Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4784354B2 - Compressor performance test method and compressor performance test apparatus - Google Patents
[go: Go Back, main page]

JP4784354B2 - Compressor performance test method and compressor performance test apparatus - Google Patents

Compressor performance test method and compressor performance test apparatus Download PDF

Info

Publication number
JP4784354B2
JP4784354B2 JP2006073212A JP2006073212A JP4784354B2 JP 4784354 B2 JP4784354 B2 JP 4784354B2 JP 2006073212 A JP2006073212 A JP 2006073212A JP 2006073212 A JP2006073212 A JP 2006073212A JP 4784354 B2 JP4784354 B2 JP 4784354B2
Authority
JP
Japan
Prior art keywords
gas
air
compressor
performance test
seal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2006073212A
Other languages
Japanese (ja)
Other versions
JP2007247566A (en
Inventor
浩 戸笈
光郎 小沼
直紀 西山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Corp
Original Assignee
IHI Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by IHI Corp filed Critical IHI Corp
Priority to JP2006073212A priority Critical patent/JP4784354B2/en
Publication of JP2007247566A publication Critical patent/JP2007247566A/en
Application granted granted Critical
Publication of JP4784354B2 publication Critical patent/JP4784354B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Control Of Positive-Displacement Pumps (AREA)

Description

本発明は圧縮機、特に酸素圧縮機の性能試験を実施する場合の圧縮機性能試験方法及び該圧縮機性能試験方法を実施する為の圧縮機性能試験装置に関するものである。   The present invention relates to a compressor performance test method for performing a performance test of a compressor, particularly an oxygen compressor, and a compressor performance test apparatus for performing the compressor performance test method.

圧縮機では、被圧縮ガスとしてのプロセスガス、軸封装置をシールするシールガスが供給され、圧縮性能、或は軸封装置のシール性能等種々の点についての性能を確認する為の性能試験が行われる。   In the compressor, a process gas as a gas to be compressed and a seal gas for sealing the shaft seal device are supplied, and a performance test for confirming the performance of various points such as the compression performance or the seal performance of the shaft seal device is performed. Done.

圧縮機の軸受部には圧縮されたプロセスガスの漏出を防止する為の軸封装置が設けられており、又軸封装置には非接触型のガス軸封装置、例えばラビリンス軸封装置が設けられる。   A shaft seal device for preventing leakage of compressed process gas is provided in the bearing portion of the compressor, and a non-contact type gas shaft seal device, for example, a labyrinth shaft seal device is provided in the shaft seal device. It is done.

斯かるガス軸封装置は性能試験の対象であり、該ガス軸封装置では、圧縮機内部から浸入するプロセスガスを軸封装置で圧力降下させ、更に軸封装置の端部に外部より高い圧力のシールガスを供給してプロセスガスの漏出を防止する様にしている。又、プロセスガスが酸素ガスである酸素圧縮機では、酸素ガスが爆発を誘引するので、特許文献1に示される様にシールガスとして不活性ガスである窒素ガスが用いられている。   Such a gas shaft seal device is an object of a performance test. In the gas shaft seal device, the process gas entering from the inside of the compressor is reduced in pressure by the shaft seal device, and further, a pressure higher than the outside is applied to the end of the shaft seal device. The sealing gas is supplied to prevent leakage of process gas. Further, in an oxygen compressor in which the process gas is oxygen gas, since oxygen gas induces explosion, nitrogen gas, which is an inert gas, is used as a seal gas as disclosed in Patent Document 1.

従来、酸素圧縮機の性能試験装置に於いて、性能試験を実施する場合、プロセスガスとして酸素ガスの代用ガスが用いられるが、湿度を含むと性能試験結果をプロセスガスに換算することが困難になるので、水分を含まない即ち湿度0の気体が用いられる。湿度0の気体としては窒素ガスが用いられ、又シールガスとしても実際の稼働状態と同様に窒素ガスが用いられている。   Conventionally, when performing a performance test in an oxygen compressor performance test apparatus, a substitute gas for oxygen gas is used as the process gas. However, if humidity is included, it is difficult to convert the performance test result into a process gas. Therefore, a gas that does not contain moisture, that is, a humidity of 0 is used. Nitrogen gas is used as the gas with a humidity of 0, and nitrogen gas is also used as the seal gas in the same manner as in the actual operation state.

先ず、図3により、酸素圧縮機のガス軸封装置の概略について説明する。   First, an outline of a gas shaft seal device of an oxygen compressor will be described with reference to FIG.

図中、1はインペラ、2は回転軸、3は軸受ブロックであり、前記インペラ1は前記回転軸2に固着され、該回転軸2はガス軸封装置4によりガスシールされている。   In the figure, 1 is an impeller, 2 is a rotating shaft, 3 is a bearing block, the impeller 1 is fixed to the rotating shaft 2, and the rotating shaft 2 is gas-sealed by a gas shaft sealing device 4.

該ガス軸封装置4はラビリンス軸封装置であり、前記回転軸2と一体に回転するブッシュ5とハウジング部6を有し、前記ブッシュ5と前記ハウジング部6間には所要段数のラビリンスシール部が形成され、例えば高圧側から第1ラビリンスシール部7、第2ラビリンスシール部8、第3ラビリンスシール部9、第4ラビリンスシール部10、第5ラビリンスシール部11、第6ラビリンスシール部12が形成されている。   The gas shaft seal device 4 is a labyrinth shaft seal device, and includes a bush 5 and a housing portion 6 that rotate integrally with the rotary shaft 2, and a required number of labyrinth seal portions between the bush 5 and the housing portion 6. For example, the first labyrinth seal portion 7, the second labyrinth seal portion 8, the third labyrinth seal portion 9, the fourth labyrinth seal portion 10, the fifth labyrinth seal portion 11, and the sixth labyrinth seal portion 12 are formed from the high pressure side. Is formed.

