Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4643234B2 - Wall building apparatus and method around pipe - Google Patents
[go: Go Back, main page]

JP4643234B2 - Wall building apparatus and method around pipe - Google Patents

Wall building apparatus and method around pipe Download PDF

Info

Publication number
JP4643234B2
JP4643234B2 JP2004340279A JP2004340279A JP4643234B2 JP 4643234 B2 JP4643234 B2 JP 4643234B2 JP 2004340279 A JP2004340279 A JP 2004340279A JP 2004340279 A JP2004340279 A JP 2004340279A JP 4643234 B2 JP4643234 B2 JP 4643234B2
Authority
JP
Japan
Prior art keywords
pipe
wall
around
ground
boring rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP2004340279A
Other languages
Japanese (ja)
Other versions
JP2006152554A (en
Inventor
恒夫 宮川
佐大 佐々木
直哉 尾関
範行 荒川
正蔵 岸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kubota Corp
Original Assignee
Kubota Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kubota Corp filed Critical Kubota Corp
Priority to JP2004340279A priority Critical patent/JP4643234B2/en
Publication of JP2006152554A publication Critical patent/JP2006152554A/en
Application granted granted Critical
Publication of JP4643234B2 publication Critical patent/JP4643234B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
  • Revetment (AREA)

Description

本発明は、地盤中に敷設された管の周りに管内から壁体を構築する管周りの壁体構築装置および工法に関するものである。   The present invention relates to a wall body construction device and a construction method around a pipe for constructing a wall body from the inside of the pipe around the pipe laid in the ground.

従来、地盤中に敷設された管の周りに、遮水等を目的として壁体を構築することが行われている。例えば、下記の特許文献1には、河川堤防の内部に貫通敷設された樋管の外周と地盤との隙間が水の通り道となって、堤防の決壊等の災害が生じるのを防ぐために、樋管の周りに環状の壁体(遮水壁)を構築することが記載されている。   Conventionally, a wall is constructed around a pipe laid in the ground for the purpose of water shielding and the like. For example, in Patent Document 1 below, in order to prevent the occurrence of a disaster such as a break of the levee due to the passage of water between the outer periphery of the culvert pipe that is pierced in the river levee and the ground, It is described that an annular wall (water-impervious wall) is constructed around the pipe.

図13は、特許文献1の壁体構築状況を説明するための図である。最初に、堤防Tの内部に推進工法によって樋管Zを貫通敷設するために、図13(a)に示すように堤防Tの堤内地N側と河川K側とに発進立坑H1と到達立坑H2とをそれぞれ形成した後、発進立坑H1から到達立坑H2に向けて地盤Gを掘削して樋管Zを推進させつつ順次継ぎ足して行く。堤防T内部に樋管Zを貫通敷設すると、図13(b)に示すように樋管Zと地盤Gとの隙間Saに硬化性を有する裏込め材Uを注入する。注入した裏込め材Uが硬化すると、樋管Z同士の接続部に予め介装された分割接続リングRgの周辺の地盤Gを強化しかつ当該周辺への地下水の浸透を防止するために、分割接続リングRgの周りを地盤改良する。地盤改良は、図13(c)に示すように樋管Z内に設置した地盤改良装置50に備わる注入管51を分割接続リングRgに形成された注入孔(図示省略)を通して地盤G中に突出させ、注入管51から地盤G中にグラウトYaをステップ注入で注入することにより行う。その際、グラウトYaの注入は樋管Z周りの360°の全範囲に対して行う。   FIG. 13 is a diagram for explaining the wall construction situation of Patent Document 1. In FIG. First, in order to pierce and lay the dredger pipe Z by the propulsion method inside the embankment T, as shown in FIG. 13A, the start shaft H1 and the reach shaft H2 on the embankment N side and the river K side of the embankment T Then, the ground G is excavated from the starting shaft H1 toward the reaching shaft H2, and the pipe Z is propelled to be sequentially added. When the dredging pipe Z is laid through the embankment T, a curable backfill material U is injected into the gap Sa between the dredging pipe Z and the ground G as shown in FIG. When the injected backfill material U is hardened, it is divided in order to strengthen the ground G around the split connection ring Rg previously installed in the connecting portion between the vertical pipes Z and to prevent the penetration of groundwater into the periphery. Improving the ground around the connection ring Rg. In the ground improvement, as shown in FIG. 13 (c), the injection pipe 51 provided in the ground improvement apparatus 50 installed in the dredging pipe Z projects into the ground G through the injection hole (not shown) formed in the split connection ring Rg. Then, the grout Ya is injected by step injection from the injection tube 51 into the ground G. At that time, the grout Ya is injected over the entire 360 ° range around the soot tube Z.

その後、注入したグラウトYaが硬化すると、分割接続リングRgの周りに地盤改良部Pが造成されるので、分割接続リングRgを解体撤去して、図13(d)に示すように環状の開口部Xを形成する。そして、樋管Z内に設置した地盤掘削機52に備わる掘削アーム53を開口部Xから地盤改良部Pに突出させて、樋管Zの円周方向に旋回させながら地盤改良部P内に環状の溝Mを掘削形成して行く。このとき、地盤改良部Pの造成により分割接続リングRgの周辺が強化されかつ当該周辺への地下水の浸透が防止されているので、地盤Gの崩壊や地下水の浸透を生じることなく樋管Zに対して垂直に環状の溝Mを形成することができる。そして、地盤改良部P内に所定深度の溝Mを形成すると、図13(e)に示すように溝M内に止水板54を挿入して、複数の止水板54を樋管Zに周方向へ順次固定して行く。止水板54を樋管Z周りに環状に設置し終えると、図13(f)に示すように溝M内にグラウトYbを注入充填する。この後、注入充填したグラウトYbが硬化すると、溝M内に止水板54が埋設固定され、樋管X周りへの環状の壁体(遮水壁)Wbの構築が完了する。   Thereafter, when the injected grout Ya is hardened, the ground improvement portion P is formed around the split connection ring Rg. Therefore, the split connection ring Rg is dismantled and removed as shown in FIG. 13 (d). X is formed. Then, the excavation arm 53 provided in the ground excavator 52 installed in the dredging pipe Z is projected from the opening X to the ground improvement section P and is annularly formed in the ground improvement section P while turning in the circumferential direction of the dredging pipe Z. The groove M is excavated and formed. At this time, since the periphery of the split connection ring Rg is strengthened by the formation of the ground improvement part P and the penetration of groundwater to the periphery is prevented, the ground pipe Z can be formed without causing the collapse of the ground G or the penetration of groundwater. On the other hand, an annular groove M can be formed perpendicularly. And if the groove | channel M of the predetermined depth is formed in the ground improvement part P, as shown in FIG.13 (e), the water stop plate 54 will be inserted in the groove | channel M, and the several water stop plate 54 will be made into the dredging pipe Z Fix it sequentially in the circumferential direction. When the water stop plate 54 has been installed in an annular shape around the soot tube Z, the grout Yb is injected and filled into the groove M as shown in FIG. Thereafter, when the injected grout Yb is cured, the water blocking plate 54 is embedded and fixed in the groove M, and the construction of the annular wall body (water-impervious wall) Wb around the tub tube X is completed.

上記によれば、地盤Gの崩壊や地下水の浸透を生じることなく樋管Zに対して垂直に環状の溝Mを形成できるので、そこに注入したグラウトYbが均質な状態で硬化して、樋管Z周りに遮水性能の高い壁体Wbを構築することができる。このため、溝M内に止水板54を挿入設置せずに、グラウトYbだけを注入充填して硬化させることにより、壁体とすることも行われている。   According to the above, since the annular groove M can be formed perpendicular to the dredging pipe Z without causing the collapse of the ground G or the penetration of groundwater, the grout Yb injected therein is hardened in a homogeneous state, A wall body Wb having high water shielding performance can be constructed around the pipe Z. For this reason, without inserting the water stop plate 54 into the groove M, only the grout Yb is injected, filled, and hardened to form a wall.

特許第2929190号公報Japanese Patent No. 2929190

しかしながら、特許文献1では、地盤改良装置50によって地盤G中にグラウトYaを注入して地盤改良部Pを造成してから、掘削機52によって地盤改良部P内に溝Mを掘削形成し、その後、形成した溝M内にグラウトYbを注入充填するので、壁体Wbを構築する工程が三段階になり、コストと工期がかかるという問題がある。また、地盤改良装置50と掘削機52の2台の装置が必要であり、これらをそれぞれ樋管Z内に設置したり樋管Z内から撤去しなけらばならないので、さらにコストと工期がかかるという問題がある。 However, in Patent Document 1, the ground improvement device 50 injects grout Ya into the ground G to form the ground improvement portion P, and then the excavator 52 excavates and forms the groove M in the ground improvement portion P. Since the grout Yb is injected and filled in the formed groove M, there is a problem that the process of constructing the wall body Wb has three stages, and costs and work time are required. In addition, two devices, the ground improvement device 50 and the excavator 52 , are required, and these must be installed or removed from the inside of the culvert pipe Z, respectively. There is a problem.

本発明は、上記問題点を解決するものであって、その課題とするところは、地盤中に敷設された管周りに遮水性能の高い壁体を構築するとともに、コストを削減しかつ工期を短縮することが可能な管周りの壁体構築装置および工法を提供することにある。   The present invention solves the above-mentioned problems, and the problem is to construct a wall body with high water-blocking performance around the pipe laid in the ground, reduce the cost and shorten the construction period. An object of the present invention is to provide a wall body construction apparatus and method around a pipe that can be shortened.

本発明に係る管周りの壁体構築装置は、地盤中に敷設されている管に形成された環状の開口部を通じて、地盤改良工程を経ることなく、管内から管周りに壁体を構築する管周りの壁体構築装置であって、開口部を閉じて地盤と管内とを隔離する隔離部材と、先端部に地盤を掘削するための刃と硬化性を有する構壁材を吐出するための吐出口とが設けられたボーリングロッドと、ボーリングロッドを隔離部材と開口部とを通して地盤中に対して出没させる出没手段と、ボーリングロッドを該ボーリングロッドの軸を中心に回転させる回転手段と、ボーリングロッドを管の円周方向に旋回させる旋回手段とを備えている。そして、出没手段がボーリングロッドを地盤中へ押し出すとともに、回転手段がボーリングロッドを回転させ、ボーリングロッドは、刃で地盤中に削孔を形成しつつ、吐出口から構壁材を吐出して削孔内に構壁材を充填する。 A wall construction apparatus around a pipe according to the present invention is a pipe that constructs a wall around a pipe from the inside of the pipe through an annular opening formed in the pipe laid in the ground without going through a ground improvement process. A surrounding wall construction apparatus, comprising: an isolation member that closes an opening and isolates the ground from the inside of a pipe; a blade for excavating the ground at a tip; and a discharge for discharging a hard wall construction material. A boring rod provided with an outlet, a projecting and retracting means for projecting the boring rod into and out of the ground through the isolation member and the opening, a rotating means for rotating the boring rod about the axis of the boring rod, and the boring rod Swiveling means for swirling the pipe in the circumferential direction of the pipe. The boring rod pushes the boring rod into the ground, and the rotating means rotates the boring rod. The boring rod forms a hole in the ground with a blade, and the wall material is discharged from the discharge port to remove the wall. Fill the hole with wall material.

このような構成によると、出没手段によってボーリングロッドを管内から隔離部材と開口部とを通して地盤中へ押し出し、かつ回転手段によってボーリングロッドを回転させ、かつボーリングロッドの吐出口から構壁材を吐出することにより、地盤中に削孔を施しつつ当該削孔内に構壁材を充填することができる。そして、このような削孔工程を旋回手段によって管内でボーリングロッドを管の円周方向に旋回させて繰り返し行うことにより、管周りに連続した状態の複数の削孔からなる環状の溝を形成することができる。さらにその後、形成した溝内の構壁材を硬化させることにより、管周りに環状の壁体を構築することができる。   According to such a configuration, the boring rod is pushed out from the inside of the pipe into the ground through the separating member and the opening by the intruding means, the boring rod is rotated by the rotating means, and the wall material is discharged from the discharge port of the boring rod. Thus, the wall material can be filled in the drilling hole while making the drilling hole in the ground. Then, by repeating such drilling step by turning the boring rod in the pipe circumferential direction by the turning means, an annular groove composed of a plurality of continuous drilling holes is formed around the pipe. be able to. Furthermore, after that, the annular wall body can be constructed around the pipe by curing the wall material in the formed groove.

上記の際、隔離部材によって管の開口部を閉じて、ボーリングロッドによって地盤中に削孔を施しつつ当該削孔内に構壁材を充填するので、管周りに閉空間状態の削孔が形成されて、当該削孔内に充填した構壁材が削孔壁を圧迫するようになり、地盤の崩壊や地下水の浸透を生じることなく、管に対して垂直に環状の溝を形成することができる。また、ボーリングロッドを回転させるので、掘削した地盤の土砂と吐出した構壁材とを削孔内で攪拌して、均一に混合させることができる。よって、溝内で構壁材が地盤中に拡散して行くことなく硬化し、管周りに均質な遮水性能の高い環状の壁体を構築することが可能となる。この結果、特許文献1のような地盤改良工程を行う必要がなくなるとともに、溝の掘削形成工程と溝内への構壁材の注入充填工程とを同時に行うので、壁体を構築する工程が一段階になり、コストを削減し工期を短縮することが可能となる。また、特許文献1のように地盤改良装置と掘削機の2台の装置を必要とせず、1台の壁体構築装置で壁体を構築することができるので、装置の設置や撤去の作業に手間と時間がかからず、コストの削減と工期の短縮とを一層推進可能となる。   At the time of the above, the opening of the pipe is closed by the separating member, and the wall material is filled in the drilling hole while making the drilling hole in the ground by the boring rod, so that a drilling hole in a closed space is formed around the pipe Then, the wall material filled in the hole is pressed against the hole, and an annular groove can be formed perpendicular to the pipe without causing collapse of the ground or infiltration of groundwater. it can. Further, since the boring rod is rotated, the excavated ground soil and the discharged wall material can be agitated in the drilling hole and uniformly mixed. Therefore, the structural wall material hardens without diffusing into the ground in the groove, and it becomes possible to construct an annular wall body having a high uniform water shielding performance around the pipe. As a result, it is not necessary to perform the ground improvement process as in Patent Document 1, and since the groove excavation forming process and the filling and filling process of the wall material into the groove are performed simultaneously, the process of constructing the wall body is one. It becomes possible to reduce costs and shorten the construction period. Moreover, since the ground body improvement apparatus and the two apparatuses of an excavator are not required like patent document 1, and a wall body can be constructed | assembled with one wall body construction apparatus, it is the work of installation or removal of an apparatus. This saves time and effort, and can further reduce costs and shorten the construction period.

さらに加えて、隔離部材によって開口部を閉じることで、ボーリングロッドによって掘削した土砂や削孔内に充填した構壁材が開口部から管内に漏れるのを防止することができ、管内で作業を安全に行えるようになる。また、ボーリングロッドを管内で旋回させることで、当該旋回に要する力が小さくて済み、旋回手段として小型の駆動装置を用いて、コストの削減を一層推進可能となる。また、例えば特許文献1の掘削アームのような部材を用いると、掘削速度が遅く、予め他の装置を用いて地盤中に当該部材の掘削部を突出可能な大きな削孔を施しておく必要がある。然るに、上述のようにボーリングロッドを地盤中で押し進めながら回転させて地盤を掘削するという所謂ボーリング掘削方式を採用したことで、掘削速度を速くすることができ、また、他の装置を用いて地盤中に大きな予備削孔を施しておかなくても、地盤中に削孔を施すことができ、掘削工程および装置の設置や撤去の作業に手間と時間がかからず、コストの削減と工期の短縮を一層推進可能となる。また、地盤中に岩等の硬質の障害物があっても、例えばはつり機のような他の装置を用いることなく、当該障害物をボーリングロッドによって粉砕しつつ掘削を継続することができ、装置の設置や撤去の作業に手間と時間がかからず、コストの削減と工期の短縮を一層推進可能となる。   In addition, by closing the opening with the isolation member, it is possible to prevent the earth and sand excavated by the boring rod and the wall material filled in the drilling hole from leaking into the pipe from the opening, making work safe in the pipe Will be able to do. Further, by turning the boring rod within the pipe, the force required for the turning can be reduced, and a cost reduction can be further promoted by using a small driving device as the turning means. For example, when a member such as the excavation arm of Patent Document 1 is used, the excavation speed is slow, and it is necessary to make a large hole that can project the excavation part of the member in the ground in advance using another device. is there. However, as described above, the so-called boring excavation method in which the boring rod is rotated while being pushed forward in the ground to excavate the ground can increase the excavation speed. You can drill holes in the ground even if you do not have large preliminary drill holes in the ground, and it takes less time and labor to install and remove the drilling process and equipment, reducing costs and Shortening can be further promoted. Also, even if there are hard obstacles such as rocks in the ground, excavation can be continued while crushing the obstacles with a boring rod without using other devices such as a hanger. It takes less time and effort to install and remove the equipment, and it is possible to further reduce the cost and the construction period.

また、本発明に係る管周りの壁体構築装置においては、上記構成に加えて、ボーリングロッドを出没手段による出没方向と垂直でかつ管の円周方向と平行な方向へ移動させるスライド手段を備えている。   In addition to the above-described structure, the wall construction apparatus around the tube according to the present invention further includes slide means for moving the boring rod in a direction that is perpendicular to the intrusion direction by the intrusion means and parallel to the circumferential direction of the tube. ing.

このようにすると、ボーリングロッドによって地盤中に削孔を施しつつ当該削孔内に構壁材を充填する削孔工程を、スライド手段によって管内でボーリングロッドを出没方向と垂直でかつ管の円周方向と平行な方向へ移動させて複数回行った後に、旋回手段によって管内でボーリングロッドを管の円周方向に旋回させることにより、隣接する削孔同士を深度方向の全体に渡って着実に連続させて、管周りに環状の溝を確実に形成することができる。そして、当該溝内の構壁材を硬化させることにより、管周りに欠陥のない遮水性能の高い環状の壁体を構築することが可能となる。また、ボーリングロッドを管内で移動させることで、当該移動に要する力が小さくて済み、スライド手段として小型の駆動装置を用いて、コストの削減を一層推進可能となる。   In this way, the drilling step of filling the wall material into the drilling hole while making the drilling hole in the ground with the boring rod is performed by the slide means so that the boring rod is perpendicular to the intrusion direction in the pipe and the circumference of the pipe. After moving several times in a direction parallel to the direction, the boring rod is swung in the pipe in the circumferential direction by the swiveling means, so that adjacent drill holes are steadily continuous over the entire depth direction. Thus, an annular groove can be reliably formed around the tube. And by hardening the wall material in the said groove | channel, it becomes possible to construct | assemble the cyclic | annular wall body with high water-blocking performance without a defect around a pipe | tube. Further, by moving the boring rod within the pipe, the force required for the movement can be reduced, and a cost reduction can be further promoted by using a small driving device as the sliding means.

また、本発明に係る管周りの壁体構築装置においては、隔離部材をまたぐように管内に取り付けられてボーリングロッドを保持する保持部材を備えていて、当該保持部材に、ボーリングロッドと隔離部材との隙間を通って管内に入り込む土砂を受止める土砂受け部と、当該土砂受け部で受止めた土砂を一定の背圧をかけながら排出する排土管とを設けている。   Moreover, in the wall body construction apparatus around the pipe according to the present invention, the apparatus includes a holding member that is attached to the pipe so as to straddle the separating member and holds the boring rod, and the holding member includes the boring rod and the separating member. The earth and sand receiving part which receives the earth and sand which penetrates in a pipe | tube through this clearance gap, and the earth discharging pipe which discharges | emits the earth and sand received by the said earth and sand receiving part, applying a fixed back pressure are provided.

このようにすると、ボーリングロッドによって掘削した地盤中の土砂を削孔内から、ボーリングロッドと隔離部材との隙間、土砂受け部、および排土管を通して一定の背圧をかけながら外部に排出することができるので、管内で作業を安全に行えるようになる。また、削孔内の構壁材および土砂の圧力が一定の背圧に保持されるので、管の上方に形成された削孔内の構壁材等が下方に流れ難くなって、当該上方の削孔内に空隙が生じるのを防止することができる。さらに、構壁材等が常に一定の圧力で削孔壁を圧迫するようになるので、地盤の崩壊や地下水の浸透を安定かつ確実に防止することが可能になる。   In this way, the soil in the ground excavated by the boring rod can be discharged from the borehole to the outside while applying a certain back pressure through the gap between the boring rod and the separating member, the earth receiving part, and the earth discharging pipe. As a result, the work can be safely performed in the pipe. In addition, since the pressure of the wall material and earth and sand in the drilling hole is maintained at a constant back pressure, the wall material and the like in the drilling hole formed above the pipe are difficult to flow downward, and the upper It is possible to prevent a void from being generated in the drilling hole. Furthermore, since the wall material or the like constantly presses the hole wall with a constant pressure, it becomes possible to stably and reliably prevent the collapse of the ground and the infiltration of groundwater.

また、本発明に係る管周りの壁体構築装置においては、保持部材に、隔離部材の近傍の地盤をほぐすための作業孔を設けている。   Moreover, in the wall construction apparatus around the pipe according to the present invention, the holding member is provided with a work hole for loosening the ground in the vicinity of the isolation member.

このようにすると、ボーリングロッドを管内から地盤中に突出させる前に、棒状部材等を作業孔に通して、隔離部材の近傍の地盤をほぐすことができるので、ボーリングロッドを回転させることなく、そのほぐした部分にボーリングロッドの先端部を容易に突出させることが可能になる。また、ボーリングロッドの刃による隔離部材の破損を防止することができ、隔離部材の地盤と管内との隔離性能を維持することが可能になる。   By doing so, before projecting the boring rod from the pipe into the ground, it is possible to loosen the ground in the vicinity of the separating member by passing the rod-like member through the working hole, so that the boring rod does not rotate. It becomes possible to easily project the tip of the boring rod at the loosened portion. Further, it is possible to prevent the isolation member from being damaged by the blade of the boring rod, and it is possible to maintain the isolation performance between the ground of the isolation member and the inside of the pipe.

また、本発明に係る管周りの壁体構築装置においては、隔離部材と保持部材との間に、開閉可能なシャッタを設けている。   Moreover, in the wall body construction apparatus around the pipe according to the present invention, an openable / closable shutter is provided between the separating member and the holding member.

このようにすると、シャッタを開くことで、ボーリングロッドを管内から地盤中に押し出して、前記削孔工程を行うことができ、シャッタを閉じることで、地盤と管内とを確実に閉塞して、土砂受け部等に詰まった土砂等を安全に除去することが可能となる。   In this way, by opening the shutter, the boring rod can be pushed out from the inside of the pipe into the ground, and the drilling process can be performed. By closing the shutter, the ground and the inside of the pipe are surely closed, It becomes possible to safely remove earth and sand clogged in the receiving part.

本発明に係る管周りの壁体構築工法は、地盤中に敷設されている管に形成された環状の開口部を通じて、地盤改良工程を経ることなく、管内から管周りに壁体を構築する管周りの壁体構築工法であって、開口部に地盤と管内とを隔離する隔離部材を設け、先端部に地盤を掘削するための刃と硬化性を有する構壁材を吐出するための吐出口とが設けられたボーリングロッドを、管内から隔離部材と開口部とを通して地盤中へ押し出し、かつボーリングロッドを当該ボーリングロッドの軸を中心に回転させて刃で地盤中に削孔を形成しつつ、構壁材を吐出口から吐出することにより削孔内に構壁材を充填し、当該削孔工程を管内でボーリングロッドを管の円周方向に旋回させて繰り返し行うことにより、管周りに連続した状態の複数の削孔からなる環状の溝を形成し、当該溝内の構壁材を硬化させて管周りに環状の壁体を構築する。 The wall construction method around the pipe according to the present invention is a pipe that constructs a wall around the pipe from the inside of the pipe through an annular opening formed in the pipe laid in the ground without going through the ground improvement process. A surrounding wall body construction method, in which an opening is provided with an isolation member that separates the ground from the inside of the pipe, and a blade for excavating the ground at the tip and a discharge port for discharging a hard wall construction material Extruding the boring rod provided with and through the separating member and the opening from the pipe into the ground, and rotating the boring rod around the axis of the boring rod to form a hole in the ground with a blade, filling the構壁material構壁material by Rikezu hole to be discharged from the discharge port, and by repeating by pivoting the boring rod the drilling process in the tube in the circumferential direction of the tube, the tube around From multiple drilling holes in a continuous state Forming a annular groove, builds an annular wall around the pipe by curing the 構壁 material of the groove.

このようにすると、管周りに閉空間状態の環状の溝が形成されて、当該溝内で土砂と均一に混合された構壁材が地盤中に拡散して行くことなく硬化し、管周りに均質な遮水性能の高い環状の壁体を構築することが可能となる。この結果、特許文献1のような地盤改良工程を行う必要がなくなるとともに、溝の掘削形成工程と溝内への構壁材の注入充填工程とを同時に行うので、壁体を構築する工程が一段階になり、コストを削減し工期を短縮することが可能となる。   In this way, an annular groove in a closed space is formed around the pipe, and the wall material uniformly mixed with the earth and sand in the groove is hardened without diffusing into the ground, and around the pipe. It becomes possible to construct a ring-shaped wall body with high uniform water shielding performance. As a result, it is not necessary to perform the ground improvement process as in Patent Document 1, and since the groove excavation forming process and the filling and filling process of the wall material into the groove are performed simultaneously, the process of constructing the wall body is one. It becomes possible to reduce costs and shorten the construction period.

また、本発明に係る管周りの壁体構築工法においては、前記削孔工程を、管内でボーリングロッドを該ボーリングロッドの出没方向と垂直でかつ管の円周方向と平行な方向へ移動させて複数回行った後に、管内でボーリングロッドを管の円周方向に旋回させる。   Further, in the wall construction method around the pipe according to the present invention, the drilling step is performed by moving the boring rod in the pipe in a direction perpendicular to the boring rod's protruding and retracting direction and parallel to the circumferential direction of the pipe. After a plurality of times, the boring rod is swung in the circumferential direction of the tube within the tube.

このようにすると、地盤中で隣接する削孔同士を深度方向の全体に渡って着実に連続させて、管周りに環状の溝を確実に形成することができ、当該溝内の構壁材を硬化させることにより、管周りに欠陥のない遮水性能の高い環状の壁体を構築することが可能となる。   In this way, the adjacent holes in the ground can be steadily continued over the entire depth direction, and an annular groove can be reliably formed around the pipe. By curing, it is possible to construct an annular wall body having high water shielding performance without defects around the pipe.

また、本発明に係る管周りの壁体構築工法においては、隔離部材の近傍の地盤をボーリングロッドの先端部を突出可能にほぐした後に、前記削孔工程を行う。   Moreover, in the wall body construction method around the pipe according to the present invention, the drilling step is performed after loosening the ground near the isolation member so that the tip of the boring rod can protrude.

このようにすると、ほぐした部分にボーリングロッドの先端部をボーリングロッドを回転させることなく突出させることができ、ボーリングロッドの刃による隔離部材の破損を防止することが可能になる。   If it does in this way, the tip part of a boring rod can be made to project in the loosened part, without rotating a boring rod, and it becomes possible to prevent damage to an isolation member by the blade of a boring rod.

さらに、本発明に係る管周りの壁体構築工法においては、管周りに環状の溝を形成してから当該溝内の構壁材が硬化するまでの間に、止水板を隔離部材と開口部とを通して溝内に挿入して管周りに環状に設置する。   Furthermore, in the wall body construction method around the pipe according to the present invention, the water stop plate is opened with the isolation member between the formation of the annular groove around the pipe and the hardening of the construction wall material in the groove. It is inserted into the groove through the part and installed in a ring around the tube.

このようにすると、小さな挿入力で溝内に止水板を容易に挿入することができる。また、溝内の構壁材が硬化したときに、止水板が埋設された環状の壁体が管周りに形成されるので、当該壁体の遮水性能を長期間維持することが可能となる。   In this way, the water stop plate can be easily inserted into the groove with a small insertion force. In addition, when the structural wall material in the groove is hardened, an annular wall body in which a water stop plate is embedded is formed around the pipe, so that the water shielding performance of the wall body can be maintained for a long time. Become.

本発明によれば、隔離部材によって管の開口部を閉じて、ボーリングロッドによって地盤中に削孔を施しつつ当該削孔内に構壁材を充填するので、地盤の崩壊や地下水の浸透を生じることなく管に対して垂直に連続状態の複数の削孔からなる環状の溝を形成し、当該溝内の構壁材を地盤中に拡散させることなく硬化させて、管周りに均質な遮水性能の高い環状の壁体を構築することが可能となる。そしてこの結果、壁体を構築する工程が一段階になり、また1台の壁体構築装置で壁体を構築できるので、コストを削減し工期を短縮することが可能となる。   According to the present invention, the opening of the pipe is closed by the separating member, and the ground wall material is filled in the drilling hole while the drilling hole is filled in the ground by the boring rod, so that the ground collapses or the groundwater penetrates. An annular groove consisting of a plurality of drilling holes in a continuous state perpendicular to the pipe is formed, and the wall material in the groove is cured without diffusing into the ground, so that a uniform water shielding around the pipe It becomes possible to construct an annular wall body with high performance. As a result, the process of constructing the wall body becomes one stage, and the wall body can be constructed by one wall body construction apparatus, so that the cost can be reduced and the construction period can be shortened.

図1〜図4は、本発明の実施形態に係る管周りの壁体構築装置を示す図である。各図は、同壁体構築装置が堤防内部に貫通敷設された樋管内に設置された状態を示している。図1は壁体構築装置の平面図、図2は壁体構築装置を図1(b)のA方向から見た側面図、図3は壁体構築装置の図1(b)におけるB−B断面図、図4は壁体構築装置の図1(b)におけるC−C断面図である。   1-4 is a figure which shows the wall body construction | assembly apparatus around the pipe | tube which concerns on embodiment of this invention. Each figure has shown the state in which the same wall construction apparatus was installed in the culvert pipe penetrated and laid inside the embankment. 1 is a plan view of the wall construction apparatus, FIG. 2 is a side view of the wall construction apparatus viewed from the direction A in FIG. 1B, and FIG. 3 is a BB view of FIG. 1B of the wall construction apparatus. Sectional drawing and FIG. 4 are CC sectional drawings in FIG.1 (b) of a wall body construction | assembly apparatus.

図1(a)において、Gは堤防の地盤、Zは堤防内部に推進工法によって貫通敷設された樋管、Uは樋管Zと地盤Gとの隙間に注入されて硬化した裏込め材である。Rgは樋管Z同士の接続部に介装された分割式の分割接続リングである。分割接続リングRgは、図1(a)ではボルトで樋管Zに取り付けられているが、ボルトを外すと、解体して図1(b)に示すように樋管Zから撤去することができる。分割接続リングRgを撤去すると、樋管Z内から壁体を構築するための作業口となる環状の開口部Xが形成される。100は樋管Z内に設置された壁体構築装置である。この壁体構築装置100は、図2および図3に示すように略弓矢形をしている。1は壁体構築装置100の構成部品の1つである環状の全周シールパッキン(以下、全周シールと記す。)である。全周シール1は、図1に示すように開口部Xを閉じて地盤Gと樋管Z内とを隔離している。また、全周シール1はゴム製で、端部が樋管Zに固定され、中央の切れ目1aで分割されている。全周シール1は、本発明における隔離部材の一実施形態を構成する。   In FIG. 1 (a), G is the ground of the dike, Z is a vertical pipe penetrating through the dike by the propulsion method, and U is a backfill material that is injected into the gap between the horizontal pipe Z and the ground G and hardened. . Rg is a split-type split connection ring interposed at the connecting portion between the rod tubes Z. The split connection ring Rg is attached to the soot tube Z with a bolt in FIG. 1 (a), but when the bolt is removed, it can be disassembled and removed from the soot tube Z as shown in FIG. 1 (b). . When the split connection ring Rg is removed, an annular opening X serving as a work port for constructing the wall body from the inside of the tub tube Z is formed. Reference numeral 100 denotes a wall construction apparatus installed in the tub tube Z. As shown in FIGS. 2 and 3, the wall construction apparatus 100 has a substantially bow and arrow shape. Reference numeral 1 denotes an annular all-around seal packing (hereinafter referred to as an all-around seal) which is one of the components of the wall construction apparatus 100. As shown in FIG. 1, the all-around seal 1 closes the opening X to isolate the ground G and the inside of the tub tube Z from each other. Further, the all-around seal 1 is made of rubber, and its end is fixed to the soot tube Z and is divided by a central cut 1a. The all-around seal 1 constitutes an embodiment of a separating member in the present invention.

2は全周シール1をまたぐように樋管Z内に設置された弓形ボックスである。詳しくは、弓形ボックス2は、図2および図4に示すようにボルトで樋管Zに固定された押さえプレート3によって、樋管Zの内周面Zaに接するように保持されている。弓形ボックス2には、図3および図4に示すように中空部からなる土砂受け部2aが設けられている。土砂受け部2aの上方(D方向側)と下方(F方向側)には、それぞれ長孔2b、2cが設けられている。4は弓形ボックス2にL、R方向(図3)へ移動可能に取り付けられたスライドプレートである。スライドプレート4は、弓形ボックス2の長孔2cを閉塞可能な大きさをしている。5は弓形ボックス2に介挿されたシャッタである。シャッタ5は、薄肉の金属板や合成樹脂等の可撓性を有する材料でアーチ形に形成されていて、図5に示すように中央から偏った位置に長孔5aが設けられている。このシャッタ5を手作業で樋管Zの円周方向(図3のQ方向または反Q方向)へずらすことにより、弓形ボックス2の長孔2bを開放状態(長孔2bと長孔5aの連通状態)または閉塞状態(長孔2bと長孔5aの非連通状態)にすることが可能になる。図3では、弓形ボックス2の長孔2bはシャッタ5によって開放状態にある。弓形ボックス2とスライドプレート4とは、本発明における保持部材の一実施形態を構成する。   Reference numeral 2 denotes an arcuate box installed in the soot tube Z so as to straddle the entire circumference seal 1. Specifically, the arcuate box 2 is held in contact with the inner peripheral surface Za of the soot tube Z by a presser plate 3 fixed to the soot tube Z with bolts as shown in FIGS. 2 and 4. As shown in FIGS. 3 and 4, the arcuate box 2 is provided with an earth and sand receiving portion 2 a formed of a hollow portion. Long holes 2b and 2c are respectively provided above (D direction side) and below (F direction side) the earth and sand receiving portion 2a. Reference numeral 4 denotes a slide plate attached to the arcuate box 2 so as to be movable in the L and R directions (FIG. 3). The slide plate 4 has a size capable of closing the long hole 2 c of the arcuate box 2. Reference numeral 5 denotes a shutter inserted in the arcuate box 2. The shutter 5 is formed in an arch shape with a flexible material such as a thin metal plate or synthetic resin, and a long hole 5a is provided at a position deviated from the center as shown in FIG. The long hole 2b of the arcuate box 2 is opened (the communication between the long hole 2b and the long hole 5a) by manually shifting the shutter 5 in the circumferential direction of the soot tube Z (Q direction or anti-Q direction in FIG. 3). State) or a closed state (non-communication state of the long hole 2b and the long hole 5a). In FIG. 3, the long hole 2 b of the arcuate box 2 is opened by the shutter 5. The arcuate box 2 and the slide plate 4 constitute one embodiment of the holding member in the present invention.

6は弓形ボックス2を貫通するようにフランジ7を介してスライドプレート4に保持されたボーリングロッドである。ボーリングロッド6とフランジ7との隙間は、Oリング等によってシールされている。ボーリングロッド6の先端部には、地盤を掘削するための刃6aと、硬化性を有する構壁材を吐出するための吐出口6b(図6)とが設けられている。図3の8はボーリングロッド6の後端部が連結された回転駆動部である。回転駆動部8は、モータおよびギヤ等から構成されていて、ボーリングロッド6を該ロッド6の軸Jを中心に高速で回転させる。回転駆動部8は、本発明における回転手段の一実施形態を構成する。   A boring rod 6 is held by the slide plate 4 via a flange 7 so as to penetrate the arcuate box 2. A gap between the boring rod 6 and the flange 7 is sealed by an O-ring or the like. The tip of the boring rod 6 is provided with a blade 6a for excavating the ground and a discharge port 6b (FIG. 6) for discharging a hard wall construction material. Reference numeral 8 in FIG. 3 denotes a rotational drive unit in which the rear end of the boring rod 6 is connected. The rotation drive unit 8 is composed of a motor, a gear, and the like, and rotates the boring rod 6 around the axis J of the rod 6 at a high speed. The rotation drive unit 8 constitutes an embodiment of the rotation means in the present invention.

9はボーリングロッド6の中空部(図示省略)に連通するように回転駆動部8に貫通状態で取り付けられたスイベルである。スイベル9の連結口9aに、樋管Z外に設置された構壁材供給装置(図示省略)の供給ホースを連結することで、ボーリングロッド6の中空部に構壁材を所定の圧力で送り込んで、ボーリングロッド6の吐出口6bから吐出させることが可能となる。構壁材の吐出量や吐出圧は図示しない調整バルブ等で調整する。また、構壁材には、硬化性を有するセメント系の硬化剤を用いるが、好ましくは粘性が高くて、注入後24時間経過しても指で押して変形する程度の強度となる強度発現の遅いベンドナイト等を配合した材料を用いる。   Reference numeral 9 denotes a swivel attached to the rotary drive unit 8 in a penetrating manner so as to communicate with a hollow portion (not shown) of the boring rod 6. By connecting the supply hose of the wall material supply device (not shown) installed outside the tub tube Z to the connection port 9a of the swivel 9, the wall material is fed into the hollow portion of the boring rod 6 with a predetermined pressure. Thus, it is possible to discharge from the discharge port 6b of the boring rod 6. The discharge amount and discharge pressure of the wall material are adjusted by an adjustment valve (not shown). In addition, a cement-based curing agent having curability is used for the wall material, but it is preferably highly viscous and has a slow development of strength that can be pushed and deformed with a finger even after 24 hours have passed since injection. A material blended with bendite or the like is used.

