JP4459173B2 - Ground improvement wooden pile and carbon stock method - Google Patents
Ground improvement wooden pile and carbon stock method Download PDFInfo
- Publication number
- JP4459173B2 JP4459173B2 JP2006026448A JP2006026448A JP4459173B2 JP 4459173 B2 JP4459173 B2 JP 4459173B2 JP 2006026448 A JP2006026448 A JP 2006026448A JP 2006026448 A JP2006026448 A JP 2006026448A JP 4459173 B2 JP4459173 B2 JP 4459173B2
- Authority
- JP
- Japan
- Prior art keywords
- ground
- pile
- wooden
- wooden pile
- wood
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Description
本発明は、大気中のCO2 を削減するための地盤改良用木杭およびカーボンストック方法に関する。 The present invention relates to a ground improvement wooden pile and a carbon stock method for reducing CO 2 in the atmosphere.
2005年2月に発効した京都議定書において温室効果ガスの排出削減義務が規定されたように、地球環境問題を考える上で大気中の温室効果ガスの削減が緊急の課題となっており、そのために種々の対策がとられているが、そのうち、CO2の削減に有効な対策の1つとして、森林,海草等を利用してCO2の吸収・固定を行うカーボンストック技術がある。 The reduction of greenhouse gases in the atmosphere is an urgent issue when considering global environmental issues, as the Kyoto Protocol, which came into effect in February 2005, stipulates the obligation to reduce greenhouse gas emissions. Various measures have been taken, and one of the effective measures for CO 2 reduction is carbon stock technology that absorbs and fixes CO 2 using forests, seaweeds, and the like.
図13に、樹木伐採と植林との繰返しを継続した場合の、森林でのCO2の炭素としての固定・貯蔵量の増加、すなわちカーボンストック量の増加の様子を示した。
個々の樹木についてみれば、そのカーボンストック量は成長に伴い漸次増加するが(区間a)、老齢化するとそのストック速度は鈍くなる(区間b)。
この時点で伐採すると、その樹木にストックされているカーボンは腐敗の進行あるいは燃焼に伴い大気中に戻る(大気中に戻る平均量は直線cのこう配として表される)が、その腐敗が進行しにくい状態におけば(傾きdを小さくすれば)、カーボンを長い期間ストック状態にしておくことができ結局大気中のCO2を削減できることが明らかである。
13, in the case of continuing the repetition of the planting and the trees felled, increase in fixed-storage amount of the carbon of CO 2 in forests, i.e. showing how the increase in carbon stocks.
In terms of individual trees, the amount of carbon stock gradually increases with growth (section a), but the stock speed becomes dull as it ages (section b).
If logging is done at this point, the carbon stocked in the tree will return to the atmosphere as the decay or combustion progresses (the average amount returned to the atmosphere is expressed as a gradient of line c), but the decay proceeds. It is clear that if it is difficult (if the slope d is reduced), the carbon can be kept in stock for a long period of time, and eventually CO 2 in the atmosphere can be reduced.
したがって、老齢化してカーボンのストック速度が鈍くなった樹木については、間伐材のみならず主伐材についても積極的に伐採するとともに、ストック速度の速い若い樹木をあらたに植林し森林の若返りを行うことで森林のカーボンストック速度を維持することができる。
一方で、伐採したものを腐敗が進行しにくい状態にして利用することによって、森林および伐採後の樹木全体としての総カーボンストック量を継続的に増大させることができる(区間e,f)。
Therefore, for trees whose aging has slowed the stock rate of carbon, not only thinned wood but also main felled wood will be actively cut, and young trees with fast stock speed will be newly planted to rejuvenate the forest. Can maintain the carbon stock speed of the forest.
On the other hand, the total carbon stock amount of the forest and the whole tree after felling can be continuously increased by using the felled tree in a state where it is difficult for the decay to proceed (sections e and f).
木材は建設材料として古くから利用されているが、水や空気との接触により腐朽し耐力が低下してしまうことや、基礎として使用されている木材が一度腐植するとその補修が難しいことから、現在では構造物基礎本体においてはセメントや鉄が多く用いられるようになっており、森林には伐採期を迎えても利用先が見つからない老齢の樹木が多数存在することになっている。
この森林の老齢化は花粉症の原因にもなっているので、大量の木材を有効利用しつつ、植林を進めて森林の若返りを促進する方策が必要とされているところでもある。
Wood has been used as a construction material for a long time, but because it decays due to contact with water and air and its proof strength declines, and once the timber used as a foundation is humated, it is difficult to repair it. Then, cement and iron are often used in the foundation of the structure, and there are many old-age trees in the forest that cannot be used even after the logging season.
This aging of the forest also causes hay fever, so there is a need for measures to promote forest rejuvenation by planting trees while effectively using large amounts of wood.
そもそも、木材の腐朽は、水・空気・栄養・適温の4条件が揃わなければ進行しないものであるから、地盤中に地下水位以下にして、または水中地盤に打設された木材の腐朽の進行はきわめて遅いものになる。 In the first place, the decay of wood does not proceed unless the four conditions of water, air, nutrition, and temperature are met, so the progress of decay of wood placed below the groundwater level in the ground or on the underwater ground Will be very slow.
そこで、地下水位が高い軟弱地盤等で建設工事を行う場合に必要となる地盤改良を、木材の打設によって行うこととすれば、そこに打設した木材の腐朽の進行はきわめて遅いので長期的にカーボンストックができるという点で好都合であり、そのうえ腐植の進行が遅いので建設材料としての信頼性も確保される。しかも、その木材の打設は、地盤が軟弱であるので容易に行えるものである。
もちろん、このような地盤に単にカーボンストックを目的に木材を打設してもよい。
Therefore, if the ground improvement required for construction work on soft ground with high groundwater level is performed by timber placement, the decay of the timber placed there will be very slow and long-term. In addition, it is advantageous in that carbon stock can be produced, and furthermore, since the progress of humus is slow, reliability as a construction material is also ensured. Moreover, the placement of the wood can be easily performed because the ground is soft.
Of course, wood may be placed on such ground simply for the purpose of carbon stock.
地盤中に木製の杭を打設する技術としては、特許文献1および2に開示されたいわゆるパイルネット工法等があるが、これは、あくまでも軟弱地盤中にブロック状の土塊を作り地盤を改良することを目的としているもので、カーボンストックを意図したものでもなく、地盤強化に必要最小限の数の杭を打設するものであるから、カーボンストックの効率は必ずしも良くない。
As a technique for placing a wooden pile in the ground, there is a so-called pile net construction method disclosed in
一方、カーボンストックの効率を上げるため単純に、多数の木材を地盤に対して密に打設しようとすると、杭間地盤の体積が減少し水平応力が増加するが、短期的には、次式で示される有効応力は増加せず、過剰間隙水圧が増加し、結果的にせん断抵抗や液状化抵抗が低下したままの地盤が形成されてしまう。 On the other hand, if a large number of timbers are simply placed densely on the ground in order to increase the efficiency of carbon stock, the volume of the ground between piles decreases and the horizontal stress increases. The effective stress indicated by is not increased, the excess pore water pressure is increased, and as a result, a ground with reduced shear resistance and liquefaction resistance is formed.
Δσh=Δu+Δσh’
(ここで、Δσh:水平全応力増加分、Δu:過剰間隙水圧、Δσh’:水平有効応力増加分)
Δσh = Δu + Δσh ′
(Where Δσh: horizontal total stress increase, Δu: excess pore water pressure, Δσh ′: horizontal effective stress increase)
したがって、木材の打設後早期に過剰間隙水圧を消散させて確実な地盤改良を行うための工夫が必要となっている。 Therefore, it is necessary to devise a method for steadily improving the ground by dissipating the excess pore water pressure at an early stage after placing the wood.
そこで、本発明は、長期的に大量のカーボンをストックでき、しかも、確実な地盤の改良をも行える地盤改良用木杭およびカーボンストック方法の提供を課題とする。 Therefore, an object of the present invention is to provide a ground improvement wooden pile and a carbon stock method that can stock a large amount of carbon in the long term and can also improve the ground reliably.
請求項1記載の本発明は、砂やシルトのような軟弱な地盤を改良するための地盤改良用木杭であって、老齢化した伐採木材からなりカーボンストック用丸太の側面に軸方向のキズをつけて気中に放置し乾燥収縮させることにより広がった前記キズを排水溝とし、この排水溝にドレーン材を充填した地盤改良用木杭である。
The present invention according to
請求項2記載の本発明は、砂やシルトのような軟弱な地盤を改良するための地盤改良用木杭であって、老齢化した樹木の伐採によって得られた伐採木材からなりカーボンストック用丸太の側面に木材の筋を横切るように螺旋状の排水溝を形成し、この排水溝にドレーン材を充填した地盤改良用木杭である。
The present invention according to
請求項3記載の本発明は、請求項1または2記載の地盤改良用木杭を砂やシルトのような軟弱な地盤に打設するカーボンストック方法である。 The third aspect of the present invention is a carbon stock method in which the ground improvement wood pile according to the first or second aspect is placed on a soft ground such as sand or silt .
本発明によれば、カーボンを地盤中に打設した地盤改良用木杭に長期的にストックすることにより、大気中のCO2 を削減し地球温暖化対策とすることができ、しかも、その地盤改良用木杭の打設により早期に過剰間隙水圧を消散させて確実な地盤の改良を行うこともできる。
また、従来利用先のなかった大量の木材を使用することができるので、あわせて植林を進めることにより老齢化した森林を若返らせ、花粉症等の問題をも解消しうる。
According to the present invention, by long-term stock ground improvement Yoboku Pile Da設the carbon into the ground, to reduce CO 2 in the atmosphere can be a global warming, yet, the Soil The improvement of the ground can be done by dissipating excess pore water pressure at an early stage by placing the improvement wood pile .
In addition, since a large amount of wood that has not been used in the past can be used, it is possible to rejuvenate an aged forest by afforestation and solve problems such as hay fever.
排水手段1……,1’……,1”……,6……を備えた地盤改良用木杭A,B,C,DまたはEを地盤に打設するカーボンストック方法。 Carbon stock method for placing ground improvement wooden piles A, B, C, D or E having drainage means 1... 1 '.
丸太の側面に排水溝1……,1’……,1”……を形成してなる地盤改良用木杭。
A ground improvement wooden pile with
まず、本発明の実施例1について詳しく説明する。
図8に示したAは、たとえば直径約20cm,長さ約5mの丸太の側面に、深さ約3cmの排水手段たる排水溝1……を8本、その軸方向に全長にわたって彫設形成するとともに、その排水溝1……に、必要に応じて砂,スラグ,木くず等のドレーン材を袋状のドレーン材充填ネット2に充填したものを詰めてなる本発明地盤改良用木杭(以下、単に「木杭」という。)である。
First, Example 1 of the present invention will be described in detail.
