Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP4878161B2 - Steel tube column joining method and joining jig - Google Patents
[go: Go Back, main page]

JP4878161B2 - Steel tube column joining method and joining jig - Google Patents

Steel tube column joining method and joining jig Download PDF

Info

Publication number
JP4878161B2
JP4878161B2 JP2006002562A JP2006002562A JP4878161B2 JP 4878161 B2 JP4878161 B2 JP 4878161B2 JP 2006002562 A JP2006002562 A JP 2006002562A JP 2006002562 A JP2006002562 A JP 2006002562A JP 4878161 B2 JP4878161 B2 JP 4878161B2
Authority
JP
Japan
Prior art keywords
joining
column
plate
pillar
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2006002562A
Other languages
Japanese (ja)
Other versions
JP2007182731A (en
Inventor
行正 荻原
修二 品田
博 藤村
清 塚本
正哉 瀧
敏之 福元
淳 久保田
達 宮坂
清三郎 東
紳一 澤泉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Nippon Steel Corp
Original Assignee
Kajima Corp
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp, Nippon Steel Corp filed Critical Kajima Corp
Priority to JP2006002562A priority Critical patent/JP4878161B2/en
Publication of JP2007182731A publication Critical patent/JP2007182731A/en
Application granted granted Critical
Publication of JP4878161B2 publication Critical patent/JP4878161B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

本発明は、鋼管柱の接合方法および当該鋼管柱の接合に用いられる鋼管柱接合用冶具に関し、鋼管からなる下部柱に鋼管からなる上部柱をボルト接合により容易に接合できるようにしたものであり、鋼管柱およびコンクリート充填鋼管柱の接合に適用できる。   The present invention relates to a method for joining steel pipe columns and a steel pipe column joining jig used for joining the steel pipe columns, wherein an upper column made of steel pipe can be easily joined to a lower column made of steel pipe by bolt joining. Applicable for joining steel pipe columns and concrete filled steel pipe columns.

一般に、鋼管からなる下部柱の上端部に鋼管からなる上部柱の下端部を接合する方法として溶接が用いられ、その際、継手部の溶接が完了するまでの間、例えば図11に図示するように下部柱20と上部柱21の端部にエレクションピース22,22をそれぞれ突設し、当該エレクションピース22,22を複数の連結プレート23と仮止めボルト24によって結合することにより下部柱20と上部柱21を仮接合している。   In general, welding is used as a method of joining the lower end of the upper column made of steel pipe to the upper end of the lower column made of steel pipe. At this time, until the welding of the joint portion is completed, for example, as shown in FIG. The erection pieces 22 and 22 project from the ends of the lower column 20 and the upper column 21 respectively, and the erection pieces 22 and 22 are connected by a plurality of connecting plates 23 and temporary fixing bolts 24 to thereby connect the lower column 20 and the upper column. The column 21 is temporarily joined.

ところで、溶接による接合は、天候や作業者の技量などによって溶接の良否が大きく左右され、信頼性に欠ける等の問題があるため、高力ボルトによる接合が望ましいとされている。   By the way, in joining by welding, the quality of welding is greatly influenced by the weather and the skill of the operator, and there is a problem of lack of reliability. Therefore, joining by high-strength bolts is desirable.

これまで、上記のように仮接合された下部柱20と上部柱21を高力ボルトによって本接合するには、下部柱20と上部柱21の各柱の端部に形成されたボルト孔に対応させて接合ナットを仮付けした接合プレートを下部柱20と上部柱21との継手部の内側に添え付け、継手部の外側にはボルト孔を形成した接合プレートを添え付け、外側の接合プレートのボルト孔から内側の接合ナットに接合ボルトを締め付けている。   Until now, the lower column 20 and the upper column 21 temporarily joined as described above are joined to each other by the high-strength bolts, corresponding to the bolt holes formed at the ends of the columns of the lower column 20 and the upper column 21. The joining plate temporarily attached with the joining nut is attached to the inside of the joint portion between the lower column 20 and the upper column 21, and the joining plate formed with a bolt hole is attached to the outside of the joint portion. The joint bolt is tightened from the bolt hole to the inner joint nut.

また、継手部の外側に接合プレートを添え付けないで下部柱20と上部柱21の外側から直接下部柱20と上部柱21の内側に添え付けられた接合ナットに高力ボルトを締め付けることも行われている。   Further, a high-strength bolt may be fastened to a joining nut attached to the inside of the lower column 20 and the upper column 21 directly from the outside of the lower column 20 and the upper column 21 without attaching a joining plate to the outside of the joint portion. It has been broken.

この接合方法においても、すべての接合ボルトを締め付け終えるまでの間、下部柱と上部柱を仮接合しておく必要があるが、これまでのエレクションピースを使用した接合方法は、エレクションピースが継手部の外側に添え付けられる接合プレートの障害になって採用できない。   Even in this joining method, it is necessary to temporarily join the lower column and the upper column until all of the joining bolts have been tightened. However, in the joining method using the conventional erection piece, the erection piece is the joint part. It cannot be used because it obstructs the joining plate attached to the outside of the plate.

他に、最も妥当な方法として、接合プレートを利用し、外側の接合プレートのボルト孔から内側の接合ナットに仮止めボルトを締め付ける方法が考えられる。   In addition, as a most appropriate method, a method of using a joining plate and tightening a temporary fixing bolt from a bolt hole of the outer joining plate to an inner joining nut can be considered.

特開平9−137511号公報JP-A-9-137511

しかし、仮止めボルトによってボルト孔や接合ナットを傷める恐れがあり、また、一般にボルト孔は、仮止めボルトに対してはある程度の遊びがあるのに対し、後から締め付けられる本設の接合ボルトとの間には比較的あそびが少ないため、ボルト孔がずれて後から本設ボルトの締付けが非常に困難になることがあった。さらに、接合プレートは一枚でも相当の重量になるにもかかわらず、複数枚用いられるためその取り扱いが面倒であった。   However, the bolt holes and joint nuts may be damaged by the temporary fixing bolts. In addition, the bolt holes generally have some play against the temporary fixing bolts. Since there is relatively little play between the bolt holes, the bolt holes are displaced and it is sometimes difficult to fasten the permanent bolts. In addition, even though a single joining plate has a considerable weight, handling is troublesome because a plurality of joining plates are used.

本発明は、以上の課題を解決するためになされたもので、鋼管からなる下部柱に上部柱をボルト接合により確実にかつ効率的に接合できるようにした鋼管柱の接合方法および当該接合方法に用いられる鋼管柱接合用冶具を提供することを目的とする。   The present invention has been made to solve the above-described problems, and a steel pipe column joining method and a joining method that allow a top column to be securely and efficiently joined to a lower column made of a steel pipe by bolt joining. It aims at providing the jig for steel pipe column joining used.

請求項1記載の鋼管柱の接合方法は、鋼管からなる下部柱1の上端部に鋼管からなる上部柱2の下端部接合用冶具8とドリフトピン9を用い、複数の接合プレート3および接合プレート4複数の接合ボルトによって接合する鋼管柱の接合方法において、複数のボルト孔4aと当該ボルト孔4aに連通する複数の接合ナット6を有する接合プレート4と、複数のボルト孔3aを有する接合プレート3を前記下部柱1および上部柱2と同一断面形状および同一寸法のリング状に形成された接合用冶具8によって仮組みする工程と、当該接合プレート3および接合プレート4を前記下部柱1の上端部まで移送すると共に、当該接合プレート4と接合プレート3の下端側を前記下部柱1の内側と外側にそれぞれ添え付ける工程と、前記接合プレート3のボルト孔3a、下部柱1のボルト孔1aおよび前記接合プレート4のボルト孔4aにドリフトピン9を挿入することにより接合プレート3と接合プレート4を前記下部柱1の上端部に仮固定する工程と、前記下部柱1の上端部に前記上部柱2の下端部を設置すると共に、当該上部柱2の内側と外側に前記接合プレート4と接合プレート3の上端側をそれぞれ添え付ける工程と、前記接合プレート3のボルト孔3aから前記下部柱1のボルト孔1a、上部柱2のボルト孔2aおよび接合プレート4のボルト孔4aに接合ボルト5を挿入し、かつ前記接合ナット6に螺合する工程からなることを特徴する。 The method for joining steel pipe columns according to claim 1 uses a joining jig 8 and a drift pin 9 to join a lower end portion of an upper column 2 made of steel pipe to an upper end portion of a lower column 1 made of steel pipe , and a plurality of joining plates 3 and joining. In a method for joining steel pipe columns joined by a plate 4 and a plurality of joining bolts 5 , a joining plate 4 having a plurality of bolt holes 4a, a plurality of joining nuts 6 communicating with the bolt holes 4a, and a plurality of bolt holes 3a are provided. A step of temporarily assembling the joining plate 3 with a joining jig 8 formed in a ring shape having the same cross-sectional shape and the same dimensions as the lower pillar 1 and the upper pillar 2, and the joining plate 3 and the joining plate 4 are joined to the lower pillar 1 The lower end side of the joining plate 4 and the joining plate 3 to the inner side and the outer side of the lower column 1, respectively, Temporarily fixing the joining plate 3 and the joining plate 4 to the upper end portion of the lower pillar 1 by inserting the drift pins 9 into the bolt holes 3 a of the joint 3, the bolt holes 1 a of the lower pillar 1, and the bolt holes 4 a of the joining plate 4. And a step of installing a lower end portion of the upper column 2 at an upper end portion of the lower column 1 and attaching an upper end side of the bonding plate 4 and the bonding plate 3 to the inner side and the outer side of the upper column 2, respectively. The joining bolt 5 is inserted from the bolt hole 3a of the joining plate 3 into the bolt hole 1a of the lower pillar 1, the bolt hole 2a of the upper pillar 2, and the bolt hole 4a of the joining plate 4, and screwed into the joining nut 6. It is characterized by comprising the steps of:

本発明は特に、下部柱と上部柱との継手部の内側と外側の両方に接合プレートを添え付けることにより、下部柱と上部柱を強固に接合できるようにしたものである。   In particular, the present invention makes it possible to firmly join the lower pillar and the upper pillar by attaching joining plates to both the inside and the outside of the joint portion between the lower pillar and the upper pillar.

また、本設用の接合プレートを下部柱と上部柱とを仮接合するための接合部材として利用するため非常に経済的であり、また仮止めボルトの代わりにドリフトピンを使用するため、ボルト孔と接合ナットを傷めることがなく、また、ボルト孔とドリフトピンとの間にはほとんど余裕がないことからボルト孔がずれることもないので、本設用の接合ボルトを確実に締め付けることができる。   In addition, since the joining plate for main installation is used as a joining member for temporarily joining the lower column and the upper column, it is very economical, and since a drift pin is used instead of the temporary fixing bolt, a bolt hole is used. The joint nut is not damaged, and the bolt hole is not displaced because there is almost no margin between the bolt hole and the drift pin, so that the joint bolt for permanent installation can be securely tightened.

請求項2記載の鋼管柱の接合方法は、鋼管からなる下部柱1の上端部に鋼管からなる上部柱2の下端部接合用冶具8とドリフトピン9を用い、複数の接合プレート複数の接合ボルトによって接合する鋼管柱の接合方法において、複数のボルト孔4aと当該ボルト孔4aに連通する複数の接合ナット6を有する接合プレート4を前記下部柱1および上部柱2と同一断面形状および同一寸法のリング状に形成された接合用冶具8によって仮組みする工程と、当該接合プレート4を前記下部柱1の上端部まで移送すると共に、当該接合プレート4の下端側を前記下部柱1の内側に添え付ける工程と、前記下部柱1のボルト孔1aと接合プレート4のボルト孔4aにドリフトピン9を挿入することにより前記接合プレート4を前記下部柱1の上端部に仮固定する工程と、前記下部柱1の上端部に前記上部柱2の下端部を設置すると共に、当該上部柱2の内側に前記接合プレート4の上端側を添え付ける工程と、前記下部柱1のボルト孔1aと上部柱2のボルト孔2aから接合プレート4のボルト孔4aに接合ボルト5を挿入し、かつ前記接合ナット6に螺合する工程からなることを特徴するものである。 The method for joining steel pipe columns according to claim 2 uses a joining jig 8 and a drift pin 9 to connect a lower end portion of an upper column 2 made of steel pipe to an upper end portion of a lower column 1 made of steel pipe , and a plurality of joining plates 4 and a plurality. In the method of joining steel pipe columns to be joined by the joining bolts 5 , the joining plate 4 having a plurality of bolt holes 4 a and a plurality of joining nuts 6 communicating with the bolt holes 4 a has the same cross-sectional shape as the lower pillar 1 and the upper pillar 2. And a step of temporarily assembling with the joining jig 8 formed in a ring shape of the same size, the joining plate 4 is transferred to the upper end of the lower pillar 1, and the lower end side of the joining plate 4 is placed on the lower pillar 1. And attaching the drift plate 9 to the bolt hole 1a of the lower pillar 1 and the bolt hole 4a of the joining plate 4 to attach the joining plate 4 to the lower pillar 1 A step of temporarily fixing to an end portion, a step of installing a lower end portion of the upper column 2 at an upper end portion of the lower column 1, a step of attaching the upper end side of the joining plate 4 to the inside of the upper column 2, It is characterized by comprising the steps of inserting the joining bolt 5 from the bolt hole 1a of the lower pillar 1 and the bolt hole 2a of the upper pillar 2 into the bolt hole 4a of the joining plate 4 and screwing into the joining nut 6. .

本発明は特に、下部柱と上部柱との継手部の内側にのみ接合プレートを添え付け、外側の接合プレートを省略することにより、下部柱と上部柱を簡単にかつ経済的に接合できるようにしたものである。   In particular, the present invention can easily and economically join the lower column and the upper column by attaching the junction plate only to the inside of the joint portion between the lower column and the upper column and omitting the outer junction plate. It is a thing.

なお、請求項1および請求項2のいずれの接合方法においても、下部柱の上端部に上部柱の下端部を配置する場合、双方の端部を互いに突き合せてもよく(メタルタッチ)、あるいは双方の端部を互いに突き合せないで双方の端部間に一定のクリアランスを設けてもよい。   In any of the joining methods of claim 1 and claim 2, when the lower end portion of the upper column is disposed at the upper end portion of the lower column, both end portions may abut each other (metal touch), or You may provide a fixed clearance between both ends, without abutting both ends.

請求項3記載の鋼管柱の接合方法は、請求項1または2記載の鋼管柱の接合方法において、接合ナットはナットホルダーによって接合プレートに取り付けることを特徴とするものである。 The method for joining steel pipe columns according to claim 3 is the method for joining steel pipe columns according to claim 1 or 2, wherein the joining nut 6 is attached to the joining plate 4 by a nut holder 7 .

なお、ここで用いられるナットホルダーは複数の接合ナットを一個一個、当該接合ナットに螺合される接合ボルトの締め付け時に供回りしないよう所定間隔おきに保持できるように形成されたナット保持ケースであって、接合プレートに溶接などによって容易に固着することができるものである。   The nut holder used here is a nut holding case formed so that a plurality of joining nuts can be held at predetermined intervals so as not to be rotated when fastening the joining bolts screwed to the joining nuts. Thus, it can be easily fixed to the joining plate by welding or the like.

請求項4記載の鋼管柱の接合用冶具は、鋼管からなる下部柱に鋼管からなる上部柱を複数の接合プレート3および4と複数の接合ボルトによって接合する際に前記接合プレート3および4を仮組みするために使用される鋼管柱の接合用冶具であって、前記下部柱および上部柱と同一断面形状および同一寸法のリング状に形成され、側部に前記接合プレート3および4をボルト止めするためのボルト孔8aが形成されてなることを特徴とするものである。 The steel pipe column joining jig according to claim 4, wherein when the upper column 2 made of steel pipe is joined to the lower column 1 made of steel pipe by the plurality of joining plates 3 and 4 and the plurality of joining bolts 5 , the joining plate 3 and 4 is a steel pipe column joining jig used for temporarily assembling 4 and is formed in a ring shape having the same cross-sectional shape and the same dimensions as the lower column 1 and the upper column 2, and the joining plate 3 and A bolt hole 8a for bolting 4 is formed.

本発明によれば、相当重量のある複数の接合プレートを下部柱および上部柱の形状寸法に合わせて予め仮組みし、同時に下部柱の上端部にセットすることができるので、作業効率が非常にアップする。また、当該接合用金具は下部柱および上部柱と同じ鋼管から簡単に形成することができる。   According to the present invention, a plurality of joining plates having a considerable weight can be temporarily assembled in accordance with the shape and dimensions of the lower column and the upper column, and simultaneously set on the upper end of the lower column. Up. Moreover, the said metal fitting for joining can be easily formed from the same steel pipe as a lower pillar and an upper pillar.

本発明は、本接合用の接合プレートとドリフトピンを仮接合用部材として利用することにより、下部柱の上端部に上部柱の下端部を複数の接合プレートと接合ボルトによってきわめて効率的にかつ強固に接合することができる等の効果を有する。   The present invention uses the joining plate and the drift pin for the final joining as temporary joining members, so that the lower end of the upper column is extremely efficiently and firmly secured to the upper end of the lower column by a plurality of joining plates and joining bolts. It has the effect that it can be joined.

本発明の接合用冶具を使用することにより、相当重量のある複数の接合プレートを下部柱の上端部に同時にセットすることができるので、作業効率が非常にアップする。   By using the joining jig of the present invention, it is possible to simultaneously set a plurality of joining plates having a considerable weight on the upper end portion of the lower column, so that the working efficiency is greatly improved.

図1(a),(b)は、共に鋼管からなる下部柱と上部柱との接合部を示し、図において、下部柱1の上端部に上部柱2の下端部が突き合わせられ、当該下部柱1と上部柱2は複数の接合プレート3および接合プレート4と複数の接合ボルト5によって接合されている。   1 (a) and 1 (b) show a joint between a lower column and an upper column made of steel pipes. In the figure, the lower column 1 is abutted against the upper end of the lower column 1, and the lower column 1 and the upper column 2 are joined by a plurality of joining plates 3 and a joining plate 4 and a plurality of joining bolts 5.

接合プレート3は下部柱1および上部柱2の各面の外側に双方の柱1,2間に跨ってそれぞれ添え付けられ、接合プレート4は下部柱1および上部柱2の各面の内側に双方の柱1,2間に跨ってそれぞれ添え付けられている。   The joining plate 3 is attached to the outside of each surface of the lower pillar 1 and the upper pillar 2 so as to straddle between both pillars 1 and 2, and the joining plate 4 is both inside the respective faces of the lower pillar 1 and the upper pillar 2. Attached across the pillars 1 and 2 respectively.

また接合ボルト5のうち、下部柱1側に締め付けられた接合ボルト5は、接合プレート3、下部柱1の各側部、および接合プレート4にそれぞれ形成されたボルト孔3a,ボルト孔1aおよびボルト孔4aをそれぞれ貫通し、接合プレート4の裏側に添え付けられた接合ナット6に螺合されている。   Of the joining bolts 5, the joining bolts 5 fastened to the lower pillar 1 side are bolt holes 3 a, bolt holes 1 a and bolts formed in the joining plate 3, each side part of the lower pillar 1, and the joining plate 4, respectively. Each of the holes 4a passes through the hole 4a and is screwed into a joint nut 6 attached to the back side of the joint plate 4.

また、上部柱2側に締め付けられた接合ボルト5は、接合プレート3、上部柱2の各側部および接合プレート4にそれぞれ形成されたボルト孔3a,ボルト孔2aおよびボルト孔4aをそれぞれ貫通し、接合プレート4の裏側に添え付けられた接合ナット6に螺合されている。   Moreover, the joining bolt 5 fastened to the upper pillar 2 side passes through the bolt hole 3a, the bolt hole 2a, and the bolt hole 4a formed in the joining plate 3, each side part of the upper pillar 2 and the joining plate 4, respectively. , And screwed to a joining nut 6 attached to the back side of the joining plate 4.

接合ナット6は接合プレート4の裏側にナットホルダー7によって取り付けられている。ナットホルダー7は複数の接合ナット6を接合プレート4のボルト4aの位置に合わせて一個一個、接合ボルト5の締め付け時に供回りしないよう保持するためのナット保持ケースであって、接合プレート4に溶接されている。なお、接合ボルト5には高力ボルトが使用されている。   The joining nut 6 is attached to the back side of the joining plate 4 by a nut holder 7. The nut holder 7 is a nut holding case for holding a plurality of joining nuts 6 one by one in accordance with the position of the bolt 4 a of the joining plate 4 so as not to be rotated when the joining bolt 5 is tightened, and is welded to the joining plate 4. Has been. Note that a high-strength bolt is used as the joining bolt 5.

下部柱1と上部柱2との接合に際しては、例えば図2に図示するように下部柱1の上端部に接合プレート3と接合プレート4をセットするために、例えば図5に図示するような接合用冶具8が使用される。   When the lower column 1 and the upper column 2 are joined, for example, as shown in FIG. 2, in order to set the joining plate 3 and the joining plate 4 on the upper end of the lower column 1, joining as shown in FIG. A jig 8 is used.

また、下部柱1の上端部に接合プレート3と接合プレート4を仮固定するために、例えば図6と図7に図示するようなドリフトピン9が使用される。   Further, in order to temporarily fix the joining plate 3 and the joining plate 4 to the upper end portion of the lower column 1, for example, a drift pin 9 as shown in FIGS. 6 and 7 is used.

接合用冶具8は、下部柱1および上部柱2と同一断面形状・同一寸法の矩形リング状に形成され、各側部の中央にボルト孔8aが形成されている。ボルト孔8aは接合プレート3および接合プレート4にそれぞれ形成された複数のボルト孔3aおよびボルト孔4aのうち、上端部に形成されたボルト孔3aおよびボルト孔4aと対応する位置に形成されている。また、接合用冶具8にはクレーン等で吊れるように吊り紐8bが取り付けられている。   The joining jig 8 is formed in a rectangular ring shape having the same cross-sectional shape and the same dimensions as the lower pillar 1 and the upper pillar 2, and a bolt hole 8a is formed at the center of each side portion. The bolt hole 8a is formed at a position corresponding to the bolt hole 3a and the bolt hole 4a formed at the upper end portion among the plurality of bolt holes 3a and the bolt holes 4a formed in the joining plate 3 and the joining plate 4, respectively. . Further, a hanging string 8b is attached to the joining jig 8 so as to be hung by a crane or the like.

そして、この接合用冶具8を用いることで、接合用冶具8の各側部の外側と内側にそれぞれ、接合プレート3と接合プレート4を各プレートのボルト孔3aおよび4aと接合用冶具8のボルト孔8aを貫通する仮付けボルト10によってそれぞれボルト止めし、クレーン等で吊って複数の接合プレート3と接合プレート4を下部柱1の上端部まで同時に移送し、セットすることができる。   Then, by using this joining jig 8, the joining plate 3 and the joining plate 4 are respectively connected to the outer side and the inside of each side portion of the joining jig 8, and the bolt holes 3 a and 4 a of each plate and the bolt of the joining jig 8. The plurality of joining plates 3 and joining plates 4 can be simultaneously transferred to the upper end of the lower column 1 by being bolted by temporary bolts 10 penetrating the holes 8a and suspended by a crane or the like.

図7(a),(b) ,(c)は、ドリフトピンの一例を示し、ドリフトピン9は中央の大径部9aと当該大径部9aの両端に形成された小径部9b,9bとから棒状に形成されている。   FIGS. 7A, 7B and 7C show an example of a drift pin. The drift pin 9 includes a central large-diameter portion 9a and small-diameter portions 9b and 9b formed at both ends of the large-diameter portion 9a. It is formed in a rod shape.

両端の小径部9b,9bは接合プレート3のボルト孔3a、下部柱1のボルト孔1aおよび接合プレート4のボルト孔4a内に連続して挿入された際、当該ボルト孔3a、ボルト孔1aおよびボルト孔4aが同じ軸線上で完全に一致するようにボルト孔3a、ボルト孔1aおよびボルト孔4aの内径とほぼ一致する外径に形成されている。また、小径部9bは接合プレート4のボルト孔4a内までは到達するが、接合ナット6には届かない長さに形成されている。   When the small diameter portions 9b, 9b at both ends are successively inserted into the bolt holes 3a of the joining plate 3, the bolt holes 1a of the lower column 1, and the bolt holes 4a of the joining plate 4, the bolt holes 3a, the bolt holes 1a and The bolt holes 4a are formed to have outer diameters that substantially match the inner diameters of the bolt holes 3a, the bolt holes 1a, and the bolt holes 4a so that the bolt holes 4a completely coincide with each other on the same axis. The small-diameter portion 9 b is formed in such a length that it reaches the inside of the bolt hole 4 a of the joining plate 4 but does not reach the joining nut 6.

また、特に図7(c)に示すドリフトピン9は、両端に小径部9b,9bを、中央に雄ネジ部9cをそれぞれ有するドリフトピン本体と、中央の雄ネジ部9cに螺合された長ナットからなる大径部9aとから形成されている。そして、長ナットからなる大径部9aを回しドリフトピン本体の軸方向に適宜移動することによりボルト孔3a、ボルト孔1aおよびボルト孔4aを合計したボルト孔の深さに応じて両端の小径部9bの長さを自由に変更できるようになっている。   Further, in particular, the drift pin 9 shown in FIG. 7 (c) is a length that is screwed into a drift pin main body having small diameter portions 9b and 9b at both ends and a male screw portion 9c at the center, and a male screw portion 9c at the center. A large-diameter portion 9a made of a nut is formed. Then, by turning the large-diameter portion 9a made of a long nut and appropriately moving in the axial direction of the drift pin main body, the small-diameter portions at both ends according to the total depth of the bolt hole 3a, the bolt hole 1a and the bolt hole 4a The length of 9b can be changed freely.

このような構成において、次に本発明の鋼管柱の接合方法を、図2と図3に図示する例に基いて説明する。   Next, a method for joining steel pipe columns according to the present invention will be described based on the example shown in FIGS.

最初に、下部柱1上端部の各側部に接合プレート3と接合プレート4をそれぞれセットする。この場合、各接合プレート3と接合プレート4は、地上において接合用冶具8によって予め仮組みし、そしてクレーンで吊って下部柱1の上端部まで移送する。   First, the joining plate 3 and the joining plate 4 are set on each side of the upper end of the lower column 1. In this case, each joining plate 3 and joining plate 4 are temporarily assembled on the ground by means of a joining jig 8 and then suspended by a crane and transferred to the upper end of the lower column 1.

接合プレート3は当該接合プレート3の下側半分を下部柱1の外側部に添え付け、上側半分を下部柱1の上方に突出させてセットする。また、接合プレート4は当該接合プレート4の下側半分を下部柱1の内側部に添え付け、上側半分を下部柱1の上方に突出させてセットする。   The joining plate 3 is set with the lower half of the joining plate 3 attached to the outer side of the lower pillar 1 and the upper half protruding above the lower pillar 1. The joining plate 4 is set with the lower half of the joining plate 4 attached to the inner side of the lower pillar 1 and the upper half protruding above the lower pillar 1.

そして、各接合プレート3のボルト孔3a、下部柱1のボルト孔1aおよび接合プレート4のボルト孔4aにドリフトピン9の小径部9bを図6に図示するように連続して挿入することにより、各接合プレート3と接合プレート4を下部柱1の上端部の各側部に仮固定する。   Then, by continuously inserting the small diameter portion 9b of the drift pin 9 into the bolt hole 3a of each joining plate 3, the bolt hole 1a of the lower pillar 1 and the bolt hole 4a of the joining plate 4 as shown in FIG. Each joining plate 3 and joining plate 4 are temporarily fixed to each side part of the upper end part of the lower pillar 1.

なお、ドリフトピン9は少なくとも接合プレート1枚につき2ヶ所のボルト孔に挿入する。ボルト孔にドリフトピン9の小径部9bを挿入することで各ボルト孔3a,1a及び4aを一致させることができる。また、こうして位置合わせした少なくとも一ヶ所のボルト孔に接合ボルト5を挿入し、その先端を接合ナット6に螺合することにより、誤って接合プレート3と接合プレート4が落下するのを未然に防止することができる。   The drift pin 9 is inserted into at least two bolt holes for each joining plate. By inserting the small-diameter portion 9b of the drift pin 9 into the bolt hole, the bolt holes 3a, 1a and 4a can be matched. Further, by inserting the joining bolt 5 into at least one bolt hole thus aligned and screwing the tip of the joining bolt 5 into the joining nut 6, it is possible to prevent the joining plate 3 and the joining plate 4 from being accidentally dropped. can do.

次に、ドリフトピン9が挿入されていないボルト孔3a、下部柱1のボルト孔1aおよび接合プレート4のボルト孔4aに接合ボルト5を挿入し、当該接合ボルト5の先端を接合ナット6に螺合する。なお、この段階では、各接合ボルト5は最後まで締め付けず、緩めに締め付け、接合ボルト5に上部柱2の荷重が作用しないようにしておく。   Next, the joining bolt 5 is inserted into the bolt hole 3 a into which the drift pin 9 is not inserted, the bolt hole 1 a of the lower pillar 1, and the bolt hole 4 a of the joining plate 4, and the tip of the joining bolt 5 is screwed into the joining nut 6. Match. At this stage, each joining bolt 5 is not tightened to the end, but is loosely tightened so that the load of the upper column 2 does not act on the joining bolt 5.

次に、接合用冶具8を取り外し、下部柱1の上端部に上部柱2の下端部を突き合わせる。そして、上部柱2下端部の各外側部に各接合プレート3の上側半分を、各内側部に各接合プレート4の上側半分をそれぞれ添え付ける。   Next, the joining jig 8 is removed, and the lower end of the upper column 2 is butted against the upper end of the lower column 1. And the upper half of each joining plate 3 is attached to each outer side part of the lower end part of the upper column 2, and the upper half of each joining plate 4 is attached to each inner part.

次に、少なくとも一ヶ所の各接合プレート3のボルト孔3a、上部柱2のボルト孔2aおよび各接合プレート4のボルト孔4aにドリフトピン9の小径部9bを挿入して各ボルト孔の位置を合わせる。そして、一致した各ボルト孔に接合ボルト5を連続して挿入し、当該接合ボルト5の先端を各接合ナット6に螺合する。また、ドリフトピン9が挿入されているボルト孔にもドリフトピン9を抜き取り、接合ボルト5を挿入し、その先端を接合ナット6に螺合する。   Next, the small-diameter portion 9b of the drift pin 9 is inserted into the bolt hole 3a of each joint plate 3, the bolt hole 2a of the upper column 2, and the bolt hole 4a of each joint plate 4, and the position of each bolt hole is determined. Match. Then, the joining bolts 5 are continuously inserted into the corresponding bolt holes, and the tips of the joining bolts 5 are screwed into the joining nuts 6. Further, the drift pin 9 is extracted from the bolt hole in which the drift pin 9 is inserted, the joining bolt 5 is inserted, and the tip thereof is screwed into the joining nut 6.

そして、下部柱1側および上部柱2側の各接合ボルト5を最後まで強く締め付けて、図1(a),(b)に図示するように下部柱1と上部柱2との接合を完了する。   Then, the joining bolts 5 on the lower pillar 1 side and the upper pillar 2 side are firmly tightened to the end, and the joining of the lower pillar 1 and the upper pillar 2 is completed as shown in FIGS. 1 (a) and 1 (b). .

図8と図9は、外側の接合プレート3がなく、内側の接合プレート4と複数の接合ボルト5のみによって下部柱1と上部柱2が接合されている柱の接合部を示したものであり、また図10(a)〜(d)はその接合手順を示したもので、図2と図3で説明した接合方法とは接合プレートが用いられない点が異なるのみである。   FIG. 8 and FIG. 9 show the joint part of the pillar in which the lower pillar 1 and the upper pillar 2 are joined only by the inner joining plate 4 and the plurality of joining bolts 5 without the outer joining plate 3. FIGS. 10A to 10D show the joining procedure, and the only difference from the joining method described in FIGS. 2 and 3 is that no joining plate is used.

本発明は、鋼管からなる下部柱と上部柱を、溶接ではなく接合ボルトによってきわめて効率的にかつ強固に接合することができる。   According to the present invention, a lower column and an upper column made of a steel pipe can be joined very efficiently and firmly by a joining bolt instead of welding.

鋼管からなる下部柱と上部柱との接合部を示し、(a)はその斜視図、(b)は横断面図である。The junction part of the lower pillar and upper pillar which consist of steel pipes is shown, (a) is the perspective view, (b) is a cross-sectional view. 下部柱の上端部に接合用冶具を用いて複数の接合プレートをセットした状態を示す斜視図である。It is a perspective view which shows the state which set the some joining plate using the jig for joining to the upper end part of a lower pillar. 下部柱の上端部に複数の接合プレートを仮固定し、上部柱の下端部を接合する状態を示す斜視図である。It is a perspective view which shows the state which temporarily fixes a some joining plate to the upper end part of a lower pillar, and joins the lower end part of an upper pillar. 下部柱の上端部に複数の接合プレートを仮固定し、上部柱の下端部を接合する状態を示す斜視図である。It is a perspective view which shows the state which temporarily fixes a some joining plate to the upper end part of a lower pillar, and joins the lower end part of an upper pillar. 下部柱の上端部に接合プレートをセットする際に用いられる接合用冶具の斜視図である。It is a perspective view of the jig for joining used when setting a joining plate to the upper end part of a lower pillar. ドリフトピンの使用状態を示す断面図である。It is sectional drawing which shows the use condition of a drift pin. (a),(b)はドリフトピンの使用状態を示す断面図、(c)はドリフトピンの他の例を示す正面図である。(A), (b) is sectional drawing which shows the use condition of a drift pin, (c) is a front view which shows the other example of a drift pin. 鋼管からなる下部柱と上部柱との接合部を示す斜視図である。It is a perspective view which shows the junction part of the lower pillar and upper pillar which consist of steel pipes. 下部柱の上端部に接合用冶具を用いて複数の接合プレートをセットした状態を示す斜視図である。It is a perspective view which shows the state which set the some joining plate using the jig for joining to the upper end part of a lower pillar. (a)〜(d)は、下部柱の上端部に上部柱の下端部を接合する手順を示す斜視図である。(A)-(d) is a perspective view which shows the procedure which joins the lower end part of an upper pillar to the upper end part of a lower pillar. 鋼管からなる下部柱と上部柱とを仮接合した状態を示す斜視図である。It is a perspective view which shows the state which temporarily joined the lower pillar and upper pillar which consist of steel pipes.

符号の説明Explanation of symbols

1 下部柱
2 上部柱
3 接合プレート(ボルト孔を有する接合プレート)
4 接合プレート(ボルト孔および接合ナットを有する接合プレート)
5 接合ボルト
6 接合ナット
7 ナットホルダー
8 接合用冶具
9 ドリフトピン
9a 大径部
9b 小径部
10 仮付けボルト
1 Lower pillar 2 Upper pillar 3 Joining plate (joint plate with bolt holes)
4 Joining plate (joint plate with bolt holes and joining nuts)
5 Joining bolt 6 Joining nut 7 Nut holder 8 Joining jig 9 Drift pin 9a Large diameter portion 9b Small diameter portion 10 Temporary bolt

Claims (4)

鋼管からなる下部柱1の上端部に鋼管からなる上部柱2の下端部接合用冶具8とドリフトピン9を用い、複数の接合プレート3および接合プレート4複数の接合ボルトによって接合する鋼管柱の接合方法において複数のボルト孔4aと当該ボルト孔4aに連通する複数の接合ナット6を有する接合プレート4と、複数のボルト孔3aを有する接合プレート3を前記下部柱1および上部柱2と同一断面形状および同一寸法のリング状に形成された接合用冶具8によって仮組みする工程と、当該接合プレート3および接合プレート4を前記下部柱1の上端部まで移送すると共に、当該接合プレート4と接合プレート3の下端側を前記下部柱1の内側と外側にそれぞれ添え付ける工程と、前記接合プレート3のボルト孔3a、下部柱1のボルト孔1aおよび前記接合プレート4のボルト孔4aにドリフトピン9を挿入することにより接合プレート3と接合プレート4を前記下部柱1の上端部に仮固定する工程と、前記下部柱1の上端部に前記上部柱2の下端部を設置すると共に、当該上部柱2の内側と外側に前記接合プレート4と接合プレート3の上端側をそれぞれ添え付ける工程と、前記接合プレート3のボルト孔3aから前記下部柱1のボルト孔1a、上部柱2のボルト孔2aおよび接合プレート4のボルト孔4aに接合ボルト5を挿入し、かつ前記接合ナット6に螺合する工程からなることを特徴する鋼管柱の接合方法。 The lower end of the upper column 2 made of steel pipe to the upper end of the lower column 1 using a bonding jig 8 and the drift pin 9 made of steel, joined by a plurality of bonding plate 3 and the junction plates 4 and a plurality of fastening bolt 5 steel In the column joining method , a plurality of bolt holes 4a, a joining plate 4 having a plurality of joining nuts 6 communicating with the bolt holes 4a, and a joining plate 3 having a plurality of bolt holes 3a are connected to the lower pillar 1 and the upper pillar 2 respectively. And a step of temporarily assembling with the joining jig 8 formed in a ring shape having the same cross-sectional shape and the same dimensions, the joining plate 3 and the joining plate 4 are transferred to the upper end portion of the lower column 1 and the joining plate 4 And attaching the lower end side of the joining plate 3 to the inside and outside of the lower pillar 1 respectively, and the bolt hole 3a of the joining plate 3 and the bottom pillar 1 A step of temporarily fixing the joining plate 3 and the joining plate 4 to the upper end of the lower pillar 1 by inserting the drift pin 9 into the bolt hole 4a of the joint hole 1a and the joining plate 4, and the upper end of the lower pillar 1 A lower end portion of the upper column 2, a step of attaching the upper end side of the bonding plate 4 and the bonding plate 3 to the inner side and the outer side of the upper column 2, and the bolt hole 3 a of the bonding plate 3, A steel pipe column comprising a step of inserting a joining bolt 5 into a bolt hole 1a of the lower pillar 1, a bolt hole 2a of the upper pillar 2, and a bolt hole 4a of the joining plate 4 and screwing into the joining nut 6 . Joining method. 鋼管からなる下部柱1の上端部に鋼管からなる上部柱2の下端部接合用冶具8とドリフトピン9を用い、複数の接合プレート複数の接合ボルトによって接合する鋼管柱の接合方法において、複数のボルト孔4aと当該ボルト孔4aに連通する複数の接合ナット6を有する接合プレート4を前記下部柱1および上部柱2と同一断面形状および同一寸法のリング状に形成された接合用冶具8によって仮組みする工程と、当該接合プレート4を前記下部柱1の上端部まで移送すると共に、当該接合プレート4の下端側を前記下部柱1の内側に添え付ける工程と、前記下部柱1のボルト孔1aと接合プレート4のボルト孔4aにドリフトピン9を挿入することにより前記接合プレート4を前記下部柱1の上端部に仮固定する工程と、前記下部柱1の上端部に前記上部柱2の下端部を設置すると共に、当該上部柱2の内側に前記接合プレート4の上端側を添え付ける工程と、前記下部柱1のボルト孔1aと上部柱2のボルト孔2aから接合プレート4のボルト孔4aに接合ボルト5を挿入し、かつ前記接合ナット6に螺合する工程からなることを特徴する鋼管柱の接合方法。 A steel pipe column joining method in which the lower end portion of the upper column 2 made of steel pipe is joined to the upper end portion of the lower column 1 made of steel pipe by using a joining jig 8 and a drift pin 9 by a plurality of joining plates 4 and a plurality of joining bolts 5 . The joint plate 4 having a plurality of bolt holes 4a and a plurality of joint nuts 6 communicating with the bolt holes 4a is formed into a ring shape having the same cross-sectional shape and the same dimensions as the lower pillar 1 and the upper pillar 2. A step of temporarily assembling with the jig 8, a step of transferring the joining plate 4 to the upper end of the lower column 1, attaching a lower end side of the joining plate 4 to the inside of the lower column 1, and the lower column 1 A step of temporarily fixing the joining plate 4 to the upper end of the lower column 1 by inserting a drift pin 9 into the bolt hole 1a of the joining plate 4 and the bolt hole 4a of the joining plate 4; The lower end of the upper column 2 is installed at the upper end of the first column 2, the upper end side of the joining plate 4 is attached to the inner side of the upper column 2, the bolt holes 1 a of the lower column 1, and the upper column 2 A steel pipe column joining method comprising the steps of inserting a joining bolt 5 from a bolt hole 2a into a bolt hole 4a of a joining plate 4 and screwing it into the joining nut 6 . 接合ナットはナットホルダーによって接合プレートに取り付けることを特徴とする請求項1または2記載の鋼管柱の接合方法。 Joint nut 6 the bonding method according to claim 1 or 2, wherein the tubular columns, characterized in that attached to the joining plate 4 by a nut holder 7. 鋼管からなる下部柱に鋼管からなる上部柱を複数の接合プレート3および4と複数の接合ボルトによって接合する際に前記接合プレート3および4を仮組みするために使用される鋼管柱の接合用冶具であって、前記下部柱および上部柱と同一断面形状および同一寸法のリング状に形成され、側部に前記接合プレート3および4をボルト止めするためのボルト孔8aが形成されてなることを特徴とする鋼管柱の接合用冶具。 A steel pipe column used for temporarily assembling the joining plates 3 and 4 when the upper pillar 2 made of steel pipe is joined to the lower pillar 1 made of steel pipe by a plurality of joining plates 3 and 4 and a plurality of joining bolts 5 . A joining jig, which is formed in a ring shape having the same cross-sectional shape and the same dimensions as the lower pillar 1 and the upper pillar 2, and a bolt hole 8a for bolting the joining plates 3 and 4 is formed in the side part. A steel pipe column joining jig characterized by comprising:
JP2006002562A 2006-01-10 2006-01-10 Steel tube column joining method and joining jig Expired - Fee Related JP4878161B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2006002562A JP4878161B2 (en) 2006-01-10 2006-01-10 Steel tube column joining method and joining jig

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2006002562A JP4878161B2 (en) 2006-01-10 2006-01-10 Steel tube column joining method and joining jig

Publications (2)

Publication Number Publication Date
JP2007182731A JP2007182731A (en) 2007-07-19
JP4878161B2 true JP4878161B2 (en) 2012-02-15

Family

ID=38339043

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2006002562A Expired - Fee Related JP4878161B2 (en) 2006-01-10 2006-01-10 Steel tube column joining method and joining jig

Country Status (1)

Country Link
JP (1) JP4878161B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US8056297B2 (en) * 2008-09-25 2011-11-15 General Electric Company Flangeless wind tower
JP6575790B2 (en) * 2014-09-12 2019-09-18 日立造船株式会社 Mooring mechanism and mooring method for mobile structure
KR101821316B1 (en) * 2016-11-30 2018-01-26 (주)피에스테크 Column and beam connecting structure
JP6779833B2 (en) * 2017-05-22 2020-11-04 オイレス工業株式会社 How to install the damper

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07292992A (en) * 1994-04-22 1995-11-07 Horiuchi Komuten:Kk Steel frame structure assembling method and centering pin used therefor
JPH1150556A (en) * 1997-08-07 1999-02-23 Miyagami Kogyo Kk Connection structure between base and column
JP2004300737A (en) * 2003-03-31 2004-10-28 Nippon Steel Corp High-strength bolted friction joint structure of steel pipe column and its construction method

Also Published As

Publication number Publication date
JP2007182731A (en) 2007-07-19

Similar Documents

Publication Publication Date Title
JP5948838B2 (en) Column and beam joining method
JP2013011095A (en) Joint structure for steel pipe
KR101299023B1 (en) The structure of matching splicing point of box type steel columns and top level of steel beam using diaphragm
JP4878161B2 (en) Steel tube column joining method and joining jig
CN106988418B (en) A kind of assembling type steel structure beam-column node structure and assembly method
JP4301973B2 (en) Tube connection structure and connection method
US7240464B2 (en) Connector for concrete poles
CN104015148A (en) H-type steel socket spanner
KR200325868Y1 (en) pipe fixing system
JP4033804B2 (en) Repair equipment and method for repairing corroded steel pipe columns
JP2006226102A (en) Connecting joint of steel pipe
KR20190015854A (en) Building piping earthquake-proof support structure
JP2006046007A (en) Joint member
JP2007032159A (en) Connecting structure of steel plate concrete structural body
CN206591634U (en) A kind of assembling type steel structure beam-column node structure
KR101008966B1 (en) Pipe joint
JP4886763B2 (en) guide pin
JP2010095972A (en) Fall prevention fixture for liner plate
RU2084712C1 (en) Load-carrying rod structure and method of manufacturing same
KR20040096429A (en) pipe fixing system
JP4774319B2 (en) Column and foundation joining device
JP2001165137A (en) Method of fitting beam-jointing bolt in rectangular steel column
KR101914679B1 (en) Steel pipe strut with connection member
JP4402563B2 (en) Bridge construction method
CN223675569U (en) Building steel structure connecting device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20081128

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110525

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110705

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110902

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20111122

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20111125

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141209

Year of fee payment: 3

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20141209

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees