JP4587219B2 - Pressure excavation machine for renewal of existing concrete pipe and renewal method of existing concrete pipe using it. - Google Patents
[go: Go Back, main page]

JP4587219B2 - Pressure excavation machine for renewal of existing concrete pipe and renewal method of existing concrete pipe using it. - Google Patents

Pressure excavation machine for renewal of existing concrete pipe and renewal method of existing concrete pipe using it. Download PDF

Info

Publication number
JP4587219B2
JP4587219B2 JP2005204001A JP2005204001A JP4587219B2 JP 4587219 B2 JP4587219 B2 JP 4587219B2 JP 2005204001 A JP2005204001 A JP 2005204001A JP 2005204001 A JP2005204001 A JP 2005204001A JP 4587219 B2 JP4587219 B2 JP 4587219B2
Authority
JP
Japan
Prior art keywords
existing concrete
concrete pipe
main body
pipe
shield
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2005204001A
Other languages
Japanese (ja)
Other versions
JP2007023529A (en
Inventor
本間良治
Original Assignee
株式会社推研
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社推研 filed Critical 株式会社推研
Priority to JP2005204001A priority Critical patent/JP4587219B2/en
Publication of JP2007023529A publication Critical patent/JP2007023529A/en
Application granted granted Critical
Publication of JP4587219B2 publication Critical patent/JP4587219B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

本発明は、地中に埋設された雨水の排水管又は下水道等に用いられる既設コンクリート管を破砕しつつ新設管を敷設する既設コンクリート管更新用圧気掘進機とそれを用いた既設コンクリート管の更新工法に関する。   The present invention relates to a pressure digging machine for renewing an existing concrete pipe for laying a new pipe while crushing an existing concrete pipe used for drainage or sewer of rainwater buried underground, and renewal of an existing concrete pipe using the same. Concerning construction method.

地中に埋設された既設コンクリート管を開削工法によることなく更新する装置として、特開平7−98077号公報(従来例1)には、全断面掘進機のように掘削断面全体に回転掘削歯を配置した掘進機により既設コンクリート管を破砕し、その後に新設管を敷設していく既設コンクリート管更新用掘進機が開示されている。また、特開平10−220174号公報(従来例2)には、地中に埋設された旧管を残したまま、該旧管を囲んでリング状に掘削し形成される空間に新たな新管を敷設する地中埋設管の更新工法が開示されている。
特開平7−98077号公報 特開平10−220174号公報
JP-A-7-98077 (conventional example 1) discloses a device for renewing an existing concrete pipe buried in the ground without using an open-cut method. An existing concrete pipe renewal excavator is disclosed in which an existing concrete pipe is crushed by an arranged excavator and then a new pipe is laid. Japanese Patent Laid-Open No. 10-220174 (conventional example 2) discloses a new new pipe in a space formed by excavating a ring around the old pipe while leaving the old pipe buried in the ground. A renewal method for underground pipes that lay down the ground is disclosed.
JP 7-98077 A JP-A-10-220174

しかしながら、従来例1の全断面掘削機では、軟鋼(SS400)の鉄筋は切断できるが、補強PC鋼材や既設コンクリート管の継手鋼材は切断できず、カッターに巻き付き、それを取り除くため作業が中断することになる。また、開削により敷設された既設コンクリート管の場合、既設コンクリート管の下部に基礎としての枕木やガラ等が埋設されており、これらを全断面掘削機のカッターで破砕しようとすると基礎部分が動揺し泥土化し、既設コンクリート管が沈下してカッターヘッドによる破砕が困難になるという問題が発生する。さらに、既設コンクリート管の周囲からの地下水の浸入により全断面掘削機による掘削が困難となる問題も発生する。さらに、既設管に分岐や割り込み人孔があると掘削でない。従来例2の既設管更新工法では、N値の低い地盤の既設管は長年の間に沈下したり、浮き上がったりしており、既設管をガイドとして新管を敷設することが困難になるという問題が発生する。   However, the full-section excavator of Conventional Example 1 can cut the rebar of mild steel (SS400), but cannot cut the reinforcing PC steel or the joint steel of the existing concrete pipe, wind around the cutter, and the work is interrupted to remove it. It will be. In addition, in the case of existing concrete pipes laid by excavation, sleepers and galley as the foundation are buried under the existing concrete pipes, and when these are crushed with the cutter of a full-section excavator, the foundation part is shaken. It becomes mud and the existing concrete pipe sinks, causing a problem that crushing with a cutter head becomes difficult. In addition, there is a problem that excavation by a full-section excavator becomes difficult due to the intrusion of groundwater from around the existing concrete pipe. Furthermore, excavation is not possible if existing pipes have branches or interruptions. In the existing pipe renewal method of Conventional Example 2, the existing pipe on the ground with a low N value has been sunk or floated for many years, making it difficult to lay a new pipe using the existing pipe as a guide Will occur.

本発明は、前記従来例の持つ課題を解決する、どのような施工条件下でも施工が可能で、既設コンクリート管内でのカッターヘッドによる破砕が困難なPC鋼材、継手鋼材の撤去作業のため作業機械又は作業員の出入を可能とし、地下水の浸入を防止する既設コンクリート管更新用圧気掘進機とそれを用いた既設コンクリート管の更新工法を提供することを目的とする。   The present invention solves the problems of the conventional example, and can be installed under any construction conditions, and is a work machine for removing PC steel and joint steel that are difficult to crush with a cutter head in an existing concrete pipe Alternatively, it is an object of the present invention to provide a pressure excavation machine for renewing an existing concrete pipe that enables entry and exit of workers and prevents intrusion of groundwater, and an existing concrete pipe renewal method using the same.