前記第1ラビリンスシール部7、第2ラビリンスシール部8、第3ラビリンスシール部9、第4ラビリンスシール部10、第5ラビリンスシール部11、第6ラビリンスシール部12、それぞれの間には圧溜室13,14,15,16,17が形成され、該圧溜室13,14,15にはプロセスガス回収ライン18が接続され、前記圧溜室16には大気パージライン19が接続され、前記圧溜室17にはシールガス供給ライン21が接続されている。   The first labyrinth seal portion 7, the second labyrinth seal portion 8, the third labyrinth seal portion 9, the fourth labyrinth seal portion 10, the fifth labyrinth seal portion 11, and the sixth labyrinth seal portion 12 are respectively pressed. Chambers 13, 14, 15, 16, and 17 are formed, a process gas recovery line 18 is connected to the pressure chambers 13, 14, and 15, and an atmospheric purge line 19 is connected to the pressure chamber 16. A seal gas supply line 21 is connected to the pressure chamber 17.

前記ガス軸封装置4では、前記プロセスガス回収ライン18より漏出したプロセスガスが回収され、前記圧溜室17にはシールガスである窒素ガスが外部圧力より高い圧力で供給される。シールガスは前記圧溜室17から外部に漏出すると共に前記圧溜室16に流入し、該圧溜室16から前記大気パージライン19を介してプロセスガスとシールガスが吸引され、大気中に放出される。   In the gas shaft seal device 4, the process gas leaked from the process gas recovery line 18 is recovered, and nitrogen gas as a seal gas is supplied to the pressure chamber 17 at a pressure higher than the external pressure. The seal gas leaks out from the pressure chamber 17 and flows into the pressure chamber 16, and the process gas and the seal gas are sucked from the pressure chamber 16 through the atmospheric purge line 19 and released into the atmosphere. Is done.

従って、上記ガス軸封装置4により軸受部がガスシールされ、プロセスガスが漏出することはない。   Therefore, the bearing portion is gas-sealed by the gas shaft seal device 4 so that the process gas does not leak out.

次に、従来の酸素圧縮機性能試験装置22について図4により説明する。   Next, a conventional oxygen compressor performance test apparatus 22 will be described with reference to FIG.

図4は2段に圧縮する1段圧縮機23、2段圧縮機24を具備した酸素圧縮機25を示しており、前記1段圧縮機23、前記2段圧縮機24はモータ26によりギアボックス27を介して駆動される様になっている。前記1段圧縮機23、前記2段圧縮機24の軸受部には上記したガス軸封装置4,4が設けられている。   FIG. 4 shows an oxygen compressor 25 having a first stage compressor 23 and a second stage compressor 24 for compressing in two stages. The first stage compressor 23 and the second stage compressor 24 are driven by a motor 26 into a gear box. 27 is driven. The above-described gas shaft seal devices 4 and 4 are provided at bearing portions of the first-stage compressor 23 and the second-stage compressor 24.

尚、図中、28,29は圧縮により昇温したプロセスガスを冷却する為の冷却器である。又該冷却器29と前記1段圧縮機23の入側とはバイパスライン31により接続され、該バイパスライン31には圧力調整弁32が設けられている。前記酸素圧縮機25が実際に設備された状態では、所要圧力に圧縮されたプロセスガスは前記冷却器29から、所要の用途、例えば製鉄の燃焼用ガスとして供される。   In the figure, reference numerals 28 and 29 denote coolers for cooling the process gas heated by compression. The cooler 29 and the inlet side of the first stage compressor 23 are connected by a bypass line 31, and a pressure regulating valve 32 is provided in the bypass line 31. In a state where the oxygen compressor 25 is actually installed, the process gas compressed to a required pressure is supplied from the cooler 29 as a required application, for example, a combustion gas for iron making.

前記バイパスライン31は、前記酸素圧縮機25のメンテナンス時の被供給側設備との切離しに使用され、前記バイパスライン31は、前記冷却器29から吐出されるプロセスガスを前記1段圧縮機23に循環させる場合の圧力調整等に使用される。   The bypass line 31 is used for disconnecting from the supply-side equipment during maintenance of the oxygen compressor 25, and the bypass line 31 supplies process gas discharged from the cooler 29 to the first-stage compressor 23. Used for pressure adjustment when circulating.

又、図4に於いて、35は窒素ガス供給源であり、該窒素ガス供給源35はシールガス供給ライン36を介して前記ガス軸封装置4,4に接続され、プロセスガス供給ライン37を介して前記1段圧縮機23の入側に接続されている。前記プロセスガス供給ライン37には、安全弁38が設けられており、前記プロセスガス供給ライン37の圧力が所定圧以上とならない様に設定されている。   In FIG. 4, reference numeral 35 denotes a nitrogen gas supply source. The nitrogen gas supply source 35 is connected to the gas shaft sealing devices 4 and 4 via a seal gas supply line 36, and a process gas supply line 37 is connected to the gas shaft seal device 4. Via the inlet side of the first stage compressor 23. The process gas supply line 37 is provided with a safety valve 38 so that the pressure of the process gas supply line 37 does not exceed a predetermined pressure.

前記窒素ガス供給源35としては、例えば窒素ガスボンベを所要数用意したものであり、或は液化窒素ガスのタンクローリを用意したものである。   As the nitrogen gas supply source 35, for example, a required number of nitrogen gas cylinders are prepared, or a tank truck of liquefied nitrogen gas is prepared.

前記酸素圧縮機25の性能試験を行う場合は、前記モータ26により前記1段圧縮機23、前記2段圧縮機24が駆動され、前記窒素ガス供給源35から前記プロセスガス供給ライン37を介して前記1段圧縮機23にプロセス代用ガスとして窒素ガスが供給され、又前記シールガス供給ライン36を介して前記ガス軸封装置4,4にシールガスが供給される。前記2段圧縮機24で圧縮され、前記冷却器29で冷却されたプロセス代用ガスは、前記バイパスライン31を介して前記1段圧縮機23に循環される。又、循環で不足するプロセス代用ガスは前記プロセスガス供給ライン37により補給される。   When performing a performance test of the oxygen compressor 25, the first stage compressor 23 and the second stage compressor 24 are driven by the motor 26, and the nitrogen gas supply source 35 passes through the process gas supply line 37. Nitrogen gas is supplied to the first-stage compressor 23 as a process substitute gas, and seal gas is supplied to the gas shaft seal devices 4 and 4 through the seal gas supply line 36. The process substitute gas compressed by the two-stage compressor 24 and cooled by the cooler 29 is circulated to the first-stage compressor 23 via the bypass line 31. Further, the process substitute gas that is insufficient in circulation is replenished by the process gas supply line 37.

而して、前記酸素圧縮機25の圧縮性能、処理ガス量等についての性能試験が行われると共に前記ガス軸封装置4のシール性能が試験される。   Thus, a performance test on the compression performance of the oxygen compressor 25, a processing gas amount, and the like is performed, and a sealing performance of the gas shaft seal device 4 is tested.

上記従来の圧縮機性能試験装置に於いては、シールガス、プロセス代用ガスは、いずれも同一の前記窒素ガス供給源35から供給される様になっており、又供給されるシールガスは大気中に放出され、而も大量に消費される。その消費量は、処理風量が20000normal m/h程度の小型の酸素圧縮機25であっても、300m/hと膨大な消費量であり、ランニングコストが極めて高いものとなっていた。又、窒素ガスを必要量確保することが容易ではなく、充分な窒素ガスの確保から試験日程の制約を受けることもあった。 In the conventional compressor performance test apparatus, the seal gas and the process substitute gas are both supplied from the same nitrogen gas supply source 35, and the supplied seal gas is in the atmosphere. Is released and consumed in large quantities. The amount of consumption is a huge amount of consumption of 300 m 3 / h even with a small oxygen compressor 25 having a processing air volume of about 20000 normal m 3 / h, and the running cost is extremely high. In addition, it is not easy to secure the necessary amount of nitrogen gas, and there are cases where the test schedule is restricted by securing sufficient nitrogen gas.

更に、大型の酸素圧縮機では、窒素ガスの消費量が多くなりすぎて、消費に合せてガスを供給することが困難である為、現状では性能試験を行っていない。   Furthermore, since a large-sized oxygen compressor consumes too much nitrogen gas and it is difficult to supply gas according to consumption, a performance test is not currently performed.

然し乍ら、顧客要求として大型の酸素圧縮機についても性能試験を行うことの要請が多く、大型の酸素圧縮機について性能試験を実施する場合には、膨大な窒素ガスの消費量に見合う窒素ガス供給源としてタンク設備を新設する等の必要があり、又膨大な窒素ガスの消費により性能試験に掛るコストが非常に高価なものとなるという問題を有していた。   However, there are many requests from customers to perform performance tests on large oxygen compressors, and when performing performance tests on large oxygen compressors, a nitrogen gas supply source commensurate with the huge amount of nitrogen gas consumed. As a result, it is necessary to install a new tank facility, etc., and there is a problem that the cost for the performance test becomes very expensive due to the consumption of a large amount of nitrogen gas.

尚、酸素圧縮機の軸封装置としては特許文献1に示されるものがあり、又圧縮機性能試験装置としては特許文献2に示されるものがある。   In addition, there exists a thing shown by patent document 1 as a shaft seal apparatus of an oxygen compressor, and there exists a thing shown by patent document 2 as a compressor performance test apparatus.

特開2000−205414号公報JP 2000-205414 A

特開平11−6483号公報Japanese Patent Laid-Open No. 11-6483

本発明は斯かる実情に鑑み、窒素ガスを使用することなく圧縮機性能試験が行える様にし、圧縮機性能試験のコストの低減を図ると共に窒素ガスの確保に起因する制約を解消するものである。   In view of such circumstances, the present invention makes it possible to perform a compressor performance test without using nitrogen gas, to reduce the cost of the compressor performance test, and to eliminate restrictions caused by securing of nitrogen gas. .

本発明は、被圧縮ガスとしてプロセスガスを供給し、軸封装置にシールガスを供給して性能試験を行う圧縮機性能試験方法に於いて、大気中から空気を吸引圧縮し、空気中の水分を除去して乾燥させ、乾燥させた空気を少なくともシールガスとして前記軸封装置に供給する様にした圧縮機性能試験方法に係るものである。   The present invention relates to a compressor performance test method in which a process gas is supplied as a gas to be compressed, a seal gas is supplied to a shaft seal device, and a performance test is performed. This is a compressor performance test method in which air is removed and dried, and dried air is supplied to the shaft seal device as at least a sealing gas.

又本発明は、被圧縮ガスとしてプロセスガスを供給し、軸封装置にシールガスを供給して性能試験を行う圧縮機性能試験方法に於いて、大気中から空気を吸引圧縮し、空気中の水分を除去して乾燥させ、乾燥させた空気をプロセスガスとして圧縮機に供給すると共にシールガスとして前記軸封装置に供給する様にした圧縮機性能試験方法に係るものである。   Further, the present invention provides a compressor performance test method in which a process gas is supplied as a gas to be compressed and a seal gas is supplied to a shaft seal device to perform a performance test. The present invention relates to a compressor performance test method in which moisture is removed and dried, and dried air is supplied as a process gas to the compressor and as a seal gas to the shaft seal device.

又本発明は、圧縮機のガス軸封装置にシールガスを供給するシールガス供給ラインに圧縮機性能試験装置が接続され、該圧縮機性能試験装置は大気中から空気を吸引圧縮する空気圧縮装置と、空気中の水分を除去する乾燥手段と、空気中の油分を除去するオイルミスト除去器とを具備し、乾燥空気を前記シールガス供給ラインを介して前記ガス軸封装置に供給する様構成した圧縮機性能試験装置に係るものである。   According to the present invention, a compressor performance test device is connected to a seal gas supply line for supplying a seal gas to a gas shaft seal device of the compressor, and the compressor performance test device sucks and compresses air from the atmosphere. And a drying means for removing moisture in the air and an oil mist remover for removing oil in the air, and supplying the dry air to the gas shaft seal device via the seal gas supply line This relates to the compressor performance testing apparatus.

又本発明は、圧縮機のガス軸封装置にシールガスを供給するシールガス供給ライン及びプロセスガス供給ラインに圧縮機性能試験装置が接続され、該圧縮機性能試験装置は大気中から空気を吸引圧縮する空気圧縮装置と、空気中の水分を除去する乾燥手段と、空気中の油分を除去するオイルミスト除去器とを具備し、乾燥空気をシールガスとして前記シールガス供給ラインを介して前記ガス軸封装置に供給すると共にプロセスガスとして前記プロセスガス供給ラインに供給する様構成した圧縮機性能試験装置に係るものである。   Further, according to the present invention, a compressor performance test device is connected to a seal gas supply line and a process gas supply line for supplying seal gas to a gas shaft seal device of the compressor, and the compressor performance test device sucks air from the atmosphere. An air compression device for compressing, a drying means for removing moisture in the air, and an oil mist remover for removing oil in the air, and the gas through the seal gas supply line using dry air as a seal gas The present invention relates to a compressor performance test apparatus configured to be supplied to a shaft seal device and supplied to the process gas supply line as a process gas.

更に又本発明は、前記空気圧縮機はギアボックスを介して駆動され、該ギアボックス内部は負圧にされ、該ギアボックスで発生したオイルミストの圧縮空気への混入を防止した圧縮機性能試験装置に係るものである。   Furthermore, the present invention is a compressor performance test in which the air compressor is driven through a gear box, the inside of the gear box is set to a negative pressure, and mixing of oil mist generated in the gear box into the compressed air is prevented. It concerns the device.

本発明によれば、被圧縮ガスとしてプロセスガスを供給し、軸封装置にシールガスを供給して性能試験を行う圧縮機性能試験方法に於いて、大気中から空気を吸引圧縮し、空気中の水分を除去して乾燥させ、乾燥させた空気を少なくともシールガスとして前記軸封装置に供給する様にしたので、圧縮機性能試験に必要なシールガスを必要量充分に用意でき、シールガスの確保に制約を受けることがなく、更にシールガスを消費することによるコストの発生がなく、ランニングコストを大幅に低減することができる。   According to the present invention, in a compressor performance test method in which a process gas is supplied as a gas to be compressed and a seal gas is supplied to a shaft seal device to perform a performance test. The water was removed and dried, and the dried air was supplied to the shaft seal device as at least a seal gas, so that a sufficient amount of seal gas required for the compressor performance test could be prepared, There is no restriction in securing, and no cost is generated due to consumption of the sealing gas, and the running cost can be greatly reduced.

又本発明によれば、被圧縮ガスとしてプロセスガスを供給し、軸封装置にシールガスを供給して性能試験を行う圧縮機性能試験方法に於いて、大気中から空気を吸引圧縮し、空気中の水分を除去して乾燥させ、乾燥させた空気をプロセスガスとして圧縮機に供給すると共にシールガスとして前記軸封装置に供給する様にしたので、圧縮機性能試験に必要なシールガス、プロセスガスを必要量充分に用意でき、シールガス、プロセスガスの確保に制約を受けることがなく、更にシールガス、プロセスガスを消費することによるコストの発生がなく、ランニングコストを大幅に低減することができる。   According to the present invention, in a compressor performance test method for performing a performance test by supplying a process gas as a gas to be compressed and supplying a seal gas to a shaft seal device, air is sucked and compressed from the atmosphere, Since moisture was removed and dried, and the dried air was supplied to the compressor as a process gas and to the shaft seal device as a seal gas, the seal gas and process required for the compressor performance test A sufficient amount of gas can be prepared, there is no restriction on securing of sealing gas and process gas, and there is no cost generation due to consumption of sealing gas and process gas, and running cost can be greatly reduced. it can.

又本発明によれば、圧縮機のガス軸封装置にシールガスを供給するシールガス供給ラインに圧縮機性能試験装置が接続され、該圧縮機性能試験装置は大気中から空気を吸引圧縮する空気圧縮装置と、空気中の水分を除去する乾燥手段と、空気中の油分を除去するオイルミスト除去器とを具備し、乾燥空気を前記シールガス供給ラインを介して前記ガス軸封装置に供給する様構成したので、圧縮機性能試験に必要なシールガスを必要量充分に用意でき、シールガスの確保に制約を受けることがなく、更にシールガスを消費することによるコストの発生がなく、ランニングコストを大幅に低減することができる。   According to the invention, the compressor performance test device is connected to the seal gas supply line that supplies the seal gas to the gas shaft seal device of the compressor, and the compressor performance test device is an air that sucks and compresses air from the atmosphere. A compression device, a drying means for removing moisture in the air, and an oil mist remover for removing oil in the air are provided, and dry air is supplied to the gas shaft seal device via the seal gas supply line. As a result, the required amount of seal gas for the compressor performance test can be prepared sufficiently, there is no restriction on securing the seal gas, and there is no cost generation due to consumption of the seal gas. Can be greatly reduced.

又本発明によれば、圧縮機のガス軸封装置にシールガスを供給するシールガス供給ライン及びプロセスガス供給ラインに圧縮機性能試験装置が接続され、該圧縮機性能試験装置は大気中から空気を吸引圧縮する空気圧縮装置と、空気中の水分を除去する乾燥手段と、空気中の油分を除去するオイルミスト除去器とを具備し、乾燥空気をシールガスとして前記シールガス供給ラインを介して前記ガス軸封装置に供給すると共にプロセスガスとして前記プロセスガス供給ラインに供給する様構成したので、圧縮機性能試験に必要なシールガス、プロセスガスを必要量充分に用意でき、シールガス、プロセスガスの確保に制約を受けることがなく、更にシールガス、プロセスガスを消費することによるコストの発生がなく、ランニングコストを大幅に低減することができる。   According to the present invention, the compressor performance test device is connected to the seal gas supply line and the process gas supply line for supplying the seal gas to the gas shaft seal device of the compressor, and the compressor performance test device is connected to the air from the atmosphere. An air compressor for sucking and compressing air, a drying means for removing moisture in the air, and an oil mist remover for removing oil in the air, and using dry air as a seal gas via the seal gas supply line Since the gas shaft seal device is supplied to the process gas supply line as a process gas, a sufficient amount of seal gas and process gas necessary for the compressor performance test can be prepared. There are no restrictions on securing the system, and there is no cost associated with consuming seal gas and process gas, greatly increasing running costs. It can be reduced.

更に又本発明によれば、前記空気圧縮機はギアボックスを介して駆動され、該ギアボックス内部は負圧にされ、該ギアボックスで発生したオイルミストの圧縮空気への混入を防止したので、前記オイルミスト除去器の負担が軽減され、オイルミスト除去性能が長期に亘って維持できる等の優れた効果を発揮する。   Furthermore, according to the present invention, the air compressor is driven through a gear box, the inside of the gear box is made negative pressure, and oil mist generated in the gear box is prevented from being mixed into the compressed air. The load of the oil mist remover is reduced, and the oil mist removal performance can be maintained over a long period of time.

以下、図面を参照しつつ本発明を実施する為の最良の形態を説明する。   The best mode for carrying out the present invention will be described below with reference to the drawings.

図1は本発明に係る圧縮機性能試験装置の概略を示すものであり、図1中、図4中で示したものと同等のものには同符号を付し、その説明を省略する。   FIG. 1 shows an outline of a compressor performance test apparatus according to the present invention. In FIG. 1, the same components as those shown in FIG.

シールガス供給ライン36、プロセスガス供給ライン37にエアバルブ39、エアバルブ40を介して圧縮機性能試験装置41が接続される。該圧縮機性能試験装置41は、空気を圧縮乾燥させ、酸素圧縮機25にシールガスとして、又プロセスガスとして供給し、性能試験を実施するものである。   A compressor performance test apparatus 41 is connected to the seal gas supply line 36 and the process gas supply line 37 via an air valve 39 and an air valve 40. The compressor performance test apparatus 41 compresses and drys air and supplies the oxygen compressor 25 as a seal gas and a process gas to perform a performance test.

前記圧縮機性能試験装置41は主に、空気圧縮装置42、冷凍式ドライヤ43、フィルタユニット44等から構成されている。   The compressor performance test apparatus 41 mainly includes an air compressor 42, a refrigeration dryer 43, a filter unit 44, and the like.

前記空気圧縮装置42は、空気圧縮機45がモータ46によりギアボックス47を介して駆動される様になっており、該ギアボックス47には真空ポンプ48が接続され、該真空ポンプ48により前記ギアボックス47内部が負圧になる様に吸引され、該ギアボックス47内部の圧力は圧力検出器49によって検出され、該圧力検出器49が検出した圧力は該圧力検出器49の表示部或は別途モニタ(図示せず)によって表示され、作業者は表示された圧力から前記ギアボックス47内の圧力を監視できる様になっている。該ギアボックス47内を負圧にすることで、該ギアボックス47内で発生したオイルミストが圧縮空気内に混入することを防止する。   The air compressor 42 is configured such that an air compressor 45 is driven by a motor 46 via a gear box 47, and a vacuum pump 48 is connected to the gear box 47, and the gears 47 are used to The inside of the box 47 is sucked so as to become a negative pressure, the pressure inside the gear box 47 is detected by a pressure detector 49, and the pressure detected by the pressure detector 49 is displayed on the display of the pressure detector 49 or separately. Displayed by a monitor (not shown), the operator can monitor the pressure in the gear box 47 from the displayed pressure. By making the pressure in the gear box 47 negative, oil mist generated in the gear box 47 is prevented from entering the compressed air.

前記空気圧縮機45の吐出側は、エアバルブ51を介して前記冷凍式ドライヤ43に接続されている。該冷凍式ドライヤ43は、空気中の水分を物理的に除去するものであり、空気を冷却し空気中の水分を結露させ、結露した水はドレン52を介して前記冷凍式ドライヤ43外に排出する。尚、該冷凍式ドライヤ43から吐出される空気の出口での露点は、前記酸素圧縮機25が供給するプロセスガスの圧力によって決定され、例えば供給されるプロセスガスの圧力が2.9MPa〜3.5MPaの時には、露点は−40℃at0.8MPaである。   The discharge side of the air compressor 45 is connected to the refrigeration dryer 43 via an air valve 51. The refrigeration dryer 43 physically removes moisture in the air, cools the air and condenses the moisture in the air, and the condensed water is discharged out of the refrigeration dryer 43 through a drain 52. To do. The dew point at the outlet of the air discharged from the refrigeration dryer 43 is determined by the pressure of the process gas supplied by the oxygen compressor 25. For example, the pressure of the supplied process gas is 2.9 MPa to 3. At 5 MPa, the dew point is −40 ° C. at 0.8 MPa.

前記フィルタユニット44は前記冷凍式ドライヤ43に接続されたエアバルブ53、結露した水を除去する水分除去器54、吸着式エアドライヤ55、オイルミスト除去器56、前記シールガス供給ライン36、前記プロセスガス供給ライン37に接続されたエアバルブ57から構成されている。   The filter unit 44 includes an air valve 53 connected to the refrigeration dryer 43, a moisture remover 54 for removing condensed water, an adsorption air dryer 55, an oil mist remover 56, the seal gas supply line 36, and the process gas supply. The air valve 57 is connected to the line 37.

前記水分除去器54は、前記冷凍式ドライヤ43から送出される空気から、結露した水滴、ミスト状の水を障害物に衝突させる等して水滴化し物理的に除去する。前記吸着式エアドライヤ55は、少なくとも1組、好ましくは2組以上の吸着ユニット58a,58bを具備し、該吸着ユニット58a,58bには水分吸着剤として、例えばシリカゲル等の乾燥剤を充填し、該乾燥剤によって空気中の水分を化学的に吸収除去する。尚、前記冷凍式ドライヤ43によって充分水分を除去できれば、前記水分除去器54は省略できる。   The moisture remover 54 is physically removed from the air sent from the refrigeration dryer 43 by causing condensed water droplets and mist-like water to collide with an obstacle to form water droplets. The adsorption type air dryer 55 includes at least one set, preferably two or more sets of adsorption units 58a and 58b, and the adsorption units 58a and 58b are filled with a desiccant such as silica gel as a moisture adsorbent, The moisture in the air is chemically absorbed and removed by the desiccant. If the refrigeration dryer 43 can sufficiently remove moisture, the moisture remover 54 can be omitted.

又、該水分除去器54を通過した空気は前記吸着ユニット58a,58bの一方、例えば吸着ユニット58aを通過する様になっており、他方の吸着ユニット58bは予備となっている。前記吸着ユニット58aの水分吸着作用が低減した場合に、流路の切換えが行われ該吸着ユニット58aが取外し可能となり、前記吸着ユニット58bにより水分除去が行われると共に、前記吸着ユニット58aの乾燥剤を新しいものと交換できる様になっている。従って、前記酸素圧縮機25の性能試験を停止、或は中断することなく前記吸着ユニット58a,58bの乾燥剤の交換が可能である。   The air passing through the moisture remover 54 passes through one of the adsorption units 58a and 58b, for example, the adsorption unit 58a, and the other adsorption unit 58b is reserved. When the moisture adsorption action of the adsorption unit 58a is reduced, the flow path is switched and the adsorption unit 58a can be removed, moisture is removed by the adsorption unit 58b, and the desiccant of the adsorption unit 58a is removed. It can be exchanged for a new one. Accordingly, the desiccant of the adsorption units 58a and 58b can be replaced without stopping or interrupting the performance test of the oxygen compressor 25.

前記オイルミスト除去器56はフィルタを有し、圧縮空気がフィルタを通過することで、圧縮空気中のオイルミストがフィルタにより除去される。   The oil mist remover 56 has a filter, and the oil mist in the compressed air is removed by the filter when the compressed air passes through the filter.

前記オイルミスト除去器56のオイルミスト除去能力としては、例えば入側の油分が30wtppmである時、出口油分は0.003wtppmに低減する能力を持っている。   As the oil mist removing capability of the oil mist remover 56, for example, when the oil content on the inlet side is 30 wtppm, the oil content at the outlet has the capability to be reduced to 0.003 wtppm.

前記エアバルブ51と前記冷凍式ドライヤ43との間にはエアバルブ61を介して圧力調整ライン62が設けられ、該圧力調整ライン62には圧力調整弁63、サイレンサ64が設けられている。前記圧力調整弁63は前記圧力調整ライン62の圧力が所定圧以上になった場合に、前記サイレンサ64を介して大気に放出するものであり、前記冷凍式ドライヤ43に送出される圧縮空気の圧力の上限を設定している。   A pressure adjustment line 62 is provided between the air valve 51 and the refrigeration dryer 43 via an air valve 61, and a pressure adjustment valve 63 and a silencer 64 are provided in the pressure adjustment line 62. When the pressure of the pressure adjustment line 62 becomes equal to or higher than a predetermined pressure, the pressure adjustment valve 63 is discharged to the atmosphere via the silencer 64, and the pressure of the compressed air sent to the refrigeration dryer 43 An upper limit is set.

尚、前記空気圧縮装置42は前記エアバルブ51を介して接続され、前記圧力調整ライン62は前記エアバルブ61を介して接続され、前記フィルタユニット44は前記エアバルブ53、前記エアバルブ57を介して接続され、前記シールガス供給ライン36は前記エアバルブ39を介して接続され、前記プロセスガス供給ライン37は前記エアバルブ40を介してそれぞれ接続される構成であり、各ユニットはエアバルブを介して切離し可能であり、個別に調整、メンテナンスが可能となっている。   The air compressor 42 is connected via the air valve 51, the pressure adjustment line 62 is connected via the air valve 61, and the filter unit 44 is connected via the air valve 53 and the air valve 57. The seal gas supply line 36 is connected via the air valve 39, and the process gas supply line 37 is connected via the air valve 40. Each unit can be disconnected via the air valve. Adjustment and maintenance are possible.

前記酸素圧縮機25の性能試験が行われる場合は、前記モータ46により前記空気圧縮機45が駆動され、圧縮空気が供給される状態で、モータ26により1段圧縮機23、2段圧縮機24が駆動される。   When the performance test of the oxygen compressor 25 is performed, the air compressor 45 is driven by the motor 46 and compressed air is supplied to the motor 26 so that the first stage compressor 23 and the second stage compressor 24 are driven by the motor 26. Is driven.

前記空気圧縮機45から送出される圧縮空気は、前記冷凍式ドライヤ43により冷却され、空気中の水分が結露され、前記ドレン52を介して除去される。更に、前記水分除去器54、前記吸着ユニット58a,58bにより完全に空気中の水分、水蒸気が除去される。尚、前記冷凍式ドライヤ43により空気中の水分の大部分が除去されるので、前記吸着ユニット58a,58bの負担が少なくなり、乾燥剤の交換頻度が減少される。又、前記冷凍式ドライヤ43、前記水分除去器54、前記吸着式エアドライヤ55は、空気から水分を除去する乾燥手段を構成するものであり、上記構成に拘らず、空気から水分を除去する構成となっていればよい。   The compressed air sent out from the air compressor 45 is cooled by the refrigeration dryer 43, moisture in the air is condensed, and is removed through the drain 52. Furthermore, moisture and water vapor in the air are completely removed by the moisture remover 54 and the adsorption units 58a and 58b. Since most of the moisture in the air is removed by the refrigeration dryer 43, the load on the adsorption units 58a and 58b is reduced, and the replacement frequency of the desiccant is reduced. The refrigeration dryer 43, the moisture remover 54, and the adsorption air dryer 55 constitute a drying unit that removes moisture from the air. Regardless of the above configuration, the moisture is removed from the air. It only has to be.

又、前記オイルミスト除去器56で油分が除去され、前記フィルタユニット44からは完全に乾燥し、又油分が除去された空気が送出される。尚、前記ギアボックス47内部は負圧にされ、該ギアボックス47内部で発生したオイルミストが圧縮空気に混入しない様になっているので、前記オイルミスト除去器56の負担が少なくなり、該オイルミスト除去器56のオイルミスト除去性能が長時間持続し、フィルタ交換間隔を長くすることができる。   In addition, oil is removed by the oil mist remover 56, and air from which the oil is completely removed from the filter unit 44 is sent out. Since the inside of the gear box 47 is set to a negative pressure so that the oil mist generated inside the gear box 47 is not mixed with the compressed air, the load on the oil mist remover 56 is reduced, and the oil mist is reduced. The oil mist removal performance of the mist remover 56 is maintained for a long time, and the filter replacement interval can be extended.

前記フィルタユニット44から送出される空気の一部は、前記シールガス供給ライン36を介してシールガスとしてガス軸封装置4に供給され、又残部が前記プロセスガス供給ライン37を介してプロセスガスとして前記1段圧縮機23に供給される。尚、プロセスガスについてはバイパスライン31を介して循環させる様にしてもよく、この場合前記プロセスガス供給ライン37から供給するプロセスガスの量は補充分だけでよく、供給量は少なくて済む。   A part of the air sent out from the filter unit 44 is supplied to the gas shaft seal device 4 as a seal gas through the seal gas supply line 36, and the remaining part is supplied as a process gas through the process gas supply line 37. The first stage compressor 23 is supplied. The process gas may be circulated through the bypass line 31. In this case, the amount of process gas supplied from the process gas supply line 37 may be only replenishment, and the supply amount may be small.

性能試験に供されるシールガス、プロセスガスは大気中の空気を乾燥したものであるので、充分な量が確保でき、又何時でも供給が可能であり、性能試験の実施時期の制限がなくなる。更に、性能試験用のガスを使用すること自体はコストが発生しない。   Since the sealing gas and process gas used for the performance test are dried air in the atmosphere, a sufficient amount can be secured and can be supplied at any time, and there is no restriction on the timing of performing the performance test. Furthermore, using the performance test gas itself is not costly.

図2は他の実施の形態を示しており、プロセスガス供給ライン37をシールガス供給ライン36から分離したものであり、前記プロセスガス供給ライン37を他のガス供給源66、例えば窒素ガス供給源に接続する。   FIG. 2 shows another embodiment, in which the process gas supply line 37 is separated from the seal gas supply line 36, and the process gas supply line 37 is connected to another gas supply source 66, for example, a nitrogen gas supply source. Connect to.

大量のガスを消費する前記シールガス供給ライン36には圧縮機性能試験装置41からの乾燥空気を供給する様にし、プロセスガスについてはバイパスライン31を介して循環させガス消費量を抑制し、不足分の窒素ガスを前記ガス供給源66から供給する様にする。   The seal gas supply line 36 that consumes a large amount of gas is supplied with dry air from the compressor performance test apparatus 41, and the process gas is circulated through the bypass line 31 to suppress the gas consumption. Minute nitrogen gas is supplied from the gas supply source 66.

該他の実施の形態でも、窒素ガスの消費量を大幅に減少させることができ、ランニングコストは大幅に減少する。   Also in the other embodiments, the consumption of nitrogen gas can be greatly reduced, and the running cost is greatly reduced.

本発明の実施の形態を示す概略構成図である。It is a schematic block diagram which shows embodiment of this invention. 本発明の他の実施の形態を示す概略構成図である。It is a schematic block diagram which shows other embodiment of this invention. 本発明が実施される酸素圧縮機のガス軸封装置を示す断面図である。It is sectional drawing which shows the gas shaft seal apparatus of the oxygen compressor with which this invention is implemented. 従来例を示す説明図である。It is explanatory drawing which shows a prior art example.

符号の説明Explanation of symbols

4 ガス軸封装置
25 酸素圧縮機
23 1段圧縮機
24 2段圧縮機
31 バイパスライン
36 シールガス供給ライン
37 プロセスガス供給ライン
41 圧縮機性能試験装置
42 空気圧縮装置
43 冷凍式ドライヤ
44 フィルタユニット
45 空気圧縮機
47 ギアボックス
48 真空ポンプ
54 水分除去器
55 吸着式エアドライヤ
56 オイルミスト除去器
4 Gas shaft seal device 25 Oxygen compressor 23 First stage compressor 24 Two stage compressor 31 Bypass line 36 Seal gas supply line 37 Process gas supply line 41 Compressor performance test device 42 Air compressor 43 Refrigeration dryer 44 Filter unit 45 Air compressor 47 Gear box 48 Vacuum pump 54 Moisture remover 55 Adsorption air dryer 56 Oil mist remover

Claims (5)

被圧縮ガスとしてプロセスガスを供給し、軸封装置にシールガスを供給して性能試験を行う圧縮機性能試験方法に於いて、大気中から空気を吸引圧縮し、空気中の水分を除去して乾燥させ、乾燥させた空気を少なくともシールガスとして前記軸封装置に供給する様にしたことを特徴とする圧縮機性能試験方法。   In the compressor performance test method, in which a process gas is supplied as a gas to be compressed and a seal gas is supplied to the shaft seal device to perform a performance test, air is sucked and compressed from the atmosphere to remove moisture in the air. A compressor performance test method, characterized in that dried and dried air is supplied to the shaft seal device as at least a seal gas. 被圧縮ガスとしてプロセスガスを供給し、軸封装置にシールガスを供給して性能試験を行う圧縮機性能試験方法に於いて、大気中から空気を吸引圧縮し、空気中の水分を除去して乾燥させ、乾燥させた空気をプロセスガスとして圧縮機に供給すると共にシールガスとして前記軸封装置に供給する様にしたことを特徴とする圧縮機性能試験方法。   In the compressor performance test method, in which a process gas is supplied as a gas to be compressed and a seal gas is supplied to the shaft seal device to perform a performance test, air is sucked and compressed from the atmosphere to remove moisture in the air. A method for testing a compressor performance, characterized in that the dried and dried air is supplied as a process gas to the compressor and as a seal gas to the shaft seal device. 圧縮機のガス軸封装置にシールガスを供給するシールガス供給ラインに圧縮機性能試験装置が接続され、該圧縮機性能試験装置は大気中から空気を吸引圧縮する空気圧縮装置と、空気中の水分を除去する乾燥手段と、空気中の油分を除去するオイルミスト除去器とを具備し、乾燥空気を前記シールガス供給ラインを介して前記ガス軸封装置に供給する様構成したことを特徴とする圧縮機性能試験装置。   A compressor performance test device is connected to a seal gas supply line that supplies seal gas to a gas shaft seal device of the compressor. The compressor performance test device includes an air compressor that sucks and compresses air from the atmosphere, It comprises a drying means for removing moisture and an oil mist remover for removing oil in the air, and is configured to supply dry air to the gas shaft seal device via the seal gas supply line. Compressor performance test equipment. 圧縮機のガス軸封装置にシールガスを供給するシールガス供給ライン及びプロセスガス供給ラインに圧縮機性能試験装置が接続され、該圧縮機性能試験装置は大気中から空気を吸引圧縮する空気圧縮装置と、空気中の水分を除去する乾燥手段と、空気中の油分を除去するオイルミスト除去器とを具備し、乾燥空気をシールガスとして前記シールガス供給ラインを介して前記ガス軸封装置に供給すると共にプロセスガスとして前記プロセスガス供給ラインに供給する様構成したことを特徴とする圧縮機性能試験装置。   A compressor performance test apparatus is connected to a seal gas supply line and a process gas supply line for supplying a seal gas to a gas shaft seal device of the compressor, and the compressor performance test apparatus is an air compression apparatus for sucking and compressing air from the atmosphere. And a drying means for removing moisture in the air and an oil mist remover for removing oil in the air, and supplying dry air as seal gas to the gas shaft seal device via the seal gas supply line And a compressor performance test apparatus configured to supply the process gas as a process gas to the process gas supply line. 前記空気圧縮機はギアボックスを介して駆動され、該ギアボックス内部は負圧にされ、該ギアボックスで発生したオイルミストの圧縮空気への混入を防止した請求項3、請求項4の圧縮機性能試験装置。   5. The compressor according to claim 3, wherein the air compressor is driven through a gear box, and the inside of the gear box is set to a negative pressure to prevent oil mist generated in the gear box from entering the compressed air. Performance test equipment.
JP2006073212A 2006-03-16 2006-03-16 Compressor performance test method and compressor performance test apparatus Expired - Fee Related JP4784354B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006073212A JP4784354B2 (en) 2006-03-16 2006-03-16 Compressor performance test method and compressor performance test apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006073212A JP4784354B2 (en) 2006-03-16 2006-03-16 Compressor performance test method and compressor performance test apparatus

Publications (2)

Publication Number Publication Date
JP2007247566A JP2007247566A (en) 2007-09-27
JP4784354B2 true JP4784354B2 (en) 2011-10-05

Family

ID=38592117

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006073212A Expired - Fee Related JP4784354B2 (en) 2006-03-16 2006-03-16 Compressor performance test method and compressor performance test apparatus

Country Status (1)

Country Link
JP (1) JP4784354B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196707A (en) * 2014-08-18 2014-12-10 南京创贝高速传动机械有限公司 Oil injection and returning pump and cooling pump test table

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101498298B (en) * 2009-02-19 2012-05-23 浙江工业大学 Apparatus and method for measuring small-sized cold compressor oil circulation amount
JP5633251B2 (en) * 2010-08-31 2014-12-03 株式会社Ihi Oxygen compressor sealing device
JP5648407B2 (en) * 2010-10-13 2015-01-07 株式会社Ihi Oxygen compressor sealing device
CN103511239A (en) * 2013-10-31 2014-01-15 南车戚墅堰机车有限公司 Testbed for dual-purpose air and vacuum pump
CN105864021B (en) * 2016-05-16 2017-12-01 台州市握奇自动化设备有限公司 Parallel water pump platform
CN108953204A (en) * 2018-06-26 2018-12-07 沈阳透平机械股份有限公司 Pipeline compressor performance test method and system
KR102064981B1 (en) 2018-11-01 2020-01-10 주식회사 오성이엔지서비스 Performance tester and performance test method for air compressors of large vehicles
CN113236532B (en) * 2021-05-08 2025-06-17 中国船舶集团有限公司第七一一研究所 Energy-saving water vapor compressor test device and test method
CN117514740A (en) * 2023-11-22 2024-02-06 保定保菱变压器有限公司 A test method and test system for sulfur hexafluoride gas pump
CN119393331A (en) * 2025-01-03 2025-02-07 山东豪迈机械制造有限公司 Compressor testing system and testing method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104196707A (en) * 2014-08-18 2014-12-10 南京创贝高速传动机械有限公司 Oil injection and returning pump and cooling pump test table
CN104196707B (en) * 2014-08-18 2016-05-18 南京创贝高速传动机械有限公司 A kind of note scavenge oil pump, coolant pump testing stand

Also Published As

Publication number Publication date
JP2007247566A (en) 2007-09-27

Similar Documents

Publication Publication Date Title
JP4784354B2 (en) Compressor performance test method and compressor performance test apparatus
US7516755B2 (en) System for producing and distributing compressed air
KR101824092B1 (en) Nitrogen gas supply system capable of controlling nitrogen flow rate and concentration and method of supplying nitrogen gas using the same
KR102155341B1 (en) Compressed air supplying system
CN102652246B (en) Method and device for low-temperature cooling/liquefaction
KR970003268B1 (en) Compression type refrigerator
KR20060081791A (en) Refrigeration unit with turbo compressor
KR100907551B1 (en) Integrated Air Dryer System
US20180017061A1 (en) Compressor system and method for conditioning inlet air
JP7520864B2 (en) Compressor installation and method for supplying compressed gas
KR102290248B1 (en) Device and method for cooling and/or low-temperature liquefaction
US12209581B2 (en) Compressor system and method for supplying compressed gas
JP2010216372A (en) Oil returning circuit and air compression device
JPH08941A (en) Compressed air dehumidifier
US11819800B2 (en) Method and system for recovering and purifying a gaseous sterilizing agent
KR19980024943A (en) Method for supplying air to air separation device and device
JP3723083B2 (en) Compressed air supply device
JP3486852B2 (en) Method and apparatus for centrally controlling prevention of air pollution by refrigerant
KR930005667B1 (en) Method and arrangement for pumping refrigerants
KR200215816Y1 (en) Air compressor
JP4686403B2 (en) Pressurizing device and gas replacement method for evaporator system path of refrigeration cycle
US11819801B2 (en) Method and system for recovering and purifying a gaseous sterilizing agent
KR102367671B1 (en) air conditioning system through cooling and dehumidification of compressed air
CN116733723A (en) First-time running cleaning device for automobile air conditioner compressor
JPH06347593A (en) Treatment for radioactive waste gas

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090128

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110525

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20110614

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20110627

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20140722

Year of fee payment: 3

LAPS Cancellation because of no payment of annual fees