, and the positional relationship between the kibble rope 24 and the rope guide part 34 (of the kibble rope 24). Replace the rope guide 34) on the right side.
[0036]
Step 6 in FIG. 9C shows a state where the swing arm 37 is operated by the swing jack 38 and the suspension position of the kibble rope 24 is moved from the exchange position X to the second stacking position Z. The kibble suspension means at the time is in the state of FIG.
[0037]
In step 7 of FIG. 10A, the kibble rope 24 is once rewound and loosened, and when the hoisting devices 23A and 23B are hoisted to tension the control ropes 30 and 32, they are attached to the kibble rope 24 side. The connecting tool 25 can be fitted into the connecting tool 26 (see FIG. 4).
[0038]
Thereafter, the kibble rope 24 is wound up and tensioned, and the control ropes 30 and 32 are loosened to connect the connection tool 25 to the connection receiver 26 in a tightly coupled state (see FIG. 3). In step 8 of FIG. The kibble rope 24 is wound up to lift the actual kibble 17B onto the second pile position Z. At this time, the control ropes 30 and 32 are loosened.
[0039]
In step 9 of FIG. 10 (c), the swivel arm 37 is operated with the swivel jack 38 to move the suspension position of the kibble rope 24 to the exchange position X, and then the attachment / detachment tools 31, 40 of the control ropes 30, 32 are moved. After disconnecting the control ropes 30 and 32 from the connection tool 25 and the connection receiver 26 by releasing the connection, the actual kibble 17B is transferred to the ground through the protruding passage including the through hole 18 for the kibble.
[0040]
In the empty kibble 17A placed at the first shearing position Y, the shearing operation by the shear loader 16 is started, but the actual kibble 17B transferred to the ground during that time is ejected again after discharging the shear. It is carried into the exchange position X through the passage, and thereafter, the stacking and discharging operations are sequentially repeated by the same operations as in the procedures 1 to 9.
[0041]
At that time, the kibble placed at the first stacking position Y becomes a new actual kibble 17B, and the kibble carried into the exchange position X becomes a new empty kibble 17A, and the new empty kibble 17A becomes an exchange position. The new actual kibble 17B is transferred from X to the second pile position Z, transferred from the first pile position Y to the ground via the exchange position X, and transferred to the ground.
[Brief description of the drawings]
FIG. 1 shows a front view of a shaft excavation facility equipped with a kibble changer according to the present invention.
FIG. 2 shows a side view of a shaft excavation facility equipped with a kibble changer according to the present invention.
FIG. 3 is an operation explanatory view of the kibble suspension means which is a main part of the present invention, and shows a state in which the connecting tool is connected to the connecting receiver.
FIG. 4 is an operation explanatory view of a kibble suspending means which is a main part of the present invention, and shows a state in which the coupling tool can be detached with respect to the coupling receiver.
FIG. 5 is an operation explanatory view of the kibble suspending means which is a main part of the present invention, and shows a state in which the coupling tool is in a state of dropping with respect to the coupling receiver.
FIG. 6 is an operation explanatory view of a rope moving means which is a main part of the present invention, and shows the whole in a plan view.
FIG. 7 is an operation explanatory view of a rope moving means as a main part of the present invention, and shows an enlarged side view of the main part.
FIG. 8 is an explanatory diagram of the operation of kibble replacement performed using the kibble replacement device according to the present invention, and is an explanatory diagram of the operation procedures 1 to 3;
FIG. 9 is an explanatory diagram of the operation of kibble replacement performed using the kibble replacement device according to the present invention, and shows the operation procedures 4 to 6;
FIG. 10 is an explanatory diagram of the operation of kibble replacement performed by using the kibble replacement device according to the present invention, and is an explanatory diagram of operation procedures 7 to 9;
[Explanation of symbols]
DESCRIPTION OF SYMBOLS 1 Sheep 2 Rope 3 Vertical shaft 4 Scaffold 5 Mobile form frame 6 Covering concrete 7 Gripper 8 Upper deck 9 Middle deck 10 Lower deck 11 Elevator 12 Lift platform 13 Ladder 14 Hopper 15 Turning chute 16 Shear loader (shaft mucker)
17 Kibble (17A, 17B)
18 Kibble through hole 19 Kibble hanging means 20 Rope moving means 21 Hanging handle 22 Hanging hook 23 Winding device (23A, 23B)
24 Kibble Rope 25 Connector (Male)
26 Linkage (female)
27 Relay rope 28 Rope fixing tool 29 Rope fixing tool 30 Control rope 31, 40 Detachment tool 32 Control rope 33 Rider receiver 34 Rope guide 35 Link mechanism 36 Rotating support base 37 Turning arm 38 Turning jack 39 Lifting jack 41, 42 Guide roller 43 Mounting base X Replacement position Y First stacking position Z Second stacking position

Claims (3)

ずり出し通路上の交換位置と坑底部に設定した第1又は第2のずり積み位置の上方との間を、キブルロープに係合して懸吊位置を移動させるロープ移動手段及び、先端に吊りフックを装着したキブルロープの途中に着脱可能な連結具と連結受け具を設けたキブル懸吊手段とを備え、前記連結具側は吊りフックを介して予め交換する各キブルに連結すると共に、当該連結具と連結受け具の間にはスカフォード上から制御ロープを操作して連結又は連結解除を行う着脱制御部を設けたことを特徴とする立坑掘削設備のキブル交換装置。Rope moving means for engaging the kibble rope and moving the suspension position between the exchange position on the slide-out path and the first or second pile position set at the bottom of the pit, and a suspension hook at the tip And a kibble suspension means provided with a connection receiver in the middle of the kibble rope fitted with the kibble rope, and the connector side is connected to each kibble to be exchanged in advance via a suspension hook, and the connection tool A kibble exchanging device for shaft excavation equipment, wherein an attachment / detachment control unit for operating or disconnecting the control rope from above the scaffold is provided between the connection receiver and the connection receiver. 前記キブル懸吊手段は、下端側が次第に縮径する円筒状で内周には昇降移動で拡縮するスライドコッターを装着した連結受け具と、連結受け具内に嵌合してスライドコッターと着脱する紡錘形の連結具と、巻上げ装置で懸吊する一方の制御ロープを連結具の上端側に繋着すると共に、巻上げ装置又は手動で引き上げ操作する他方の制御ロープをスライドコッターの上端側に繋着した着脱制御部とを備え、一方の制御ロープの途中には当該ロープを上下に分離する着脱具を設けた請求項1に記載した立坑掘削設備のキブル交換装置。The kibble suspending means has a cylindrical shape whose lower end side is gradually reduced in diameter, a connection receiver having a slide cotter that is expanded and contracted by moving up and down on the inner periphery, and a spindle type that fits into the connection receiver and is attached to and detached from the slide cotter. The connecting tool and one control rope suspended by the hoisting device are connected to the upper end side of the connecting device, and the hoisting device or the other control rope to be manually pulled up is connected to the upper end side of the slide cotter. The kibble exchanging device for shaft excavation equipment according to claim 1, further comprising a control unit, and a detachable tool for separating the rope up and down in the middle of one control rope. 前記ロープ移動手段は、先端にキブルロープと係合するロープ案内部を設け、基端側をスカフォード上に枢支した旋回アームと、旋回アームの基端側に一端が連結され、ロッドの伸縮で旋回アームを旋回させる旋回用ジャッキと、旋回アームの先端側に装着したロープ案内部を起伏させ、吊り点の移動方向に適合させる起伏用ジャッキとを設けた請求項1又は請求項2に記載した立坑掘削設備のキブル交換装置。The rope moving means is provided with a rope guide portion that engages with a kibble rope at the distal end, a pivot arm having a proximal end pivotally supported on a scaffold, and one end connected to the proximal end side of the pivot arm, so that the rod can be expanded and contracted. The turning jack for turning the turning arm, and the raising / lowering jack for raising and lowering the rope guide portion mounted on the distal end side of the turning arm and adapting to the moving direction of the suspension point are provided. Kibble changer for shaft excavation equipment.
JP2001181713A 2001-06-15 2001-06-15 Kibble changer for shaft excavation equipment Expired - Fee Related JP4427209B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2001181713A JP4427209B2 (en) 2001-06-15 2001-06-15 Kibble changer for shaft excavation equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2001181713A JP4427209B2 (en) 2001-06-15 2001-06-15 Kibble changer for shaft excavation equipment

Publications (2)

Publication Number Publication Date
JP2002371784A JP2002371784A (en) 2002-12-26
JP4427209B2 true JP4427209B2 (en) 2010-03-03

Family

ID=19021939

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2001181713A Expired - Fee Related JP4427209B2 (en) 2001-06-15 2001-06-15 Kibble changer for shaft excavation equipment

Country Status (1)

Country Link
JP (1) JP4427209B2 (en)

Also Published As

Publication number Publication date
JP2002371784A (en) 2002-12-26

Similar Documents

Publication Publication Date Title
US3937340A (en) Aerial platform having boom mounted pipe holder
US5711382A (en) Automated oil rig servicing system
US6036035A (en) Apparatus and method for extending and storing jib of crane
CN110295856A (en) A Hydraulic Vertical Lift Automatic Workover Rig
JP4427209B2 (en) Kibble changer for shaft excavation equipment
CN216341258U (en) Workstation for mounting movable arm pin shaft
JP4027628B2 (en) Kibble replacement method in shaft excavation
JP3238976B2 (en) Jib removal device for jib boom
JP4408584B2 (en) Replacement kibble method and apparatus for shaft excavation equipment
JP2003054876A (en) Device and method for attaching and detaching side frame
EP4197958B1 (en) Crane
JP4805054B2 (en) Hamaglab and its crown device
EP1081088A1 (en) Apparatus for displacing loads using a mobile platform
JP3889521B2 (en) Pile driver and its work floor mounting method
JP3696325B2 (en) Pile driver leader undulation method and apparatus
JP4077281B2 (en) Shaft excavator
JPH0192198A (en) Method and equipment for mounting and dismounting jib to crane
JP3114608B2 (en) Multipurpose crane
JPH07187574A (en) Crane jib equipment
JP4550331B2 (en) Replacement kibble device in shaft excavation
CN110121478B (en) Load handling tool and hydraulic crane including such load handling tool
JP2536185Y2 (en) Automatic sling jig
JP3013772B2 (en) Multipurpose crane
JP3446911B2 (en) Front frame hoisting device
JPS582290B2 (en) Ground dynamic consolidation method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080130

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20091116

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20091124

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20091214

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20121218

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees