JP4838822B2 - シミュレーション装置及びシミュレーション方法 - Google Patents
シミュレーション装置及びシミュレーション方法 Download PDFInfo
- Publication number
- JP4838822B2 JP4838822B2 JP2008099559A JP2008099559A JP4838822B2 JP 4838822 B2 JP4838822 B2 JP 4838822B2 JP 2008099559 A JP2008099559 A JP 2008099559A JP 2008099559 A JP2008099559 A JP 2008099559A JP 4838822 B2 JP4838822 B2 JP 4838822B2
- Authority
- JP
- Japan
- Prior art keywords
- work
- amount
- day
- value
- simulation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims description 111
- 238000004088 simulation Methods 0.000 title claims description 49
- 230000003203 everyday effect Effects 0.000 claims description 7
- 238000010586 diagram Methods 0.000 description 8
- 238000004364 calculation method Methods 0.000 description 7
- 230000003111 delayed effect Effects 0.000 description 4
- 238000007796 conventional method Methods 0.000 description 2
- 230000033228 biological regulation Effects 0.000 description 1
- 230000007423 decrease Effects 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
各工程に割当てられる作業者の数(作業能力量)が最適であることが望まれる。
各工程に対し、作業者が最適な日程にて割り当てられることが望まれる。
余剰能力が他の工程に最適に振り替えられることが望まれる。
作業計画を再検討する際に当初の計画を大幅に見直す必要が無く最小限の変更で済むことが望まれる。
作業開始前に予想されていた状況に対して、作業開始後の状況がずれているとき、より少ない演算量でその作業開始後の状況を加味して作業進捗状況を把握することが望まれている。
本発明の他の目的は、各工程に割当てられる作業者の数(作業能力量)の最適化を行うことができるシミュレーション装置および方法を提供することである。
本発明のさらに他の目的は、各工程に対し、作業者が最適な日程にて割り当てられることができるシミュレーション装置および方法を提供することである。
本発明のさらに他の目的は、余剰能力が他の工程に最適に振り替えられることができるシミュレーション装置および方法を提供することである。
本発明のさらに他の目的は、作業計画を再検討する際に当初の計画を大幅に見直す必要が無く最小限の変更で済むことができるシミュレーション装置および方法を提供することである。
本発明のさらに他の目的は、作業開始前に予想されていた状況に対して、作業開始後の状況がずれているとき、より少ない演算量でその作業開始後の状況を加味して作業進捗状況を把握することができるシミュレーション装置および方法を提供することである。
(a)前記入力手段が、日ごとに行うべき作業量の値を記述した作業計画を受け取ることと、
(b)前記入力手段が、1日当たりの作業量として表された基本能力の設定値と、1日当たりの作業量として表された許容能力の設定値とを受け取ることと、
(c)前記シミュレーション手段が、前記作業計画に記述された各日の作業量の値が前記基本能力の設定値を超えているか否かを判定することと、
(d)前記シミュレーション手段が、前記判定の結果、前記作業計画に記述された作業量の値が前記基本能力の設定値を超えている日が連続してある場合、前記作業計画に記述された作業量の値から前記基本能力の設定値を減じた差の前記連続する日についての合計を連続オーバー作業量として算出し、前記連続オーバー作業量が前記許容能力の設定値を超えているか否かを判断することと、
(e)前記シミュレーション手段が、前記連続オーバー作業量が前記許容能力の設定値を超えていないと判断した場合、前記作業計画を実行可能であると決定することと、
(f)前記入力手段が、工程のそれぞれの実際の進捗状況を示すデータを受け取ることと、
(g)前記シミュレーション手段が、前記実際の進捗状況を示すデータを前記工程に対応したプロセスモデルに入力し、前記実際の進捗状況を示すデータが入力された前記プロセスモデルに基づいてシミュレーションを行い、前記工程の進捗予想を行うことと
を備えている。
本実施形態は、各工程毎の進捗予想をより正確に行うための作業進捗予想装置である。図1は、作業進捗予想装置の動作の流れを示すフローチャートである。
図2のテーブルの行に示される作業場所AからZは、ステップS1にて特定された工程および作業場所を示している。本ケースでは、作業場所と工程とが一対一に対応している。図2のテーブルの列に示される「日」は、ステップS1にて特定された計画日時を示している。
さらに、図6に示される余剰能力が分かると、ステップS2の作業者数の割当てを再検討したり、余剰能力を他の作業場所に振り替えることを検討することが可能となる。
ステップS13では、上記基本能力として、1日に行う作業量が300kgを超えたらその基本能力を超えていると判断される。
ステップS15では、上記許容能力として、1日のみであれば100kgを超えなければ許容容量内と判断され、連続する2日間であればその2日間の合計が100kgを超えなければ許容容量内と判断され、連続する3日間であればその3日間の合計が100kgを超えなければ許容容量内と判断される。
以下に、最小作業単位について説明する。ここでは、作業Bの最小作業単位が40kgであり、1日につき3つの最小作業単位(120kg)ずつ行うことが予定されているとする。
第3実施形態は、作業が開始された後に実際の作業進捗状況を反映させたデータをシミュレータに入力して、その後の作業進捗状況をより正確に予想することを企図したものである。
102 プロセスモデル
103 プロセスモデル
M 製品
Claims (2)
- 作業進捗度の予想を行う各工程に割当てられる作業者の数を示すデータを受け取ると共に、特定の時点における各工程のそれぞれの実際の作業進捗状況を示すデータとを受け取る入力手段と、
作業内容および作業環境の少なくともいずれかに応じた前記作業者の数と作業進捗度の関係を示し、且つ、前記作業者の数と前記作業進捗度との関係が、前記作業者の数に比例しない部分を有するように決定された関数のデータを格納する格納手段と、
シミュレーション手段と
を備え、
前記シミュレーション手段は、前記入力手段に入力された作業者の数と前記格納手段に格納された関数を用いて各工程の作業進捗度を予想すると共に余剰能力を算出し、且つ、
前記シミュレーション手段は、各工程の作業量を各工程に対応するプロセスモデルにプロセス条件として設定し、前記プロセス条件が設定された前記プロセスモデルによって作業進捗状況を予想するように構成されると共に、前記各工程の前記特定の時点における前記実際の作業進捗状況を示すデータを前記プロセスモデルに入力して前記実際の作業進捗状況に応じた状態に前記プロセスモデルを設定し、前記実際の作業進捗状況に応じた状態に設定された前記プロセスモデルを用いて前記特定の時点の後の時点における作業進捗状況を予想し、
前記入力手段が、日ごとに行うべき作業量の値を記述した作業計画と、1日当たりの作業量として表された基本能力の設定値と、1日当たりの作業量として表された許容能力の設定値とを受け取り、
前記シミュレーション手段は、前記作業計画に記述された各日の作業量の値が前記基本能力の設定値を超えているか否かを判定し、前記判定の結果、前記作業計画に記述された作業量の値が前記基本能力の設定値を超えている日が連続してある場合、前記作業計画に記述された作業量の値から前記基本能力の設定値を減じた差の前記連続する日についての合計を連続オーバー作業量として算出し、前記連続オーバー作業量が前記許容能力の設定値を超えていない場合、前記作業計画を実行可能であると判断する
作業進捗予想装置。 - 入力手段と、作業内容および作業環境の少なくともいずれかに応じた前記作業者の数と作業進捗度の関係を示し、且つ、前記作業者の数と前記作業進捗度との関係が、前記作業者の数に比例しない部分を有するように決定された関数のデータを格納する格納手段と、シミュレーション手段とを備える作業進捗予想装置を用いたシミュレーション方法であって、
前記シミュレーション手段が、前記入力手段に入力された作業者の数と前記格納手段に格納された関数を用いて各工程の作業進捗度を予想すると共に余剰能力を算出することと、
前記シミュレーション手段が、前記各工程の作業量をプロセス条件として各工程に対応するプロセスモデルに設定することと、
前記シミュレーション手段が、前記プロセス条件が設定された前記プロセスモデルによって作業進捗状況を予想する際に前記各工程の前記特定の時点における実際の作業進捗状況を示すデータを前記プロセスモデルに入力して前記実際の作業進捗状況に対応する状態に前記プロセスモデルを設定することと、
前記シミュレーション手段が、前記実際の作業進捗状況に応じた状態に設定された前記プロセスモデルを用いて前記特定の時点の後の時点における作業進捗状況を予想することと、
前記入力手段が、日ごとに行うべき作業量の値を記述した作業計画と、1日当たりの作業量として表された基本能力の設定値と、1日当たりの作業量として表された許容能力の設定値とを受け取ることと、
前記シミュレーション手段は、前記作業計画に記述された各日の作業量の値が前記基本能力の設定値を超えているか否かを判定し、前記判定の結果、前記作業計画に記述された作業量の値が前記基本能力の設定値を超えている日が連続してある場合、前記作業計画に記述された作業量の値から前記基本能力の設定値を減じた差の前記連続する日についての合計を連続オーバー作業量として算出し、前記連続オーバー作業量が前記許容能力の設定値を超えていない場合、前記作業計画を実行可能であると判断すること
とを備えたシミュレーション方法。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2008099559A JP4838822B2 (ja) | 2008-04-07 | 2008-04-07 | シミュレーション装置及びシミュレーション方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2008099559A JP4838822B2 (ja) | 2008-04-07 | 2008-04-07 | シミュレーション装置及びシミュレーション方法 |
Related Parent Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2000186953A Division JP2002007656A (ja) | 2000-06-21 | 2000-06-21 | 作業進捗予想装置および方法、作業計画検討装置および方法、ならびに工程進捗予想装置および方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2008192172A JP2008192172A (ja) | 2008-08-21 |
| JP4838822B2 true JP4838822B2 (ja) | 2011-12-14 |
Family
ID=39752155
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2008099559A Expired - Fee Related JP4838822B2 (ja) | 2008-04-07 | 2008-04-07 | シミュレーション装置及びシミュレーション方法 |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP4838822B2 (ja) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5318651B2 (ja) * | 2009-04-28 | 2013-10-16 | 株式会社神戸製鋼所 | スケジューリング方法及びスケジューリングプログラム、並びにスケジューリングシステム |
Family Cites Families (10)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH05210683A (ja) * | 1992-01-31 | 1993-08-20 | Toshiba Corp | 定例作業のスケジュール作成装置 |
| JPH06348713A (ja) * | 1993-06-08 | 1994-12-22 | Matsushita Electric Ind Co Ltd | プロジェクト管理支援装置 |
| JP3336732B2 (ja) * | 1994-04-01 | 2002-10-21 | トヨタ自動車株式会社 | 生産計画評価装置 |
| JPH07296062A (ja) * | 1994-04-22 | 1995-11-10 | Sony Corp | 人員配置決定支援方法 |
| JP2666755B2 (ja) * | 1995-01-11 | 1997-10-22 | 日本電気株式会社 | ワークフローシステム |
| JPH08227432A (ja) * | 1995-02-21 | 1996-09-03 | Shin Meiwa Ind Co Ltd | 仮想工程実行システム |
| DE19712445A1 (de) * | 1997-03-25 | 1998-10-01 | Bosch Gmbh Robert | System zur Steuerung und/oder Regelung von Betriebsabläufen bei einem Kraftfahrzeug |
| JPH11328276A (ja) * | 1998-03-16 | 1999-11-30 | Mitsubishi Heavy Ind Ltd | スケジューリングシステム |
| JPH11313402A (ja) * | 1998-04-28 | 1999-11-09 | Shinko Electric Co Ltd | 自動搬送システム、自動搬送車、自動搬送車の制御方法、およびプログラムを記録した媒体 |
| JP3983908B2 (ja) * | 1998-10-27 | 2007-09-26 | 株式会社東芝 | 水力機械の封水装置及びその制御方法 |
-
2008
- 2008-04-07 JP JP2008099559A patent/JP4838822B2/ja not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2008192172A (ja) | 2008-08-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7752020B2 (en) | System and method for modeling construction risk using location-based construction planning models | |
| JP4033291B2 (ja) | プロジェクトリスク管理システム | |
| JP7112959B2 (ja) | 工場、特に石油製油所の建設用の個々の足場構成要素よりそれぞれが組み立てられることとなる、足場ユニットを提供し組み立てる方法 | |
| JP2012194712A (ja) | 生産計画作成方法 | |
| US20190287053A1 (en) | System for planning where to place merchandise items and method for planning where to place merchandise items | |
| Amaran et al. | Medium-term maintenance turnaround planning under uncertainty for integrated chemical sites | |
| US20180349824A1 (en) | Determining a production plan | |
| JPH11328276A (ja) | スケジューリングシステム | |
| JP6929433B2 (ja) | 生産管理装置、生産管理方法及びプログラム | |
| JP5478545B2 (ja) | 作業者配置支援装置 | |
| Joseph et al. | Analysis of dynamic due-date assignment models in a flexible manufacturing system | |
| JP4838822B2 (ja) | シミュレーション装置及びシミュレーション方法 | |
| Herrmann | A history of decision-making tools for production scheduling | |
| JP5442524B2 (ja) | スケジュール作成方法及びスケジュール作成プログラム、並びにスケジュール作成装置 | |
| WO2026001456A1 (zh) | 物料管理方法、电子设备和存储介质 | |
| JP2017117049A (ja) | 物流管理支援装置および物流管理支援方法 | |
| JP2009205446A (ja) | 置場運用計画装置および運用方法 | |
| WO2016020982A1 (ja) | 情報処理システム及び情報処理方法 | |
| König | Robust construction scheduling using discrete-event simulation | |
| JP6695298B2 (ja) | 発注制御装置 | |
| JP2002007656A (ja) | 作業進捗予想装置および方法、作業計画検討装置および方法、ならびに工程進捗予想装置および方法 | |
| JP2009251650A (ja) | 工程やラインが複数存在する環境におけるロット着手順序判断方法、その装置及びそのプログラム | |
| JP2005122581A (ja) | 納期管理システム | |
| JP4679091B2 (ja) | 生産計画を再設定する生産管理システム、及び当該システムを実行させるプログラム | |
| Fanchao et al. | Symbiotic simulation control in supply chain of lubricant additive industry |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20110225 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20110425 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20110628 |
|
| A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20110826 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20110913 |
|
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20110930 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20141007 Year of fee payment: 3 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20141007 Year of fee payment: 3 |
|
| LAPS | Cancellation because of no payment of annual fees |