For example, A shown in FIG. 8 is formed by engraving and forming eight
この木杭Aの直径や全長は適宜変更できる。また、その下端は先鋭にするのが好ましい。これにより地盤に貫入させ易いものとなる。この木杭Aは間伐材はもちろん主伐材からも製作できるものである。
上記排水溝1……にはドレーン材を充填したドレーン材充填ネット2を詰めてあるので、当該木杭Aの地盤中への打設時に排水溝1……に土砂が詰まってしまうことが防止される。
The diameter and total length of the wooden pile A can be changed as appropriate. Moreover, it is preferable that the lower end is sharpened. This makes it easy to penetrate the ground. This wooden pile A can be manufactured not only from thinned wood but also from main cut wood.
Since the drain groove 1... Is packed with a drain
なお、ドレーン材はドレーン材充填ネット2に充填することなくそのまま排水溝1……に詰めてもよい。また、排水溝1……にドレーン材を詰めないこととしてもよい。
Note that the drain material may be packed in the
図9〜12にそれぞれ示したB〜Gは、他の本発明木杭の例である。 BG shown to FIGS. 9-12 is an example of another this invention wooden pile, respectively.
図9に示した本発明木杭Bは、上記本発明木杭Aとは、排水溝1’……を丸太の側面に螺旋状に彫設形成した点だけを異にするものである。上記木杭Aのように軸方向の排水溝1……は、のみを用いて彫ろうとすると、丸太が筋に沿って裂けやすい。この点、木杭Bは排水溝1’……を、丸太の筋を横切るよう螺旋状に形成してあるので、これを彫る際にも丸太が裂けにくい。
The present invention wooden pile B shown in FIG. 9 is different from the present invention wooden pile A only in that the drainage grooves 1 ′... As in the case of the above wooden pile A, if the drainage grooves 1 in the axial direction are sculpted using only the log, the log is easily torn along the line. In this respect, the wooden pile B has the
図10に示した本発明木杭Cは、丸太表面にカッターのような鋭利な刃物でその軸方向に深さ数cm〜5cm程度のキズをつけるとともに、その丸太を気中に放置することで乾燥収縮させ、広がった上記キズを排水溝1”……としたものである。
上記木杭A,Bは排水溝1,1’を彫るのにやや手間が掛かり、木くずが発生してしまうが、この木杭Cはその製作が簡単かつ安価に行え、木くずも発生しない。
この木杭Cの排水溝1”……にも、上記ドレーン材をドレーン材充填ネット2に充填して、あるいはそのネット2に充填せずそのまま詰めるのが好ましい。ただし、排水溝1”……に何も詰めないこととしてもよい。
The wood stake C of the present invention shown in FIG. 10 has a flaw of about several centimeters to 5 cm deep in the axial direction with a sharp blade such as a cutter on the surface of the log, and by leaving the log in the air. The above-mentioned scratches that have been dried and shrunk and spread are defined as
The wooden piles A and B require a little effort to carve the
It is preferable that the
図11に示した本発明木杭Dは、下端を先鋭にした3本の丸太3……を緊束ワイヤ4……で束ねるとともに、各丸太3……の下端を覆うように円錐形のボトムキャップ5を取り付けて地盤へ貫入し易くしてあるものである。
この木杭Dを構成する3本の丸太3……の隙間は排水手段たる排水路6になっている。木杭Dの下端には上記のとおりボトムキャップ5が取り付けられているので、木杭Dの打込みによってもその排水路6には土砂が入り込まないようになっている。
The wooden stake D of the present invention shown in FIG. 11 is formed by concatenating three
A gap between the three
上記ボトムキャップは円錐形に限らず先鋭のものであれば角錐形のものでもよい。
上記排水路6には、木杭A〜Cと同様にドレーン材を詰めるのが好ましい。これにより、丸太3……同士がしっかりと固定されぐらつきが防止される。
なお、束ねる丸太3……の本数は適宜変更でき、また、各丸太3……の側面には、上記木杭A〜Cのように排水溝を彫設形成してもよい。
The bottom cap is not limited to a conical shape, and may be a pyramid shape as long as it is sharp.
The
Note that the number of
図12に示した本発明木杭Eは、所要本数の短い丸太7……をその長さ方向に重合した重合丸太8……を7本、その複数箇所において緊束ワイヤ4……で束ねているものである。なお、束ねる重合丸太8……の本数は適宜変更できる。
互いに隣接する重合丸太8……はその丸太7……の重合部の位置を長さ方向にずらしてあるので、上記緊束ワイヤ4により複数箇所で緊束することでしっかりと固定されているが、各丸太7……の上下端に互いに嵌合する凹凸を形成しておくことで、ずれないようにしておくのが好ましい。
The wood pile E of the present invention shown in FIG. 12 is formed by bundling seven
The
各重合丸太8……の間の隙間は排水路6……になっており、ここには、木杭A〜Dと同様にドレーン材を詰めるのが好ましい。これにより、重合丸太8……同士がしっかりと固定されることにもなり互いのぐらつきが防止される。
また、各丸太7……の側面に、排水溝を彫設形成しておくのも好ましい。
9は、各重合丸太8の下端を覆うように取り付けられた円錘形のボトムキャップである。
A gap between each of the
It is also preferable to engrave and form drainage grooves on the side surfaces of each
Reference numeral 9 denotes a conical bottom cap attached so as to cover the lower end of each
上記ボトムキャップは円錐形に限らず先鋭のものであれば角錐形のものでもよい。
また、上記重合丸太8……の長さ方向上部側の丸太7……としては、腐植しないか、あるいは腐植し難い材質のものを用いるのが好ましい。
このように上部の丸太7……を腐植しないか、あるいは腐植し難い材質のものとすることにより、その部分が地下水位面より上に出た場合の腐植防止を図ることができる。
The bottom cap is not limited to a conical shape, and may be a pyramid shape as long as it is sharp.
