JP4650864B2 - Cogeneration system operation control device - Google Patents
Cogeneration system operation control device Download PDFInfo
- Publication number
- JP4650864B2 JP4650864B2 JP2001137724A JP2001137724A JP4650864B2 JP 4650864 B2 JP4650864 B2 JP 4650864B2 JP 2001137724 A JP2001137724 A JP 2001137724A JP 2001137724 A JP2001137724 A JP 2001137724A JP 4650864 B2 JP4650864 B2 JP 4650864B2
- Authority
- JP
- Japan
- Prior art keywords
- power
- generation device
- power generation
- operation control
- time zone
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/14—Combined heat and power generation [CHP]
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02T—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO TRANSPORTATION
- Y02T10/00—Road transport of goods or passengers
- Y02T10/10—Internal combustion engine [ICE] based vehicles
- Y02T10/12—Improving ICE efficiencies
Landscapes
- Feedback Control In General (AREA)
- Control Of Eletrric Generators (AREA)
- Supply And Distribution Of Alternating Current (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、コージェネレーションシステムを運転制御する運転制御装置、更に詳しくは、コージェネレーションシステムの耐久性や起動ロス等を考慮して起動、稼働停止する運転制御装置に関する。
【0002】
【従来の技術】
一般に、コージェネレーションシステムは、エンジン、燃料電池等によって電力を発生する発電装置と、発電装置にて発生した電力を配電線に系統連系するためのインバータと、発電装置から発生する熱を回収して温水として貯える貯湯装置と、発電装置を運転制御するための運転制御手段と、を備えている。このシステムでは、運転制御手段は電力負荷に対応して発電装置を運転制御し、電力負荷が大きくなると発電装置が起動し、発電装置からの発電電力が電力負荷に供給される一方、電力負荷が小さくなると発電装置の稼働が停止し、このように発電装置の運転を停止してシステムの運転効率を高めている。
【0003】
【発明が解決しようとする課題】
このようなコージェネレーションシステムでは、耐久性、経済性の観点からすると、発電装置の起動、稼働停止を頻繁に行うことは望ましくなく、変動する電力負荷に応答して短時間に起動、稼働停止を繰り返し行うと、システム全体の耐久性が低下し、その寿命が短くなる。また、起動、稼働停止の繰り返しによって起動ロスがかさみ、経済性が低下する。
【0004】
本発明の目的は、頻繁な起動、稼働停止を回避して発電装置を運転制御し、これによってシステム全体の耐久性の低下や経済性の低下を抑えることができるコージェネレーションの運転制御装置を提供することである。
【0014】
本発明は、コージェネレーション用発電装置と、前記発電装置からの発電電力を配電線に系統連系するためのインバータと、前記発電装置から発生する熱を回収して温水として貯えるための貯湯装置と、前記発電装置を運転制御するための運転制御手段と、を具備するコージェネレーションシステムの運転制御装置であって、
前記運転制御手段は、電力が供給される電力負荷の電力値を利用して前記発電装置を運転制御するとともに、設定した時間帯情報に基づいて前記発電装置を運転制御し、前記時間帯情報として起動禁止時間帯を設定したときには前記発電装置の継続的稼働運転は許容するが、前記発電装置の起動運転を禁止し、また前記時間帯情報として稼働禁止時間帯を設定したときには前記発電装置の継続的稼働運転及び起動運転を禁止することを特徴とする。
【0015】
本発明に従えば、運転制御手段は電力負荷の電力値を利用するとともに、設定した時間帯情報に基づいて発電装置を運転制御し、時間帯情報として起動禁止時間帯及び稼働禁止時間帯が設定可能である。起動禁止時間帯では、発電装置の継続的稼働運転は許容されるが、その起動運転が強制的に禁止され、停止状態から起動されることはない。また、稼働禁止時間帯では、発電装置の継続的稼働運転及び起動運転が強制的に禁止され、稼働状態のときには停止し、また停止状態のときには起動されることはない。このような起動禁止時間帯及び稼働禁止時間帯を設定可能にすることによって、発電装置の効率的運転が可能となり、また発電装置の起動、稼働停止の頻度を抑えることができる。
【0016】
【発明の実施の形態】
以下、添付図面を参照して、本発明に従うコージェネレーションシステムの運転制御装置の実施形態について説明する。
第1の実施形態
まず、図1〜図4を参照して、コージェネレーションシステムの運転制御装置の第1の実施形態について説明する。図1は、コージェネレーションシステムの一例の全体を示す簡略図であり、図2は、図1のコージェネレーションシステムの制御系を簡略的に示すブロック図であり、図3は、図2の制御系による制御を説明するための図であり、図4は、図2の制御系の制御の流れを示すフローチャートである。
【0017】
図1において、図示のコージェネレーションシステムは、エンジン2(例えばガスエンジン)によって駆動される発電機4を含む発電装置6と、エンジン2にて発生した熱を温水として貯える貯湯装置8とを備え、エンジン2の冷却水から排出される熱が後述する如くして貯湯装置8に貯えられる。発電装置6は、発電機4をエンジン2によって駆動する形態のものに代えて、燃料電池でもよい。
【0018】
発電装置6の出力側には系統連系インバータ10が設けらている。このインバータ10は、発電機4の発電電力を商用系統12から供給される電力と同じ電圧及び同じ周波数にするものである。商用系統12は、例えば単相3線式100/200Vであり、配電線14を介して電力負荷16、即ちテレビ、冷蔵庫、洗濯機等の各種電気機器に電気的に接続される。インバータ10は、コージェネ用配電線18を介して配電線14に電気的に接続され、コージェネ用発電装置6にて発生した発電電力がインバータ6及びコージェネ用配電線18を介して電力負荷16に供給される。
【0019】
配電線14には電力負荷計測手段22が設けられ、この電力負荷計測手段22は電力負荷16の負荷電力を計測する。この電力負荷計測手段22は、また、配電線14を通して流れる電流に逆潮流が発生しているか否かを検知し、この形態では、逆潮流が生じないように、発電装置6からインバータ6を介して配電線14に供給される電力が制御される。貯湯装置8は、温水を貯える貯湯タンク38と、温水を循環させるための温水循環流路40とを備えている。温水循環流路40の一端側は貯湯タンク38の底部に接続され、その他端側が貯湯タンク38の上部に接続され、貯湯タンク38内の温水はこの温水循環流路40を通して循環される。この温水循環流路40には、更に、温水を循環するための循環ポンプ42が設けられている。
【0020】
温水循環流路40に関連して、熱交換器46が配設されている。熱交換器46は、エンジン2のラジエタ48からの冷却水を循環させるための冷却水循環流路50を流れる冷却水と温水循環流路40を流れる温水との間で熱交換を行うもので、エンジン2からの冷却水によって温水循環流路40を流れる温水を加熱する。この冷却水循環流路40には、冷却水を循環させるための循環ポンプ52が配設されている。
【0021】
貯湯タンク38には、水(例えば水道水)を供給するための水供給流路を構成する給水ライン54が接続され、この給水ライン54の一端側が貯湯タンク38の底部に接続され、その他端側は、水道管の如き水供給源(図示せず)に接続されている。この給水ライン54には減圧逆止弁56が配設され、貯湯タンク38から給水ライン54側に温水が逆流するのを防止する。
【0022】
貯湯タンク38には、更に、温水を供給するための温水供給流路を構成する給湯ライン58が接続されている。給湯ライン58の一端側は貯湯タンク38の上部に接続され、その他端側には1個又は複数個のカラン(図示せず)が接続され、カランを開栓すると、貯湯タンク38内の温水が給湯ライン58を通して出湯する。
【0023】
このコージェネレーションシステムは、運転制御手段60によって作動制御される。図2をも参照して、運転制御手段60は、例えばマイクロコンピュータから構成され、コージェネレーションシステムの運転制御装置の一部を構成する。図示の運転制御手段60は、作動制御手段62、起動信号生成手段64、停止信号生成手段66及び平均値演算手段68を備えている。作動制御手段62はコージェネレーションシステムの各種構成要素、例えばエンジン2への燃料供給路に配設された電磁弁(図示せず)等を作動制御し、起動信号生成手段64は発電装置6を起動させるための起動信号を生成し、停止信号生成手段66は発電装置6の稼働を停止させるための停止信号を生成し、平均値演算手段68は電力負荷16の平均電力値を後述する如く演算する。
【0024】
運転制御手段60は、更に、第1及び第2メモリ70,72を備えている。第1メモリ70には、起動信号を生成する基準電力となる第1電力値αと、停止信号を生成する基準電圧となる第2電力値βと、平均値演算手段68によって平均値化する時間範囲である所定時間間隔、例えば30分が記憶されている。第1電力値αは第2電力値βより大きく、このように設定することによって、発電装置6の起動、稼働停止に所謂ヒステリシス特性を持たせることができる。電力負荷計測手段22からの計測信号は運転制御手段60に送給され、かく送給された計測信号の計測データは第2メモリ72に記憶され、第2メモリ72に記憶された計測データを用いて平均値演算手段68は、電力負荷16の平均電力値を演算する。
【0025】
運転制御手段60に関連して入力手段74が設けられている。入力手段74は運転開始スイッチ、運転停止スイッチ等の各種操作スイッチ(図示せず)を含み、これらスイッチからの入力信号は運転制御手段60に送給され、運転制御手段60はかかる入力信号に基づいてコージェネレーションシステムを運転する。
【0026】
次に、図1及び図2とともに図4を参照して上述したコージェネレーションシステムの運転制御について説明すると、まず、電力負荷計測手段22が電力負荷16の電力を計測し(ステップS1)、この計測信号が運転制御手段60に送給され、この計測データが運転制御手段60の第2メモリ72に記憶される。そして、運転制御手段60の平均値演算手段68が第2メモリ72に記憶された計測データを用いて平均電力値を演算する(ステップS2)。この形態では、所定時間間隔として例えば30分が設定され、現時点から30分前までの30分間における電力負荷16の電力の平均値、即ち平均電力値が演算される。
【0027】
このように平均電力値が演算されると、次に、演算した平均電力値と第1メモリ70に記憶された第1電力値αとの比較が行われる(ステップS3)。上記平均電力値が第1電力値α以上であると、電力負荷16の負荷状態が大きく、従って発電装置6から発電電力を電力負荷16に供給するのがよく、このときには、ステップS4からステップS5に進む。
【0028】
ステップS5では、発電装置6の運転状態の確認が行われ、発電装置6が稼働中であるか否かが判断される(ステップS6)。そして、発電装置6が稼働中であるときには、その運転状態を維持し、ステップS6からステップS1に戻る。一方、発電装置6が停止状態にあると、ステップS6からステップS7に移り、起動信号生成手段64が起動信号を生成し、この起動信号に基づいて作動制御手段62は発電装置6を起動し、発電装置6からの発電電力がインバータ6を介して電力負荷16に供給される。即ち、作動制御手段62はエンジン2を起動し、電磁弁(図示せず)が開になって燃料が供給され、発電機4が駆動される。
【0029】
これに対して、上記平均電力値が第1電力値αより小さいと、ステップS4からステップS8に移り、演算した平均電力値と第1メモリ70に記憶された第2電力値βとの比較が行われる(ステップS8)。上記平均電力値が第2電力値β以上であると、ステップS9からステップS1に戻り、発電装置6が稼働状態のときにはその稼働状態が維持され、発電装置6が停止状態のときにはその停止状態が維持される。
【0030】
一方、上記平均電力値が第2電力値βより小さいと、発電装置6を稼働しても効率が悪くなり、それ故に、このときにはステップS10に進む。ステップS10では、発電装置6の運転状態の確認が行われ、発電装置6が稼働中であるか否かが判断される(ステップS11)。そして、発電装置6が停止状態であるときには、その停止状態が維持され、ステップS1に戻る。また、発電装置6が稼働状態にあると、ステップS11からステップS12に進み、停止信号生成手段66が停止信号を生成し、この停止信号に基づいて作動制御手段62は発電装置6の稼働を停止し、発電装置6からの発電電力の供給が停止する。即ち、作動制御手段62は電磁弁(図示せず)を閉にしてエンジン2への燃料供給を停止し、これによってエンジン2を作動停止する。
【0031】
この形態では、電力負荷16の電力の平均値を利用して発電装置6を運転制御するので、次の通りの特徴が得られる。図3において、波線は電力負荷計測手段22の計測電力を示し、実線は平均値演算手段68の平均電力値を示しており、上述した運転制御では、電力負荷計測手段22の計測電力が一時的に第1電力値α以上になっても発電装置6が起動せず、電力の平均値が第1電力値α以上になる、即ち図3において時刻T1になって初めて発電装置6が起動する。また、電力負荷計測手段22の計測電力が一時的に第2電力値βより小さくなっても発電装置6が稼働停止せず、電力の平均値が第2電力値βより小さくなる、即ち図3において時刻T2になって初めて発電装置6が稼働停止する。発電装置6はこのように運転制御されるので、発電装置6の起動、稼働停止の頻度が少なくなり、コージェネレーションシステムの耐久性を向上させることができる。
【0032】
尚、上記第1の実施形態では、電力負荷16の電力を平均化して発電装置6を制御することと、発電装置6の起動、稼働停止に所謂ヒステリシス特性を持たせることを組み合わせて適用しているが、これらは必ずしも組み合わせる必要はなく、それぞれ単独でコージェネレーションシステムの運転制御に適用することができる。
【0033】
第2の実施形態
次に、図5及び図6を参照して、コージェネレーションシステムの運転制御装置の第2の実施形態について説明する。図5は、第2の実施形態のコージェネレーションシステムの制御系を簡略的に示すブロック図であり、図6は、図5の制御系の制御の流れを示すフローチャートである。この第2の実施形態においては、電力負荷計測手段の計測電力を用いて運転制御し、また発電装置6を起動した後及び稼働停止した後は所定時間その状態を維持するように構成されている。尚、以下の実施形態において、上記第1の実施形態と実質上同一の構成要素には同一の参照番号を付し、その説明を省略する。
【0034】
図5において、第2の実施形態における運転制御手段60Aは、第1の実施形態の第1メモリ70に相当するメモリ82を備え、このメモリ82に、起動信号を生成する基準電力となる第1電力値α、停止信号を生成する基準電電力となる第2電力値β、起動後に継続して稼働状態を維持する稼働継続時間及び停止後に継続して停止状態を維持する停止継続時間が記憶されている。また、この運転制御手段60Aはタイマ84を含み、タイマ84は、起動後は稼働継続時間を計時し、また停止後は停止継続時間を計時する。この稼働継続時間及び停止継続時間は、例えば60分程度と同じ時間に設定してもよいが、異なる時間に設定してもよい。この第2の実施形態のその他の構成は、平均値演算手段68及び第2メモリ72が省略されている以外は上記第1の実施形態と実質上同一である。
【0035】
図5とともに図6を参照して、第2の実施形態の運転制御装置による運転制御について説明すると、まず、電力負荷計測手段22が電力負荷16の電力を計測し(ステップS21)、この計測信号が運転制御手段60Aに送給され、この計測電力値とメモリ82に記憶された第1電力値αとの比較が行われる(ステップS22)。上記計測電力値が第1電力値α以上であると、電力負荷16の負荷状態が大きく、このときには、ステップS23からステップS24に進む。
【0036】
ステップS24では、発電装置6の運転状態の確認が行われ、発電装置6が稼働中であるか否かが判断される(ステップS25)。そして、発電装置6が稼働中であるときには、その運転状態を維持し、ステップS25からステップS21に戻る。一方、発電装置6が停止状態にあると、ステップS25からステップS26に移り、起動信号生成手段64が起動信号を生成し、この起動信号に基づいて作動制御手段62は発電装置6を起動する。そして、かく起動すると、ステップS27に進み、タイマ84が作動し、タイマ84が稼働継続時間を計時し、この稼働継続時間を計時する間、運転制御手段60Aは発電装置6を強制的に稼働状態に保ち、タイマ84がタイムアップした後にステップS21に戻る。
【0037】
これに対して、上記計測電力値が第1電力値α未満であると、ステップS23からステップS29に移り、計測電力値とメモリ82に記憶された第2電力値βとの比較が行われる(ステップS29)。上記計測電力値が第2電力値β以上であると、ステップS30からステップS21に戻り、発電装置6が稼働運転状態のときにはその稼働運転状態が維持され、発電装置6が停止状態のときにはその停止状態が維持される。
【0038】
一方、上記計測電力値が第2電力値β未満であると、ステップS31に進む。
ステップS31では、発電装置6の運転状態の確認が行われ、発電装置6が稼働中であるか否かが判断される(ステップS32)。そして、発電装置6が停止状態であるときには、その停止状態が維持され、ステップS21に戻る。また、発電装置6が稼働状態であると、ステップS32からステップS33に進み、停止信号生成手段66が停止信号を生成し、この停止信号に基づいて作動制御手段62は発電装置6の稼働を停止する。そして、かく停止すると、ステップS34に進み、タイマ84が作動し、タイマ84が停止継続時間を計時し、この停止継続時間を計時する間、運転制御手段60Aは発電装置6を強制的に停止状態に保ち、タイマ84がタイムアップした後にステップS21に戻る。
【0039】
この第2の実施形態では、起動後に発電装置6を所定の稼働継続時間の間稼働状態に、また停止後に発電装置6を所定の停止継続時間の間停止状態に強制的に維持しているので、例えば稼働継続時間中(又は停止継続時間中)に電力負荷計測手段22の計測電力が一時的に第2電力値βより小さくなっても(又は第1電力値α以上になっても)発電装置6が稼働停止(又は起動)せず、稼働継続時間(又は停止継続時間)経過後に計測電力値が第2電力値βより小さくなて(又は第1電力値α以上になって)初めて発電装置6が稼働停止(又は起動)する。かくして、このように運転制御しても発電装置6の起動、稼働停止の頻度が少なくなり、コージェネレーションシステムの耐久性を向上させることができる。
【0040】
尚、上記第2の実施形態では、発電装置16を起動後に稼働継続時間の間稼働状態に維持することと、発電装置6を停止後に停止継続時間の間停止状態に維持することとを組み合わせて適用しているが、これらは必ずしも組み合わせて適用する必要はなく、それぞれ単独でコージェネレーションシステムの運転制御に適用することができる。また、このような運転制御と第1の実施形態の運転制御、即ち電力負荷16の平均電力値を利用して運転制御すること及び/又は発電装置6の起動、稼働停止に所謂ヒステリシス特性を持たせることを組み合わせるようにしてもよい。
【0041】
第3の実施形態
次に、図7及び図8を参照して、コージェネレーションシステムの運転制御装置の第3の実施形態について説明する。図7は、第3の実施形態のコージェネレーションシステムの制御系を簡略的に示すブロック図であり、図8は、図7の制御系による制御を説明するための図である。この第3の実施形態においては、発電装置の起動を禁止する起動禁止時間帯及びその稼働を禁止する稼働禁止時間帯が設定可能に構成されている。
【0042】
図7において、第3の実施形態における運転制御手段60Bは、起動禁止手段92及び稼働禁止手段94を含んでいる。起動禁止手段92は、設定された起動禁止時間帯において発電装置6の継続的稼働運転は許容するが、発電装置6の起動運転を強制的に禁止し、従って、この起動禁止時間帯では停止信号の生成は許容されるが、起動信号の生成は禁止される。また、稼働禁止手段94は、設定された稼働禁止時間帯において発電装置6の継続的稼働運転及び起動運転を強制的に禁止し、従って、稼働禁止時間帯の開始時に停止信号が生成され、この稼働禁止時間帯では起動信号の生成が禁止される。運転制御手段60Bは、更に、第2の実施形態におけるメモリ82に相当するメモリ82B及び計時手段96を備え、入力手段74を入力操作することによって設定される起動禁止時間帯(その開始時刻及び終了時刻)及び稼働禁止時間帯(その開始時刻及び終了時刻)がメモリ82Bに記憶され、計時手段96は時刻を計時する。この第3の実施形態のその他の構成は、タイマ84が省略されている以外は上記第2の実施形態と実質上同一である。
【0043】
図7とともに図8を参照して、第3の実施形態の運転制御装置による運転制御について説明すると、例えば、時刻t1(例えば午後8時)までが電力負荷16が大きく、その後の時刻t2(例えば午後10時)以降に電力負荷16が再び大きくなる場合、起動禁止時間帯及び稼働禁止時間帯を設定しないときには、図8(a)に示すように、運転制御手段60Bは、時刻t1まで発電装置6を稼働運転し、また時刻t2に発電装置6を起動し、この時刻t2以降稼働し、時刻t1から時刻t2の間、発電装置6の運転を停止する。
【0044】
電力負荷16のこのような負荷状態において、例えば、特定時間において発電装置6の稼働運転(即ち、起動運転及び稼働運転)を強制的に禁止することを使用者が望む、例えば深夜の時間帯(例えば午後11時から翌日の午前5時までの時間帯)において騒音発生をなくすために発電装置6の運転の停止を望むとき、入力手段74を入力操作して稼働禁止時間帯の開始時刻tx(例えば午後11時)及びその終了時刻(例えば翌日の午前5時)を設定すればよく、かく設定すると、この稼働禁止時間帯の情報がメモリ82Bに記憶され、運転制御手段60Bは、電力負荷計測手段22からの計測電力を利用するとともに、設定した稼働禁止の時間帯情報に基づいて発電装置6を運転制御するようになる。即ち、このとき、運転制御手段60Bの稼働禁止手段94は、設定された稼働禁止時間帯においては発電装置6の起動運転及び稼働運転を禁止するので、図8(b)に示すように、時刻tx(例えば午後11時)に停止信号生成手段66が停止信号を生成し、作動制御手段62はこの停止信号に基づいて発電装置6を停止し、設定した稼働禁止時間帯における発電装置6の稼働運転が強制的に停止される。また、この稼働禁止時間帯においては、起動信号生成手段64による起動信号の生成が強制的に禁止され、停止した発電装置6が起動運転されることはない。このように稼働禁止時間帯を設けることによって発電装置6の起動運転及び稼働運転を禁止し、例えば深夜における騒音の発生を確実になくすことができる。
【0045】
しかし、このように稼働禁止時間帯を設定した場合、その設定時間によっては、次の通りの問題が生じる。即ち、図8(b)から理解される如く、発電装置6は時刻t1において起動し、稼働禁止時間帯の開始時刻である時刻txで稼働運転停止し、比較的短い時間(この例では1時間)運転されることになり、発電装置6の起動回数が増え、このような運転頻度が多くなると耐久性が低下するおそれがある。
【0046】
このような運転をなくすためには、電力負荷16との関連で稼働禁止時間帯の開始時刻を図8(c)で示すように早い時刻ty(例えば午後7時)に設定すればよい。このように設定した場合、時刻ty以降において発電装置6の起動運転及び稼働運転が禁止されるので、図8(b)で示したような比較的短時間(この例では時刻t2と時刻txとの間の運転)の運転がなくなり上述した不都合が解消される。しかしこの場合、発電装置6の稼働時間が短くなり、発電装置6を効率良く運転できなくなるおそれがある。
【0047】
そこで、稼働禁止時間帯の設定に加えて起動禁止時間帯を設定可能にすることによって、比較的短時間の運転を少なくしながら発電装置6の効率的な運転が可能になる。
例えば、電力負荷16のこのような負荷状態で上述した稼働禁止時間帯を設定した場合において、更に、例えば、他の特定時間において発電装置6の起動運転を強制的に禁止することを使用者が望む、例えば夜の時間帯(例えば午後7時から稼働禁止時間帯の開始時刻txまでの時間帯)において発電装置の起動、稼働停止の短時間での繰り返しを少なくするために発電装置6の起動禁止を望むとき、入力手段74を入力操作して起動禁止時間帯の開始時刻ty(例えば午後7時)及びその終了時刻(例えば午後11時)を設定すればよく、かく設定すると、この起動禁止時間帯の情報がメモリ82Bに記憶され、運転制御手段60Bは、電力負荷計測手段22からの計測電力を利用するとともに、設定した稼働禁止及び起動禁止の時間帯情報に基づいて発電装置6を運転制御する。即ち、このとき、運転制御手段60Bの起動禁止手段94は、設定された起動禁止時間帯においては発電装置6の起動運転を禁止するのみであるので、図8(d)に示すように、発電装置6が稼働運転中においてはその稼働状態が許容され、時刻t1になって発電装置6の稼働が停止し、そして、一旦停止した後は発電装置6の起動運転が禁止される。このように、稼働禁止時間帯と起動禁止時間帯とを組み合わせて設定することによって、図8(b)及び(c)と図8(d)とを比較することによって容易に理解される如く、発電装置6の起動、稼働停止の回数を抑えながら発電装置6の運転時間を長くすることができ、コージェネレーションシステムを効率よく運転することができる。
【0048】
この第3の実施形態では、稼働禁止時間帯及び起動禁止時間帯を設定して発電装置を運転制御しているが、このような運転制御に、第1の実施形態及び/又は第2の実施形態の運転制御を組み合わせるようにしてもよい。
以上、本発明に従うコージェネレーションシステムの運転制御装置の各種実施形態について説明したが、本発明はかかる実施形態に限定されるものではなく、本発明の範囲を逸脱することなく種々の変形乃至修正が可能である。
【0054】
本発明の請求項1のコージェネレーションシステムの運転制御装置によれば、運転制御手段は電力負荷の電力値を利用するとともに、設定する時間帯情報として起動禁止時間帯及び稼働禁止時間帯が設定可能であるので、発電装置の効率的運転が可能となり、また発電装置の起動、稼働停止の頻度を抑えることができる。
【図面の簡単な説明】
【図1】第1の実施形態の運転制御装置を備えたコージェネレーションシステムの一例の全体を示す簡略図である。
【図2】図1のコージェネレーションシステムの制御系を簡略的に示すブロック図である。
【図3】図2の制御系による制御を説明するための図である。
【図4】図2の制御系の制御の流れを示すフローチャートである。
【図5】第2の実施形態の運転制御装置を装備したコージェネレーションシステムの制御系を簡略的に示すブロック図である。
【図6】図5のコージェネレーションシステムの制御系の制御の流れを示すフローチャートである。
【図7】第3の実施形態の運転制御装置を装備したコージェネレーションシステムの制御系を簡略的に示すブロック図である。
【図8】図7のコージェネレーションシステムの制御系による制御を説明するための図である。
【符号の説明】
2 エンジン
4 発電機
6 発電装置
8 貯湯装置
10 系統連系インバータ
12 商用系統
14 配電線
16 電力負荷
22 電力負荷計測手段
60,60A,60B 運転制御手段
62 作動制御手段
64 起動信号生成手段
66 停止信号生成手段
68 平均値演算手段
84 タイマ
92 起動禁止手段
94 稼働禁止手段[0001]
BACKGROUND OF THE INVENTION
The present invention relates to an operation control apparatus that controls the operation of a cogeneration system, and more particularly to an operation control apparatus that starts and stops operation in consideration of durability, start-up loss, and the like of the cogeneration system.
[0002]
[Prior art]
In general, a cogeneration system recovers heat generated from a power generation device that generates electric power by an engine, a fuel cell, etc., an inverter for connecting the power generated by the power generation device to a distribution line, and a power generation device. And a hot water storage device for storing the hot water, and an operation control means for controlling the operation of the power generation device. In this system, the operation control means controls the power generation device in response to the power load, and when the power load increases, the power generation device is activated and the generated power from the power generation device is supplied to the power load. When it becomes smaller, the operation of the power generation device stops, and the operation of the power generation device is stopped in this way to increase the operation efficiency of the system.
[0003]
[Problems to be solved by the invention]
In such a cogeneration system, it is not desirable to frequently start and stop the power generator from the viewpoint of durability and economy, and start and stop in a short time in response to the changing power load. Repeatedly, the durability of the entire system is lowered and its life is shortened. Moreover, the start-up loss is increased due to the repeated start-up and operation stop, and the economic efficiency is lowered.
[0004]
An object of the present invention is to provide a cogeneration operation control device that controls operation of a power generation device while avoiding frequent start-up and operation stop, thereby suppressing deterioration in durability and economic efficiency of the entire system. It is to be.
[0014]
The present inventionA power generator for cogeneration, an inverter for systematically connecting the generated power from the power generator to a distribution line, a hot water storage device for recovering heat generated from the power generator and storing it as hot water, and the power generator An operation control means for controlling the operation of the cogeneration system, comprising:
The operation control means performs operation control of the power generation device using a power value of an electric power load to which power is supplied, and controls operation of the power generation device based on the set time zone information, as the time zone information. When the start prohibition time zone is set, continuous operation operation of the power generation device is allowed, but the start operation of the power generation device is prohibited, and when the operation prohibition time zone is set as the time zone information, the power generation device is continued. It is characterized by prohibiting static operation and start-up operation.
[0015]
According to the present invention, the operation control means uses the power value of the power load, controls the operation of the power generation device based on the set time zone information, and sets the start prohibition time zone and the operation prohibition time zone as time zone information. Is possible. In the start prohibition time zone, the continuous operation operation of the power generator is allowed, but the start operation is forcibly prohibited and is not started from the stopped state. Further, in the operation prohibition time zone, the continuous operation operation and the start operation of the power generation device are forcibly prohibited, and the power generation device is stopped when in the operation state and is not started when in the stop state. By making it possible to set such a start prohibition time zone and an operation prohibition time zone, it is possible to efficiently operate the power generation device, and it is possible to suppress the frequency of startup and operation stop of the power generation device.
[0016]
DETAILED DESCRIPTION OF THE INVENTION
Hereinafter, an embodiment of an operation control device of a cogeneration system according to the present invention will be described with reference to the accompanying drawings.
First embodiment
First, with reference to FIGS. 1-4, 1st Embodiment of the operation control apparatus of a cogeneration system is described. 1 is a simplified diagram illustrating an example of a cogeneration system as a whole, FIG. 2 is a block diagram schematically illustrating a control system of the cogeneration system of FIG. 1, and FIG. 3 is a control system of FIG. FIG. 4 is a flowchart showing a control flow of the control system of FIG. 2.
[0017]
In FIG. 1, the illustrated cogeneration system includes a
[0018]
A
[0019]
The
[0020]
A
[0021]
The hot
[0022]
The hot
[0023]
This cogeneration system is operation-controlled by the operation control means 60. Referring also to FIG. 2, the operation control means 60 is constituted by, for example, a microcomputer and constitutes a part of the operation control device of the cogeneration system. The illustrated operation control means 60 includes an operation control means 62, a start signal generation means 64, a stop signal generation means 66, and an average value calculation means 68. The operation control means 62 controls the operation of various components of the cogeneration system, for example, a solenoid valve (not shown) disposed in the fuel supply path to the
[0024]
The operation control means 60 further includes first and
[0025]
An
[0026]
Next, the operation control of the cogeneration system described above with reference to FIGS. 1 and 2 and FIG. 4 will be described. First, the power load measuring means 22 measures the power of the power load 16 (step S1). A signal is sent to the operation control means 60, and this measurement data is stored in the
[0027]
Once the average power value is calculated in this way, the calculated average power value is then compared with the first power value α stored in the first memory 70 (step S3). When the average power value is greater than or equal to the first power value α, the load state of the
[0028]
In step S5, the operation state of the
[0029]
On the other hand, if the average power value is smaller than the first power value α, the process proceeds from step S4 to step S8, where the calculated average power value is compared with the second power value β stored in the
[0030]
On the other hand, if the average power value is smaller than the second power value β, the efficiency is deteriorated even when the
[0031]
In this embodiment, since the
[0032]
In the first embodiment, the power of the
[0033]
Second embodiment
Next, with reference to FIG.5 and FIG.6, 2nd Embodiment of the operation control apparatus of a cogeneration system is described. FIG. 5 is a block diagram schematically showing a control system of the cogeneration system of the second embodiment, and FIG. 6 is a flowchart showing a control flow of the control system of FIG. In the second embodiment, operation control is performed using the measured power of the power load measuring means, and the state is maintained for a predetermined time after the
[0034]
In FIG. 5, the operation control means 60A in the second embodiment includes a memory 82 corresponding to the
[0035]
The operation control by the operation control apparatus of the second embodiment will be described with reference to FIG. 6 together with FIG. 5. First, the power load measuring means 22 measures the power of the power load 16 (step S21), and this measurement signal Is supplied to the operation control means 60A, and the measured power value is compared with the first power value α stored in the memory 82 (step S22). If the measured power value is greater than or equal to the first power value α, the load state of the
[0036]
In step S24, the operation state of the
[0037]
On the other hand, when the measured power value is less than the first power value α, the process proceeds from step S23 to step S29, and the measured power value is compared with the second power value β stored in the memory 82 ( Step S29). When the measured power value is greater than or equal to the second power value β, the process returns from step S30 to step S21, and the operation state is maintained when the
[0038]
On the other hand, if the measured power value is less than the second power value β, the process proceeds to step S31.
In step S31, the operation state of the
[0039]
In the second embodiment, the
[0040]
In the second embodiment, a combination of maintaining the
[0041]
Third embodiment
Next, with reference to FIG.7 and FIG.8, 3rd Embodiment of the operation control apparatus of a cogeneration system is described. FIG. 7 is a block diagram schematically showing a control system of the cogeneration system of the third embodiment, and FIG. 8 is a diagram for explaining control by the control system of FIG. In the third embodiment, a start prohibition time zone for prohibiting startup of the power generation apparatus and an operation prohibition time zone for prohibiting the operation thereof can be set.
[0042]
In FIG. 7, the
[0043]
The operation control by the operation control apparatus of the third embodiment will be described with reference to FIG. 8 together with FIG. 7. For example, the
[0044]
In such a load state of the
[0045]
However, when the operation prohibition time zone is set in this way, the following problem occurs depending on the set time. That is, as understood from FIG. 8B, the
[0046]
In order to eliminate such operation, the start time of the operation prohibition time zone in relation to the
[0047]
Therefore, by making it possible to set the start prohibition time zone in addition to the operation prohibition time zone setting, it is possible to efficiently operate the
For example, in the case where the operation prohibition time zone described above is set in such a load state of the
[0048]
In the third embodiment, the operation prohibition time zone and the start prohibition time zone are set to control the operation of the power generation apparatus. For such operation control, the first embodiment and / or the second implementation are performed. You may make it combine the form of operation control.
As mentioned above, although various embodiment of the operation control apparatus of the cogeneration system according to this invention was described, this invention is not limited to this embodiment, Various deformation | transformation thru | or corrections do not deviate from the scope of the present invention. Is possible.
[0054]
[Brief description of the drawings]
FIG. 1 is a simplified diagram showing an entire example of a cogeneration system including an operation control apparatus according to a first embodiment.
2 is a block diagram schematically showing a control system of the cogeneration system of FIG. 1. FIG.
FIG. 3 is a diagram for explaining control by the control system of FIG. 2;
4 is a flowchart showing a control flow of the control system of FIG. 2;
FIG. 5 is a block diagram schematically showing a control system of a cogeneration system equipped with an operation control apparatus of a second embodiment.
6 is a flowchart showing a control flow of a control system of the cogeneration system of FIG. 5;
FIG. 7 is a block diagram schematically showing a control system of a cogeneration system equipped with an operation control apparatus of a third embodiment.
8 is a diagram for explaining control by the control system of the cogeneration system of FIG. 7; FIG.
[Explanation of symbols]
2 Engine
4 Generator
6 Power generator
8 Hot water storage device
10 Grid-connected inverter
12 Commercial system
14 Distribution lines
16 Power load
22 Power load measuring means
60, 60A, 60B operation control means
62 Operation control means
64 Activation signal generating means
66 Stop signal generating means
68 Average value calculation means
84 timer
92 Start prohibition means
94 Operation prohibition means
Claims (1)
前記運転制御手段は、電力が供給される電力負荷の電力値を利用して前記発電装置を運転制御するとともに、設定した時間帯情報に基づいて前記発電装置を運転制御し、前記時間帯情報として起動禁止時間帯を設定したときには前記発電装置の継続的稼働運転は許容するが、前記発電装置の起動運転を禁止し、また前記時間帯情報として稼働禁止時間帯を設定したときには前記発電装置の継続的稼働運転及び起動運転を禁止することを特徴とするコージェネレーションシステムの運転制御装置。A power generator for cogeneration, an inverter for systematically connecting the generated power from the power generator to a distribution line, a hot water storage device for recovering heat generated from the power generator and storing it as hot water, and the power generator An operation control means for controlling the operation of the cogeneration system, comprising:
The operation control means performs operation control of the power generation device using a power value of an electric power load to which power is supplied, and controls operation of the power generation device based on the set time zone information, as the time zone information. When the start prohibition time zone is set, continuous operation operation of the power generation device is allowed, but the start operation of the power generation device is prohibited, and when the operation prohibition time zone is set as the time zone information, the power generation device is continued. The operation control device for a cogeneration system is characterized by prohibiting general operation and start-up operation.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001137724A JP4650864B2 (en) | 2001-05-08 | 2001-05-08 | Cogeneration system operation control device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001137724A JP4650864B2 (en) | 2001-05-08 | 2001-05-08 | Cogeneration system operation control device |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2002335627A JP2002335627A (en) | 2002-11-22 |
| JP4650864B2 true JP4650864B2 (en) | 2011-03-16 |
Family
ID=18984784
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2001137724A Expired - Fee Related JP4650864B2 (en) | 2001-05-08 | 2001-05-08 | Cogeneration system operation control device |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4650864B2 (en) |
Families Citing this family (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4535392B2 (en) * | 2006-03-23 | 2010-09-01 | 大阪瓦斯株式会社 | Cogeneration system |
| JP5268443B2 (en) * | 2008-06-18 | 2013-08-21 | 東芝燃料電池システム株式会社 | Fuel cell power generation system and control method thereof |
| JP5554269B2 (en) * | 2011-03-15 | 2014-07-23 | 東京瓦斯株式会社 | Cogeneration system |
| CN102629760B (en) * | 2011-12-13 | 2014-09-17 | 国电南瑞科技股份有限公司 | Method adaptive for coordinated optimization of low-frequency pump sheadding and load shedding with secure and stable frequency |
| JP2013207955A (en) * | 2012-03-29 | 2013-10-07 | Panasonic Corp | Electric power generation system and operation method for electric power generation system |
| JP6979833B2 (en) * | 2017-09-07 | 2021-12-15 | 大阪瓦斯株式会社 | Power generation system |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP3259296B2 (en) * | 1991-11-29 | 2002-02-25 | 株式会社明電舎 | Reverse power prevention method for cogeneration system |
| JP2888717B2 (en) * | 1992-04-06 | 1999-05-10 | 公生 石丸 | Energy supply system |
| JPH06141468A (en) * | 1992-10-21 | 1994-05-20 | Osaka Gas Co Ltd | Load sharing method |
| JPH097618A (en) * | 1995-06-22 | 1997-01-10 | Mitsubishi Electric Corp | Fuel cell power generation system |
| JP3504072B2 (en) * | 1996-08-06 | 2004-03-08 | 中部電力株式会社 | Power system supply and demand plan creation device |
-
2001
- 2001-05-08 JP JP2001137724A patent/JP4650864B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2002335627A (en) | 2002-11-22 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US20050048337A1 (en) | Fuel-cell power generation system and control method therefor | |
| JP5829492B2 (en) | Hot water storage type hot water supply system and operation control method thereof | |
| JP4650864B2 (en) | Cogeneration system operation control device | |
| JP4213636B2 (en) | Hot water storage hot water source | |
| JP3888455B2 (en) | Cogeneration system | |
| JP3857601B2 (en) | Cogeneration system | |
| JP3836761B2 (en) | Cogeneration system | |
| JP2011027408A (en) | Cogeneration system | |
| JP5381084B2 (en) | Cogeneration system and hot water storage system | |
| JP2004095360A (en) | Fuel cell system and operation method thereof | |
| JP7260352B2 (en) | energy supply system | |
| JP2006329581A (en) | Electric water heater | |
| JP4889214B2 (en) | Cogeneration system | |
| JP4897855B2 (en) | Cogeneration system | |
| JPH08226145A (en) | Heat insulation device for piped water in hot water supply system | |
| JP2005076892A (en) | Cogeneration system | |
| JP4710511B2 (en) | Hot water storage water heater | |
| JP4487140B2 (en) | Hot water supply system | |
| JP3876658B2 (en) | Heat pump bath hot water system | |
| JP2004170025A (en) | Electric water heater | |
| JP3979770B2 (en) | Hot water storage hot water supply system | |
| JP4330542B2 (en) | Cogeneration system | |
| JP2004063118A (en) | Fuel cell system | |
| JP2006084040A (en) | Cogeneration system | |
| JP3913052B2 (en) | Hot water storage system using exhaust heat |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20080125 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20091019 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20091027 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20091214 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20100930 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20101122 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20101208 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20101208 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 4650864 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20131224 Year of fee payment: 3 |
|
| LAPS | Cancellation because of no payment of annual fees |