JP4488853B2 JP2004274453A JP2004274453A JP4488853B2 JP 4488853 B2 JP4488853 B2 JP 4488853B2 JP 2004274453 A JP2004274453 A JP 2004274453A JP 2004274453 A JP2004274453 A JP 2004274453A JP 4488853 B2 JP4488853 B2 JP 4488853B2
Authority
JP
Japan
Prior art keywords
strand
jig
band
hole
bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2004274453A
Other languages
Japanese (ja)
Other versions
JP2006089960A (en
Inventor
慎一 山野辺
泰志 工藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
SE Corp
Original Assignee
Kajima Corp
SE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp, SE Corp filed Critical Kajima Corp
Priority to JP2004274453A priority Critical patent/JP4488853B2/en
Publication of JP2006089960A publication Critical patent/JP2006089960A/en
Application granted granted Critical
Publication of JP4488853B2 publication Critical patent/JP4488853B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Description

本発明は、結合治具および籠体に関するものである。   The present invention relates to a coupling jig and a housing.

従来、杭等を建設しようとする場所の上方の空間に制限がある場合には、(1)軸方向の鋼材に使用するストランドをドラムに巻きつけておき、ストランドを掘削孔に建て込みつつ帯筋を設置して籠体を組み立てる方法(例えば、特許文献1)や、(2)軸方向の鋼材にストランドを用いた籠体を、掘削孔の入り口付近で曲げつつ掘削孔内に降下させる方法(例えば、特許文献2参照)があった。   Conventionally, when there is a restriction on the space above the place where a pile or the like is to be constructed, (1) the strand used for the steel material in the axial direction is wound around the drum, and the band is built while the strand is built in the excavation hole. A method of assembling a frame by installing a line (for example, Patent Document 1), or (2) A method of lowering a frame using a strand in an axial steel material into the excavation hole while bending it near the entrance of the excavation hole (For example, see Patent Document 2).

特開平11−36294号公報Japanese Patent Laid-Open No. 11-36294 特開平11−293668号公報JP-A-11-293668

また、(3)結束治具を用いて、軸筋であるストランドと帯筋とを交差角が変化可能なように結束して籠体を形成し、ストランドを円弧状に曲げて長さを縮めた状態の籠体を、ストランドを直線状に戻しつつ掘削孔に設置する方法が提案されていた。   (3) Using a binding jig, the strands that are axis bars and the band bars are bound so that the crossing angle can be changed to form a housing, and the strands are bent into an arc shape to shorten the length. There has been proposed a method in which the skeleton in the state is placed in the excavation hole while returning the strand to a straight line.

しかしながら、(1)の方法では、孔の直上にストランドの本数と同じ数量のドラムを含む設置用機材を配置する必要があるため、広い作業領域が必要となるうえ、頻繁に継手を入れるため作業効率が良くない。(2)の方法では、組み立てた鉄筋籠を限られた空頭内で曲げるのが困難である。   However, in the method (1), it is necessary to arrange installation equipment including drums in the same number as the number of strands directly above the hole, so that a large work area is required and work is frequently performed to insert joints. Inefficient. In the method (2), it is difficult to bend the assembled reinforcing bar rod within a limited empty head.

(3)の方法は、(1)、(2)の問題点を解決するものであるが、その結合治具は、ストランドと帯鉄筋をそれぞれ断面が円形の部材で保持し、結合するものであった。結合治具の寸法や構造は,完成した杭の曲げモーメントやせん断力に対する耐荷性能、籠体を製造する過程における作業の容易さ、籠体の縮小率などにおいて極めて重要な役割を担っており、改良が望まれていた。   The method of (3) solves the problems of (1) and (2), but the joining jig holds and joins the strand and the band reinforcing bar with members each having a circular cross section. there were. The dimensions and structure of the connecting jig play an extremely important role in the load bearing performance against the bending moment and shearing force of the finished pile, the ease of work in the process of manufacturing the frame, the reduction rate of the frame, etc. Improvement was desired.

本発明は、このような問題に鑑みてなされたもので、その目的とするところは、ストランドへの治具取り付け、帯鉄筋への治具取り付け、籠体の組立などの各工程における作業性が良く、経済的で、籠体の長さを十分に縮小できる結合治具および籠体を提供することにある。   The present invention has been made in view of such a problem, and the object of the present invention is that workability in each process such as jig attachment to a strand, jig attachment to a band rebar, and assembly of a frame is performed. It is an object of the present invention to provide a coupling jig and a casing that are good, economical, and can sufficiently reduce the length of the casing.

前述した目的を達成するための第1の発明は、軸筋であるストランドを保持する筒状部材と、前記ストランドの周囲に設けられた帯筋に固定されたアングル材と、端部が前記筒状部材の外側面に固定され、前記アングル材を貫通する棒材と、前記アングル材が前記棒材から抜けることを防ぐために前記棒材に設置される部材と、からなり、前記アングル材に対して前記筒状部材が回転することを特徴とする結合治具である。筒状部材は、例えば鋼管とする。この場合、ストランドを鋼管の内部に通し、ストランドと鋼管との間に樹脂等の接着剤を充填する。   According to a first aspect of the present invention for achieving the above-described object, a cylindrical member that holds a strand that is an axial bar, an angle member fixed to a band provided around the strand, and an end portion of the cylindrical bar A rod member that is fixed to the outer surface of the shaped member and penetrates the angle member, and a member that is installed on the rod member to prevent the angle member from being removed from the rod member. And the cylindrical member rotates. The cylindrical member is, for example, a steel pipe. In this case, the strand is passed through the steel pipe, and an adhesive such as a resin is filled between the strand and the steel pipe.

第2の発明は、軸筋であるストランドを保持する筒状部材と、前記ストランドの周囲に設けられた帯筋に固定されたアングル材と、端部が前記筒状部材に固定されて、前記筒状部材に突出して設けられ、前記アングル材を貫通する棒材と、前記アングル材が前記棒材から抜けることを防ぐために前記棒材に設置される部材と、からなり、前記アングル材に対して前記筒状部材が回転し、前記筒状部材が、筒軸方向の2辺を外側に曲げて形成した外向き溝を有する第1の半筒体と、筒軸方向の2辺を内側に曲げて形成した内向き溝を有する第2の半筒体とからなり、前記ストランドを前記第1の半筒体内に配置し、前記外向き溝と前記内向き溝とを嵌め合わせて、前記第1の半筒体と前記第2の半筒体とを一体化することを特徴とする結合治具である。   2nd invention is the cylindrical member holding the strand which is an axial line | wire, the angle material fixed to the strip provided around the said strand, an edge part is being fixed to the said cylindrical member, A rod member that protrudes from the cylindrical member and penetrates the angle member, and a member that is installed on the rod member to prevent the angle member from falling out of the rod member. The cylindrical member is rotated, and the cylindrical member has a first semi-cylindrical body having an outward groove formed by bending two sides in the cylinder axis direction outward, and two sides in the cylinder axis direction are set inward. A second half cylinder having an inward groove formed by bending, the strand is disposed in the first half cylinder, the outward groove and the inward groove are fitted together, and the first A coupling jig characterized in that one half-cylinder and the second half-cylinder are integrated. A.

棒材は、ボルト、ネジスタッド等とする。アングル材を、筒状部材に固定されたボルト、ネジスタッド等に挿通することにより、アングル材に対する筒状部材の回転が可能となる。また、アングル材がボルト、ネジスタッド等から抜けることを防ぐために、ナットがボルト、ネジスタッド等に固定される。   The bar material shall be bolts, screw studs, etc. By inserting the angle member through a bolt, a screw stud, or the like fixed to the tubular member, the tubular member can be rotated with respect to the angle member. Further, a nut is fixed to the bolt, the screw stud, etc. in order to prevent the angle member from coming off from the bolt, the screw stud, etc.

第3の発明は、軸筋であるストランドを保持する筒状部材と、凹型に成形され、前記凹型の底部に穴を有し、前記凹型の上端部が前記ストランドの周囲に設けられた帯筋に固定されたプレス材と、一端に設けられた拡径部が前記穴を介して前記凹型の内部に配置され、他端が前記筒状部材に固定された棒材と、を具備し、前記プレス材に対して前記筒状部材が回転することを具備することを特徴とする結合治具である。   According to a third aspect of the present invention, there is provided a cylindrical member for holding a strand which is an axial line, a band formed in a concave shape, having a hole in a bottom portion of the concave shape, and an upper end portion of the concave shape provided around the strand. A pressing member fixed to the rod, and a diameter-enlarged portion provided at one end is disposed inside the concave mold through the hole, and a rod member having the other end fixed to the cylindrical member, It is a coupling jig characterized in that the cylindrical member rotates with respect to the press material.

プレス材に設けられる穴は、径が棒材の拡径部の径より大きい第1の穴と、径が棒材の拡径部の径より小さく棒材の通常部の径より大きい第2の穴とを連続して配置したものとするのが望ましい。棒材の拡径部は、第1の穴に通してプレス材の凹型の内部に配置される。そして、棒材を第2の穴の方向に移動させた後、第1の穴が塞がれる。   The hole provided in the press material has a first hole whose diameter is larger than the diameter of the expanded portion of the bar material, and a second hole whose diameter is smaller than the diameter of the expanded portion of the bar material and larger than the diameter of the normal portion of the bar material. It is desirable that the holes are continuously arranged. The diameter-enlarged portion of the bar is passed through the first hole and disposed inside the concave mold of the press material. Then, after the bar is moved in the direction of the second hole, the first hole is closed.

第4の発明は、第1、第2または第3の発明の結合治具を用いて、ストランドと帯筋とが結合されたことを特徴とする籠体である。帯筋の内側には、必要に応じて補強リングが設置される。   4th invention is a housing | casing characterized by the strand and the band being couple | bonded using the coupling jig of 1st, 2nd or 3rd invention. A reinforcing ring is installed inside the band as needed.

本発明によれば、ストランドへの治具取り付け、帯鉄筋への治具取り付け、籠体の組立などの各工程における作業性が良く、経済的で、籠体の長さを十分に縮小できる結合治具および籠体を提供できる。   According to the present invention, the workability in each process such as jig attachment to a strand, jig attachment to a reinforcing bar, and assembly of a housing is good, economical, and the coupling can sufficiently reduce the length of the housing. A jig and a housing can be provided.

以下、図面に基づいて、本発明の第1の実施の形態について詳細に説明する。図1は、籠体1の立面図である。図1の(a)図は、通常の状態の籠体1の立面図、図1の(b)図は、長さを縮めた状態の籠体1の立面図を示す。図1に示すように、籠体1は、軸筋であるストランド3、複数のストランド3を囲むように配置された帯筋5等からなる。   Hereinafter, a first embodiment of the present invention will be described in detail with reference to the drawings. FIG. 1 is an elevational view of the housing 1. 1A is an elevation view of the housing 1 in a normal state, and FIG. 1B is an elevation view of the housing 1 in a shortened length. As shown in FIG. 1, the housing 1 includes a strand 3 that is an axial line, a band 5 that is disposed so as to surround the plurality of strands 3, and the like.

ストランド3は、帯筋5の直径と同程度以上に曲げても強度等に問題が生じないような、可撓性を有する材料とする。ストランド3には、例えば、PC鋼より線、ワイヤロープの他、炭素繊維、グラスファイバー、アラミド繊維等の繊維をより合わせたもの等が用いられる。帯筋5は、鉄筋等とする。   The strand 3 is made of a flexible material that does not cause a problem in strength or the like even if it is bent to the same degree or more as the diameter of the band 5. The strand 3 is made of, for example, a twisted PC fiber, a wire rope, or a combination of fibers such as carbon fiber, glass fiber, and aramid fiber. The band 5 is a reinforcing bar or the like.

図2は、ストランド3と帯鉄筋5の結合に用いる回転結合治具7(7a)の斜視図である。図3は、ストランド3と帯鉄筋5との結合部の断面図である。図3の(a)図は、図1の(a)図のBaに示す部分を拡大したものの断面図、図3の(b)図は、図1の(b)図のBbに示す部分を拡大したものの断面図である。   FIG. 2 is a perspective view of a rotary coupling jig 7 (7 a) used for coupling the strand 3 and the band reinforcing bar 5. FIG. 3 is a cross-sectional view of a joint portion between the strand 3 and the band reinforcing bar 5. 3 (a) is a cross-sectional view of an enlarged portion indicated by Ba in FIG. 1 (a), and FIG. 3 (b) is a portion indicated by Bb in FIG. 1 (b). It is sectional drawing of what was expanded.

図2、図3に示すように、回転結合治具7は、スリーブ9、アングル材11、ワッシャ13、ネジスタッド15、ナット16、ナット17等からなる。スリーブ9は、ストランド3を保持する筒状部材である。スリーブ9の内部にはストランド3が通され、スリーブ9とストランド3との間には、接着剤として樹脂19等が充填される。ネジスタッド15は、その一端の溶接部23において、スリーブ9の外側面に固定される。   As shown in FIGS. 2 and 3, the rotary coupling jig 7 includes a sleeve 9, an angle member 11, a washer 13, a screw stud 15, a nut 16, a nut 17, and the like. The sleeve 9 is a cylindrical member that holds the strand 3. The strand 3 is passed through the inside of the sleeve 9, and a resin 19 or the like is filled as an adhesive between the sleeve 9 and the strand 3. The screw stud 15 is fixed to the outer surface of the sleeve 9 at a welded portion 23 at one end thereof.

アングル材11は、辺11aと辺11bとからなる。アングル材11の辺11aの外側面12aは、フレア溶接等によって帯鉄筋5に固定される。帯鉄筋5は、通常、1本の鉄筋を円弧状に加工し、両端を重ね合せた部分をフレア溶接して1本の環状としている。この溶接は、適切な管理のもとに行えれば、帯鉄筋5としての強度などの所要性能を確保することができる。アングル材11を帯鉄筋5に固定する際にも、適切な方法と管理によって直接溶接することにより、十分な強度が得られる。   The angle member 11 includes a side 11a and a side 11b. The outer surface 12a of the side 11a of the angle member 11 is fixed to the belt reinforcing bar 5 by flare welding or the like. The band reinforcing bar 5 is usually formed into a single ring by processing one reinforcing bar into an arc shape and flaring the portion where both ends are overlapped. If this welding can be performed under appropriate management, required performance such as strength as the belt reinforcing bar 5 can be secured. Even when the angle member 11 is fixed to the rebar 5, sufficient strength can be obtained by direct welding by an appropriate method and management.

ネジスタッド15の溶接部23の周囲には、ワッシャ13が配置される。ネジスタッド15のネジ部21は、アングル材11の辺11bに挿通される。ワッシャ13はネジスタッド15とアングル材11の回転を円滑にする。ナット16およびナット17は、お互いを締付けるように螺合することでネジスタッド15に固定され、ネジスタッド15がアングル材11から抜け出すのを防ぐ。   A washer 13 is disposed around the welded portion 23 of the screw stud 15. The screw portion 21 of the screw stud 15 is inserted into the side 11 b of the angle member 11. The washer 13 makes the screw stud 15 and the angle member 11 rotate smoothly. The nut 16 and the nut 17 are fixed to the screw stud 15 by being screwed together so as to prevent the screw stud 15 from coming out of the angle member 11.

回転結合治具7を用いてストランド3と帯鉄筋5とを結合するには、例えば、ネジスタッド15が固定されたスリーブ9の内部にストランド3を通して樹脂19を充填する。また、アングル11の辺11aに帯鉄筋5を溶接しておく。そして、ネジスタッド15をワッシャ13、アングル材11に挿通し、ネジ部21にナット16、ナット17を捩じ込む。   In order to couple the strand 3 and the band reinforcing bar 5 using the rotary coupling jig 7, for example, the resin 19 is filled through the strand 3 into the sleeve 9 to which the screw stud 15 is fixed. Further, the band reinforcing bar 5 is welded to the side 11 a of the angle 11. Then, the screw stud 15 is inserted into the washer 13 and the angle member 11, and the nut 16 and the nut 17 are screwed into the screw portion 21.

回転結合治具7を用いて籠体1を組み立てる際には、アングル材11の辺11bが同心円上に配置されるようにすれば、ストランド3が真円上に配置される。そのため、辺11aに溶接される帯鉄筋5の真円誤差による位置の多少不ぞろいは問題とならない。   When assembling the housing 1 using the rotary coupling jig 7, if the sides 11b of the angle member 11 are arranged on a concentric circle, the strand 3 is arranged on a perfect circle. For this reason, the unevenness of the position due to the roundness error of the band reinforcing bar 5 welded to the side 11a does not cause a problem.

回転結合治具7では、図2の矢印Cに示すように、アングル材11に対して、ネジスタッド15が固定されたスリーブ9が回転する。これにより、籠体1では、ストランド3と帯鉄筋5との交差角を変化させることができる。   In the rotary coupling jig 7, as shown by an arrow C in FIG. 2, the sleeve 9 to which the screw stud 15 is fixed rotates with respect to the angle member 11. Thereby, in the housing 1, the crossing angle of the strand 3 and the band reinforcement 5 can be changed.

籠体1が図1の(a)図に示す状態のとき、Baに示すストランド3と帯鉄筋5との交差点は図3の(a)図に示す状態であるが、図1の(a)図の矢印Aに示す方向にストランド3を曲げると、図3の(b)図に示すように、帯鉄筋5とストランド3との交差角が変化し、ストランド3が螺旋状になると同時に帯筋5の配筋間隔が徐々に縮まり、図1の(b)図に示すように籠体1の長さが短くなる。   When the housing 1 is in the state shown in FIG. 1A, the intersection of the strand 3 and the reinforcing bar 5 shown in Ba is in the state shown in FIG. 3A, but in FIG. When the strand 3 is bent in the direction shown by the arrow A in the figure, as shown in FIG. 3 (b), the crossing angle between the band reinforcing bar 5 and the strand 3 changes, and the strand 3 becomes spiral and at the same time 5 is gradually reduced, and the length of the casing 1 is shortened as shown in FIG.

籠体1は、図1の(b)図に示すように縮小された状態から、図1の(a)図に示すように伸展させつつ、地盤に掘削された孔内に設置される。籠体1を伸展させる際には、帯鉄筋5とストランド3との交差角が変化して、ストランド3が直線状になると同時に、帯筋5の配筋間隔が徐々に大きくなる。   The casing 1 is installed in a hole excavated in the ground while being extended as shown in FIG. 1A from the contracted state as shown in FIG. When the frame 1 is extended, the crossing angle between the band reinforcing bar 5 and the strand 3 changes, and the strand 3 becomes linear, and at the same time, the bar arrangement interval of the band 5 gradually increases.

このように、第1の実施の形態の回転結合治具7を用いれば、帯鉄筋5へのアングル材11の取り付けと、ストランド3へのスリーブ9の取り付けを別工程で行え、分業が可能であるので、製造効率が良い。アングル材11に帯鉄筋5を直接溶接するため、従来の治具と比較して、部品数が少なく、コストが安くなる。また、帯鉄筋5の加工精度を必要以上に厳しくする必要がなく、真円に対して誤差をもっている場合にも、精度のよい籠体1を容易に製造することができる。   As described above, when the rotary coupling jig 7 according to the first embodiment is used, the attachment of the angle material 11 to the rebar 5 and the attachment of the sleeve 9 to the strand 3 can be performed in separate processes, and division of labor is possible. Because there is, production efficiency is good. Since the band reinforcing bar 5 is directly welded to the angle member 11, the number of parts is smaller and the cost is lower than that of a conventional jig. In addition, it is not necessary to make the processing accuracy of the band reinforcing bar 5 stricter than necessary, and even when there is an error with respect to the perfect circle, the highly accurate casing 1 can be easily manufactured.

次に、第2の実施の形態について説明する。図4は、帯鉄筋5に取り付けた回転結合治具25の図である。図4の(a)図は、帯鉄筋5に取り付けた回転結合治具25を円形の帯鉄筋5の上下方向から見た図、図4の(b)図は、帯鉄筋5に取り付けた回転結合治具25を円形の帯鉄筋5の内側方向から見た図を示す。   Next, a second embodiment will be described. FIG. 4 is a view of the rotary coupling jig 25 attached to the band reinforcing bar 5. 4A is a view of the rotary coupling jig 25 attached to the band rebar 5 as viewed from the vertical direction of the circular band rebar 5, and FIG. 4B is a rotation attached to the band rebar 5. The figure which looked at the coupling jig 25 from the inner side direction of the circular rebar 5 is shown.

第2の実施の形態では、図1に示す籠体1を組み立てる際に、図2、図3に示す回転結合治具7のかわりに、回転結合治具25を用いる。図5は、ストランド3と帯鉄筋5との結合部の断面図である。図5の(a)図は、図1の(a)図のBaに示す部分を拡大したものの断面図、図5の(b)図は、図1の(b)図のBbに示す部分を拡大したものの断面図である。   In the second embodiment, when the casing 1 shown in FIG. 1 is assembled, a rotary coupling jig 25 is used instead of the rotary coupling jig 7 shown in FIGS. FIG. 5 is a cross-sectional view of a connecting portion between the strand 3 and the band reinforcing bar 5. 5 (a) is a cross-sectional view of an enlarged portion indicated by Ba in FIG. 1 (a), and FIG. 5 (b) is a portion indicated by Bb in FIG. 1 (b). It is sectional drawing of what was expanded.

図4、図5に示すように、回転結合治具25は、スリーブ9、プレス材27、スタッド31、外れ止め37等からなる。図5に示すように、スリーブ9は、ストランド3を保持する筒状部材である。スリーブ9の内部にはストランド3が通され、スリーブ9とストランド3との間には、接着剤として樹脂19等が充填される。   As shown in FIGS. 4 and 5, the rotary coupling jig 25 includes a sleeve 9, a press material 27, a stud 31, a stopper 37 and the like. As shown in FIG. 5, the sleeve 9 is a cylindrical member that holds the strand 3. The strand 3 is passed through the inside of the sleeve 9, and a resin 19 or the like is filled as an adhesive between the sleeve 9 and the strand 3.

図4の(a)図に示すように、スタッド31は、本体35と、本体35の片端の溶接部33と、本体35の他端に設けられた拡径部である頭部29とからなる。スタッド31は、その一端の溶接部33において、スリーブ9の外側面に固定される。また、外れ止め37は、板状材の2辺を、それぞれL字型とコの字型に曲げて形成したものである。   As shown in FIG. 4A, the stud 31 includes a main body 35, a welded portion 33 at one end of the main body 35, and a head portion 29 that is a diameter-expanded portion provided at the other end of the main body 35. . The stud 31 is fixed to the outer surface of the sleeve 9 at a welded portion 33 at one end thereof. Further, the stopper 37 is formed by bending two sides of the plate-like material into an L shape and a U shape, respectively.

図4の(a)図に示すように、プレス材27は、凹型部28の凹型の上端に溶接部30を設けて成形され、溶接部30が帯鉄筋5に固定される。プレス材27を帯鉄筋5に固定する際にも、第1の実施の形態でのアングル材11の帯鉄筋5への固定と同様に、適切な方法と管理によって直接溶接することにより、帯鉄筋5としての十分な強度が得られる。   As shown in FIG. 4A, the press material 27 is formed by providing a welded portion 30 at the upper end of the concave mold portion 28, and the welded portion 30 is fixed to the band reinforcing bar 5. Even when the press member 27 is fixed to the band rebar 5, similarly to the fixing of the angle member 11 to the band rebar 5 in the first embodiment, the band rebar is directly welded by an appropriate method and management. A sufficient strength as 5 is obtained.

図4の(b)図に示すように、プレス材27の凹型部28の底部32には、鍵穴39が設けられる。鍵穴39は、径がスタッド31の頭部29の径より大きい穴39aと、径がスタッド31の頭部29の径より小さく本体35の径より大きい穴39bとを連続して配置したものである。   As shown in FIG. 4B, a keyhole 39 is provided in the bottom 32 of the concave portion 28 of the press material 27. The key hole 39 is formed by continuously arranging a hole 39 a having a diameter larger than the diameter of the head 29 of the stud 31 and a hole 39 b having a diameter smaller than the diameter of the head 29 of the stud 31 and larger than the diameter of the main body 35. .

図4、図5に示すように、スタッド31の頭部29は、プレス材27の凹型部28の内部に配置される。スタッド31の本体35は、穴39b内に配置される。なお、図5に示すように、回転結合治具25の供用中には、図4の(b)図に示すように、外れ止め37をプレス材27に嵌め込むことによって穴39aが塞がれる。外れ止め37は、スタッド31の頭部39が鍵穴39から抜けるのを防ぐ。   As shown in FIGS. 4 and 5, the head portion 29 of the stud 31 is disposed inside the concave portion 28 of the press material 27. The main body 35 of the stud 31 is disposed in the hole 39b. As shown in FIG. 5, during use of the rotary coupling jig 25, as shown in FIG. 4B, the hole 39 a is closed by fitting the stopper 37 into the press material 27. . The stopper 37 prevents the head 39 of the stud 31 from coming out of the key hole 39.

回転結合治具25を用いてストランド3と帯鉄筋5とを結合するには、例えば、スリーブ9の外側面にスタッド31を固定し、内部にストランド3を通して樹脂19を充填する。また、プレス材27を帯鉄筋5に固定しておく。そして、プレス材27の鍵穴39の穴39aにスタッド31の頭部29を挿入し、スタッド31を図4の(a)図の矢印Eに示す方向に移動させて本体31を穴39b内に配置した後、図4の(b)図に示すように外れ止め37をプレス材27に嵌め込んで穴39aを塞ぐ。   In order to couple the strand 3 and the reinforcing bar 5 using the rotary coupling jig 25, for example, the stud 31 is fixed to the outer surface of the sleeve 9, and the resin 19 is filled through the strand 3 inside. Further, the press material 27 is fixed to the rebar 5. Then, the head portion 29 of the stud 31 is inserted into the hole 39a of the key hole 39 of the press material 27, and the stud 31 is moved in the direction indicated by the arrow E in FIG. 4A to arrange the main body 31 in the hole 39b. After that, as shown in FIG. 4B, the stopper 37 is fitted into the press material 27 to close the hole 39a.

回転結合治具25では、図4の(b)図の矢印Fに示すように、プレス材27に対して、スリーブ9に固定されたスタッド31が回転する。これにより、籠体1では、ストランド3と帯鉄筋5との交差角を変化させることができる。   In the rotation coupling jig 25, as shown by an arrow F in FIG. 4B, the stud 31 fixed to the sleeve 9 rotates with respect to the press material 27. Thereby, in the housing 1, the crossing angle of the strand 3 and the band reinforcement 5 can be changed.

籠体1が図1の(a)図に示す状態のとき、Baに示すストランド3と帯鉄筋5との交差点は図5の(a)図に示す状態であるが、図1の(a)図の矢印Aに示す方向にストランド3を曲げると、図5の(b)図に示すように、帯鉄筋5とストランド3との交差角が変化し、ストランド3が螺旋状になると同時に帯筋5の配筋間隔が徐々に縮まり、図1の(b)図に示すように籠体1の長さが短くなる。   When the housing 1 is in the state shown in FIG. 1 (a), the intersection of the strand 3 and the reinforcing bar 5 shown in Ba is in the state shown in FIG. 5 (a), but in FIG. When the strand 3 is bent in the direction indicated by the arrow A in the figure, as shown in FIG. 5 (b), the crossing angle between the band reinforcing bar 5 and the strand 3 changes, and the strand 3 becomes spiral and at the same time. 5 is gradually reduced, and the length of the casing 1 is shortened as shown in FIG.

このように、第2の実施の形態の回転結合治具25を用いれば、帯鉄筋5へのプレス材27の取り付けと、ストランド3へのスリーブ9の取り付けを別工程で行え、分業が可能であるので、製造効率が良い。また、籠体1の組立は極めて簡単で、工場、工事現場の作業ヤードのいずれにおいても可能である。さらに、帯鉄筋5を含めた回転結合治具25の高さ寸法が小さいので、籠体1の縮小率が回転結合治具25を含む帯鉄筋5で決まってしまう場合には、第1の実施の形態よりも縮小率を向上することができる。   As described above, when the rotary coupling jig 25 of the second embodiment is used, the attachment of the press material 27 to the band reinforcing bar 5 and the attachment of the sleeve 9 to the strand 3 can be performed in separate processes, and division of labor is possible. Because there is, production efficiency is good. Further, the assembly of the housing 1 is extremely simple and can be performed in either a factory or a work yard at a construction site. Furthermore, since the height dimension of the rotary coupling jig 25 including the band reinforcing bar 5 is small, the first implementation is performed when the reduction rate of the housing 1 is determined by the band reinforcing bar 5 including the rotary coupling jig 25. The reduction rate can be improved as compared with the embodiment.

なお、プレス材27を帯鉄筋5に固定する方法は、溶接でなくてもよい。また、鍵穴39のうち穴39aを塞ぐ部材は、外れ止め37に限らず、樹脂製のリベット等を穴39aに取り付けてもよい。頭部29を有するスタッド31は、ナットとボルトを一体化したものでも代用できる。さらに、帯鉄筋5の軸直角方向に穴39aと穴39bを配置して鍵穴39を形成し、籠体1の組立時にスタッド31を軸直角方向にスライドさせて穴39aを塞いでもよい。但し、図4、図5に示すように、ストランド3の可撓性を利用して、スタッド31を帯鉄筋5の軸方向にスライドさせる方が望ましい。   In addition, the method of fixing the press material 27 to the band reinforcing bar 5 may not be welding. The member that closes the hole 39a in the key hole 39 is not limited to the stopper 37, and a resin rivet or the like may be attached to the hole 39a. The stud 31 having the head 29 can be replaced with an integrated nut and bolt. Further, the hole 39a and the hole 39b may be arranged in the direction perpendicular to the axis of the band reinforcing bar 5 to form the keyhole 39, and when the housing 1 is assembled, the stud 31 may be slid in the direction perpendicular to the axis to close the hole 39a. However, as shown in FIGS. 4 and 5, it is preferable to slide the stud 31 in the axial direction of the band reinforcing bar 5 by utilizing the flexibility of the strand 3.

次に、第3の実施の形態について説明する。図6は、帯鉄筋5aとストランド3の結合に用いる回転結合治具7bの各部品を示す図である。図7は、ストランド3と帯鉄筋5との結合部の断面図を示す図である。図7の(a)図は、図1の(a)図のBcに示す部分を拡大したものの断面図、図7の(b)図は、図1の(b)図のBdに示す部分を拡大したものの断面図である。   Next, a third embodiment will be described. FIG. 6 is a view showing each component of the rotary coupling jig 7 b used for coupling the band reinforcing bar 5 a and the strand 3. FIG. 7 is a view showing a cross-sectional view of a joint portion between the strand 3 and the band reinforcing bar 5. 7A is a cross-sectional view of an enlarged portion indicated by Bc in FIG. 1A, and FIG. 7B is a portion indicated by Bd in FIG. 1B. It is sectional drawing of what was expanded.

第3の実施の形態では、図1に示す籠体1を組み立てる際に、上下端の帯鉄筋5の位置において、ストランド3の内側に補強リング45を設置する。図6に示すように、上下端の帯鉄筋5aとストランド3の交差部には、回転結合治具7bが設置される。   In the third embodiment, when the casing 1 shown in FIG. 1 is assembled, the reinforcing ring 45 is installed inside the strand 3 at the position of the upper and lower band reinforcing bars 5. As shown in FIG. 6, a rotary coupling jig 7 b is installed at the intersection of the upper and lower ends of the rebar 5 a and the strand 3.

図6に示すように、回転結合治具7bは、回転結合治具7a(図2)の構成部品に、さらに、ネジスタッド41、ワッシャ43、補強リング45、ナット46、ナット47等を追加して構成される。   As shown in FIG. 6, the rotation coupling jig 7 b further includes a screw stud 41, a washer 43, a reinforcing ring 45, a nut 46, a nut 47 and the like in addition to the components of the rotation coupling jig 7 a (FIG. 2). Configured.

回転結合治具7bのネジスタッド41は、図7に示すように、溶接部42において、スリーブ9の外側面に固定される。ネジスタッド41は、ネジスタッド15と回転軸が一致するように配置される。   As shown in FIG. 7, the screw stud 41 of the rotary coupling jig 7 b is fixed to the outer surface of the sleeve 9 at the weld portion 42. The screw stud 41 is arranged so that the screw stud 15 and the rotation axis coincide.

ネジスタッド41の溶接部42の周囲には、ワッシャ43が配置される。ネジスタッド41のネジ部44は、補強リング45に挿通される。ワッシャ43はネジスタッド41と補強リング45の回転を円滑にする。ナット47およびナット46は、お互いを締付けるように螺合することでネジスタッド41に固定され、ネジスタッド41が補強リング45から抜け出すのを防ぐ。   A washer 43 is disposed around the welded portion 42 of the screw stud 41. The screw portion 44 of the screw stud 41 is inserted into the reinforcing ring 45. The washer 43 facilitates the rotation of the screw stud 41 and the reinforcing ring 45. The nut 47 and the nut 46 are fixed to the screw stud 41 by being screwed together so that the screw stud 41 is prevented from coming out of the reinforcing ring 45.

補強リング45は、図6に示すように、複数の円弧状の平板48、平板状の連結材49、頭付きボルト51、ナット53からなる。補強リング45は、平板48の端部を突き合せた状態で、連結材49に挟まれる。平板48と連結材49とは、ボルト51およびナット53により一体化される。   As shown in FIG. 6, the reinforcing ring 45 includes a plurality of arc-shaped flat plates 48, flat plate-shaped connecting members 49, headed bolts 51, and nuts 53. The reinforcing ring 45 is sandwiched between the connecting members 49 in a state where the end portions of the flat plate 48 are abutted. The flat plate 48 and the connecting member 49 are integrated by a bolt 51 and a nut 53.

回転結合治具7bを用いてストランド3と帯鉄筋5aとを結合するには、例えば、スリーブ9にネジスタッド15、ネジスタッド41を固定した状態で、スリーブ9の内部にストランド3を通して樹脂19を充填する。また、アングル11の辺11aに、帯鉄筋5aを溶接しておく。   In order to couple the strand 3 and the rebar 5a using the rotary coupling jig 7b, for example, in a state where the screw stud 15 and the screw stud 41 are fixed to the sleeve 9, the resin 19 is passed through the strand 3 inside the sleeve 9. Fill. Further, the band reinforcing bar 5 a is welded to the side 11 a of the angle 11.

その後、ネジスタッド15に、ワッシャ13、帯鉄筋5aを溶接したアングル材11を挿通し、ネジ部21にナット16、ナット17を捩じ込む。前後して、ネジスタッド41に、ワッシャ43、平板48を挿通し、ネジ部44にナット47、ナット46を捩じ込む。さらに、平板48端部に連結材49を配置し、平板48と連結材49に頭付きボルト51を挿入し、頭付きボルト51にナット53を捩じ込んで複数の平板48を一体化し、円形の補強リング45とする。   Thereafter, the angle member 11 welded with the washer 13 and the band rebar 5 a is inserted into the screw stud 15, and the nut 16 and the nut 17 are screwed into the screw portion 21. Before and after, the washer 43 and the flat plate 48 are inserted into the screw stud 41, and the nut 47 and the nut 46 are screwed into the screw portion 44. Further, a connecting member 49 is arranged at the end of the flat plate 48, a headed bolt 51 is inserted into the flat plate 48 and the connecting member 49, a nut 53 is screwed into the headed bolt 51, and a plurality of flat plates 48 are integrated to form a circular shape. The reinforcing ring 45 is used.

図7に示す回転結合治具7bでは、アングル材11に対して、ネジスタッド15が固定されたスリーブ9が回転する。また、補強リング45に対して、ネジスタッド41が固定されたスリーブ9が回転する。これにより、籠体1では、ストランド3と帯鉄筋5との交差角を変化させることができる。   In the rotary coupling jig 7 b shown in FIG. 7, the sleeve 9 to which the screw stud 15 is fixed rotates with respect to the angle member 11. Further, the sleeve 9 to which the screw stud 41 is fixed rotates with respect to the reinforcing ring 45. Thereby, in the housing 1, the crossing angle of the strand 3 and the band reinforcement 5 can be changed.

籠体1が図1の(a)図に示す状態のとき、Bcに示すストランド3と帯鉄筋5aとの交差点は図7の(a)図に示す状態であるが、図1の(a)図の矢印Aに示す方向にストランド3を曲げると、図7の(b)図に示すように、帯鉄筋5aとストランド3との交差角が変化し、ストランド3が螺旋状になると同時に帯筋5の配筋間隔が徐々に縮まり、図1の(b)図に示すように籠体1の長さが短くなる。   When the housing 1 is in the state shown in FIG. 1 (a), the intersection of the strand 3 and the band reinforcing bar 5a shown in Bc is in the state shown in FIG. 7 (a), but FIG. When the strand 3 is bent in the direction shown by the arrow A in the figure, as shown in FIG. 7 (b), the crossing angle between the band reinforcing bar 5a and the strand 3 changes, and the strand 3 becomes spiral at the same time. 5 is gradually reduced, and the length of the casing 1 is shortened as shown in FIG.

縮小される途中の状態にある籠体1のストランド3には、曲げと捩じれが生じており、これを帯鉄筋5とストランド3の交差部に設置される回転結合治具7が拘束している。回転結合治具7に作用する荷重は、籠体1の位置によって異なり、籠体1の端部位置、すなわち、最上下段の帯鉄筋5a位置の回転結合治具7bにおいて最も大きい。回転結合治具7bでは、補強リング45を用いることにより、強度に余裕をもたせることができる。   The strand 3 of the housing 1 that is in the process of being reduced is bent and twisted, and this is constrained by the rotary coupling jig 7 installed at the intersection of the band reinforcing bar 5 and the strand 3. . The load acting on the rotary coupling jig 7 varies depending on the position of the casing 1, and is greatest at the end position of the casing 1, that is, the rotational coupling jig 7 b at the position of the uppermost lower bar rebar 5 a. In the rotary coupling jig 7b, the reinforcement ring 45 can be used to allow a sufficient margin in strength.

このように、第3の実施の形態によれば、籠体1の上下端部において、第1の実施の形態の回転結合治具7aに補強リング45等を追加した回転結合治具7bを用いる。これにより、回転結合治具7bは、帯鉄筋5aとストランド3の交差部に作用する荷重に対し、十分耐えられるものとなる。追加された補強リング45等は、籠体1が完全に伸展した状態では不要であるので、必要に応じて回収・再利用が可能である。   Thus, according to the third embodiment, the rotary coupling jig 7b in which the reinforcing ring 45 and the like are added to the rotary coupling jig 7a of the first embodiment is used at the upper and lower ends of the housing 1. . Thereby, the rotation coupling jig 7b can sufficiently withstand the load acting on the crossing portion of the band reinforcing bar 5a and the strand 3. The added reinforcing ring 45 or the like is unnecessary when the housing 1 is fully extended, and can be collected and reused as necessary.

なお、補強リングは、図6に示すような、複数の平板48を円形に一体化したものに限らない。補強リングは、例えば、帯鉄筋5と同様の組立リング鉄筋としてもよい。補強リングの設置位置は、籠体1の上下端のみに限らない。第3の実施の形態では、回転結合治具7aと補強リング45を組み合わせた回転結合治具7bについて説明したが、例えば、強度が高く溶接性に劣る帯鉄筋5を用いる場合には、ストランド3と帯鉄筋5との交差点に何も設けずに、あるいは、交差点を紐状のもので結合し、ストランド3に固定したスリーブ9に補強リング45を設置してもよい。   The reinforcing ring is not limited to one in which a plurality of flat plates 48 are integrated into a circle as shown in FIG. The reinforcing ring may be, for example, an assembly ring reinforcing bar similar to the band reinforcing bar 5. The installation position of the reinforcing ring is not limited to the upper and lower ends of the housing 1. In the third embodiment, the rotary coupling jig 7b in which the rotary coupling jig 7a and the reinforcing ring 45 are combined has been described. For example, when the belt reinforcing bar 5 having high strength and poor weldability is used, the strand 3 The reinforcing ring 45 may be installed on the sleeve 9 fixed to the strand 3 without providing anything at the intersection of the steel bar 5 and the reinforcing bar 45 by connecting the intersection with a string.

次に、第4の実施の形態について説明する。図8は、ストランド3に回転結合治具55の半割方式治具57a、半割方式治具57bを設置する各工程を示す図である。図8の(a)図は、ストランド3に設置する前の半割方式治具57a、半割方式治具57bの斜視図、図8の(b)図は、半割方式治具57a、半割方式治具57bをストランド3に設置した状態の斜視図である。   Next, a fourth embodiment will be described. FIG. 8 is a diagram showing each process of installing the half-method jig 57 a and the half-method jig 57 b of the rotary coupling jig 55 on the strand 3. 8A is a perspective view of the half split method jig 57a and the half split method jig 57b before being installed on the strand 3, and FIG. 8B is a half split method jig 57a and a half split method jig 57a. It is a perspective view of the state which installed the split method jig | tool 57b in the strand 3. FIG.

図9は、ストランド3と帯鉄筋5との結合部の断面図である。図9の(a)図は、図1の(a)図のBaに示す部分を拡大したものの断面図、図9の(b)図は、図1の(b)図のBbに示す部分を拡大したものの断面図である。   FIG. 9 is a cross-sectional view of a joint portion between the strand 3 and the band reinforcing bar 5. 9 (a) is a cross-sectional view of an enlarged portion indicated by Ba in FIG. 1 (a), and FIG. 9 (b) is a portion indicated by Bb in FIG. 1 (b). It is sectional drawing of what was expanded.

図9に示すように、回転結合治具55は、半割方式治具57a、半割方式治具57b、アングル材11、ワッシャ13、ネジスタッド15、ナット16、ナット17等からなる。回転結合治具55は、図2および図3に示す回転結合治具7において、スリーブ9の代わりに、半割方式治具57a、半割方式治具57bからなる筒体を用いたものである。   As shown in FIG. 9, the rotary coupling jig 55 includes a half-type jig 57a, a half-type jig 57b, an angle member 11, a washer 13, a screw stud 15, a nut 16, a nut 17, and the like. The rotary coupling jig 55 is a rotary coupling jig 7 shown in FIGS. 2 and 3 using a cylindrical body made up of a half-type jig 57a and a half-type jig 57b instead of the sleeve 9. .

図8の(a)図に示すように、半割方式治具57aの本体61a、半割方式治具57bの本体61bは、いずれも、断面がコの字型の半筒体で、筒軸方向の2辺が斜辺となっている。半割方式治具57aの本体61aは、筒軸方向の2辺を外側に曲げて形成した外向き溝59aを有する。半割方式治具57bの本体61bは、筒軸方向の2辺を内側に曲げて形成した内向き溝59bを有する。   As shown in FIG. 8 (a), the main body 61a of the half method jig 57a and the main body 61b of the half method jig 57b are both half-cylinders having a U-shaped cross section. Two sides in the direction are the hypotenuse. The main body 61a of the half split jig 57a has an outward groove 59a formed by bending two sides in the cylinder axis direction outward. The main body 61b of the halved jig 57b has an inward groove 59b formed by bending two sides in the cylinder axis direction inward.

図8の(b)図に示すように、半割方式治具57aと半割方式治具57bとの間には、ストランド3が挟まれる。半割方式治具57aの外側面には、ネジスタッド15が、その一端の溶接部23において固定される。   As shown in FIG. 8 (b), the strand 3 is sandwiched between the half method jig 57a and the half method jig 57b. A screw stud 15 is fixed to the outer surface of the half-type jig 57a at a welded portion 23 at one end thereof.

回転結合治具55を用いてストランド3と帯鉄筋5とを結合するには、例えば、図8の(a)図に示すように、半割方式治具57aの本体61a内にストランド3を配置した後、半割方式治具57aの外向き溝59aの延長上に、半割方式治具57bの内向き溝59bを配置する。そして、外向き溝59aと内向き溝59bとを嵌め合わせつつ、半割方式治具57bを図8の(a)図の矢印Gに示す方向に移動させて、図8の(b)図に示すように、半割方式治具57aと半割方式治具57bとを筒状に一体化する。   In order to couple the strand 3 and the band reinforcing bar 5 using the rotary coupling jig 55, for example, as shown in FIG. 8 (a), the strand 3 is arranged in the main body 61a of the half split jig 57a. After that, the inward groove 59b of the half method jig 57b is disposed on the extension of the outward groove 59a of the half method jig 57a. Then, while fitting the outward groove 59a and the inward groove 59b, the halving jig 57b is moved in the direction indicated by the arrow G in FIG. 8A, and FIG. As shown, the half method jig 57a and the half method jig 57b are integrated into a cylindrical shape.

半割方式治具57aおよび半割方式治具57bとストランド3との間には、必要に応じて樹脂等を充填する。また、適切な時期に、図9に示すように、ネジスタッド15をワッシャ13、帯鉄筋5が溶接されたアングル材11に挿通し、ネジ部21にナット16、ナット17を捩じ込む。   A resin or the like is filled between the half method jig 57a and the half method jig 57b and the strand 3 as necessary. Further, at an appropriate time, as shown in FIG. 9, the screw stud 15 is inserted into the angle member 11 to which the washer 13 and the band rebar 5 are welded, and the nut 16 and the nut 17 are screwed into the screw portion 21.

回転結合治具55では、帯鉄筋5が固定されたアングル材11に対して、ネジスタッド15が固定された半割方式治具57a、半割方式治具57bが回転する。これにより、籠体1では、ストランド3と帯鉄筋5との交差角を変化させることができる。   In the rotary coupling jig 55, the half method jig 57a and the half method jig 57b to which the screw stud 15 is fixed rotate with respect to the angle member 11 to which the band reinforcing bar 5 is fixed. Thereby, in the housing 1, the crossing angle of the strand 3 and the band reinforcement 5 can be changed.

籠体1が図1の(a)図に示す状態のとき、Baに示すストランド3と帯鉄筋5との交差点は図9の(a)図に示す状態であるが、図1の(a)図の矢印Aに示す方向にストランド3を曲げると、図9の(b)図に示すように、帯鉄筋5とストランド3との交差角が変化し、ストランド3が螺旋状になると同時に帯筋5の配筋間隔が徐々に縮まり、図1の(b)図に示すように籠体1の長さが短くなる。   When the housing 1 is in the state shown in FIG. 1 (a), the intersection of the strand 3 and the reinforcing bar 5 shown in Ba is in the state shown in FIG. 9 (a), but in FIG. 1 (a). When the strand 3 is bent in the direction indicated by the arrow A in the figure, as shown in FIG. 9B, the crossing angle between the band reinforcing bar 5 and the strand 3 changes, and at the same time the strand 3 becomes spiral, the band 5 is gradually reduced, and the length of the casing 1 is shortened as shown in FIG.

このように、第4の実施の形態では、半筒体の半割方式治具57a、半割方式治具57bを、ストランド3を挟んで一体化させる。第1の実施の形態に示すような筒状のスリーブ9(図2)を用いる場合は、製造ラインでストランド3の端部に圧着スリーブ等を加工する前に必要な数のスリーブ9をストランド3に取り付ける必要があるが、半割方式治具57a、半割方式治具57bは取り付け時期を選ばない。半割方式治具57a、半割方式治具57bは、通常の製造ラインでストランド3の端部に圧着スリーブ等を加工した後にストランド3に取り付けることができる。   As described above, in the fourth embodiment, the half-cylinder method jig 57 a and the half method jig 57 b are integrated with the strand 3 interposed therebetween. When the cylindrical sleeve 9 (FIG. 2) as shown in the first embodiment is used, the necessary number of the sleeves 9 is added to the strand 3 before the crimping sleeve or the like is processed at the end of the strand 3 in the production line. However, the halving method jig 57a and the halving method jig 57b can be attached at any time. The half method jig 57a and the half method jig 57b can be attached to the strand 3 after a crimping sleeve or the like is processed at the end of the strand 3 in a normal production line.

また、通常、ストランド3の端部は、素線がほどけないようにバンドなどで結束されており、径が大きくなっている。そのため、スリーブ9にストランド3を挿通させる方法では、スリーブ9の内径をストランド3の端部を挿通させることができる大きさとする必要がある。しかし、半割方式治具57a、半割方式治具57bを用いることにより、本体61a、本体61bの大きさをストランド3の外接直径に合わせて設定することができる。   In addition, the ends of the strands 3 are usually bundled with a band or the like so that the strands cannot be unwound and have a large diameter. Therefore, in the method of inserting the strand 3 through the sleeve 9, it is necessary to make the inner diameter of the sleeve 9 large enough to insert the end of the strand 3. However, the size of the main body 61a and the main body 61b can be set according to the circumscribed diameter of the strand 3 by using the half method jig 57a and the half method jig 57b.

回転結合治具55では、本体61a、本体61bの大きさをストランド3の外接直径に合わせて設定するため、ストランド3との固定に使用する樹脂の量を、スリーブ9を用いる場合と比較して、著しく減じることができる。また、ストランド3の中心と、帯鉄筋5に固定されるアングル材11との距離が小さくなるので、軸方向鋼材であるストランド3と帯鉄筋5の間隔(鋼材間隔)を小さくできる。鋼材間隔が小さいと、帯鉄筋5、回転結合治具55、ストランド3の配置位置を決定する際に、最外縁鋼材である帯鉄筋5に対するコンクリートのかぶりを十分に確保すると同時にストランド3の配置直径を大きくでき、曲げに対する有効高さが大きく取れるので、断面性能がよいことに繋がる。   Since the size of the main body 61a and the main body 61b is set according to the circumscribed diameter of the strand 3 in the rotary coupling jig 55, the amount of resin used for fixing to the strand 3 is compared with the case where the sleeve 9 is used. , Can be significantly reduced. Moreover, since the distance between the center of the strand 3 and the angle member 11 fixed to the band reinforcing bar 5 becomes small, the distance (steel material interval) between the strand 3 which is an axial steel material and the band reinforcing bar 5 can be reduced. When the steel material interval is small, when determining the arrangement position of the band reinforcing bar 5, the rotary coupling jig 55, and the strand 3, the arrangement diameter of the strand 3 is secured at the same time as ensuring the sufficient covering of the concrete with respect to the band reinforcing bar 5 which is the outermost edge steel material. Since the effective height for bending can be increased, the cross-sectional performance is improved.

なお、回転結合治具55では、半割方式治具57a、半割方式治具57bの断面形状をコの字型としたが、半割方式治具57は、一体化して筒状になるような形状であればよい。   In the rotary coupling jig 55, the cross-sectional shapes of the half method jig 57a and the half method jig 57b are U-shaped. However, the half method jig 57 is integrated into a cylindrical shape. Any shape can be used.

第1から第4の実施の形態で述べた各回転結合治具は、組み合わせて用いることができる。例えば、籠体1の縮小率が帯鉄筋5の高さ寸法で決まらない部分(杭下端付近で、通常、帯鉄筋5が200〜300mm間隔で配置される範囲)については、第1の実施の形態の回転結合治具7aを用い、縮小率が帯鉄筋5を固定する部材の高さ寸法で決まってしまう部分(杭頭付近で、通常、帯鉄筋5が125〜150mm間隔で配置される範囲)については、第2の実施の形態の回転結合治具25を用い、帯鉄筋5が最も密に配置される杭頭部直近(杭頭部から杭径の2倍程度の範囲)については、治具を用いないか紐状のもので結束し、最上下段の帯鉄筋5には第3の実施の形態の回転結合治具7bを用いることなどが考えられる。第1の実施の形態の回転結合治具7a、第2の実施の形態の回転結合治具25、第3の実施の形態の回転結合治具7bのスリーブ9の代わりに第4の実施の形態で述べたような半割方式治具を用いてもよい。   The rotary coupling jigs described in the first to fourth embodiments can be used in combination. For example, for the portion where the reduction rate of the frame 1 is not determined by the height dimension of the band reinforcing bar 5 (in the vicinity of the lower end of the pile, the range in which the band reinforcing bars 5 are usually arranged at intervals of 200 to 300 mm), The portion where the reduction rate is determined by the height dimension of the member that fixes the band reinforcing bar 5 (the range in which the band reinforcing bars 5 are usually arranged at intervals of 125 to 150 mm near the pile head) About the pile head nearest to which the rebar 5 is arranged most densely (in the range of about twice the pile diameter from the pile head) using the rotary coupling jig 25 of the second embodiment, It is conceivable that the jig is not used or is bound with a string-like one, and the rotary coupling jig 7b of the third embodiment is used for the uppermost band rebar 5. The fourth embodiment instead of the sleeve 9 of the rotary coupling jig 7a of the first embodiment, the rotary coupling jig 25 of the second embodiment, and the rotary coupling jig 7b of the third embodiment. A halved jig as described above may be used.

上述したように、帯鉄筋5の位置に応じて回転結合治具を使い分けることで、ストランド3を縮小・伸展するときに、治具に作用する荷重に対して十分な強度を有し、籠体1の製造が容易で、コストの安い籠体1を提供することができる。   As described above, by properly using the rotary coupling jig according to the position of the rebar 5, it has sufficient strength against the load acting on the jig when the strand 3 is contracted / extended, 1 is easy to manufacture and can provide a low-cost housing 1.

籠体1では、ストランド3と帯鉄筋5の全ての交差点に、第1から第4の実施の形態で述べたような回転結合治具を設置する必要はない。例えば、途中段の交差点を紐状のもので結束してもよいし、交差点に何も治具を設けなくてもよい。   In the housing 1, it is not necessary to install a rotary coupling jig as described in the first to fourth embodiments at all the intersections of the strand 3 and the band reinforcing bar 5. For example, the intersection at the middle stage may be bound with a string, or no jig may be provided at the intersection.

ストランド3と帯鉄筋5の交差点に治具を設けない場合は、籠体1を伸展する作業を行いながら、通常の結束点線などにより帯鉄筋5とストランド3とを結束することが可能である。この場合、籠体1を建てこみながら組み立てる必要があるが、籠体全体の治具個数を減らすことができ、治具のコストが安くなるという利点がある。   When a jig is not provided at the intersection of the strand 3 and the band rebar 5, the band rebar 5 and the strand 3 can be bound by a normal binding dotted line or the like while performing the work of extending the frame 1. In this case, it is necessary to assemble the housing 1 while it is built, but there is an advantage that the number of jigs in the whole housing can be reduced and the cost of the jig is reduced.

第1の実施の形態で述べたように、籠体1は、伸展させつつ掘削孔内に設置されるが、ストランド3と帯鉄筋5の交差点に治具を設けない場合は、その際、帯鉄筋5を所定の間隔で紐に取り付け、すだれ状としておいて、ストランド3を伸展した後、自重によりすだれを伸ばして所定の間隔に配置し、ストランド3と帯鉄筋5とを結束してもよい。   As described in the first embodiment, the casing 1 is installed in the excavation hole while being extended. However, in the case where no jig is provided at the intersection of the strand 3 and the strip reinforcing bar 5, The reinforcing bars 5 may be attached to the string at a predetermined interval and made into a comb shape. After the strand 3 is extended, the interstrand is stretched by its own weight and arranged at a predetermined interval, and the strand 3 and the band reinforcing bar 5 may be bound. .

以上、添付図面を参照しながら本発明にかかる結合治具および籠体の好適な実施形態について説明したが、本発明はかかる例に限定されない。当業者であれば、特許請求の範囲に記載された技術的思想の範疇内において各種の変更例または修正例に想到し得ることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。   The preferred embodiments of the coupling jig and the housing according to the present invention have been described above with reference to the accompanying drawings, but the present invention is not limited to such examples. It is obvious for those skilled in the art that various modifications or modifications can be conceived within the scope of the technical idea described in the claims, and these are naturally within the technical scope of the present invention. It is understood that it belongs.

籠体1の立面図Elevated view of enclosure 1 ストランド3と帯鉄筋5の結合に用いる回転結合治具7(7a)の斜視図The perspective view of the rotation coupling jig 7 (7a) used for the coupling | bonding of the strand 3 and the band reinforcement 5 ストランド3と帯鉄筋5との結合部の断面図Sectional drawing of the joint part of the strand 3 and the band reinforcement 5 帯鉄筋5に取り付けた回転結合治具25の図The figure of the rotation coupling jig 25 attached to the belt reinforcement 5 ストランド3と帯鉄筋5との結合部の断面図Sectional drawing of the joint part of the strand 3 and the band reinforcement 5 帯鉄筋5aとストランド3の結合に用いる回転結合治具7bの各部品を示す図The figure which shows each component of the rotation coupling jig 7b used for the coupling | bonding of the band reinforcement 5a and the strand 3 ストランド3と帯鉄筋5との結合部の断面図Sectional drawing of the joint part of the strand 3 and the band reinforcement 5 ストランド3に回転結合治具55の半割方式治具57a、半割方式治具57bを設置する各工程を示す図The figure which shows each process of installing the half method jig | tool 57a and the half method jig 57b of the rotation coupling jig 55 in the strand 3. FIG. ストランド3と帯鉄筋5との結合部の断面図Sectional drawing of the joint part of the strand 3 and the band reinforcement 5

符号の説明Explanation of symbols

1………籠体
3………ストランド
5、5a………帯鉄筋
7、7a、7b、25、55………回転結合治具
9………スリーブ
11………アングル材
15、41………ネジスタッド
16、17、46、47、53………ナット
19………樹脂
21、44………ネジ部
27………プレス材
28………凹型部
29………頭部
31………スタッド
32………底部
37………外れ止め
39………鍵穴
39a、39b………穴
45………補強リング
57a、57b………半割方式治具
59a………外向き溝
59b………内向き溝
DESCRIPTION OF SYMBOLS 1 ......... Cut 3 ......... Strand 5, 5a ......... Reinforcing bar 7, 7a, 7b, 25, 55 ......... Rotation coupling jig 9 ......... Sleeve 11 ......... Angle material 15, 41 ... …… Screw stud 16, 17, 46, 47, 53 ……… Nut 19 ……… Resin 21, 44 ……… Screw part 27 ……… Press material 28 ……… Concave part 29 ……… Head 31… …… Stud 32 ………… Bottom 37 ……… Release prevention 39 ……… Key hole 39a, 39b ……… Hole 45 ……… Reinforcement ring 57a, 57b ……… Half-type jig 59a ……… Outward groove 59b ......... Inward groove

Claims (7)

軸筋であるストランドを保持する筒状部材と、
前記ストランドの周囲に設けられた帯筋に固定されたアングル材と、
端部が前記筒状部材の外側面に固定され、前記アングル材を貫通する棒材と、
前記アングル材が前記棒材から抜けることを防ぐために前記棒材に設置される部材と、
からなり、
前記アングル材に対して前記筒状部材が回転することを特徴とする結合治具。
A cylindrical member for holding a strand which is an axis,
An angle member fixed to a band provided around the strand; and
An end portion is fixed to the outer surface of the cylindrical member , and a bar member that penetrates the angle member;
A member installed on the bar to prevent the angle member from coming off the bar;
Consists of
The coupling jig, wherein the cylindrical member rotates with respect to the angle member.
前記筒状部材が鋼管であり、前記ストランドを前記鋼管の内部に通し、前記ストランドと前記鋼管との間に接着剤を充填することを特徴とする請求項1記載の結合治具。   The coupling jig according to claim 1, wherein the cylindrical member is a steel pipe, the strand is passed through the steel pipe, and an adhesive is filled between the strand and the steel pipe. 軸筋であるストランドを保持する筒状部材と、
前記ストランドの周囲に設けられた帯筋に固定されたアングル材と、
端部が前記筒状部材に固定されて、前記筒状部材に突出して設けられ、前記アングル材を貫通する棒材と、
前記アングル材が前記棒材から抜けることを防ぐために前記棒材に設置される部材と、
からなり、
前記アングル材に対して前記筒状部材が回転し、
前記筒状部材が、筒軸方向の2辺を外側に曲げて形成した外向き溝を有する第1の半筒体と、筒軸方向の2辺を内側に曲げて形成した内向き溝を有する第2の半筒体とからなり、
前記ストランドを前記第1の半筒体内に配置し、前記外向き溝と前記内向き溝とを嵌め合わせて、前記第1の半筒体と前記第2の半筒体とを一体化することを特徴とする結合治具。
A cylindrical member for holding a strand which is an axis,
An angle member fixed to a band provided around the strand; and
An end is fixed to the cylindrical member, and is provided protruding from the cylindrical member, and a bar that penetrates the angle member,
A member installed on the bar to prevent the angle member from coming off the bar;
Consists of
The cylindrical member rotates with respect to the angle member,
The cylindrical member has a first semi-cylindrical body having an outward groove formed by bending two sides in the cylinder axis direction outward, and an inward groove formed by bending the two sides in the cylinder axis direction inward. A second half cylinder,
The strand is arranged in the first half cylinder, and the outward groove and the inward groove are fitted together to integrate the first half cylinder and the second half cylinder. A coupling jig characterized by
軸筋であるストランドを保持する筒状部材と、
凹型に成形され、前記凹型の底部に穴を有し、前記凹型の上端部が前記ストランドの周囲に設けられた帯筋に固定されたプレス材と、
一端に設けられた拡径部が前記穴を介して前記凹型の内部に配置され、他端が前記筒状部材に固定された棒材と、
を具備し、
前記プレス材に対して前記筒状部材が回転することを具備することを特徴とする結合治具。
A cylindrical member for holding a strand which is an axis,
A press material that is molded into a concave mold, has a hole in the bottom of the concave mold, and the upper end of the concave mold is fixed to a band provided around the strand;
A diameter-enlarged portion provided at one end is disposed inside the concave mold through the hole, and the other end is fixed to the cylindrical member,
Comprising
The cylindrical jig rotates with respect to the said press material, The coupling jig characterized by the above-mentioned.
前記穴が、径が前記拡径部の径より大きい第1の穴と、径が前記拡径部の径より小さく前記棒材の通常部の径より大きい第2の穴とを連続して配置したものであり、
前記拡径部を前記第1の穴に通して前記凹型の内部に配置した後、前記棒材を前記第2の穴の方向に移動させ、前記第1の穴を塞ぐことを特徴とする請求項4記載の結合治具。
The hole continuously arranges a first hole whose diameter is larger than the diameter of the enlarged diameter part and a second hole whose diameter is smaller than the diameter of the enlarged diameter part and larger than the diameter of the normal part of the bar. And
After the diameter-expanded portion is disposed in the concave mold through the first hole, the bar is moved in the direction of the second hole to close the first hole. Item 5. The connecting jig according to Item 4.
請求項1から請求項5のいずれかに記載された結合治具を用いて、ストランドと帯筋とが結合されたことを特徴とする籠体。   6. A casing comprising a strand and a band which are coupled using the coupling jig according to claim 1. 前記帯筋の内側に、補強リングが設置されたことを特徴とする請求項6記載の籠体。   The housing according to claim 6, wherein a reinforcing ring is installed inside the band.
JP2004274453A 2004-09-22 2004-09-22 Coupling jig and housing Expired - Lifetime JP4488853B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004274453A JP4488853B2 (en) 2004-09-22 2004-09-22 Coupling jig and housing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004274453A JP4488853B2 (en) 2004-09-22 2004-09-22 Coupling jig and housing

Publications (2)

Publication Number Publication Date
JP2006089960A JP2006089960A (en) 2006-04-06
JP4488853B2 true JP4488853B2 (en) 2010-06-23

Family

ID=36231197

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004274453A Expired - Lifetime JP4488853B2 (en) 2004-09-22 2004-09-22 Coupling jig and housing

Country Status (1)

Country Link
JP (1) JP4488853B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4958586B2 (en) * 2007-03-06 2012-06-20 鹿島建設株式会社 Housing and manufacturing method of housing
JP6871781B2 (en) * 2017-03-31 2021-05-12 東日本旅客鉄道株式会社 Reinforcing bar cage pile head fixing and holding structure

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52118519U (en) * 1976-03-08 1977-09-08
JPS6127387Y2 (en) * 1981-04-21 1986-08-15
JPS6110348U (en) * 1984-06-26 1986-01-22 横浜ゴム株式会社 Anti-corrosion cover for steel pipe piles
JP3051857B2 (en) * 1997-06-11 2000-06-12 征寿 佐藤 Tying tool
JP3735828B2 (en) * 1997-07-16 2006-01-18 東日本旅客鉄道株式会社 Pile construction method using foldable rebar
JP4163070B2 (en) * 2003-07-31 2008-10-08 鹿島建設株式会社 Construction method of frame and pile

Also Published As

Publication number Publication date
JP2006089960A (en) 2006-04-06

Similar Documents

Publication Publication Date Title
JP6871781B2 (en) Reinforcing bar cage pile head fixing and holding structure
JP4958586B2 (en) Housing and manufacturing method of housing
JP5541521B2 (en) Mixed structural beam
JP4163070B2 (en) Construction method of frame and pile
JP2018172869A (en) Connection structure of reinforcing bar cage and pillar member
JP4488853B2 (en) Coupling jig and housing
JP5131839B2 (en) Concrete pile with outer shell steel pipe and manufacturing method thereof
JP4757047B2 (en) Connection method and structure of pile and column member using frame and frame
JP4386804B2 (en) Seismic reinforcement structure for existing steel towers
KR101770596B1 (en) Pile connecting apparatus
JP3962320B2 (en) Construction method of filled steel pipe reinforced concrete columns
JP2001303680A (en) Joint between filled steel pipe member and RC member or PC member
KR101736575B1 (en) Assembled Reinforced Cap for Head of Pile
JP4557711B2 (en) Reinforcement structure around openings in reinforced concrete beams
JP2010174557A (en) Assembly structure of reinforcing bars and method of assembly of the same
KR102136949B1 (en) Pretentioned spun high strength concrete piles
KR101543961B1 (en) Complex pile
JP4984279B2 (en) Reinforcing bar cage for ready-made piles
JP2006037549A (en) Anchoring reinforcement and anchoring structure of band reinforcement using the same
JP5258104B2 (en) Reinforced concrete pile
KR102386761B1 (en) a structure for rebar coupler
KR101644449B1 (en) Phc pile using joint plate and connecting fin
KR20160118731A (en) Coupling device for concrete and steel File
JP4373392B2 (en) PCa material
JP4419456B2 (en) Method of joining reinforced concrete member and steel pipe concrete

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070412

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090330

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20090908

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20091105

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100330

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100330

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130409

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 4488853

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130409

Year of fee payment: 3

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160409

Year of fee payment: 6

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term