発明の既設コンクリート管更新用圧気掘進機は、前記課題を解決するために、発進立坑22と到達立坑23間の地中に埋設された既設コンクリート管2の外径より大きい内径を有する掘進機本体3の前部に作業員、資材、作業機械及び破砕物の出入を可能とする中央部に開口部5を備えたリング状カッターヘッド4とバルクヘッド10を配置し、前記既設コンクリート管の到達立坑側にエアロックマスター38を配置し、前記掘進機本体内部及び前記既設コンクリート内を高気圧状態に保持する前後部にエアロックドア15、17を配置した圧気胴14を前記掘進機本体の後部側に配置し、前記圧気胴の後部、又は前記掘進機本体と前記圧気胴との間にセミシールドジャッキ20を配置したセミシールド胴19を一体に連結し、前記セミシールドジャッキと後方の新設管21をアンカー手段52により連結し、前記新設管を反力受けとした前記セミシールドジャッキの伸縮により前記掘進機本体を切羽面に対して押圧、引き離し可能とすることを特徴とする。 In order to solve the above-described problem, the existing concrete pipe renewal pneumatic excavator of the present invention has an inner diameter larger than the outer diameter of the existing concrete pipe 2 embedded in the ground between the start shaft 22 and the arrival shaft 23. A ring-shaped cutter head 4 having an opening 5 and a bulkhead 10 are arranged at the front part of the main body 3 so that workers, materials, work machines, and crushed materials can be taken in and out , and reach the existing concrete pipe. place the airlock master 38 Shaft side, the shield machine main body inside and rear of the existing the shield machine main body to gas cylinder 14 placing the air lock doors 15 and 17 to the front and rear of the inside concrete pipes held in high pressure state placed side connecting rear portion of the gas cylinder, or a semi-shielding cylinder 19 placing the semi-shield jacks 20 between the shield machine main body and the gas cylinder together, the semi The over field jack and rear new tube 21 is connected by anchoring means 52, characterized in that pressing, and can detach the newly tube against the working face surface of the shield machine main body by expansion and contraction of the semi-shielding jacks and reaction force receiving And

また、本発明の既設コンクリート管更新用圧気掘進機は、前記既設コンクリート管内に延びる排水管が前記掘進機本体、前記圧気胴、及び前記セミシールド胴を貫通して配置されることを特徴とする。 Moreover, existing concrete pipe updating gas excavator of the present invention is characterized in that the drain pipe extending in the existing concrete pipe is disposed the shield machine main body, the gas cylinder, and through said semi-shielding cylinder .

また、本発明の既設コンクリート管更新用圧気掘進機は、前記掘進機本体、前記圧気胴、及び前記セミシールド胴をそれぞれ防水型とすることを特徴とする。 Moreover, existing concrete pipe updating gas excavator of the present invention, the shield machine main body, the gas cylinder, and characterized by a waterproof the semi shield cylinder, respectively.

また、本発明の既設コンクリート管更新用圧気掘進機は、前記掘進機本体の前端がリング状カッターヘッド配置位置より圧気状態下で地山の崩落土砂の掘進機本体内への浸入を防止できる長さだけ前方に突出し、先端に超硬合金製のスリットカッターを備えることを特徴とする。 In addition, the pressure excavator for renewing an existing concrete pipe according to the present invention is a length capable of preventing intrusion of collapsed earth and sand of a natural ground into the excavator main body when the front end of the main body of the excavator is in a pressurized state from the position of the ring-shaped cutter head. This is characterized by protruding forward and having a slit cutter made of cemented carbide at the tip.

また、本発明の既設コンクリート管の更新工法は、前記請求項1〜のいずれかの既設コンクリート管更新用圧気掘進機を用い、既設コンクリート管内に圧気を遮断するエアロック設備を配置し、掘進機本体内及び既設コンクリート管内を圧気状態として地下水の浸入を防止してドライな作業空間とし、リング状カッターヘッドの回転による既設コンクリート管の破砕と、前記リング状カッターの中央開口部から既設コンクリート管内への作業員、資材、作業機械及び破砕物の出入を行い、前記作業空間内での作業機械及び作業員によるリング状カッターヘッドで破砕が困難な既設コンクリート管の補強PC鋼材、継手鋼材等の切断・撤去作業を行い、既設コンクリート管破砕後の空間に新設管を敷設することを特徴とする。
以上
Moreover, the renewal method of the existing concrete pipe of the present invention uses the pressure concrete excavating machine for renewing the existing concrete pipe according to any one of claims 1 to 4 and arranges an air lock facility for shutting off the pressure in the existing concrete pipe, The inside of the machine and the existing concrete pipe are in a pressurized state to prevent ingress of groundwater to create a dry work space. The existing concrete pipe is crushed by the rotation of the ring-shaped cutter head and the central opening of the ring-shaped cutter Employees, materials, work machines, and crushed materials are taken into and out of the concrete space. Reinforcing concrete steel pipes, joint steel materials, etc. for existing concrete pipes that are difficult to break with a ring cutter head by the work machines and workers in the work space. It is characterized by cutting and removing work and laying new pipes in the space after crushing existing concrete pipes.
more than

本発明の地中に埋設された既設コンクリート管の外径より大きい内径を有する掘進機本体の前部に中央部に開口部を備えたリング状カッターヘッドとバルクヘッドを配設し、掘進機本体内部及び既設コンクリート内を圧気状態に保持する圧気胴を連結する構成により、既設コンクリート管内へのリング状カッターヘッドで破砕困難な補強PC鋼材、継手鋼材撤去のための作業員、資材、作業機械及び破砕物の出入を可能とし、作業空間を圧気状態として地下水の浸入を防止したドライな作業空間とすることができる。
圧気胴の後部、又は前記掘進機本体と圧気胴との間にセミシールド胴を一体に連結し、さらにセミシールドジャッキと後方の新設管数本をアンカー手段により連結し、掘進機本体を切羽面に対して押圧、引き離し可能とする構成により、掘進機本体のリング状カッターヘッドで既設コンクリート管を破砕中に補強PC鋼材等が絡まったような場合、掘進機本体を切羽面から引き離し、作業員による撤去作業が可能とすると共に、外径に対して既設コンクリート管更新用圧気掘進機の全体の長さを長くすることができるので、軟弱な地山状態においても推進方向の精度を保持することができる。
既設コンクリート管内に延びる排水管を掘進機本体、圧気胴、及びセミシールド胴を貫通して配置する構成により、排水管を地表部分に配置する必要がなく、地表部分の人、車両の通行を阻害しない。
圧気胴の前後部にエアロックドアを配置する構成により、掘進機本体内及び既設コンクリート管内に供給される圧縮空気による圧気状態を保持しつつ作業員、作業機械、資材、破砕物の搬送が可能となる。
掘進機本体、圧気胴、及びセミシールド胴をそれぞれ防水型とする構成により、地下水の湧水量が多い地層においてもドライな作業空間を保持できると共に、大雨時に作業を休止し、圧気胴の前後部エアロックドアを開放し、流入した大量の雨水を掘進機本体、圧気胴、及びセミシールド胴を1本の排水管として排水することが可能となる。
掘進機本体の前端がカッターヘッド配置位置より圧気状態下での崩落土砂の掘進機本体内への浸入を防止できる長さだけ前方に突出し、先端に超硬合金製のスリットカッターを備える構成により、地山からの崩落土砂の掘進機本体内への浸入を防止でき、推進ジャッキによる掘進機本体の地山への推進がスムーズに実施でき、途中に分岐管が存在しても、超硬合金製のスリットカッターで切断できる。
本第1〜第6発明のいずれかの既設コンクリート管更新用圧気掘進機を用い、既設コンクリート管内に圧気を遮断するエアロック設備を配置し、掘進機本体内及び既設コンクリート管内を圧気状態として地下水の浸入を防止してドライな作業空間とし、カッターヘッドの回転による既設コンクリート管の破砕と、前記リング状カッターの中央開口部から既設コンクリート管内への作業員、資材、作業機械及び破砕物の出入を行い、前記作業空間内での作業機械及び作業員によるリング状カッターヘッドで破砕が困難な既設コンクリート管の補強PC鋼材、継手鋼材等の切断・撤去作業を行い、既設コンクリート管破砕後の空間に新設管を敷設する構成により、前記既設コンクリート管更新用圧気掘進機と同様に、既設コンクリート管内へのリング状カッターヘッドで破砕困難な補強PC鋼材、継手鋼材撤去のための作業機械及び作業員による作業を可能とし、作業空間を圧気状態として地下水の作業空間内への浸入を防止しドライな作業空間とすることができるので、施工条件の変化にも対応でき、汎用性が高く、効率の良い既設コンクリート管の更新工法とすることができる。
A ring-shaped cutter head having an opening in the center and a bulk head are disposed at the front of an excavator main body having an inner diameter larger than the outer diameter of an existing concrete pipe buried in the ground of the present invention, and the excavator main body By connecting a pneumatic cylinder that keeps the inside and existing concrete in a pressurized state, it is difficult to crush with a ring-shaped cutter head into the existing concrete pipe. Reinforced PC steel, workers for removing joint steel, materials, work machines, and The crushed material can be taken in and out, and the working space can be made into a dry working space where the working space is in a pressurized state to prevent ingress of groundwater.
A semi-shield cylinder is integrally connected to the rear of the pressure cylinder, or between the main body and the pressure cylinder. Further, the semi-shield jack and several new pipes are connected by anchor means. When the existing concrete pipe is crushed by the ring-shaped cutter head of the excavator body and the reinforcing PC steel material is entangled with the ring cutter head of the excavator body, the excavator body is pulled away from the face and the worker The overall length of the existing concrete pipe renewal machine can be increased with respect to the outer diameter, so that the propulsion direction accuracy can be maintained even in soft ground conditions. Can do.
The drain pipe that extends into the existing concrete pipe is placed through the main body of the excavator, the pneumatic cylinder, and the semi-shield cylinder, so there is no need to place the drain pipe on the ground surface, obstructing the passage of people and vehicles on the ground surface do not do.
Air lock doors are arranged at the front and rear of the pressure cylinder to enable transport of workers, work machines, materials, and crushed materials while maintaining the pressure of compressed air supplied to the excavator body and existing concrete pipes. It becomes.
The construction of the excavator body, pressure cylinder, and semi-shield cylinder is waterproof, so that it is possible to maintain a dry work space even in the formation where there is a large amount of groundwater springs, and the work is suspended during heavy rain, and the front and rear parts of the pressure cylinder The air lock door is opened, and a large amount of rainwater that has flowed in can be drained using the main body of the excavator, the pressure cylinder, and the semi-shield cylinder as one drain pipe.
With a configuration in which the front end of the excavator main body protrudes forward by a length that can prevent the intrusion of collapsed sand and sand into the excavator main body under pressure from the cutter head arrangement position, and a slit cutter made of cemented carbide is provided at the tip, Can prevent the fallen sediment from entering the main body of the excavator from the natural ground, can smoothly promote the main body of the main excavator to the natural ground with a propulsion jack, and even if there is a branch pipe in the middle, it is made of cemented carbide Can be cut with a slit cutter.
Using the pressure excavator for renewing an existing concrete pipe according to any one of the first to sixth aspects of the invention, an air lock facility for shutting off the pressure is arranged in the existing concrete pipe, and the groundwater is set in the excavator main body and the existing concrete pipe in a pressurized state. To prevent the intrusion of the material into a dry work space, crushing the existing concrete pipe by rotating the cutter head, and entering / exiting workers, materials, work machines, and crushed materials from the central opening of the ring cutter into the existing concrete pipe The space after the existing concrete pipe is crushed by cutting / removing PC steel, joint steel, etc. of the existing concrete pipe that is difficult to crush with the ring cutter head by the work machine and workers in the work space In the same way as the above-mentioned pressure excavation machine for renewing existing concrete pipes, a new pipe is installed in the existing concrete pipe. Work machine and workers to remove reinforced PC steel and joint steel that are difficult to crush with a guillotine cutter head, enabling the work to be carried out by the work space and preventing the ingress of groundwater into the work space. Therefore, it is possible to cope with a change in construction conditions, and to provide a highly versatile and efficient renewal method for an existing concrete pipe.

本発明の実施の形態を図により説明する。図1は、本発明の既設コンクリート管更新用圧気掘進機を用いて地下に埋設された既設コンクリート管の更新状態を示す全体図であり、図2は、図1のA−A線の断面図であり、図3は、図1のB−B線の断面図であり、図4は図1の一部拡大図である。   Embodiments of the present invention will be described with reference to the drawings. FIG. 1 is an overall view showing a renewed state of an existing concrete pipe buried underground using the pressure excavation machine for renewing an existing concrete pipe of the present invention, and FIG. 2 is a cross-sectional view taken along line AA of FIG. 3 is a cross-sectional view taken along line BB in FIG. 1, and FIG. 4 is a partially enlarged view of FIG.

