JP4866146B2 - Simulation method of particle movement in sand recycling - Google Patents
[go: Go Back, main page]

JP4866146B2 - Simulation method of particle movement in sand recycling - Google Patents

Simulation method of particle movement in sand recycling Download PDF

Info

Publication number
JP4866146B2
JP4866146B2 JP2006137433A JP2006137433A JP4866146B2 JP 4866146 B2 JP4866146 B2 JP 4866146B2 JP 2006137433 A JP2006137433 A JP 2006137433A JP 2006137433 A JP2006137433 A JP 2006137433A JP 4866146 B2 JP4866146 B2 JP 4866146B2
Authority
JP
Japan
Prior art keywords
sand
particles
earth
particle
beach
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2006137433A
Other languages
Japanese (ja)
Other versions
JP2007308916A (en
Inventor
将之 小塚
芳満 田島
和夫 百瀬
武晴 坂上
敏雅 石井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Japan Atomic Power Co Ltd
Penta Ocean Construction Co Ltd
Tokyo Electric Power Services Co Ltd
Original Assignee
Japan Atomic Power Co Ltd
Penta Ocean Construction Co Ltd
Tokyo Electric Power Services Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Japan Atomic Power Co Ltd, Penta Ocean Construction Co Ltd, Tokyo Electric Power Services Co Ltd filed Critical Japan Atomic Power Co Ltd
Priority to JP2006137433A priority Critical patent/JP4866146B2/en
Publication of JP2007308916A publication Critical patent/JP2007308916A/en
Application granted granted Critical
Publication of JP4866146B2 publication Critical patent/JP4866146B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Underground Or Underwater Handling Of Building Materials (AREA)

Description

本発明は、海底等でのサンドリサイクルにおいて、浚渫後に海底に投入された土砂の移動をシミュレーションでき、土砂投入位置を決定できる方法等に関する。   The present invention relates to a method and the like that can simulate the movement of earth and sand thrown into the seabed after dredging in sand recycling at the seabed and the like, and can determine the earth and sand throwing position.

海浜や河口の沿岸に港湾施設のごとき人工構造物を設けた場合、潮の流れがそれにより変化して近くの海岸線や海底が浸食され、削り取られた土砂が港湾施設内等に流入して堆積してしまうという現象が生じることがある。このような堆積が生じても、堆積した土砂を随時浚渫して浸食された場所に還元することで、浸食や堆積が生じる前の状態に回復させることは可能である(サンドリサイクル)。しかし、浸食された場所が遠浅の海のような比較的浅い海底である場合には、土砂運搬船が浸食された場所に近づけず、土砂を直接に投入することができない。   When an artificial structure such as a port facility is installed on the beach or estuary coast, the flow of the tide changes, and the nearby coastline and the seabed are eroded, and the shaved earth flows into the port facility and accumulates. May occur. Even if such deposition occurs, it is possible to recover the state before the erosion or deposition occurs (sand recycling) by reducing the accumulated earth and sand to an eroded place at any time. However, when the eroded place is a relatively shallow sea bottom such as a shallow sea, the earth and sand transport ship cannot approach the eroded place and the earth and sand cannot be directly input.

このような場合に、土砂運搬船を用いず、固定設置されたポンプ及び、圧送式パイプラインやベルトコンベア等からなる固定サンドバイパスシステムにより、継続的に海底の浚渫及び被浚渫物の移送を行う試みが知られている(例えば、非特許文献1参照)。しかし、設備が大がかりで費用がかかるうえ、海岸の景観にも大きな影響を与えてしまう。   In such a case, an attempt is made to continuously transfer the seabed dredging and the objects to be crushed by a fixed sand bypass system consisting of a fixed pump and a pressure-feed pipeline, belt conveyor, etc., without using a sediment carrier. Is known (see, for example, Non-Patent Document 1). However, the facilities are large and expensive, and the coastal landscape is greatly affected.

そこで、土砂を浸食された場所に直接投入するのではなく、土砂運搬船で投入可能であって、かつ浸食された場所の潮の上流となる場所に土砂を投入し、その後の潮の流れにより浸食された場所に土砂が自然に移動するようにする方法も提案されている。しかし、土砂を投入する場所を的確に定めることははなはだ困難である。例えば、蛍光砂を用いて潮の流れによる土砂の移動状況をあらかじめ実地調査し、その結果に基づいて土砂の投入場所を決定することも行われている。しかし、この調査は試行錯誤的に行わざるを得ず、しかも多大な時間と手間を要するため実質的に調査回数が限られてしまう。そのため、的確に投入場所を定めるのはかなり困難なのが実情である。
”輸出品 サンドバイパスシステム(Export Sand Bypass system)”、クイーンズランド州政府(Queensland Government)発行、[平成18年1月5日検索]、インターネット<http://www.transport.qld.gov.au/Home.nsf/index/sandbypasssystem>
Therefore, instead of directly throwing the earth and sand into the eroded place, the earth and sand can be put in by the earth and sand transport ship, and the earth and sand are thrown into a place upstream of the tide of the eroded place, and then eroded by the flow of the tide. There has also been proposed a method for allowing earth and sand to move naturally to the designated place. However, it is very difficult to determine exactly where to put earth and sand. For example, a field survey is carried out in advance on the state of movement of earth and sand due to the flow of tide using fluorescent sand, and the place where the earth and sand is introduced is determined based on the result. However, this investigation must be done by trial and error, and requires a lot of time and effort, so the number of investigations is practically limited. Therefore, the actual situation is that it is quite difficult to accurately determine the input location.
"Export Sand Bypass system", published by Queensland Government, [Search January 5, 2006], Internet <http://www.transport.qld.gov.au /Home.nsf/index/sandbypasssystem>

本発明は、海底の堆積場所から浚渫された土砂を、浸食された場所とは異なる場所に投入した場合に、その後の海浜流による土砂移動を的確にシミュレーションでき、土砂の最適投入位置を決定できる方法等を提供することを課題とする。   The present invention can accurately simulate the subsequent movement of the sand and sand by the beach flow when the sand dredged from the sedimentation place of the seabed is put in a place different from the eroded place, and the optimum position of the sand and sand can be determined. It is an object to provide a method and the like.

発明の第1は、サンドリサイクルにおける粒子移動のシミュレーション方法であって、前記サンドリサイクルが行われる場所の地形条件と波浪条件と前記粒子の初期条件とを設定するステップと、前記地形条件と前記波浪条件とから前記場所における平面波浪場と海浜流場とを演算するステップと、前記平面波浪場と前記海浜流場とから前記粒子にかかる外力場を演算するステップと、前記外力場による前記粒子の移動位置を確率過程により演算するステップとを備えることを特徴とするシミュレーション方法である。   A first aspect of the invention is a method for simulating particle movement in sand recycling, the step of setting terrain conditions, wave conditions, and initial conditions of the particles where the sand recycling is performed, and the terrain conditions and the wave conditions. Calculating a plane wave field and a beach flow field at the location from the conditions; calculating an external force field applied to the particles from the plane wave field and the beach flow field; and And a step of calculating a moving position by a stochastic process.

ここで、前記の初期条件は、複数の前記粒子が集合して、複数の移動層を積層した形状をなすことを含むものであることは好ましい。また、さらに、前記の外力場と前記初期条件とから前記粒子の移動可能性を判断するステップを備え、前記移動可能性が肯定される場合に、前記移動位置を演算することは好ましい。   Here, it is preferable that the initial condition includes that the plurality of particles aggregate to form a shape in which a plurality of moving layers are stacked. Furthermore, it is preferable that a step of determining the movement possibility of the particles from the external force field and the initial condition is provided, and the movement position is calculated when the movement possibility is affirmed.

発明の第2は、前記のいずれかのシミュレーション方法を、コンピュータに実行させるためのプログラムである。   A second aspect of the invention is a program for causing a computer to execute any one of the above simulation methods.

サンドリサイクルにおいて蛍光砂による実地調査を行う必要が無く、必要な回数だけシミュレーションを繰り返し行うことが可能であり、サンドリサイクルに適した土砂の投入位置を的確に決定できる。   In sand recycling, there is no need to conduct on-site investigations with fluorescent sand, and simulation can be repeated as many times as necessary, so that it is possible to accurately determine the earth and sand input position suitable for sand recycling.

以下、本発明の実施の形態について図面を用いて説明する。図1は、海底2の土砂投入位置に投入された実際の土砂1がなす形状の模式図であり、図1(1)は側面図、(2)は上面図である。土砂は直径2Rで高さHのお椀を伏せたような形状に堆積する。この表面から土砂が海浜流によって徐々に運搬されて、目的とする浸食位置への土砂の還元を実現する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. FIG. 1 is a schematic diagram of the shape formed by the actual earth and sand 1 introduced into the earth and sand loading position of the seabed 2, FIG. 1 (1) is a side view, and (2) is a top view. The earth and sand are deposited in a shape like a bowl with a diameter of 2R and a height of H. Sediment is gradually transported from the surface by the beach current, and the sediment is returned to the target erosion position.

しかし、このままの形状では計算上の取り扱いが難しいので、簡単化のために、海底に投入された土砂は、全体でN個の粒子からなる平たい円筒形状をしていると考える。図2は、このような土砂の形状を理想化した円筒10の側面を模式的に示した図である。そして、円筒10の全体高さをΔh、直径を2rとし、円筒10を薄層の積み重ねとしてとらえ、土砂は円筒の上面だけからNs個の粒子を含む厚さδsの一枚の薄層である移動層を単位として海浜流に運搬されて移動すると考える。   However, since it is difficult to handle the calculation with the shape as it is, for simplification, it is considered that the earth and sand thrown into the seabed has a flat cylindrical shape composed of N particles as a whole. FIG. 2 is a diagram schematically showing a side surface of the cylinder 10 in which the shape of the earth and sand is idealized. Then, the overall height of the cylinder 10 is Δh, the diameter is 2r, and the cylinder 10 is regarded as a stack of thin layers. The earth and sand is a single thin layer having a thickness δs including Ns particles from only the upper surface of the cylinder. I think that it is transported and moved to the beach flow by the moving layer.

ところが移動層に含まれる土砂の全部が単位時間で運搬されるとは限らないから、移動層をさらに上下2層に分けて考え、上側の層11は、単位時間中に海浜流により粒子が移動するものの、円筒10内には留まる粒子からなる層であるとする。この移動する粒子の個数をN0個とする。なお、円筒10内に留まっているかどうかは、移動後の位置で判断する。一方、下側の層12は、Δt後に海浜流の影響を受け始める粒子からなる層である。さらに、一番下の層13は、海浜流の影響を未だ受けないで、動いていない粒子の層と考える。つまり、図2は、ある時間から単位時間Δtが経過する時点の円筒10の状況を示した模式図である。なお、単位時間Δtは、具体的には1分とか1時間とか1日とかを適宜定めればよい。この例では、Δtを30分と定めて演算を行っている。 However, not all of the earth and sand contained in the moving layer is transported in unit time, so the moving layer is further divided into two upper and lower layers, and the upper layer 11 moves particles by the beach current during unit time. However, it is assumed that the layer is composed of particles that remain in the cylinder 10. The number of moving particles is N 0 . Whether or not the cylinder 10 remains is determined based on the position after the movement. On the other hand, the lower layer 12 is a layer composed of particles that begin to be affected by the beach current after Δt. Further, the lowest layer 13 is not yet affected by the beach current and is considered as a layer of particles that are not moving. That is, FIG. 2 is a schematic diagram showing the state of the cylinder 10 at the time when the unit time Δt elapses from a certain time. Note that the unit time Δt may be determined as appropriate, specifically 1 minute, 1 hour, or 1 day. In this example, the calculation is performed with Δt set to 30 minutes.

このように投入された土砂を円筒形状のN個の粒子の集合としてとらえ、個々の粒子が海浜流に運搬される軌跡を求めることでシミュレーションを行い、その結果によって元の土砂投入位置が適切かどうかを判断するのであるが、海浜流は、投入された土砂の全部の粒子に対してほぼ同じように働くため、単に個々の粒子の軌跡を海浜流に沿って演算するだけでは、円筒10がほぼそのままの形で平行移動するにすぎない結果となり、実際の土砂の移動の状況からかけ離れた結果となってしまう。これは、計算上の都合から比較的粗い単位区画で平均化されて求められた海浜流では、実際の流れで生じる細かいランダムな流れを表現できず、また、粒子どうしの衝突による散乱等の影響も反映できないことによる。   The soil and sand introduced in this way are regarded as a collection of N particles having a cylindrical shape, and a simulation is performed by obtaining a trajectory in which each particle is transported to the beach flow. However, since the beach current works in the same manner for all the particles of the earth and sand that have been input, simply calculating the trajectory of each particle along the beach current makes the cylinder 10 As a result, the result is merely a translation in almost the same form, which is far from the actual situation of earth and sand movement. This is because the beach current obtained by averaging in a relatively coarse unit block for calculation convenience cannot express the fine random flow that occurs in the actual flow, and it is also affected by scattering due to particle collisions, etc. Because it cannot be reflected.

そこで、個々の粒子の軌跡を求めるにあたり、図3に示すようなランダムな拡散因子を含む確率過程を用いる。図3は、ある粒子のある時間における位置ベクトルをXnとした場合に、単位時間Δt後の同じ粒子の位置ベクトルをXn+1の位置を示した図である。ここで、海浜流による粒子運搬の速度ベクトルをUsとすると、Usだけを考えた単位時間後の位置ベクトルは、XnにUsΔtを足したYn+1である。これに、さらに拡散ベクトルaf(θ)を足した位置のベクトルを、Xn+1とする。すなわち、次の式(1)が成り立つ。
n+1=Xn+UsΔt+af(θ)・・・・・・(1)
Therefore, in obtaining the trajectory of each particle, a stochastic process including a random diffusion factor as shown in FIG. 3 is used. FIG. 3 is a diagram illustrating the position vector X n + 1 of the same particle position vector after unit time Δt, where X n is the position vector of a particle at a certain time. Here, assuming that the velocity vector for particle transport by the beach current is Us, the position vector after unit time considering only Us is Y n + 1 obtained by adding UsΔt to X n . A vector at a position obtained by adding the diffusion vector af (θ) to this is defined as X n + 1 . That is, the following equation (1) is established.
X n + 1 = X n + UsΔt + af (θ) (1)

ここで、f(θ)は、一様乱数を用いてランダムな方向(θ)を向く単位ベクトルであり、粒子の軌跡が確率的に定まる確率過程の中心的な役割を果たす。また、UsΔtの終点を中心として拡散因子となるベクトルaf(θ)の方向を定める方向分布関数でもある。aは、確率過程(拡散)による単位時間あたりの移動距離であり、粒子の拡散係数Dと単位時間Δtとを用いて次の式(2)で定義される。
a=(2DΔt)1/2・・・・・・・・(2)
Here, f (θ) is a unit vector pointing in a random direction (θ) using a uniform random number, and plays a central role in a stochastic process in which the trajectory of particles is stochastically determined. It is also a directional distribution function that determines the direction of the vector af (θ) serving as a diffusion factor around the end point of UsΔt. a is a moving distance per unit time by a stochastic process (diffusion), and is defined by the following equation (2) using the particle diffusion coefficient D and the unit time Δt.
a = (2DΔt) 1/2 (2)

なお、拡散係数Dは、計算対象となる海域が砕波帯域内にあるという前提で、混合距離が波高Hに比例し、代表速度が、波による擾乱の振幅である底面軌道流束振幅Umに比例するとして、次の式(3)で定義したものを用いた。なお、底面軌道流束振幅Umは、波浪場と地形条件とから定めることができる。
D=0.003UmH・・・・・・・・・・・・(3)
The diffusion coefficient D is based on the assumption that the sea area to be calculated is in the wave breaking band, the mixing distance is proportional to the wave height H, and the representative velocity is proportional to the bottom orbital flux amplitude Um, which is the amplitude of the disturbance caused by the wave. Then, what was defined by the following formula (3) was used. The bottom orbit flux amplitude Um can be determined from the wave field and topographic conditions.
D = 0.003UmH (3)

このような拡散因子af(θ)を含めることにより、各粒子がランダムウォークすると共に、粒子の移動方向を粒子ごとにバラつかせることが可能になり、実際の土砂の移動状況を反映することが可能になった。なお、粒子の速度ベクトルUsは、海浜流による平均速度ベクトルUcと同じ方向で、かつ長さをUcの1%とした(Us=0.01Uc)。   By including such a diffusion factor af (θ), it becomes possible for each particle to randomly walk and also to vary the moving direction of the particle for each particle, and reflect the actual state of earth and sand movement. It became possible. The velocity vector Us of the particles is in the same direction as the average velocity vector Uc due to the beach current, and the length is 1% of Uc (Us = 0.01 Uc).

以上のモデルを基にして、以下のようにして海底に投入された土砂の移動シミュレーションを行う。図4は、シミュレーションの概略フローを示した図である。なお、シミュレーションはコンピュータにより行う例で説明する。処理を開始すると、まず処理対象である海域の地形条件を入力する(S10ステップ)。地形条件には、既存の海岸線及び港湾設備等の位置及び形状、海岸線近くの海底部分の地形や水深、海底の土質等が含まれる。   Based on the above model, the movement simulation of earth and sand thrown into the seabed is performed as follows. FIG. 4 is a diagram showing a schematic flow of simulation. The simulation will be described using an example in which the simulation is performed by a computer. When the process is started, first, the terrain condition of the sea area to be processed is input (step S10). The topographic conditions include the position and shape of existing coastlines and harbor facilities, topography and water depth of the seabed near the coastline, soil quality of the seabed, and the like.

図5に実際のシミュレーション例で入力された海域の模式図を示す。これは、茨城県の東海港の平面図であり、岸壁32の図面上部には、複数の等深線22が記された海域が拡がっており、図面左手には突堤31と32で囲まれた港湾20が設けられている。以下、港湾20の右手にある岸壁32付近の海底の土砂が、海浜流(大まかには図面右から左に流れている。)により浸食され、港湾の入り口21と港湾20内に堆積するため、これを浚渫して浸食された部分に還元したい場合を例として説明する。   FIG. 5 shows a schematic diagram of the sea area input in an actual simulation example. This is a plan view of the Tokai Port in Ibaraki Prefecture, and the sea area where a plurality of contour lines 22 are drawn is expanded in the upper part of the drawing of the quay 32, and the port 20 surrounded by jetties 31 and 32 on the left side of the drawing. Is provided. In the following, because the sediment on the seabed near the quay 32 on the right hand side of the port 20 is eroded by the beach current (roughly flows from the right to the left of the drawing) and accumulates in the port entrance 21 and the port 20, A case where it is desired to reduce this to an eroded portion will be described as an example.

次に、投入された土砂を運搬する海浜流を生じる元となる、海浜沖合の波浪条件を設定する(S20ステップ)。波浪条件は、海浜の沖合においてあらかじめ定めた期間においてどのような波浪が来襲したかを計測し、このデータに基づいてスペクトル法等により解析された波浪の統計的な波高、周期、波向等のデータを含む。   Next, wave conditions off the beach, which are the origins of the beach current that carries the loaded earth and sand, are set (step S20). Wave conditions measure what kind of waves have occurred in a predetermined period offshore on the beach, and statistical wave height, period, wave direction, etc. of waves analyzed by the spectral method etc. based on this data. Contains data.

次に、投入される土砂を代表するN個の粒子の初期条件が設定される(S30ステップ)。N個の粒子は、図5の試験投入位置40に投入されるとしてシミュレーションを行うから、初期条件には試験投入位置40の位置座標を含む。また、これらN個の粒子が、図2に示す平たい円筒形状をなしていると考えるのはすでに説明したとおりであり、初期条件には、円筒形状におけるそれぞれの粒子の深さのデータ(投入直後の円筒上面の高さを基準として、各粒子の埋没深さを示したデータ)が含まれている。   Next, initial conditions for N particles representing the earth and sand to be introduced are set (step S30). Since the simulation is performed assuming that the N particles are input to the test input position 40 in FIG. 5, the initial condition includes the position coordinates of the test input position 40. In addition, as described above, it is considered that these N particles have a flat cylindrical shape shown in FIG. 2. As initial conditions, the depth data of each particle in the cylindrical shape (immediately after the injection) Data indicating the buried depth of each particle on the basis of the height of the upper surface of the cylinder.

次に、設定された地形条件と波浪条件から、対象となる海浜の平面波浪場を演算する(S40ステップ)。平面波浪場とは、海浜付近における時間的に平均された波浪エネルギーの平面的な分布が求められたスカラー場と、波向が求められたベクトル場とからなり、上記の海浜沖合における波浪条件と海浜の地形条件とから、エネルギー平衡方程式を介して演算する。実際の演算は、海域を複数の単位領域に分割し、微分方程式を離散化した通常の数値解法で行う。   Next, the plane wave field of the target beach is calculated from the set topographic condition and wave condition (step S40). A plane wave field consists of a scalar field in which the time-averaged wave energy distribution in the vicinity of the beach is calculated and a vector field in which the wave direction is calculated. It is calculated from the terrain condition of the beach through the energy balance equation. The actual calculation is performed by a normal numerical method in which the sea area is divided into a plurality of unit areas and the differential equations are discretized.

次に、海浜流場を演算する(S50ステップ)。海浜流場とは、対象となる海浜付近の場所ごとに時間平均された海浜流れの速度(流速)と方向(流向)とを特定したベクトル場である。まず先に求めた平面波浪場から、砕波による波高減衰を考慮して時間的に平均された波高と波向の値を海浜の場所ごとに得る。海浜流場は、これらの平均的な波高と波向分布とを前提とし、ラディエイションストレス(radiation stress)を基因として、沖側境界の境界条件と側方境界の境界条件とを仮定し、さらに海底の摩擦項を仮定して、非線形長波方程式を用いて演算する。なお、側方境界とは、例えば、図5のように沿岸が図面に対して左右方向に延びているとすると、実演算を可能にするために、その左右方向の範囲を決めた場合の境界を意味する。   Next, the beach flow field is calculated (step S50). The beach flow field is a vector field that specifies the speed (velocity) and direction (flow direction) of the beach flow averaged for each location near the target beach. First, from the plane wave field obtained earlier, the values of wave height and wave direction averaged over time are obtained for each beach location in consideration of wave height attenuation due to breaking waves. Assuming these average wave heights and wave direction distributions, the coastal flow field assumes the boundary conditions of the offshore boundary and the lateral boundary based on the radiation stress. In addition, assuming a friction term on the seabed, the calculation is performed using a nonlinear long wave equation. For example, when the coast extends in the left-right direction with respect to the drawing as shown in FIG. 5, the side boundary is the boundary when the range in the left-right direction is determined in order to enable actual calculation. Means.

なお、波浪場と海浜流場を演算する具体的な数式及び演算方法等に関しては、ここでは、清水琢三、熊谷隆宏、三村信夫、渡辺晃共著、「汀線変化を考慮した3次元海浜変型長期予測モデル」、海岸工学論文集、第41巻、pp.406−410、土木学会発行(1994年)に記載された数式及び演算方法等に従って行っている。   As for the specific formulas and calculation methods for calculating the wave field and the beach flow field, here, Shinzo Shimizu, Takahiro Kumagai, Nobuo Mimura, Jun Watanabe, “Three-dimensional beach transformation long-term considering shoreline changes. Prediction Model ", Coastal Engineering Papers, Vol. 41, pp. This is performed in accordance with mathematical formulas and calculation methods described in 406-410, published by Japan Society of Civil Engineers (1994).

次に、ある粒子i(i=1)に着目し、t=Δtにおいて粒子iにかかる外力場を演算する(S60ステップ)。具体的には、先に求めた平面波浪場と海浜流場から、粒子iにかかる外力である底面剪断応力を抽出し、この底面剪断応力と粒子の水中重量で代表した安定力との比であるシールズ数を演算する。なお、この粒子の移動させる底面剪断応力は、円筒形状内か円筒形状外か等の、海底における粒子の位置によって当然に変化する。   Next, paying attention to a certain particle i (i = 1), an external force field applied to the particle i at t = Δt is calculated (step S60). Specifically, the bottom shear stress, which is an external force applied to the particle i, is extracted from the plane wave field and beach flow field obtained previously, and the ratio of the bottom shear stress and the stability force represented by the weight of the particle in water Calculate a certain number of Shields. It should be noted that the bottom shear stress to which the particles are moved naturally changes depending on the position of the particles on the seabed, such as whether they are inside the cylinder or outside the cylinder.

次に、着目している粒子iが、海浜流により移動しうるかどうかを判断する(S70ステップ)。判断の基準は2つあり、両方を満たした場合に粒子iは移動しうると判断する。基準の1つめは、粒子iのシールズ数があらかじめ定められた限界シールズ数を超えているか否かである。超えている場合には、粒子の運動を引き起こす底面剪断応力が粒子の安定力を上回っているので、粒子iは移動しうる。2つめの基準は、粒子iの円筒形状における埋没深さが移動層の厚みδsより小さいか否かである。小さい場合には、粒子iは円筒形状の十分表層に位置するので移動できる。両方を満たしている場合には、フローはS80ステップに移行し、いずれか一方または両方とも満たしていない場合には、フローはS90ステップに移行する。なお、時間の経過により粒子iが円筒形状から外に移動している場合は、移動可能と判断する。   Next, it is determined whether or not the focused particle i can be moved by the beach current (step S70). There are two criteria for determination, and if both are satisfied, it is determined that the particle i can move. The first criterion is whether or not the number of shields of particle i exceeds a predetermined limit number of shields. If so, the particle i can move because the bottom shear stress causing the motion of the particle exceeds the stability of the particle. The second criterion is whether or not the buried depth of the particle i in the cylindrical shape is smaller than the thickness δs of the moving layer. In the case of being small, the particles i can move because they are positioned sufficiently on the surface of the cylindrical shape. If both are satisfied, the flow proceeds to step S80, and if either or both are not satisfied, the flow proceeds to step S90. In addition, when the particle | grains i are moving outside from cylindrical shape with progress of time, it determines that it can move.

S80ステップでは、粒子iが移動可能な場合に、t=0+Δtにおける粒子iの移動位置を演算する。移動位置の演算にあたっては、上記の式(1)を用い、拡散を考慮したランダムウォークにより演算する。粒子iは海浜流に大まかに沿いながら、乱数に従ってジグザグに移動することになる。これにより、粒子ごとに移動の軌跡が異なる結果となるから、実際の土砂粒子の移動の様子をかなり的確に再現することが可能となる。   In step S80, when the particle i is movable, the moving position of the particle i at t = 0 + Δt is calculated. In calculating the movement position, the above equation (1) is used, and the movement position is calculated by a random walk considering diffusion. The particles i move in a zigzag manner according to random numbers while roughly following the beach current. As a result, the movement trajectory varies from particle to particle, so that the actual movement of the earth and sand particles can be reproduced fairly accurately.

S90ステップでは、i=Nを満たすか否か、すなわちN個の粒子全部について演算が終了したか否かが判断される。満たさない場合は、フローはS90ステップからS60ステップに移行し、i=i+1とすることでiを1だけ増加させて、すなわち別の粒子iについてS60ステップからS90ステップを実行する。これを全部の粒子N個に対して行う。   In step S90, it is determined whether i = N is satisfied, that is, whether the calculation has been completed for all N particles. If not, the flow proceeds from step S90 to step S60, i is increased by 1 by setting i = i + 1, that is, steps S60 to S90 are executed for another particle i. This is performed for all N particles.

一方、i=Nを満たす場合は、全部の粒子について演算が終了しているので、フローはS90ステップからS100ステップに移行して、tがあらかじめ定めた計算時間を上回っているか否かを判断する。ここで、あらかじめ定めた計算時間とは、土砂投入からどれだけの期間内に土砂の還元が生じればよいかを決めた時間である。例えば、1ヶ月や3ヶ月、1年などという還元終了までの計画期間を設定する。この例では40日を設定している。tがあらかじめ定めた計算時間を上回っていない場合には、まだ予定された還元終了時間が経過していないことになるから、フローはS100ステップからS60ステップに戻り、t=t+Δtとすることで時間tをΔtだけ進めて、再度S60ステップからS100ステップを実行する。時間tがΔtの累積によりあらかじめ定めた計算時間に到達するまでこのフローを繰り返す。   On the other hand, when i = N is satisfied, since the calculation has been completed for all the particles, the flow proceeds from step S90 to step S100, and it is determined whether or not t exceeds a predetermined calculation time. . Here, the predetermined calculation time is a time for which it is determined in what period the earth and sand should be reduced after the earth and sand is charged. For example, a plan period until the end of the reduction such as one month, three months, one year, or the like is set. In this example, 40 days are set. If t does not exceed the predetermined calculation time, the scheduled reduction end time has not yet elapsed, so the flow returns from step S100 to step S60, and t = t + Δt. t is advanced by Δt, and steps S60 to S100 are executed again. This flow is repeated until the time t reaches a predetermined calculation time due to the accumulation of Δt.

時間tがあらかじめ定めた計算時間を超えた場合は、予定された還元終了時間に到達したので、フローはS100ステップからS110ステップに移行して、N個の粒子の最終移動位置のデータを図5の地形図に重ねて出力して処理を終了する。   If the time t exceeds the predetermined calculation time, the scheduled reduction end time has been reached, so the flow proceeds from step S100 to step S110, and the data of the final movement positions of the N particles is shown in FIG. The process is finished after being output on the topographical map.

次に、実際の海域に対してシミュレーションを行った例を示す。上記の図5に記載の地形に対して、試験投入位置40に土砂(N=10万個)を投入して16日間経過した場合のシミュレーション結果を図6に示す。図6では、各単位区画に移動した粒子数の常用対数に対する等高線を用いてシミュレーション結果を表示している。ただし、砂数が0の場合は便宜上0とした。図6からわかるように、試験投入位置40から図面に向かって左下方向に粒子が拡散して移動している状況がわかる。図7は、同じ状況下で投入から40日経過した場合のシミュレーション結果を示した図である。粒子の一部は岸壁32や港湾の入り口21に到達していることがわかる。   Next, an example is shown in which a simulation is performed on an actual sea area. FIG. 6 shows a simulation result when 16 days have elapsed since the earth and sand (N = 100,000 pieces) were added to the test input position 40 with respect to the terrain described in FIG. In FIG. 6, the simulation results are displayed using contour lines with respect to the common logarithm of the number of particles moved to each unit section. However, when the number of sand was 0, it was set to 0 for convenience. As can be seen from FIG. 6, it can be seen that the particles are diffusing and moving from the test loading position 40 toward the lower left direction toward the drawing. FIG. 7 is a diagram showing a simulation result when 40 days have passed since the insertion under the same situation. It can be seen that some of the particles reach the quay 32 and the entrance 21 of the harbor.

一方、シミュレーション結果の妥当性を検証するために、同じ海域の試験投入位置40に、実際に蛍光砂を投入した実地調査を実施した。図8は、実地調査において、サンプリングを行った場所を示した図である。サンプリングは、図6、7に対応して投入から16日後と40日後にそれぞれ図中の碁盤状の線の各交点で行い、各交点で容量300cm3(表面積120cm2)の土砂を採取し、含まれている蛍光砂の数をカウントした。投入から16日後の実地調査の結果を図9に、40日後の実地調査の結果を図10に示す。なお、調査結果は碁盤状の部分だけを示した。また、交点近くの数字は得られた蛍光砂数の常用対数である。ただし、砂数が0の場合は便宜上0とした。なお、現地調査では、対象海域の沖合に波浪計を設置し、シミュレーションに用いるための波浪条件を同時に計測するようにした。 On the other hand, in order to verify the validity of the simulation results, a field survey was conducted in which fluorescent sand was actually introduced at the test entry position 40 in the same sea area. FIG. 8 is a diagram showing a place where sampling was performed in the field survey. Sampling is performed at each intersection of a checkerboard-like lines in each Figure to 16 days and after 40 days from the feeding corresponding to FIGS. 6 and 7, soil was collected volume 300 cm 3 (surface area 120 cm 2) at each intersection, The number of fluorescent sand contained was counted. FIG. 9 shows the results of the field survey 16 days after the introduction, and FIG. 10 shows the results of the field survey after 40 days. The survey results showed only a grid-like part. The number near the intersection is a common logarithm of the number of fluorescent sands obtained. However, when the number of sand was 0, it was set to 0 for convenience. In the field survey, a wave meter was installed offshore of the target sea area to simultaneously measure the wave conditions for use in the simulation.

図6と図9とを比較すると、粒子が試験投入位置40から図面左下方向に拡散して移動している点で近似した結果が得られていることがわかる。また、図7と図10を比較すると、一部の粒子が岸壁や港湾の入り口付近に到達している点において、かなり近似した結果が得られていることがわかる。シミュレーションで用いた海浜流が平均化された巨視的な流れにすぎず、粒子の移動に直接的に影響する微視的な擾乱を含まないこと、などを考慮すると、図6と図9の結果の近似度は、驚くほど高いと言える。   Comparing FIG. 6 and FIG. 9, it can be seen that an approximate result is obtained in that the particles diffuse and move from the test loading position 40 in the lower left direction of the drawing. Moreover, comparing FIG. 7 with FIG. 10, it can be seen that a result that is quite approximate is obtained in that some particles reach the vicinity of the entrance of the quay or harbor. Considering that the beach current used in the simulation is only an averaged macroscopic flow and does not include microscopic disturbances that directly affect particle movement, the results of FIGS. The approximation of is surprisingly high.

さらに、図11から図14に、土砂の投入場所を変更した場合のシミュレーション結果を示す。図11は、土砂の投入位置を図6の試験投入位置40より北側(図面左側)に変更し、より突堤31に近い位置に投入した場合に、投入から16日経過後の状況のシミュレーション結果である。粒子が図面左下に移動している点は図6と同様であるが、16日で粒子が港湾入り口21や岸壁32に到達する結果となっている。図12は、図11のさらに24日後、すなわち投入から40日経過後の状況のシミュレーション結果である。   Further, FIGS. 11 to 14 show simulation results when the place where the earth and sand is charged is changed. FIG. 11 is a simulation result of the situation after 16 days have passed since the earth and sand injection position is changed to the north side (left side of the drawing) from the test injection position 40 in FIG. . The point that the particles are moving to the lower left of the drawing is the same as in FIG. 6, but the particles reach the harbor entrance 21 and the quay 32 in 16 days. FIG. 12 shows the simulation result of the situation after 24 days from FIG.

図13は、土砂の投入位置を図11の投入位置から岸壁により近い位置に変更し、投入から16日経過後の状況のシミュレーション結果である。16日経過時点では、粒子が港湾入り口21に達していないが、岸壁32には到達していることがわかる。さらに、図14は、図13の時点から24日経過後、すなわち投入から40日経過後の状況のシミュレーション結果である。40日後でも粒子は港湾入り口21に到達していないことがわかる。   FIG. 13 is a simulation result of a situation after 16 days have elapsed since the loading position of earth and sand was changed from the loading position of FIG. 11 to a position closer to the quay. It can be seen that the particles have not reached the harbor entrance 21 but have reached the quay 32 when the 16th day has passed. Furthermore, FIG. 14 shows the simulation result of the situation after 24 days from the time of FIG. 13, that is, after 40 days from the insertion. It can be seen that the particles have not reached the harbor entrance 21 even after 40 days.

このように、土砂投入位置を変更してシミュレーションを繰り返すことにより、粒子が到達することが望ましい場所(例えば、岸壁32)に到達し、到達しないことが望ましい場所(例えば、港湾入り口21)に到達しない望ましい投入場所を、容易に確定することが可能になる。その際、現地の波浪条件を何らかの手段で入手すればよいだけで、現地における蛍光砂を用いた実地調査が不要となるから、実地調査にかかる膨大な手間と費用がかからなくなる。   In this way, by changing the earth and sand input position and repeating the simulation, the particles reach a place where it is desirable that the particles reach (for example, the quay 32) and reach a place where it is desirable that the particles do not reach (for example, the port entrance 21). This makes it possible to easily determine the desired input location. At that time, it is only necessary to obtain the local wave conditions by some means, and the on-site survey using the fluorescent sand on the site becomes unnecessary, so that enormous labor and cost for the on-site survey are eliminated.

以上、実施の形態について説明してきたが、本発明は上記の具体的な実施態様に限定されるものではなく種々の変型が可能である。例えば、上記では投入された土砂が、薄層を積層した平たい円筒形状をなすとするモデルを使用したが、計算上は円筒を点として扱うため円筒形状である必要はなく、四角や三角などの任意の形状のモデルとすればよい。要は、ある時間tでは、移動しうる粒子と移動し得ない粒子があること、また、移動可能であっても単位時間Δtの間に土砂投入位置から外に移動しうるか否かあることが、それぞれ結果に反映できるようにすればよい。   Although the embodiments have been described above, the present invention is not limited to the specific embodiments described above, and various modifications are possible. For example, in the above, a model was used in which the earth and sand thrown in was formed into a flat cylindrical shape in which thin layers were stacked. However, in the calculation, the cylinder does not have to be a cylindrical shape because it is treated as a point, such as a square or a triangle. A model having an arbitrary shape may be used. In short, there are particles that can move and particles that cannot move at a certain time t, and whether or not the particles can move out of the sediment input position during the unit time Δt even though they can move. Each can be reflected in the result.

また、平面波浪場や海浜流場を計算するにあたり、上記では文献記載の方法により行ったが、公知の他の方法を用いてもよい。また、確率過程を用いた粒子の軌跡の演算は、上記のように一様乱数を用いてランダムにベクトルの方向を変えて行うのではなく、海浜流れ方向を基準として、粒子の移動方向のズレ角度を引数にした確率関数を用いるようにしてもよい。また、拡散係数は、砕破帯域を前提にして定義したが、砕波帯域以外も含めて、それぞれで適宜定めるようにしても良い。   In calculating the plane wave field and the beach flow field, the method described in the literature is used in the above description, but other known methods may be used. In addition, the calculation of the particle trajectory using a stochastic process is not performed by randomly changing the vector direction using a uniform random number as described above, but by shifting the particle movement direction based on the beach flow direction. A probability function using an angle as an argument may be used. Further, although the diffusion coefficient is defined on the assumption of the breaking band, it may be appropriately determined for each including the breaking wave band.

また、上記では本発明をシミュレーション方法として説明したが、本発明は、シミュレーション方法をコンピュータに実行させるためのプログラムであっても良い。また、プログラムはコンピューターが読み取り可能な記録媒体に格納してもよい。ここで記録媒体とは、フレキシブルディスク、光磁気ディクス、ROM、CD−ROM等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記録装置のことを言う。また、プログラムは、任意に分割し、分割したものをそれぞれに記憶媒体に格納してもよい。   Although the present invention has been described above as a simulation method, the present invention may be a program for causing a computer to execute the simulation method. The program may be stored in a computer-readable recording medium. Here, the recording medium refers to a recording medium such as a flexible disk, a magneto-optical disk, a portable medium such as a ROM and a CD-ROM, and a hard disk incorporated in a computer system. The program may be arbitrarily divided, and the divided programs may be stored in the storage medium.

海底に投入された土砂の状態を示した模式図である。It is the schematic diagram which showed the state of the earth and sand thrown into the seabed. 投入土砂を円筒形状に理想化したモデルの模式図である。It is a schematic diagram of the model which idealized the input earth and sand into a cylindrical shape. 確率過程の計算手法を図示した概念図である。It is the conceptual diagram which illustrated the calculation method of the stochastic process. シミュレーションの概略フローを示したフローチャートである。It is the flowchart which showed the outline flow of simulation. シミュレーション対象とした海域の例の地形図である。It is the topographical map of the example of the sea area made into simulation object. 試験投入位置40に土砂を投入した場合の16日経過後のシミュレーション結果を示した図である。It is the figure which showed the simulation result after 16 days passage when earth and sand are thrown into the test pouring position. 試験投入位置40に土砂を投入した場合の40日経過後のシミュレーション結果を示した図である。It is the figure which showed the simulation result after 40 day passage when earth and sand are thrown into the test pouring position. 実地調査を行った際に、蛍光砂のサンプリングを行った地点を示した図である。It is the figure which showed the point which sampled the fluorescent sand when conducting the field survey. 試験投入位置40に、蛍光砂を投入してから16日経過した時点の蛍光砂分布を示した図である。It is the figure which showed the fluorescent sand distribution at the time of passing 16 days after putting fluorescent sand into the test charging position 40. 試験投入位置40に、蛍光砂を投入してから40日経過した時点の蛍光砂分布を示した図である。It is the figure which showed the fluorescent sand distribution at the time of 40 days having passed since the fluorescent sand was thrown into the test insertion position. 他の投入位置に土砂を投入した場合の、16日経過後のシミュレーション結果を示した図である。It is the figure which showed the simulation result after 16 days when the earth and sand are thrown into another loading position. 他の投入位置に土砂を投入した場合の、40日経過後のシミュレーション結果を示した図である。It is the figure which showed the simulation result after 40-day progress when earth and sand are thrown into another loading position. さらに他の投入位置に土砂を投入した場合の、16日経過後のシミュレーション結果を示した図である。Furthermore, it is the figure which showed the simulation result after 16 days passage when earth and sand are thrown into other loading positions. さらに他の投入位置に土砂を投入した場合の、40日経過後のシミュレーション結果を示した図である。Furthermore, it is the figure which showed the simulation result after progress for 40 days when earth and sand are thrown into another loading position.

符号の説明Explanation of symbols

1 海底に投入された土砂
2 海底
10 理想化された土砂
11 Δt後に移動中であるが、円筒内に留まる粒子の層
12 Δt後に円筒内で移動しはじめる粒子の層
13 Δt後に移動しない粒子の層
20 港湾
21 港湾の入り口
22 等深線
30 北側突堤
31 南側突堤
32 岸壁
40 試験投入位置
DESCRIPTION OF SYMBOLS 1 Earth and sand thrown into the seabed 2 Seabed 10 Idealized earth and sand 11 A layer of particles 12 Δt that remains in the cylinder but starts moving in the cylinder after Δt 13 A particle that does not move after Δt Layer 20 Port 21 Port entrance 22 Contour line 30 North side jetty 31 South side jetty 32 Quay wall 40 Test entry position

Claims (4)

サンドリサイクルにおける粒子移動のシミュレーション方法であって、前記サンドリサイクルが行われる場所の地形条件と波浪条件と前記粒子の初期条件とを設定するステップと、前記地形条件と前記波浪条件とから前記場所における平面波浪場と海浜流場とを演算するステップと、前記平面波浪場と前記海浜流場とから前記粒子にかかる外力場を演算するステップと、前記外力場による前記粒子の移動位置を確率過程により演算するステップとを備えることを特徴とするシミュレーション方法。   A method for simulating particle movement in sand recycling, comprising: setting a topographic condition, a wave condition, and an initial condition of the particle at a place where the sand recycling is performed; and from the topographic condition and the wave condition, A step of calculating a plane wave field and a beach flow field, a step of calculating an external force field applied to the particles from the plane wave field and the beach flow field, and a moving position of the particles by the external force field by a stochastic process And a step of calculating. 前記の初期条件は、複数の前記粒子が集合して、複数の移動層を積層した形状をなすモデルを含むものであることを特徴とする請求項1に記載のシミュレーション方法。   The simulation method according to claim 1, wherein the initial condition includes a model in which a plurality of the particles are aggregated to form a shape in which a plurality of moving layers are stacked. さらに、前記の外力場と前記初期条件とから前記粒子の移動可能性を判断するステップを備え、前記移動可能性が肯定される場合に、前記移動位置を演算することを特徴とする請求項1または2に記載のシミュレーション方法。   2. The method according to claim 1, further comprising a step of determining the movement possibility of the particles from the external force field and the initial condition, and the movement position is calculated when the movement possibility is affirmed. Or the simulation method of 2. 請求項1から3のいずれかに記載のシミュレーション方法を、コンピュータに実行させるためのプログラム。
A program for causing a computer to execute the simulation method according to claim 1.
JP2006137433A 2006-05-17 2006-05-17 Simulation method of particle movement in sand recycling Expired - Fee Related JP4866146B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006137433A JP4866146B2 (en) 2006-05-17 2006-05-17 Simulation method of particle movement in sand recycling

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006137433A JP4866146B2 (en) 2006-05-17 2006-05-17 Simulation method of particle movement in sand recycling

Publications (2)

Publication Number Publication Date
JP2007308916A JP2007308916A (en) 2007-11-29
JP4866146B2 true JP4866146B2 (en) 2012-02-01

Family

ID=38842029

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006137433A Expired - Fee Related JP4866146B2 (en) 2006-05-17 2006-05-17 Simulation method of particle movement in sand recycling

Country Status (1)

Country Link
JP (1) JP4866146B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334402A (en) * 2013-07-12 2013-10-02 水利部交通运输部国家能源局南京水利科学研究院 Sediment accumulation forecasting method aiming at trenchless harbor basin channel

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7508353B2 (en) * 2020-12-07 2024-07-01 五洋建設株式会社 Submarine topography estimation method, trained model generation method, submarine topography estimation device and program
CN114438952B (en) * 2022-01-24 2023-05-16 中国长江三峡集团有限公司 Test simulation system and test simulation method for reservoir Sha Feng dispatching
CN115561765B (en) * 2022-09-16 2025-09-26 哈尔滨工程大学 A method for AUV long-distance terrain contour assisted navigation

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2995713B2 (en) * 1995-11-06 1999-12-27 東京電力株式会社 Sand pocket type harbor equipment
JP4492363B2 (en) * 2005-01-25 2010-06-30 五洋建設株式会社 Design method for fixed sand bypass system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103334402A (en) * 2013-07-12 2013-10-02 水利部交通运输部国家能源局南京水利科学研究院 Sediment accumulation forecasting method aiming at trenchless harbor basin channel

Also Published As

Publication number Publication date
JP2007308916A (en) 2007-11-29

Similar Documents

Publication Publication Date Title
Takahashi Debris flow: mechanics, prediction and countermeasures
Kleinhans et al. Meandering channel dynamics in highly cohesive sediment on an intertidal mud flat in the Westerschelde estuary, the Netherlands
Reungoat et al. Sediment processes and flow reversal in the undular tidal bore of the Garonne River (France)
Uddin et al. Flow and erosion at a bend in the braided Jamuna River
Mishra et al. Alluvial cover on bedrock channels: Applicability of existing models
Chechko et al. Dynamics of sediments disposed in the marine coastal zone near the Vistula Lagoon inlet, south-eastern part of the Baltic Sea.
Spiske et al. A quasi-experimental setting of coarse clast transport by the 2010 Chile tsunami (Bucalemu, Central Chile)
JP4866146B2 (en) Simulation method of particle movement in sand recycling
Fernández-Fernández et al. Longshore transport estimation on Ofir Beach in northwest Portugal: Sand-tracer experiment
Carling Historical Review of Literature with Respect to Recent Investigations
Osada et al. Influence of channel morphology on ice conveyance and bridging: Experiments with a numerical model
Zhang et al. Spatial variability of surface sediment basis on geostatistical analysis in the littoral area of Yellow River delta, China
Harris et al. Marine scour and offshore wind: lessons learnt and future challenges
Walder et al. Case study: mapping tsunami hazards associated with debris flow into a reservoir
Kuang et al. Influence of wind force on a silt-muddy coast: Huanghua Harbor Coast, China
CN118747484A (en) A method for calculating channel deposit volume and a method for predicting hydraulic debris flow mechanism
Nakata et al. Modelling emplacement of the world’s largest tsunami boulder
KR102662720B1 (en) Estimation method of land reclamation sand spreading loss according to flow speed and water depth
Serizawa et al. Model for predicting formation of a cuspate foreland
Al-Salem et al. Modeling of sediment transport using wave height action in Fialaka Marina
Lucas et al. Modelling of flow characteristics in the access channel of Bali tourism port using DualSPHysics
Cheng et al. Numerical model for three-dimensional scour below a pipeline in steady currents
Seifart The long term impact of the Seli One shipwreck on the Table Bay beaches
Leung et al. A case study of the deep-sea tailings outfall in the tropical south Pacific
Heera et al. Navigating the environmental approval process for rainbowing sand onto port beach

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20090514

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110428

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20111012

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20111111

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20171118

Year of fee payment: 6

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees