JP6979833B2 - Power generation system - Google Patents
[go: Go Back, main page]

JP6979833B2 - Power generation system - Google Patents

Power generation system Download PDF

Info

Publication number
JP6979833B2
JP6979833B2 JP2017172542A JP2017172542A JP6979833B2 JP 6979833 B2 JP6979833 B2 JP 6979833B2 JP 2017172542 A JP2017172542 A JP 2017172542A JP 2017172542 A JP2017172542 A JP 2017172542A JP 6979833 B2 JP6979833 B2 JP 6979833B2
Authority
JP
Japan
Prior art keywords
power
load
fuel cell
power generation
generated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2017172542A
Other languages
Japanese (ja)
Other versions
JP2019050648A (en
Inventor
潤 岩見
覚 上野山
哲朗 大西
俊哉 御堂
壮哉 白木
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Osaka Gas Co Ltd
Original Assignee
Osaka Gas Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Osaka Gas Co Ltd filed Critical Osaka Gas Co Ltd
Priority to JP2017172542A priority Critical patent/JP6979833B2/en
Publication of JP2019050648A publication Critical patent/JP2019050648A/en
Application granted granted Critical
Publication of JP6979833B2 publication Critical patent/JP6979833B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/30Hydrogen technology
    • Y02E60/50Fuel cells

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Fuel Cell (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明は、電力系統と連系可能であり、炭化水素を含む原燃料ガスを改質して得られる水素を利用して発電する燃料電池装置と、電力系統及び燃料電池装置の少なくとも一方から電力の供給を受ける電力負荷装置と、燃料電池装置の動作を制御する制御装置とを備え、制御装置は、電力負荷装置の負荷電力を賄うときの経済性が良くなるように燃料電池装置の発電電力を決定する発電システムに関する。 The present invention can be interconnected with a power system, and power can be generated from at least one of a fuel cell device, a power system, and a fuel cell device, which can generate electricity by using hydrogen obtained by reforming a raw material fuel gas containing hydrocarbons. It is equipped with a power load device that receives the supply of the fuel and a control device that controls the operation of the fuel cell device. Regarding the power generation system to determine.

特許文献1には、商用電力系統に対して電力を逆潮流可能に設けられた自家発電手段と、商用電力系統側のエネルギ情報と自家発電手段側のエネルギ情報とを取得するためのエネルギ情報取得手段と、エネルギ情報取得手段で取得した情報に基づいて経済的に最も有利な運転モードに自家発電手段を運転制御する制御手段とを備えるシステムが記載されている。自家発電手段の例としては、発電機とエンジンとの組み合わせ、及び、燃料電池が記載されている。 Patent Document 1 describes an in-house power generation means provided so that electric power can be reverse-flowed to a commercial power system, and energy information acquisition for acquiring energy information on the commercial power system side and energy information on the in-house power generation means side. A system including means and control means for operating and controlling the private power generation means to the most economically advantageous operation mode based on the information acquired by the energy information acquisition means is described. Examples of private power generation means include a combination of a generator and an engine, and a fuel cell.

特許文献1に記載のシステムにおいて、運転モード決定装置(17)は、時間帯や季節等によって刻々と変化する買電単価及び売電単価及び発電単価を比較して、システムを経済的に最も有利な条件で運転するための運転モードを決定する。そして、この決定指令をコントローラ(13)に与える。コントローラ(13)は、決定指令にしたがって自家発電手段の動作制御と回路の切替制御とを行う。例えば、自家発電手段は、停止する状態、最大能力で動作する状態、発電出力を負荷電力に追従させる状態などに切り替えられる。また、負荷と自家発電手段と商用電力系統との間の電気回路の接続状態は、開閉器(6,10,12)の開閉制御によって切り替えられる。これにより、発電機(2)を停止して負荷(7,8,9)に必要な電力の全てを商用電源系統(11)から買電するような運転や、発電機(2)の余剰電力を売電する運転や、負荷(7,8,9)に必要な電力の全てを発電機(2)の出力で供給する運転などを切り替えることができる。
特許文献1では、自家発電システムの発電単価として、自家発電手段の運転に要するガスエネルギコストが記載されている。
In the system described in Patent Document 1, the operation mode determining device (17) is most economically advantageous for the system by comparing the power purchase unit price, the power sale unit price, and the power generation unit price, which change every moment depending on the time zone, the season, and the like. Determine the operation mode for driving under various conditions. Then, this determination command is given to the controller (13). The controller (13) controls the operation of the private power generation means and the switching control of the circuit according to the determination command. For example, the private power generation means can be switched to a state of stopping, a state of operating at the maximum capacity, a state of making the power generation output follow the load power, and the like. Further, the connection state of the electric circuit between the load, the private power generation means, and the commercial power system is switched by the opening / closing control of the switch (6, 10, 12). As a result, the generator (2) is stopped and all the power required for the load (7, 8, 9) is purchased from the commercial power supply system (11), and the surplus power of the generator (2) is purchased. It is possible to switch between the operation of selling the electric power and the operation of supplying all the electric power required for the load (7, 8, 9) with the output of the generator (2).
Patent Document 1 describes the gas energy cost required for operating the private power generation means as the power generation unit price of the private power generation system.

特開平10−42472号公報Japanese Unexamined Patent Publication No. 10-42472

燃料電池装置の発電効率はどの発電電力でも同じになる訳ではなく、例えば発電電力が大きくなるにつれて発電効率が高くなるといった特性を示す。
よって、電力負荷装置の負荷電力が相対的に小さい場合に、その負荷電力に等しい電力を燃料電池装置で発電させようとすると(即ち、負荷追従させようとすると)、燃料電池の発電電力を相対的に小さくしなければならない(即ち、発電効率が低くなる)。その結果、燃料電池装置の発電単価が相対的に大きくなる。
尚、電力負荷装置の負荷電力が相対的に小さい場合に、その負荷電力よりも大きい電力を燃料電池装置で発電させることもできる。この場合、燃料電池装置の発電電力を負荷追従させる場合に比べて燃料電池装置での発電に要する総コストは大きくなるものの、発電効率が高くなるのに伴って発電単価が小さくなり、且つ、余剰電力を売電できるようになる。そのため、燃料電池装置の発電電力を負荷追従させる場合に比べて、経済性が良くなる可能性もある。
The power generation efficiency of the fuel cell device is not the same for all generated powers. For example, the power generation efficiency increases as the generated power increases.
Therefore, when the load power of the power load device is relatively small, if the fuel cell device tries to generate electricity equal to the load power (that is, if the load is followed), the generated power of the fuel cell is relative. It must be made smaller (that is, the power generation efficiency becomes lower). As a result, the unit price of power generation of the fuel cell device becomes relatively large.
When the load power of the power load device is relatively small, the fuel cell device can generate electric power larger than the load power. In this case, the total cost required for power generation in the fuel cell device is higher than in the case where the generated power of the fuel cell device is made to follow the load, but the power generation unit price becomes smaller as the power generation efficiency increases, and the surplus You will be able to sell electricity. Therefore, there is a possibility that the economy will be improved as compared with the case where the generated power of the fuel cell device is made to follow the load.

このように、電力負荷装置の負荷電力が相対的に小さい時期というのは、電力負荷装置の負荷電力、燃料電池の発電電力及び発電単価、余剰電力及び売電単価などを考慮して、経済性が良くなるのは燃料電池装置をどのように運転させた場合であるのかを検証することが好ましい時期であるとも言える。 In this way, the period when the load power of the power load device is relatively small is economical in consideration of the load power of the power load device, the power generation power and the power generation unit price of the fuel cell, the surplus power and the power sale unit price, and the like. It can be said that it is a preferable time to verify how the fuel cell device is operated to improve.

それに対して、電力負荷装置の負荷電力が相対的に大きい場合に、その負荷電力の全てを燃料電池装置の発電電力で賄おうとすると、燃料電池装置の発電電力が大きくなることで発電に要する総コストは大きくなるものの、発電効率が高くなるのに伴って発電単価が相対的に小さい電力を電力負荷装置に供給できる。つまり、電力負荷装置の負荷電力が相対的に大きい場合には、負荷追従運転を行った場合に発電に要する総コストと、例えば最大発電電力で発電を行って、余剰電力が発生すればその電力を売電する場合の総コストとにそれほど大きな差が生じないと考えられる。その結果、電力負荷装置の負荷電力が相対的に大きい時期というのは、電力負荷装置の負荷電力、燃料電池の発電電力及び発電単価、余剰電力及び売電単価などを考慮して、経済性が良くなるのは燃料電池装置をどのように運転させた場合であるのかを検証する必要性が低い時期であるとも言える。 On the other hand, when the load power of the power load device is relatively large, if all of the load power is to be covered by the generated power of the fuel cell device, the generated power of the fuel cell device becomes large and the total required for power generation is increased. Although the cost increases, it is possible to supply electric power having a relatively low unit price of power generation to the power load device as the power generation efficiency increases. That is, when the load power of the power load device is relatively large, the total cost required for power generation when the load follow-up operation is performed and, for example, the maximum power generation power is used to generate power, and if surplus power is generated, that power is used. It is considered that there will be no big difference from the total cost of selling electricity. As a result, the period when the load power of the power load device is relatively large is economical in consideration of the load power of the power load device, the power generated by the fuel cell and the unit price of power generation, the surplus power and the unit price of power sold. It can be said that the improvement is in the period when there is little need to verify how the fuel cell device is operated.

このように、経済性が良くなるのは燃料電池装置をどのように運転させた場合であるのかを検証する必要性が低い時期と高い時期とが存在するにも関わらず、特許文献1に記載のシステムでは、刻々と変化する買電単価及び売電単価及び発電単価を常に比較し続けて、システムを経済的に最も有利な条件で運転するための運転モードを決定し、必要に応じて瞬時に自家発電手段の運転切替や回路の切り替えなどを行わなければならない。例えば、商用電力系統の電力単価(買電単価)や自家発電システムの発電単価(ガスエネルギコスト)が変更される度に、自家発電手段を停止状態から稼働状態に変更することや、稼働状態から停止状態に変更することなどを急に行わなければならない可能性がある。 As described above, Patent Document 1 describes that the economic efficiency is improved even though there are times when it is necessary to verify how the fuel cell device is operated and there are times when it is high. In this system, the ever-changing unit price of electricity purchased, unit price of electricity, and unit price of power generation are constantly compared to determine the operation mode for operating the system under the most economically advantageous conditions, and instantly as needed. In addition, it is necessary to switch the operation of the private power generation means and switch the circuit. For example, every time the power unit price (power purchase unit price) of the commercial power system or the power generation unit price (gas energy cost) of the private power generation system is changed, the private power generation means may be changed from the stopped state to the operating state, or from the operating state. It may be necessary to suddenly change to a stopped state.

更に、全く予期できないタイミングで、自家発電手段の動作状態と回路の切替状態とをどのような状態にするのかを随時決定する必要性や、その決定に従って自家発電手段の起動・停止・発電電力変更など瞬時に行う必要性などがあるものの、実際にシステムを運用した場合には、自家発電手段の動作状態と回路の切替状態との決定が時間的に遅れる可能性や、自家発電手段の発電電力を瞬時に所望の値にさせることができない可能性などがある。特に、自家発電手段として、炭化水素を含む原燃料ガスを改質して得られる水素を利用して発電する燃料電池装置を用いる場合、原燃料ガスの供給量を変更しても瞬時に水素の生成量が変更されない(発電電力が変更されない)という問題や、燃料電池装置の起動・停止を瞬時に行うことができないという問題などがある。 Furthermore, it is necessary to determine at any time what state the operating state of the private power generation means and the switching state of the circuit should be at a completely unpredictable timing, and the start / stop / power generation change of the private power generation means according to the decision. Although it is necessary to do it instantly, when the system is actually operated, there is a possibility that the determination between the operating state of the private power generation means and the switching state of the circuit may be delayed in time, and the generated power of the private power generation means. May not be instantly set to the desired value. In particular, when a fuel cell device that generates electricity by using hydrogen obtained by reforming a raw fuel gas containing hydrocarbons is used as a private power generation means, hydrogen can be instantaneously generated even if the supply amount of the raw fuel gas is changed. There are problems such as the problem that the amount of production is not changed (the generated power is not changed) and the problem that the fuel cell device cannot be started and stopped instantly.

本発明は、上記の課題に鑑みてなされたものであり、その目的は、適切なタイミングで、電力負荷装置の負荷電力を賄うときの経済性が良くなるように燃料電池装置の発電電力を決定できる発電システムを提供する点にある。 The present invention has been made in view of the above problems, and an object thereof is to determine the generated power of the fuel cell device so as to improve the economic efficiency when supplying the load power of the power load device at an appropriate timing. The point is to provide a power generation system that can be used.

上記目的を達成するための本発明に係る発電システムの特徴構成は、電力系統と連系可能であり、炭化水素を含む原燃料ガスを改質して得られる水素を利用して発電する燃料電池装置と、前記電力系統及び前記燃料電池装置の少なくとも一方から電力の供給を受ける電力負荷装置と、前記燃料電池装置の動作を制御する制御装置とを備え、前記制御装置は、前記電力負荷装置の負荷電力を賄うときの経済性を考慮して前記燃料電池装置の発電電力を決定する発電システムであって、
前記制御装置は、
1日の中の所定の第1判定期間での前記電力負荷装置による第1負荷電力と、前記第1判定期間とは異なる所定の第2判定期間での前記電力負荷装置による第2負荷電力とを対比して、前記第1判定期間及び前記第2判定期間のうち、負荷電力が小さい方の判定期間を経済性判定期間に設定し、負荷電力が大きい方の判定期間を非経済性判定期間に設定
定された前記経済性判定期間の開始前に、前記燃料電池装置で発電するときの発電料金及び前記燃料電池装置の発電電力の一部を売電するときの売電料金とを少なくとも考慮して、前記経済性判定期間での前記燃料電池装置の発電電力を前記経済性判定期間において前記経済性が良くなる値に決定す点にある。
The characteristic configuration of the power generation system according to the present invention for achieving the above object is a fuel cell that can be interconnected with an electric power system and generates electricity by using hydrogen obtained by reforming a raw material fuel gas containing hydrocarbons. The device includes a power load device that receives power from at least one of the power system and the fuel cell device, and a control device that controls the operation of the fuel cell device. The control device is the power load device of the power load device. It is a power generation system that determines the generated power of the fuel cell device in consideration of the economic efficiency when covering the load power.
The control device is
The first load power by the power load device in the predetermined first judgment period in one day and the second load power by the power load device in the predetermined second judgment period different from the first judgment period. in contrast to the one of the first determination period and the second determination period is set to a completion determination period after the judgment period towards the load power is small, non-economy determining determination period towards the load power is large set in the period,
Before the start of setting has been the economy determination period, selling and electricity rates by at least taking into account the time of electricity sold some of generated power of the generator charges and the fuel cell system at the time of power generation by the fuel cell device Te is the generated power of the fuel cell system in the economy determination period to a point that determine the value economy is improved in the economic efficiency determination period.

上記特徴構成によれば、制御装置は、1日の中の所定の第1判定期間での電力負荷装置による第1負荷電力と、第1判定期間とは異なる所定の第2判定期間での電力負荷装置による第2負荷電力とを対比して、第1判定期間及び第2判定期間のうち、負荷電力が小さい方の判定期間を経済性の判定を行う経済性判定期間に設定し、負荷電力が大きい方の判定期間を経済性の判定を行わない非経済性判定期間に設定し、設定された経済性判定期間の開始前に、燃料電池装置で発電するときの発電料金及び燃料電池装置の発電電力の一部を売電するときの売電料金とを少なくとも考慮して、経済性判定期間での燃料電池装置の発電電力を経済性判定期間において経済性が良くなる値に決定する。つまり、制御装置は、電力負荷装置の負荷電力が小さくなる経済性判定期間に限って、即ち、経済性が良くなるのは燃料電池装置をどのように運転させた場合であるのかを検証することが好ましい時期に限って上記のように燃料電池装置の発電電力を経済性判定期間において経済性が良くなる値に決定する。その結果、経済性に基づいて燃料電池装置の発電電力を随時決定することや、その決定に従って燃料電池装置の起動・停止・発電電力変更など瞬時に行うことなどを行わなくてもよくなる。
従って、適切なタイミングで、電力負荷装置の負荷電力を賄うときの経済性が良くなるように燃料電池装置の発電電力を決定できる発電システムを提供できる。
According to the above-mentioned feature configuration, the control device has a first load power by the power load device in a predetermined first judgment period in a day and a power in a predetermined second judgment period different from the first judgment period. By comparing with the second load power by the load device, the judgment period of the first judgment period and the second judgment period, whichever has the smaller load power, is set as the economic judgment period for judging the economic efficiency, and the load power is set. set uneconomic determination period is not performed determination of economic efficiency of the determination period of the larger, before the start of the set has been economics determination period, the power generation rates and fuel cell system at the time of power generation by the fuel cell system The generated power of the fuel cell device in the economic evaluation period is determined to be a value that improves the economic efficiency in the economic evaluation period, at least considering the power selling charge when selling a part of the generated electric power. In other words, the control device should verify only during the economic efficiency determination period when the load power of the power load device becomes small, that is, how the fuel cell device is operated to improve the economic efficiency. However, as described above, the generated power of the fuel cell device is determined to a value that improves the economic efficiency in the economic efficiency determination period only at a preferable time. As a result, it is not necessary to determine the generated power of the fuel cell device at any time based on economic efficiency, and to instantly start / stop the fuel cell device, change the generated power, etc. according to the decision.
Therefore, it is possible to provide a power generation system capable of determining the power generation of the fuel cell device so as to improve the economic efficiency when supplying the load power of the power load device at an appropriate timing.

本発明に係る発電システムの別の特徴構成は、前記燃料電池装置で発電するために要する発電料金情報を取得する発電料金情報取得装置と、前記燃料電池装置で発電した電力を前記電力系統へ売るときの売電料金情報を取得する売電料金情報取得装置とを備え、
前記制御装置は、設定された前記経済性判定期間の開始前に、前記発電料金情報及び前記売電料金情報を参照して導出できる前記燃料電池装置で発電するときの発電料金及び前記燃料電池装置の発電電力の一部を売電するときの売電料金とを考慮して、前記経済性判定期間での前記燃料電池装置の発電電力を、前記電力負荷装置による負荷電力に追従した値に決定した場合と、所定の最大発電電力の値に決定した場合とのうち、前記経済性判定期間において前記経済性が良くなる方に決定する点にある。
Another characteristic configuration of the power generation system according to the present invention is a power generation charge information acquisition device for acquiring power generation charge information required for power generation by the fuel cell device, and selling the power generated by the fuel cell device to the power system. Equipped with a power sales charge information acquisition device that acquires power sales charge information at the time
Wherein the control device, before the start of the set has been the economy determination period, the power generation rates and the fuel cell at the time of power generation by the fuel cell system can be derived by referring to the power rate information and the power sale fee information Considering the power generation fee when selling a part of the power generated by the device, the power generated by the fuel cell device during the economic efficiency determination period is set to a value that follows the load power by the power load device. Of the case where the value is determined and the case where the value of the predetermined maximum power generation is determined, the point is to determine the one that improves the economic efficiency in the economic efficiency determination period.

上記特徴構成によれば、制御装置は、設定された経済性判定期間における燃料電池装置の発電電力を、電力負荷装置による負荷電力に追従した値に決定した場合と、所定の最大発電電力の値に決定した場合とのうち、経済性判定期間において経済性が良くなる方に、その経済性判定期間の開始前に決定しておくことができる。その結果、経済性に基づいて燃料電池装置の発電電力を随時決定することや、その決定に従って燃料電池装置の起動・停止・発電電力変更など瞬時に行うことなどを行わなくてもよくなる。 With the above arrangement, control apparatus, in the case where the power generated by the fuel cell device in configured to economics determination period was determined to be a value that follows the load power by the power load device, the predetermined maximum generated power Of the cases where the value of is determined, the one whose economic efficiency is improved in the economic efficiency determination period can be determined before the start of the economic efficiency determination period. As a result, it is not necessary to determine the generated power of the fuel cell device at any time based on economic efficiency, and to instantly start / stop the fuel cell device, change the generated power, etc. according to the decision.

本発明に係る発電システムの更に別の特徴構成は、前記電力負荷装置の負荷電力を賄うために前記電力系統から電力を購入するときの買電電力についての買電料金情報を取得する買電料金情報取得装置と、前記燃料電池装置で発電するために要する発電料金情報を取得する発電料金情報取得装置と、前記燃料電池装置で発電した電力を前記電力系統へ売るときの売電料金情報を取得する売電料金情報取得装置とを備え、
前記制御装置は、設定された前記経済性判定期間の開始前に、前記買電料金情報及び前記発電料金情報及び前記売電料金情報を参照して導出できる、前記電力系統から電力の供給を受けるときの買電料金と、前記燃料電池装置で発電するときの発電料金及び発電電力の一部を売電するときの売電料金とを考慮して、前記経済性判定期間での前記燃料電池装置の発電電力を、前記電力負荷装置による負荷電力に追従した値に決定した場合と、所定の最大発電電力の値に決定した場合と、ゼロに決定した場合とのうち、前記経済性判定期間において前記経済性が良くなる方に決定する点にある。
Yet another characteristic configuration of the power generation system according to the present invention is a power purchase charge for acquiring power purchase charge information regarding the power purchase charge when purchasing power from the power system in order to cover the load power of the power load device. The information acquisition device, the power generation charge information acquisition device that acquires the power generation charge information required for power generation by the fuel cell device, and the power sale charge information when selling the power generated by the fuel cell device to the power system are acquired. Equipped with a power sales charge information acquisition device
Wherein the control device, before the start of the set has been the economy determination period can be derived by referring to the power purchase fee information and the power rate information and the power selling charge information, the power supply from the power system Considering the power purchase fee when receiving, the power generation fee when generating power with the fuel cell device, and the power selling fee when selling a part of the generated power, the fuel cell in the economic evaluation period. The economic efficiency determination period includes the case where the power generation of the device is determined to be a value that follows the load power of the power load device, the case where the value is determined to be the predetermined maximum power generation value, and the case where the value is determined to be zero. The point is to decide which one will improve the economic efficiency.

上記特徴構成によれば、制御装置は、設定された経済性判定期間における燃料電池装置の発電電力を、電力負荷装置による負荷電力に追従した値に決定した場合と、所定の最大発電電力の値に決定した場合と、ゼロに決定した場合とのうち、経済性判定期間において経済性が良くなる方に、その経済性判定期間の開始前に決定しておくことができる。その結果、経済性に基づいて燃料電池装置の発電電力を随時決定することや、その決定に従って燃料電池装置の起動・停止・発電電力変更など瞬時に行うことなどを行わなくてもよくなる。 With the above arrangement, control apparatus, in the case where the power generated by the fuel cell device in configured to economics determination period was determined to be a value that follows the load power by the power load device, the predetermined maximum generated power Of the case where the value is determined to be the value of and the case where the value is determined to be zero, the one whose economic efficiency is improved in the economic evaluation period can be determined before the start of the economic evaluation period. As a result, it is not necessary to determine the generated power of the fuel cell device at any time based on economic efficiency, and to instantly start / stop the fuel cell device, change the generated power, etc. according to the decision.

本発明に係る発電システムの更に別の特徴構成は、前記制御装置は、設定された前記非経済性判定期間の開始前に、前記非経済性判定期間での前記燃料電池装置の発電電力を、前記電力負荷装置による負荷電力に追従した値又は所定の最大発電電力の値に決定する点にある。 Yet another characterizing feature of the power generation system according to the present invention, the control device, before the start of the set has been the uneconomic determination period, the generated power of the fuel cell system in the non-economical determination period The point is to determine the value following the load power of the power load device or the value of the predetermined maximum generated power.

電力負荷装置の負荷電力が相対的に大きい場合には、負荷追従運転を行った場合に発電に要する総コストと、例えば最大発電電力で発電を行って、余剰電力が発生すればその電力を売電する場合の総コストとの間にそれほど大きな差が生じないと考えられる。その結果、電力負荷装置の負荷電力が相対的に大きい時期というのは、電力負荷装置の負荷電力、燃料電池装置の発電電力及び発電単価、余剰電力及び売電単価などを考慮して、経済性が良くなるのは燃料電池装置をどのように運転させた場合であるのかを検証する必要性が低い時期であるとも言える。
そこで本特徴構成では、制御装置は、設定された非経済性判定期間の開始前に、非経済性判定期間での燃料電池装置の発電電力を、電力負荷装置による負荷電力に追従した値又は所定の最大発電電力の値に予め決定する。これにより、経済性が大きく悪化しない状態で燃料電池装置を運転させることができる。
When the load power of the power load device is relatively large, the total cost required for power generation when load-following operation is performed, for example, power is generated with the maximum generated power, and if surplus power is generated, the power is sold. It is considered that there is not much difference from the total cost of electricity. As a result, the period when the load power of the power load device is relatively large is economical in consideration of the load power of the power load device, the generated power and the unit price of the fuel cell device, the surplus power, and the unit price of selling power. It can be said that the improvement is in the period when there is little need to verify how the fuel cell device is operated.
Therefore, in this characteristic configuration, the control device, before the start of uneconomic determination period is set, the generated power of the fuel cell system in a non-economical determination period, the value follows the load power by the power load device or The value of the predetermined maximum generated power is determined in advance. As a result, the fuel cell device can be operated in a state where the economic efficiency is not significantly deteriorated.

本発明に係る発電システムの更に別の特徴構成は、前記電力負荷装置による過去の負荷電力についての情報を取得する負荷電力情報取得装置を備え、
前記制御装置は、前記負荷電力情報取得装置が取得した前記電力負荷装置による過去の負荷電力についての情報を参照して、前記電力負荷装置による前記第1負荷電力及び前記第2負荷電力を決定する点にある。
Yet another characteristic configuration of the power generation system according to the present invention includes a load power information acquisition device for acquiring information on past load power by the power load device.
The control device determines the first load power and the second load power by the power load device with reference to the information about the past load power by the power load device acquired by the load power information acquisition device. At the point.

上記特徴構成によれば、電力負荷装置での過去の負荷電力についての情報を参照することで、第1負荷電力及び第2負荷電力の信頼性を高めることができる。 According to the above feature configuration, the reliability of the first load power and the second load power can be improved by referring to the information about the past load power in the power load device.

第1実施形態の発電システムの構成を示す図である。It is a figure which shows the structure of the power generation system of 1st Embodiment. 第1判定期間及び第2判定期間とを例示する図であるIt is a figure which illustrates the 1st determination period and the 2nd determination period. 第2実施形態の発電システムの構成を示す図である。It is a figure which shows the structure of the power generation system of 2nd Embodiment.

<第1実施形態>
以下に図面を参照して本発明の第1実施形態の発電システムについて説明する。
図1は、発電システムの構成を示す図である。図示するように、発電システムは、燃料電池装置10と電力負荷装置3と制御装置2とを備える。燃料電池装置10及び電力負荷装置3は、電力系統1に接続される電力線4に接続される。このように、燃料電池装置10は電力系統1と連系可能であり、電力負荷装置3は電力系統1及び燃料電池装置10の少なくとも一方から電力の供給を受けるように構成されている。制御装置2は、電力負荷装置3の負荷電力を賄うときの経済性を考慮して燃料電池装置10の発電電力を決定する機能を担う。
<First Embodiment>
The power generation system according to the first embodiment of the present invention will be described below with reference to the drawings.
FIG. 1 is a diagram showing a configuration of a power generation system. As shown in the figure, the power generation system includes a fuel cell device 10, a power load device 3, and a control device 2. The fuel cell device 10 and the power load device 3 are connected to a power line 4 connected to the power system 1. As described above, the fuel cell device 10 can be interconnected with the power system 1, and the power load device 3 is configured to receive power from at least one of the power system 1 and the fuel cell device 10. The control device 2 has a function of determining the generated power of the fuel cell device 10 in consideration of economic efficiency when supplying the load power of the power load device 3.

燃料電池装置10は、炭化水素を含む原燃料ガスを改質して得られる水素を利用して発電する。燃料電池装置10の動作は、制御装置2が制御する。本実施形態では、燃料電池装置10は、改質部12と燃料電池部11とを備える。改質部12は、例えば都市ガスなどの炭化水素(メタン等)を含む原燃料ガスを水蒸気改質して、水素を主成分とする燃料ガスを生成する。そして、改質部12で生成された燃料ガス(水素)は燃料電池部11に供給される。燃料電池部11は、改質部12で生成された燃料ガスが供給されるアノード(図示せず)及び酸素ガスが供給されるカソード(図示せず)を有する燃料電池11aと、その燃料電池11aで発生した電力を、所望の電圧、周波数、位相の電力に変換して電力線4に出力するための電力変換部11bとを備える。 The fuel cell device 10 generates electricity by using hydrogen obtained by reforming a raw fuel gas containing a hydrocarbon. The operation of the fuel cell device 10 is controlled by the control device 2. In the present embodiment, the fuel cell device 10 includes a reforming unit 12 and a fuel cell unit 11. The reforming unit 12 steam reforms a raw fuel gas containing a hydrocarbon (methane or the like) such as city gas to generate a fuel gas containing hydrogen as a main component. Then, the fuel gas (hydrogen) generated in the reforming section 12 is supplied to the fuel cell section 11. The fuel cell unit 11 includes a fuel cell 11a having an anode (not shown) to which the fuel gas generated by the reforming unit 12 is supplied and a cathode (not shown) to which oxygen gas is supplied, and the fuel cell 11a thereof. It is provided with a power conversion unit 11b for converting the power generated in the above into power of a desired voltage, frequency, and phase and outputting it to the power line 4.

電力線4の途中の、燃料電池装置10が接続されている箇所よりも上流側(電力系統1側)には、電力を計測する電力計測器CT1が設けられている。電力計測器CT1は、例えば電力線4における電力の電流値を検出するために用いられるカレントトランス(計器用変流器)を用いて構成され、所定の電圧値(例えば100V、200V等)との積から、電力線4での電力値を導出できる。尚、電力計測器CT2は電力線4での電力の電流値のみを制御装置2に伝達し、制御装置2が電力値の導出を行ってもよい。 A power measuring instrument CT1 for measuring electric power is provided on the upstream side (power system 1 side) of the middle of the power line 4 from the location to which the fuel cell device 10 is connected. The power measuring instrument CT1 is configured by using, for example, a current transformer (instrument transformer) used for detecting the current value of electric power in the power line 4, and is a product of a predetermined voltage value (for example, 100V, 200V, etc.). From, the power value in the power line 4 can be derived. The power measuring instrument CT2 may transmit only the current value of the power on the power line 4 to the control device 2, and the control device 2 may derive the power value.

電力負荷装置3の負荷電力と燃料電池装置10の発電電力(燃料電池装置10から電力線4に供給される電力)とが等しい場合、電力計測器CT1が計測する電力はゼロになる。よって、制御装置2は、燃料電池装置10の発電電力を、電力負荷装置3による負荷電力に追従した値に制御する場合、例えば電力計測器CT1が計測する電力がゼロになるように、燃料電池装置10に対して発電指令を与えればよい。尚、制御装置2は、燃料電池装置10の発電電力が、電力負荷装置3による負荷電力よりも所定値だけ小さい状態(即ち、電力計測器CT1が計測する電力が上記所定値になる状態)を維持して追従させるような制御を行ってもよい。 When the load power of the power load device 3 and the generated power of the fuel cell device 10 (power supplied from the fuel cell device 10 to the power line 4) are equal, the power measured by the power measuring instrument CT1 becomes zero. Therefore, when the control device 2 controls the generated power of the fuel cell device 10 to a value that follows the load power of the power load device 3, for example, the fuel cell so that the power measured by the power measuring instrument CT1 becomes zero. A power generation command may be given to the device 10. The control device 2 sets the state in which the generated power of the fuel cell device 10 is smaller than the load power of the power load device 3 by a predetermined value (that is, the power measured by the power measuring instrument CT1 becomes the predetermined value). Control may be performed so as to maintain and follow.

また、電力負荷装置3の負荷電力が燃料電池装置10の発電電力よりも大きい場合、即ち、不足電力が生じる場合には、電力計測器CT1が計測する電力は例えば正の値になり、その不足電力に相当する電力(買電電力)が電力系統1から供給されている。つまり、電力計測器CT1は買電電力を計測していることになる。
電力負荷装置3の負荷電力が燃料電池装置10の発電電力よりも小さい場合、即ち、余剰電力が生じる場合には、電力計測器CT1が計測する電力は例えば負の値になり、その余剰電力に相当する電力(売電電力)が燃料電池装置10から電力系統1へ供給されている。つまり、電力計測器CT1は売電電力を計測していることになる。
Further, when the load power of the power load device 3 is larger than the generated power of the fuel cell device 10, that is, when a shortage of power occurs, the power measured by the power measuring instrument CT1 becomes, for example, a positive value, and the shortage thereof. Electric power corresponding to electric power (purchased electric power) is supplied from the electric power system 1. That is, the power measuring instrument CT1 measures the purchased power.
When the load power of the power load device 3 is smaller than the generated power of the fuel cell device 10, that is, when surplus power is generated, the power measured by the power measuring instrument CT1 becomes, for example, a negative value, and the surplus power becomes The corresponding electric power (electricity sold) is supplied from the fuel cell device 10 to the electric power system 1. That is, the power measuring instrument CT1 measures the power sold.

加えて、本実施形態の発電システムは、燃料電池装置10で発電した電力を電力系統1へ売るときの売電料金情報を取得する売電料金情報取得装置8と、燃料電池装置10で発電するために要する発電料金情報を取得する発電料金情報取得装置9とを備える。 In addition, in the power generation system of the present embodiment, the power generation charge information acquisition device 8 for acquiring the power sale charge information when selling the power generated by the fuel cell device 10 to the power system 1 and the fuel cell device 10 generate power. It is provided with a power generation charge information acquisition device 9 for acquiring power generation charge information required for the purpose.

本実施形態の場合、燃料電池装置10は原燃料ガスを改質して得られる水素を利用して発電を行うため、その原燃料ガスの料金が発電するために要する料金であると言える。よって、発電料金情報は、発電単価としてのガス単価を含む。例えば、制御装置2は、燃料電池装置10で単位電力を発電するのに要するガス量(発電効率)とガス単価との積により、単位電力を発電するための金額、即ち発電単価を決定できる。尚、燃料電池装置10の発電効率はどの発電電力でも同じになる訳ではなく、例えば、発電電力が大きい方が燃料電池装置10の発電効率は高くなり、発電電力が小さくなるにつれて燃料電池装置10の発電効率は低くなる特性を示す。その場合、つまり、発電電力が大きい方が燃料電池装置10の発電単価は低くなり、発電電力が小さくなるにつれて燃料電池装置10の発電単価は高くなる。このような特性は記憶装置5に記憶されており、制御装置2はその特性を記憶装置5から読み出して、発電単価の決定の際に利用する。発電料金情報取得装置9は、インターネットなどの情報通信回線を介して、原燃料ガスの供給事業者からそのガス単価についての情報を取得する。発電料金情報取得装置9が取得した発電料金情報は制御装置2に伝達される。また、制御装置2は、その発電料金情報を記憶装置5に記憶させることもできる。そして、制御装置2は、燃料電池装置10の発電電力とその発電単価との積から、燃料電池装置10で発電するときの発電料金を導出できる。 In the case of the present embodiment, since the fuel cell device 10 generates electricity by using hydrogen obtained by reforming the raw material and fuel gas, it can be said that the charge of the raw material and fuel gas is the charge required for power generation. Therefore, the power generation charge information includes the gas unit price as the power generation unit price. For example, the control device 2 can determine the amount of money for generating the unit power, that is, the power generation unit price, by the product of the gas amount (power generation efficiency) required for the fuel cell device 10 to generate the unit power and the gas unit price. The power generation efficiency of the fuel cell device 10 is not the same for all generated powers. For example, the larger the generated power, the higher the power generation efficiency of the fuel cell device 10, and the smaller the generated power, the higher the power generation efficiency of the fuel cell device 10. Shows the characteristic that the power generation efficiency of is low. In that case, that is, the larger the generated power, the lower the power generation unit price of the fuel cell device 10, and the smaller the generated power, the higher the power generation unit price of the fuel cell device 10. Such characteristics are stored in the storage device 5, and the control device 2 reads the characteristics from the storage device 5 and uses them when determining the power generation unit price. The power generation charge information acquisition device 9 acquires information about the gas unit price from the raw fuel gas supplier via an information communication line such as the Internet. The power generation charge information acquired by the power generation charge information acquisition device 9 is transmitted to the control device 2. Further, the control device 2 can also store the power generation charge information in the storage device 5. Then, the control device 2 can derive the power generation charge when the fuel cell device 10 generates power from the product of the power generated by the fuel cell device 10 and the power generation unit price thereof.

売電料金情報取得装置8が取得する売電料金情報は、例えば売電単価であり、売電料金情報取得装置8はインターネットなどの情報通信回線を介して、電力の売却を受け付けている電気事業者等からその売電単価についての情報を取得する。売電料金情報取得装置8が取得した売電料金情報は制御装置2に伝達される。また、制御装置2は、その売電料金情報を記憶装置5に記憶させることもできる。そして、制御装置2は、電力系統1への売電電力とその売電単価との積から、燃料電池装置10の発電電力の一部を売電するときの売電料金を導出できる。 The power selling price information acquired by the power selling price information acquisition device 8 is, for example, the power selling unit price, and the power selling price information acquisition device 8 is an electric power business that accepts the sale of electric power via an information communication line such as the Internet. Obtain information about the unit price of electricity sold from a person or the like. The power sale charge information acquired by the power sale charge information acquisition device 8 is transmitted to the control device 2. Further, the control device 2 can also store the power sale charge information in the storage device 5. Then, the control device 2 can derive a power selling charge when selling a part of the generated power of the fuel cell device 10 from the product of the power sold to the power system 1 and the unit price of the power sold.

上述のように、電力負荷装置3には燃料電池装置10の発電電力を供給でき、燃料電池装置10の発電電力の少なくとも一部を電力系統1へ逆潮流させる(売電する)こともできる。そのため、電力負荷装置3に対して電力を供給する場合、(1)電力負荷装置3の負荷電力に追従させた電力を燃料電池装置10で発電し、その発電電力により負荷電力を賄うこと、(2)電力負荷装置3の負荷電力よりも大きい電力を燃料電池装置10で発電し、その発電電力により負荷電力を賄うとともに、余剰電力を電力系統1に売電すること、などの幾つかの運転パターンが考えられる。但し、燃料電池装置10から電力の供給を受けた場合(即ち、発電を行った場合)には発電料金が発生する。尚、燃料電池装置10で発電した電力を電力系統1へと逆潮流させた場合(即ち、売電を行った場合)には売電料金を得ることができる。このように、電力負荷装置3の負荷電力が同じであっても、燃料電池装置10の発電電力が変化すれば経済性も変化する可能性がある。 As described above, the electric power generated by the fuel cell device 10 can be supplied to the electric power load device 3, and at least a part of the generated electric power of the fuel cell device 10 can be reverse-flowed (sold) to the electric power system 1. Therefore, when supplying power to the power load device 3, (1) the fuel cell device 10 generates power that follows the load power of the power load device 3, and the generated power is used to cover the load power. 2) Some operations such as generating power larger than the load power of the power load device 3 with the fuel cell device 10, covering the load power with the generated power, and selling the surplus power to the power system 1. A pattern is possible. However, when power is supplied from the fuel cell device 10 (that is, when power is generated), a power generation fee is incurred. When the electric power generated by the fuel cell device 10 is reversely flowed to the electric power system 1 (that is, when the electric power is sold), the electric power selling charge can be obtained. As described above, even if the load power of the power load device 3 is the same, the economic efficiency may change if the generated power of the fuel cell device 10 changes.

但し、電力負荷装置3の負荷電力が相対的に小さい場合に、その負荷電力に等しい電力を燃料電池装置10で発電させようとすると(即ち、負荷追従させようとすると)、燃料電池11aの発電電力を相対的に小さくしなければならない(即ち、発電効率が低くなる)。その結果、燃料電池装置10の発電単価が相対的に大きくなる。尚、電力負荷装置3の負荷電力が相対的に小さい場合に、その負荷電力よりも大きい電力を燃料電池装置10で発電させることもできる。この場合、燃料電池装置10の発電電力を負荷追従させる場合に比べて燃料電池装置10での発電に要する総コストは大きくなるものの、発電効率が高くなるのに伴って発電単価が小さくなり、且つ、余剰電力を売電できるようになる。そのため、燃料電池装置10の発電電力を負荷追従させる場合に比べて、経済性が良くなる可能性もある。
このように、電力負荷装置3の負荷電力が相対的に小さい時期というのは、電力負荷装置3の負荷電力、燃料電池11aの発電電力及び発電単価、余剰電力及び売電単価などを考慮して、経済性が良くなるのは燃料電池装置10をどのように運転させた場合であるのかを検証することが好ましい時期であるとも言える。
However, when the load power of the power load device 3 is relatively small and the fuel cell device 10 tries to generate power equal to the load power (that is, when the load is followed), the power generation of the fuel cell 11a is generated. The power must be relatively low (ie, the power generation efficiency is low). As a result, the power generation unit price of the fuel cell device 10 becomes relatively large. When the load power of the power load device 3 is relatively small, the fuel cell device 10 can generate electric power larger than the load power. In this case, the total cost required for power generation in the fuel cell device 10 is higher than in the case where the generated power of the fuel cell device 10 is made to follow the load, but the power generation unit price becomes smaller as the power generation efficiency becomes higher, and the power generation unit price becomes smaller. , You will be able to sell surplus electricity. Therefore, there is a possibility that the economy will be improved as compared with the case where the generated power of the fuel cell device 10 is made to follow the load.
In this way, the period when the load power of the power load device 3 is relatively small takes into consideration the load power of the power load device 3, the power generation power and the power generation unit price of the fuel cell 11a, the surplus power, the power sale unit price, and the like. It can be said that it is a preferable time to verify how the fuel cell device 10 is operated to improve the economic efficiency.

それに対して、電力負荷装置3の負荷電力が相対的に大きい場合、その負荷電力の全てを燃料電池装置10の発電電力で賄おうとすると、燃料電池装置10の発電電力が大きくなることで発電に要する総コストは大きくなるものの、発電単価が相対的に小さい電力を電力負荷装置3に供給できる。つまり、電力負荷装置3の負荷電力が相対的に大きい場合には、負荷追従運転を行った場合の燃料電池装置10の発電単価と、定格発電電力を行って、余剰電力が発生すればその電力を売電する場合の燃料電池11aの発電単価とにそれほど大きな差が生じないと考えられるため、上述したような電力負荷装置3の負荷電力が相対的に小さい場合に比べて、経済性が良くなるのは燃料電池装置10をどのように運転させた場合であるのかを検証する必要性は低い。 On the other hand, when the load power of the power load device 3 is relatively large, if all of the load power is to be covered by the power generated by the fuel cell device 10, the power generated by the fuel cell device 10 becomes large, resulting in power generation. Although the total cost required is large, it is possible to supply the power load device 3 with electric power having a relatively small unit price of power generation. That is, when the load power of the power load device 3 is relatively large, the power generation unit price of the fuel cell device 10 when the load follow-up operation is performed and the rated power generation power are performed, and if surplus power is generated, that power is used. Since it is considered that there is not a large difference in the power generation unit price of the fuel cell 11a when selling power, it is more economical than the case where the load power of the power load device 3 as described above is relatively small. There is little need to verify how the fuel cell device 10 is operated.

そこで、本実施形態において制御装置2は、1日の中の所定の第1判定期間での電力負荷装置3による第1負荷電力と、第1判定期間とは異なる所定の第2判定期間での電力負荷装置3による第2負荷電力とを対比して、負荷電力が小さい方の判定期間を経済性の判定を行う経済性判定期間に設定し、負荷電力が大きい方の判定期間を経済性の判定を行わない非経済性判定期間に設定する第1処理と、第1処理で設定された経済性判定期間の開始前に、燃料電池装置10で発電するときの発電料金及び燃料電池装置10の発電電力の一部を売電するときの売電料金とを少なくとも考慮して、経済性判定期間での燃料電池装置10の発電電力を経済性判定期間において経済性が良くなる値に決定する第2処理とを行う。 Therefore, in the present embodiment, the control device 2 has a first load power by the power load device 3 in a predetermined first determination period in one day and a predetermined second determination period different from the first determination period. In comparison with the second load power by the power load device 3, the judgment period of the smaller load power is set as the economic judgment period for judging the economic efficiency, and the judgment period of the larger load power is the economical. Before the start of the first process set in the non-economical determination period in which the determination is not made and the economic efficiency determination period set in the first process, the power generation charge when the fuel cell device 10 generates electricity and the fuel cell device 10 The power generated by the fuel cell device 10 in the economic evaluation period is determined to be a value that improves the economic efficiency in the economic evaluation period, at least considering the power selling charge when selling a part of the generated power. 2 Processing is performed.

〔第1処理〕
図2は、1日の中の第1判定期間及び第2判定期間とを例示する図である。本実施形態では、第1判定期間は3時から12時までの9時間であり、第2判定期間は15時から24時までの9時間である。つまり、第1判定期間は昼間を主に含み、第2判定期間は夜間を主に含む。そして、制御装置2は、上述した第1処理において、第1判定期間での電力負荷装置3による第1負荷電力と第2判定期間での電力負荷装置3による第2負荷電力とを対比する。例えば、制御装置2は、第1判定期間及び第2判定期間の何れにも属さない時刻に(例えば1時等に)第1処理を行って、次に到来する第1判定期間及び第2判定期間のうち、何れを経済性判定期間に設定し、何れを非経済性判定期間に設定するのかを決定する。尚、制御装置2は、第1処理を適当なタイミングで定期的に行えばよい。例えば、制御装置2は、1日に1回、2週間に1回、1カ月に1回などの適当なタイミングで、第1処理を行うことができる。
[First process]
FIG. 2 is a diagram illustrating the first determination period and the second determination period in one day. In the present embodiment, the first determination period is 9 hours from 3:00 to 12:00, and the second determination period is 9 hours from 15:00 to 24:00. That is, the first determination period mainly includes the daytime, and the second determination period mainly includes the nighttime. Then, in the first process described above, the control device 2 compares the first load power by the power load device 3 in the first determination period with the second load power by the power load device 3 in the second determination period. For example, the control device 2 performs the first process at a time that does not belong to either the first determination period or the second determination period (for example, at 1 o'clock), and then the first determination period and the second determination that arrive next. It is determined which of the periods is set as the economic judgment period and which is set as the non-economic judgment period. The control device 2 may periodically perform the first process at an appropriate timing. For example, the control device 2 can perform the first processing at an appropriate timing such as once a day, once every two weeks, or once a month.

本実施形態では、発電システムは、電力負荷装置3による過去の負荷電力についての情報を取得する負荷電力情報取得装置6を備える。負荷電力情報取得装置6には、電力計測器CT2で計測される電力についての情報が伝達される。電力計測器CT2は、電力線4の途中に設けられ、電力負荷装置3に供給される電力を計測する。電力計測器CT2は、例えば電力線4における電力の電流値を検出するために用いられるカレントトランス(計器用変流器)を用いて構成され、所定の電圧値(例えば100V、200V等)との積から、電力線4での電力値を導出できる。尚、電力計測器CT2は電力線4での電力の電流値のみを負荷電力情報取得装置6に伝達し、負荷電力情報取得装置6が電力値の導出を行ってもよい。 In the present embodiment, the power generation system includes a load power information acquisition device 6 that acquires information about past load power by the power load device 3. Information about the electric power measured by the electric power measuring instrument CT2 is transmitted to the load electric power information acquisition device 6. The power measuring instrument CT2 is provided in the middle of the power line 4 and measures the power supplied to the power load device 3. The power measuring instrument CT2 is configured by using, for example, a current transformer (instrument transformer) used for detecting the current value of electric power in the power line 4, and is a product of a predetermined voltage value (for example, 100V, 200V, etc.). From, the power value in the power line 4 can be derived. The power measuring instrument CT2 may transmit only the current value of the power on the power line 4 to the load power information acquisition device 6, and the load power information acquisition device 6 may derive the power value.

上述のようにして負荷電力情報取得装置6が取得した情報は制御装置2に伝達され、記憶装置5に記憶される。そして、制御装置2は、負荷電力情報取得装置6が取得した電力負荷装置3による過去の負荷電力についての情報を参照して、電力負荷装置3による第1判定期間での第1負荷電力及び第2判定期間での第2負荷電力を決定する。このように、電力負荷装置3での過去の負荷電力についての情報を参照することで、第1負荷電力及び第2負荷電力の信頼性を高めることができる。例えば、制御装置2は、過去1週間での1日の中の第1判定期間(例えば、3時〜12時の間の9時間)の平均負荷電力と、第2判定期間(例えば、15時〜24時の間の9時間)の平均負荷電力とを対比する。そして、制御装置2は、負荷電力が小さい方の判定期間を経済性の判定を行う経済性判定期間に設定し、負荷電力が大きい方の判定期間を経済性の判定を行わない非経済性判定期間に設定する。よって、本実施形態では、第2判定期間よりも第1判定期間の方が大きいならば、使用者は、発電システムが設けられている家や事業所などの施設に昼間に滞在する昼間滞在型であると言える。それに対して、第1判定期間よりも第2判定期間の方が大きいならば、使用者は、発電システムが設けられている施設に夜間に滞在する夜間滞在型であると言える。 The information acquired by the load power information acquisition device 6 as described above is transmitted to the control device 2 and stored in the storage device 5. Then, the control device 2 refers to the information about the past load power by the power load device 3 acquired by the load power information acquisition device 6, and the first load power and the first load power in the first determination period by the power load device 3. 2 Determine the second load power in the determination period. In this way, by referring to the information about the past load power in the power load device 3, the reliability of the first load power and the second load power can be improved. For example, the control device 2 has the average load power of the first determination period (for example, 9 hours between 3:00 and 12:00) and the second determination period (for example, 15:00 to 24) in the day in the past week. Contrast with the average load power (9 hours between hours). Then, the control device 2 sets the determination period with the smaller load power as the economic efficiency determination period for determining the economic efficiency, and sets the determination period with the larger load power as the uneconomical determination period without determining the economic efficiency. Set to the period. Therefore, in the present embodiment, if the first judgment period is larger than the second judgment period, the user stays in the daytime at a facility such as a house or a business establishment where a power generation system is installed. It can be said that. On the other hand, if the second determination period is larger than the first determination period, it can be said that the user is a night stay type who stays at a facility provided with a power generation system at night.

〔第2処理〕
制御装置2は、第2処理において、第1処理で設定された経済性判定期間の開始前に、発電料金情報及び売電料金情報を参照して導出できる燃料電池装置10で発電するときの発電料金及び燃料電池装置10の発電電力の一部を売電するときの売電料金とを考慮して、経済性判定期間での燃料電池装置10の発電電力を、電力負荷装置3による負荷電力に追従した値に決定した場合と、所定の最大発電電力の値に決定した場合とのうち、経済性判定期間において経済性が良くなる方に決定する。ここで、制御装置2は、燃料電池装置10の発電電力とその発電単価との積から燃料電池装置10で発電するときの発電料金を導出でき、電力系統1への売電電力とその売電単価との積から燃料電池装置10の発電電力の一部を売電するときの売電料金を導出できる。
[Second process]
In the second process, the control device 2 generates power when the fuel cell device 10 that can derive power by referring to the power generation charge information and the power sale charge information before the start of the economic efficiency determination period set in the first process. Considering the charge and the power generation charge when selling a part of the generated power of the fuel cell device 10, the generated power of the fuel cell device 10 in the economic evaluation period is changed to the load power of the power load device 3. Of the case where the value is determined to follow and the case where the value is determined to be the predetermined maximum power generation value, it is determined which one is more economical in the economic efficiency determination period. Here, the control device 2 can derive the power generation charge when the fuel cell device 10 generates power from the product of the power generated by the fuel cell device 10 and the power generation unit price thereof, and the power sold to the power system 1 and the power sold thereof. From the product with the unit price, it is possible to derive the power selling charge when selling a part of the generated power of the fuel cell device 10.

そして、制御装置2は、売電料金情報取得装置8から伝達された売電料金情報及び発電料金情報取得装置9から伝達された発電料金情報を参照して、燃料電池装置10で発電するときの発電料金及び発電電力の一部を売電するときの売電料金とを考慮して、経済性判定期間での燃料電池装置10の発電電力を、電力負荷装置3による負荷電力に追従した値に決定した場合の経済性と、所定の最大発電電力の値に決定した場合の経済性とを導出できる。そして、制御装置2は、経済性判定期間での燃料電池装置10の発電電力を、経済性判定期間において経済性が良くなる値に決定する。 Then, when the control device 2 refers to the power sale charge information transmitted from the power sale charge information acquisition device 8 and the power generation charge information transmitted from the power generation charge information acquisition device 9, the fuel cell device 10 generates power. Considering the power generation charge and the power generation charge when selling a part of the generated power, the generated power of the fuel cell device 10 during the economic efficiency determination period is set to a value that follows the load power of the power load device 3. It is possible to derive the economic efficiency when the determination is made and the economic efficiency when the value of the predetermined maximum power generation is determined. Then, the control device 2 determines the generated power of the fuel cell device 10 in the economic efficiency determination period to a value that improves the economic efficiency in the economic efficiency determination period.

制御装置2は、経済性判定期間での燃料電池装置10の発電電力を、電力負荷装置3による負荷電力に追従した値に決定した場合、例えば電力計測器CT1が計測する電力がゼロになるように、燃料電池装置10に対して発電指令を与える。
それに対して、制御装置2は、経済性判定期間での燃料電池装置10の発電電力を所定の最大発電電力の値に決定した場合、燃料電池装置10の発電電力がその最大発電電力になるように燃料電池装置10に対して発電指令を与える。
When the control device 2 determines the generated power of the fuel cell device 10 in the economic efficiency determination period to a value that follows the load power of the power load device 3, for example, the power measured by the power measuring instrument CT1 becomes zero. Gives a power generation command to the fuel cell device 10.
On the other hand, when the control device 2 determines the power generation power of the fuel cell device 10 in the economical efficiency determination period to the value of the predetermined maximum power generation power, the power generation power of the fuel cell device 10 becomes the maximum power generation power. Gives a power generation command to the fuel cell device 10.

以上のように、制御装置2は、電力負荷装置3の負荷電力が小さくなる経済性判定期間に限って、即ち、経済性が良くなるのは燃料電池装置10をどのように運転させた場合であるのかを検証することが好ましい時期に限って上記第2処理を行う。その結果、経済性に基づいて燃料電池装置10の発電電力を随時決定することや、その決定に従って燃料電池装置10の起動・停止・発電電力変更など瞬時に行うことなどを行わなくてもよくなる。従って、適切なタイミングで、電力負荷装置3の負荷電力を賄うときの経済性が良くなるように燃料電池装置10の発電電力を決定できる発電システムを提供できる。 As described above, the control device 2 is limited to the economic efficiency determination period in which the load power of the power load device 3 becomes small, that is, the economic efficiency is improved when the fuel cell device 10 is operated. The second process is performed only at a time when it is preferable to verify the existence. As a result, it is not necessary to determine the generated power of the fuel cell device 10 at any time based on economic efficiency, and to instantly start / stop the fuel cell device 10 or change the generated power according to the determination. Therefore, it is possible to provide a power generation system capable of determining the generated power of the fuel cell device 10 so as to improve the economic efficiency when supplying the load power of the power load device 3 at an appropriate timing.

また、上記第1処理で設定された非経済性判定期間では、即ち、電力負荷装置3の負荷電力が相対的に大きい期間では、燃料電池装置10が負荷追従運転を行った場合に発電に要する総コストと、例えば燃料電池装置10が最大発電電力で発電を行って、余剰電力が発生すればその電力を売電する場合の総コストとの間にそれほど大きな差が生じないと考えられる。その結果、電力負荷装置3の負荷電力が相対的に大きい時期というのは、電力負荷装置3の負荷電力、燃料電池装置10の発電電力及び発電単価、余剰電力及び売電単価などを考慮して、経済性が良くなるのは燃料電池装置10をどのように運転させた場合であるのかを検証する必要性が低い時期であるとも言える。
そこで、本実施形態において制御装置2は、第2処理において、第1処理で設定された非経済性判定期間の開始前に、非経済性判定期間での燃料電池装置10の発電電力を、電力負荷装置3による負荷電力に追従した値又は所定の最大発電電力の値に決定する。そして、制御装置2は、例えば電力計測器CT1が計測する電力がゼロになるように、又は、燃料電池装置10の発電電力がその最大発電電力になるように、燃料電池装置10に対して発電指令を与える。これにより、経済性が大きく悪化しない状態で燃料電池装置10を運転させることができる。
Further, in the uneconomical determination period set in the first process, that is, in the period when the load power of the power load device 3 is relatively large, power generation is required when the fuel cell device 10 performs the load follow-up operation. It is considered that there is not a great difference between the total cost and, for example, the total cost when the fuel cell device 10 generates power with the maximum generated power and the surplus power is generated and the power is sold. As a result, the time when the load power of the power load device 3 is relatively large takes into consideration the load power of the power load device 3, the generated power and the unit price of the fuel cell device 10, the surplus power, the unit price of selling power, and the like. It can be said that the economic efficiency is improved at a time when it is not necessary to verify how the fuel cell device 10 is operated.
Therefore, in the present embodiment, in the second process, the control device 2 uses the generated power of the fuel cell device 10 in the uneconomical determination period before the start of the uneconomical determination period set in the first process. It is determined to be a value following the load power of the load device 3 or a predetermined maximum power generation power value. Then, the control device 2 generates power to the fuel cell device 10 so that, for example, the power measured by the power measuring device CT1 becomes zero, or the generated power of the fuel cell device 10 becomes the maximum generated power thereof. Give a command. As a result, the fuel cell device 10 can be operated in a state where the economic efficiency is not significantly deteriorated.

<第2実施形態>
第2実施形態の発電システムは、電力系統から供給される電力の買電料金も考慮して経済性を判定する点で上記実施形態と異なっている。以下に第2実施形態の発電システムについて説明するが、上記実施形態と同様の構成については説明を省略する。
<Second Embodiment>
The power generation system of the second embodiment is different from the above-described embodiment in that the economic efficiency is determined in consideration of the purchase price of the electric power supplied from the electric power system. The power generation system of the second embodiment will be described below, but the description of the same configuration as that of the above embodiment will be omitted.

図3は第2実施形態の発電システムの構成を示す図である。
本実施形態の発電システムは、電力負荷装置3の負荷電力を賄うために電力系統1から電力を購入するときの買電電力についての買電料金情報を取得する買電料金情報取得装置7を備えている。この買電料金情報は、例えば上記買電単価であり、買電料金情報取得装置7はインターネットなどの情報通信回線を介して、電力系統1に電力を供給している事業者(例えば電力会社等)からその買電単価についての情報を取得する。買電料金情報取得装置7が取得した買電料金情報は制御装置2に伝達される。また、制御装置2は、その買電料金情報を記憶装置5に記憶させることもできる。そして、制御装置2は、電力系統1からの買電電力とその買電単価との積から、電力系統1から電力の供給を受けるときの買電料金を導出できる。
FIG. 3 is a diagram showing the configuration of the power generation system of the second embodiment.
The power generation system of the present embodiment includes a power purchase charge information acquisition device 7 for acquiring power purchase charge information regarding the power purchase power when purchasing power from the power system 1 in order to cover the load power of the power load device 3. ing. This power purchase charge information is, for example, the above-mentioned power purchase unit price, and the power purchase charge information acquisition device 7 is a business operator (for example, an electric power company, etc.) that supplies power to the power system 1 via an information communication line such as the Internet. ) To obtain information about the unit price of electricity purchased. The power purchase charge information acquired by the power purchase charge information acquisition device 7 is transmitted to the control device 2. Further, the control device 2 can also store the power purchase charge information in the storage device 5. Then, the control device 2 can derive the power purchase charge when receiving the power supply from the power system 1 from the product of the power purchased from the power system 1 and the unit price of the power purchased.

電力負荷装置3に電力を供給する電源としては電力系統1及び燃料電池装置10の2つがあるため、電力負荷装置3は電力系統1及び燃料電池装置10のどちらからも電力供給を受けることができる。そのため、電力負荷装置3に対して電力を供給する場合、(1)燃料電池装置10の発電電力をゼロにして、電力負荷装置3の負荷電力の全てを電力系統1からの買電電力で賄うこと、(2)電力負荷装置3の負荷電力に等しい電力を燃料電池装置10で発電し、その発電電力により負荷電力を賄うこと、(3)電力負荷装置3の負荷電力よりも大きい電力を燃料電池装置10で発電し、その発電電力により負荷電力を賄うとともに、余剰電力を電力系統1に売電すること、などの幾つかの運転パターンが考えられる。但し、電力系統1から電力の供給を受けた場合(即ち、買電を行った場合)には買電料金が発生し、燃料電池装置10から電力の供給を受けた場合(即ち、発電を行った場合)には発電料金が発生する。尚、燃料電池装置10で発電した電力を電力系統1へと逆潮流させた場合(即ち、売電を行った場合)には売電料金を得ることができる。このように、電力負荷装置3の負荷電力が同じであっても、燃料電池装置10の発電電力が変化すれば経済性も変化する可能性がある。 Since there are two power sources for supplying electric power to the electric power load device 3, the electric power system 1 and the fuel cell device 10, the electric power load device 3 can receive electric power from both the electric power system 1 and the fuel cell device 10. .. Therefore, when supplying power to the power load device 3, (1) the generated power of the fuel cell device 10 is set to zero, and all the load power of the power load device 3 is covered by the power purchased from the power system 1. That, (2) power equal to the load power of the power load device 3 is generated by the fuel cell device 10, and the load power is covered by the generated power, (3) power larger than the load power of the power load device 3 is used as fuel. Several operation patterns are conceivable, such as generating power with the battery device 10, covering the load power with the generated power, and selling the surplus power to the power system 1. However, when power is supplied from the power system 1 (that is, when power is purchased), a power purchase fee is incurred, and when power is supplied from the fuel cell device 10 (that is, power generation is performed). In that case), a power generation fee will be incurred. When the electric power generated by the fuel cell device 10 is reversely flowed to the electric power system 1 (that is, when the electric power is sold), the electric power selling charge can be obtained. As described above, even if the load power of the power load device 3 is the same, the economic efficiency may change if the generated power of the fuel cell device 10 changes.

そして、制御装置2は、第2処理において、第1処理で設定された経済性判定期間の開始前に、買電料金情報及び発電料金情報及び売電料金情報を参照して導出できる、電力系統1から電力の供給を受けるときの買電料金と、燃料電池装置10で発電するときの発電料金及び発電電力の一部を売電するときの売電料金とを考慮して、経済性判定期間での燃料電池装置10の発電電力を、電力負荷装置3による負荷電力に追従した値に決定した場合と、所定の最大発電電力の値に決定した場合と、ゼロに決定した場合とのうち、経済性判定期間において経済性が良くなる方に決定する。 Then, in the second process, the control device 2 can derive the power system by referring to the power purchase charge information, the power generation charge information, and the power sale charge information before the start of the economic efficiency determination period set in the first process. Economical judgment period in consideration of the power purchase fee when receiving power supply from 1 and the power generation fee when generating power with the fuel cell device 10 and the power selling fee when selling a part of the generated power. When the power generation of the fuel cell device 10 in the above is determined to be a value that follows the load power of the power load device 3, the value of the predetermined maximum power generation is determined, or the value is determined to be zero. Decide which one will improve the economic efficiency during the economic efficiency judgment period.

<別実施形態>
<1>
上記実施形態では、発電システムの構成について具体例を挙げて説明したが、その構成については適宜変更可能である。
例えば、上記実施形態では、制御装置2が燃料電池装置10などと別体でなっている例を説明したが、制御装置2は燃料電池装置10の内部に設けられている制御ユニットと兼用でもよい。
<Another Embodiment>
<1>
In the above embodiment, the configuration of the power generation system has been described with specific examples, but the configuration can be changed as appropriate.
For example, in the above embodiment, the example in which the control device 2 is separate from the fuel cell device 10 and the like has been described, but the control device 2 may also be used as a control unit provided inside the fuel cell device 10. ..

<2>
上記実施形態では、第1判定期間及び第2判定期間について具体例を挙げて説明したが、それらの長さや時期は適宜変更可能である。また、上記実施形態では、第1判定期間及び第2判定期間が互いに時間的に重ならない場合について説明したが、第1判定期間と第2判定期間とは時間的に一部重なってもよい。
<2>
In the above embodiment, the first determination period and the second determination period have been described with specific examples, but their lengths and timings can be changed as appropriate. Further, in the above embodiment, the case where the first determination period and the second determination period do not overlap each other in time has been described, but the first determination period and the second determination period may partially overlap in time.

<3>
上記実施形態(別実施形態を含む、以下同じ)で開示される構成は、矛盾が生じない限り、他の実施形態で開示される構成と組み合わせて適用でき、また、本明細書において開示された実施形態は例示であって、本発明の実施形態はこれに限定されず、本発明の目的を逸脱しない範囲内で適宜改変できる。
<3>
The configurations disclosed in the above embodiment (including other embodiments, the same shall apply hereinafter) can be applied in combination with the configurations disclosed in other embodiments as long as there is no contradiction, and are also disclosed herein. The embodiment is an example, and the embodiment of the present invention is not limited to this, and can be appropriately modified without departing from the object of the present invention.

本発明は、適切なタイミングで、電力負荷装置の負荷電力を賄うときの経済性が良くなるように燃料電池装置の発電電力を決定できる発電システムに利用できる。 INDUSTRIAL APPLICABILITY The present invention can be used for a power generation system capable of determining the power generation of a fuel cell device so as to improve the economic efficiency when supplying the load power of the power load device at an appropriate timing.

1 電力系統
2 制御装置
3 電力負荷装置
4 電力線
5 記憶装置
6 負荷電力情報取得装置
7 買電料金情報取得装置
8 売電料金情報取得装置
9 発電料金情報取得装置
10 燃料電池装置
11 燃料電池部
11a 燃料電池
11b 電力変換部
12 改質部
CT1 電力計測部
CT2 電力計測部
1 Power system 2 Control device 3 Power load device 4 Power line 5 Storage device 6 Load power information acquisition device 7 Power purchase charge information acquisition device 8 Power sale charge information acquisition device 9 Power generation charge information acquisition device 10 Fuel cell device 11 Fuel cell unit 11a Fuel cell 11b Power conversion unit 12 Remodeling unit CT1 Power measurement unit CT2 Power measurement unit

Claims (5)

電力系統と連系可能であり、炭化水素を含む原燃料ガスを改質して得られる水素を利用して発電する燃料電池装置と、
前記電力系統及び前記燃料電池装置の少なくとも一方から電力の供給を受ける電力負荷装置と、
前記燃料電池装置の動作を制御する制御装置とを備え、
前記制御装置は、前記電力負荷装置の負荷電力を賄うときの経済性を考慮して前記燃料電池装置の発電電力を決定する発電システムであって、
前記制御装置は、
1日の中の所定の第1判定期間での前記電力負荷装置による第1負荷電力と、前記第1判定期間とは異なる所定の第2判定期間での前記電力負荷装置による第2負荷電力とを対比して、前記第1判定期間及び前記第2判定期間のうち、負荷電力が小さい方の判定期間を経済性判定期間に設定し、負荷電力が大きい方の判定期間を非経済性判定期間に設定
定された前記経済性判定期間の開始前に、前記燃料電池装置で発電するときの発電料金及び前記燃料電池装置の発電電力の一部を売電するときの売電料金とを少なくとも考慮して、前記経済性判定期間での前記燃料電池装置の発電電力を前記経済性判定期間において前記経済性が良くなる値に決定する発電システム。
A fuel cell device that can be interconnected with the power system and generates electricity using hydrogen obtained by reforming raw fuel gas containing hydrocarbons.
A power load device that receives power from at least one of the power system and the fuel cell device, and
A control device for controlling the operation of the fuel cell device is provided.
The control device is a power generation system that determines the generated power of the fuel cell device in consideration of economic efficiency when supplying the load power of the power load device.
The control device is
The first load power by the power load device in the predetermined first judgment period in one day and the second load power by the power load device in the predetermined second judgment period different from the first judgment period. in contrast to the one of the first determination period and the second determination period is set to a completion determination period after the judgment period towards the load power is small, non-economy determining determination period towards the load power is large set in the period,
Before the start of setting has been the economy determination period, selling and electricity rates by at least taking into account the time of electricity sold some of generated power of the generator charges and the fuel cell system at the time of power generation by the fuel cell device Te, power generation systems that determine the fuel the value economy is improved electric power generated in the economics determination period of the battery device in the economics determination period.
前記燃料電池装置で発電するために要する発電料金情報を取得する発電料金情報取得装置と、
前記燃料電池装置で発電した電力を前記電力系統へ売るときの売電料金情報を取得する売電料金情報取得装置とを備え、
前記制御装置は、設定された前記経済性判定期間の開始前に、前記発電料金情報及び前記売電料金情報を参照して導出できる前記燃料電池装置で発電するときの発電料金及び前記燃料電池装置の発電電力の一部を売電するときの売電料金とを考慮して、前記経済性判定期間での前記燃料電池装置の発電電力を、前記電力負荷装置による負荷電力に追従した値に決定した場合と、所定の最大発電電力の値に決定した場合とのうち、前記経済性判定期間において前記経済性が良くなる方に決定する請求項1に記載の発電システム。
A power generation charge information acquisition device that acquires power generation charge information required for power generation by the fuel cell device, and a power generation charge information acquisition device.
It is equipped with a power selling price information acquisition device for acquiring power selling price information when selling the power generated by the fuel cell device to the power system.
Wherein the control device, before the start of the set has been the economy determination period, the power generation rates and the fuel cell at the time of power generation by the fuel cell system can be derived by referring to the power rate information and the power sale fee information Considering the power generation fee when selling a part of the power generated by the device, the power generated by the fuel cell device during the economic efficiency determination period is set to a value that follows the load power by the power load device. The power generation system according to claim 1, wherein the power generation system is determined according to the case where the value is determined and the case where the value of the predetermined maximum power generation is determined, whichever is better in the economic efficiency determination period.
前記電力負荷装置の負荷電力を賄うために前記電力系統から電力を購入するときの買電電力についての買電料金情報を取得する買電料金情報取得装置と、
前記燃料電池装置で発電するために要する発電料金情報を取得する発電料金情報取得装置と、
前記燃料電池装置で発電した電力を前記電力系統へ売るときの売電料金情報を取得する売電料金情報取得装置とを備え、
前記制御装置は、設定された前記経済性判定期間の開始前に、前記買電料金情報及び前記発電料金情報及び前記売電料金情報を参照して導出できる、前記電力系統から電力の供給を受けるときの買電料金と、前記燃料電池装置で発電するときの発電料金及び発電電力の一部を売電するときの売電料金とを考慮して、前記経済性判定期間での前記燃料電池装置の発電電力を、前記電力負荷装置による負荷電力に追従した値に決定した場合と、所定の最大発電電力の値に決定した場合と、ゼロに決定した場合とのうち、前記経済性判定期間において前記経済性が良くなる方に決定する請求項1に記載の発電システム。
A power purchase charge information acquisition device for acquiring power purchase charge information for power purchase power when purchasing power from the power system in order to cover the load power of the power load device, and a power purchase charge information acquisition device.
A power generation charge information acquisition device that acquires power generation charge information required for power generation by the fuel cell device, and a power generation charge information acquisition device.
It is equipped with a power selling price information acquisition device for acquiring power selling price information when selling the power generated by the fuel cell device to the power system.
Wherein the control device, before the start of the set has been the economy determination period can be derived by referring to the power purchase fee information and the power rate information and the power selling charge information, the power supply from the power system Considering the power purchase fee when receiving, the power generation fee when generating power with the fuel cell device, and the power selling fee when selling a part of the generated power, the fuel cell in the economic evaluation period. The economic efficiency determination period includes the case where the power generation of the device is determined to be a value that follows the load power of the power load device, the case where the value is determined to be the predetermined maximum power generation value, and the case where the value is determined to be zero. The power generation system according to claim 1, wherein the power generation system is determined to be more economical.
前記制御装置は、設定された前記非経済性判定期間の開始前に、前記非経済性判定期間での前記燃料電池装置の発電電力を、前記電力負荷装置による負荷電力に追従した値又は所定の最大発電電力の値に決定する請求項1〜3の何れか一項に記載の発電システム。 Wherein the control device, before the start of the set have been the non-economical determination period, the generated power of the fuel cell device of the non-economical determination period, the value follows the load power by the power load device or predetermined The power generation system according to any one of claims 1 to 3, which is determined by the value of the maximum generated power of. 前記電力負荷装置による過去の負荷電力についての情報を取得する負荷電力情報取得装置を備え、
前記制御装置は、前記負荷電力情報取得装置が取得した前記電力負荷装置による過去の負荷電力についての情報を参照して、前記電力負荷装置による前記第1負荷電力及び前記第2負荷電力を決定する請求項1〜4の何れか一項に記載の発電システム。
A load power information acquisition device for acquiring information on past load power by the power load device is provided.
The control device determines the first load power and the second load power by the power load device with reference to the information about the past load power by the power load device acquired by the load power information acquisition device. The power generation system according to any one of claims 1 to 4.
JP2017172542A 2017-09-07 2017-09-07 Power generation system Active JP6979833B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017172542A JP6979833B2 (en) 2017-09-07 2017-09-07 Power generation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017172542A JP6979833B2 (en) 2017-09-07 2017-09-07 Power generation system

Publications (2)

Publication Number Publication Date
JP2019050648A JP2019050648A (en) 2019-03-28
JP6979833B2 true JP6979833B2 (en) 2021-12-15

Family

ID=65906009

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017172542A Active JP6979833B2 (en) 2017-09-07 2017-09-07 Power generation system

Country Status (1)

Country Link
JP (1) JP6979833B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7291096B2 (en) * 2020-03-30 2023-06-14 東京瓦斯株式会社 Power monitoring control device, power monitoring control program

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4650864B2 (en) * 2001-05-08 2011-03-16 大阪瓦斯株式会社 Cogeneration system operation control device
JP2006127967A (en) * 2004-10-29 2006-05-18 Ebara Ballard Corp Cogeneration system and its operation method
JP4553961B2 (en) * 2008-01-11 2010-09-29 中国電力株式会社 Energy supply system, energy type selection server, and energy supply method
JP5232266B2 (en) * 2011-04-21 2013-07-10 積水化学工業株式会社 Power control system

Also Published As

Publication number Publication date
JP2019050648A (en) 2019-03-28

Similar Documents

Publication Publication Date Title
JP6202403B2 (en) Power supply system
JP5807171B2 (en) Energy management system and power supply control device
JP6216377B2 (en) Power adjustment device, power adjustment method, power adjustment system, power storage device, server, program
EP3806265A1 (en) Device and method for intelligent control of power supply source connection
WO2008117392A1 (en) Power system
JP5945594B2 (en) Power supply system
JP6655805B2 (en) Energy management device and energy management method
WO2017077716A1 (en) Charging/discharging control device, charging/discharging control method, and program
KR20150062188A (en) Method and System for controlling generator output of islanded microgrids
JP4192131B2 (en) Power generation planning method and power generation planning apparatus using secondary battery
EP2830183B1 (en) Power consumption mode guiding device and system
JP6979833B2 (en) Power generation system
JP7335128B2 (en) Power distribution system and method
JP2013074704A (en) Control device and control method
JP7386029B2 (en) power supply system
Monteiro et al. Control, optimization, and management of vehicle electrification in modern power grids
JPH09312935A (en) Power storage type power supply system and power storage method
JP6541081B2 (en) Power supply system
JP6584774B2 (en) Power control system, power control apparatus, and power control method
JP6029356B2 (en) Combined heat and power system
JP6704479B2 (en) POWER SUPPLY SYSTEM, POWER SUPPLY DEVICE, AND POWER SUPPLY SYSTEM CONTROL METHOD
JP6313922B2 (en) Power selling system
JP2015076966A (en) Control device for power supply system using fuel cell, power supply system using fuel cell, and control method therefor
JP2016073073A (en) Power supply system
JP2004170049A (en) Cogeneration system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20200414

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20210224

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20210316

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20210510

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20211019

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20211116

R150 Certificate of patent or registration of utility model

Ref document number: 6979833

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150