Number control device and multi-can installation system Download PDF

Info

Publication number
JP4985964B2
JP4985964B2 JP2007189188A JP2007189188A JP4985964B2 JP 4985964 B2 JP4985964 B2 JP 4985964B2 JP 2007189188 A JP2007189188 A JP 2007189188A JP 2007189188 A JP2007189188 A JP 2007189188A JP 4985964 B2 JP4985964 B2 JP 4985964B2
Authority
JP
Japan
Prior art keywords
boiler
combustion
boilers
candidate
combustion stage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2007189188A
Other languages
Japanese (ja)
Other versions
JP2009024946A (en
Inventor
弘之 竹田
浩二 三浦
和也 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Miura Co Ltd
Original Assignee
Miura Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Miura Co Ltd filed Critical Miura Co Ltd
Priority to JP2007189188A priority Critical patent/JP4985964B2/en
Publication of JP2009024946A publication Critical patent/JP2009024946A/en
Application granted granted Critical
Publication of JP4985964B2 publication Critical patent/JP4985964B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Description

本発明は、蒸気ボイラや温水ボイラのようなボイラを複数台設置した多缶設置システムにおいて、ボイラ間に設定された優先順位に基づき、ボイラの燃焼台数を制御する台数制御装置、およびその台数制御装置を備えた多缶設置システムに関するものである。   The present invention relates to a multi-can installation system in which a plurality of boilers such as steam boilers and hot water boilers are installed, and a unit control device for controlling the number of boilers to be burned based on the priority set between the boilers, and the number control thereof The present invention relates to a multi-can installation system equipped with a device.

複数台設置した小型のボイラの燃焼台数を制御することで、各ボイラの出力を効率的に集合させ使用者に供給する多缶設置システムがある。蒸気ボイラであれば、各ボイラを共通のスチームヘッダに接続し、各ボイラからの蒸気をスチームヘッダに集め、そのスチームヘッダから負荷に蒸気を供給する。そのスチームヘッダには、負荷の状態を把握するため圧力検出器が設けられる。また各ボイラには稼動優先順位が予め設定される。燃焼台数を制御する台数制御装置は、圧力検出器の検出結果に基づいて必要な燃焼台数を定め、優先順位の高いボイラから順に燃焼させて必要な燃焼台数を確保し、残りのボイラは停止させる(例えば特許文献1参照)。   There is a multi-can installation system in which the output of each boiler is efficiently gathered and supplied to the user by controlling the number of combustion of small boilers installed in a plurality. If it is a steam boiler, each boiler will be connected to a common steam header, the steam from each boiler will be collected in a steam header, and steam will be supplied to load from the steam header. The steam header is provided with a pressure detector to grasp the state of the load. In addition, an operation priority order is preset for each boiler. The unit control device that controls the number of combustion sets the required number of combustion based on the detection result of the pressure detector, burns in order from the boiler with the highest priority, secures the required number of combustion, and stops the remaining boilers (For example, refer to Patent Document 1).

このような多缶設置システムにおいては、稼動優先順位を変更するローテーションが行われている。優先順位が固定されていると、一部のボイラの稼動時間(燃焼時間)が他のボイラと比べて著しく長くなり、システム全体としての寿命が短くなるためである。例えば1日ごとに各ボイラの稼動時間を積算し、その積算値の小さい順に優先順位を高くすることにより、各ボイラの稼動時間を平均化することができる。またローテーションの他、全ブローを実施したボイラに対し、缶体保護を目的に優先的に燃焼させて缶内の濃縮度を高めるなどの各種の目的で優先順位が変更されることもある。
特開平2−21102号公報
In such a multi-can installation system, rotation for changing the operation priority is performed. This is because if the priority order is fixed, the operation time (burning time) of some boilers is significantly longer than other boilers, and the life of the entire system is shortened. For example, the operation time of each boiler can be averaged by accumulating the operation time of each boiler every day and increasing the priority in ascending order of the integrated value. In addition to rotation, the priority order may be changed for various purposes such as preferential combustion for the purpose of protecting the can body to increase the concentration in the can with respect to the boiler that has performed full blow.
JP-A-2-21102

従来の台数制御装置では、上述のように必要な燃焼台数を定め、優先順位の高いボイラから順に燃焼させて燃焼台数を確保している。その結果、各ボイラに設定している優先順位と、各ボイラの実際の燃焼状態は常に整合することになる。ローテーションや全ブロー実施等により優先順位が変更された場合も同様に制御される。   In the conventional number control device, the necessary number of combustion is determined as described above, and the number of combustion is ensured by burning sequentially from the boilers with the highest priority. As a result, the priority order set for each boiler always matches the actual combustion state of each boiler. The same control is performed when the priority order is changed due to rotation or full blow.

しかしながら、必要な燃焼台数が変動したときだけでなく優先順位が変更された場合にも、燃焼するボイラが切り替わることで、十分な出力を一時的に確保できなくなる恐れがある。優先順位の変更前に燃焼していたボイラの優先順位がその変更によって低くなると、そのボイラに停止指示が行われる一方で、優先順位の変更前に待機していたボイラの優先順位が高くなると、そのボイラに燃焼指示が行われるためである。待機状態にあるボイラに燃焼指示を行っても、そのボイラが蒸気を供給できる状態になるまでに一定の時間が必要であるのに対し、燃焼状態のボイラに停止指示を行えば、すぐに燃焼が停止する。ボイラが蒸気を供給できる状態になるまでには、パージや着火のように燃焼を開始するまでに要する時間や、燃焼を開始してから蒸気の供給が可能となる状態までボイラを加熱する時間が必要である。   However, not only when the required number of combustion units fluctuates but also when the priority is changed, there is a possibility that sufficient output cannot be temporarily secured by switching the combustion boiler. If the priority of the boiler that was burning before the change in priority is lowered due to the change, the stop instruction is given to the boiler, while the priority of the boiler that was waiting before the change in priority becomes higher, This is because a combustion instruction is given to the boiler. Even if a combustion instruction is given to a boiler that is in a standby state, it takes a certain amount of time for the boiler to be able to supply steam. Stops. Before the boiler can supply steam, the time required to start combustion, such as purge or ignition, or the time to heat the boiler to a state where steam can be supplied after starting combustion. is necessary.

本発明は、ボイラ間の優先順位に変更があった場合でも、多缶設置システムの出力を安定化させることのできる台数制御装置、台数制御プログラム、およびその台数制御装置を備えた多缶設置システムを提供することを課題とする。   The present invention relates to a unit control device, a unit control program, and a multi-can installation system provided with the unit control device capable of stabilizing the output of the multi-can installation system even when the priority order among boilers is changed. It is an issue to provide.

本発明の一態様によれば、待機を含む複数の燃焼段階を有するボイラを複数台設置した多缶設置システムの台数制御装置を提供する。この台数制御装置は、ボイラ間の優先順位を変更する優先順位変更手段と、ボイラの中で燃焼段階を変更する候補ボイラを決定する候補ボイラ決定手段と、候補ボイラ間の優先順位を比較することによって、燃焼段階を変更する対象ボイラを候補ボイラから選択する対象ボイラ選択手段と、対象ボイラについて燃焼段階の変更を指示する燃焼段階指示手段とを備え、燃焼段階指示手段は、ボイラ間の優先順位が変更された後、要求負荷の変動により燃焼段階の変更の必要が生じてから、対象ボイラについて燃焼段階の変更を指示する。   According to one aspect of the present invention, there is provided a number control device for a multi-can installation system in which a plurality of boilers having a plurality of combustion stages including standby are installed. This number control device compares priority between candidate boilers, priority changing means for changing priority among boilers, candidate boiler determining means for determining candidate boilers for changing the combustion stage in the boiler, and candidate boilers The target boiler selecting means for selecting the target boiler whose combustion stage is to be changed from the candidate boilers, and the combustion stage indicating means for instructing the change of the combustion stage for the target boiler. Is changed, the change of the combustion stage is required due to the fluctuation of the required load, and the change of the combustion stage is instructed for the target boiler.

この台数制御装置では、優先順位の高いボイラから順に燃焼させるのではなく、候補ボイラ間の優先順位を比較することによって対象ボイラを選択し、その対象ボイラについて燃焼段階の変更を指示する。候補ボイラ以外のボイラの優先順位は参照されず、候補ボイラ以外のボイラの燃焼段階は変更されない。例えば燃焼状態にあるボイラを候補ボイラにしなければ、ローテーションや全ブロー実施等によりボイラ間の優先順位が変更されても、そのボイラを停止するのを避けることができる。また燃焼量に過不足が生じ燃焼段階の変更の必要が生じれば、適当なボイラを対象ボイラとして選択すればよい。また、対象ボイラについては、ボイラ間の優先順位が変更された後、要求負荷の変動により燃焼段階の変更の必要が生じてから燃焼段階の変更が指示される。ボイラ間の優先順位が変更されても、要求負荷の変動により燃焼段階の変更の必要が生じるまでは、ボイラの燃焼段階を維持することになる。したがって、この台数制御装置では、優先順位に変更があっても燃焼量に過不足が生じ難くなり、多缶設置システムの出力を安定化させることができる。   In this number control device, the target boiler is selected by comparing priorities among candidate boilers, instead of burning in order from the boilers with the highest priority, and the change of the combustion stage is instructed for the target boiler. The priority order of the boilers other than the candidate boilers is not referred to, and the combustion stage of the boilers other than the candidate boilers is not changed. For example, if the boiler in the combustion state is not used as a candidate boiler, it is possible to avoid stopping the boiler even if the priority order among the boilers is changed due to rotation or full blow. Further, if the combustion amount becomes excessive or insufficient and the combustion stage needs to be changed, an appropriate boiler may be selected as the target boiler. In addition, for the target boiler, after the priority order among the boilers is changed, the change of the combustion stage is instructed after the change of the required load causes the change of the combustion stage. Even if the priority order among the boilers is changed, the combustion stage of the boiler is maintained until the combustion stage needs to be changed due to fluctuations in the required load. Therefore, in this number control device, even if there is a change in the priority order, excess and deficiency in the amount of combustion hardly occurs, and the output of the multi-can installation system can be stabilized.

しかも、対象ボイラは候補ボイラ間の優先順位を比較することによって選択される。このため、優先順位の変更によってボイラの燃焼状態を直ちに且つ一斉に切り替えなくても、要求負荷の変動により燃焼段階の変更の必要が生じたときに序々に入れ替えを行っていくことによって、優先順位の変更が各ボイラの燃焼段階に反映されることになる。したがって、ローテーション等の優先順位を変更する本来の目的を損ねることもない。   Moreover, the target boiler is selected by comparing priorities among candidate boilers. For this reason, even if it is not necessary to immediately and simultaneously switch the combustion state of the boiler by changing the priority order, the priority order is changed by gradually changing when the combustion stage needs to be changed due to fluctuations in the required load. Will be reflected in the combustion stage of each boiler. Therefore, the original purpose of changing the priority order such as rotation is not impaired.

候補ボイラ決定手段は、要求負荷の変動により燃焼段階を引き上げる必要が生じたとき、燃焼段階を引き上げ可能なボイラを引き上げ候補ボイラに決定し、対象ボイラ選択手段は、引き上げ候補ボイラで変更後の優先順位の高いものから、燃焼段階を引き上げる引き上げ対象ボイラを選択することができる。   When it becomes necessary to raise the combustion stage due to fluctuations in the required load, the candidate boiler determining means decides the boiler that can raise the combustion stage as the candidate boiler, and the target boiler selection means is the priority after the change in the candidate boiler It is possible to select a boiler to be lifted that raises the combustion stage from the ones with higher ranks.

候補ボイラ決定手段は、要求負荷の変動により燃焼段階を引き下げる必要が生じたとき、燃焼状態にあるボイラを引き下げ候補ボイラに決定し、対象ボイラ選択手段は、引き下げ候補ボイラで変更後の優先順位の低いものから、燃焼段階を引き下げる引き下げ対象ボイラを選択することもできる。   When it becomes necessary to lower the combustion stage due to fluctuations in the required load, the candidate boiler determining means determines the boiler that is in the combustion state as the lowering candidate boiler, and the target boiler selecting means determines the priority order after the change in the lowering candidate boiler. It is also possible to select a lowering target boiler that lowers the combustion stage from the lowest.

この台数制御装置は、ボイラ間の優先順位の高い順に選択される制御対象ボイラ、および制御対象ボイラ以外の予備缶ボイラを設定する予備缶設定手段をさらに備えるようにしてもよい。   The number control device may further include a control target boiler that is selected in descending order of priority among the boilers, and a spare can setting unit that sets a spare can boiler other than the control target boiler.

多缶設置システムに設けられた複数台のボイラのうち、予備缶ボイラは、原則的に停止あるいは待機させる。夜間など時間帯により、多缶設置システムの負荷が低下し、通常負荷より少ない台数で制御を行うことで出力をより安定化させたり、季節や時間帯によって負荷量が異なるので、不要なボイラをできるだけ停止させて省エネ・省力化を図ったりするためである。   Of the multiple boilers provided in the multi-can installation system, the spare boiler can be stopped or put on standby in principle. The load of the multi-can installation system decreases depending on the time of day, such as at night, and the output is more stabilized by controlling with a smaller number of units than the normal load, and the load varies depending on the season and time of day. This is to make it stop as much as possible to save energy and labor.

制御対象ボイラや予備缶ボイラは、例えば優先順位の高いものから、所定台数分の制御対象ボイラを選択することによって決定することができる。予備缶ボイラは、優先順位の低いものから選ばれることになる。このため、優先順位に変更があれば、制御対象ボイラや予備缶ボイラも変更される。優先順位の変更により制御対象ボイラが予備缶ボイラに変わったとき、その予備缶ボイラを直ちに停止させると、要求負荷に対して、多缶設置システムの出力が十分に確保できない可能性がある。   A control object boiler and a backup can boiler can be determined by selecting the control object boiler for a predetermined number from a thing with high priority, for example. The spare can boiler will be selected from those with lower priority. For this reason, if the priority order is changed, the control target boiler and the spare can boiler are also changed. When the control target boiler is changed to a spare can boiler due to the change in the priority order, if the spare can boiler is immediately stopped, there is a possibility that the output of the multi-can installation system cannot be sufficiently secured for the required load.

そこで、候補ボイラ決定手段が、ボイラ間の優先順位が変更された後、要求負荷の変動により燃焼段階を引き下げる必要が生じたとき、制御対象ボイラおよび予備缶ボイラの中で燃焼段階を引き下げる引き下げ候補ボイラを決定するようにしてもよい。   Therefore, when the candidate boiler determination means needs to lower the combustion stage due to fluctuations in the required load after the priority order between the boilers is changed, the candidate for lowering the combustion stage in the controlled boiler and the spare can boiler You may make it determine a boiler.

この場合、優先順位の変更があっても、要求負荷の変動により燃焼段階を引き下げる必要が生じて、予備缶ボイラが引き下げ候補ボイラにならなければ、予備缶ボイラは待機にならない。優先順位の変更により制御対象ボイラが予備缶ボイラに変わっても、直ちに停止せず、予備缶ボイラを含めたボイラの中から引き下げ候補ボイラとして決定され、さらに引き下げ対象ボイラとして選択されたきに、そのボイラの燃焼段階が引き下げられる。   In this case, even if there is a change in the priority order, it is necessary to lower the combustion stage due to fluctuations in the required load. If the spare can boiler does not become a candidate for reduction, the spare can boiler does not stand by. Even if the boiler to be controlled changes to a spare can boiler due to the change in priority, it will not stop immediately, but will be determined as a candidate for reduction from among the boilers including the spare can boiler, The combustion stage of the boiler is lowered.

このため、複数台のボイラの一部を予備缶ボイラとしている場合でも、優先順位の変更によって燃焼量の不足が生じ難くなり、多缶設置システムの出力をさらに安定化することができる。   For this reason, even when some of the plurality of boilers are used as spare can boilers, it becomes difficult for the combustion amount to be insufficient due to the change in the priority order, and the output of the multi-can installation system can be further stabilized.

また候補ボイラ決定手段が、ボイラ間の優先順位が変更された後、要求負荷の変動により燃焼段階を引き上げる必要が生じたとき、制御対象ボイラの中で燃焼段階を引き上げる引き上げ候補ボイラを決定することもできる。いいかえれば、燃焼段階を引き上げるボイラを選択する場合には、予備缶ボイラが引き上げ候補ボイラから外れる。   Also, the candidate boiler determining means determines the candidate boiler for raising the combustion stage among the controlled boilers when it becomes necessary to raise the combustion stage due to fluctuations in the required load after the priority order among the boilers is changed. You can also. In other words, when selecting a boiler that raises the combustion stage, the spare can boiler is removed from the candidate boilers for raising.

そのため、優先順位の変更により制御対象ボイラが予備缶ボイラに変わったとき、その予備缶ボイラが直ちに停止しなくても、その後の要求負荷の変動によって順次待機状態となる。すなわち、燃焼段階を引き上げる必要が生じたときは予備缶ボイラの燃焼段階を引き上げることなく状態を維持し、燃焼段階を引き下げる必要が生じたときは予備缶ボイラの燃焼段階は優先的に引き下がるので、予備缶ボイラは順次待機状態になる。このため、予備缶ボイラが長期に燃焼を継続するのを防止できる。   For this reason, when the controlled boiler is changed to the spare can boiler due to the change of the priority order, even if the spare can boiler does not stop immediately, the standby state is sequentially entered due to the fluctuation of the required load thereafter. That is, when it is necessary to raise the combustion stage, the state is maintained without raising the combustion stage of the preliminary can boiler, and when the combustion stage needs to be lowered, the combustion stage of the preliminary can boiler is preferentially lowered. The spare can boilers are sequentially put on standby. For this reason, it can prevent that a preliminary | backup can boiler continues combustion for a long term.

このように多缶設置システムの出力を安定化させつつ、予備缶ボイラを定めて制御対象ボイラの台数を減らすことでシステム全体の制御性を良くしたり、省エネ・省力化を図ったりすることが可能となる。   In this way, while stabilizing the output of the multi-can installation system, it is possible to improve the controllability of the entire system by reducing the number of boilers to be controlled by setting up spare can boilers, and to save energy and labor It becomes possible.

また本発明の他の態様によれば、上述の台数制御装置として、コンピュータや組み込み機器を機能させる台数制御プログラムが提供される。   According to another aspect of the present invention, a number control program for causing a computer or an embedded device to function is provided as the above-described number control device.

また本発明のさらに他の態様によれば、上述の台数制御装置を備えた多缶設置システムが提供される。この多缶設置システムは、ボイラ間の優先順位に変更があった場合でも、安定した出力を行うことが可能である。   Moreover, according to the further another aspect of this invention, the multi-can installation system provided with the above-mentioned number control apparatus is provided. This multi-can installation system can perform stable output even when the priority order among boilers is changed.

以上の構成を採用することにより、ボイラ間の優先順位に変更があった場合でも、多缶設置システムの出力を安定化させることが可能である。   By adopting the above configuration, it is possible to stabilize the output of the multi-can installation system even when the priority order among the boilers is changed.

以下、添付図面を参照して、本発明の実施の形態について説明する。以下の実施の形態において、本発明は、低燃、高燃および待機(停止)の3つの燃焼段階を有する蒸気ボイラを複数台設置した多缶設置システムの台数制御装置として実現されている。   Embodiments of the present invention will be described below with reference to the accompanying drawings. In the following embodiments, the present invention is realized as a number control device of a multi-can installation system in which a plurality of steam boilers having three combustion stages of low combustion, high combustion, and standby (stop) are installed.

図1は本実施の形態における多缶設置システムの全体構成を簡略的に示す図である。ここでは、多缶設置システムが5台の3位置蒸気ボイラ101を備える。3位置ボイラ101は、供給燃料の相違により低燃または高燃の状態で燃焼する。例えば各ボイラ101における高燃時の燃焼量が低燃時の約2倍である場合、高燃時の燃焼量を1.0と数えれば、各ボイラ101の燃焼量は0.5刻みで変更することができることになる。3位置ボイラに代えて、オン・オフボイラを用いてもよいし、低燃・中燃・高燃の4位置ボイラや、その他の多位置ボイラを用いるようにしてもよい。   FIG. 1 is a diagram schematically showing the overall configuration of a multi-can installation system in the present embodiment. Here, the multi-can installation system includes five three-position steam boilers 101. The three-position boiler 101 burns in a low-burning or high-burning state due to the difference in supplied fuel. For example, when the combustion amount at high combustion in each boiler 101 is about twice that at low combustion, if the combustion amount at high combustion is counted as 1.0, the combustion amount of each boiler 101 is changed in 0.5 increments. Will be able to. Instead of the three-position boiler, an on / off boiler may be used, a low-burning / medium / high-burning four-position boiler, or other multi-position boilers may be used.

全てのボイラ101は、スチームヘッダ102に蒸気管103を通じて接続されている。ボイラ101からの蒸気は、スチームヘッダ102に蒸気管103を通じて集合する。スチームヘッダ102は、使用者の設備に接続され、集合した蒸気をその設備に供給する。   All the boilers 101 are connected to the steam header 102 through the steam pipe 103. The steam from the boiler 101 collects in the steam header 102 through the steam pipe 103. The steam header 102 is connected to the user's equipment and supplies the collected steam to the equipment.

そのスチームヘッダ102には、圧力検出器104が配置されている。圧力検出器104は、スチームヘッダ102内部の蒸気圧力を検出する。使用者設備の需要増大により負荷が増加し、供給蒸気量が不足すれば、スチームヘッダ102内部の蒸気圧力が減少することになる。一方、使用者設備の需要低下により負荷が減少し、供給蒸気量が過剰になれば、スチームヘッダ102内部の蒸気圧力が増加することになる。このため、圧力検出器104からの圧力検知信号により負荷変動をモニターできる。   A pressure detector 104 is disposed in the steam header 102. The pressure detector 104 detects the steam pressure inside the steam header 102. If the load increases due to an increase in demand for user equipment and the amount of supplied steam is insufficient, the steam pressure inside the steam header 102 decreases. On the other hand, if the load decreases due to a decrease in demand for user equipment and the amount of supplied steam becomes excessive, the steam pressure inside the steam header 102 increases. For this reason, the load fluctuation can be monitored by the pressure detection signal from the pressure detector 104.

圧力検出器104は、台数制御装置105と信号線106により接続されている。台数制御装置105は、信号線106を介して、圧力検出器104からの圧力検知信号を受信する。台数制御装置105は、圧力検出器104からの圧力検知信号に基づいて、要求負荷に対応する必要な燃焼量を定め、その必要燃焼量にしたがって各ボイラ101に燃焼段階の変更を指示し、5台のボイラ101の燃焼量を制御する。上述のように各ボイラ101における高燃時の燃焼量を1.0とすれば、5台のボイラ101の合計燃焼量は0.5刻みで0.0から5.0まで変化させることができる。   The pressure detector 104 is connected to the number control device 105 by a signal line 106. The number controller 105 receives a pressure detection signal from the pressure detector 104 via the signal line 106. The number control device 105 determines a necessary combustion amount corresponding to the required load based on the pressure detection signal from the pressure detector 104, and instructs each boiler 101 to change the combustion stage according to the required combustion amount. The combustion amount of the boiler 101 is controlled. As described above, assuming that the combustion amount at the time of high combustion in each boiler 101 is 1.0, the total combustion amount of the five boilers 101 can be changed from 0.0 to 5.0 in 0.5 increments. .

台数制御装置105は、要求負荷の変動により燃焼量が不足している場合、待機から低燃、または低燃から高燃に燃焼段階を引き上げる指示をボイラ101に行う。要求負荷の変動により燃焼量が過剰になっている場合、高燃から低燃、低燃から待機、または高燃から待機に燃焼段階を引き下げる指示をボイラ101に行う。   The number control device 105 instructs the boiler 101 to raise the combustion stage from standby to low fuel or from low to high fuel when the combustion amount is insufficient due to fluctuations in the required load. If the combustion amount is excessive due to fluctuations in the required load, the boiler 101 is instructed to lower the combustion stage from high fuel to low fuel, from low fuel to standby, or from high fuel to standby.

ここで、ボイラ101の発停は、仮想ボイラ単位で扱うこともできる。仮想ボイラとは、ボイラが持つ上述のような燃焼量の違い(低燃、中燃、高燃、・・・)をそれぞれ独立したボイラとみなし、それぞれの蒸発量をボイラに見立てたものである。例えばオン・オフボイラであれば、仮想ボイラは1台であり、実際の物理的なボイラ数と一致する。また3位置ボイラは、物理的に一台であっても、低燃焼蒸発量ボイラと、(高燃焼蒸発量−低燃焼蒸発量)ボイラとの2台であると仮想的に数えることができる。4位置ボイラは低燃焼蒸発量ボイラ、(中燃焼蒸発量−低燃焼蒸発量)ボイラ、(高燃焼蒸発量−中燃焼蒸発量)ボイラの3台であると仮想的に数えることができる。よって、3位置ボイラが低燃状態であれば、その低燃焼蒸発量ボイラに対しては燃焼指示を行っており、その(高燃焼蒸発量−低燃焼蒸発量)ボイラに対しては停止指示を行っていると制御上扱うことができる。   Here, the start / stop of the boiler 101 can be handled in units of virtual boilers. A virtual boiler is a boiler that treats the differences in the amount of combustion (low combustion, medium combustion, high combustion, etc.) of the boiler as described above as independent boilers. . For example, in the case of an on / off boiler, there is one virtual boiler, which matches the actual number of physical boilers. Further, even if the three-position boiler is physically one unit, it can be virtually counted as two units of a low combustion evaporation amount boiler and a (high combustion evaporation amount-low combustion evaporation amount) boiler. The four-position boiler can be virtually counted as three boilers: a low combustion evaporation amount boiler, a (medium combustion evaporation amount-low combustion evaporation amount) boiler, and a (high combustion evaporation amount-medium combustion evaporation amount) boiler. Therefore, if the three-position boiler is in a low combustion state, a combustion instruction is given to the low combustion evaporation boiler, and a stop instruction is given to the (high combustion evaporation-low combustion evaporation) boiler. It can be handled for control.

台数制御装置105は、各ボイラ101の制御モジュールと信号線107を介して接続されている。台数制御装置105は、信号線107を介して各ボイラ101の制御モジュールに各種の指示を行ったり、制御モジュールから各種のデータを受信したりして、5台のボイラ101に対し上述の制御を行う。各ボイラ101の制御モジュールは、台数制御装置105から燃焼段階の変更指示の信号を受けると、その指示にしたがって当該ボイラを制御する。またボイラの実際の燃焼状態やその他のデータを台数制御装置105に送信する。多缶設置システムの負荷量から定めた必要燃焼量に対して、実際の燃焼量が不足していれば、ボイラに燃焼指示を行い、実際の燃焼量が過剰であれば、ボイラに停止指示を行う。   The number control device 105 is connected to the control module of each boiler 101 via a signal line 107. The number control device 105 gives various instructions to the control module of each boiler 101 via the signal line 107 and receives various data from the control module to perform the above-described control on the five boilers 101. Do. When the control module of each boiler 101 receives a signal for changing the combustion stage from the number control device 105, it controls the boiler according to the instruction. Further, the actual combustion state of the boiler and other data are transmitted to the number control device 105. If the actual combustion amount is insufficient relative to the required combustion amount determined from the load amount of the multi-can installation system, the boiler is instructed to combust. If the actual combustion amount is excessive, the boiler is instructed to stop. Do.

台数制御装置105は、ボイラ室におけるオペレーションパネルとして利用でき、そのため前面部に、タッチパネル付きの液晶ディスプレイ108を備えている。目標値や制御幅のようなパラメータや制御方式の設定や、そのときの状態やアラームの表示をこのディスプレイ108により行うことができる。   The number control device 105 can be used as an operation panel in a boiler room. For this reason, a liquid crystal display 108 with a touch panel is provided on the front side. The display 108 can be used to set parameters and control methods such as target values and control widths, and display the status and alarms at that time.

図2は本実施の形態における台数制御装置に用いるハードウェア構成の一例を示す図である。台数制御装置105には、この例のような汎用の情報処理回路のほか、その目的に特化した専用回路を利用することができる。台数制御装置105は、MPU201やバス202を備えている。MPU201はバス202を通じて、I/O203や通信インターフェイス204、ディスプレイインターフェイス205、記憶装置206と接続されている。MPU201は、これらと入出力を行うことにより、台数制御装置105の機能を実現する。   FIG. 2 is a diagram illustrating an example of a hardware configuration used in the number control device according to the present embodiment. In addition to the general-purpose information processing circuit as in this example, a dedicated circuit specialized for the purpose can be used for the number control device 105. The number control device 105 includes an MPU 201 and a bus 202. The MPU 201 is connected to an I / O 203, a communication interface 204, a display interface 205, and a storage device 206 through a bus 202. The MPU 201 implements the function of the number control device 105 by performing input / output with these.

I/O203は、信号線106を介して圧力検出器104を台数制御装置105と接続し、圧力検出器104からの圧力検知信号を受信する。通信インターフェイス204は、信号線107を介してボイラ101を台数制御装置105に接続する。この通信インターフェイス204に対して5台のボイラ101をカスケードに接続してもよいし、その他の形式で接続してもよい。また必要に応じて信号線107上にリピータを配置するようにしてもよい。ディスプレイインターフェイス205は、ディスプレイ108をバス202に接続する。ディスプレイインターフェイス205は、MPU201からの指令を受信してLCD207への表示信号を生成し、またタッチパネル208からの入力信号をMPU201へ出力する。   The I / O 203 connects the pressure detector 104 to the number control device 105 via the signal line 106 and receives a pressure detection signal from the pressure detector 104. The communication interface 204 connects the boiler 101 to the number control device 105 via the signal line 107. The five boilers 101 may be connected to the communication interface 204 in cascade, or may be connected in other forms. Further, a repeater may be arranged on the signal line 107 as necessary. A display interface 205 connects the display 108 to the bus 202. The display interface 205 receives a command from the MPU 201, generates a display signal for the LCD 207, and outputs an input signal from the touch panel 208 to the MPU 201.

記憶装置206には、フラッシュメモリのような不揮発性メモリや、RAMのような揮発性メモリ、その他のストレージを用いることができる。この記憶装置206は、制御プログラム209のコードを格納している。MPU201は、制御プログラム209のコードを記憶装置206から読み出し、そのプログラム209の指令にしたがってバス202上のデバイスに対して入出力を行う。   As the storage device 206, a nonvolatile memory such as a flash memory, a volatile memory such as a RAM, or other storage can be used. This storage device 206 stores the code of the control program 209. The MPU 201 reads out the code of the control program 209 from the storage device 206 and inputs / outputs the device on the bus 202 in accordance with the command of the program 209.

記憶装置206は、ボイラ管理テーブル210や優先順位テーブル211をさらに格納している。ボイラ管理テーブル210は、MPU201の制御により各ボイラ101に対して行われた指示や、各ボイラ101から受信した状態を格納する。優先順位テーブル211は、ボイラ101間の優先順位の設定をボイラ101ごとに格納する。   The storage device 206 further stores a boiler management table 210 and a priority order table 211. The boiler management table 210 stores an instruction given to each boiler 101 under the control of the MPU 201 and a state received from each boiler 101. The priority order table 211 stores the priority order setting among the boilers 101 for each boiler 101.

優先順位は、燃焼指示や停止指示を行うボイラを選択するために用いられる。優先順位は、例えば整数値を用いて、数値が小さいほど優先順位が高くなるよう設定することができる。ボイラ101の1号機から5号機のそれぞれに「1」乃至「5」の優先順位が割り当てられている場合、1号機の優先順位が最も高く、5号機の優先順位が最も低い。   The priority order is used to select a boiler that gives a combustion instruction or a stop instruction. The priority order can be set, for example, using an integer value so that the lower the numerical value, the higher the priority order. When the priority order of “1” to “5” is assigned to each of the first to fifth units of the boiler 101, the first unit has the highest priority and the fifth unit has the lowest priority.

このような優先順位の設定のほか、記憶装置206は、タッチパネル付きディスプレイ108などから入力された制御目標値や制御幅のようなパラメータ、動作設定のデータも格納する。このデータは、優先順位を変更するローテーションに関する設定データも含む。その設定データは、ローテーションの間隔や実行時刻などのデータを有する。ローテーションにより、例えば1号機から5号機の優先順位が逆順に変更される。優先順位の変更は、このようなローテーションに加え、全ブロー実施により該当ボイラの優先順位が繰り上げられる場合や、優先順位の高いボイラが燃焼不可状態から復帰した場合などに行われる。   In addition to such priority order settings, the storage device 206 also stores control target values, parameters such as control widths, and operation setting data input from the touch panel display 108 or the like. This data also includes setting data regarding rotation for changing the priority order. The setting data includes data such as rotation intervals and execution times. Due to the rotation, for example, the priority order of No. 1 to No. 5 is changed in reverse order. In addition to such rotation, the priority order is changed when the priority order of the relevant boiler is increased by performing all blows, or when a boiler with a high priority order returns from a non-combustible state.

図3は優先順位テーブルの一例を説明するための図である。この例において、優先順位テーブル211は、ボイラごとにレコードを有する。各レコードは、例えばボイラ識別子、優先順位、および前回優先順位といった項目のデータを含む。ボイラ識別子は、MPU201がボイラを識別するのに用いる符号である。この例では、「No.1」乃至「No.5」のように各ボイラの号数を文字データで記述している。優先順位は、「1」乃至「5」のように各ボイラに割り当てられた優先順位の数値データを格納する。この例では、1号ボイラに優先順位として「5」が割り当てられており、2号ボイラに優先順位として「4」が割り当てられている。ボイラが故障などしている場合には、そのボイラに対するレコードを一時的に削除したり、そのボイラの優先順位の値に数値データを書き込まなかったり、特定の符号を書き込んだりすることができる。各ボイラの優先順位を変更する場合は、MPU201がこの優先順位テーブル211のデータを書き換える。前回優先順位の項目は、変更前の優先順位の数値データを格納する。   FIG. 3 is a diagram for explaining an example of the priority order table. In this example, the priority table 211 has a record for each boiler. Each record includes data of items such as a boiler identifier, a priority, and a previous priority. The boiler identifier is a code used by the MPU 201 to identify the boiler. In this example, the number of each boiler is described as character data such as “No. 1” to “No. 5”. The priority order stores numerical data of the priority order assigned to each boiler such as “1” to “5”. In this example, “5” is assigned as priority to the No. 1 boiler, and “4” is assigned as priority to the No. 2 boiler. When a boiler is out of order, the record for the boiler can be temporarily deleted, numerical data can not be written to the priority value of the boiler, or a specific code can be written. When changing the priority order of each boiler, the MPU 201 rewrites data in the priority order table 211. The previous priority item stores numerical data of the priority prior to the change.

この台数制御装置105において、MPU201は、ローテーションなどで優先順位に変更があっても、多缶設置システムの出力を安定化できるように制御を行う。優先順位に変更があってから、要求負荷の変動により燃焼量(または蒸気量)に不足や過剰が生じ、燃焼段階を変更する必要が生じるまでは、ボイラ101への燃焼段階の変更を指示しない。例えば高燃状態のボイラの優先順位が一番低い順位に変更されても、その変更時にそのボイラを直ちに停止しない。蒸気量の不足により燃焼段階を変更する必要が生じれば、そのときに、燃焼量を増加させることの可能な他のボイラを変更後の優先順位に基づいて選択し、選択したボイラに燃焼段階を引き上げる指示を行う。制御プログラム209の指令にしたがってMPU201が、ボイラ管理テーブル210や燃焼順位テーブル211への入出力、演算やデータの加工を行うことにより、このような制御機能が実現される。   In this number control device 105, the MPU 201 performs control so that the output of the multi-can installation system can be stabilized even if the priority order is changed due to rotation or the like. After the priority is changed, the boiler 101 is not instructed to change the combustion stage until the combustion quantity (or steam quantity) becomes insufficient or excessive due to fluctuations in the required load and the combustion stage needs to be changed. . For example, even if the priority of a boiler in a high combustion state is changed to the lowest priority, the boiler is not immediately stopped at the time of the change. If it is necessary to change the combustion stage due to a shortage of steam, select another boiler that can increase the combustion quantity based on the priority after the change, and then select the combustion stage for the selected boiler. Give instructions to raise. Such a control function is realized by the MPU 201 performing input / output to the boiler management table 210 and the combustion order table 211, calculation, and data processing in accordance with a command of the control program 209.

図4は台数制御装置の機能的構成を説明するための図である。台数制御装置105は検知信号受信部401、燃焼量演算部402、状態取得部403、優先順位変更部404、候補ボイラ決定部405、対象ボイラ選択部406および燃焼段階指示部407を備える。   FIG. 4 is a diagram for explaining a functional configuration of the number control device. The number control device 105 includes a detection signal reception unit 401, a combustion amount calculation unit 402, a state acquisition unit 403, a priority order change unit 404, a candidate boiler determination unit 405, a target boiler selection unit 406, and a combustion stage instruction unit 407.

検知信号受信部401は、多缶設置システムの負荷を表す圧力検知信号を圧力検出器104から受信する。燃焼量演算部402は、圧力検出器104からの圧力検知信号に基づいて、その蒸気圧力に対応する必要燃焼量を演算する。状態取得部403は、ボイラ101の運転状態のデータを各ボイラ101の制御モジュールから取得し、ボイラ101の実際の燃焼段階をボイラ管理テーブル210に書き込む。優先順位変更部404は、ローテーションに関する設定などにしたがって優先順位テーブル211のデータを書き換え、優先順位の設定を変更する。   The detection signal receiving unit 401 receives a pressure detection signal representing the load of the multi-can installation system from the pressure detector 104. Based on the pressure detection signal from the pressure detector 104, the combustion amount calculation unit 402 calculates a necessary combustion amount corresponding to the steam pressure. The state acquisition unit 403 acquires the operation state data of the boiler 101 from the control module of each boiler 101 and writes the actual combustion stage of the boiler 101 in the boiler management table 210. The priority order changing unit 404 rewrites data in the priority order table 211 according to settings relating to rotation and the like, and changes the priority order setting.

候補ボイラ決定部405は、ボイラ101の燃焼段階にしたがって、ボイラ101の中で燃焼段階を変更する候補ボイラを決定する。候補ボイラ決定部405は、ボイラ管理テーブル210から各ボイラ101の燃焼段階を読み出す。この実施の形態において、候補ボイラ決定部405は、要求負荷の変動により燃焼段階の変更の必要が生じたとき、候補ボイラを決定する。たとえば、各ボイラ101の燃焼段階から得られるシステム全体の燃焼量と燃焼量演算部402からの燃焼量とを単位時間ごとに比較することで、燃焼段階の変更の必要が生じたかどうかを判断することができる。要求負荷の変動により燃焼量の不足が生じ、燃焼段階を引き上げる必要が生じたときには、燃焼段階が高燃以外のボイラ101を引き上げ候補ボイラとして決定する。ここでは、燃焼段階が待機または低燃のボイラ101が引き上げ候補ボイラとして決定される。燃焼段階が待機か低燃にあるボイラは、仮想ボイラ単位では、いずれも燃焼指示の可能なボイラである。一方、要求負荷の変動により燃焼量が過剰となり、燃焼段階を引き下げる必要が生じたときには、燃焼段階が待機以外のボイラ101を引き下げ候補ボイラとして決定する。すなわち、燃焼段階が低燃か高燃のボイラ101が引き下げ候補ボイラとして決定される。燃焼段階が低燃か高燃にあるボイラは、仮想ボイラ単位では、いずれも停止指示の可能なボイラとなる。ボイラ101間の優先順位が変更されても、要求負荷の変動により燃焼段階の変更の必要が生じなければ、候補ボイラは決定されない。候補ボイラ決定部405は、候補ボイラを決定すると、ボイラ識別子のようにその候補ボイラを特定するデータを対象ボイラ選択部406に供給する。   Candidate boiler determination unit 405 determines a candidate boiler that changes the combustion stage in boiler 101 in accordance with the combustion stage of boiler 101. Candidate boiler determination unit 405 reads the combustion stage of each boiler 101 from boiler management table 210. In this embodiment, the candidate boiler determination unit 405 determines a candidate boiler when it is necessary to change the combustion stage due to fluctuations in the required load. For example, by comparing the combustion amount of the entire system obtained from the combustion stage of each boiler 101 with the combustion amount from the combustion amount calculation unit 402 for each unit time, it is determined whether or not the combustion stage needs to be changed. be able to. When a shortage of combustion occurs due to fluctuations in the required load and it is necessary to raise the combustion stage, the boiler 101 whose combustion stage is other than the high combustion is determined as a candidate boiler for raising. Here, the boiler 101 whose combustion stage is standby or low in combustion is determined as the pulling candidate boiler. Boilers whose combustion stage is in standby or low combustion are boilers that can give a combustion instruction in units of virtual boilers. On the other hand, when the amount of combustion becomes excessive due to fluctuations in the required load, and it becomes necessary to lower the combustion stage, the boiler 101 whose combustion stage is other than standby is determined as a candidate boiler for lowering. That is, the boiler 101 whose combustion stage is low combustion or high combustion is determined as the reduction candidate boiler. Boilers whose combustion stage is at low combustion or high combustion are boilers that can be instructed to stop in units of virtual boilers. Even if the priority order among the boilers 101 is changed, the candidate boiler is not determined unless the combustion stage needs to be changed due to fluctuations in the required load. When the candidate boiler determination unit 405 determines a candidate boiler, the candidate boiler determination unit 405 supplies data for specifying the candidate boiler like the boiler identifier to the target boiler selection unit 406.

対象ボイラ選択部406は、候補ボイラ間の優先順位を比較することによって、燃焼段階を変更する対象ボイラを候補ボイラから選択する。対象ボイラ選択部406は、候補ボイラの優先順位を優先順位テーブル211から読み出す。図3の例であれば、候補ボイラ決定部405からボイラ識別子として「No.3」、「No.4」および「No.5」が得られると、対象ボイラ選択部406は、それらボイラ識別子に対応する優先順位の値「2」、「1」および「3」を優先順位テーブル211から読み出す。優先順位の値を読み出すと、対象ボイラ選択部406はそれらの値を比較する。要求負荷の変動により燃焼段階を引き上げる必要が生じたときには、読み出した値の小さい順に、引き上げ対象ボイラを選択する。   The target boiler selection unit 406 selects a target boiler whose combustion stage is to be changed from the candidate boilers by comparing priorities among the candidate boilers. The target boiler selection unit 406 reads the priority order of candidate boilers from the priority order table 211. In the example of FIG. 3, when “No. 3”, “No. 4”, and “No. 5” are obtained from the candidate boiler determination unit 405 as the boiler identifiers, the target boiler selection unit 406 selects the boiler identifiers. The corresponding priority values “2”, “1”, and “3” are read from the priority table 211. When the priority order values are read, the target boiler selection unit 406 compares these values. When it becomes necessary to raise the combustion stage due to fluctuations in the required load, the boilers to be raised are selected in ascending order of the read values.

例えば、要求負荷の変動により燃焼段階を引き上げる必要が生じたときには、読み出した値の小さい順に、引き上げ対象ボイラを選択する。優先順位の値として「1」乃至「3」を読み出したときには、値「1」が最も小さいので、対象ボイラ選択部406は、その値に対応する4号ボイラを引き上げ対象ボイラとして選択する。   For example, when it becomes necessary to raise the combustion stage due to fluctuations in the required load, the boilers to be raised are selected in ascending order of the read values. When “1” to “3” are read as the priority values, the value “1” is the smallest, so the target boiler selection unit 406 selects the No. 4 boiler corresponding to the value as the target boiler to be raised.

また要求負荷の変動により燃焼段階を引き下げる必要が生じたときには、読み出した値の大きい順に、引き下げ対象ボイラを選択する。例えば、優先順位の値として「4」および「5」を読み出したときには、値「5」の方が大きいので、対象ボイラ選択部406は、その値に対応する1号ボイラを引き下げ対象ボイラとして選択する。   When it is necessary to lower the combustion stage due to fluctuations in the required load, the reduction target boilers are selected in descending order of the read values. For example, when “4” and “5” are read as priority values, the value “5” is larger, so the target boiler selection unit 406 selects the No. 1 boiler corresponding to the value as the target boiler to be lowered. To do.

優先順位が変更されてから対象ボイラを選択する場合には、その選択に、変更後の優先順位が用いられる。対象ボイラ選択部406は、対象ボイラを選択すると、その対象ボイラを特定するデータを燃焼段階指示部407に供給する。   When the target boiler is selected after the priority order is changed, the changed priority order is used for the selection. When the target boiler is selected, the target boiler selection unit 406 supplies data for specifying the target boiler to the combustion stage instruction unit 407.

燃焼段階指示部407は、対象ボイラについて燃焼段階を変更する指示を行って、当該対象ボイラの燃焼段階を引き上げるか引き下げる。対象ボイラ以外のボイラについては、その燃焼段階を維持する。仮想ボイラ単位では、燃焼指示または停止指示を送信する。この実施の形態において、候補ボイラの決定および対象ボイラの選択は、ボイラ間の優先順位が変更されても、要求負荷の変動により燃焼段階の変更の必要が生じてから行っている。燃焼段階指示部407は、その決定または選択の時期にあわせて、対象ボイラについて燃焼段階の変更を指示することになる。   The combustion stage instruction | indication part 407 performs the instruction | indication which changes a combustion stage about an object boiler, and raises or lowers the combustion stage of the said object boiler. For boilers other than the target boiler, the combustion stage is maintained. In the virtual boiler unit, a combustion instruction or a stop instruction is transmitted. In this embodiment, the determination of the candidate boiler and the selection of the target boiler are performed after the combustion stage needs to be changed due to fluctuations in the required load even if the priority order among the boilers is changed. The combustion stage instructing unit 407 instructs the target boiler to change the combustion stage in accordance with the determination or selection timing.

燃焼段階指示部407は、各ボイラ101に指示を送信するとともに、その指示をボイラ管理テーブル210に書き込む。ボイラ101の制御モジュールは、その指示にしたがってボイラ101の燃焼段階を制御し、それによって、多缶設置システムの負荷に応じた蒸気量の調整が行われる。   The combustion stage instruction unit 407 transmits an instruction to each boiler 101 and writes the instruction in the boiler management table 210. The control module of the boiler 101 controls the combustion stage of the boiler 101 according to the instruction, thereby adjusting the amount of steam according to the load of the multi-can installation system.

図5は本実施の形態における台数制御装置による制御例を説明するための図である。この例は、時刻t1において、1号ボイラから5号ボイラまでの優先順位が「5」、「4」、「2」、「1」、「3」から「1」、「2」、「4」、「5」、「3」にそれぞれ変更されたときの制御例である。図5の上段は、スチームヘッダの蒸気圧力、およびその圧力から得られた必要燃焼量を時系列に示している。図5の下段は、1号ボイラから5号ボイラまでの各ボイラの燃焼段階を時系列に示している。   FIG. 5 is a diagram for explaining an example of control by the number control device in the present embodiment. In this example, at time t1, the priorities from No. 1 boiler to No. 5 boiler are “5”, “4”, “2”, “1”, “3” to “1”, “2”, “4”. ”,“ 5 ”, and“ 3 ”. The upper part of FIG. 5 shows the steam header steam pressure and the required combustion amount obtained from the pressure in time series. The lower part of FIG. 5 shows the combustion stage of each boiler from No. 1 boiler to No. 5 boiler in time series.

この例における初期の時刻t0では、必要燃焼量が2.5であり、また蒸気を供給可能なボイラ(供蒸可能ボイラ)の燃焼量も2.5になっている。その時刻t0では優先順位の高い4号ボイラ、3号ボイラの燃焼段階が高燃であり、その次に優先順位の高い5号ボイラの燃焼段階が低燃である。優先順位の低い2号ボイラおよび1号ボイラの燃焼段階は待機である。   At the initial time t0 in this example, the required combustion amount is 2.5, and the combustion amount of the boiler capable of supplying steam (steaming boiler) is also 2.5. At the time t0, the combustion stage of the No. 4 boiler and the No. 3 boiler with high priority has high combustion, and the combustion stage of the No. 5 boiler with the next highest priority has low combustion. The combustion stage of No. 2 boiler and No. 1 boiler with low priority is standby.

時刻t1でローテーションによって優先順位が変更されたとする。その時刻t1で、もし変更後の優先順位の高い順に、燃焼段階の変更指示を行うボイラを選択したとすると、1号ボイラおよび2号ボイラに順次燃焼段階の引き上げ指示が行われ、3号ボイラおよび4号ボイラに対してはそれらを待機させる停止指示が行われることになる。しかしながら、1号ボイラに引き上げ指示を行っても、蒸気の供給が可能となるまで時間が必要になる。このため、優先順位の変更によってボイラの燃焼段階を引き上げたり引き下げたりすると、多缶設置システムの出力が不安定化する可能性がある。   Assume that the priority is changed by rotation at time t1. At that time t1, if the boilers for instructing the combustion stage change are selected in the order of higher priority after the change, the No. 1 and No. 2 boilers are instructed to sequentially raise the combustion stage, and the No. 3 boiler. And the stop instruction | indication which makes them wait is performed with respect to No. 4 boiler. However, even if the instruction to raise the No. 1 boiler is given, it takes time until the steam can be supplied. For this reason, if the combustion stage of the boiler is raised or lowered by changing the priority order, the output of the multi-can installation system may become unstable.

この実施の形態における台数制御装置は、上述のように優先順位に変更があっても、要求負荷に変動がなければ、各ボイラの燃焼段階を変更しない。要求負荷に変更があるかどうかは例えば0.5秒ごとに判断する。この例では、優先順位が変更された時刻t1の後も時刻t2になる前は必要燃焼量が変わらない。したがって、燃焼段階の変更指示は行われず、各ボイラの燃焼段階は維持される。   The number control device in this embodiment does not change the combustion stage of each boiler if there is no change in the required load even if the priority order is changed as described above. Whether there is a change in the required load is determined, for example, every 0.5 seconds. In this example, the required combustion amount does not change after time t1 when the priority is changed and before time t2. Therefore, the combustion stage change instruction is not performed, and the combustion stage of each boiler is maintained.

時刻t2になると、スチームヘッダの蒸気圧力が減少しており、そのため必要燃焼量が2.5から3.0に増加する。台数制御装置は、必要燃焼量が増加して燃焼段階を引き上げる必要が生じたと判断すると、燃焼段階が待機か低燃の1号ボイラ、2号ボイラ、5号ボイラを引き上げ候補ボイラとして決定する。引き上げ候補ボイラを決定すると、その引き上げ候補ボイラ間の変更後の優先順位を比較することによって、燃焼段階を引き上げる指示対象である引き上げ対象を選択する。燃焼量の不足は0.5であり、3つのボイラに対する変更後の優先順位は、順に「1」、「2」、「3」であるから、1号ボイラが引き上げ対象ボイラとして選択される。燃料量の不足によっては2台以上のボイラを引き上げ対象ボイラとして選択してもよい。また引き上げ対象ボイラ以外の2号ボイラから5号ボイラの燃焼段階は維持される。このとき5台のボイラ101は変更後の優先順位の高い順に燃焼しておらず、供蒸可能ボイラの燃焼量は2.5となる。   At time t2, the steam pressure in the steam header has decreased, so the required amount of combustion increases from 2.5 to 3.0. If it is determined that the required amount of combustion has increased and the combustion stage needs to be raised, the number control device determines that the No. 1 boiler, No. 2 boiler, No. 5 boiler, or No. 5 boiler whose combustion stage is standby or low in combustion is selected as a candidate boiler. When the raising candidate boiler is determined, the raising target, which is an instruction target for raising the combustion stage, is selected by comparing the priorities after the change among the raising candidate boilers. The shortage of combustion amount is 0.5, and the priorities after the change for the three boilers are “1”, “2”, and “3” in order, so the No. 1 boiler is selected as the boiler to be lifted. Depending on the shortage of fuel, two or more boilers may be selected as the target boiler. Moreover, the combustion stage of No. 2 boilers to No. 5 boilers other than the boiler to be lifted is maintained. At this time, the five boilers 101 are not burned in order of priority after the change, and the combustion amount of the steamable boiler becomes 2.5.

時刻t3になると、スチームヘッダの蒸気圧力が増加しており、そのため必要燃焼量が3.0から2.5に減少する。台数制御装置は、必要燃焼量が減少して燃焼段階を引き下げる必要が生じたと判断すると、燃焼段階が低燃か高燃の1号ボイラおよび3号ボイラから5号ボイラを引き下げ候補ボイラとして決定する。この場合、台数制御装置は、1号ボイラおよび3号ボイラから5号ボイラの変更後の優先順位を比較することによって、燃焼段階を引き下げる指示対象である引き下げ対象ボイラを選択する。燃焼量の不足は0.5であり、引き下げ候補ボイラのうち最も優先順位の低いボイラは4号ボイラであるため、4号ボイラが引き下げ対象ボイラとして選択され、その燃焼段階が高燃から低燃に引き下げられる。この時刻t3を経過したとき、1号ボイラが供蒸可能な状態になっているので、供蒸可能ボイラの燃焼量は2.5となる。   At time t3, the steam pressure in the steam header increases, so the required amount of combustion decreases from 3.0 to 2.5. When it is determined that the required combustion amount has decreased and the combustion stage needs to be lowered, the number control device determines that the combustion stage is the low boiler or the high combustion No. 1 boiler and the No. 3 boiler as the candidate boiler. . In this case, the number control device selects a lowering target boiler which is an instruction target for lowering the combustion stage by comparing priorities after the change from the No. 1 boiler and the No. 3 boiler to the No. 5 boiler. The shortage of combustion amount is 0.5, and the boiler with the lowest priority among the reduction candidate boilers is the No. 4 boiler, so the No. 4 boiler is selected as the reduction target boiler, and its combustion stage is from high to low Pulled down. When this time t3 has elapsed, the No. 1 boiler is in a steamable state, so the combustion amount of the steamable boiler is 2.5.

時刻t4になると、スチームヘッダの蒸気圧力がさらに増加しており、そのため必要燃焼量が2.5から2.0に減少する。台数制御装置は、同様にして4号ボイラを引き下げ対象ボイラとして選択し、4号ボイラの燃焼段階が低燃から待機に引き下げられる。これによって、供蒸可能ボイラの燃焼量は2.0となる。   At time t4, the steam pressure in the steam header further increases, so the required combustion amount decreases from 2.5 to 2.0. Similarly, the number control device selects the No. 4 boiler as the lowering target boiler, and the combustion stage of the No. 4 boiler is lowered from low combustion to standby. Thereby, the combustion amount of the steamable boiler becomes 2.0.

このように、優先順位の変更があった時刻t1に4号ボイラを停止しなくても、必要燃焼量が減少したときに優先的に4号ボイラが停止され、変更後の優先順位と各ボイラの燃焼段階が序々に整合することになる。ローテーションのような優先順位の変更をする間隔と較べると、整合するのに要する時間は極めて短いので、実質的に優先順位に基づいて各ボイラの燃焼段階が制御される。したがって、優先順位による燃焼の制御やローテーションのような優先順位の変更の効果を損ねない。   Thus, even if the No. 4 boiler is not stopped at the time t1 when the priority order is changed, the No. 4 boiler is preferentially stopped when the required combustion amount is reduced, and the changed priority order and each boiler are changed. The combustion phase of the will be consistent. Compared with the interval for changing the priority order such as rotation, the time required for matching is extremely short, so that the combustion stage of each boiler is controlled substantially based on the priority order. Therefore, the effect of changing the priority order such as combustion control or rotation by priority order is not impaired.

さらに時間が経過し時刻t5になると、スチームヘッダの蒸気圧力が減少し、そのため必要燃焼量が2.0から2.5に増加し、燃焼量が0.5だけ不足する。台数制御装置は、必要燃焼量が増加して燃焼段階を引き上げる必要が生じたと判断すると、燃焼段階が低燃または待機の1号ボイラ、2号ボイラ、4号ボイラ、5号ボイラを引き上げ候補ボイラとして決定する。その引き上げ候補ボイラの中から、そのとき優先順位の最も高い1号ボイラを引き上げ対象ボイラとして選択する。1号ボイラの燃焼段階が低燃から高燃に引き上げられ、供蒸可能ボイラの燃焼量は2.5に増加する。   Further, when time elapses and time t5 is reached, the steam pressure in the steam header decreases, so that the required combustion amount increases from 2.0 to 2.5, and the combustion amount is insufficient by 0.5. When the number control device determines that the necessary combustion amount has increased and the combustion stage needs to be raised, the No. 1 boiler, the No. 2 boiler, the No. 4 boiler, the No. 4 boiler, and the No. 5 boiler that are in the low combustion stage or the standby stage are raised. Determine as. Among the candidate boilers for raising, the first boiler with the highest priority at that time is selected as the boiler to be raised. The combustion stage of the No. 1 boiler is raised from low combustion to high combustion, and the combustion amount of the steamable boiler increases to 2.5.

時刻t6になると、スチームヘッダの蒸気圧力がさらに減少し、そのため必要燃焼量が2.5から3.0に増加し、燃焼量が0.5だけ不足する。台数制御装置は、燃焼段階が低燃または待機の2号ボイラ、4号ボイラ、5号ボイラを引き上げ候補ボイラとして決定する。その引き上げ候補ボイラの中から、そのとき優先順位の最も高い2号ボイラを引き上げ対象ボイラとして選択する。供蒸可能ボイラの燃焼量は2.5のままである。   At time t6, the steam pressure in the steam header further decreases, so that the required combustion amount increases from 2.5 to 3.0, and the combustion amount becomes insufficient by 0.5. The number control device determines the No. 2 boiler, the No. 4 boiler, and the No. 5 boiler whose combustion stage is low in combustion or standby as a candidate boiler. Among the candidate boilers for raising, the No. 2 boiler having the highest priority at that time is selected as the target boiler to be raised. The combustion amount of the steamable boiler remains 2.5.

時刻t7になると、スチームヘッダの蒸気圧力が再び増加し、そのため必要燃焼量が3.0から2.5に減少し、燃焼量が0.5だけ過剰になる。台数制御装置は、そのとき燃焼段階が高燃または低燃の4つのボイラを引き下げ候補ボイラとして決定する。その引き下げ候補ボイラの中から、そのとき優先順位の最も低い3号ボイラを引き下げ対象ボイラとして選択する。3号ボイラの燃焼段階が高燃から低燃に引き下げられる一方で、時刻t7が経過したときには2号ボイラが供蒸可能になっているので、供蒸可能ボイラの燃焼量は2.5となっている。   At time t7, the steam pressure in the steam header increases again, so the required amount of combustion decreases from 3.0 to 2.5 and the amount of combustion becomes excessive by 0.5. The number control device then determines four boilers whose combustion stage is high or low as pulling down candidate boilers. From among the reduction candidate boilers, the No. 3 boiler having the lowest priority at that time is selected as the reduction target boiler. While the combustion stage of the No. 3 boiler is lowered from high combustion to low combustion, since the No. 2 boiler can be steamed when the time t7 has elapsed, the combustion amount of the steamable boiler becomes 2.5. ing.

時刻t8になると、スチームヘッダの蒸気圧力がさらに増加し、そのため必要燃焼量が2.5から2.0に減少し、燃焼量が0.5だけ過剰になる。台数制御装置は、そのとき燃焼段階が高燃または低燃の4台のボイラを引き下げ候補ボイラとして決定する。その引き下げ候補ボイラの中から、同様にして3号ボイラを引き下げ対象ボイラとして選択する。3号ボイラの燃焼段階が低燃から待機に引き下げられ、供蒸可能ボイラの燃焼量は2.0に減少する。これによって3号ボイラおよび4号ボイラは、変更後の優先順位にしたがって待機状態になっている。   At time t8, the steam pressure in the steam header further increases, so the required amount of combustion decreases from 2.5 to 2.0, and the amount of combustion becomes excessive by 0.5. The number control device then determines four boilers whose combustion stage is high or low in combustion as candidate boilers to be lowered. Similarly, the No. 3 boiler is selected as the reduction target boiler from the reduction candidate boilers. The combustion stage of the No. 3 boiler is lowered from low combustion to standby, and the combustion amount of the steamable boiler is reduced to 2.0. Thereby, the No. 3 boiler and the No. 4 boiler are in a standby state according to the priority after the change.

時刻t9になると、スチームヘッダの蒸気圧力が減少し、そのため必要燃焼量が2.0から2.5に増加する。台数制御装置は、そのとき燃焼段階が低燃または待機の2号ボイラから5号ボイラを引き上げ候補ボイラとして決定する。その引き上げ候補ボイラの中から、優先順位の最も高い2号ボイラを引き上げ対象ボイラとして選択する。2号ボイラの燃焼段階が低燃から高燃に引き上げられ、供蒸可能ボイラの燃焼量は2.5に増加する。これによって、各ボイラの燃焼段階が優先順位通りになっている。   At time t9, the steam pressure in the steam header decreases, so the required amount of combustion increases from 2.0 to 2.5. At this time, the number control device raises the No. 5 boiler from the No. 2 boiler whose combustion stage is low combustion or standby, and determines it as a candidate boiler. Among the candidate boilers for raising, No. 2 boiler with the highest priority is selected as the target boiler for raising. The combustion stage of No. 2 boiler is raised from low combustion to high combustion, and the combustion amount of steamable boiler increases to 2.5. This ensures that the combustion stage of each boiler is in priority order.

このように本実施の形態における台数制御装置は、優先順位の設定に変更があっても、要求負荷の変動により燃焼段階の変更の必要が生じたときに、そのときの燃焼段階にしたがって候補ボイラを選択する。燃焼ボイラを候補ボイラから外すことにより、燃焼ボイラの燃焼段階の引き下げを行わない。燃焼段階の変更は対象ボイラについてのみ行い、その他のボイラの燃焼段階は維持する。優先順位に変更があっても即座かつ一斉に燃焼ボイラの入れ替えを行わず、要求負荷の変動により燃焼段階の変更の必要が生じたときに序々に入れ替えを行っていくことで、蒸気圧力を安定させた状態で優先順位の変更を行うことが可能となる。   As described above, the number control device according to the present embodiment, even if the priority setting is changed, when the combustion stage needs to be changed due to fluctuations in the required load, the candidate boilers are changed according to the combustion stage at that time. Select. By removing the combustion boiler from the candidate boiler, the combustion stage of the combustion boiler is not lowered. The combustion stage is changed only for the target boiler, and the combustion stages of the other boilers are maintained. Even if there is a change in priority, the combustion boilers are not replaced immediately and all at once, but the steam pressure is stabilized by gradually replacing the combustion stage when it is necessary to change the combustion stage due to fluctuations in the required load. It is possible to change the priority in the state of being made.

上述の例では、台数制御装置が、多缶設置システムに設けられた全てのボイラに対して制御を行っていた。しかしながら、夜間など時間帯により、多缶設置システムの負荷が定常的に低下したり、季節や時間帯によって負荷量が異なるために不要なボイラが生じたりする場合がある。このため、省エネ・省力化や制御性の向上を目的として、設置されたボイラの一部を制御対象ボイラとし、残りのボイラを予備缶とするようにしてもよい。不要なボイラ等を予備缶として原則的に燃焼させず待機させる。   In the above example, the number control device controls all the boilers provided in the multi-can installation system. However, depending on the time zone such as night, the load of the multi-can installation system may steadily decrease, or an unnecessary boiler may be generated because the load amount varies depending on the season or time zone. For this reason, for the purpose of energy saving / labor saving and improvement in controllability, a part of the installed boilers may be controlled boilers and the remaining boilers may be spare cans. Unnecessary boilers, etc. are kept in standby as a spare can in principle.

図4に示すように、台数制御装置105は、このような制御対象ボイラおよび予備缶ボイラを設定するため、予備缶設定部408をさらに備えるようにしてもよい。予備缶設定部408は、優先順位の高い順に、予め設定された最大燃焼台数分の制御対象ボイラを選択することにより、ボイラ101のうちから、制御対象ボイラ、および制御対象ボイラ以外の予備缶ボイラを決定する。例えば最大燃焼台数が3台に設定されていれば、5台のボイラ101のうち、優先順位の高い3台のボイラが制御対象ボイラとして設定され、優先順位の低い2台のボイラが予備缶ボイラとして設定される。   As shown in FIG. 4, the number control device 105 may further include a spare can setting unit 408 in order to set such a control target boiler and a spare can boiler. The spare can setting unit 408 selects the control target boilers corresponding to the preset maximum number of combustion units in descending order of priority, so that the boilers other than the control target boiler and the control target boiler are selected from the boilers 101. To decide. For example, if the maximum number of combustion units is set to three, among the five boilers 101, three boilers with higher priority are set as control target boilers, and two boilers with lower priority are spare boilers. Set as

予備缶設定部408は、優先順位変更部404より優先順位の変更通知があると、優先順位テーブル211を参照し、制御対象ボイラおよび予備缶ボイラを設定し、その設定をボイラ管理テーブル210に書き込む。例えば、ボイラ管理テーブル210に、制御対象ボイラか予備缶ボイラかを示すフラグをボイラごとに用意しておき、予備缶設定部408が、制御対象ボイラおよび予備缶ボイラの決定結果にしたがって、そのフラグの値を書き込むようにすればよい。   When there is a priority change notification from the priority changing unit 404, the spare can setting unit 408 refers to the priority order table 211, sets the controlled boiler and the spare can boiler, and writes the settings to the boiler management table 210. . For example, in the boiler management table 210, a flag indicating whether the boiler is a controlled boiler or a spare can boiler is prepared for each boiler, and the spare can setting unit 408 determines the flag according to the determination result of the controlled boiler and the spare can boiler. It is sufficient to write the value of.

この場合、候補ボイラ決定部405は、要求負荷の変動により燃焼段階を引き下げる必要が生じたとき、制御対象ボイラおよび予備缶ボイラの中から燃焼段階を引き下げる引き下げ候補ボイラを決定する。この決定は、制御対象ボイラおよび予備缶ボイラの燃焼段階にしたがってすることができる。対象ボイラ選択部406は、引き下げ候補ボイラ間で優先順位の低いものから、燃焼段階を引き下げる引き下げ対象ボイラを選択する。上述の例のように、優先順位の変更があっても、要求負荷の変動により燃焼段階を引き下げる必要が生じて引き下げ候補ボイラを決定しなければ、引き下げ対象ボイラが選択されず、また引き下げ対象ボイラ以外のボイラの燃焼段階は、予備缶ボイラの燃焼段階も含め維持される。すなわち、優先順位の変更により制御対象ボイラが予備缶ボイラに変わっても、直ちに停止しない。要求負荷の変動により燃焼段階の引き下げの必要が生じたときに、予備缶ボイラを含めたボイラの中から、燃焼段階を引き下げるボイラを変更後の優先順位に基づいて選択する。   In this case, when it becomes necessary to lower the combustion stage due to fluctuations in the required load, the candidate boiler determination unit 405 determines a lowering candidate boiler that lowers the combustion stage from among the control target boiler and the spare can boiler. This determination can be made according to the combustion stage of the controlled boiler and the spare can boiler. The target boiler selection unit 406 selects a lowering target boiler that lowers the combustion stage from the lower priority among the lowering candidate boilers. As in the above example, even if the priority order is changed, if it is necessary to lower the combustion stage due to fluctuations in the required load and the reduction candidate boiler is not determined, the reduction target boiler is not selected and the reduction target boiler is selected. The combustion stage of the other boilers is maintained including the combustion stage of the spare can boiler. That is, even if the control target boiler is changed to the spare can boiler due to the change of the priority order, it does not stop immediately. When it is necessary to lower the combustion stage due to fluctuations in the required load, a boiler that lowers the combustion stage is selected from the boilers including the spare can boiler based on the changed priority.

このため、ボイラ101の一部を予備缶ボイラとしている場合でも、優先順位の変更によって燃焼量の不足が生じ難くなり、多缶設置システムの出力をさらに安定化することができる。   For this reason, even when a part of the boiler 101 is a spare can boiler, a shortage of the combustion amount is less likely to occur due to the change in the priority order, and the output of the multi-can installation system can be further stabilized.

また候補ボイラ決定部405は、要求負荷の変動により燃焼段階を引き上げる必要が生じたとき、制御対象ボイラの中から引き上げ候補ボイラを決定し、対象ボイラ選択部406は、それら引き上げ候補ボイラ間の優先順位を比較することによって、その増加分に対して引き上げ対象ボイラを選択することができる。   Further, when it becomes necessary to raise the combustion stage due to fluctuations in the required load, the candidate boiler determining unit 405 determines a candidate boiler to be raised from among the boilers to be controlled, and the target boiler selecting unit 406 prioritizes these candidate boilers for raising. By comparing the ranks, it is possible to select the target boiler for the increase.

引き上げ対象ボイラを選択する場合には、予備缶ボイラを引き上げ候補ボイラに含めない。優先順位の変更により制御対象ボイラが予備缶ボイラに変わったとき、その予備缶ボイラが直ちに待機としなくても、予備缶ボイラには引き下げ指示しか行われないから、予備缶ボイラは順次待機状態になる。したがって、予備缶ボイラが長期に燃焼を継続するのを防止することができる。   When selecting the boiler to be lifted, the spare can boiler is not included in the candidate boilers for lifting. When the boiler to be controlled is changed to a spare can boiler due to the change in priority, even if the spare can boiler does not immediately go to standby, the spare can boiler can only be instructed to pull down, so the spare can boiler is put into a standby state sequentially. Become. Therefore, it is possible to prevent the preliminary can boiler from continuing to burn for a long time.

図6は本実施の形態における台数制御装置による制御の他の例を説明するための図である。この例も、時刻t1において、1号ボイラから5号ボイラまでの優先順位が「5」、「4」、「2」、「1」、「3」から「1」、「2」、「4」、「5」、「3」にそれぞれ変更されたときの制御例である。ただし、最大燃焼台数が5台ではなく3台に設定されているため、5台のボイラのうち2台が予備缶ボイラとなる。   FIG. 6 is a diagram for explaining another example of the control by the number control device in the present embodiment. Also in this example, at time t1, the priorities from the No. 1 boiler to the No. 5 boiler are “5”, “4”, “2”, “1”, “3” to “1”, “2”, “4”. ”,“ 5 ”, and“ 3 ”. However, since the maximum number of combustion is set to three instead of five, two of the five boilers are spare can boilers.

この例における初期の時刻t0では、必要燃焼量は2.0であり、また供蒸可能ボイラの燃焼量も2.0になっている。その時刻t0では優先順位の高い4号ボイラ、3号ボイラの燃焼段階が高燃であり、その次に優先順位の高い5号ボイラの燃焼段階が待機である。これら3台が制御対象ボイラであり、残りの2号ボイラおよび1号ボイラが予備缶ボイラである。   At the initial time t0 in this example, the required combustion amount is 2.0, and the combustion amount of the steamable boiler is also 2.0. At the time t0, the combustion stage of the No. 4 boiler and the No. 3 boiler with high priority is high combustion, and the combustion stage of the No. 5 boiler with the next highest priority is standby. These three are controlled boilers, and the remaining No. 2 and No. 1 boilers are spare boilers.

この時刻t0から時刻t1になると、上述のように優先順位が変更される。その時刻t1で、もし変更後の優先順位の低い順に4号ボイラおよび3号ボイラを予備缶ボイラとして設定し、直ちに待機させてしまうと、供蒸可能なボイラの燃焼量が0.0になって、必要燃焼量から大きく不足してしまう。   From this time t0 to time t1, the priority is changed as described above. At the time t1, if the No. 4 boiler and the No. 3 boiler are set as spare can boilers in the order of lower priority after the change, and if they are put on standby immediately, the combustion amount of the steaming boiler becomes 0.0. As a result, the required amount of combustion is greatly insufficient.

この例では、優先順位の変更により制御対象ボイラおよび予備缶ボイラが変わっても、要求負荷の変動により燃焼段階を変更する必要が生じなければ、変更前の予備缶ボイラの燃焼段階を待機にする変更を指示しない。時刻t1では、4号ボイラおよび3号ボイラに対しては引き下げ指示が行われず、両ボイラの燃焼段階が維持される。これによって、優先順位の変更された時刻t1でも、供蒸可能ボイラの燃焼量を2.0に維持することができる。   In this example, even if the control target boiler and the spare can boiler change due to the change in the priority order, if it is not necessary to change the combustion stage due to fluctuations in the required load, the combustion stage of the spare can boiler before the change is put on standby. Do not instruct changes. At time t1, no lowering instruction is issued to the No. 4 and No. 3 boilers, and the combustion stage of both boilers is maintained. As a result, the combustion amount of the steamable boiler can be maintained at 2.0 even at the time t1 when the priority is changed.

時刻t2になると、スチームヘッダの蒸気圧力が減少しており、そのため必要燃焼量が2.0から2.5に増加する。台数制御装置は、要求負荷の変動により燃焼段階を引き上げる必要が生じたと判断すると、制御対象ボイラであって燃焼段階を引き上げ可能な1号ボイラ、2号ボイラ、5号ボイラを引き上げ候補ボイラとして決定し、その引き上げ候補ボイラの中から、それらボイラの優先順位に基づいて、引き上げ対象ボイラを選択する。燃焼量の不足は0.5であり、3つの引き上げ候補ボイラに対する変更後の優先順位は、順に「1」、「2」、「3」であるから、1号ボイラが引き上げ対象ボイラとして選択される。これによって1号ボイラの燃焼段階が待機から低燃に引き上げられるものの、供蒸可能な状態に1号ボイラがなるまで時間を要する。しかしながら、1号ボイラ以外のボイラの燃焼段階は、予備缶ボイラである3号ボイラおよび4号ボイラの燃焼段階も含め維持される。このため、優先順位の変更があっても燃焼量は減少せず、このときの供蒸可能ボイラの燃焼量は2.0になっている。   At time t2, the steam pressure in the steam header decreases, so the required combustion amount increases from 2.0 to 2.5. When the number control device determines that it is necessary to raise the combustion stage due to fluctuations in the required load, the No. 1 boiler, the No. 2 boiler, and the No. 5 boiler that can raise the combustion stage are determined as candidate boilers to be raised. Then, a boiler to be raised is selected from the boiler candidate boilers to be raised based on the priority order of the boilers. The shortage of combustion amount is 0.5, and the priority order after the change for the three candidate boilers to be raised is “1”, “2”, “3” in order, so the No. 1 boiler is selected as the boiler to be raised. The Although this raises the combustion stage of the No. 1 boiler from standby to low combustion, it takes time for the No. 1 boiler to become steamable. However, the combustion stages of the boilers other than the No. 1 boiler are maintained including the combustion stages of the No. 3 boiler and the No. 4 boiler which are spare can boilers. For this reason, even if there is a change in priority, the combustion amount does not decrease, and the combustion amount of the steamable boiler at this time is 2.0.

時刻t3になると、スチームヘッダの蒸気圧力が増加しており、そのため必要燃焼量が2.5から2.0に減少し、燃焼量が0.5だけ過剰になる。台数制御装置は、要求負荷の変動により燃焼段階を引き下げる必要が生じたと判断すると、燃焼状態にある制御対象ボイラおよび予備缶ボイラを引き下げ候補ボイラとして決定し、それら引き下げ候補ボイラの優先順位に基づいて引き下げ対象ボイラを選択する。それら引き下げ候補ボイラのうち最も優先順位の低いボイラは、優先順位の変更により予備缶ボイラとなった4号ボイラであるため、4号ボイラの燃焼段階が高燃から低燃に引き下げられる。この時刻t3を経過したとき、1号ボイラが供蒸可能な状態になっているので、供蒸可能ボイラの燃焼量は2.0となる。   At time t3, the steam pressure in the steam header increases, so the required amount of combustion decreases from 2.5 to 2.0 and the amount of combustion becomes excessive by 0.5. When determining that it is necessary to lower the combustion stage due to fluctuations in the required load, the unit control device determines the boiler to be controlled and the spare can boiler in the combustion state as reduction candidate boilers, and based on the priority order of these reduction candidate boilers Select the target boiler. Of these reduction candidate boilers, the boiler with the lowest priority is the No. 4 boiler that has become a spare can boiler due to the change in the priority, and therefore the combustion stage of the No. 4 boiler is reduced from high to low. When this time t3 has elapsed, the No. 1 boiler is in a steamable state, so the combustion amount of the steamable boiler is 2.0.

時刻t4になると、スチームヘッダの蒸気圧力が再び減少し、そのため必要燃焼量が2.0から2.5に増加し、燃焼量が0.5だけ不足する。台数制御装置は、そのとき制御対象ボイラであって燃焼段階を引き上げ可能な1号ボイラ、2号ボイラおよび5号ボイラを引き上げ候補ボイラとして決定し、最も優先順位の高い1号ボイラを引き上げ対象ボイラとして選択する。これによって、1号ボイラの燃焼段階が低燃から高燃に引き上げられ、供蒸可能ボイラの燃焼量は2.5となる。   At time t4, the steam pressure in the steam header decreases again, so that the required combustion amount increases from 2.0 to 2.5, and the combustion amount becomes insufficient by 0.5. The number control device determines the No. 1 boiler, No. 2, No. 2 boiler and No. 5 boiler, which are the controlled boilers at that time, which can raise the combustion stage, as the candidate boilers, and raises the No. 1 boiler with the highest priority. Select as. As a result, the combustion stage of the No. 1 boiler is raised from low combustion to high combustion, and the amount of combustion of the steamable boiler becomes 2.5.

時刻t5になると、スチームヘッダの蒸気圧力が増加し、そのため必要燃焼量が2.5から2.0に減少し、燃焼量が0.5だけ過剰になる。台数制御装置は、制御対象ボイラおよび予備缶ボイラの中から燃焼状態にある1号ボイラ、3号ボイラおよび4号ボイラを引き下げ候補ボイラとして決定し、そのとき最も優先順位の低い4号ボイラを引き下げ対象ボイラとして選択する。これによって、4号ボイラの燃焼段階が低燃から待機に引き下げられ、供蒸可能ボイラの燃焼量は2.0となる。   At time t5, the steam pressure in the steam header increases, so the required amount of combustion decreases from 2.5 to 2.0 and the amount of combustion becomes excessive by 0.5. The number control device determines the No. 1 boiler, No. 3 boiler, and No. 4 boiler in the combustion state from among the boilers to be controlled and the spare can boiler as reduction candidate boilers, and lowers the No. 4 boiler with the lowest priority at that time. Select as target boiler. As a result, the combustion stage of the No. 4 boiler is lowered from low combustion to standby, and the combustion amount of the steamable boiler becomes 2.0.

時刻t6になると、スチームヘッダの蒸気圧力が減少し、そのため必要燃焼量が2.0から2.5に増加し、燃焼量が0.5だけ不足する。台数制御装置は、要求負荷の変動により燃焼段階を引き上げる必要が生じたと判断すると、制御対象ボイラであって燃焼段階を引き上げ可能な2号ボイラおよび5号ボイラを引き上げ候補ボイラとして決定し、その引き上げ候補ボイラの中から、最も優先順位の高い2号ボイラを引き上げ対象ボイラとして選択する。これによって、2号ボイラの燃焼段階を待機から低燃に引き上げる指示がされるものの、供蒸可能な状態ではないので、供蒸可能ボイラの燃焼量は2.0となる。   At time t6, the steam pressure in the steam header decreases, so the required combustion amount increases from 2.0 to 2.5, and the combustion amount becomes insufficient by 0.5. When determining that it is necessary to raise the combustion stage due to fluctuations in the required load, the unit control device determines the No. 2 and No. 5 boilers that are to be controlled and can raise the combustion stage as raising candidate boilers, and raises them. From the candidate boilers, the No. 2 boiler with the highest priority is selected as the target boiler. Thus, although an instruction to raise the combustion stage of the No. 2 boiler from standby to low combustion is given, since it is not in a steamable state, the amount of combustion in the steamable boiler is 2.0.

上述した時刻t5の際の制御では、優先順位の変更により制御対象ボイラおよび予備缶ボイラが変わったときに、予備缶ボイラとなった4号ボイラを停止していなくても、要求負荷の変動により燃焼段階を引き下げる必要が生じたときに優先的に4号ボイラが停止されている。また時刻t6の際の制御では、引き上げ候補ボイラから、予備缶ボイラである4号ボイラが除外されているため、4号ボイラの待機状態は継続する。予備缶ボイラを優先順位の変更時に直ちに待機としなくても、このように予備缶ボイラに引き上げ指示を行わず必要が生じたときに引き下げ指示を行うことによって、予備缶ボイラの設定と実際とが序々に整合することになる。ローテーションのような優先順位の変更をする間隔と較べると、整合するのに要する時間は極めて短いので、実質的に予備缶ボイラは制御対象から外れ冷態を継続することになる。したがって、予備缶ボイラによる省エネ・省力化等の効果を損ねない。   In the control at the time t5 described above, when the controlled boiler and the spare can boiler change due to the change in the priority order, even if the No. 4 boiler that has become the spare can boiler is not stopped, The No. 4 boiler is preferentially stopped when it is necessary to lower the combustion stage. Further, in the control at the time t6, the No. 4 boiler, which is a spare can boiler, is excluded from the candidate boilers for lifting, and therefore the standby state of the No. 4 boiler continues. Even if the standby boiler is not put on standby immediately when the priority order is changed, the setting and actual setting of the spare can boiler can be performed by instructing the spare can boiler to be lowered without instructing to raise it. It will be consistent. Compared with the interval for changing the priority order such as rotation, the time required for matching is extremely short, so that the preliminary boiler can be substantially removed from the controlled object and continue to cool. Therefore, the effects of energy saving and labor saving by the spare can boiler are not impaired.

さらに時間が経過し時刻t7になると、スチームヘッダの蒸気圧力が増加し、そのため必要燃焼量が2.5から2.0に減少し、燃焼量が0.5だけ過剰になる。台数制御装置は、要求負荷の変動により燃焼段階を引き下げる必要が生じたと判断すると、制御対象ボイラおよび予備缶ボイラのうち燃焼段階が高燃または低燃の1号ボイラ乃至3号ボイラを引き下げ候補ボイラとして決定し、その引き下げ候補ボイラの中から、最も優先順位の低い3号ボイラを引き下げ対象ボイラとして選択する。これによって、3号ボイラの燃焼段階が高燃から低燃に引き下げられる。このとき2号ボイラが供蒸可能な状態になっており、供蒸可能ボイラの燃焼量は2.0となる。   When time elapses and time t7 is reached, the steam pressure in the steam header increases, so that the required combustion amount decreases from 2.5 to 2.0, and the combustion amount becomes excessive by 0.5. If it is determined that the combustion stage needs to be lowered due to fluctuations in the required load, the unit control device lowers the No. 1 to No. 3 boilers whose combustion stage is high or low among the control target boiler and the spare can boiler. The No. 3 boiler with the lowest priority is selected as the target boiler for reduction from among the reduction candidate boilers. As a result, the combustion stage of the No. 3 boiler is lowered from high combustion to low combustion. At this time, the No. 2 boiler is in a steamable state, and the combustion amount of the steamable boiler is 2.0.

時刻t8になると、スチームヘッダの蒸気圧力が減少し、そのため必要燃焼量が2.0から2.5に増加し、燃焼量が0.5だけ不足する。台数制御装置は、要求負荷の変動により燃焼段階を引き上げる必要が生じたと判断すると、制御対象ボイラのうち燃焼段階が低燃または待機である2号ボイラおよび5号ボイラを引き上げ候補ボイラとして決定し、その引き上げ候補ボイラの中から、そのとき最も優先順位の高い2号ボイラを引き上げ対象ボイラとして選択する。これによって、2号ボイラの燃焼段階が低燃から高燃に引き上げられ、供蒸可能ボイラの燃焼量は2.5となる。   At time t8, the steam pressure in the steam header decreases, so the required amount of combustion increases from 2.0 to 2.5, and the amount of combustion is insufficient by 0.5. When determining that it is necessary to raise the combustion stage due to fluctuations in the required load, the number control device determines the No. 2 and No. 5 boilers whose combustion stage is low combustion or standby among the boilers to be controlled as the candidate boilers for raising, From among the candidate boilers for raising, the No. 2 boiler with the highest priority at that time is selected as the boiler to be raised. Thereby, the combustion stage of No. 2 boiler is pulled up from low combustion to high combustion, and the combustion amount of the steamable boiler becomes 2.5.

時刻t9になると、スチームヘッダの蒸気圧力が増加し、そのため必要燃焼量が2.5から2.0に減少し、燃焼量が0.5だけ過剰になる。台数制御装置は、要求負荷の変動により燃焼段階を引き下げる必要が生じたと判断すると、時刻t7の際と同様に、制御対象ボイラおよび予備缶ボイラのうち燃焼段階が高燃または低燃の1号ボイラから3号ボイラを引き下げ候補ボイラとして決定し、その引き下げ候補ボイラの中から、最も優先順位の低い3号ボイラを引き下げ対象ボイラとして選択する。これによって、3号ボイラの燃焼段階が低燃から待機に引き下げられ、供蒸可能ボイラの燃焼量は2.0となる。このときには、予備缶ボイラである3号ボイラおよび4号ボイラのいずれも待機状態となり、予備缶ボイラの変更後の設定通りになっている。   At time t9, the steam pressure in the steam header increases, so that the required amount of combustion decreases from 2.5 to 2.0 and the amount of combustion becomes excessive by 0.5. When the number control device determines that the combustion stage needs to be lowered due to fluctuations in the required load, the first boiler with the combustion stage having high or low combustion among the control target boiler and the spare can boiler as at time t7. No. 3 boiler is determined as a reduction candidate boiler, and No. 3 boiler with the lowest priority is selected as the reduction target boiler from among the reduction candidate boilers. As a result, the combustion stage of the No. 3 boiler is lowered from low combustion to standby, and the combustion amount of the steamable boiler becomes 2.0. At this time, both the No. 3 boiler and No. 4 boiler, which are spare can boilers, are in a standby state, and are set according to the settings after the change of the spare can boiler.

このように本実施の形態における台数制御装置は、多缶設置システムの出力する蒸気圧力を安定化させたまま、ボイラ間の優先順位の変更に伴って制御対象ボイラおよび予備缶ボイラを更新することができる。さらに、優先順位の変更により制御対象ボイラが予備缶ボイラに変わったとき、その予備缶ボイラが直ちに待機としなくても、その状態は継続せず、予備缶ボイラは順次待機状態になる。予備缶ボイラが長期に燃焼を継続するのを防止することができ、省エネ・省力化、制御性の向上など予備缶ボイラを設定する効果を損ねない。   As described above, the number control device in the present embodiment updates the controlled boiler and the spare can boiler in accordance with the change in the priority order among the boilers while stabilizing the steam pressure output from the multi-can installation system. Can do. Further, when the controlled boiler is changed to the spare can boiler due to the change in the priority order, even if the spare can boiler is not immediately put on standby, the state is not continued, and the spare can boiler is sequentially put on standby. It is possible to prevent the spare can boiler from continuing to burn for a long time, and the effects of setting the spare can boiler such as energy saving, labor saving, and improvement in controllability are not impaired.

上述の実施の形態で利用した制御プログラムは、コンピュータ読み取り可能な媒体に格納することができる。コンピュータ読み取り可能な媒体は、コンピュータ読み取り可能な記録媒体および伝送媒体を含む。例えばプログラムのコードを電気信号や光信号、磁気信号などで表現し、その信号を搬送波に載せて送信することで、同軸ケーブルや銅線、光ファイバのような伝送媒体でそのプログラムを提供することができる。またコンピュータ読み取り可能な記録媒体としては、CD−ROMやDVD−ROMなどの光学メディアや、フレキシブルディスクのような磁気メディア、フラッシュメモリやRAMなどの半導体メモリを利用することができる。   The control program used in the above-described embodiment can be stored in a computer-readable medium. The computer readable medium includes a computer readable recording medium and a transmission medium. For example, a program code is expressed by an electric signal, an optical signal, a magnetic signal, etc., and the signal is placed on a carrier wave and transmitted, so that the program is provided on a transmission medium such as a coaxial cable, copper wire, or optical fiber. Can do. As a computer-readable recording medium, optical media such as CD-ROM and DVD-ROM, magnetic media such as a flexible disk, and semiconductor memory such as flash memory and RAM can be used.

上述の実施の形態は本発明の技術的範囲を制限するものではなく、既に記載したもの以外でも、その範囲内で種々の変形や応用が可能である。例えば上述の実施の形態のように優先順位の設定を変更する際、燃焼予定ボイラが無圧のときには、有圧になるまでその変更を遅延させたり、その変更に先行して有圧にしたりするようにしてもよい。   The above-described embodiment does not limit the technical scope of the present invention, and various modifications and applications can be made within the scope other than those already described. For example, when changing the priority setting as in the above-described embodiment, when the combustion-scheduled boiler has no pressure, the change is delayed until the pressure is increased, or the pressure is increased prior to the change. You may do it.

また上述の実施の形態では、優先順位変更部から優先順位の変更通知が予備缶設定部にあったときに制御対象ボイラおよび予備缶ボイラの設定を更新したが、優先順位の変更とその更新を同期させなくてもよい。   Further, in the above-described embodiment, the setting of the control target boiler and the spare can boiler is updated when the priority change notification is sent from the priority change unit to the spare can setting unit, but the priority change and the update are performed. It is not necessary to synchronize.

また上述の実施の形態では、要求負荷の変動により燃焼段階の必要が生じたときに候補ボイラを決定したが、これに限られるものではない。これに代えて、またはこれと共に、予め定めた期間ごとに候補ボイラを決定し、燃焼段階を変更するようにしてもよい。   In the above-described embodiment, the candidate boiler is determined when the combustion stage becomes necessary due to fluctuations in the required load. However, the present invention is not limited to this. Instead of this, or together with this, a candidate boiler may be determined every predetermined period, and the combustion stage may be changed.

さらに上述の実施の形態では、ボイラの実際の燃焼段階にしたがって候補ボイラを決定したが、台数制御装置からのボイラへの指示によって候補ボイラを決定するようにしてもよい。この指示は、これからボイラへ与える指示であってもよいし、ボイラに与えた指示内容であってもよい。   Further, in the above-described embodiment, the candidate boiler is determined according to the actual combustion stage of the boiler. However, the candidate boiler may be determined by an instruction from the number control device to the boiler. This instruction may be an instruction to be given to the boiler from now on or may be an instruction content given to the boiler.

さらに上述の実施の形態では、5台の3位置蒸気ボイラを設けた多缶設置システムについて本発明を適用したが、これに限られるものではなく、温水ボイラのような他の種類のボイラを設けた多缶設置システムについて適用することも可能である。   Furthermore, in the above-described embodiment, the present invention is applied to a multi-can installation system provided with five three-position steam boilers. However, the present invention is not limited to this, and other types of boilers such as a hot water boiler are provided. It is also possible to apply to multi-can installation systems.

本実施の形態における多缶設置システムの全体構成を簡略的に示す図である。It is a figure which shows simply the whole structure of the multiple can installation system in this Embodiment. 本実施の形態における台数制御装置に用いるハードウェア構成の一例を示す図である。It is a figure which shows an example of the hardware constitutions used for the number control apparatus in this Embodiment. 優先順位テーブルの一例を説明するための図である。It is a figure for demonstrating an example of a priority table. 台数制御装置の機能的構成を説明するための図である。It is a figure for demonstrating the functional structure of a number control apparatus. 本実施の形態における台数制御装置による制御例を説明するための図である。It is a figure for demonstrating the example of control by the number control apparatus in this Embodiment. 本実施の形態における台数制御装置による制御の他の例を説明するための図である。It is a figure for demonstrating the other example of control by the number control apparatus in this Embodiment.

符号の説明Explanation of symbols

101 ボイラ
102 スチームヘッダ
104 圧力検出器
105 台数制御装置
209 制御プログラム
210 ボイラ管理テーブル
211 優先順位テーブル
212 変換データ
213 パターンデータ
401 検知信号受信部
402 台数演算部
403 状態取得部
404 優先順位変更部
405 候補ボイラ決定部
406 対象ボイラ選択部
407 燃焼段階指示部
408 予備缶設定部
DESCRIPTION OF SYMBOLS 101 Boiler 102 Steam header 104 Pressure detector 105 Number control apparatus 209 Control program 210 Boiler management table 211 Priority order table 212 Conversion data 213 Pattern data 401 Detection signal receiving part 402 Number calculation part 403 Status acquisition part 404 Priority order change part 405 Candidate Boiler determination unit 406 Target boiler selection unit 407 Combustion stage instruction unit 408 Preliminary can setting unit

Claims (8)

待機を含む複数の燃焼段階を有するボイラを複数台設置した多缶設置システムの台数制御装置であって、
前記ボイラ間の優先順位を変更する優先順位変更手段と、
前記ボイラの中で燃焼段階を変更する候補ボイラを決定する候補ボイラ決定手段と、
前記候補ボイラ間の優先順位を比較することによって、燃焼段階を変更する対象ボイラを前記候補ボイラから選択する対象ボイラ選択手段と、
前記対象ボイラについて燃焼段階の変更を指示する燃焼段階指示手段とを備え、
前記燃焼段階指示手段は、前記ボイラ間の優先順位が変更された後、要求負荷の変動により燃焼段階の変更の必要が生じてから、前記対象ボイラについて燃焼段階の変更を指示する台数制御装置。
A multi-can installation system unit control device in which a plurality of boilers having a plurality of combustion stages including standby are installed,
Priority changing means for changing the priority between the boilers;
Candidate boiler determining means for determining a candidate boiler for changing the combustion stage in the boiler;
A target boiler selecting means for selecting a target boiler for changing a combustion stage from the candidate boilers by comparing priorities among the candidate boilers;
Combustion stage instruction means for instructing the change of the combustion stage for the target boiler,
The number control device for instructing the change of the combustion stage for the target boiler after the combustion stage instructing means needs to be changed due to a change in required load after the priority order among the boilers is changed.
前記燃焼段階指示手段は、前記対象ボイラ以外のボイラの燃焼段階を維持する請求項1記載の台数制御装置。   The number control device according to claim 1, wherein the combustion stage instruction means maintains a combustion stage of a boiler other than the target boiler. 前記候補ボイラ決定手段は、要求負荷の変動により燃焼段階を引き上げる必要が生じたとき、燃焼段階を引き上げ可能なボイラを候補ボイラに決定し、
前記対象ボイラ選択手段は、前記候補ボイラで変更後の優先順位の高いものから、燃焼段階を引き上げる対象ボイラを選択する請求項1または2に記載の台数制御装置。
The candidate boiler determining means determines a boiler capable of raising the combustion stage as a candidate boiler when it is necessary to raise the combustion stage due to fluctuations in the required load,
3. The number control device according to claim 1, wherein the target boiler selecting unit selects a target boiler that raises a combustion stage from the candidate boilers having higher priority after the change.
前記候補ボイラ決定手段は、要求負荷の変動により燃焼段階を引き下げる必要が生じたとき、燃焼状態にあるボイラを候補ボイラに決定し、
前記対象ボイラ選択手段は、前記候補ボイラで変更後の優先順位の低いものから、燃焼段階を引き下げる対象ボイラを選択する請求項1乃至3のいずれか1項に記載の台数制御装置。
The candidate boiler determining means determines a boiler in a combustion state as a candidate boiler when it is necessary to lower the combustion stage due to fluctuations in required load,
The number control device according to any one of claims 1 to 3, wherein the target boiler selecting means selects a target boiler that lowers the combustion stage from the candidate boilers having a low priority after the change.
前記ボイラ間の優先順位の高い順に選択される制御対象ボイラ、および前記制御対象ボイラ以外の予備缶ボイラを設定する予備缶設定手段をさらに備え、
前記候補ボイラ決定手段は、前記ボイラ間の優先順位が変更された後、要求負荷の変動により燃焼段階を引き下げる必要が生じたとき、前記制御対象ボイラおよび前記予備缶ボイラの中で燃焼段階を引き下げる候補ボイラを決定する請求項1または2に記載の台数制御装置。
Further comprising a control target boiler selected in descending order of priority between the boilers, and a preliminary can setting means for setting a preliminary can boiler other than the control target boiler;
The candidate boiler determining means lowers the combustion stage in the controlled boiler and the spare boiler when the combustion stage needs to be lowered due to a change in required load after the priority order between the boilers is changed. The number control device according to claim 1 or 2, wherein a candidate boiler is determined.
前記候補ボイラ決定手段は、前記ボイラ間の優先順位が変更された後、要求負荷の変動により燃焼段階を引き上げる必要が生じたとき、前記制御対象ボイラの中で燃焼段階を引き上げる候補ボイラを決定する請求項5記載の台数制御装置。   The candidate boiler determining means determines a candidate boiler for raising the combustion stage among the boilers to be controlled when it becomes necessary to raise the combustion stage due to a change in required load after the priority order among the boilers is changed. The number control device according to claim 5. 請求項1乃至6のいずれか1項に記載の台数制御装置としてコンピュータを機能させるための台数制御プログラム。   A number control program for causing a computer to function as the number control device according to any one of claims 1 to 6. 複数台のボイラと、請求項1乃至6のいずれか1項に記載の台数制御装置とを備える多缶設置システム。   A multi-can installation system comprising a plurality of boilers and the number control device according to any one of claims 1 to 6.
JP2007189188A 2007-07-20 2007-07-20 Number control device and multi-can installation system Active JP4985964B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2007189188A JP4985964B2 (en) 2007-07-20 2007-07-20 Number control device and multi-can installation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2007189188A JP4985964B2 (en) 2007-07-20 2007-07-20 Number control device and multi-can installation system

Publications (2)

Publication Number Publication Date
JP2009024946A JP2009024946A (en) 2009-02-05
JP4985964B2 true JP4985964B2 (en) 2012-07-25

Family

ID=40396908

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2007189188A Active JP4985964B2 (en) 2007-07-20 2007-07-20 Number control device and multi-can installation system

Country Status (1)

Country Link
JP (1) JP4985964B2 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011069517A (en) * 2009-09-24 2011-04-07 Miura Co Ltd Method for controlling boiler group, program, controller and boiler system
JP2011069516A (en) * 2009-09-24 2011-04-07 Miura Co Ltd Method for controlling boiler group, program, controller and boiler system
JP5434728B2 (en) * 2010-03-23 2014-03-05 三浦工業株式会社 Program, controller and boiler system
JP2012132651A (en) * 2010-12-24 2012-07-12 Miura Co Ltd Boiler device and method for controlling the same
JP5835842B2 (en) * 2011-12-02 2015-12-24 株式会社サムソン Multi-can boiler
JP5995271B2 (en) * 2012-06-12 2016-09-21 株式会社サムソン Multi-can boiler
JP6119274B2 (en) * 2013-01-31 2017-04-26 三浦工業株式会社 Boiler system
JP6102357B2 (en) * 2013-03-07 2017-03-29 三浦工業株式会社 Boiler system
JP6102365B2 (en) * 2013-03-13 2017-03-29 三浦工業株式会社 Boiler system
JP6776767B2 (en) * 2016-09-27 2020-10-28 三浦工業株式会社 Boiler system

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6484318A (en) * 1987-09-28 1989-03-29 Toshiba Corp Controller for the number of operating pumps
JP2754212B2 (en) * 1988-07-07 1998-05-20 三浦工業株式会社 Boiler automatic unit control system including blow operation
JP3357573B2 (en) * 1997-05-15 2002-12-16 株式会社サムソン Boiler unit control device
JP3998812B2 (en) * 1998-05-28 2007-10-31 株式会社サムソン How to control the number of boilers with multiple cans
JP3999024B2 (en) * 2002-04-11 2007-10-31 株式会社サムソン Multi-can installed boiler unit control device

Also Published As

Publication number Publication date
JP2009024946A (en) 2009-02-05

Similar Documents

Publication Publication Date Title
JP4985964B2 (en) Number control device and multi-can installation system
JP5434728B2 (en) Program, controller and boiler system
JP2023015324A (en) Hot water supply device, program and control method
JP5916194B2 (en) Multi-can boiler
JP2010091139A (en) Control program, control system, and boiler system
JP4148514B2 (en) Number control device in boiler multi-can installation system
JP5692807B2 (en) Multi-can boiler
JP2011069515A (en) Method for controlling boiler group, program, controller and boiler system
JP5045914B2 (en) Boiler unit controller
JP5402402B2 (en) Hot water system
JP6142667B2 (en) Boiler system
JP5541780B2 (en) Boiler multi-can installation system
JP5678614B2 (en) Program, controller, boiler and boiler system
JP2002081604A (en) Method for controlling number of thermal instruments
JP6550999B2 (en) Boiler system
JP2011179731A (en) Boiler multiple-can installation system
JP6194634B2 (en) Boiler system
JP6387703B2 (en) Boiler system
JP2008224084A (en) Boiler multi-can installation system
JP5440607B2 (en) Program, controller and boiler system
JP2021042895A (en) Operation control method for multi-can installation boiler
JP2013204907A (en) Boiler system
JP5835842B2 (en) Multi-can boiler
JP6314502B2 (en) Boiler system
JPH0336404A (en) Automatic setting of control pattern for number of boilers in automatic controller of number of boilers

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100416

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20100416

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120319

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20120404

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120417

R150 Certificate of patent or registration of utility model

Ref document number: 4985964

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150511

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250