既設コンクリート管更新用圧気掘進機1は、地中に埋設された既設コンクリート管2の外径より大きな内径を有する掘進機本体3を備える。掘進機本体の外径は、新設管の外径にほぼ一致するもので、新設管の内径は、既設コンクリート管2を調査し、その最大センター誤差をカバーできる内径とする。掘進機本体3の前部には、既設コンクリート管2の破砕に必要な部分だけにカッターを設けるリング状カッターヘッド4とし、駆動源により回転駆動されるように配置する。リング状カッターヘッド4は、中央に作業員、資材、作業機及び破砕物の出入が可能な大きな開口部5を形成した面盤6を備え、面盤6に所定間隔毎にローラビット7を回転自在に配置する。リング状カッターヘッド3の回転により、ローラビット7が既設コンクリート管2の端部を破砕する。   The existing concrete pipe renewal pressure excavator 1 includes an excavator body 3 having an inner diameter larger than the outer diameter of the existing concrete pipe 2 embedded in the ground. The outer diameter of the main body of the excavator is substantially the same as the outer diameter of the new pipe. The inner diameter of the new pipe is determined by examining the existing concrete pipe 2 and covering the maximum center error. At the front part of the excavator main body 3, a ring-shaped cutter head 4 is provided in which a cutter is provided only at a portion necessary for crushing the existing concrete pipe 2, and is arranged so as to be rotationally driven by a driving source. The ring-shaped cutter head 4 is provided with a face plate 6 having a large opening 5 in the center where a worker, material, work machine and crushed material can be taken in and out, and a roller bit 7 is rotated on the face plate 6 at predetermined intervals. Arrange freely. The roller bit 7 crushes the end portion of the existing concrete pipe 2 by the rotation of the ring-shaped cutter head 3.

掘進機本体3のリング状カッターヘッド4の配置位置から所定距離前方に山止め円筒部8が延びている。山止め円筒部8の突出長さは、圧気状態下で地山の崩落土砂が掘進機本体3内に浸入しない長さとする。山止め円筒部8の先端には、超硬合金製のスリットカッター9を備え、推進ジャッキによる地山への掘進機本体の推進をスムーズとし、分岐管が存在する場合でも、超硬合金製のスリットカッターにより切断できる。   A mountain-clamping cylindrical portion 8 extends forward from the arrangement position of the ring-shaped cutter head 4 of the excavator main body 3 by a predetermined distance. The protruding length of the mountain stopper cylindrical portion 8 is set to a length that prevents the collapsed earth and sand of the natural mountain from entering the excavator main body 3 under a pressurized state. At the tip of the mountain stop cylindrical portion 8, a cemented carbide slit cutter 9 is provided to facilitate the propulsion of the excavator body to the ground with a propelling jack, and even if there is a branch pipe, it is made of cemented carbide. Can be cut with a slit cutter.

掘進機本体3のリング状カッターヘッド4の後部に中央に開口を備えたバルクヘッド10を配置する。バルクヘッド10に、リング状カッターヘッド3を回転駆動する減速機構を備えた駆動手段11を配置する。また、リング状カッターヘッド4とバルクヘッド10との間に、リング状カッターヘッド4により破砕された既設コンクリート管2と一部地山の掘削土砂を受けるホッパー12を設置する。ホッパー12の下部にはエンドレスベルト等の破砕物搬送手段13を配置する。   A bulkhead 10 having an opening at the center is arranged at the rear of the ring-shaped cutter head 4 of the excavator main body 3. The bulkhead 10 is provided with driving means 11 having a speed reduction mechanism that rotationally drives the ring-shaped cutter head 3. Further, between the ring-shaped cutter head 4 and the bulk head 10, an existing concrete pipe 2 crushed by the ring-shaped cutter head 4 and a hopper 12 that receives excavated soil from some natural ground are installed. A crushed material conveying means 13 such as an endless belt is disposed below the hopper 12.

掘進機本体3の後部に圧気胴14をシール材を介して水密に一体に緊結する。圧気胴14の前部には、開閉自在な前部エアロックドア15を形成した前部隔壁16を配置し、後部には開閉自在な後部エアロックドア17を形成した後部隔壁18を配置する。圧気胴14の前後部のエアロックドア15,17により区画された空間を、発進立坑22から出入する作業員、作業機械、資材、破砕物用のマテリアルロック及びマンロックとする。圧気胴14の前後部のエアロックドア15、17を交互に開閉し、作業員、作業機械、資材、破砕物を搬送することにより、掘進機本体3内及び既設コンクリート管2内の圧気状態を保持する。   A pressure cylinder 14 is fastened to a rear portion of the excavator main body 3 in a watertight manner through a sealing material. A front partition 16 formed with a front airlock door 15 that can be opened and closed is disposed at the front of the pressure cylinder 14, and a rear partition 18 formed with a rear airlock door 17 that can be opened and closed is disposed at the rear. The spaces defined by the air lock doors 15 and 17 at the front and rear portions of the pressure cylinder 14 are used as workers, work machines, materials, and material locks and manlocks for entering and leaving the start shaft 22. By alternately opening and closing the air lock doors 15 and 17 at the front and rear portions of the pressure cylinder 14 and conveying workers, work machines, materials, and crushed materials, the pressure state in the excavator main body 3 and the existing concrete pipe 2 is changed. Hold.

図4に示されるように、圧気胴14の後部にセミシールド胴19をシール材を介して水密に一体に緊結する。セミシールド胴19には、複数のセミシールドジャッキ20を配置し、セミシールドジャッキ20の前端と圧気胴14の後部をクレビス継手50により連結固定し、セミシールドジャッキ20の後端を後続の新設管21の前端に連結ボルト51等で固定する。さらに、セミシールドジャッキ20と後続の新設管21数本とをタイロッド等のアンカー手段52で連結する。セミシールドジャッキ20は、セミシールド胴19の後部に水密の接続される新設管21の端部を反力受けとして、圧気胴14と掘進機本体3を押圧推進し、複数のセミシールドジャッキ20の伸長量を調節して掘進機本体3の推進方向の制御や、リング状カッターヘッド5の既設コンクリート管2の端部への押圧力を制御する。掘進機本体3のリング状カッターヘッド4により既設コンクリート管2の端面を破砕中に、リング状カッターヘッド4では切断破砕できない補強PC鋼材が絡まったような場合、後続の新設管21にアンカー止めされたセミシールドジャッキ20により、掘進機本体3を既設コンクリート管2の端面から引き離し、作業員がリング状カッター4に絡まった補強PC鋼材等を撤去する作業をする。セミシールド胴19を掘進機本体3の後部に連結し、セミシールド胴19の後部に圧気胴14を連結してもよい。   As shown in FIG. 4, a semi-shield cylinder 19 is fastened to a rear portion of the pressure cylinder 14 in a watertight manner through a sealing material. A plurality of semi-shielded jacks 20 are arranged on the semi-shielded cylinder 19, the front end of the semi-shielded jack 20 and the rear part of the pressure cylinder 14 are connected and fixed by a clevis joint 50, and the rear end of the semi-shielded jack 20 is connected to a subsequent new pipe. It is fixed to the front end of 21 with a connecting bolt 51 or the like. Further, the semi-shield jack 20 and several subsequent new pipes 21 are connected by an anchor means 52 such as a tie rod. The semi-shield jack 20 uses the end of a new pipe 21 that is watertightly connected to the rear part of the semi-shield cylinder 19 as a reaction force to push the pneumatic cylinder 14 and the excavator main body 3 and push the plurality of semi-shield jacks 20. The extension amount is adjusted to control the propulsion direction of the excavator main body 3 and the pressing force to the end of the existing concrete pipe 2 of the ring-shaped cutter head 5. When the end face of the existing concrete pipe 2 is being crushed by the ring-shaped cutter head 4 of the excavator main body 3 and a reinforced PC steel material that cannot be cut and crushed by the ring-shaped cutter head 4 is entangled, it is anchored to the subsequent new pipe 21. The semi-shield jack 20 is used to pull the excavator body 3 away from the end face of the existing concrete pipe 2, and the worker performs the work of removing the reinforced PC steel material entangled with the ring-shaped cutter 4. The semi-shield cylinder 19 may be connected to the rear part of the excavator main body 3, and the compressed air cylinder 14 may be connected to the rear part of the semi-shield cylinder 19.

既設コンクリート管2が埋設された地表から発進立坑22と到達立坑23を所定間隔で掘削する。発進立坑22と到達立坑23との間の距離は、地表部の状態や新設管21の推進埋設のための押圧力等の条件により決定される。   The start shaft 22 and the reaching shaft 23 are excavated at a predetermined interval from the ground surface where the existing concrete pipe 2 is embedded. The distance between the starting shaft 22 and the reaching shaft 23 is determined by conditions such as the state of the ground surface and the pressing force for propulsion embedding of the new pipe 21.

発進立坑22上の地表部には、新設管21を吊り下ろす新設管用ホイスト24と、破砕物搬送用トロバケツ25を吊り上げ、吊り下ろすトロバケツ用ホイスト26を移動自在としたテルハクレーン27が設置され。テルハクレーン27の下部にトロバケツ25で搬送される破砕物をダンプトラックの荷台に荷積するための転倒受け台28、ホッパー29が配置される。   On the surface of the start shaft 22, a new pipe hoist 24 that suspends the new pipe 21 and a terro crane 27 that lifts and suspends the crushed material transporting bucket 25 are installed. A fall cradle 28 and a hopper 29 for loading the crushed material conveyed by the toro bucket 25 onto the dump truck bed are disposed below the Telha crane 27.

また、発進立坑22上の地表部には、掘進機本体3と既設コンクリート管2内を圧気状態とするための圧縮空気を供給するためのコンプレッサ等の圧気ブロワユニット30が設置される。圧気ブロワユニット30からの圧縮空気は、地表送気管31、立坑底マニホールド32,フレキシブルホース33,坑内送気管34を介して掘進機本体3及び既設コンクリート管2内に送られ、掘進機本体内3及び既設コンクリート2内を圧気状態とする。坑内送気管34は、圧気胴14の前後隔壁16,18を機密に貫通して配置する。   In addition, a pressure blower unit 30 such as a compressor for supplying compressed air for bringing the inside of the excavator main body 3 and the existing concrete pipe 2 into a pressurized state is installed on the surface of the start shaft 22. Compressed air from the pressure blower unit 30 is sent into the excavator main body 3 and the existing concrete pipe 2 via the surface air feed pipe 31, the shaft bottom manifold 32, the flexible hose 33, and the underground air feed pipe 34, and inside the excavator main body 3 And the inside of the existing concrete 2 is brought into a pressurized state. The underground air pipe 34 is disposed through the front and rear partition walls 16 and 18 of the pressure cylinder 14 in a secret manner.

発進立坑22には、新設管21と既設コンクリート管更新用圧気掘進機1を推進する押圧ジャッキ(図示せず)の反力受けとなる支圧壁35を設置する。発進立坑22と到達立坑23間の既設コンクリート管2が新設管21に更新されると、到達立坑23を新たな発進立坑として、次の区間の既設コンクリート管2を新設管21に更新する。   In the start shaft 22, a support wall 35 serving as a reaction force of a pressing jack (not shown) for propelling the newly installed pipe 21 and the pressure excavator 1 for updating the existing concrete pipe is installed. When the existing concrete pipe 2 between the start vertical shaft 22 and the arrival vertical shaft 23 is updated to the new installation pipe 21, the existing concrete pipe 2 in the next section is updated to the new installation pipe 21 with the arrival vertical shaft 23 as a new start vertical shaft.

新設管21,セミシールド胴19、圧気胴14,掘進機本体3の底部にトロバケツ25が走行する軌条36を敷設する。また、新設管21,セミシールド胴19、圧気胴14,掘進機本体3の底部に小口径排水管37を敷設し、小口径排水管37は、圧気胴14の前後隔壁16,18を気密に貫通配置される。小口径排水管37は、既設コンクリート管2内に溜まった流入地下水を発進立坑22側に排水する。   A rail 36 on which the bucket 25 travels is laid on the bottom of the new pipe 21, the semi-shield cylinder 19, the pressure cylinder 14, and the machine main body 3. Further, a small-diameter drain pipe 37 is laid on the bottom of the new pipe 21, the semi-shield cylinder 19, the pressure cylinder 14, and the machine body 3, and the small-diameter drain pipe 37 hermetically seals the front and rear partition walls 16 and 18 of the pressure cylinder 14. It is arranged through. The small-diameter drain pipe 37 drains inflow groundwater accumulated in the existing concrete pipe 2 to the start shaft 22 side.

既設コンクリート管2内にはエアロックマスター38を配置する。エアロックマスター38は、既設コンクリート管2の内壁に気密に当接するシールリングを備えた隔壁に第1エアロックドア39が形成され、隔壁後部に形成され気密筺体の後部に第2エアロックドア40が形成される。第1エアロックドア39と第2エアロックドア40で区画された気密筺体内を、到達立坑23側から作業員が既設コンクリート管2内に出入するためのマンロック41としても良い。エアロックマスター38には、作業空間内の換気のための排気逃がし弁42と、作業空間内の圧力を調節する圧力調節弁43を設置する。エアロックマスター38は、既設コンクリート管2内の所定の位置に固定する固定式しても良いし、到達立坑23に設置したウィンチ等の牽引手段(図示せず)により、既設コンクリート管2の更新に応じて到達立坑23側に移動する移動式としても良い。   An air lock master 38 is disposed in the existing concrete pipe 2. In the air lock master 38, a first air lock door 39 is formed on a partition wall provided with a seal ring that comes into airtight contact with the inner wall of the existing concrete pipe 2, and a second air lock door 40 is formed on the rear portion of the airtight housing. Is formed. The airtight housing defined by the first airlock door 39 and the second airlock door 40 may be used as a manlock 41 for an operator to enter and exit the existing concrete pipe 2 from the reach shaft 23 side. The air lock master 38 is provided with an exhaust relief valve 42 for ventilation in the work space and a pressure adjustment valve 43 for adjusting the pressure in the work space. The air lock master 38 may be fixed so as to be fixed at a predetermined position in the existing concrete pipe 2, or the existing concrete pipe 2 can be updated by a traction means (not shown) such as a winch installed in the reaching shaft 23. It is good also as a mobile type which moves to the reach shaft 23 side according to.

圧気胴14のマテリアルロックとエアロックマスター38のマンロック41により圧気状態に保持された既設コンクリート管2内には、発進立坑22側から搬送される移動自在な作業台車44が配置される。作業台車44にはブレーカ等の破砕工具45が設備される。作業空間内でリング状カッターヘッド4では破砕が困難な既設コンクリート管2の継手鋼材46や補強PC鋼材を、作業台車44の破砕工具45、及び作業員の作業により切断撤去する。   In the existing concrete pipe 2 held in a pressurized state by the material lock of the pressure cylinder 14 and the manlock 41 of the air lock master 38, a movable work carriage 44 conveyed from the start shaft 22 side is disposed. The work carriage 44 is equipped with a crushing tool 45 such as a breaker. In the work space, the joint steel material 46 and the reinforced PC steel material of the existing concrete pipe 2 that are difficult to be crushed by the ring-shaped cutter head 4 are cut and removed by the work of the crushing tool 45 of the work carriage 44 and the worker.

到達立坑23には、次の更新区間の既設コンクリート2から水が流れ込むため、水中ポンプ47を配置する。水中ポンプ47によりポンプアップされる排水は、到達立坑23を経て、地表部に配置した排水管により発進立坑22側に搬送すると、地表部の道路の人、車両の通行の邪魔になることがある。そのため、水中ポンプ47からポンプアップされた排水は、エアロックマスター38と圧気胴14の前後部隔壁16、18を気密に貫通する大口径排水管48により発進立坑22側に搬送し、既に更新された新設管内に排水する。この場合、掘進機本体3のリング状カッターヘッド4による既設コンクリート管2の破砕と推進が進むので、大口径排水管48の一部に伸縮管49を介在させ、大口径排水管48の1本分の長さを掘進すると、大口径排水管48を1本撤去し、伸縮管49を延ばして繋ぐことを繰り返す。   Since the water flows from the existing concrete 2 in the next renewal section, the submersible pump 47 is arranged in the reach shaft 23. When the drainage pumped up by the submersible pump 47 is transported to the start shaft 22 side by the drainage pipe arranged on the surface through the reaching shaft 23, it may interfere with the traffic on the surface roads and vehicles. . Therefore, the drainage pumped up from the submersible pump 47 is conveyed to the start shaft 22 side by the large-diameter drainage pipe 48 that airtightly penetrates the airlock master 38 and the front and rear partition walls 16 and 18 of the pressurized air cylinder 14, and has already been updated. Drain into a new pipe. In this case, since the existing concrete pipe 2 is crushed and propelled by the ring-shaped cutter head 4 of the excavator main body 3, the telescopic pipe 49 is interposed in a part of the large-diameter drain pipe 48, and one large-diameter drain pipe 48 is provided. When the length of the minute is dug, one large-diameter drain pipe 48 is removed, and the extension pipe 49 is extended and connected repeatedly.

既設コンクリート管2が雨水管等の場合、大きな降雨があると増水し、水中ポンプ47,大口径排水管48による排水では処理しきれなくなる。このような場合、作業を休止し、圧気胴の前後のエアロックドア15、17及びエアロックマスター38の第1、第2エアロックドア39、40を開放し、雨水を既設コンクリート管2、掘進機本体3、圧気胴14,セミシールド胴19、新設管21からなる一本の連続する配水管とし発進立坑21側に搬送し、既に更新された新設管21に排水する。1本の排水管とするため、掘進機本体、圧気胴、及びセミシールド胴をそれぞれ防水型とし、さらに、坑内で使用する機器も全て防水型とする。   In the case where the existing concrete pipe 2 is a rainwater pipe or the like, if there is a large amount of rain, the water will increase, and the wastewater from the submersible pump 47 and the large-diameter drain pipe 48 cannot be treated. In such a case, the operation is suspended, the air lock doors 15 and 17 before and after the pressure cylinder, and the first and second air lock doors 39 and 40 of the air lock master 38 are opened, and rainwater is passed through the existing concrete pipe 2 and the excavation. It is transported to the start shaft 21 side as a continuous water distribution pipe comprising the machine main body 3, the pressure cylinder 14, the semi-shield cylinder 19, and the new pipe 21, and drained to the new pipe 21 that has already been updated. In order to use one drain pipe, the main body of the excavator, the pressure cylinder, and the semi-shield cylinder are each waterproof, and all equipment used in the mine is also waterproof.

以上のように、本発明の既設コンクリート管更新用圧気掘進機とそれを用いた既設コンクリート管の更新工法により、各種困難な施工条件の下でも、既設コンクリート管の更新が可能となる。   As described above, the existing concrete pipe can be updated even under various difficult construction conditions by the existing concrete pipe renewal pressure excavation machine and the existing concrete pipe renewal method using the same.

本発明の実施形態を示す全体概略図である。1 is an overall schematic diagram showing an embodiment of the present invention. 図1のA−A線断面図である。It is the sectional view on the AA line of FIG. 図1のB−B線断面図である。It is the BB sectional view taken on the line of FIG. 図1の一部拡大図である。FIG. 2 is a partially enlarged view of FIG. 1.

符号の説明Explanation of symbols

1:既設コンクリート管更新用圧気掘進機、2:既設コンクリート管、3:掘進機本体
、4:リング状カッターヘッド、5:中央開口部、6:面盤、7:ローラビット、8:山止め円筒部、9:スリットカッター、10:バルクヘッド、11:駆動手段、12:ホッパー、13:破砕物搬送手段、14:圧気胴、15:前部エアロックドア、16:前部隔壁、17:後部エアロックドア、18:後部隔壁、19:セミシールド胴、20:セミシールドジャッキ、21:新設管、22:発進立坑、23:到達立坑、24:新設管用ホイスト、25:トロバケツ、26:トロバケツ用ホイスト、27:テルハクレーン、28:転倒受け台、29:ホッパー、30:圧気ブロワユニット、31:地表送気管、32:立坑底マニホールド、33:フレキシブルホース、34:坑内送気管、35:支圧壁、36:軌条、37:小口径配水管、38:エアロックマスター、39:第1エアロックドア、40:第2エアロックドア、41:マンロック、42:排気逃がし弁、43:圧力調節弁、44、作業台車、45:破砕工具、46:継手鋼材、47:水中ポンプ、48:大口径排水管、49:伸縮管、50:クレビス継ぎ手、51:連結ボルト、52:アンカー手段

1: Excavator for renewal of existing concrete pipe, 2: Existing concrete pipe, 3: Main body of excavator, 4: Ring-shaped cutter head, 5: Central opening, 6: Face plate, 7: Roller bit, 8: Stop Cylindrical part, 9: slit cutter, 10: bulk head, 11: driving means, 12: hopper, 13: crushed material conveying means, 14: pressure cylinder, 15: front airlock door, 16: front partition, 17: Rear airlock door, 18: Rear bulkhead, 19: Semi shield barrel, 20: Semi shield jack, 21: New pipe, 22: Start shaft, 23: Reaching shaft, 24: New pipe hoist, 25: Toro bucket, 26: Toro bucket For hoist, 27: Telha crane, 28: overturning cradle, 29: hopper, 30: pressurized air blower unit, 31: ground air pipe, 32: shaft bottom manifold, 33: flexible Sibble hose, 34: underground air pipe, 35: bearing wall, 36: rail, 37: small-diameter water pipe, 38: air lock master, 39: first air lock door, 40: second air lock door, 41: man Lock, 42: Exhaust relief valve, 43: Pressure control valve, 44, Working carriage, 45: Crushing tool, 46: Fitting steel, 47: Submersible pump, 48: Large diameter drain pipe, 49: Expansion pipe, 50: Clevis joint , 51: connecting bolt, 52: anchor means

Claims (5)

発進立坑(22)と到達立坑(23)間の地中に埋設された既設コンクリート管(2)の外径より大きい内径を有する掘進機本体(3)の前部に作業員、資材、作業機械及び破砕物の出入を可能とする中央開口部(5)を備えたリング状カッターヘッド(4)とバルクヘッド(10)を配置し、前記既設コンクリート管の到達立坑側にエアロックマスター(38)を配置し、前記掘進機本体内部及び前記既設コンクリート内を高気圧状態に保持する前後部にエアロックドア(15、17)を配置した圧気胴(14)を前記掘進機本体後部側に配置し、前記圧気胴の後部、又は前記掘進機本体と前記圧気胴との間にセミシールドジャッキ(20)を配置したセミシールド胴(19)を一体に連結し、前記セミシールドジャッキと後方の新設管(21)をアンカー手段により連結し、前記新設管を反力受けとした前記セミシールドジャッキの伸縮により前記掘進機本体を切羽面に対して押圧、引き離し可能とすることを特徴とする既設コンクリート管更新用圧気掘進機。 Workers, materials, and work machines are located in front of the excavator body (3) having an inner diameter larger than the outer diameter of the existing concrete pipe (2) buried in the ground between the start shaft (22) and the reaching shaft (23). And a ring-shaped cutter head (4) having a central opening (5) that enables entry and exit of crushed material, and a bulk head (10) are arranged, and an air lock master (38) is provided on the side of the existing shaft of the existing concrete pipe. was placed, said shield machine main body inside and the existing within concrete pipes arranged gas cylinder (14) placing the air lock doors (15, 17) to the front and rear holding the high pressure state to the shield machine main body rear side , the rear portion of the gas cylinder, or the integrally connected to the semi-shielding body arranged semi shield jacks (20) (19) between the shield machine main body and the gas cylinder, the semi-shield jacks and rear new tube 21) connected by anchoring means, pressing the new tube to the shield machine main body to the working face surface by expansion and contraction of the semi-shielding jacks and reaction force receiving, existing concrete pipe, characterized in that to enable detachment update Pressure pneumatic digging machine. 前記既設コンクリート管内に延びる排水管が前記掘進機本体、前記圧気胴、及び前記セミシールド胴を貫通して配置されることを特徴とする請求項1に記載の既設コンクリート管更新用圧気掘進機。 The existing drain pipe the shield machine main body extending in the concrete pipe, the gas cylinder, and existing concrete pipe updating gas shield tunneling machine according to claim 1, characterized in that it is disposed through the semi-shielding cylinder. 前記掘進機本体、前記圧気胴、及び前記セミシールド胴をそれぞれ防水型とすることを特徴とする請求項1または2に記載の既設コンクリート管更新用圧気掘進機。 The shield machine main body, the gas cylinder, and existing concrete pipe updating gas shield tunneling machine according to claim 1 or 2, characterized in that the waterproof the semi shield cylinder, respectively. 前記掘進機本体の前端がリング状カッターヘッド配置位置より圧気状態下で地山の崩落土砂の掘進機本体内への浸入を防止できる長さだけ前方に突出し、先端に超硬合金製のスリットカッターを備えることを特徴とする請求項1〜3のいずれか1項に記載の既設コンクリート管更新用圧気掘進機。 The front end of the excavator main body protrudes forward by a length that can prevent the intrusion of collapsed soil from the natural ground into the excavator main body under pressure from the ring cutter head placement position, and a cemented carbide slit cutter at the tip existing concrete pipe updating gas shield tunneling machine according to claim 1, characterized in that it comprises a. 前記請求項1〜4のいずれかの既設コンクリート管更新用圧気掘進機を用い、既設コンクリート管内に圧気を遮断するエアロック設備を配置し、掘進機本体内及び既設コンクリート管内を圧気状態として地下水の浸入を防止してドライな作業空間とし、リング状カッターヘッドの回転による既設コンクリート管の破砕と、前記リング状カッターの中央開口部から既設コンクリート管内への作業員、資材、作業機械及び破砕物の出入を行い、前記作業空間内での作業機械及び作業員によるリング状カッターヘッドで破砕が困難な既設コンクリート管の補強PC鋼材、継手鋼材等の切断・撤去作業を行い、既設コンクリート管破砕後の空間に新設管を敷設することを特徴とする既設コンクリート管の更新工法。 Using the pressure excavation machine for renewing an existing concrete pipe according to any one of claims 1 to 4, an air lock device for blocking the pressure air is arranged in the existing concrete pipe, and the ground water is set in the excavator main body and the existing concrete pipe in a pressurized state. Prevents intrusion to create a dry work space, crushes the existing concrete pipe by rotating the ring-shaped cutter head, and removes workers, materials, work machines and crushed materials from the central opening of the ring-shaped cutter into the existing concrete pipe. Performing cutting / removal work of reinforcing concrete steel pipes, joint steels, etc. that are difficult to crush with a ring-shaped cutter head by working machines and workers in the work space, after crushing the existing concrete pipe Renewal method for existing concrete pipes, characterized by laying new pipes in the space.
JP2005204001A 2005-07-13 2005-07-13 Pressure excavation machine for renewal of existing concrete pipe and renewal method of existing concrete pipe using it. Expired - Fee Related JP4587219B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2005204001A JP4587219B2 (en) 2005-07-13 2005-07-13 Pressure excavation machine for renewal of existing concrete pipe and renewal method of existing concrete pipe using it.

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2005204001A JP4587219B2 (en) 2005-07-13 2005-07-13 Pressure excavation machine for renewal of existing concrete pipe and renewal method of existing concrete pipe using it.

Publications (2)

Publication Number Publication Date
JP2007023529A JP2007023529A (en) 2007-02-01
JP4587219B2 true JP4587219B2 (en) 2010-11-24

Family

ID=37784664

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2005204001A Expired - Fee Related JP4587219B2 (en) 2005-07-13 2005-07-13 Pressure excavation machine for renewal of existing concrete pipe and renewal method of existing concrete pipe using it.

Country Status (1)

Country Link
JP (1) JP4587219B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5705031B2 (en) * 2011-06-01 2015-04-22 株式会社推研 Buried pipe reconstruction method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS54149236A (en) * 1978-05-13 1979-11-22 Noboru Takahashi Method of executing tunnel
JP2659615B2 (en) * 1990-11-16 1997-09-30 株式会社フジタ Opening / closing method and opening / closing device for lock door in pneumatic shield
JP3321383B2 (en) * 1997-03-21 2002-09-03 財団法人土木研究センター Renewal method of underground sewer and excavation device therefor
JP3220421B2 (en) * 1997-09-22 2001-10-22 株式会社奥村組 Existing pipeline update device

Also Published As

Publication number Publication date
JP2007023529A (en) 2007-02-01

Similar Documents

Publication Publication Date Title
US12378884B2 (en) Method and system of constructing an underground tunnel
CN116113754A (en) a tunnel shield
CN113323680B (en) Disposal method for long-time shutdown of shield machine in tunneling tunnel
CN107387093A (en) A kind of shallow buried covered excavation system and construction method suitable for soft soil layer
JPH04227094A (en) Method for making waste harmless and device for putting said method into practice
CN115596453A (en) "Micro brush slope" entry method for long-distance side of tunnel passing through accumulation
CN109630123A (en) Deep shaft rock ripper
JP4587219B2 (en) Pressure excavation machine for renewal of existing concrete pipe and renewal method of existing concrete pipe using it.
JP7357517B2 (en) Pipe construction method using propulsion method
CN208431000U (en) Deep shaft rock ripper
JP2005180112A (en) Ground improvement structure and ground improvement method
JP3401177B2 (en) Sewer renewal shield excavator
CN100545419C (en) Pneumatic boring machine for updating existing concrete pipeline and its updating method
CN103154434A (en) closed trench tunnel
Gschnitzer et al. TBM modification for challenging rock conditions–a progress report of the Niagara Tunnel Project (NTP)
JP2004003229A (en) How to build a shaft
Zou Mechanical Underground Excavation in Rock
JP3795859B2 (en) Propulsion pipe for pipe propulsion method
Zhu et al. Protection of ground buildings (structures) and treatment technologies of underground obstacles
Committee on Construction Equipment and Techniques Trenchless excavation construction methods: classification and evaluation
JP3220421B2 (en) Existing pipeline update device
JP3724734B2 (en) Underground cavity filling method
Petterson Cape Flats sewer upgrade takes top award
Black Performance of trenchless techniques for sewer construction in Hong Kong
HK40057221A (en) Method and system of constructing an underground tunnel

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20080624

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100422

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100512

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100629

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20100901

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20100901

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130917

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees