JP5206080B2 - Coke oven drying method for burning - Google Patents
Coke oven drying method for burning Download PDFInfo
- Publication number
- JP5206080B2 JP5206080B2 JP2008096476A JP2008096476A JP5206080B2 JP 5206080 B2 JP5206080 B2 JP 5206080B2 JP 2008096476 A JP2008096476 A JP 2008096476A JP 2008096476 A JP2008096476 A JP 2008096476A JP 5206080 B2 JP5206080 B2 JP 5206080B2
- Authority
- JP
- Japan
- Prior art keywords
- drying
- brick
- furnace body
- hole
- plug
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Drying Of Solid Materials (AREA)
Description
コークス炉の炉体設備における火入れ時の炉体乾燥方法に関し、特に、炉体乾燥用の乾燥孔から栓煉瓦が脱落するのを防止し、また、乾燥孔の数量減を図ったコークス炉の火入れ時の炉体乾燥方法に関するものである。 Regarding the method of drying the furnace body at the time of firing in the furnace body equipment of the coke oven, in particular, it is possible to prevent the plug bricks from falling off from the drying holes for drying the furnace body and to reduce the number of drying holes. The present invention relates to a furnace body drying method.
コークス炉の炉体設備は、炉体の下部に蓄熱室があり、その上部に炭化室と燃焼室とが交互に配列された構造を有し、燃焼室内でのガスの燃焼によって、燃焼室に隣接して配列された炭化室内に装入された石炭のコークス化を行うものである。 The coke oven furnace body equipment has a heat storage chamber in the lower part of the furnace body, and has a structure in which carbonization chambers and combustion chambers are alternately arranged in the upper part. Coking of coal charged in the carbonization chambers arranged adjacent to each other is performed.
このようなコークス炉の炉体設備は、耐火煉瓦積みで築炉されるが、築炉後の炉体は、耐火煉瓦自体や目地モルタル等に含まれている水分のために湿った状態にあり、実操業の開始いわゆる火入れに先立って炉体を乾燥させる必要がある。 The furnace equipment of such a coke oven is constructed by refractory brickwork, but the furnace body after the construction is in a moist state due to moisture contained in the refractory brick itself and joint mortar. It is necessary to dry the furnace body before the start of actual operation, so-called burning.
これまで、築炉後の炉体乾燥に関する技術としては、例えば、製銑、製鋼、化学工業、窯業等で使用される耐火煉瓦で築炉された工業用炉の炉体を燃焼排ガスを用いて乾燥させる際に、炉壁部分の温度を測定し、築炉後の炉体乾燥度を判定する方法や(例えば、特許文献1参照)、高炉の炉体乾燥方法として、高炉内に複数の羽口から熱風を吹込み炉体煉瓦を乾燥する際に、炉体煉瓦に設置した複数の温度センサーで乾燥用ノズルから吹き出す熱風で乾燥される煉瓦の乾燥温度を検出しながら、それらの乾燥温度が均一になるように、各熱風供給管に取付けた熱風制御弁により前記乾燥用ノズルの熱風量を調整するようにした高炉炉体煉瓦の乾燥方法が提案されている(例えば、特許文献2参照)。 Up to now, as a technique related to furnace body drying after furnace construction, for example, furnace bodies of industrial furnaces constructed with refractory bricks used in steelmaking, steelmaking, chemical industry, ceramic industry, etc., using combustion exhaust gas When drying, a method of measuring the temperature of the furnace wall portion and determining the degree of dryness of the furnace body after building (see, for example, Patent Document 1), as a furnace body drying method of a blast furnace, When drying the furnace brick by blowing hot air from the mouth, the drying temperature of the bricks dried by the hot air blown from the drying nozzle is detected by the multiple temperature sensors installed on the furnace brick. There has been proposed a method for drying a blast furnace brick in which the amount of hot air of the drying nozzle is adjusted by a hot air control valve attached to each hot air supply pipe so as to be uniform (see, for example, Patent Document 2). .
これらの従来技術に示される炉体は、コークス炉に比較してシンプルな炉体構造であり、炉体乾燥用の燃焼排ガスの通気には特別の手段を講じる必要性はなかった。 The furnace bodies shown in these prior arts have a simple furnace body structure as compared with a coke oven, and there is no need to take special measures for ventilation of combustion exhaust gas for drying the furnace body.
ところが、コークス炉の炉体は複数の炉室に区切られた炉体構造となっているので、コークス炉の炉体煉瓦積み後の炉体乾燥のためには、炭化室でCOGあるいは軽油等の燃料を燃焼し、その燃焼排ガスを燃焼室、蛇腹、蓄熱室、水平煙道等炉体全体に導き、煙道・煙突より大気へ排出して、炉体乾燥を行うことが必要となる。 However, since the furnace body of the coke oven has a furnace body structure divided into a plurality of furnace chambers, in order to dry the furnace body after the brick building of the coke oven furnace, COG or light oil or the like is used in the carbonization chamber. It is necessary to burn the fuel, lead the combustion exhaust gas to the entire furnace body such as the combustion chamber, bellows, heat storage chamber, horizontal flue, etc., discharge it to the atmosphere from the flue / chimney, and dry the furnace body.
コークス炉の炭化室と燃焼室間を仕切る炉壁は、接合部に相当する炉壁煉瓦の端面にダボ等が設置され、炉操業に於ける気密性が保持されているが、築炉後の乾燥期間だけは炭化室より燃焼室へ燃焼排ガスを導くための乾燥孔が設置される。この乾燥孔は、炉体乾燥後には、栓煉瓦で栓詰めして閉鎖される。乾燥孔の数は20〜40ケ/窯あり、栓詰め作業に時間を要し過ぎると窯が長時間開放され、炉体が冷却され過ぎ、好ましくない。更には炉全体では2,000ケ程度の栓煉瓦があり、栓詰め作業が大変であれば、多くの労力を要し、好ましくないという問題がある。 The furnace wall that separates the carbonization chamber and the combustion chamber of the coke oven is installed with dowels etc. on the end face of the furnace wall brick corresponding to the joint, and the airtightness in the furnace operation is maintained. Only during the drying period, a drying hole for introducing the combustion exhaust gas from the carbonization chamber to the combustion chamber is provided. The drying hole is closed with plug bricks after the furnace body is dried. The number of drying holes is 20 to 40 / kiln. If too much time is required for the plugging operation, the kiln is opened for a long time, and the furnace body is cooled too much. Furthermore, there are about 2,000 plug bricks in the whole furnace, and if the plugging work is difficult, there is a problem that it takes a lot of labor and is not preferable.
また、乾燥孔は通常、燃焼室のターニングポイント部分に設置されるが、この場合、乾燥孔は炭化室への石炭の装入レベルより下になり、乾燥栓受け煉瓦に栓詰めした栓煉瓦が装入石炭のコーク化に伴ってコークスに固着して、コークス押出し時にコークスと共に炉外へ排出される(栓煉瓦が外れる)現象が度々発生していた。栓煉瓦が外れると、燃焼室へ石炭乾留ガスが漏れ込み、煙突よりの黒煙発生の原因となり、好ましくないという問題が生じていた。 In addition, the drying hole is usually installed at the turning point of the combustion chamber. In this case, the drying hole is below the coal charge level in the carbonization chamber, and the plug brick plugged into the dry plug receiving brick is plugged. There was a frequent occurrence of the phenomenon that the coal was fixed to the coke along with the coking of the charged coal and discharged to the outside of the furnace together with the coke (the plug brick was removed). When the plug brick is detached, coal dry distillation gas leaks into the combustion chamber, causing black smoke from the chimney, which is undesirable.
なお、コークス炉の立ち上げに関する技術は種々提案されているが(例えば、特許文献3、4参照)、コークス炉用高密度珪石煉瓦に関するものや、ドライメーンでの爆発を防止する技術に関するもので、コークス炉の炉体設備における火入れ時の炉体乾燥に関する技術は、これまで提案されていない。 Various technologies related to the start-up of coke ovens have been proposed (see, for example, Patent Documents 3 and 4), but they relate to high-density silica bricks for coke ovens and technologies for preventing explosions in dry mains. No technology has been proposed for drying the furnace body at the time of firing in the furnace body equipment of the coke oven.
そこで、本発明は、上記問題点を解決しようとするもので、乾燥栓受け煉瓦の乾燥孔の栓詰め作業の容易化を図ると共に、乾燥孔に栓詰めされた栓煉瓦にコークスが固着する事によって生じる栓煉瓦の脱落防止を図り、また、乾燥孔の数量減を図ったコークス炉の火入れ時の炉体乾燥方法を提供することを目的とするものである。 Therefore, the present invention is intended to solve the above-mentioned problems, and facilitates the plugging operation of the drying hole of the drying plug receiving brick, and the coke adheres to the plug brick plugged in the drying hole. It is an object of the present invention to provide a method for drying a furnace body at the time of firing of a coke oven in which plug bricks generated by the above are prevented from falling off and the number of drying holes is reduced.
本発明者は、上記課題を解決すべく鋭意研究し、乾燥栓受け煉瓦の乾燥孔をコークス炉の炉頂部の天井近くに炭化室と燃焼室とを連通させるように設置すると、乾燥栓受け煉瓦の栓詰め作業の容易化が達成され、かつ、コークスが栓詰めされた栓煉瓦へ固着する事による栓煉瓦の脱落防止ができることを知見した。また、乾燥孔の替りに炭化室と燃焼室とを連通する乾燥連絡管を炉上に設置する事で、乾燥栓受け煉瓦の設置数量を削減できることを知見した。 The present inventor has eagerly studied to solve the above-mentioned problem, and when the drying hole of the drying plug receiving brick is installed near the ceiling at the top of the coke oven so that the carbonization chamber and the combustion chamber communicate with each other, the drying plug receiving brick It has been found that the plugging work can be facilitated and that the brick can be prevented from falling off when the coke is fixed to the plugged brick. In addition, it was found that the installation quantity of drying plug receiving bricks can be reduced by installing a drying connecting pipe communicating with the carbonization chamber and the combustion chamber on the furnace instead of the drying hole.
本発明は、これらの知見に基づいて完成したもので、その発明の要旨は次の通りである。 The present invention has been completed based on these findings, and the gist of the invention is as follows.
(1) 炉体の下部に蓄熱室があり、その上部に燃焼室と炭化室とが交互に配列された構造を有するコークス炉の炉体設備における火入れ時の炉体乾燥方法において、炭化室の石炭装入レベルより上の炉頂部の側壁に、炭化室と燃焼室とを連通する乾燥孔を有する乾燥栓受け煉瓦を配置し、炭化室で燃料を燃焼して生成した燃焼排ガスを前記乾燥孔を通じて炭化室より燃焼室へ導き、炉内全体に燃焼排ガスを通気することによって炉体を乾燥し、炉体乾燥後に石炭装入口から栓煉瓦を乾燥栓受け煉瓦の乾燥孔に挿入して栓詰めを行うことを特徴とするコークス炉の炉体設備における火入れ時の炉体乾燥方法。
(1) In a furnace body drying method at the time of firing in a furnace body facility of a coke oven having a structure in which a heat storage chamber is provided at a lower portion of the furnace body and combustion chambers and carbonization chambers are alternately arranged at an upper portion thereof, A drying plug receiving brick having a drying hole communicating with the carbonization chamber and the combustion chamber is disposed on the side wall of the furnace top portion above the coal charging level, and the combustion exhaust gas generated by burning the fuel in the carbonization chamber is the drying hole. Through the carbonization chamber to the combustion chamber and vent the combustion exhaust gas throughout the furnace to dry the furnace body. After drying the furnace body, plug brick is inserted into the drying hole of the dry plug receiving brick from the coal inlet and plugged. The furnace body drying method at the time of firing in the furnace body equipment of the coke oven characterized by performing.
(2) 炭化室の石炭装入口からの距離が近い位置の炉壁には、乾燥孔を有する乾燥栓受け煉瓦を設け、炭化室の石炭装入口からの距離が遠い位置にある燃焼室のフリュー孔には、乾燥連絡管の一端を接続し、該乾燥連絡管の他端を炭化室の石炭装入口に接続し、炭化室で燃料を燃焼して生成した燃焼排ガスを前記乾燥孔及び乾燥連絡管を通じて炭化室より燃焼室へ導き、炉内全体に燃焼排ガスを通気することによって炉体を乾燥し、炉体乾燥後に石炭装入口から栓煉瓦を乾燥栓受け煉瓦の乾燥孔に挿入して栓詰めを行うと共に、乾燥連絡管を撤去することを特徴とする上記(1)に記載のコークス炉の炉体設備における火入れ時の炉体乾燥方法。 (2) The furnace wall at a position close to the coal charging inlet of the carbonization chamber is provided with a drying stopper receiving brick having a drying hole, and the flue of the combustion chamber at a position far from the coal charging inlet of the carbonization chamber is provided. One end of the drying connecting pipe is connected to the hole, the other end of the drying connecting pipe is connected to the coal charging inlet of the carbonization chamber, and the combustion exhaust gas generated by burning fuel in the carbonization chamber is connected to the drying hole and the drying communication. The furnace body is dried by guiding the combustion chamber from the carbonization chamber to the combustion chamber through the pipe and venting the combustion exhaust gas throughout the furnace. After drying the furnace body, the plug brick is inserted into the drying hole of the dry plug receiving brick from the coal inlet and plugged. The furnace body drying method at the time of burning in the furnace body equipment of the coke oven according to the above (1), wherein filling is performed and the drying communication pipe is removed.
(3)前記乾燥栓受け煉瓦の乾燥孔は、栓煉瓦の外径よりも大径の乾燥孔部分と、栓煉瓦が燃焼室側に抜け落ちないストッパーの役割を果たすように栓煉瓦の先端部の外径よりも小径の乾燥孔部分とから形成されていることを特徴とする上記(1)または(2)に記載のコークス炉の炉体設備における火入れ時の炉体乾燥方法。 (3) The drying hole of the drying plug receiving brick has a drying hole portion having a diameter larger than the outer diameter of the plug brick and a tip of the plug brick so as to serve as a stopper that prevents the plug brick from falling to the combustion chamber side. The method for drying a furnace body at the time of firing in the furnace body equipment of a coke oven according to (1) or (2), wherein the drying hole portion has a diameter smaller than the outer diameter.
(4) 前記乾燥連絡管は撤去し易い様にフリュー孔及び仮装入口蓋へ嵌め込む構造としたことを特徴とする上記(2)または(3)に記載のコークス炉の炉体設備における火入れ時の炉体乾燥方法。 (4) At the time of the firing in the furnace body equipment of the coke oven according to (2) or (3), wherein the drying communication pipe is structured to be fitted into a flue hole and a temporary entrance lid so as to be easily removed. Furnace body drying method.
本発明によれば、従来は、乾燥孔は約2,000ケ程度/炉全体あり、必ず、10ケ程度/年は栓煉瓦の脱落が発生するものであるが、乾燥孔を石炭装入レベルより上に設けるようにしたので、乾燥孔からの栓煉瓦の脱落がなくなり、黒煙発生がなくなって環境改善、生産性の向上、コークス炉の長寿命化を達成でき、また、乾燥孔のある乾燥栓受け煉瓦を炉頂部に設置したので、乾燥栓受け煉瓦の栓詰め作業が容易に出来る様になった。さらに、炭化室と燃焼室との通気を図る乾燥孔に替えて乾燥連絡管を設置するようにした。その結果、炭化室の長時間開放がなくなり、炭化室を冷却し過ぎる事がなくなった。そして、栓詰め作業による労力も軽減された。さらに、乾燥栓受け煉瓦の数が少なくなり、炉体強度が向上するという顕著な効果を奏するものである。 According to the present invention, conventionally, there are about 2,000 dry holes / whole furnace, and there is always about 10 pieces / year of falling off the plug bricks. Since it was installed above the plug bricks from the drying holes, black smoke was not generated, improving the environment, improving productivity, extending the life of the coke oven, and having drying holes. Since the drying plug receiving brick was installed at the top of the furnace, it became easy to plug the drying plug receiving brick. Furthermore, a drying communication pipe was installed instead of the drying hole for venting the carbonization chamber and the combustion chamber. As a result, the carbonization chamber was not opened for a long time, and the carbonization chamber was not overcooled. And the effort of plugging work has been reduced. Furthermore, the number of dry plug receiving bricks is reduced, and a remarkable effect is achieved in that the furnace body strength is improved.
コークス炉は、炉体の下部に蓄熱室があり、その上部に燃焼室と炭化室とが交互に配列された構造を有し、燃焼室で燃料を燃焼させることで、燃焼室に隣接して配列された炭化室内に装入された石炭を乾留してコークス化するものである。燃焼室で燃焼した排ガスは、蛇腹、蓄熱室、煙道を通じて煙突より大気へ排出される。炭化室は、この燃焼排ガス通路から隔離された構造となっている。こうしたコークス炉の炉体設備には、高温での機械的強度が高く、高温での体積変化が少なく、かつ、熱伝導性が比較的良好である性質を有する珪石煉瓦か主として用いられ、温度変化が激しい炉頂部等には粘土煉瓦が用いられている。 The coke oven has a heat storage chamber in the lower part of the furnace body, and has a structure in which combustion chambers and carbonization chambers are alternately arranged in the upper part, and by burning fuel in the combustion chamber, it is adjacent to the combustion chamber. Coal charged in the aligned carbonization chambers is carbonized to coke. The exhaust gas burned in the combustion chamber is discharged from the chimney to the atmosphere through the bellows, the heat storage chamber, and the flue. The carbonization chamber has a structure isolated from the combustion exhaust gas passage. In such a coke oven furnace structure, quartz brick is mainly used, which has high mechanical strength at high temperature, small volume change at high temperature, and relatively good thermal conductivity. Clay brick is used at the top of the furnace where there is a lot of heat.
コークス炉の炉体設備は、珪石煉瓦や粘土煉瓦等の耐火煉瓦積みで築炉されるが、築炉後の炉体は、耐火煉瓦自体や煉瓦目地(接合部)のモルタル等に含まれている水分のために湿った状態にあり、実操業の開始いわゆる火入れに先立って炉体を乾燥させる必要がある。炉体を乾燥させるには、乾燥期間だけは、炭化室でCOG(コークス炉ガス)あるいは軽油等を燃焼し、その乾燥用の燃焼排ガスを炭化室より燃焼室へ導き、炉内全体に燃焼排ガスを通気することによって行う。しかし、コークス炉の炭化室と燃焼室間を仕切る炉壁は、接合部に相当する炉壁煉瓦の端面にダボ等が配置され、炉実操業に於ける気密性保持しているため、炉壁に炭化室と燃焼室とを連通する通気孔を設けなければ、炭化室より燃焼室に乾燥用の燃焼排ガスを導き、炉内全体に乾燥用の燃焼排ガスを通気して炉体を乾燥する事ができない。 The furnace body equipment of the coke oven is constructed by refractory bricks such as silica brick and clay brick, but the furnace body after the construction is included in the refractory brick itself or the mortar of the brick joint (joint). It is necessary to dry the furnace body prior to the start of actual operation, so-called burning. In order to dry the furnace body, only during the drying period, COG (coke oven gas) or light oil is burned in the carbonization chamber, the combustion exhaust gas for drying is guided from the carbonization chamber to the combustion chamber, and the combustion exhaust gas is spread throughout the furnace. Do it by ventilating. However, the furnace wall that separates the carbonization chamber and combustion chamber of the coke oven has a dowel etc. on the end face of the furnace wall brick that corresponds to the joint, and keeps hermeticity in the actual operation of the furnace wall. If there is no vent hole communicating with the carbonization chamber and the combustion chamber, the flue gas for drying is led from the carbonization chamber to the combustion chamber, and the flue gas for drying is ventilated throughout the furnace to dry the furnace body. I can't.
図1は、従来のコークス炉の炭化室と燃焼室との炉団長方向(コークスをプッシャーにより押し出す方向)の部分断面図である。 FIG. 1 is a partial cross-sectional view in the length direction (direction in which coke is pushed out by a pusher) between a carbonization chamber and a combustion chamber of a conventional coke oven.
従来は、図1に示すように、石炭装入口6を備えた炭化室1とフリュー孔7を備えた燃焼室2とを連通させるために、蓄熱室上に煉瓦積みされ炭化室1と燃焼室2とを区画する炉壁上部に乾燥孔3を有する乾燥栓受け煉瓦4を設置し、炭化室1と燃焼室2とを乾燥孔3で連通させている。この乾燥孔3は炉頂部5の天井8下方の燃焼室のターニングポイント部に設けられ、石炭装入レベル9より下側に設置されるのが通常である。炭化室1で燃焼させた乾燥用の燃焼排ガスは、乾燥栓受け煉瓦4の乾燥孔3を通じて燃焼室2に導いて、炉体を乾燥させている。
Conventionally, as shown in FIG. 1, in order to connect a carbonization chamber 1 having a
炉体乾燥後には、乾燥栓受け煉瓦4の乾燥孔3に栓煉瓦を挿入して乾燥孔3を閉鎖する栓詰め作業をする。乾燥孔3を閉鎖する栓詰め作業は、栓詰め治具の先端部に栓煉瓦を装着し、炭化室上方に設けられている石炭装入口より棒状の治具を差し込んで、栓煉瓦を乾燥栓受け煉瓦の乾燥孔に挿入して栓をし、乾燥孔を永久に閉鎖する。栓煉瓦の外周表面にはモルタルが塗布されていて、栓煉瓦と乾燥栓受け煉瓦の接合部をモルタルにより隙間の無いように接合して、栓煉瓦により乾燥孔を閉鎖すると共に、栓煉瓦が乾燥栓受け煉瓦から脱落しないようにしてある。乾燥栓受け煉瓦の数は20〜40ケ/窯あり、栓詰め作業に時間を要し過ぎると窯が長時間開放され、炉体が冷却され過ぎ、好ましくない。更には炉全体では2,000ケ程度の栓煉瓦があり、栓詰め作業が大変であれば、多くの労力を要することとなる問題があった。
また、コークス炉の実操業中に栓煉瓦が脱落すると、燃焼室へ炭化室で生成した石炭乾留ガスが漏れ込み、煙突より黒煙発生が生ずる現象が度々発生するという問題があった。このような栓煉瓦の脱落は、コークス炉全体で2000ケもの栓煉瓦があるので、必ず10ケ程度/年は脱落が生じていた。
本発明者がその栓煉瓦の脱落問題を究明したところ、乾燥孔がある乾燥栓受け煉瓦の設置位置が石炭装入レベルより下にあるため、装入石炭のコークス化にともなってコークスが乾燥栓受け煉瓦へ固着して、コークスの窯出し時に乾燥栓受け煉瓦から栓煉瓦がコークスと共に押し出されて脱落することを知見した。
After drying the furnace body, plugging work is performed in which the plug brick is inserted into the drying hole 3 of the drying plug receiving brick 4 to close the drying hole 3. The plugging operation for closing the drying hole 3 is performed by attaching a plug brick to the tip of the plugging jig and inserting a rod-shaped jig from the coal inlet provided above the carbonization chamber to dry the plug brick. It is inserted into the drying hole of the receiving brick and plugged, and the drying hole is closed permanently. The outer surface of the plug brick is coated with mortar, the joint between the plug brick and the dry plug receiving brick is joined with no gap between the mortar, the drying hole is closed with the plug brick, and the plug brick is dried. It is designed not to fall off from the stopper receiving brick. The number of dry plug receiving bricks is 20 to 40 / kiln. If too much time is required for the plugging operation, the kiln is opened for a long time and the furnace body is cooled too much, which is not preferable. Furthermore, there are about 2,000 plug bricks in the entire furnace, and there is a problem that a lot of labor is required if the plugging work is difficult.
In addition, when plug bricks fall off during the actual operation of the coke oven, there is a problem that coal dry distillation gas generated in the carbonization chamber leaks into the combustion chamber and black smoke is frequently generated from the chimney. Since there are 2000 pieces of plug bricks in the whole coke oven, such plug bricks were always dropped out at about 10 pieces / year.
When the present inventor investigated the problem of falling off the plug brick, the installation position of the dry plug receiving brick with a dry hole is below the coal charge level. It was found that when the coke was fixed to the receiving brick, the plug brick was pushed out of the dry stopper receiving brick together with the coke and dropped off when the coke was discharged from the kiln.
そこで、本発明では、乾燥栓受け煉瓦を石炭装入レベルより上の炉頂部に配置し、石炭装入口から乾燥孔までの距離を短縮して、栓詰め作業が容易に出来るようにした。
そして、乾燥孔を石炭装入レベルより上とすることにより、乾燥栓受け煉瓦へ栓詰めされた栓煉瓦へのコークスの固着を抑制し、コークス押し出し時の栓煉瓦の脱落を防止するようにした。
Therefore, in the present invention, the drying plug receiving brick is arranged at the top of the furnace above the coal charging level, and the distance from the coal charging inlet to the drying hole is shortened so that the plugging work can be easily performed.
And by making the drying hole above the coal charging level, the coke is prevented from sticking to the plug brick plugged into the dry plug receiving brick, and the plug brick is prevented from falling off when the coke is pushed out. .
本発明の乾燥栓受け煉瓦のコークス炉内での設置位置について図を参酌して説明する。 The installation position of the drying plug receiving brick according to the present invention in the coke oven will be described with reference to the drawings.
図2は、本発明でのコークス炉における炉団長方向の炭化室と燃焼室との部分断面図である。 FIG. 2 is a partial cross-sectional view of the carbonization chamber and the combustion chamber in the furnace group length direction in the coke oven according to the present invention.
図2に示すように、コークス炉において、炉壁煉瓦で仕切られた炭化室1と燃焼室2とが交互に配列された構造となっていて、夫々の天井8部より上は炉頂部5となっている。炭化室1の上部の炉頂部5には石炭装入口6が設けられ、コーク炉の操業時には、炭化室1の石炭装入レベルから天井8部までの空間(炉頂空間)は、炭化室で発生した乾留ガスを上昇管10から排出するための通路となっている。そして、燃焼室2の上部はフリュー孔7となっている。
As shown in FIG. 2, in the coke oven, the carbonization chambers 1 and the combustion chambers 2 partitioned by the bricks of the furnace wall are alternately arranged. It has become. A
本発明では、乾燥栓受け煉瓦4を石炭装入レベル9より上の炉頂部5に配置する。具体的には、乾燥栓受け煉瓦4は炭化室1の石炭装入口6直下及び上昇管10直下の炉頂部5の炭化室天井8の近傍に設ける。この部分は煉瓦厚みが厚いので、乾燥孔3を設けても炉体強度の低下が少ない。乾燥栓受け煉瓦4の乾燥孔3は炭化室1の石炭装入口6と燃焼室2のフリュー孔7に接続し、両者を連通させる。これによって、築炉後の煉瓦乾燥時に炭化室1から燃焼室2へ炉体乾燥用燃焼排ガスが乾燥孔3を通じて導くようにでき、炉体を乾燥することができる。そして、乾燥孔3の孔サイズは、コークス炉の大きさにもよるが、例えば、Ф80mm〜Ф90mm程度とし、炭化室1の装入口6側を大きく、燃焼室2のフリュー孔7側はこれより若干小さくする。これは炭化室1の装入口側から栓煉瓦を装入するためである。また、燃焼室2のフリュー孔側は栓煉瓦のストパッーの役割及びガスシールの役割を果たすように、栓煉瓦の径寸法より小さい孔径とすることが好ましい。
In the present invention, the drying plug receiving brick 4 is disposed in the furnace top 5 above the coal charging level 9. Specifically, the drying stopper receiving brick 4 is provided in the vicinity of the carbonization chamber ceiling 8 of the furnace top 5 immediately below the
乾燥栓受け煉瓦4を炉頂部5に配置することで、石炭装入口6から乾燥栓受け煉瓦4までの距離が従来の設置位置より短縮され、築炉後の乾燥作業終了(レギュラーヒーティングとなる)時の炉上及び石炭装入口6から行う栓煉瓦の栓詰め作業が容易に出来るようになった。尚、上昇管の直下にある乾燥孔は窯口より栓詰め作業が行うが、これは押出機あるいはガイド車上より行え、容易に出来る。
By disposing the drying plug receiving brick 4 on the furnace top 5, the distance from the
また、乾燥栓受け煉瓦4の乾燥孔3が炭化室1の石炭装入レベル9より上になり、コークスの乾燥孔に栓詰めされた栓煉瓦への固着がなくなり、乾燥栓受け煉瓦から栓煉瓦の脱落もなくなる。さらに、乾燥孔3を炭化室1の石炭装入レベル9より上の壁厚が厚い炉頂部5に設置する事で、炉体強度を高く維持でき、壁に多少の損傷があっても致命傷にはならないという利点がある。 Moreover, the drying hole 3 of the drying plug receiving brick 4 is above the coal charging level 9 of the carbonization chamber 1, and there is no sticking to the plug brick plugged in the drying hole of the coke. There will be no dropout. Furthermore, by installing the drying hole 3 in the top 5 of the carbonization chamber 1 where the wall thickness above the coal charging level 9 is thick, the furnace body strength can be maintained high, and even if there is some damage to the wall, it is fatal. There is an advantage not to be.
図3は、乾燥栓受け煉瓦に栓煉瓦を装着する栓詰め作業を示す図である。 FIG. 3 is a diagram showing a plugging operation for mounting the plug brick on the dry plug receiving brick.
乾燥栓は、乾燥孔3を有する乾燥栓受け煉瓦4と栓煉瓦11とから構成されていて、乾燥栓受け煉瓦4は炭化室1と燃焼室2とを仕切る炉壁に配置され、乾燥栓受け煉瓦4の乾燥孔3は炭化室1と燃焼室2とを連通している。炉体乾燥後に、この乾燥栓受け煉瓦4には炭化室1側から乾燥栓11を用いて栓詰め作業が行なわれる。乾燥栓受け煉瓦4の形状は、例えば、図3(a)に示すように、孔径(d、d1)の異なる1つの乾燥孔3が設けられていて、炭化室1側から栓煉瓦11を差し込むことができるように、栓煉瓦11の外径よりもやや大径(d径)の炭化室1側の乾燥孔3部分と、栓煉瓦11が燃焼室2側に抜け落ちないストッパー12の役割及びガスシールの役割を果たすように栓煉瓦11の先端部の外径よりも小径(d1径)の燃焼室2側の乾燥孔3部分とが形成されている。栓煉瓦11は、中央部に栓詰め冶具の先端部を挿入できる栓詰め冶具挿入穴13が形成されていて、栓煉瓦11の外形は先端部に向かってやや細くなった先細円筒体状の形状となっている。 The drying plug is composed of a drying plug receiving brick 4 having a drying hole 3 and a plug brick 11, and the drying plug receiving brick 4 is disposed on a furnace wall that partitions the carbonizing chamber 1 and the combustion chamber 2. The drying hole 3 of the brick 4 communicates the carbonization chamber 1 and the combustion chamber 2. After drying the furnace body, the drying plug receiving brick 4 is plugged using a drying plug 11 from the carbonization chamber 1 side. For example, as shown in FIG. 3A, the shape of the drying plug receiving brick 4 is such that one drying hole 3 having a different hole diameter (d, d 1 ) is provided, and the plug brick 11 is provided from the carbonization chamber 1 side. The role of the drying hole 3 part on the carbonization chamber 1 side having a diameter (d diameter) slightly larger than the outer diameter of the plug brick 11 so that the plug brick 11 can be inserted, and the stopper 12 that prevents the plug brick 11 from falling off to the combustion chamber 2 side. and drying the hole 3 portion of the combustion chamber 2 side of the smaller diameter than the outer diameter of the distal end portion of the plug bricks 11 in the act as gas seals (d 1 diameter) are formed. The plug brick 11 is formed with a plugging jig insertion hole 13 into which the distal end portion of the plugging jig can be inserted at the center, and the outer shape of the plug brick 11 is a tapered cylindrical shape that becomes slightly narrower toward the distal end portion. It has become.
石炭装入口6から近い位置にある栓煉瓦11の栓詰め作業は、栓煉瓦11の外周表面にモルタルを塗布し、棒状の栓詰め冶具のL字状先端部を前記栓煉瓦の冶具挿入孔13に挿入することにより装着し、栓煉瓦11が装着された状態の栓詰め冶具を炭化室1の石炭装入口6より差し込んで、図3(b)に示すように、栓煉瓦11を乾燥栓受け煉瓦4の乾燥孔3に挿入する。その後、栓煉瓦11から棒状の栓詰め冶具を除去して作業を終了する。栓煉瓦3はモルタルにより乾燥孔内に固着され、炭化室1と燃焼室2とを連通する乾燥孔を永久に閉鎖する。また、石炭装入口6からの栓詰め作業を説明したが、上昇管10から近い位置にある栓煉瓦11の栓詰め作業も同様の栓詰め作業を行うことができる。なお、本発明では、上記に述べた乾燥栓に限定されるものではなく、たとえば、先細円筒体形状の乾燥孔3を備えた乾燥栓受け煉瓦4から構成されるものでも良い。
The plugging work of the plug brick 11 located close to the
乾燥栓受け煉瓦4は長年の操業で、乾燥孔3部分より亀裂が入り、これが煉瓦全体に進展していき、最終的には煉瓦が損傷する可能性があるので、乾燥栓受け煉瓦4は少ない方が良い。 The dry stopper receiving brick 4 has been operated for many years, and cracks are generated from the drying hole 3 part, which progresses to the entire brick and eventually damages the brick. Better.
そこで、本発明では乾燥栓受け煉瓦4の設置数を少なくすることについて検討し、乾燥栓受け煉瓦4に替えて、炭化室1の石炭装入口6と燃焼室2のフリュー孔7を繋ぐ乾燥連絡管14を設置する事で、炭化室1で燃焼した乾燥ガスを燃焼室2へ導くことを可能とした。このため、乾燥連絡管14を設ければ乾燥孔3を有する乾燥栓受け煉瓦4を設置しなくても良いことを見出した。特に、乾燥栓受け煉瓦4の乾燥孔3への栓煉瓦11の栓詰め作業は、例えば、栓詰め冶具の先端部に栓煉瓦11を装着し、石炭装入口6或いは窯口より栓詰め冶具を炭化室1内に差し込んで乾燥栓受け煉瓦4の乾燥孔3に栓煉瓦11を栓詰めするものであるから、炭化室1の上部の壁構造よりして、栓詰め冶具の先端が乾燥栓受け煉瓦4の乾燥孔3に届きにくく栓詰め作業が困難な乾燥孔3を有する乾燥栓受け煉瓦4の設置部位が生じる。このような部位には、乾燥栓受け煉瓦4を設置すること無しに、乾燥栓受け煉瓦4の乾燥孔3に替えて炭化室1と燃焼室2とを連通する乾燥連絡管14を設けた方が良い。例えば、炭化室1の石炭装入口6からの距離が近い位置の炉壁には乾燥孔3を有する乾燥栓受け煉瓦4を設けて乾燥孔3を介して炭化室1から燃焼室2へ炉体乾燥用燃焼排ガスを導入し、乾燥する。また、炭化室1の石炭装入口6からの距離が遠く、乾燥後の乾燥孔4の栓詰め作業が困難な位置にある燃焼室2のフリュー孔7には、乾燥連絡管14の一端を接続し、その他端を炭化室1の石炭装入口6に接続し、この乾燥連絡管14を介して炭化室1から燃焼室2へ炉体乾燥用燃焼排ガスを導入し、乾燥するのがこのましい。
Therefore, in the present invention, it is considered to reduce the number of installation of the drying plug receiving bricks 4, and in place of the drying plug receiving bricks 4, drying communication connecting the
図4(a)は、炭化室と燃焼室とを連絡する乾燥連絡管を設置したコークス炉の炉頂の状態を示す図で、図4(b)はA−A線での断面図である。 FIG. 4A is a view showing the state of the top of the coke oven provided with a drying communication pipe that connects the carbonization chamber and the combustion chamber, and FIG. 4B is a cross-sectional view taken along the line AA. .
図4に示すように、栓詰め冶具の先端が乾燥栓受け煉瓦4の乾燥孔3に届きにくい乾燥孔設置部位については、乾燥孔3を有する乾燥栓受け煉瓦4に替えて炭化室1の石炭装入口6と燃焼室2のフリュー孔7を繋ぐように乾燥連絡管14を炉頂17に設ける。乾燥連絡管14を設けたことで、乾燥孔3を有する乾燥栓受け煉瓦4は設置する必要がなくなる。乾燥連絡管14は、断面逆U字状の管であって、炉頂17のなるべく低い位置に設置することが好ましい。低い位置であれば炉上の歩行に邪魔にならないし、乾燥連絡管14の重量も軽くて済む。そして、この乾燥連絡管14は原則、乾燥孔3を有する乾燥栓受け煉瓦4を設けてない燃焼室2のフリュー孔7と炭化室1の石炭装入口6とを連結するものとする。乾燥孔3を有する乾燥栓受け煉瓦4を設けた燃焼室2のフリュー孔7と炭化室1の石炭装入口6に設置しても、あまり効果が発揮出来ないので好ましくないからである。
As shown in FIG. 4, for the drying hole installation site where the tip of the plugging jig is difficult to reach the drying hole 3 of the drying plug receiving brick 4, the coal in the carbonizing chamber 1 is replaced with the drying plug receiving brick 4 having the drying hole 3. A drying
この乾燥連絡管14は築炉後の乾燥作業が終了し、レギュラーヒーティングになるまで設置しておくので、材質は鋼材、特にステンレス鋼材とし、全周に保温材を巻き、放熱・やけど等がない様にすることが好ましい。尚、レギュラーヒーティングになれば、この乾燥連絡管14は撤去する。
This
図5は、乾燥連絡管14の取り付け部の構造を示す図で、(a)は炭化室1の石炭装入口6への取り付け構造、(b)は燃焼室2のフリュー孔への取り付け構造を示す図である。
FIG. 5 is a diagram showing the structure of the attachment portion of the drying
乾燥連絡管14は、取り付けが容易で、かつ、レギュラーヒーティングになった後に撤去し易い様にする。炭化室1の石炭装入口6には、図5(a)に示すように、中央部に乾燥連絡管14の一端を装入できる穴を有する仮装入口蓋15を設置し、仮装入口蓋15に乾燥連絡管14の一端を嵌め込み、炭化室1と乾燥連絡管14とを接続する。一方、燃焼室2のフリュー孔7には、図5(b)に示すように、乾燥連絡管14の他端をシール性確保のためのガイド16を設けた燃焼室2のフリュー孔7へ嵌め込み、燃焼室2と乾燥連絡管14とを接続する。乾燥連絡管14の寸法はシール性確保のため、燃焼室2のフリュー孔7との隙間がなるべく小さくなるものとすることが好ましい。
The
以下実施例に基づいて本発明を説明する。 Hereinafter, the present invention will be described based on examples.
コークス炉の築炉後の炉体乾燥は、炭化室にてCOGあるいは軽油等の燃料を燃焼し、その燃焼排ガスを燃焼室、蛇腹、蓄熱室、水平煙道に導き、煙道を経由して、煙突より大気放散する事で行う。 After the coke oven is built, the furnace body is dried by burning fuel such as COG or light oil in the carbonization chamber, leading the combustion exhaust gas to the combustion chamber, bellows, heat storage chamber, horizontal flue, and via the flue This is done by releasing air from the chimney.
炭化室1から燃焼室2へ炉体乾燥用燃焼排ガスをどの様に導くかが築炉後の炉体乾燥には重要である。 How to lead the combustion exhaust gas for drying the furnace body from the carbonization chamber 1 to the combustion chamber 2 is important for drying the furnace body after the construction.
この実施例では、図4に示すように、石炭装入レベルより上方の炉頂部に炭化室1と燃焼室2を繋ぐ乾燥孔3を設置し、そして、乾燥孔3の栓詰め作業が困難な部分となる乾燥孔設置位置には乾燥孔3を設けることなく、石炭装入口6とフリュー孔7を繋ぐ乾燥連絡管14を設置する事で、炭化室1から燃焼室2へ炉体乾燥用燃焼排ガスを導くようにした。具体的には、炭化室1の石炭装入口6からの距離が近い位置の炉壁には乾燥孔3を有する乾燥栓受け煉瓦4を設けて乾燥孔3を介して炭化室1から燃焼室2へ炉体乾燥用燃焼排ガスを導入し、乾燥した。また、炭化室1の石炭装入口6からの距離が遠く、乾燥後の乾燥孔4の栓詰め作業が困難な位置にある燃焼室2のフリュー孔7には、乾燥連絡管14の一端を接続し、その他端を炭化室1の石炭装入口6に接続し、この乾燥連絡管14を介して炭化室1から燃焼室2へ炉体乾燥用燃焼排ガスを導入し、乾燥した。
In this embodiment, as shown in FIG. 4, a drying hole 3 connecting the carbonization chamber 1 and the combustion chamber 2 is installed at the top of the furnace above the coal charging level, and plugging of the drying hole 3 is difficult. The combustion for drying the furnace body from the carbonization chamber 1 to the combustion chamber 2 is performed by installing the drying
石炭装入レベルより上方の炉頂部5に炭化室1と燃焼室2を繋ぐ乾燥孔3を有する乾燥栓受け煉瓦4の設置については、乾燥孔3を石炭装入口6直下及び上昇管7直下の炉頂炭化室1の天井8部分に設けた。この炉頂部5の天井8部分は煉瓦厚みが厚いので、乾燥孔3を設けても炉体強度の低下が少ない。この乾燥孔3は一方を炭化室1の石炭装入口6に、他方を燃焼室2のフリュー孔7に接続させる。そして、乾燥栓受け煉瓦4の乾燥孔3の孔サイズはФ80〜Ф90mmとし、炭化室1の石炭装入口6側をФ90mmと大きく、燃焼室2のフリュー孔3側はこれより若干小さくФ85mmとする。これは炭化室1の装入口6側の乾燥孔3に栓煉瓦11を入れるためである。また、フリュー孔7側は栓煉瓦のストパッーとなるので、栓煉瓦11の先端の寸法(Ф85mm)より乾燥孔サイズを小さくФ80mmとする。
Regarding the installation of the drying plug receiving brick 4 having the drying hole 3 connecting the carbonization chamber 1 and the combustion chamber 2 at the furnace top 5 above the coal charging level, the drying hole 3 is directly below the
乾燥孔3を有する乾燥栓受け煉瓦4を設けてない炉壁に近い位置の燃焼室2のフリュー孔7と炭化室1の石炭装入口6とを繋ぐ乾燥連絡管14は、炉上のなるべく低い位置に設置する。低い位置であれば炉上の歩行に邪魔にならないし、乾燥連絡管14の重量も軽くて済む。
The drying
上記のように、乾燥孔3を有する乾燥栓受け煉瓦4と乾燥連絡管14とを設置した後、炭化室1内の下部に燃焼バーナを挿入し、COGを燃焼させた。燃焼排ガスは、1000〜1400℃程度の温度の燃焼排ガスとなり、炭化室1内を上昇し、乾燥栓受け煉瓦4の乾燥孔3または乾燥連絡管14を通じて燃焼室2に流入し、蛇腹、蓄熱室、水平煙道に導き、煙道を経由して、煙突より大気放散させることができた。
As described above, after the drying plug receiving brick 4 having the drying hole 3 and the drying
乾燥作業が終了し、レギュラーヒーティングになれば、炉上及び窯口より乾燥孔の栓詰め作業を行い、また、乾燥連絡管14を撤去する。
When the drying operation is completed and regular heating is achieved, the plugging operation of the drying hole is performed on the furnace and the kiln opening, and the
なお、上記実施例では、乾燥栓受け煉瓦4の乾燥孔3と乾燥連絡管14の両者を設置した例について説明したが、乾燥孔3だけ又は乾燥連絡管14だけでも実施可能であるが、両者を併用して実施することが好ましい。
In addition, although the said Example demonstrated the example which installed both the drying hole 3 and the drying
1炭化室
2燃焼室
3乾燥孔
4乾燥栓受け煉瓦
5炉頂部
6石炭装入口
7フリュー孔
8天井
9石炭装入レベル
10上昇管
11栓煉瓦
12ストッパー
13冶具挿入穴
14乾燥連絡管
15仮装入蓋
16ガイド
17炉頂
1 Coking chamber 2 Combustion chamber 3 Drying hole 4 Drying plug receiving brick 5
Claims (4)
There is a heat storage chamber at the bottom of the furnace body, and in the furnace body drying method at the time of firing in the furnace equipment of a coke oven having a structure in which combustion chambers and carbonization chambers are alternately arranged at the top, the coal charging of the carbonization chamber A drying plug receiving brick having a drying hole communicating with the carbonization chamber and the combustion chamber is disposed on the furnace wall at the top of the furnace above the level , and combustion exhaust gas generated by burning fuel in the carbonization chamber is carbonized through the drying hole. The furnace body is led from the chamber to the combustion chamber and the flue gas is ventilated throughout the furnace to dry the furnace body. After the furnace body is dried, the plug brick is inserted into the drying hole of the dry plug receiving brick from the coal inlet and plugged. A furnace body drying method at the time of firing in a furnace body equipment of a coke oven characterized by the above.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2008096476A JP5206080B2 (en) | 2008-04-02 | 2008-04-02 | Coke oven drying method for burning |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2008096476A JP5206080B2 (en) | 2008-04-02 | 2008-04-02 | Coke oven drying method for burning |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2009249437A JP2009249437A (en) | 2009-10-29 |
| JP5206080B2 true JP5206080B2 (en) | 2013-06-12 |
Family
ID=41310444
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2008096476A Active JP5206080B2 (en) | 2008-04-02 | 2008-04-02 | Coke oven drying method for burning |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP5206080B2 (en) |
Families Citing this family (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5206079B2 (en) * | 2008-04-02 | 2013-06-12 | 新日鐵住金株式会社 | Coke oven drying stopper |
| JP5211892B2 (en) * | 2008-06-26 | 2013-06-12 | 新日鐵住金株式会社 | Coke oven drying hole closing method, and coke oven drying hole brick |
| CN102827619B (en) * | 2012-09-24 | 2013-11-20 | 沈阳海源干馏设备技术开发有限公司 | Integrated gas retort |
| CN106147798B (en) * | 2015-04-14 | 2018-10-19 | 五冶集团上海有限公司 | Coke oven flue elbow installation method |
| CN104987868B (en) * | 2015-07-03 | 2017-06-16 | 江苏永钢集团有限公司 | Coke oven flue elbow installing and fixing method |
| JP6544103B2 (en) * | 2015-07-17 | 2019-07-17 | 日本製鉄株式会社 | Chamber type coke oven |
| CN109628108B (en) * | 2018-12-21 | 2021-01-19 | 中国一冶集团有限公司 | Method for building secondary air inlet of heat recovery coke oven |
| CN115287085B (en) * | 2022-07-29 | 2026-03-31 | 中冶天工集团有限公司 | A plug brick installation device and its application method for the drying holes on the top of a coke oven |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5206079B2 (en) * | 2008-04-02 | 2013-06-12 | 新日鐵住金株式会社 | Coke oven drying stopper |
-
2008
- 2008-04-02 JP JP2008096476A patent/JP5206080B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2009249437A (en) | 2009-10-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5206080B2 (en) | Coke oven drying method for burning | |
| US12060525B2 (en) | Systems for treating a surface of a coke plant sole flue | |
| JP6870396B2 (en) | How to dry the furnace body and burner at the time of burning in the furnace body equipment of the coke oven | |
| JP6753338B2 (en) | Hot brick transshipment repair method for coke oven | |
| JP5206079B2 (en) | Coke oven drying stopper | |
| CN101353579B (en) | 7.63m coke oven negative pressure in-furnace furnace drying method | |
| JP6631326B2 (en) | Furnace body drying method at the time of burning in furnace body equipment of coke oven | |
| CN209877630U (en) | Novel pot-type calcining furnace | |
| US3880967A (en) | Method for lining gun brick in coke ovens | |
| JPS6154350B2 (en) | ||
| JP2011208010A (en) | Method for charging coal into coke oven | |
| JP2019077811A (en) | Refractory structure of coke oven | |
| JP5703852B2 (en) | Coke oven hot transfer furnace wall temperature rising method | |
| JP6544103B2 (en) | Chamber type coke oven | |
| CN117801830A (en) | A coke oven oven channel structure | |
| JP2795149B2 (en) | Hot repair method of coke oven carbonization room wall brick | |
| RU31578U1 (en) | CAST IRON BLAST FURNACE | |
| CN203605216U (en) | Multi-air-flue straight tube pulverized coal combustion furnace | |
| RU1807072C (en) | Coke oven | |
| JPS6226442Y2 (en) | ||
| JPS589198Y2 (en) | Ibushikawarashiyouseigama | |
| JPS6131749B2 (en) | ||
| CN117402633A (en) | A coke oven rising tube base installation structure and installation method | |
| JP2021138859A (en) | Method of repairing pillar wall of regeneration chamber in coke oven | |
| JP2012007000A (en) | Heat insulation plate-installing method when reloading ceiling brick of carbonizing chamber of coke oven in hot condition |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20100810 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20121121 |
|
| A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20121127 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20121225 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20130122 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20130204 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20160301 Year of fee payment: 3 |
|
| R151 | Written notification of patent or utility model registration |
Ref document number: 5206080 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20160301 Year of fee payment: 3 |
|
| A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20140704 |
|
| S533 | Written request for registration of change of name |
Free format text: JAPANESE INTERMEDIATE CODE: R313533 |
|
| R350 | Written notification of registration of transfer |
Free format text: JAPANESE INTERMEDIATE CODE: R350 |