Further, it is preferable to use a material that does not humus or is difficult to humus as the
By making the
上記木杭D,Eは、細くて短い間伐材からでも太くて長いものを製作することができるので、これまで有効利用されていなかった間伐材を多量に使うことができる。 Since the above wooden piles D and E can be made thick and long even from thin and short thinned lumber, a large amount of thinned lumber that has not been effectively used so far can be used.
本発明カーボンストック方法は、上記の本発明木杭A,B,C,D,またはEを多数地盤中に打設してカーボンストックを行うとともに、必要に応じ地盤の改良をも行うものであるが、本実施例は、地下水位の高い軟弱地盤にその木杭Aを打設し、その地盤上に盛土を造成したものである(図1)。 In the carbon stock method of the present invention, the above-described wood piles A, B, C, D, or E of the present invention are placed in the ground to perform carbon stock, and the ground is also improved if necessary. However, in this embodiment, the wooden pile A is placed on soft ground having a high groundwater level, and embankment is created on the ground (FIG. 1).
本発明方法は、多数本の上記木杭A……を、所定の間隔をおいて軟弱地盤11に打設することにより行う。上記木杭A……は、その全長またはほぼ全長が地下水位以下に位置するよう打設するのが木杭A……の腐植防止のために好ましい。
The method of the present invention is performed by placing a large number of the above-mentioned wooden piles A ... on the
木杭A……の打設時に生じる過剰間隙水圧は時間の経過とともに消散していくが、その消散時間は排水距離が短いほど早い。圧密理論によれば、消散時間は排水距離の二乗に比例する。上記木杭A……は、排水溝1を備えているので、過剰間隙水圧の早期消散を実現する。
すなわち、単に木材を打設した場合に片面排水を仮定すると軟弱地盤の厚さの二乗の消散時間を要していたものが、(杭間距離/2)2の消散時間になり、圧倒的に消散時間が短くなる(なお、一般的に、軟弱地盤厚さ》(杭間距離/2)2である。)。
Excess pore water pressure generated when placing wooden stakes A ... dissipates over time, but the dissipation time is faster as the drainage distance is shorter. According to the consolidation theory, the dissipation time is proportional to the square of the drainage distance. Since the said wooden pile A ... is equipped with the
In other words, when one side drainage is assumed when simply placing wood, the one that required a dissipation time of the square of the thickness of the soft ground is the dissipation time of (distance between piles / 2) 2 , which is overwhelming. Dissipation time is shortened (in general, soft ground thickness >> (distance between piles / 2) 2 ).
地盤は、間隙比が小さいほど沈下量が少なく、せん断抵抗および液状化抵抗が増すが、過剰間隙水圧の消散に伴い、早期に杭間地盤の間隙比が減少するので、これに伴い杭間地盤の沈下が抑制される。
さらに、地盤は拘束圧が増すほどせん断抵抗および液状化抵抗が増すが、木杭の打設により間隙比の減少と同時に、木杭A……間の内部の有効応力の増加により拘束圧が増加し、せん断抵抗および液状化抵抗が増加する。
したがって、打設する木杭A……が、排水溝1……を備えていることにより、早期に地盤が強化改良されることになる。
The smaller the gap ratio, the smaller the settlement amount, and the greater the shear resistance and liquefaction resistance. However, as the excess pore water pressure is dissipated, the gap ratio of the inter-pile ground decreases earlier. Sinking is suppressed.
Furthermore, as the restraint pressure increases, the shear resistance and liquefaction resistance increase, but at the same time as the gap ratio decreases due to the placement of the wooden piles, the restraint pressure increases due to the increase in the effective stress between the wooden piles A ... However, shear resistance and liquefaction resistance increase.
Therefore, the ground pile is reinforced and improved at an early stage by providing the
また、木杭A……の打設により地盤が密になり、水平応力の増加により拘束圧が増加することで地盤と丸太との摩擦応力が増加し、杭間地盤の圧密沈下量が低減する。さらに、地盤の密度増加と拘束圧増加の効果により木杭A……間の地盤の強度が上がることと地盤全体の横方向の剛性が増加し水平方向への抵抗性も増加する。 In addition, the ground becomes dense due to the placement of wooden piles A ..., and the frictional stress between the ground and the log increases by increasing the restraint pressure due to the increase in horizontal stress, reducing the amount of consolidation settlement of the ground between the piles. . Furthermore, the strength of the ground between the wooden piles A ... increases due to the effect of increasing the density of the ground and increasing the restraint pressure, and the lateral rigidity of the entire ground is increased, and the resistance in the horizontal direction is also increased.
また、砂やシルトのような地盤に木杭A……を打設した場合には、地盤の液状化に対して以下の効果がある。
すなわち、木杭A……の打設により各木杭A間の地盤密度が増加すること、木杭A……間の水平応力が増加し拘束圧が増加すること、木杭A……打設により地盤全体のせん断剛性が増加することにより地盤の液状化抵抗が増加する。
さらに、木杭A……の排水溝1……は、液状化時の過剰間隙水圧を早期に低減し、地盤の確実な強化に寄与する。
Further, when the wooden pile A ... is placed on the ground such as sand or silt, the following effects are obtained for the liquefaction of the ground.
That is, the placement of the wooden piles A ... increases the ground density between the wooden piles A, the horizontal stress between the wooden piles A ... increases and the restraint pressure increases, the wooden piles A ... As a result, the shear resistance of the ground is increased by increasing the shear rigidity of the entire ground.
Furthermore, the
なお、一般的には、地下水位以下に丸太を打設すれば丸太は時間の経過とともに水を含み飽和するが、打設直後や地盤の液状化時等、木杭A……の浮き上がりが懸念される場合がある。
この場合、打設に先立ち、木杭A……を真空チャンバーに入れて一度真空下におき、その後吸水させる飽和化処理を予め行っておくことができる。このとき、水の代わりに樹脂等を含浸させれば飽和化が進むとともに木杭A……の強度も格段に上がる。
また、この飽和化処理は、真空チャンバーを使用することなく、木杭A……の側面を所要の膜で上下端を開口させたストロー状に被覆し、その上端または下端から水または樹脂を吸い込ませることもできる。
この飽和化処理は、上記木杭B〜Eについても、同様に施すことができる。
In general, if logs are placed below the groundwater level, the logs will contain water and become saturated over time, but there is concern over the lifting of wooden piles A ... immediately after placement or when the ground is liquefied. May be.
In this case, prior to placing, the wood pile A can be placed in a vacuum chamber and once put under vacuum, and then a saturation treatment for absorbing water can be performed in advance. At this time, if the resin or the like is impregnated instead of water, the saturation progresses and the strength of the wooden pile A.
In addition, this saturation treatment covers the side surface of the wooden pile A ... with a required film in a straw shape with the upper and lower ends opened without using a vacuum chamber, and sucks water or resin from the upper end or the lower end. It can also be made.
This saturation treatment can be similarly applied to the wooden piles B to E.
木杭A……の打設後、その地盤上に盛土12をする。
上記木杭A……は、その全長またはほぼ全長が地下水位以下に位置するよう打設するのが木杭A……の腐敗防止のために好ましいが、盛土を行う場合には、たとえば、その頭部を軟弱地盤から突出状態にして打設し、その頭部同士を、鉄筋等の可撓性を有する連結部材で網状にしかも連結部材を下方へ撓ませて連結することもできる。
そして、その杭頭部および連結部材をサンドマットで埋め込み、その上に土木用シートを敷設した後に盛土12を行うことにより、盛土荷重を、軟弱地盤の表層ではなく群杭効果によってその深層に広範囲に作用させることができる。
After placing the wooden pile A ..., the
The above-mentioned wooden pile A ... is preferably placed so that its entire length or almost the entire length is below the groundwater level in order to prevent the corruption of the wooden pile A .... It is also possible to place the heads in a projecting state from the soft ground, make the heads mesh with a flexible connecting member such as a reinforcing bar, and bend the connecting member downward to connect them.
Then, by embedding the pile head and the connecting member with a sand mat and laying a civil engineering sheet thereon, and performing
軟弱地盤に打設された上記木杭A……は、盛土12の荷重を地盤の深部に伝達することで表層近くの荷重増分を減らし、表層近くの圧密沈下量を低減する。
The above-mentioned wooden pile A placed on the soft ground reduces the load increment near the surface layer by transmitting the load of the
本発明木杭Aは間伐材、主伐材のいずれからも製作できるものであるから、従来利用先の見つからなかった木材を積極的に利用することができ、しかも圧倒的に大量に使用可能である。
したがって、老齢化した樹木を大量に使用する一方、植林を進めることで、森林の若返りを促進し、花粉症等の森林問題の解決にも寄与する。
Since the present invention wood pile A can be manufactured from either thinned or main-cutting wood, it is possible to actively use wood that has not been used in the past, and can be used in an overwhelmingly large amount. .
Therefore, while using a large amount of aging trees, reforestation promotes forest rejuvenation and contributes to solving forest problems such as hay fever.
また、地下水位以下に打設された木杭A……は、ほとんど腐植しないので、長期間にわたりカーボンをストックすることができるから、大気中のCO2の削減を進めることになる。
従来、道路,水道,下水道,鉄道,建築,各種開発等を目的とする土木・建設工事は、重機の使用等によりCO2を大量に排出する地球環境に対する負荷が高い産業であるとされ、その環境イメージは低いものであったが、本発明工法は、その実施によりカーボンを大量にストックすることができるものであるから、積極的に施工を推進すれば、結果として、社会基盤整備を行いつつ、同時に、多くのカーボンをストックし地球環境の改善を図ることができるものである。
In addition, the wooden piles A ... placed below the groundwater level hardly humus, so carbon can be stocked over a long period of time, thus reducing CO 2 in the atmosphere.
Conventionally, civil engineering and construction work for the purpose of roads, water supply, sewerage, railways, architecture, various developments, etc. are considered to be industries with high impact on the global environment that emit large amounts of CO 2 due to the use of heavy machinery, etc. Although the environmental image was low, the method of the present invention can stock a large amount of carbon through its implementation. Therefore, if construction is actively promoted, as a result, social infrastructure is being improved. At the same time, a lot of carbon can be stocked to improve the global environment.
なお、本発明木杭Aに代え、上記本発明木杭B〜Eを打設してもよい。 In place of the present invention wooden pile A, the present invention wooden piles B to E may be placed.
本実施例は、本発明木杭を地下水位の高い軟弱地盤に打設してカーボンストックを行うとともに、地盤を改良し、地表にグラウンド,駐車場,公園等を造成したものである(図2)。 In this embodiment, the present invention wood pile is placed on soft ground with a high groundwater level to perform carbon stock, the ground is improved, and a ground, a parking lot, a park, etc. are created on the ground surface (FIG. 2). ).
グラウンド,駐車場,公園等は、地盤にかかる荷重がほとんど無いため、設計をほとんど必要としないが、地盤が軟弱な場合には不同沈下が生じ、地表面の平坦性が失われることが多い。
このような場合に本発明木杭A(またはB,C,D,E)……を、所定の間隔をおいて軟弱地盤21に打設することにより、カーボンストックを行うことができる。また、打設する木杭A(またはB,C,D,E)……は排水手段を備えているから早期に地盤を強化することができる。
なお、22は排水溝である。
Grounds, parking lots, parks, etc. require almost no design because there is almost no load on the ground, but when the ground is soft, uneven settlement occurs and the flatness of the ground surface is often lost.
In such a case, the carbon stock can be produced by driving the wooden pile A (or B, C, D, E)... Of the present invention on the
本実施例は、本発明木杭を軟弱地盤に打設してカーボンストックを行うとともに地盤を改良し、かつその木杭を構造物基礎として利用した例である(図3)。 The present embodiment is an example in which the wood pile of the present invention is placed on soft ground to perform carbon stock, the ground is improved, and the wood pile is used as a structure foundation (FIG. 3).
近年、腐植のおそれから、木材の建築基礎への適用はほとんど行われていないが、上記のとおり本発明木杭A(またはB,C,D,E)……を地下水位以下に打設すれば、腐植はほとんど進行しない。
そこで、必要に応じて杭頭処理や基礎底盤の引き下げ等により本発明木杭A(またはB,C,D,E)……を軟弱地盤31中に地下水位以下にして打設することでカーボンストックを行いつつ、これを戸建て住宅(図3(a))や工場・低層ビル(図3(b))の基礎とすることができる。
In recent years, due to the fear of humus, timber has been hardly applied to building foundations, but as described above, the present invention wooden pile A (or B, C, D, E) ... is placed below the groundwater level. For example, humus hardly progresses.
Therefore, the carbon pile A (or B, C, D, E) ... of the present invention is placed in the
本実施例は、本発明木杭を構造物周辺地盤へ打設してカーボンストックを行うとともに地盤を改良した例である(図4)。 The present embodiment is an example in which the wood pile is placed on the ground around the structure to perform carbon stock and the ground is improved (FIG. 4).
軟弱地盤上の構造物41は、一般的にHPC杭等の杭基礎42……で支えられる場合が多いので、その構造物41自体の沈下量は極めて小さい。
しかし、その構造物41の周辺地盤は、無対策の場合が多いため地盤沈下が発生し構造部41の一階部分と周辺の地表面との間に段差が生じてしまう場合が多い。
このようなとき、段差を縮めるために周辺地盤の表面舗装43の舗装厚を増したり盛土したりすることが行われるが、これによってさらに沈下が進むので、イタチごっこになってしまう。バリヤフリーの構造物でも、このような入り口での段差が問題となっている。
Since the
However, since the surrounding ground of the
In such a case, in order to reduce the level difference, the pavement thickness of the
そこで、これを解決するために、構造物41の周辺地盤の上記構造物41側には、本発明木杭A(またはB,C,D,E)……を軟弱地盤44を貫通させて比較的硬い支持層45まで届くよう打設し、構造物41から離れるほど木杭A……の長さを徐々に短くなるように打設する。
このように、本発明木杭は支持杭とすることも摩擦杭とすることも可能である。
これにより、地盤表面の沈下量は構造物から離れるほど徐々に多くなるので、段差の問題が解消されるとともに、カーボンストックを行うことができる。
一般のコンクリート杭や鋼製の杭を使用する場合は、長さの異なる杭を製作するのは手間が掛かるが、本発明木杭A(またはB,C,D,E)……であれば、現場にて容易に切断して長さ調整が可能である。
Therefore, in order to solve this, the wooden pile A (or B, C, D, E) of the present invention is passed through the
Thus, this invention wooden pile can be used as a support pile or a friction pile.
Thereby, the amount of settlement on the ground surface gradually increases as the distance from the structure increases, so that the problem of the step is solved and carbon stock can be performed.
When using ordinary concrete piles or steel piles, it takes time to produce piles with different lengths, but if the present invention wooden pile A (or B, C, D, E) ... The length can be adjusted easily by cutting on site.
本実施例は、本発明木杭を、水路51の下方地盤に打設してカーボンストックを行うとともに地盤を改良した例である(図5)。
The present embodiment is an example in which the wood pile is placed on the lower ground of the
水路や管路等の線状構造物は勾配を確保することが重要であるが、下水管等では、地震時の液状化や軟弱地盤の影響で勾配が変化してしまう被害がよく生じる。
この勾配の変化を防止するために水路,管路等の下方地盤に本発明木杭A(またはB,C,D,E)……を打設するとよい。
It is important to secure a gradient in linear structures such as waterways and pipes, but in sewage pipes and the like, damage often occurs due to liquefaction during earthquakes and changes in the soft ground.
In order to prevent this change in gradient, the present invention wooden pile A (or B, C, D, E)...
図示したものは、地盤52に本発明木杭A(またはB,C,D,E)……を打設し、その上に貧配合混合土を埋め戻した埋戻し層53を形成しそこに水路51を形成しているものであるが、この水路51の底部に下方地盤52に連通するドレーン54……を設けて該下方地盤52へ水を供給するようにすれば、本発明木杭A(またはB,C,D,E)……の腐植の進行を遅らせ、長期間にわたりカーボンをストックしておくことができる。
また、このような線状構造物が構築される地盤は、線状であるがゆえに地盤内の地層が変化に富む場合が多いが、木杭A(またはB,C,D,E)……はその地層に応じて切断して適宜長さを調整しながら打設することができる。
In the illustrated example, the present invention wood pile A (or B, C, D, E)... Is placed on the
In addition, since the ground on which such a linear structure is constructed is linear, the ground layer in the ground is often rich in changes, but the wooden pile A (or B, C, D, E) ... Can be placed by cutting according to the formation and adjusting the length appropriately.
本実施例は、本発明木杭を埋め立て地に打設してカーボンストックを行うとともに地盤を改良した例である(図6)。 This example is an example in which the wood pile of the present invention is placed in a landfill to perform carbon stock and the ground is improved (FIG. 6).
海洋や湖沼等の埋め立て地は、軟弱地盤に土砂を埋め立てるのでその後大きな沈下が生じる場合が多い。この対策として一般にサンドレーンやサンドコンパクション、またセメント等により地盤を固化する深層混合処理工法等がある。サンドドレーン等は山地を削り砂を確保する必要があるのに対して本実施例の工法によれば、排水のための排水溝1……を有する本発明木杭A……(またはB,C,D,E)を使用するから、サンドドレーン等と同等の効果を得ながら、環境上の効果が高い。
図6において、61は更新統、62は砂層、63は粘土層、64は砂層、65は埋土層、66は固化改良層であり、本発明木杭A(またはB,C,D,E)……は、上記埋土層65より更新統61に達するように打設されている。
その木杭A(またはB,C,D,E)……は、完全に水中に打設されることになるから腐朽のおそれがないのでカーボンを長期にストックできることになる。
In landfills such as oceans and lakes, earth and sand are reclaimed on soft ground, and large settlements often occur thereafter. As countermeasures, there are generally sand lanes, sand compaction, and a deep mixing treatment method in which the ground is solidified by cement or the like. While sand drains and the like need to cut the mountain area to secure sand, according to the construction method of the present embodiment, the present invention wood pile A ...... (or B, C) having
In FIG. 6, 61 is a Pleistocene, 62 is a sand layer, 63 is a clay layer, 64 is a sand layer, 65 is a buried layer, 66 is a solidification improvement layer, and the wood pile A (or B, C, D, E) of the present invention. ) ... is placed to reach the
Since the wooden pile A (or B, C, D, E)... Is completely placed in water, there is no risk of decay, so carbon can be stocked for a long time.
本実施例は、本発明木杭を海底軟弱地盤の浚渫法面に打設してカーボンストックを行うとともに地盤を改良した例である(図7)。 The present embodiment is an example in which the present invention wood pile is placed on the slope of the seabed soft ground to perform carbon stock and the ground is improved (FIG. 7).
航路確保のための浚渫法面71は、浚渫作業のみによって造成されるのでその勾配は緩く、また、海底地盤72は砂やシルト等で形成されている場合が多く液状化しやすいものであることが多い。
このような地盤は、地震の後液状化し平坦になろうとするので航路の水深が確保できなくなる可能性が考えられる。
そこで、本実施例はカーボンをストックするとともに浚渫法面71を安定化するために、そこに本発明木杭A(またはB,C,D,E)……を打設したものである。
本発明木杭A(またはB,C,D,E)……の打設により浚渫法面71が安定化し、斜面勾配を急にすることも可能になる。
また、液状化しやすい地盤では、木杭A(またはB,C,D,E)……の打設により液状化抵抗を増すことができ、地震によって航路が確保できなくなることを防止できる。
The
Since such ground tends to liquefy and become flat after the earthquake, there is a possibility that the water depth of the channel cannot be secured.
Therefore, in this embodiment, in order to stock carbon and stabilize the
By placing the wood pile A (or B, C, D, E) of the present invention, the
Moreover, in the ground which is easy to be liquefied, liquefaction resistance can be increased by placing the wooden piles A (or B, C, D, E)...
上記各実施例で示した以外にも、本発明木杭は、護岸や突堤基礎の地盤への打設、あるいは、河川堤防、スーパー堤防の地盤への打設等を行うことができる。 In addition to the examples shown in the above embodiments, the wooden piles of the present invention can be placed on the ground of a revetment or jetty foundation, or can be placed on the ground of a river dike or a super dike.
A〜E 地盤改良用木杭
1,1’,1” 排水溝
2 ドレーン材充填ネット
3,7 丸太
4 緊束ワイヤ
5,9 ボトムキャップ
6 排水路
8 重合丸太
11,21,31,44 軟弱地盤
12 盛土
22 排水溝
41 構造物
42 杭基礎
43 表面舗装
45 支持層
51 水路
53 埋戻し層
54 ドレーン
61 更新統
62,64 砂層
63 粘土層
65 埋土層
66 固化改良層
71 浚渫法面
72 海底地盤
A to E Ground improvement
Claims (3)
老齢化した伐採木材からなりカーボンストック用丸太の側面に軸方向のキズをつけて気中に放置し乾燥収縮させることにより広がった前記キズを排水溝とし、この排水溝にドレーン材を充填したことを特徴とする地盤改良用木杭。 It is a wooden pile for ground improvement to improve soft ground like sand and silt,
And the scratch drains spread by left drying shrinkage in the gas with a side surface in the axial flaw of carbon stock roundwood consists aging were harvested wood, it filled with drain material to the drainage grooves A wooden pile for ground improvement characterized by
老齢化した樹木の伐採によって得られた伐採木材からなりカーボンストック用丸太の側面に木材の筋を横切るように螺旋状の排水溝を形成し、この排水溝にドレーン材を充填したことを特徴とする地盤改良用木杭。 It is a wooden pile for ground improvement to improve soft ground like sand and silt,
It is characterized by the fact that a spiral drainage groove is formed on the side of the log for carbon stock , and the drainage groove is filled with drain material. A wooden pile for ground improvement.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2006026448A JP4459173B2 (en) | 2006-02-03 | 2006-02-03 | Ground improvement wooden pile and carbon stock method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2006026448A JP4459173B2 (en) | 2006-02-03 | 2006-02-03 | Ground improvement wooden pile and carbon stock method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2007205068A JP2007205068A (en) | 2007-08-16 |
| JP4459173B2 true JP4459173B2 (en) | 2010-04-28 |
Family
ID=38484763
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2006026448A Expired - Fee Related JP4459173B2 (en) | 2006-02-03 | 2006-02-03 | Ground improvement wooden pile and carbon stock method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4459173B2 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2015176195A1 (en) * | 2014-05-19 | 2015-11-26 | 雷学军 | Method for implementing "zero carbon" region development mode |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5030003B2 (en) * | 2009-09-14 | 2012-09-19 | 飛島建設株式会社 | Light weight wood, light weight wood production method and ground improvement method using light weight wood |
| JP5261839B2 (en) * | 2010-12-21 | 2013-08-14 | 飛島建設株式会社 | Method for preventing decay of wooden piles by capillary head |
| JP2012188830A (en) * | 2011-03-09 | 2012-10-04 | Oonishi:Kk | Soil improvement structure and soil improvement method |
| JP5670414B2 (en) * | 2012-12-27 | 2015-02-18 | 飛島建設株式会社 | Ground liquefaction countermeasures |
| JP2014190037A (en) * | 2013-03-27 | 2014-10-06 | Endo Ringyo Kk | Liquefaction prevention pile and manufacturing apparatus for the same |
| JP7545721B2 (en) * | 2020-10-27 | 2024-09-05 | 株式会社セリタ建設 | Wooden Pile Unit |
-
2006
- 2006-02-03 JP JP2006026448A patent/JP4459173B2/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| WO2015176195A1 (en) * | 2014-05-19 | 2015-11-26 | 雷学军 | Method for implementing "zero carbon" region development mode |
Also Published As
| Publication number | Publication date |
|---|---|
| JP2007205068A (en) | 2007-08-16 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7377726B2 (en) | Method and apparatus for building reinforced sea walls and levees | |
| CN102677682B (en) | Ecological slope protection structure and construction method thereof | |
| JP4459173B2 (en) | Ground improvement wooden pile and carbon stock method | |
| CN111173006B (en) | Ecological slope protection method for reinforcing hilly soil by combining permeable retaining wall and sounding type bar planting belt | |
| JP4782648B2 (en) | Retaining wall | |
| CN104264628B (en) | A kind of ecological health care type soil and slope protection and construction process thereof | |
| Romankiewicz et al. | 10. New perspectives on the structure of the Antonine Wall | |
| JP6989900B2 (en) | Bamboo drain material and liquefaction countermeasure construction method | |
| US9611615B2 (en) | Apparatus and method for stabilizing a slab foundation | |
| KR100541923B1 (en) | River arranging method and structure thereof | |
| CN2878518Y (en) | Stress releasing cage | |
| KR20150109121A (en) | Concrete pile utilizing wasted tire and the slope stabilizing structure thereof | |
| KR100479500B1 (en) | The slope tree-planting structure using socket type steel pipe, and his construction method | |
| JP4504864B2 (en) | Dam body reinforcement structure with wave-dissipating function | |
| JP4601525B2 (en) | Wooden pile burial method | |
| KR200328589Y1 (en) | The slope tree-planting structure using steel pipe | |
| CN202610810U (en) | Ecological slope protection structure | |
| CN115119680A (en) | Coastline landscape restoration method and coastline landscape restoration system | |
| JP5784686B2 (en) | Earth retaining structure, retaining wall structure and soil structure | |
| KR200338740Y1 (en) | River arranging structure | |
| Takuma et al. | Rebuilding Canal Bulkheads in Amsterdam’s Historic District with Pressed-In Pipe Piles | |
| Steinholtz | Wetland trail design and construction | |
| JPH07310325A (en) | Stable cylinder on ground surface | |
| Gray et al. | Protecting a pipeline | |
| JP6037490B1 (en) | Civil engineering structure and construction method of civil engineering structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080124 |
|
| RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20080205 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A821 Effective date: 20080326 |
|
| RD02 | Notification of acceptance of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7422 Effective date: 20080326 |
|
| RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20080415 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080902 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20081020 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20090414 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20090605 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20100202 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20100209 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 4459173 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130219 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130219 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140219 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140219 Year of fee payment: 4 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20150219 Year of fee payment: 5 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| S531 | Written request for registration of change of domicile |
Free format text: JAPANESE INTERMEDIATE CODE: R313531 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |
|
| LAPS | Cancellation because of no payment of annual fees |