10はスライドプレート4に立設されたマストである。マスト10には、モータ、ギヤ、スプロケット、およびチェーン等から構成された出没駆動部11が設けられている。出没駆動部11のチェーンには、図3に示す連結プレート12を介して回転駆動部8が連結されている。出没駆動部11は、マスト10に沿って回転駆動部8をD、F方向へ移動させることにより、ボーリングロッド6をシャッタ5の長孔5a、弓形ボックス2の長孔2b、全周シール1、および開口部Xを通して、地盤G中に押し出したり、樋管Z内に引っ込めたりする。図3には、ボーリングロッド6が樋管Z内に最大限引っ込められて没入した状態を実線で示し、ボーリングロッド6が地盤G中に最大限押し出された状態を2点鎖線で示している。図4および図6は、ボーリングロッド6が全周シール1を押し開いて地盤G中に略半ストローク分突出した状態を示している。出没駆動部11は、本発明における出没手段の一実施形態を構成する。   A mast 10 is erected on the slide plate 4. The mast 10 is provided with an in / out drive unit 11 composed of a motor, a gear, a sprocket, a chain, and the like. A rotation drive unit 8 is connected to the chain of the in / out drive unit 11 via a connection plate 12 shown in FIG. The appearance drive unit 11 moves the rotary drive unit 8 in the D and F directions along the mast 10 to move the boring rod 6 into the long hole 5a of the shutter 5, the long hole 2b of the arcuate box 2, the all-around seal 1, And it pushes out into the ground G through the opening X or retracts into the tub tube Z. In FIG. 3, a state in which the boring rod 6 is retracted to the maximum extent in the vertical pipe Z and is immersed is shown by a solid line, and a state in which the boring rod 6 is pushed out into the ground G is shown by a two-dot chain line. 4 and 6 show a state in which the boring rod 6 pushes open the entire circumference seal 1 and protrudes into the ground G by approximately half a stroke. The in / out drive unit 11 constitutes an embodiment of in / out means in the present invention.

図1および図2に示す13はスライドシリンダである。スライドシリンダ13の本体13aの後端は、弓形ボックス2に連結されている。スライドシリンダ13のロッド13bの先端は、スライドプレート4に連結されている。スライドシリンダ13は、ロッド13bを伸縮させることにより、スライドプレート4を介してボーリングロッド6を出没方向F、Dと垂直でかつ樋管Zの円周方向Qと平行なL、R方向へ弓形ボックス2の長孔2cの大きさの範囲内で移動させる。図3には、ボーリングロッド6が最大限L方向へ移動した状態を実線で示し、ボーリングロッド6が最大限R方向へ移動した状態を1点鎖線で示している。また、図1および図2は、ボーリングロッド6が最大限L方向へ移動した状態を示している。スライドシリンダ13は、本発明におけるスライド手段の一実施形態を構成する。   Reference numeral 13 shown in FIGS. 1 and 2 denotes a slide cylinder. The rear end of the main body 13 a of the slide cylinder 13 is connected to the arcuate box 2. The tip of the rod 13 b of the slide cylinder 13 is connected to the slide plate 4. The slide cylinder 13 expands and contracts the rod 13b to move the boring rod 6 through the slide plate 4 in the L and R directions perpendicular to the projecting directions F and D and parallel to the circumferential direction Q of the vertical tube Z. 2 is moved within the range of the size of the long hole 2c. In FIG. 3, the state in which the boring rod 6 has moved in the L direction at maximum is indicated by a solid line, and the state in which the boring rod 6 has moved in the R direction at maximum is indicated by a one-dot chain line. 1 and 2 show a state in which the boring rod 6 has moved in the L direction as much as possible. The slide cylinder 13 constitutes an embodiment of the slide means in the present invention.

図1および図2に示す14は旋回シリンダである。旋回シリンダ14の本体14aの後端は、ボルトで樋管Zに固定された反力プレート15にピンを介して回転可能に連結されている。旋回シリンダ14のロッド14bの先端は、弓形ボックス2にピンを介して回転可能に連結されている。弓形ボックス2の底部には、図2に示すようにガイドローラ16が樋管Zの内周面Zaを転動可能に取り付けられている。図1および図2(a)に示すように旋回シリンダ14のロッド14bを収縮させた状態で、押さえプレート3を樋管Zの内周面Zaに沿って円周方向Qへ所定角度ずらして、ボルトによって樋管Zに固定する。押さえプレート3をずらすとき、弓形ボックス2は、押さえプレート3と旋回シリンダ14とによって保持されているので、樋管Zの径方向(D方向)と円周方向(Q方向および反Q方向)へ動くことはない。この状態から、図2(b)に示すように旋回シリンダ14のロッド14bを伸長させると、ガイドローラ16が内周面Zaに沿って転動して、弓形ボックス2とボーリングロッド6等がQ方向へ所定角度旋回する。旋回角度は、旋回シリンダ14の本体14aと反力プレート15との連結位置(反力プレート15に設けられた複数のピン穴15gのこと)、およびロッド14bと弓形ボックス2との連結位置(弓形ボックス2に設けられた複数のピン穴2gのこと)とをそれぞれ変えることで調整可能となる。旋回後、押さえプレート3に設けられた複数の固定孔3hと、当該各固定孔3hと同心円状態にある弓形ボックス2に設けられた複数のピン穴2gまたは固定孔2hとにボルト(図示省略)を嵌合して、弓形ボックス2を押さえプレート3に仮固定する。そしてこの仮固定状態で、旋回シリンダ14と反力プレート15若しくは弓形ボックス2との連結を外し、ロッド14bを収縮させて、旋回シリンダ14と反力プレート15若しくは弓形ボックス2との連結位置を変える。または、旋回シリンダ14を反力プレート15から外し、反力プレート15を樋管Zから外してQ方向へ所定角度ずらした位置に固定し、ロッド14bを収縮させて、旋回シリンダ14を反力プレート15に連結する。いずれかのようにして旋回シリンダ14の収縮と連結位置変えを行うと、固定孔3hとピン穴2gまたは固定孔2hからボルトを抜去して、弓形ボックス2の押さえプレート3への仮固定を解除する。この後、上述したように押さえプレート3をQ方向へさらに所定角度ずらして固定した後、ロッド14bを伸長させると、弓形ボックス2とボーリングロッド6等がさらにQ方向へ所定角度旋回する。つまり、上述した一連の手順を繰り返し行うことで、ボーリングロッド6が樋管Zの円周方向Qへ360°旋回可能となる。旋回シリンダ14は、本発明における旋回手段の一実施形態を構成する。   Reference numeral 14 shown in FIGS. 1 and 2 denotes a turning cylinder. The rear end of the main body 14a of the turning cylinder 14 is rotatably connected to a reaction force plate 15 fixed to the tub tube Z with a bolt via a pin. The tip of the rod 14b of the turning cylinder 14 is rotatably connected to the arcuate box 2 via a pin. As shown in FIG. 2, a guide roller 16 is attached to the bottom of the arcuate box 2 so that the inner peripheral surface Za of the soot tube Z can roll. With the rod 14b of the turning cylinder 14 contracted as shown in FIGS. 1 and 2 (a), the holding plate 3 is shifted by a predetermined angle in the circumferential direction Q along the inner peripheral surface Za of the soot tube Z. It fixes to the soot pipe Z with a volt | bolt. When the presser plate 3 is moved, the arcuate box 2 is held by the presser plate 3 and the turning cylinder 14, so that the radial direction (D direction) and the circumferential direction (Q direction and anti-Q direction) It doesn't move. When the rod 14b of the swing cylinder 14 is extended from this state as shown in FIG. 2B, the guide roller 16 rolls along the inner peripheral surface Za, and the arcuate box 2 and the boring rod 6 are Turn a predetermined angle in the direction. The turning angle is determined by connecting the main body 14a of the turning cylinder 14 and the reaction force plate 15 (a plurality of pin holes 15g provided in the reaction force plate 15), and the connection position of the rod 14b and the arcuate box 2 (bow shape). It can be adjusted by changing each of the plurality of pin holes 2g provided in the box 2). After turning, bolts (not shown) are provided in a plurality of fixing holes 3h provided in the holding plate 3 and a plurality of pin holes 2g or fixing holes 2h provided in the arcuate box 2 concentric with the fixing holes 3h. And the arcuate box 2 is temporarily fixed to the holding plate 3. In this temporarily fixed state, the connection between the turning cylinder 14 and the reaction force plate 15 or the arcuate box 2 is disconnected, the rod 14b is contracted, and the connection position between the turning cylinder 14 and the reaction force plate 15 or the arcuate box 2 is changed. . Alternatively, the revolving cylinder 14 is removed from the reaction force plate 15, the reaction force plate 15 is removed from the vertical tube Z and fixed at a position shifted by a predetermined angle in the Q direction, the rod 14b is contracted, and the revolving cylinder 14 is retreated. 15 is connected. If the revolving cylinder 14 is contracted and the connection position is changed as described above, the bolt is removed from the fixing hole 3h and the pin hole 2g or the fixing hole 2h, and the temporary fixing of the arcuate box 2 to the holding plate 3 is released. To do. Thereafter, as described above, after the holding plate 3 is further shifted and fixed in the Q direction by a predetermined angle and then the rod 14b is extended, the arcuate box 2 and the boring rod 6 and the like further rotate in the Q direction by a predetermined angle. That is, by repeating the above-described series of procedures, the boring rod 6 can turn 360 ° in the circumferential direction Q of the soot tube Z. The turning cylinder 14 constitutes an embodiment of turning means in the present invention.

図4に示す17は弓形ボックス2の排出部2dに接続された排土管である。排土管17の内部には、エアーで膨張収縮するゴムチューブからなる背圧弁18が設けられている。上述したように、出没駆動部11によってボーリングロッド6を地盤G中に押し出すことと、回転駆動部8によってボーリングロッド6を回転させることと、ボーリングロッド6の吐出口6bから構壁材を吐出することとを同時に行うと、地盤Gが掘削されて削孔が形成されつつ当該削孔内に構壁材が充填される。この際、掘削された土砂は、構壁材と混ざり合いながらボーリングロッド6と全周シール1との隙間S(図6に図示)を通って弓形ボックス2の土砂受け部2aに入り込む。そして、土砂受け部2aに入り込んだ土砂等は、背圧弁18によって一定の背圧をかけられながら排出部2dと排土管17とを通って外部へ排出される。これにより、土砂受け部2a内、および土砂受け部2a内と隙間Sを介して連通する地盤G中に施された削孔内にある構壁材等の圧力が上記一定の背圧に保持される。なお、この一定の背圧は、地盤G中に含まれる地下水の水頭圧以上、または削孔内に充填された構壁材の水頭圧以上に設定する。具体的には、0.2〜0.3kg/cm程度に設定する。 Reference numeral 17 shown in FIG. 4 denotes a soil discharge pipe connected to the discharge part 2 d of the arcuate box 2. A back pressure valve 18 made of a rubber tube that expands and contracts with air is provided inside the soil discharge pipe 17. As described above, the boring rod 6 is pushed out into the ground G by the appearance driving unit 11, the boring rod 6 is rotated by the rotation driving unit 8, and the wall material is discharged from the discharge port 6 b of the boring rod 6. If this is performed at the same time, the ground G is excavated to form a hole, and the wall material is filled into the hole. At this time, the excavated earth and sand enter the earth and sand receiving part 2a of the arcuate box 2 through the gap S (shown in FIG. 6) between the boring rod 6 and the all-around seal 1 while being mixed with the wall material. And the earth and sand etc. which entered the earth and sand receiving part 2a are discharged | emitted outside through the discharge part 2d and the earth discharge pipe | tube 17, applying a fixed back pressure by the back pressure valve 18. FIG. As a result, the pressure of the wall material or the like in the drilling hole formed in the earth and sand receiving part 2a and in the ground G communicating with the earth and sand receiving part 2a via the gap S is maintained at the constant back pressure. The The constant back pressure is set to be equal to or higher than the water head pressure of the groundwater contained in the ground G or higher than the water head pressure of the wall material filled in the drilling hole. Specifically, it is set to about 0.2 to 0.3 kg / cm 2 .

図2および図3に示す19はスライドプレート4に取り付けられた保守ブラケットである。保守ブラケット19には、スライドプレート4の孔4aと弓形ボックス2の長孔2cとに連通するサービスホール19aと、紙面に対して垂直な方向へ開閉可能なシャッタ20とが設けられている。シャッタ20を閉じると、サービスホール19aが閉塞されて、土砂受け部2a内に入り込んだ土砂等がサービスホール19aを通って樋管Z内に漏れなくなる。また、シャッタ20を開けると、サービスホール19aが開放されて、図7に示すように棒状部材21をサービスホール19aから挿入して、土砂受け部2a、全周シール1、および開口部Xを通して地盤G中に突出可能となる。棒状部材21の後端部には、外部から水を供給するためのホース23を連結する連結部21aが設けられ、先端部には、水を吐出するための吐出口21bと、地盤Gを削るための爪21cとが設けられている。22は棒状部材21を挿入した状態でサービスホール19aを封止するラバーである。図7に示すように棒状部材21を地盤G中に突出した状態で、吐出口21bから水を吐出させつつ棒状部材21を上下や左右に動かすことで、全周シール1の近傍の裏込め材Uおよび地盤G(破線で囲った部分)を、崩したり土砂受け部2aに掻き入れたりする等してほぐす(やわらかくする)ことが可能となる。サービスホール19aは、本発明における作業孔の一実施形態を構成する。   Reference numeral 19 shown in FIGS. 2 and 3 denotes a maintenance bracket attached to the slide plate 4. The maintenance bracket 19 is provided with a service hole 19a communicating with the hole 4a of the slide plate 4 and the long hole 2c of the arcuate box 2 and a shutter 20 that can be opened and closed in a direction perpendicular to the paper surface. When the shutter 20 is closed, the service hole 19a is closed, so that the sand or the like that has entered the earth and sand receiving portion 2a does not leak into the vertical pipe Z through the service hole 19a. Further, when the shutter 20 is opened, the service hole 19a is opened, and the rod-like member 21 is inserted from the service hole 19a as shown in FIG. 7, and the ground is passed through the earth and sand receiving portion 2a, the entire circumference seal 1, and the opening X. Can project into G. A connecting portion 21a for connecting a hose 23 for supplying water from the outside is provided at the rear end portion of the rod-shaped member 21, and a discharge port 21b for discharging water and the ground G are shaved at the front end portion. For this purpose, a claw 21c is provided. A rubber 22 seals the service hole 19a with the rod-shaped member 21 inserted. As shown in FIG. 7, with the rod-shaped member 21 protruding into the ground G, the back-filling material in the vicinity of the all-around seal 1 is moved by moving the rod-shaped member 21 up and down and left and right while discharging water from the discharge port 21b. It is possible to loosen (soften) U and ground G (portions enclosed by broken lines) by breaking them or scraping them into the earth and sand receiving part 2a. The service hole 19a constitutes an embodiment of the work hole in the present invention.

図8A〜図12は、本発明の実施形態に係る管周りの壁体構築工法を説明するための図である。本工法は、上述した壁体構築装置100を用いて実施する。前述したように、樋管Z同士の接続部に介装された分割接続リングRg(図1(a)に図示)を解体撤去して、樋管Zに環状の開口部X(例えば、図1(b)に図示)を形成した後、樋管Z内に壁体構築装置100を設置する。このとき、弓形ボックス2が動かないように、押さえプレート3を樋管Zに本固定しておく。そしてまず最初に、シャッタ5と、保守ブラケット19のシャッタ20(図7)とを開いて、図8A(a)に示すように棒状部材21をサービスホール19aから全周シール1と開口部Xとを通して地盤G中に突出して、前述したように棒状部材21によって全周シール1の近傍の地盤Gをほぐす。ほぐし終えると、棒状部材21をサービスホール19aから抜去して、シャッタ20を閉じる。次に、突出駆動部11によってボーリングロッド6をF方向へ押し、ボーリングロッド6の刃6aを全周シール1と開口部Xとを通して、図8A(b)に示すように地盤G中に突出させる。このとき、全周シール1の近傍の地盤Gがほぐれているので、ボーリングロッド6の刃6aを容易に地盤G中へ突出できる。   8A to 12 are views for explaining a wall body construction method around a pipe according to the embodiment of the present invention. This construction method is carried out using the wall construction apparatus 100 described above. As described above, the split connection ring Rg (shown in FIG. 1A) interposed in the connecting portion between the soot tubes Z is disassembled and removed, and the annular opening X (for example, FIG. After forming (shown in (b)), the wall construction apparatus 100 is installed in the tub tube Z. At this time, the presser plate 3 is permanently fixed to the soot tube Z so that the arcuate box 2 does not move. First, the shutter 5 and the shutter 20 (FIG. 7) of the maintenance bracket 19 are opened, and the rod-shaped member 21 is moved from the service hole 19a to the all-round seal 1 and the opening X as shown in FIG. 8A (a). And protrudes into the ground G through the rod-shaped member 21 as described above, loosening the ground G in the vicinity of the all-around seal 1. When the loosening is finished, the rod-shaped member 21 is removed from the service hole 19a, and the shutter 20 is closed. Next, the boring rod 6 is pushed in the F direction by the projecting drive unit 11, and the blade 6a of the boring rod 6 is protruded into the ground G as shown in FIG. 8A (b) through the entire circumference seal 1 and the opening X. . At this time, since the ground G in the vicinity of the all-around seal 1 is loosened, the blade 6a of the boring rod 6 can be easily protruded into the ground G.

ボーリングロッド6の刃6aを突出させると、突出駆動部11によってボーリングロッド6をF方向へ押し出して行くことと、回転駆動部8によってボーリングロッド6を回転させることと、ボーリングロッド6の吐出口6b(図6)から構壁材を吐出することとをそれぞれ同時に行う。これにより、ボーリングロッド6によって地盤Gが掘削されて、ボーリングロッド6の径よりも若干大きな径の削孔Vが形成されつつ当該削孔V内に構壁材(図では符号Yで示す。)が充填されて行く。このとき、掘削された土砂が構壁材Yと混ざり合って、ボーリングロッド6と全周シール1との隙間S(図6)を通って土砂受け部2aに入り込み、さらに排土管17(図4)を通って一定の背圧をかけられながら樋管Z外へ排出されて行く。これにより、削孔V内に充填した構壁材Yの圧力が上記一定の背圧に保持される。なお、構壁材Yは、セメント等の粒子が大きくて削孔Vの壁に目詰まりするため、地盤G中へ殆ど浸透せずに削孔Vの壁を圧迫する。また、構壁材Yは粘性が高いため、削孔V内から全周シール1の切れ目1a(図1)を通って樋管Z内に漏れ難い。そして、図8A(c)に示すようにボーリングロッド6を最大限F方向へ押し出すと、突出駆動部11によってボーリングロッド6をD方向へ引っ込めて行って、樋管Z内へ没入させる。このとき、ボーリングロッド6の回転と構壁材Yの吐出とを継続して行うと、削孔V内で土砂と構壁材Yとが均一な状態で混ざり合い、削孔V内の圧力が上記一定の背圧のまま保持された状態が維持される。   When the blade 6a of the boring rod 6 is protruded, the boring rod 6 is pushed out in the F direction by the protrusion driving unit 11, the boring rod 6 is rotated by the rotation driving unit 8, and the discharge port 6b of the boring rod 6 The wall material is discharged simultaneously from (FIG. 6). As a result, the ground G is excavated by the boring rod 6 and a hole V having a diameter slightly larger than the diameter of the boring rod 6 is formed, and the wall material (indicated by symbol Y in the drawing) is formed in the hole V. Goes filled. At this time, the excavated earth and sand are mixed with the construction wall material Y, enter the earth and sand receiving part 2a through the gap S (FIG. 6) between the boring rod 6 and the entire circumference seal 1, and further, the earth discharging pipe 17 (FIG. 4). ) And is discharged out of the tub tube Z while applying a certain back pressure. Thereby, the pressure of the wall material Y filled in the hole V is maintained at the constant back pressure. Note that the wall material Y presses the wall of the drilling hole V almost without penetrating into the ground G because particles such as cement are large and clog the wall of the drilling hole V. Further, since the wall construction material Y has high viscosity, it is difficult to leak from the bore hole V through the cut 1a (FIG. 1) of the all-around seal 1 into the soot pipe Z. Then, as shown in FIG. 8A (c), when the boring rod 6 is pushed out in the F direction as much as possible, the boring rod 6 is retracted in the D direction by the projecting drive unit 11, and is inserted into the soot tube Z. At this time, if the rotation of the boring rod 6 and the discharge of the wall material Y are continuously performed, the earth and sand and the wall material Y are mixed in the hole V in a uniform state, and the pressure in the hole V is reduced. The state in which the constant back pressure is maintained is maintained.

ボーリングロッド6を樋管Z内へ没入させると、スライドシリンダ13(図2)によってスライドプレート4等とともにボーリングロッド6とを、図8A(d)に示すようにボーリングロッド6の径よりも小さな所定ピッチでR方向へ移動させる。移動後、上述したように突出駆動部11によってボーリングロッド6の刃6aを地盤G中に突出させる。このとき、突出させる地盤Gの側近に既に削孔Vを施しているので、当該地盤Gが軟らかくなっていて、ボーリングロッド6の刃6aが容易に突出できる。続けて、上述したようにボーリングロッド6をF方向へ押し出して行くことと、ボーリングロッド6を回転させることと、吐出口6bから構壁材Yを吐出することとをそれぞれ同時に行って、地盤G中に削孔Vを形成しつつ当該削孔V内に構壁材Yを充填して行く。このとき、ボーリングロッド6の一部が1本目の削孔V内を進んで行き、1本目の削孔Vと2本目の削孔Vとが重なり合う。そして、図8B(e)に示すようにボーリングロッド6を最大限F方向へ押し出すと、上述したようにボーリングロッド6を樋管Z内へ没入させて、所定ピッチでさらにR方向へ移動させる。移動後、再びボーリングロッド6によって地盤G中に削孔Vを施しつつ当該削孔V内に構壁材Yを充填する削孔工程を行う。   When the boring rod 6 is inserted into the vertical tube Z, the slide cylinder 13 (FIG. 2) moves the boring rod 6 together with the slide plate 4 and the like to a predetermined diameter smaller than the diameter of the boring rod 6 as shown in FIG. 8A (d). Move in the R direction at a pitch. After the movement, the blade 6a of the boring rod 6 is caused to protrude into the ground G by the protrusion driving unit 11 as described above. At this time, since the hole V has already been made in the vicinity of the ground G to be projected, the ground G is soft, and the blade 6a of the boring rod 6 can be easily projected. Subsequently, as described above, the boring rod 6 is pushed in the F direction, the boring rod 6 is rotated, and the wall material Y is discharged from the discharge port 6b. The wall material Y is filled into the hole V while forming the hole V therein. At this time, a part of the boring rod 6 advances in the first drilling hole V, and the first drilling hole V and the second drilling hole V overlap. Then, as shown in FIG. 8B (e), when the boring rod 6 is pushed out in the F direction as much as possible, the boring rod 6 is immersed into the vertical tube Z as described above, and is further moved in the R direction at a predetermined pitch. After the movement, a drilling step of filling the wall material Y into the drilling hole V while performing drilling V in the ground G again by the boring rod 6 is performed.

そして、上記削孔工程をスライドシリンダ13によってボーリングロッド8をR方向へ移動させながら4回行って、図8B(f)に示すように地盤G中に4本の削孔Vを施すと、ボーリングロッド6を樋管Z内へ没入させて、図8B(g)に示すようにスライドプレート4等とともにボーリングロッド6を最大限L方向へ移動させる。そして移動後、前述したように旋回シリンダ14(図2)によって弓形ボックス2等とともにボーリングロッド6を、図8B(h)に示すようにQ方向へ所定角度旋回させる。このときの旋回角度は、次に出没駆動部11によってボーリングロッド6を最大限地盤G中に押し出したときに、ボーリングロッド6の刃6aが既に施した削孔V内に確実に入り込むような小さな角度に設定しておく。ボーリングロッド6をQ方向へ所定角度旋回させると、上記削孔工程をボーリングロッド8をR方向へ移動させながら4回行って、図8C(i)に示すように地盤G中にさらに4本の削孔Vを施す。このとき地盤G中に施された8本の削孔Vの先端側(F方向側)の状態を図9に示す。図9では、旋回シリンダ14による旋回前に施された4本の削孔Vを2点鎖線で示し、旋回後に施された4本の削孔Vを実線で示している。全8本の削孔Vは、隣接する削孔V同士で重なり合って、深度方向の全体に渡って連続した状態になっている。   Then, the above drilling step is performed four times while the boring rod 8 is moved in the R direction by the slide cylinder 13, and when four holes V are formed in the ground G as shown in FIG. The rod 6 is immersed in the soot tube Z, and the boring rod 6 is moved in the L direction to the maximum along with the slide plate 4 and the like as shown in FIG. 8B (g). After the movement, the boring rod 6 together with the arcuate box 2 and the like is swung by a predetermined angle in the Q direction as shown in FIG. 8B (h) by the swivel cylinder 14 (FIG. 2) as described above. The turning angle at this time is small so that the next time the boring rod 6 is pushed into the ground G to the maximum extent by the projecting / retracting drive unit 11, the blade 6a of the boring rod 6 surely enters the hole V already made. Set the angle. When the boring rod 6 is turned by a predetermined angle in the Q direction, the above drilling step is performed four times while moving the boring rod 8 in the R direction, and four more in the ground G as shown in FIG. 8C (i). Drill holes V. The state of the tip side (F direction side) of the eight holes V made in the ground G at this time is shown in FIG. In FIG. 9, the four drilling holes V made before turning by the turning cylinder 14 are indicated by a two-dot chain line, and the four drilling holes V made after turning are indicated by a solid line. All the eight drilling holes V overlap with each other and are in a continuous state in the entire depth direction.

この後、上述したように、ボーリングロッド6の樋管Z内への没入と、ボーリングロッド6のL方向への最大限の移動と、ボーリングロッド6のQ方向への所定角度の旋回と、ボーリングロッド8をR方向へ移動させながらの4回の上記削孔工程という一連の作業を繰り返し行うと、図8C(j)に示すように樋管Z周りに構壁材Yを充填した連続状態の複数の削孔Vからなる溝Mが形成されて、徐々にQ方向へ拡大されて行く。その際、地盤G中に岩等の硬質の障害物Eがあっても、ボーリングロッド6を出没駆動部11によってF方向へ押し出しながら回転駆動部8によって回転させて地盤Gを掘削しているので、図8C(k)に示すようにボーリングロッド6の刃6aで障害物Eを粉砕して、削孔Vの形成を継続することができる。また、ボーリングロッド6の刃6aを障害物Eの種類(質、大きさ、強度等)に応じたタイプのものに交換することで、障害物Eを一層確実に粉砕することが可能となる。   Thereafter, as described above, the boring rod 6 is immersed in the vertical tube Z, the maximum movement of the boring rod 6 in the L direction, the turning of the boring rod 6 by a predetermined angle in the Q direction, and the boring. When the series of operations of the above four drilling steps while moving the rod 8 in the R direction is repeated, a continuous state in which the wall material Y is filled around the vertical tube Z as shown in FIG. 8C (j). A groove M composed of a plurality of holes V is formed and gradually expanded in the Q direction. At that time, even if there is a hard obstacle E such as a rock in the ground G, the ground G is excavated by rotating the boring rod 6 by the rotary drive unit 8 while pushing the boring rod 6 in the F direction by the intrusion drive unit 11. 8C (k), the obstacle E can be crushed with the blade 6a of the boring rod 6, and the formation of the hole V can be continued. Moreover, by replacing the blade 6a of the boring rod 6 with a type corresponding to the type (quality, size, strength, etc.) of the obstacle E, the obstacle E can be crushed more reliably.

そして、上述の一連の作業を繰り返し行って、ボーリングロッド6を円周方向Qに360°旋回させ終えると、図10(l)に示すように樋管Z周りに構壁材Yを充填した環状の溝Mが形成された状態となる。この後は、壁体構築装置100を解体して撤去し、図10(m)に示すように樋管Z同士の接続部に分割接続リングRgを組み付けて元に戻す。そしてしばらくした後、溝M内の構壁材Yが硬化すると、樋管Z周りに環状の壁体Wが樋管Zに対して垂直に構築されて遮水壁となる。   Then, when the boring rod 6 is turned 360 ° in the circumferential direction Q by repeating the above-described series of operations, the annular wall Z is filled with the wall material Y around the vertical tube Z as shown in FIG. The groove M is formed. Thereafter, the wall construction apparatus 100 is disassembled and removed, and the split connection ring Rg is assembled to the connecting portion between the tubules Z as shown in FIG. Then, after a while, when the structural wall material Y in the groove M is cured, an annular wall W is constructed perpendicularly to the soot tube Z around the soot tube Z and becomes a water shielding wall.

また、壁体構築装置100を解体して撤去した後、分割接続リングRgを組み付けずに、溝M内の構壁材Yが硬化するまでの間に、図11(n)に示すように鋼材からなる止水板25を全周シール1を押しのけて溝M内に挿入し、止水板25の底部25aを樋管Z同士の接続部にボルトで固定するようにしてもよい。なお、止水板25の挿入は、ジャッキやシリンダ等を用いて行う。止水板25を1枚固定すると、別の止水板25を固定済みの止水板25に沿わせながら全周シール1を押しのけて溝M内に挿入し、底部25aを樋管Zに固定する。そして、次々に止水板25を溝M内に挿入して樋管Zに固定して行くと、最終的に、図11(o)に示すように樋管Z周りに止水板25が環状に設置された状態になる。このような状態になると、樋管Zの開口部Xが、図12に示すように止水板25の底部25aで閉じられるので、そのまま溝M内の構壁材Yを硬化させる。なおこのとき、底部25aの上に分割接続リングRgを組み付けて元に戻してもよい。この後、構壁材Yが硬化すると、樋管Z周りに止水板25を埋設した環状の壁体Waが樋管Zに対して垂直に構築されて遮水壁となる。   In addition, after disassembling and removing the wall construction apparatus 100, the steel material as shown in FIG. 11 (n) until the construction wall material Y in the groove M is cured without assembling the split connection ring Rg. The water stop plate 25 made of may be inserted into the groove M by pushing the entire circumference seal 1 and the bottom portion 25a of the water stop plate 25 may be fixed to the connecting portion between the vertical pipes Z with bolts. The water stop plate 25 is inserted using a jack, a cylinder, or the like. When one water stop plate 25 is fixed, the entire seal 1 is pushed out and inserted into the groove M while another water stop plate 25 is placed along the fixed water stop plate 25, and the bottom portion 25a is fixed to the pipe Z. To do. Then, when the water stop plates 25 are successively inserted into the grooves M and fixed to the soot tube Z, the water stop plate 25 finally loops around the soot tube Z as shown in FIG. It becomes the state installed in. If it will be in such a state, since the opening part X of the soot pipe Z will be closed by the bottom part 25a of the water stop board 25 as shown in FIG. 12, the construction wall material Y in the groove | channel M will be hardened as it is. At this time, the split connection ring Rg may be assembled on the bottom 25a and returned to its original state. Thereafter, when the structural wall material Y is cured, the annular wall body Wa in which the water blocking plate 25 is embedded around the dredger tube Z is constructed perpendicularly to the dredger tube Z to become a water shielding wall.

以上のように、開口部Xに全周シール1を設けて、ボーリングロッド6によって地盤G中に削孔Vを施しつつ当該削孔V内に構壁材Yを充填することで、樋管Z周りに閉空間状態の削孔Vが形成されて、当該削孔V内に充填した構壁材Yが削孔Vの壁を圧迫するようになり、地盤Gの崩壊や地下水の浸透を生じることなく、樋管Zに対して垂直に環状の溝Mを形成することができる。また、回転駆動部8によってボーリングロッド6を回転させることで、掘削した地盤Gの土砂と吐出口6bから吐出した構壁材Yとを削孔V内で攪拌して、均一に混合させることができる。よって、形成した溝M内で構壁材Yが地盤G中に拡散して行くことなく硬化し、樋管Z周りに均質な遮水性能の高い環状の壁体Wを構築することが可能となる。そしてこの結果、特許文献1のような地盤改良工程を行う必要がなくなるとともに、溝Mの掘削形成工程と溝M内への構壁材Yの注入充填工程とを同時に行うので、壁体Wを構築する工程が一段階になり、コストを削減し工期を短縮することが可能となる。また、特許文献1のように地盤改良装置と掘削機の2台の装置を必要とせず、1台の壁体構築装置100で壁体Wを構築することができるので、装置の設置や撤去の作業に手間と時間がかからず、コストの削減と工期の短縮とを一層推進可能となる。また、壁体構築装置100は、特許文献1の地盤改良装置や掘削機と比べて小型で、樋管Z内での占有スペースが小さいので、樋管Z内で作業がし易く、設置と撤去に手間と時間がかからず、コストの削減と工期の短縮を一層推進可能となる。   As described above, the entire circumference seal 1 is provided in the opening X, and the drilling tube Z is filled with the wall material Y in the drilling hole V while the drilling hole V is formed in the ground G by the boring rod 6. A hole V in a closed space is formed around the wall, and the wall material Y filled in the hole V presses the wall of the hole V, causing the ground G to collapse and groundwater infiltration. The annular groove M can be formed perpendicularly to the soot tube Z. Further, by rotating the boring rod 6 by the rotation driving unit 8, the earth and sand of the excavated ground G and the wall material Y discharged from the discharge port 6b can be stirred in the drilling hole V and mixed uniformly. it can. Therefore, the wall material Y is hardened in the formed groove M without diffusing into the ground G, and it is possible to construct an annular wall body W with high water-blocking performance that is homogeneous around the vertical pipe Z. Become. As a result, it is not necessary to perform the ground improvement process as in Patent Document 1, and the excavation formation process of the groove M and the filling and filling process of the wall material Y into the groove M are performed simultaneously. The construction process becomes one step, and it is possible to reduce costs and shorten the construction period. Moreover, since the wall body W can be constructed | assembled with the one wall body construction apparatus 100, without requiring two apparatuses of a ground improvement apparatus and an excavator like patent document 1, installation and removal of an apparatus are possible. The work does not take time and effort, and it is possible to further reduce costs and shorten the construction period. In addition, the wall construction apparatus 100 is smaller than the ground improvement apparatus and excavator of Patent Document 1, and has a small occupation space in the vertical pipe Z. Therefore, the wall construction apparatus 100 is easy to work in the vertical pipe Z, and is installed and removed. Therefore, it is possible to further reduce the cost and the construction period without taking time and effort.

また、例えば特許文献1の掘削アームのような部材を用いると、掘削速度が遅く、予め他の装置を用いて地盤G中に当該部材の掘削部を突出可能な大きな削孔を施しておく必要がある。然るに、上述のようにボーリングロッド6を地盤G中で押し進めながら回転させて地盤Gを掘削するという所謂ボーリング掘削方式を採用したことで、掘削速度を速くすることができ、また、他の装置を用いて地盤G中に大きな予備削孔を施しておかなくても、地盤G中に削孔Vを施すことができ、掘削工程および装置の設置や撤去の作業に手間と時間がかからず、コストの削減と工期の短縮を一層推進可能となる。また、地盤G中に岩等の硬質の障害物Eがあっても、例えばはつり機のような他の装置を用いることなく、当該障害物Eをボーリングロッド6によって粉砕しつつ掘削を継続することができ、装置の設置や撤去の作業に手間と時間がかからず、コストの削減と工期の短縮を一層推進可能となる。   For example, when a member such as the excavating arm of Patent Document 1 is used, the excavation speed is slow, and it is necessary to make a large hole in the ground G that can project the excavating part of the member in advance using another device. There is. However, as described above, by adopting a so-called boring excavation method in which the boring rod 6 is rotated while being pushed forward in the ground G to excavate the ground G, the excavation speed can be increased, and other devices can be used. Even if a large preliminary drilling hole is not made in the ground G, it is possible to make a drilling hole V in the ground G, and it does not take time and labor for the excavation process and the installation and removal work of the device, Cost reduction and shortening of construction period can be further promoted. Further, even if there is a hard obstacle E such as a rock in the ground G, the excavation is continued while the obstacle E is crushed by the boring rod 6 without using another device such as a suspension machine. Therefore, it takes less time and labor to install and remove the device, and it is possible to further promote cost reduction and shortening the construction period.

また、ボーリングロッド6によって地盤G中に削孔Vを施しつつ当該削孔V内に構壁材Yを充填する削孔工程を、スライドシリンダ13によってボーリングロッド6を出没方向F、Dと垂直でかつ樋管Zの円周方向Qと平行なR方向へ移動させて複数回行った後に、旋回シリンダ14によってボーリングロッド6をQ方向に旋回させることで、隣接する削孔V同士を深度方向の全体に渡って着実に連続させて、樋管Z周りに環状の溝Mを確実に形成することができる。そして、当該溝M内の構壁材Yを硬化させることで、樋管Z周りに欠陥のない遮水性能の高い環状の壁体Wを構築することが可能となる。   In addition, a drilling process in which the drilling hole V is filled in the ground G by the boring rod 6 and the wall material Y is filled in the drilling hole V, and the boring rod 6 is perpendicular to the projecting directions F and D by the slide cylinder 13. In addition, after moving a plurality of times by moving in the R direction parallel to the circumferential direction Q of the tub tube Z, the boring rod 6 is swung in the Q direction by the swiveling cylinder 14 so that the adjacent drill holes V are moved in the depth direction. The annular groove M can be surely formed around the soot tube Z by steadily continuing over the whole. Then, by hardening the structural wall material Y in the groove M, it is possible to construct an annular wall body W having a high water shielding performance without defects around the vertical pipe Z.

