Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4521722B2 - Plant operation control system - Google Patents
[go: Go Back, main page]

JP4521722B2 - Plant operation control system - Google Patents

Plant operation control system Download PDF

Info

Publication number
JP4521722B2
JP4521722B2 JP2004359698A JP2004359698A JP4521722B2 JP 4521722 B2 JP4521722 B2 JP 4521722B2 JP 2004359698 A JP2004359698 A JP 2004359698A JP 2004359698 A JP2004359698 A JP 2004359698A JP 4521722 B2 JP4521722 B2 JP 4521722B2
Authority
JP
Japan
Prior art keywords
operation signal
control device
plant
transmission
memory
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2004359698A
Other languages
Japanese (ja)
Other versions
JP2006171841A (en
Inventor
雅司 北村
穂積 門原
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hokkaido Electric Power Co Inc
Kansai Electric Power Co Inc
Kyushu Electric Power Co Inc
Japan Atomic Power Co Ltd
Shikoku Electric Power Co Inc
Mitsubishi Heavy Industries Ltd
Original Assignee
Hokkaido Electric Power Co Inc
Kansai Electric Power Co Inc
Kyushu Electric Power Co Inc
Japan Atomic Power Co Ltd
Shikoku Electric Power Co Inc
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hokkaido Electric Power Co Inc, Kansai Electric Power Co Inc, Kyushu Electric Power Co Inc, Japan Atomic Power Co Ltd, Shikoku Electric Power Co Inc, Mitsubishi Heavy Industries Ltd filed Critical Hokkaido Electric Power Co Inc
Priority to JP2004359698A priority Critical patent/JP4521722B2/en
Publication of JP2006171841A publication Critical patent/JP2006171841A/en
Application granted granted Critical
Publication of JP4521722B2 publication Critical patent/JP4521722B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Programmable Controllers (AREA)
  • Safety Devices In Control Systems (AREA)

Description

この発明は、プラント機器の操作を行うプラント操作制御システムに係り、特に原子力プラントの安全系設備に対する運転操作のように操作信号を誤りなく伝送する必要の有る高信頼性が要求される伝送システムに関するものである。   The present invention relates to a plant operation control system that operates plant equipment, and more particularly to a transmission system that is required to transmit an operation signal without error, such as an operation for a safety system facility of a nuclear power plant. Is.

従来、原子力プラント安全施設制御装置における通常運転機能に関する部分を、安全機能に関する部分から分離することにより、少なくとも通常運転機能の部分についての厳しい管理と検査を不要にする原子力プラント安全施設制御装置がある。この装置では、原子力プラントの通常運転機能と安全機能を共有する原子力プラント安全施設制御装置において、通常運転機能を制御する通常運転機能制御装置と、この通常運転機能制御装置から独立して設けられ、安全機能を制御する安全機能制御装置と、通常機能制御装置および安全機能制御装置からの出力信号を受信して、安全機能制御装置の出力信号を優先して原子力プラントに制御信号として出力する信号優先装置とが設けられている(特許文献1参照)。   Conventionally, there is a nuclear plant safety facility control device that eliminates the need for strict management and inspection at least for the normal operation function portion by separating the portion related to the normal operation function in the nuclear plant safety facility control device from the portion related to the safety function. . In this device, in the nuclear power plant safety facility control device that shares the normal operation function and the safety function of the nuclear power plant, the normal operation function control device that controls the normal operation function and the normal operation function control device are provided independently. Safety function control device that controls safety functions, and signal priority that receives output signals from normal function control devices and safety function control devices, and prioritizes output signals of safety function control devices and outputs them as control signals to nuclear power plants The apparatus is provided (refer patent document 1).

特開平7−167987号公報(請求項1)JP-A-7-167987 (Claim 1)

従来の技術では、安全機能制御装置からの出力(Start又はStop)がある場合には常に安全機能制御装置からの操作信号が優先され、安全機能制御装置からの出力がない場合については通常運転機能制御装置からの出力がプラント側へ伝達されるというロジックとなっている。したがって、安全機能制御装置からの出力が無い場合には、通常運転機能制御装置からの出力がそのまま伝達されるため、通常運転機能制御装置が誤信号を発信した場合にはこれを防止することが出来ない。原子力プラントの操作器の場合には、常時操作信号を出し続けるのではなく、操作が行われた場合だけ操作信号が伝送されるのであるから、通常は安全機能制御装置からの出力はないため、従来の技術では通常運転機能制御装置から悪影響を受ける可能性がある。また、安全機能制御装置から常時いずれかの信号を出力するように制御回路を構成した場合には、通常運転機能制御装置からは操作を行うことができないこととなる。   In the prior art, when there is an output (Start or Stop) from the safety function control device, the operation signal from the safety function control device is always given priority, and when there is no output from the safety function control device, the normal operation function The logic is that the output from the control device is transmitted to the plant side. Therefore, when there is no output from the safety function control device, the output from the normal operation function control device is transmitted as it is, and this can be prevented when the normal operation function control device sends an error signal. I can't. In the case of a nuclear power plant controller, since the operation signal is transmitted only when the operation is performed instead of continuously outputting the operation signal, normally there is no output from the safety function control device. In the prior art, there is a possibility that the normal operation function control device may be adversely affected. In addition, when the control circuit is configured to always output any signal from the safety function control device, the operation cannot be performed from the normal operation function control device.

この発明は上記のような課題を解消するためになされたものであり、計算機化されたプラント操作制御システムにおいて、常用系の監視操作プロセッサ(中央制御装置)によって誤信号〔操作信号〕を発信(伝送)しないプラント操作制御システムを提供することを目的とする。   The present invention has been made to solve the above-described problems. In a computerized plant operation control system, an error signal [operation signal] is transmitted by an ordinary monitoring operation processor (central control device) ( The object is to provide a plant operation control system that does not transmit).

本発明は、上記従来の課題を解決するためになされたもので、特許請求の範囲に記載された各発明は、プラント操作制御システムおよびその中央制御装置として、それぞれ以下の(1)〜(5)に述べる各手段を採用したものである。   The present invention has been made in order to solve the above-described conventional problems, and each of the inventions described in the scope of the claims includes the following (1) to (5) as a plant operation control system and a central control device thereof, respectively. ) Are used.

(1)第1の手段は、プラント機器に対する操作信号を出力する中央制御装置と、前記操作信号を格納する第1のメモリを備え、第1のメモリ内に格納された前記操作信号を含む格納情報を伝送路を介して伝送する第1の伝送制御装置と、前記伝送路を介して前記格納情報を受信し、前記格納情報を格納する第1のメモリと同様の構造を有する第2のメモリを備えた第2の伝送制御装置と、第2の伝送制御装置から前記操作信号を受け取り前記プラント機器を制御する計装制御装置とを備えたプラント操作制御システムであって、
前記中央制御装置がその演算周期毎に前記第1の伝送制御装置に出力できる前記操作信号の数を1つに限定するとともに、
前記第1及び第2のメモリ内に格納される前記格納情報は、少なくとも、前記中央制御装置の演算周期毎に格納制御部によって更新される前部インクリメントカウンタと、運転員の操作があった場合に前記格納制御部によって更新される操作信号カウンタと、運転員の操作があった場合に前記中央制御装置から出力され前記格納制御部によって格納される前記操作信号と、運転員の操作がなかった場合には前記前部インクリメントカウンタの更新の後に前記中央制御装置の演算周期毎に前記格納制御部によって更新され、運転員の操作があった場合には前記前部インクリメントカウンタ、前記操作信号カウンタ及び前記操作信号の更新の後に前記中央制御装置の演算周期毎に前記格納制御部によって更新される後部インクリメントカウンタと、を有することを特徴とする。
(1) A first means includes a central control device that outputs an operation signal for plant equipment, and a first memory that stores the operation signal, and the storage includes the operation signal stored in the first memory. A first transmission control device for transmitting information via a transmission line; and a second memory having a structure similar to that of the first memory for receiving the storage information and storing the storage information via the transmission line A plant operation control system comprising: a second transmission control device including: an instrument control device that receives the operation signal from the second transmission control device and controls the plant equipment;
The central controller limits the number of operation signals that can be output to the first transmission controller for each calculation cycle to one, and
The storage information stored in the first and second memories is at least a front increment counter that is updated by a storage control unit every calculation cycle of the central control unit and an operator's operation. The operation signal counter updated by the storage control unit, the operation signal output from the central control unit and stored by the storage control unit when there was an operation of the operator, and the operation of the operator were absent In this case, after the update of the front increment counter, it is updated by the storage control unit every calculation cycle of the central control unit, and when there is an operation by an operator, the front increment counter, the operation signal counter, and A rear increment counter that is updated by the storage control unit every calculation period of the central control unit after the operation signal is updated; Characterized in that it has a.

(2)第2の手段に係るプラント操作制御システムは、前記の第1の手段において、前記第1及び第2のメモリ内に格納される前記格納情報は、前記操作信号カウンタと前記操作信号との合計値を有することを特徴とする。   (2) In the plant operation control system according to the second means, in the first means, the stored information stored in the first and second memories includes the operation signal counter, the operation signal, It has the total value of.

(3)第3の手段に係るプラント操作制御システムは、前記の第1又は第2の手段において、前記第1及び第2のメモリ内に格納される前記操作信号として、前記中央制御装置から前回以前に出力された操作信号を有することを特徴とする。   (3) The plant operation control system according to the third means is the previous operation from the central control device as the operation signal stored in the first and second memories in the first or second means. It has the operation signal output previously.

(4)第4の手段に係るプラント操作制御システムは、前記の第1から第3のいずれかの手段において、前記第1及び第2のメモリ内に格納される前記格納情報は、前記第1及び第2のメモリ内の前記格納情報が格納されるメモリエリアの最初と最後に、前記インクリメントカウンタを有することを特徴とする。   (4) In the plant operation control system according to the fourth means, in any one of the first to third means, the stored information stored in the first and second memories is the first The increment counter is provided at the beginning and end of the memory area in which the storage information in the second memory is stored.

(5)第5の手段は、前記の第1から第4のいずれかの手段において、
操作イベント受付処理に対応する 画面のID番号と、画面表示処理に対応する画面のID番号とを比較し、一致すれば操作信号を生成することを特徴とする。
(5) The fifth means is any one of the first to fourth means ,
The screen ID number corresponding to the operation event reception process is compared with the screen ID number corresponding to the screen display process, and if they match, an operation signal is generated.

特許請求の範囲に記載の各請求項に係る発明は、上記の(1)〜(5)に記載の各手段を採用しているので、それぞれ以下のような効果を有する。   The invention according to each claim described in the claims employs the means described in the above (1) to (5), and thus has the following effects.

(1)請求項1に記載の発明は上記第1の手段を採用しているので、インクリメントカウンタの値が1だけしか増加していないにもかかわらず、操作信号カウンタの値が2以上増加していた場合には、中央制御装置、伝送制御装置又は伝送路の故障により誤った信号が送信されていることが検知できる。このようにして、常用系の監視操作プロセッサ(中央制御装置)によっても、誤信号(操作信号)を発信(伝送)することのないプラント操作制御システムを提供することができる。   (1) Since the invention described in claim 1 employs the first means, the value of the operation signal counter increases by 2 or more even though the value of the increment counter has increased only by 1. If it is, it can be detected that an erroneous signal is transmitted due to a failure of the central control device, transmission control device or transmission path. In this way, it is possible to provide a plant operation control system that does not transmit (transmit) an error signal (operation signal) even by a regular monitoring operation processor (central control device).

(2)請求項2に記載の発明は上記第2の手段を採用しているので、請求項1に記載の発明の効果に加えて、受信側の第1の伝送制御装置において、各々の合計値が一致しない場合には、送信側の中央制御装置、第1の伝送制御装置又は伝送路が異常であり操作信号が誤った信号であることが検知できる。   (2) Since the invention described in claim 2 employs the second means, in addition to the effect of the invention described in claim 1, in the first transmission control device on the receiving side, If the values do not match, it can be detected that the central control device on the transmission side, the first transmission control device or the transmission path is abnormal and the operation signal is an incorrect signal.

(3)請求項3に記載の発明は上記第3の手段を採用しているので、請求項1又は請求項2に記載の発明の効果に加えて、中央制御装置から前回以前に出力された操作信号を格納することができ、中央制御装置が操作信号を第1のメモリに書き込むタイミングよりも計装制御装置が第2のメモリの操作信号を読みに行くタイミングが遅れても、計装制御装置は操作信号を漏れなく取得することができる。   (3) Since the invention described in claim 3 employs the above-mentioned third means, in addition to the effect of the invention described in claim 1 or 2, it was output from the central controller before the previous time. The operation signal can be stored, and the instrumentation control can be performed even if the timing at which the instrumentation controller reads the operation signal in the second memory is delayed from the timing at which the central controller writes the operation signal in the first memory. The apparatus can acquire the operation signal without omission.

(4)請求項4に記載の発明は上記第4の手段を採用しているので、請求項1から請求項3のいずれか1項に記載の発明の効果に加えて、最初と最後のインクリメントカウンタを比較することで、中央制御装置が所定の演算周期処理(操作信号出力処理)を終了していないことを確認することができ、操作信号の情報の同時性を確認することができる。   (4) Since the invention according to claim 4 employs the fourth means, in addition to the effect of the invention according to any one of claims 1 to 3, the first and last increments By comparing the counters, it can be confirmed that the central control device has not finished the predetermined calculation cycle processing (operation signal output processing), and the simultaneity of the information of the operation signals can be confirmed.

(5)請求項5に記載の発明は、上記第5の手段を採用しており、中央制御装置の内部で、操作イベント受付処理と画面の表示処理との処理間で画面番号の確認を行うことにしたので、中央制御装置の内部処理の健全性を自己診断することができ、誤った操作信号をプラント機器に送信することが防止される。   (5) The invention according to claim 5 employs the fifth means, and checks the screen number between the operation event reception process and the screen display process within the central control unit. As a result, the soundness of the internal processing of the central control unit can be self-diagnosed, and an erroneous operation signal can be prevented from being transmitted to the plant equipment.

以下、本発明の各実施の形態を図面に基づいて詳細に説明する。
まず、本発明の第1の実施の形態に係るプラント操作制御システムを、図1、図2、図3に基づき説明する。
図1は、本発明の第1の実施の形態に係るプラント操作制御システムを示す構成図、図2は、本発明の第1の実施の形態おける中央制御装置及び第1の伝送制御装置を示すブロック構成図、図3は、本発明の第1の実施の形態における計装制御装置への第2の伝送制御装置を示すブロック構成図である。
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
First, the plant operation control system which concerns on the 1st Embodiment of this invention is demonstrated based on FIG.1, FIG.2, FIG.3.
FIG. 1 is a configuration diagram showing a plant operation control system according to a first embodiment of the present invention, and FIG. 2 shows a central control device and a first transmission control device according to the first embodiment of the present invention. FIG. 3 is a block configuration diagram showing a second transmission control device to the instrumentation control device in the first embodiment of the present invention.

図1に図示のように、本発明の第1の実施の形態に係るプラント操作制御システムは、プラント機器を操作するための操作信号を出力する中央制御装置10aと、中央制御装置10aからの操作信号を受けて各種のプラント機器に操作信号を出力する計装制御装置20と、中央制御装置10aと伝送路30とを接続する第1の伝送制御装置11と、計装制御装置20と伝送路30とを接続する第2の伝送制御装置21とにより構成されている。なお、図1では説明の簡略化のため、中央制御装置10a及び計装制御装置20が、各々1台接続されているシステムを示したが、一般的に各々複数台接続されている。   As shown in FIG. 1, the plant operation control system according to the first embodiment of the present invention includes a central controller 10a that outputs an operation signal for operating plant equipment, and an operation from the central controller 10a. An instrumentation control device 20 that receives signals and outputs operation signals to various plant devices, a first transmission control device 11 that connects the central control device 10a and the transmission path 30, and an instrumentation control device 20 and transmission paths. The second transmission control device 21 is connected to the second transmission control device 21. In FIG. 1, for simplification of explanation, a system in which one central control device 10a and one instrumentation control device 20 are connected to each other is shown.

中央制御装置10aに接続された第1の伝送制御装置11は、伝送する信号を格納する第1のメモリ41を備えており、この第1のメモリ41内には、中央制御装置10aから送信される操作信号を含む格納情報の格納エリアとして第1の各メモリエリア42〜47が割り当てられている。また、計装制御装置20に接続された第2の伝送制御装置21は、伝送された信号を格納する第2のメモリ51を備えており、この第2のメモリ51内には、第1の伝送制御装置11から送信される操作信号を含む格納情報の格納エリアとして第2の各メモリエリア52〜57が割り当てられている。なお、第1の伝送制御装置内11の第1のメモリ41と第2の伝送制御装置21内の第2のメモリ51とは、同一の格納構造(ネットワーク装置の共有メモリ)となっている。   The first transmission control device 11 connected to the central control device 10a includes a first memory 41 for storing a signal to be transmitted. In the first memory 41, the first transmission control device 11 is transmitted from the central control device 10a. First memory areas 42 to 47 are allocated as storage areas for storage information including operation signals. The second transmission control device 21 connected to the instrumentation control device 20 includes a second memory 51 for storing the transmitted signal. The second memory 51 includes the first transmission control device 20. Second memory areas 52 to 57 are allocated as storage areas for storage information including operation signals transmitted from the transmission control device 11. Note that the first memory 41 in the first transmission control device 11 and the second memory 51 in the second transmission control device 21 have the same storage structure (shared memory of the network device).

そして、第1の伝送制御装置11、第2の伝送制御装置21並びに伝送路30は、サイクリック伝送方式のネットワーク装置を形成しており、中央制御装置10aと計装制御装置20との間で信号を送受信するにあたって、第1の伝送制御装置11、第2の伝送制御装置21内の第1のメモリ41、第2のメモリ51に格納された情報を定期的かつシーケンシャルに伝送路30を通して伝送している。   The first transmission control device 11, the second transmission control device 21, and the transmission path 30 form a cyclic transmission network device, and between the central control device 10a and the instrumentation control device 20. When transmitting and receiving signals, the information stored in the first transmission control device 11, the first memory 41 in the second transmission control device 21, and the second memory 51 is periodically and sequentially transmitted through the transmission path 30. is doing.

次に、図2に図示のように、中央制御装置10aは、運転員が操作を行う操作部101と、操作部101からの操作内容に対応した操作信号を生成する操作信号生成部102aと、中央制御装置10aが演算を行う周期毎に操作信号生成部102aで生成した操作信号を第1の伝送制御装置11に出力する操作信号出力部103とにより構成されている。   Next, as illustrated in FIG. 2, the central control device 10a includes an operation unit 101 that is operated by an operator, an operation signal generation unit 102a that generates an operation signal corresponding to the operation content from the operation unit 101, The operation signal output unit 103 is configured to output the operation signal generated by the operation signal generation unit 102a to the first transmission control device 11 at every cycle in which the central control device 10a performs calculation.

第1の伝送制御装置11は、操作信号の格納を制御する格納制御部111と、中央制御装置10aと計装制御装置20の間で送受信する信号を格納する第1のメモリ41と、所定伝送タイミング毎に第1のメモリ41内の格納情報を伝送路30を介して図1に図示の計装制御装置20へ伝送する伝送部112を備えている。   The first transmission control device 11 includes a storage control unit 111 that controls storage of operation signals, a first memory 41 that stores signals transmitted and received between the central control device 10a and the instrumentation control device 20, and a predetermined transmission. A transmission unit 112 is provided that transmits the information stored in the first memory 41 to the instrumentation control device 20 shown in FIG.

第1のメモリ41には、中央制御装置10aからの操作信号を含む格納情報の格納エリアとして第1の各メモリエリア42〜47が割り当てられている。すなわち、第1の前部(最初)インクリメントカウンタメモリエリア42には、操作信号に加えて中央制御装置10aが演算を行う周期ごとに更新するインクリメントカウンタが格納され、第1の装置番号メモリエリア43には中央制御装置10aの装置番号が格納され、第1の操作信号カウンタメモリエリア44には中央制御装置10aから新たな操作信号が出力される毎にカウントされる操作信号カウンタが格納され、第1の操作信号メモリエリア45には操作信号(操作信号N、N−1、N−2)が格納され、第1の合計値メモリエリア46には第1の操作信号カウンタメモリエリア44と第1の操作信号メモリエリア45の値の合計値が格納され、第1の後部(最後)インクリメントカウンタメモリエリア47には第1の前部インクリメントカウンタメモリエリア42と同様のインクリメントカウンタが格納される。   In the first memory 41, first memory areas 42 to 47 are allocated as storage areas for storage information including operation signals from the central controller 10a. That is, in the first front (first) increment counter memory area 42, an increment counter that is updated every period in which the central control device 10a performs an operation is stored in addition to the operation signal, and the first device number memory area 43 is stored. Stores the device number of the central control device 10a, and the first operation signal counter memory area 44 stores an operation signal counter that is counted each time a new operation signal is output from the central control device 10a. One operation signal memory area 45 stores operation signals (operation signals N, N-1, and N-2), and the first total value memory area 46 includes the first operation signal counter memory area 44 and the first operation signal counter memory area 44. Are stored in the first rear (last) increment counter memory area 47 in the first front ink. Similar increment counter and placement counter memory area 42 is stored.

そして、図3に図示のように、第2の伝送制御装置21は、図1に図示の第1の伝送制御装置11からのメモリ情報を伝送路30を介して受信する受信部121と、第1の伝送制御装置11と計装制御装置20の間で送受信する信号を格納する第2のメモリ51を備えている。   As shown in FIG. 3, the second transmission control device 21 includes a receiving unit 121 that receives the memory information from the first transmission control device 11 shown in FIG. A second memory 51 for storing a signal to be transmitted and received between the first transmission control device 11 and the instrumentation control device 20.

第2のメモリ51には、第1の伝送制御装置11から伝送される操作信号を含む格納情報の格納エリアとして第2の各メモリエリア52〜57が割り当てられている。すなわち、第2の前部インクリメントカウンタメモリエリア52には、操作信号に加えて中央制御装置10aが演算を行う周期ごとに更新するインクリメントカウンタが格納され、第2の装置番号メモリエリア53には中央制御装置10aの装置番号が格納され、第2の操作信号カウンタメモリエリア54には新たな操作信号が出力される毎にカウントされる操作信号カウンタが格納され、第2の操作信号メモリエリア55には操作信号(操作信号N、N−1、N−2)が格納され、第2の合計値メモリエリア56には第2の操作信号カウンタメモリエリア54と55の値の合計値が格納され、第2の後部インクリメントカウンタメモリエリア57には第2の前部インクリメントカウンタメモリエリア52と同様のインクリメントカウンタが格納される。   Second memory areas 52 to 57 are assigned to the second memory 51 as storage areas for storage information including operation signals transmitted from the first transmission control device 11. That is, in the second front increment counter memory area 52, in addition to the operation signal, an increment counter that is updated every period in which the central controller 10a performs an operation is stored. The device number of the control device 10 a is stored, and an operation signal counter that is counted each time a new operation signal is output is stored in the second operation signal counter memory area 54. Stores the operation signals (operation signals N, N-1, and N-2), and the second total value memory area 56 stores the total value of the values of the second operation signal counter memory areas 54 and 55. The second rear increment counter memory area 57 has an increment counter similar to the second front increment counter memory area 52. It is paid.

次に、図1〜図3に基づき、本発明の第1の実施の形態における動作について説明する。運転員がプラント機器を操作するために中央制御装置10aの操作部101を操作すると、操作信号生成部102aは、操作部101からの操作内容に対応した操作信号を生成し、操作信号出力部103に出力する。操作信号出力部103は、操作信号生成部102aで生成した操作信号を、中央制御装置10aが演算する周期毎に第1の伝送制御装置11に出力する。ここで、中央制御装置10aが各演算周期毎に操作信号出力部103から出力できる操作信号の数を1つだけに限定する。   Next, based on FIGS. 1-3, the operation | movement in the 1st Embodiment of this invention is demonstrated. When the operator operates the operation unit 101 of the central control apparatus 10a to operate the plant equipment, the operation signal generation unit 102a generates an operation signal corresponding to the operation content from the operation unit 101, and the operation signal output unit 103 Output to. The operation signal output unit 103 outputs the operation signal generated by the operation signal generation unit 102a to the first transmission control device 11 for each cycle calculated by the central control device 10a. Here, the number of operation signals that the central control apparatus 10a can output from the operation signal output unit 103 for each calculation period is limited to one.

第1の伝送制御装置11の格納制御部111は、中央制御装置10aの演算周期毎に、中央制御装置10aからの操作信号の情報を、第1のメモリ41内の第1の各メモリエリア42〜47に格納する。すなわち、格納制御部111は、第1の前部インクリメントカウンタメモリエリア42に対して、中央制御装置10aが演算を行う周期毎(つまり、中央制御装置10aから第1の伝送制御装置11に信号が出力される毎)に更新されるインクリメントカウンタを格納する。また、第1の装置番号メモリエリア43には中央制御装置10aの装置番号を格納し、第1の操作信号カウンタメモリエリア44には中央制御装置10aから新たな操作信号が出力される毎に更新する操作信号カウンタを格納する。   The storage control unit 111 of the first transmission control device 11 receives the information of the operation signal from the central control device 10a for each calculation cycle of the central control device 10a in each first memory area 42 in the first memory 41. ~ 47. That is, the storage control unit 111 sends a signal to the first transmission control device 11 from the central control device 10a for each cycle in which the central control device 10a performs an operation on the first front increment counter memory area 42. Stores an increment counter that is updated every time it is output. The first device number memory area 43 stores the device number of the central control device 10a, and the first operation signal counter memory area 44 is updated each time a new operation signal is output from the central control device 10a. The operation signal counter to be stored is stored.

そして、格納制御部111は、第1の操作信号メモリエリア45に、操作信号出力部103から出力される操作信号を格納する。この時、中央制御装置10aの各演算周期毎に出力される操作信号の数は1つだけに限定されており、その時の新たな操作信号Nがあればこの操作信号Nを第1の操作信号メモリエリア45の最初のメモリエリアに格納する。また、第1の操作信号メモリエリア45は、例えば2つのバッファエリアが設けられており、前回出力された操作信号N−1を最初から2番目のメモリエリアに、前々回の操作信号を最初から3番目のメモリエリアに格納し、新しい操作信号が送られてくる毎に順々に後方のメモリエリアに移行するように構成されている。   The storage control unit 111 stores the operation signal output from the operation signal output unit 103 in the first operation signal memory area 45. At this time, the number of operation signals output for each calculation cycle of the central controller 10a is limited to one. If there is a new operation signal N at that time, the operation signal N is used as the first operation signal. Store in the first memory area of the memory area 45. The first operation signal memory area 45 is provided with, for example, two buffer areas. The operation signal N-1 output last time is assigned to the second memory area from the beginning, and the operation signal of the previous operation is set to 3 from the beginning. The memory area is stored in the second memory area, and each time a new operation signal is sent, the memory area is sequentially shifted to the rear memory area.

更に、格納制御部111は、第1の操作信号カウンタメモリエリア44の操作信号カウンタと第1の操作信号メモリエリア45の操作信号の値の合計を計算して、第1の合計値メモリエリア46に格納し、第1の後部インクリメントカウンタメモリエリア47に第1の前部インクリメントカウンタメモリエリア42と同値のインクリメントカウンタを格納して周期処理を終える。   Further, the storage control unit 111 calculates the sum of the values of the operation signal counter in the first operation signal counter memory area 44 and the operation signal in the first operation signal memory area 45, and calculates the first total value memory area 46. In the first rear increment counter memory area 47, an increment counter having the same value as that of the first front increment counter memory area 42 is stored, and the cycle processing is finished.

すなわち、第1の伝送制御装置11は、中央制御装置10aの演算周期毎にインクリメントカウンタ42を更新し、運転員の操作があった場合には、第1の操作信号カウンタメモリエリア44の操作信号カウンタ、第1の操作信号メモリエリア45の操作信号、第1の合計値メモリエリア46の合計値を更新するとともに、処理の最後に第1の後部インクリメントカウンタメモリエリア47に同じインクリメントカウンタを格納して周期処理を終える。したがって、第1の前部インクリメントカウンタメモリエリア42と第1の後部インクリメントカウンタメモリエリア47は周期の演算が終わった時点では同じ値となり、操作信号の入力の有る無しに関わらず、第1の前部インクリメントカウンタメモリエリア42と第1の後部インクリメントカウンタメモリエリア47は更新されることとなる。一方、第1の装置番号メモリエリア43から第1の合計値メモリエリア46は操作の入力があった場合にのみ更新される。   That is, the first transmission control device 11 updates the increment counter 42 every calculation cycle of the central control device 10a, and when there is an operation by the operator, the operation signal in the first operation signal counter memory area 44 is updated. The counter, the operation signal in the first operation signal memory area 45, and the total value in the first total value memory area 46 are updated, and the same increment counter is stored in the first rear increment counter memory area 47 at the end of the processing. To finish the cycle processing. Therefore, the first front increment counter memory area 42 and the first rear increment counter memory area 47 have the same value when the cycle calculation is finished, and the first front increment counter memory area 47 and the first front increment counter memory area 47 have the same value regardless of whether the operation signal is input. The unit increment counter memory area 42 and the first rear increment counter memory area 47 are updated. On the other hand, the first device number memory area 43 to the first total value memory area 46 are updated only when an operation is input.

第1のメモリ41の第1の各メモリエリア42〜47に書き込まれた操作信号の情報は、伝送部112により、伝送路30を介して、計装制御装置20の第2の伝送制御装置21に所定の伝送タイミングによりサイクリック伝送される。第2の伝送制御装置21の受信部121は、伝送路30を介して中央制御装置10aからのメモリ情報を受信すると、第2のメモリ51内の第2の各メモリエリア52〜57に格納する。ここで、第2のメモリ51の第2の各メモリエリア52〜57には、第1のメモリ41の第1の各メモリエリア42〜47に対応した情報が格納される。   Information on the operation signal written in each of the first memory areas 42 to 47 of the first memory 41 is transmitted by the transmission unit 112 via the transmission path 30 to the second transmission control device 21 of the instrumentation control device 20. Are cyclically transmitted at a predetermined transmission timing. When the receiving unit 121 of the second transmission control device 21 receives the memory information from the central control device 10 a via the transmission path 30, the receiving unit 121 stores the memory information in the second memory areas 52 to 57 in the second memory 51. . Here, information corresponding to the first memory areas 42 to 47 of the first memory 41 is stored in the second memory areas 52 to 57 of the second memory 51.

計装制御装置20は、計装制御装置20の演算周期毎に、第2の伝送制御装置21の第2のメモリ51を読み出しに行く。ここで、計装制御装置20は、第2の操作信号カウンタメモリエリア54の操作信号カウンタを確認し、ここが更新されている場合は、前回確認時の操作信号カウント値と今回確認した操作信号カウント値の差分だけ新たな操作信号が書き込まれたと判断し、操作信号が格納されている第1の操作信号メモリエリア45から該当する新規の操作信号を読み込む。例えば、図3において、第2の操作信号カウンタメモリエリア54の操作信号カウンタが前回確認時より2つ更新されている場合、第2の操作信号メモリエリア55から操作信号Nと操作信号N−1を読み込む。   The instrumentation control device 20 reads out the second memory 51 of the second transmission control device 21 every calculation cycle of the instrumentation control device 20. Here, the instrumentation control device 20 checks the operation signal counter in the second operation signal counter memory area 54. If this is updated, the operation signal count value at the previous confirmation and the operation signal confirmed this time are confirmed. It is determined that a new operation signal has been written by the difference between the count values, and the corresponding new operation signal is read from the first operation signal memory area 45 in which the operation signal is stored. For example, in FIG. 3, when two operation signal counters in the second operation signal counter memory area 54 have been updated since the previous confirmation, the operation signal N and the operation signal N−1 from the second operation signal memory area 55 are displayed. Is read.

以上のように本発明の第1の実施の形態に係るプラント操作制御システムによれば、中央制御装置10aが各演算周期に第1の伝送制御装置11に出力できる操作信号の数を1つだけに限定したので、第1の前部インクリメントカウンタメモリエリア42のインクリメントカウンタの値が1だけしか増加していないにもかかわらず、第1の操作信号カウンタメモリエリア44の操作信号カウンタの値が2以上増加していた場合には、中央制御装置10a、第1の伝送制御装置11又は伝送路30の故障により誤った信号が送信されていることが検知できる。   As described above, according to the plant operation control system according to the first embodiment of the present invention, the central controller 10a can output only one operation signal to the first transmission controller 11 in each calculation cycle. Therefore, the value of the operation signal counter in the first operation signal counter memory area 44 is 2 even though the value of the increment counter in the first front increment counter memory area 42 has increased by only 1. If it has increased, it can be detected that an erroneous signal is transmitted due to a failure of the central control device 10a, the first transmission control device 11 or the transmission path 30.

また、この本発明の第1の実施の形態では、中央制御装置10aの第1の伝送制御装置11において、第1の操作信号カウンタメモリエリア44の操作信号カウンタの値と第1の操作信号メモリエリア45の操作信号の合計値をあらかじめ計算して第1の合計値メモリエリア46に格納して伝送するようにしているため、受信側の第2の伝送制御装置21で第2の操作信号カウンタメモリエリア54と第2の操作信号メモリエリア55の値を合計した値が第2の合計値メモリエリア56と一致しない場合には、送信側の中央制御装置10a、第1の伝送制御装置11又は伝送路30が異常であり操作信号が誤った信号であることが検知できる。   Further, in the first embodiment of the present invention, in the first transmission control device 11 of the central control device 10a, the value of the operation signal counter in the first operation signal counter memory area 44 and the first operation signal memory. Since the total value of the operation signals of the area 45 is calculated in advance and stored in the first total value memory area 46 for transmission, the second operation signal counter is received by the second transmission control device 21 on the receiving side. If the sum of the values in the memory area 54 and the second operation signal memory area 55 does not match the second total value memory area 56, the central controller 10a on the transmitting side, the first transmission controller 11 or It can be detected that the transmission line 30 is abnormal and the operation signal is an incorrect signal.

また、この本発明の第1の実施の形態では、第1の操作信号メモリエリア45、第2の操作信号メモリエリア55にバッファエリアを設けているので、中央制御装置10aから前回以前に出力された操作信号を格納することができ、中央制御装置10aが操作信号を第1のメモリ41に書き込むタイミングよりも計装制御装置20が第2のメモリ51の操作信号を読みに行くタイミングが遅れても、計装制御装置20は操作信号を漏れなく取得することができる。   In the first embodiment of the present invention, since the buffer areas are provided in the first operation signal memory area 45 and the second operation signal memory area 55, the central control device 10a outputs them before the previous time. The timing at which the instrumentation control device 20 reads the operation signal in the second memory 51 is delayed from the timing at which the central control device 10a writes the operation signal in the first memory 41. In addition, the instrumentation control device 20 can acquire the operation signal without omission.

更に、本発明の第1の実施の形態では、中央制御装置10aから伝送される操作信号情報の最初と最後にインクリメントカウンタを挿入したので、両インクリメントカウンタを比較することで、中央制御装置10aが所定の演算周期処理(操作信号出力処理)を終了していないことを確認することができ、操作信号の情報の同時性を確認することができる。   Furthermore, in the first embodiment of the present invention, since the increment counter is inserted at the beginning and the end of the operation signal information transmitted from the central controller 10a, the central controller 10a compares the two increment counters. It can be confirmed that the predetermined calculation cycle processing (operation signal output processing) has not been completed, and the simultaneity of the information of the operation signal can be confirmed.

次に、本発明の第2の実施の形態に係るプラント操作制御システムを、図4、図5に基づき説明する。
図4は、本発明の第2の実施の形態におけるプラント操作制御システムの中央制御装置の構成を示すブロック図、図5は、本発明の第2の実施の形態における中央制御装置の内部処理を示すフローチャートである。
本発明の第1の実施の形態では、送信側の中央制御装置と受信側の計装制御装置側との操作信号の伝送方式により誤信号を検知して信頼性を確保するプラント操作制御システムについて説明したが、本発明の第2の実施の形態では、送信側の中央制御装置の信頼性を高めることで、誤った操作信号がプラントに影響を与える可能性をさらに排除するようにする。
Next, a plant operation control system according to a second embodiment of the present invention will be described with reference to FIGS.
FIG. 4 is a block diagram showing the configuration of the central control device of the plant operation control system in the second embodiment of the present invention, and FIG. 5 shows the internal processing of the central control device in the second embodiment of the present invention. It is a flowchart to show.
In the first embodiment of the present invention, a plant operation control system that detects a false signal by a transmission method of an operation signal between a transmission-side central control device and a reception-side instrumentation control device side and ensures reliability. As described above, in the second embodiment of the present invention, the possibility of an erroneous operation signal affecting the plant is further eliminated by increasing the reliability of the central controller on the transmission side.

図4に図示のように、中央制御装置10bは、運転員が操作を行うタッチパネルやキーボード等の操作部101と、操作部101からの操作内容に応じてプラント機器の操作イベントを受け付ける操作イベント受付処理部110と、この操作イベントに基づいて操作信号を生成する操作信号生成部102bと、運転員が監視操作する操作画面104を制御する画像処理部105と、操作信号生成部102bで生成した操作信号を本発明の第1の実施の形態に記載の第1の伝送制御装置11に出力する操作信号出力部103とにより構成されている。   As illustrated in FIG. 4, the central control device 10b receives an operation event 101 for receiving an operation event of the plant equipment according to the operation content from the operation unit 101 and the operation unit 101 such as a touch panel or a keyboard operated by an operator. The processing unit 110, the operation signal generation unit 102b that generates an operation signal based on the operation event, the image processing unit 105 that controls the operation screen 104 monitored by the operator, and the operation generated by the operation signal generation unit 102b The operation signal output unit 103 outputs a signal to the first transmission control device 11 described in the first embodiment of the present invention.

図5に図示のように、ステップS11は、操作イベントを受け付ける処理であり、運転員がタッチパネル等の操作部101を操作して入力した操作内容に応じて、操作イベント受付処理部110がプラント機器の操作イベントを受け付ける。またそれと同時に、操作イベント受付処理部110は、当該操作イベントに含まれる画面のID番号(ID#1)を読み出す。ステップS21は、操作イベント受付処理部110が操作イベントに含まれる画面のID番号(ID#1)を操作信号生成部102bに出力する処理である。
ステップS31は、画像処理部105が現在表示中の監視操作画面104のID番号(ID#2)を操作信号生成部102bに出力する処理である。
As shown in FIG. 5, step S <b> 11 is a process for receiving an operation event, and the operation event reception processing unit 110 is operated by the plant device according to the operation content input by the operator operating the operation unit 101 such as a touch panel. The operation event of is accepted. At the same time, the operation event reception processing unit 110 reads the screen ID number (ID # 1) included in the operation event. Step S21 is a process in which the operation event reception processing unit 110 outputs the ID number (ID # 1) of the screen included in the operation event to the operation signal generation unit 102b.
Step S31 is a process of outputting the ID number (ID # 2) of the monitoring operation screen 104 currently displayed by the image processing unit 105 to the operation signal generating unit 102b.

さらに、ステップS41は、操作信号生成部102bにおいて、前記ID番号であるID#1とID#2との同一性をチェックする処理であり、ステップS51は、ID#1とID#2が一致した場合に操作信号を生成する処理である。ステップS61はID#1とID#2が一致しない場合にエラー出力を行う処理である。   Further, step S41 is a process of checking the identity between ID # 1 and ID # 2 as the ID numbers in the operation signal generation unit 102b, and step S51 is a process in which ID # 1 and ID # 2 match. In this case, the operation signal is generated. Step S61 is a process of outputting an error when ID # 1 and ID # 2 do not match.

次に、本発明の第2の実施の形態に係るプラント操作制御システムの動作について説明する。運転員が監視操作画面104を用いて操作を行う場合、操作を行うためのプラント機器は操作画面104上にあるはずである。したがって、運転員の操作に基づいて操作イベントを受け付ける処理と画面を表示する処理の双方から、表示中の画面番号を受信すればそれらは同じ画面番号となることから、ステップS11で操作イベント受付処理を行った後、ステップS21で操作イベントに含まれる画面のID番号を出力しこれをID#1とし、ステップS31で現在表示中の画面のID番号を画面制御処理から出力しこれをID#2として、ステップS41でこれらを比較することで中央制御装置10b内部の処理が健全であるかどうかを確認する。ステップS41でID#1とID#2の一致が確認できれば、中央制御装置10bは健全であると見なしてステップS51で操作信号を生成する。ステップS41でID#1とID#2が一致しなければ、中央制御装置10b内部の処理は一部が故障しているとみなしてステップS61のエラー出力をおこなう。   Next, the operation of the plant operation control system according to the second embodiment of the present invention will be described. When the operator performs an operation using the monitoring operation screen 104, the plant equipment for performing the operation should be on the operation screen 104. Therefore, if the screen number being displayed is received from both the process for accepting the operation event based on the operation of the operator and the process for displaying the screen, they will be the same screen number. In step S21, the ID number of the screen included in the operation event is output as ID # 1, and in step S31, the ID number of the currently displayed screen is output from the screen control process and is output as ID # 2. In step S41, it is confirmed whether the processing inside the central control apparatus 10b is sound by comparing them. If the coincidence between ID # 1 and ID # 2 can be confirmed in step S41, the central control apparatus 10b is regarded as healthy and generates an operation signal in step S51. If ID # 1 and ID # 2 do not coincide with each other in step S41, it is considered that a part of the processing inside the central control apparatus 10b has failed, and an error is output in step S61.

以上のように本発明の第2の実施の形態に係るプラント操作制御システムによれば、中央制御装置10bの内部で、操作イベント処理と画面の表示処理との処理間で画面番号の確認を行うことにしたので、中央制御装置10bの内部処理の健全性を自己診断することができ、誤った操作信号をプラント機器に送信することが防止される。   As described above, according to the plant operation control system according to the second embodiment of the present invention, the screen number is confirmed between the operation event process and the screen display process in the central controller 10b. As a result, the soundness of the internal processing of the central controller 10b can be self-diagnosed, and an erroneous operation signal can be prevented from being transmitted to the plant equipment.

本発明の第1の実施の形態に係るプラント操作制御システムを示す構成図である。It is a lineblock diagram showing the plant operation control system concerning a 1st embodiment of the present invention. 本発明の第1の実施の形態おける中央制御装置及び第1の伝送制御装置を示すブロック構成図である。It is a block block diagram which shows the central control apparatus and the 1st transmission control apparatus in the 1st Embodiment of this invention. 本発明の第1の実施の形態における計装制御装置への第2の伝送制御装置を示すブロック構成図である。It is a block block diagram which shows the 2nd transmission control apparatus to the instrumentation control apparatus in the 1st Embodiment of this invention. 本発明の第2の実施の形態におけるプラント操作制御システムの中央制御装置の構成を示すブロック図である。It is a block diagram which shows the structure of the central controller of the plant operation control system in the 2nd Embodiment of this invention. 本発明の第2の実施の形態における中央制御装置の内部処理を示すフローチャートである。It is a flowchart which shows the internal process of the central control apparatus in the 2nd Embodiment of this invention.

符号の説明Explanation of symbols

10a、10b 中央制御装置
11 第1の伝送制御装置
20 計装制御装置
21 第2の伝送制御装置
30 伝送路
41 第1のメモリ
51 第2のメモリ
42〜47 第1の各メモリエリア
52〜57 第2の各メモリエリア
101 操作部
102a、102b 操作信号生成部
103 操作信号出力部
104 操作画面
105 画像処理部
110 操作イベント受付処理部
111 格納制御部
112 伝送部
121 受信部
10a, 10b Central control device 11 First transmission control device 20 Instrumentation control device 21 Second transmission control device 30 Transmission path 41 First memory 51 Second memory 42 to 47 First memory areas 52 to 57 Second memory area 101 Operation unit 102a, 102b Operation signal generation unit 103 Operation signal output unit 104 Operation screen 105 Image processing unit 110 Operation event reception processing unit 111 Storage control unit 112 Transmission unit 121 Reception unit

Claims (5)

プラント機器に対する操作信号を出力する中央制御装置と、前記操作信号を格納する第1のメモリを備え、第1のメモリ内に格納された前記操作信号を含む格納情報を伝送路を介して伝送する第1の伝送制御装置と、前記伝送路を介して前記格納情報を受信し、前記格納情報を格納する第1のメモリと同様の構造を有する第2のメモリを備えた第2の伝送制御装置と、第2の伝送制御装置から前記操作信号を受け取り前記プラント機器を制御する計装制御装置とを備えたプラント操作制御システムであって、
前記中央制御装置がその演算周期毎に前記第1の伝送制御装置に出力できる前記操作信号の数を1つに限定するとともに、
前記第1及び第2のメモリ内に格納される前記格納情報は、少なくとも、前記中央制御装置の演算周期毎に前記第1の伝送制御装置内の格納制御部によって更新される前部インクリメントカウンタと、前記中央制御装置の演算周期毎に運転員の操作があった場合に前記格納制御部によって更新される操作信号カウンタと、前記中央制御装置の演算周期毎に運転員の操作があった場合に前記中央制御装置から出力され前記格納制御部によって格納される前記操作信号と、運転員の操作がなかった場合には前記前部インクリメントカウンタの更新の後に前記中央制御装置の演算周期毎に前記格納制御部によって更新され、運転員の操作があった場合には前記前部インクリメントカウンタ、前記操作信号カウンタ及び前記操作信号の更新の後に前記中央制御装置の演算周期毎に前記格納制御部によって更新される後部インクリメントカウンタと、を有することを特徴とするプラント操作制御システム。
A central control device that outputs an operation signal for plant equipment, and a first memory that stores the operation signal, and transmits storage information including the operation signal stored in the first memory via a transmission path. A second transmission control device comprising: a first transmission control device; and a second memory that has the same structure as the first memory that receives the storage information via the transmission path and stores the storage information A plant operation control system comprising an instrumentation control device that receives the operation signal from a second transmission control device and controls the plant equipment,
The central controller limits the number of operation signals that can be output to the first transmission controller for each calculation cycle to one, and
The storage information stored in the first and second memories includes at least a front increment counter updated by a storage control unit in the first transmission control device at least every calculation cycle of the central control device. An operation signal counter that is updated by the storage control unit when there is an operator's operation every calculation cycle of the central control unit, and an operator's operation at every calculation cycle of the central control unit The operation signal output from the central control unit and stored by the storage control unit, and the storage for each calculation cycle of the central control unit after updating of the front increment counter when there is no operation by an operator When updated by the control unit and operated by an operator, the front increment counter, the operation signal counter and the operation signal are updated after the operation signal is updated. Plant operation control system comprising: the rear increment counter which is updated by the storage control unit in each calculation cycle of the central control device.
前記第1及び第2のメモリ内に格納される前記格納情報は、前記操作信号カウンタと前記操作信号との合計値を有することを特徴とする請求項1に記載のプラント操作制御システム。   The plant operation control system according to claim 1, wherein the storage information stored in the first and second memories has a total value of the operation signal counter and the operation signal. 前記第1及び第2のメモリ内に格納される前記操作信号として、前記中央制御装置から前回以前に出力された操作信号を有することを特徴とする請求項1又は請求項2に記載のプラント操作制御システム。   The plant operation according to claim 1 or 2, wherein the operation signal stored in the first and second memories includes an operation signal output before the previous time from the central control unit. Control system. 前記第1及び第2のメモリ内に格納される前記格納情報は、前記第1及び第2のメモリ内の前記格納情報が格納されるメモリエリアの最初と最後に、前記インクリメントカウンタを有することを特徴とする請求項1から請求項3のいずれか1項に記載のプラント操作制御システム。   The storage information stored in the first and second memories has the increment counter at the beginning and end of the memory area in which the storage information in the first and second memories is stored. The plant operation control system according to any one of claims 1 to 3, wherein the plant operation control system is characterized. 前記中央制御装置は、操作イベント受付処理に対応する画面のID番号と、画面表示処理に対応する画面のID番号とを比較し、一致すれば操作信号を生成することを特徴とする請求項1から請求項4のいずれか1項に記載のプラント操作制御システム。 It said central control unit includes an operation event reception processing ID number of the screen corresponding to claim compares the ID number of the screen corresponding to the screen display processing, and generates an operation signal if they match 1 plant operation control system according to any one of claims 4.
JP2004359698A 2004-12-13 2004-12-13 Plant operation control system Expired - Lifetime JP4521722B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004359698A JP4521722B2 (en) 2004-12-13 2004-12-13 Plant operation control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004359698A JP4521722B2 (en) 2004-12-13 2004-12-13 Plant operation control system

Publications (2)

Publication Number Publication Date
JP2006171841A JP2006171841A (en) 2006-06-29
JP4521722B2 true JP4521722B2 (en) 2010-08-11

Family

ID=36672558

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004359698A Expired - Lifetime JP4521722B2 (en) 2004-12-13 2004-12-13 Plant operation control system

Country Status (1)

Country Link
JP (1) JP4521722B2 (en)

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0436801A (en) * 1990-05-31 1992-02-06 Daikoku Denki Co Ltd Controller
JP3352194B2 (en) * 1993-12-16 2002-12-03 株式会社東芝 Nuclear plant safety facility controller
JPH09258818A (en) * 1996-03-21 1997-10-03 Mitsubishi Electric Corp Plant operation signal transmission device
JPH09311716A (en) * 1996-05-24 1997-12-02 Toshiba Corp LAN device
JP4024603B2 (en) * 2002-07-03 2007-12-19 株式会社東芝 Programmable controller

Also Published As

Publication number Publication date
JP2006171841A (en) 2006-06-29

Similar Documents

Publication Publication Date Title
US8675805B2 (en) Automated periodic surveillance testing method and apparatus in digital reactor protection system
KR20150039508A (en) Watchdog apparatus and method thereof
US9589637B1 (en) Storage element with storage and clock tree monitoring circuit and methods therefor
JP2562701B2 (en) Error display device for data transmission system
JP5505966B2 (en) Fault management system and method
US5790558A (en) Numerical control apparatus
JP4521722B2 (en) Plant operation control system
JPS58225453A (en) Error detecting system of diagnosing circuit
US20080126644A1 (en) System for generating access conflict in access conflict test
JPH05260049A (en) Fault managing method for network system
KR20200124317A (en) Programmable display system and programmable indicator
CN101098211B (en) Sending control device, receiving control device, and communication system
JP3156750B2 (en) Alarm issuing device
JP6471234B2 (en) Control system
JP3272195B2 (en) Redundant system switching monitoring control device
JPH07295602A (en) Redundant control device
JPH06245280A (en) Information transmitter
JPH03289516A (en) Process-quantity displaying apparatus
JP7233616B1 (en) PULSE WIDTH DISPLAY SYSTEM AND PULSE WIDTH DISPLAY METHOD
JP4746383B2 (en) Radiation measurement equipment
JP2007532992A (en) Error detection method and control system during data processing in processing system
JP2000312190A (en) Data transmission method
JP2016194738A (en) Monitoring controller and control method of monitoring controller
WO2023012898A1 (en) Information processing system, information processing device and information processing method
JP3567069B2 (en) Matrix test equipment

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20070213

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20090330

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20090428

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20090428

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100202

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100204

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100405

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100427

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20100427

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20100427

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100519

R150 Certificate of patent or registration of utility model

Ref document number: 4521722

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130604

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term