また、全周シール1によって開口部Xを閉じることで、ボーリングロッド6によって掘削した土砂や削孔V内に充填した構壁材Yが開口部Xから樋管Z内に漏れるのを防止することができ、樋管Z内で作業を安全に行えるようになる。また、ボーリングロッド6を樋管Z内でQ方向へ旋回させかつL、R方向へ移動させるので、当該旋回および移動に要する力が小さくて済み、旋回手段として小型の旋回シリンダ14、スライド手段として小型のスライドシリンダ13をそれぞれ用いることができ、コストの削減を一層推進可能となる。   Further, by closing the opening X with the entire circumference seal 1, it is possible to prevent the earth and sand excavated by the boring rod 6 and the wall material Y filled in the drilling hole V from leaking from the opening X into the duct Z. Thus, the work can be safely performed in the tub tube Z. Further, since the boring rod 6 is swung in the vertical direction Z in the vertical pipe Z and moved in the L and R directions, the force required for the swiveling and movement is small, and the small swiveling cylinder 14 as the swiveling means and the sliding means are sufficient. Each of the small slide cylinders 13 can be used, and cost reduction can be further promoted.

また、ボーリングロッド6によって掘削した土砂とこれに混ざり合った構壁材Yを、削孔V内からボーリングロッド6と全周シール1との隙間S、弓形ボックス2の土砂受け部2a、および排土管17をそれぞれ通して、一定の背圧をかけながら外部に排出することができるので、樋管Z内で作業を安全に行えるようになる。また、削孔V内の構壁材Y等の圧力が一定の背圧に保持されるので、樋管Zの上方に形成された削孔V内の構壁材Y等が下方に流れ難くなって、当該上方の削孔V内に空隙が生じるのを防止することができる。また、構壁材Y等が常に一定の圧力で削孔Vの壁を圧迫するようになるので、地盤Gの崩壊や地下水の浸透を安定かつ確実に防止することが可能になる。   Further, the earth and sand excavated by the boring rod 6 and the construction wall material Y mixed with the earth and sand are removed from the drilling hole V between the gap S between the boring rod 6 and the entire circumference seal 1, the earth and sand receiving portion 2a of the arcuate box 2, and the drainage. Since it can be discharged to the outside through each of the clay pipes 17 while applying a certain back pressure, the work can be safely performed in the vertical pipe Z. In addition, since the pressure of the wall material Y and the like in the hole V is maintained at a constant back pressure, the wall material Y and the like in the hole V formed above the soot tube Z hardly flows downward. Thus, it is possible to prevent a void from being generated in the upper drilling hole V. Further, since the wall material Y or the like always presses the wall of the drilling hole V with a constant pressure, it is possible to stably and reliably prevent the ground G from collapsing and the penetration of groundwater.

また、最初にボーリングロッド6を樋管Z内から地盤G中に突出させる前に、棒状部材21をサービスホール19aから挿入して、土砂受け部2a、全周シール1、および開口部Xをそれぞれ通して地盤G中に突出させ、全周シール1の近傍の地盤Gをほぐすことができるので、ボーリングロッド6を回転させることなく、そのほぐした部分にボーリングロッド6の先端部を容易に突出させることが可能になる。また、ボーリングロッド6の刃6aによる全周シール1の破損を防止することができ、全周シール1の地盤Gと樋管Z内との隔離性能を維持することが可能になる。また、土砂受け部2a等に土砂等が詰まった場合には、土砂等をサービスホール19aから除去することができる。その際、全周シール1と弓形ボックス2との間に設けたシャッタ5を閉じることで、地盤Gと樋管Z内とを確実に閉塞して、全周シール1の切れ目1aからの土砂や構壁材の漏れを確実に防止することができ、土砂受け部2a等に詰まった土砂等をサービスホール19aから安全に除去することが可能となる。   In addition, before the boring rod 6 is first projected from the inside of the dredging pipe Z into the ground G, the rod-like member 21 is inserted from the service hole 19a, and the earth and sand receiving portion 2a, the entire circumference seal 1 and the opening X are respectively connected. Since the ground G in the vicinity of the all-around seal 1 can be loosened through the ground G, the tip of the boring rod 6 is easily projected to the loosened portion without rotating the boring rod 6. It becomes possible. In addition, it is possible to prevent the all-around seal 1 from being damaged by the blade 6a of the boring rod 6, and it is possible to maintain the isolation performance between the ground G of the all-around seal 1 and the inside of the pipe Z. Moreover, when the earth and sand receiving part 2a etc. are clogged with earth and sand, the earth and sand etc. can be removed from the service hole 19a. At that time, by closing the shutter 5 provided between the all-round seal 1 and the arcuate box 2, the ground G and the inside of the tub tube Z are surely closed, and earth and sand from the cut 1 a of the all-around seal 1 Leakage of the wall material can be surely prevented, and the earth and sand clogged in the earth and sand receiving part 2a and the like can be safely removed from the service hole 19a.

さらに、樋管Z周りに環状の溝Mを形成してから、止水板25を全周シール1と開口部Xとを通して溝M内に挿入して樋管Z周りに環状に設置することで、溝M内の構壁材Yが硬化したときに、止水板25が埋設された環状の壁体Waが樋管Z周りに形成され、当該壁体Waの遮水性能を長期間維持することが可能となる。また、溝M内の構壁材Yが硬化するまでの間に止水板25を溝M内に挿入することで、ジャッキやシリンダ等の小型の機材を用いて、小さな挿入力で溝M内に止水板25を容易に挿入することができる。また、溝M内の構壁材Yを流動性を失う半硬化の状態まで硬化させた後、止水板25を溝M内に挿入すると、止水板25の挿入時に止水板25と全周シール1との隙間から構壁材Yが樋管Z内に漏れるのを防止することができる。   Furthermore, after forming the annular groove M around the soot tube Z, the water stop plate 25 is inserted into the groove M through the entire circumference seal 1 and the opening X, and installed around the soot tube Z in an annular shape. When the wall material Y in the groove M is hardened, an annular wall body Wa in which the water blocking plate 25 is embedded is formed around the vertical pipe Z, and the water shielding performance of the wall body Wa is maintained for a long time. It becomes possible. Further, by inserting the water stop plate 25 into the groove M until the structural wall material Y in the groove M is hardened, the inside of the groove M can be obtained with a small insertion force using a small equipment such as a jack or a cylinder. It is possible to easily insert the water stop plate 25. In addition, after the wall material Y in the groove M is cured to a semi-cured state that loses fluidity, when the water stop plate 25 is inserted into the groove M, all of the water stop plate 25 and the water stop plate 25 are inserted when the water stop plate 25 is inserted. It is possible to prevent the wall material Y from leaking into the soot tube Z from the gap with the circumferential seal 1.

以上述べた実施形態においては、隔離部材としての環状の全周シール1を、分割接続リングRgを解体撤去する前から開口部Xに設けた例を挙げているが、本発明はこれのみに限定するものではなく、隔離部材は、分割接続リングRgを解体撤去した後に開口部Xに設けるようにしてもよい。   In the embodiment described above, an example in which the annular all-around seal 1 as a separating member is provided in the opening X before the split connection ring Rg is disassembled and removed is described, but the present invention is limited to this. Instead, the separating member may be provided in the opening X after dismantling and removing the split connection ring Rg.

また、以上の実施形態では、全周シール1の近傍の地盤Gをほぐすために、先端が若干曲がった棒状部材21を用いた例を挙げているが、本発明はこれのみに限定するものではなく、これ以外に、バールのような真直な部材や、鉤状の部材を用いるようにしてもよい。つまり、全周シール1の近傍の地盤Gを突いたり削ったりして、ほぐすことができる部材であればよい。また、全周シール1の近傍の地盤Gをほぐす部材と、当該地盤Gに水を吐出する部材とを別々に設けるようにしてもよい。   Moreover, in the above embodiment, in order to loosen the ground G in the vicinity of the all-around seal 1, the example using the rod-like member 21 having a slightly bent tip is given, but the present invention is not limited to this. Alternatively, a straight member such as a bar or a bowl-shaped member may be used. That is, any member may be used as long as it can loosen the ground G in the vicinity of the all-around seal 1 by poking or scraping it. Further, a member for loosening the ground G in the vicinity of the all-around seal 1 and a member for discharging water to the ground G may be provided separately.

また、以上の実施形態では、分割接続リングRgの組み付け作業や、止水板25の挿入設置作業を、壁体構築装置100を撤去した後に行っているが、これらの作業は、壁体構築装置100を樋管Zに設置したまま行ってもよい。また、溝Mの拡大中に、随時行うようにしてもよい。   Moreover, in the above embodiment, although the assembly | attachment operation | work of the division | segmentation connection ring Rg and the insertion installation operation | work of the water stop board 25 are performed after removing the wall body construction | assembly apparatus 100, these work | work is performed by a wall body construction | assembly apparatus. 100 may be performed with the tube 100 installed in the tub tube Z. Moreover, you may make it carry out at any time while the groove | channel M is expanded.

さらに、以上の実施形態では、削孔Vの形成や溝M内への止水板25の挿入設置といった作業を、樋管Zの下方から開始した例を挙げているが、本発明はこれのみに限定するものではなく、これらの作業は、環状の開口部Xの全体に渡って全周シール1を設けているため、樋管Zのどの方向からでも開始することができる。   Further, in the above embodiment, an example is given in which the operations such as the formation of the hole V and the insertion and installation of the water stop plate 25 in the groove M are started from the lower side of the tub tube Z, but the present invention is only this. However, these operations can be started from any direction of the soot tube Z because the entire circumference seal 1 is provided over the entire annular opening X.

本発明の実施形態に係る管周りの壁体構築装置の平面図である。It is a top view of the wall body construction device around the pipe concerning the embodiment of the present invention. 同壁体構築装置を図1のA方向から見た側面図である。It is the side view which looked at the same wall building apparatus from the A direction of FIG. 同壁体構築装置の図1(b)におけるB−B断面図である。It is BB sectional drawing in FIG.1 (b) of the same wall construction apparatus. 同壁体構築装置の図1(b)におけるC−C断面図である。It is CC sectional drawing in FIG.1 (b) of the same wall construction apparatus. 同壁体構築装置のシャッタを示す図である。It is a figure which shows the shutter of the wall construction apparatus. 同壁体構築装置のボーリングロッドの地盤突出状態を示す図である。It is a figure which shows the ground protrusion state of the boring rod of the wall construction apparatus. 同壁体構築装置に挿入された棒状部材を示す図である。It is a figure which shows the rod-shaped member inserted in the wall construction apparatus. 本発明の実施形態に係る管周りの壁体構築工法を説明する図である。It is a figure explaining the wall body construction construction method of the circumference of a pipe concerning the embodiment of the present invention. 本発明の実施形態に係る管周りの壁体構築工法を説明する図である。It is a figure explaining the wall body construction construction method of the circumference of a pipe concerning the embodiment of the present invention. 本発明の実施形態に係る管周りの壁体構築工法を説明する図である。It is a figure explaining the wall body construction construction method of the circumference of a pipe concerning the embodiment of the present invention. 本発明の実施形態に係る管周りの壁体構築工法を説明する図である。It is a figure explaining the wall body construction construction method of the circumference of a pipe concerning the embodiment of the present invention. 本発明の実施形態に係る管周りの壁体構築工法を説明する図である。It is a figure explaining the wall body construction construction method of the circumference of a pipe concerning the embodiment of the present invention. 本発明の実施形態に係る管周りの壁体構築工法を説明する図である。It is a figure explaining the wall body construction construction method of the circumference of a pipe concerning the embodiment of the present invention. 本発明の実施形態に係る管周りの壁体構築工法を説明する図である。It is a figure explaining the wall body construction construction method of the circumference of a pipe concerning the embodiment of the present invention. 従来の管周りの壁体構築状況を説明する図である。It is a figure explaining the wall body construction situation of the conventional pipe circumference.

符号の説明Explanation of symbols

1 全周シールパッキン
2 弓形ボックス
2a 土砂受け部
4 スライドプレート
5 シャッタ
6 ボーリングロッド
6a 刃
6b 吐出口
8 回転駆動部
11 出没駆動部
13 スライドシリンダ
14 旋回シリンダ
17 排土管
19a サービスホール
25 止水板
100 管周りの壁体構築装置
D ボーリングロッドの没入方向
E 障害物
F ボーリングロッドの突出方向
G 地盤
J ボーリングロッドの軸
M 溝
Q 樋管の円周方向、ボーリングロッドの旋回方向
R ボーリングロッドの移動方向
L ボーリングロッドの移動方向
S ボーリングロッドと全周シールパッキンとの隙間
W 壁体
Wa 壁体
X 開口部
Y 構壁材
Z 樋管
DESCRIPTION OF SYMBOLS 1 All-around seal packing 2 Arcuate box 2a Sediment receiving part 4 Slide plate 5 Shutter 6 Boring rod 6a Blade 6b Discharge port 8 Rotation drive part 11 Intrusion drive part 13 Slide cylinder 14 Turning cylinder 17 Exhaust pipe 19a Service hole 25 Water stop plate 100 Wall body construction equipment around the pipe D Dipping direction of the boring rod E Obstacle F Projecting direction of the boring rod G Ground J Shaft of the boring rod M Groove Q Circumferential direction of the pipe, turning direction of the boring rod R Moving direction of the boring rod L Moving direction of boring rod S Clearance between boring rod and all-around seal packing W Wall body Wa Wall body X Opening Y Frame member Z Steel pipe

Claims (9)

地盤中に敷設されている管に形成された環状の開口部を通じて、地盤改良工程を経ることなく、前記管内から管周りに壁体を構築する管周りの壁体構築装置であって、
前記開口部を閉じて地盤と管内とを隔離する隔離部材と、
先端部に地盤を掘削するための刃と硬化性を有する構壁材を吐出するための吐出口とが設けられたボーリングロッドと、
前記ボーリングロッドを前記隔離部材と前記開口部とを通して地盤中に対して出没させる出没手段と、
前記ボーリングロッドを該ボーリングロッドの軸を中心に回転させる回転手段と、
前記ボーリングロッドを前記管の円周方向に旋回させる旋回手段と、を備え
前記出没手段が前記ボーリングロッドを地盤中へ押し出すとともに、前記回転手段が前記ボーリングロッドを回転させ、前記ボーリングロッドは、前記刃で地盤中に削孔を形成しつつ、前記吐出口から前記構壁材を吐出して前記削孔内に構壁材を充填することを特徴とする管周りの壁体構築装置。
Through the annular opening formed in the pipe laid in the ground, without passing through the ground improvement process, it is a wall body construction device around the pipe to build a wall body around the pipe from the inside,
An isolation member that closes the opening and isolates the ground and the pipe;
A boring rod provided with a blade for excavating the ground at the tip and a discharge port for discharging a hard wall construction material,
Intrusion means for causing the boring rod to invade into the ground through the isolation member and the opening,
Rotating means for rotating the boring rod about the axis of the boring rod;
Turning means for turning the boring rod in a circumferential direction of the pipe ,
The retracting means pushes the boring rod into the ground, the rotating means rotates the boring rod, and the boring rod forms a hole in the ground with the blade, and the wall forms the wall from the discharge port. An apparatus for constructing a wall body around a pipe, wherein a wall material is discharged into the hole and discharged .
請求項1に記載の管周りの壁体構築装置において、
前記ボーリングロッドを前記出没手段による出没方向と垂直でかつ前記管の円周方向と平行な方向へ移動させるスライド手段を備えたことを特徴とする管周りの壁体構築装置。
In the apparatus for constructing a wall around a pipe according to claim 1,
An apparatus for constructing a wall around a pipe, comprising: slide means for moving the boring rod in a direction perpendicular to the direction of appearance of the intrusion means and parallel to the circumferential direction of the pipe.
請求項1または請求項2に記載の管周りの壁体構築装置において、
前記隔離部材をまたぐように前記管内に取り付けられて、前記ボーリングロッドを保持する保持部材を備え、
前記保持部材に、前記ボーリングロッドと前記隔離部材との隙間を通って前記管内に入り込む土砂を受止める土砂受け部と、当該土砂受け部で受止めた土砂を一定の背圧をかけながら排出する排土管とを設けたことを特徴とする管周りの壁体構築装置。
In the apparatus for constructing a wall around a pipe according to claim 1 or 2,
A holding member attached to the pipe so as to straddle the isolation member and holding the boring rod;
To the holding member, the earth and sand receiving portion for receiving the earth and sand entering the pipe through the gap between the boring rod and the isolation member, and the earth and sand received by the earth and sand receiving portion are discharged while applying a certain back pressure. An apparatus for constructing a wall body around a pipe, characterized in that a soil discharge pipe is provided.
請求項3に記載の管周りの壁体構築装置において、
前記保持部材に、前記隔離部材の近傍の地盤をほぐすための作業孔を設けたことを特徴とする管周りの壁体構築装置。
In the wall body construction device around a pipe according to claim 3,
An apparatus for constructing a wall around a pipe, wherein the holding member is provided with a work hole for loosening the ground in the vicinity of the isolation member.
請求項3または請求項4に記載の管周りの壁体構築装置において、
前記隔離部材と前記保持部材との間に、開閉可能なシャッタを設けたことを特徴とする管周りの壁体構築装置。
In the apparatus for constructing a wall around a pipe according to claim 3 or 4,
An apparatus for constructing a wall around a pipe, wherein an openable / closable shutter is provided between the isolation member and the holding member.
地盤中に敷設されている管に形成された環状の開口部を通じて、地盤改良工程を経ることなく、前記管内から管周りに壁体を構築する管周りの壁体構築工法であって、
前記開口部に地盤と前記管内とを隔離する隔離部材を設け、
先端部に地盤を掘削するための刃と硬化性を有する構壁材を吐出するための吐出口とが設けられたボーリングロッドを、前記管内から前記隔離部材と前記開口部とを通して地盤中へ押し出し、かつ前記ボーリングロッドを当該ボーリングロッドの軸を中心に回転させて前記刃で地盤中に削孔を形成しつつ、前記構壁材を前記吐出口から吐出することにより前記削孔内に前記構壁材を充填し、
当該削孔工程を前記管内で前記ボーリングロッドを前記管の円周方向に旋回させて繰り返し行うことにより、前記管周りに連続した状態の複数の前記削孔からなる環状の溝を形成し、
当該溝内の前記構壁材を硬化させて前記管周りに環状の壁体を構築することを特徴とする管周りの壁体構築工法。
Through the annular opening formed in the pipe laid in the ground, without passing through the ground improvement process, it is a wall body construction method around the pipe to build a wall body around the pipe from the inside of the pipe,
An isolation member for isolating the ground and the inside of the pipe is provided in the opening,
A boring rod provided with a blade for excavating the ground at the tip and a discharge port for discharging a hard wall construction material is pushed out from the pipe into the ground through the isolation member and the opening. and the structure in said boring by ejecting the boring rod while forming a boring in the ground by the blade shaft is rotated around the of the boring rod, the構壁material from said discharge port Filling the wall material,
By repeatedly performing the drilling step in the pipe by turning the boring rod in the circumferential direction of the pipe, an annular groove composed of a plurality of the drilling holes in a continuous state around the pipe is formed,
A wall construction method around a tube, wherein the wall material in the groove is cured to construct an annular wall around the tube.
請求項6に記載の管周りの壁体構築工法において、
前記削孔工程を前記管内で前記ボーリングロッドを該ボーリングロッドの出没方向と垂直でかつ前記管の円周方向と平行な方向へ移動させて複数回行った後に、前記管内で前記ボーリングロッドを前記管の円周方向に旋回させることを特徴とする管周りの壁体構築工法。
In the wall structure construction method around the pipe according to claim 6,
The drilling step is performed a plurality of times in the pipe by moving the boring rod in a direction perpendicular to the boring rod's protruding and retracting direction and parallel to the circumferential direction of the pipe, and then moving the boring rod in the pipe. A method for constructing a wall around a pipe, characterized by swirling in the circumferential direction of the pipe.
請求項6または請求項7に記載の管周りの壁体構築工法において、
前記隔離部材の近傍の地盤を前記ボーリングロッドの先端部を突出可能にほぐした後に、前記削孔工程を行うことを特徴とする管周りの壁体構築工法。
In the wall structure construction method around a pipe according to claim 6 or claim 7,
A wall construction method around a pipe, wherein the drilling step is performed after loosening the ground in the vicinity of the isolation member so that the tip of the boring rod can protrude.
請求項6ないし請求項8のいずれかに記載の管周りの壁体構築工法において、
前記管周りに前記環状の溝を形成してから当該溝内の前記構壁材が硬化するまでの間に、止水板を前記隔離部材と前記開口部とを通して前記溝内に挿入して前記管周りに環状に設置することを特徴とする管周りの壁体構築工法。
In the wall body construction method around the pipe according to any one of claims 6 to 8,
Between the formation of the annular groove around the tube and the hardening of the wall material in the groove, a water stop plate is inserted into the groove through the isolation member and the opening. A wall construction method around a pipe, characterized by being installed in a ring around the pipe.
JP2004340279A 2004-11-25 2004-11-25 Wall building apparatus and method around pipe Expired - Lifetime JP4643234B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2004340279A JP4643234B2 (en) 2004-11-25 2004-11-25 Wall building apparatus and method around pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2004340279A JP4643234B2 (en) 2004-11-25 2004-11-25 Wall building apparatus and method around pipe

Publications (2)

Publication Number Publication Date
JP2006152554A JP2006152554A (en) 2006-06-15
JP4643234B2 true JP4643234B2 (en) 2011-03-02

Family

ID=36631168

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2004340279A Expired - Lifetime JP4643234B2 (en) 2004-11-25 2004-11-25 Wall building apparatus and method around pipe

Country Status (1)

Country Link
JP (1) JP4643234B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113216097B (en) * 2021-05-06 2024-09-10 中国葛洲坝集团第一工程有限公司 Jacking-free gate bottom pivot sealing element connecting tool and method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56111798A (en) * 1980-02-09 1981-09-03 Nippon Telegraph & Telephone Method of injection construction for chemical to back section of segment
JP2627815B2 (en) * 1990-10-08 1997-07-09 株式会社栗本鐵工所 How to lay pipes that penetrate the embankment
JP2557562B2 (en) * 1990-10-19 1996-11-27 株式会社クボタ How to lay a gutter pipe for dikes
JP2695319B2 (en) * 1991-10-02 1997-12-24 株式会社フジタ Tunnel construction method
JPH08199154A (en) * 1995-01-23 1996-08-06 Chem Grouting Co Ltd Injection solidification material and steel pipe sheet pile joint water stop method
JP2929190B1 (en) * 1998-05-25 1999-08-03 株式会社大阪防水建設社 Construction method of impermeable wall for gutter pipe
JP3324513B2 (en) * 1998-06-26 2002-09-17 株式会社栗本鐵工所 How to lay a conduit that penetrates the embankment without excavation

Also Published As

Publication number Publication date
JP2006152554A (en) 2006-06-15

Similar Documents

Publication Publication Date Title
CN111396067B (en) Comprehensive shield steel sleeve receiving construction method in complex environment
CN114562277B (en) A variable cross-section tunnel construction method
JP6029122B2 (en) Tunnel excavator and tunnel construction method
JP3863888B2 (en) Two-stage propulsion method and coupler
JP4643234B2 (en) Wall building apparatus and method around pipe
JP5291024B2 (en) Direct cast concrete method
JP2005180112A (en) Ground improvement structure and ground improvement method
JP3970133B2 (en) Tunnel excavator
JP4334954B2 (en) Method and apparatus for widening underground space
JPH09303088A (en) How to replace the cutter bit of the shield machine
JP2762935B2 (en) Horizontal mortar pile construction method
JP3867924B2 (en) Diverging type propulsion machine
JP2021113409A (en) Open shield machine, and tunnel construction method
JP2005023637A (en) Construction method for water-impervious walls for dredging pipes
JP4712529B2 (en) Tunnel excavator
JP2002194988A (en) Method and equipment for receiving a tunnel excavator into an arrival shaft
JP4180347B2 (en) Construction method of underground continuous wall and underground continuous wall
JPH0280790A (en) Soil receiving work by horizontal auger
JP2840024B2 (en) Vertical hole forming method
KR102488061B1 (en) Tunnel excavation structure with backflow prevention member of backfill member
JP2005023638A (en) Wall body building device around pipe
JP2003328695A (en) Segment and tunnel construction method using the same
JP4762641B2 (en) Tunnel excavator
JP2006249865A (en) Shielding construction method and shield boring machine
JP3511429B2 (en) Replacement of existing buried pipes

Legal Events

Date Code Title Description
A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20070515

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20070515

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20070918

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071121

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20071218

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20071219

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20071218

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20090930

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20091117

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20100108

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20101130

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20101202

R150 Certificate of patent or registration of utility model

Ref document number: 4643234

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20131210

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term