JP5207086B2 - Construction method of underground tank - Google Patents
[go: Go Back, main page]

JP5207086B2 - Construction method of underground tank - Google Patents

Construction method of underground tank Download PDF

Info

Publication number
JP5207086B2
JP5207086B2 JP2010143781A JP2010143781A JP5207086B2 JP 5207086 B2 JP5207086 B2 JP 5207086B2 JP 2010143781 A JP2010143781 A JP 2010143781A JP 2010143781 A JP2010143781 A JP 2010143781A JP 5207086 B2 JP5207086 B2 JP 5207086B2
Authority
JP
Japan
Prior art keywords
roof
side wall
construction
ground
bottom plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2010143781A
Other languages
Japanese (ja)
Other versions
JP2012007371A (en
Inventor
三雄 永島
雅樹 若林
雅徳 土屋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shimizu Corp
Original Assignee
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shimizu Corp filed Critical Shimizu Corp
Priority to JP2010143781A priority Critical patent/JP5207086B2/en
Publication of JP2012007371A publication Critical patent/JP2012007371A/en
Application granted granted Critical
Publication of JP5207086B2 publication Critical patent/JP5207086B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

本発明は、例えば、液化天然ガス等の低温液体の貯蔵に用いられる地下タンクの施工方法に関する。   The present invention relates to a method for constructing an underground tank used for storing a low-temperature liquid such as liquefied natural gas.

従来より、液化天然ガス(LNG)等の低温液体の貯蔵タンクとして、底版と、底版の周囲に沿って構築された側壁と、側壁の上部を覆う屋根を備え、底版と側壁とが地中に埋設された地下タンクが使用されている。
このような、地下タンクの施工手順としては、地中に筒状の地中連続壁を構築して、地中連続壁の内部を掘削し、続いて、底版や側壁などの躯体を構築して、躯体が完成した後に屋根を構築している。このため、地中連続壁の内部の掘削工事や、底版や側壁の構築工事は、屋根がない状態で行われていて明かり工事となるため、工程が天候に左右されている。
このことは、地下タンクの施工において、工期短縮を困難にする一要因となっている。
Conventionally, as a storage tank for low-temperature liquid such as liquefied natural gas (LNG), a bottom slab, a side wall constructed along the periphery of the bottom slab, and a roof covering the top of the side slab are provided. A buried underground tank is used.
The construction procedure for such underground tanks is to construct a cylindrical underground wall in the ground, excavate the interior of the underground continuous wall, and then build a frame such as a bottom plate or side wall. The roof is built after the building is completed. For this reason, the excavation work inside the underground continuous wall and the construction work of the bottom slab and the side wall are performed without a roof and are light work, so the process depends on the weather.
This is one factor that makes it difficult to shorten the construction period in the construction of underground tanks.

近年では、地下タンク内部の掘削工事や、底版や側壁の構築工事に先行して、屋根を構築する地下タンクの施工方法が行われている(例えば特許文献1乃至11参照)。これらの地下タンクの施工方法では、屋根がある状態でタンク内部の掘削工事や、底版構築工事を行うことができるため、工程が天候に左右されることが少ない。   In recent years, an underground tank construction method for constructing a roof has been performed prior to excavation work inside an underground tank and construction work for a bottom slab and side walls (see, for example, Patent Documents 1 to 11). In these underground tank construction methods, excavation work inside the tank and bottom plate construction work can be performed with a roof, so that the process is less affected by the weather.

特開平7−279475号公報JP-A-7-279475 特許第3501283号公報Japanese Patent No. 3501283 特開2000−73385号公報JP 2000-73385 A 特開2000−96588号公報JP 2000-96588 A 特開昭61−21277号公報Japanese Patent Laid-Open No. 61-21277 特開昭63−67380号公報JP-A 63-67380 特開平4−333784号公報JP-A-4-333784 特開平7−11807号公報JP-A-7-11807 特開平7−91103号公報Japanese Unexamined Patent Publication No. 7-91103 特開2000−73384号公報JP 2000-73384 A 特開2000−87371号公報JP 2000-87371 A

ところで、地下タンクには、側壁の全部またはほとんどが、地中に埋設された地下タンクの他に、側壁の上部側が、地下タンクが構築される前の地盤面よりも上方に位置し、この側壁の上部側の外周に盛土を行うことで、地中に埋設された形態とした地下タンクがある。   By the way, in the underground tank, all or most of the side wall is located above the ground surface before the underground tank is constructed, in addition to the underground tank buried in the ground. There is an underground tank that is buried in the ground by embankment on the outer periphery of the upper part of the basin.

このような地下タンクは、側壁の上端部が、構築される前の地盤面よりも、例えば、10m程度上側に位置するように構築されている。
そして、このような地下タンクは、側壁の全部またはほとんどが地中に埋設された地下タンクと比べて、施工の際に、地盤の掘削量を少なくすることができると共に、地下水による揚圧力に対抗するために躯体を補強したり躯体のボリュームを大きくしたりする必要が少ないため、工期の短縮や、コストの削減を図ることができる。
Such an underground tank is constructed such that the upper end portion of the side wall is located, for example, about 10 m above the ground surface before construction.
Such underground tanks can reduce the amount of ground excavation during construction and counteract the lifting pressure caused by groundwater compared to underground tanks where all or most of the side walls are buried underground. Therefore, since it is not necessary to reinforce the casing or increase the volume of the casing, the construction period can be shortened and the cost can be reduced.

そこで、このような地下タンクの施工において、特許文献1乃至11に開示された従来の地下タンクの施工方法のように、屋根が架設された状態で地下タンク内部の掘削工事や、底版および側壁の構築工事を行うと、更なる工期の短縮およびコストの削減を図ることが可能である。
しかしながら、特許文献1乃至11に開示された従来の地下タンクの施工方法は、側壁の全部またはほとんどが、地中に埋設された地下タンクを対象としたものである。
例えば、特許文献1に記載された地下タンクの施工方法では、屋根が扇形または半円に分割され、横方向にスライド可能であるが、屋根が原地盤面よりも上方に位置する場合、横方向の移動は困難である。
また、例えば、特許文献2乃至10に記載された従来の地下タンクの施工方法では、工事中は、屋根に工事用の開口部を形成し、この開口部から資機材や土砂などの搬出入を行っているが、屋根が地盤面よりも上方に位置する場合、資機材や土砂などを高く吊上げる必要があり、かえって工期やコストがかかることになる。
Therefore, in the construction of such an underground tank, as in the conventional underground tank construction method disclosed in Patent Documents 1 to 11, excavation work inside the underground tank with the roof erected, the bottom plate and the side wall When construction work is performed, it is possible to further shorten the construction period and reduce costs.
However, the conventional underground tank construction methods disclosed in Patent Documents 1 to 11 are intended for underground tanks in which all or most of the side walls are buried in the ground.
For example, in the construction method of the underground tank described in Patent Document 1, the roof is divided into a fan shape or a semicircle and can be slid in the horizontal direction. However, when the roof is positioned above the original ground surface, the horizontal direction It is difficult to move.
Further, for example, in the conventional underground tank construction methods described in Patent Documents 2 to 10, an opening for construction is formed in the roof during construction, and materials and earth and sand are carried in and out from this opening. However, if the roof is located above the ground surface, it is necessary to lift the equipment and earth and sand, etc., which increases the work period and cost.

本発明は、上述する事情に鑑みてなされたもので、側壁の上部側が、地下タンクが構築される前の地盤面よりも上方に位置する地下タンクの施工においても、屋根のある状態で、地下タンク内部の掘削工程や底版および側壁を構築する工程を行うことができる地下タンクの施工方法を提供することを目的とする。   The present invention has been made in view of the circumstances described above, and in the construction of an underground tank in which the upper side of the side wall is located above the ground surface before the underground tank is constructed, It aims at providing the construction method of an underground tank which can perform the excavation process inside a tank, and the process of constructing a bottom slab and a side wall.

上記目的を達成するため、本発明に係る地下タンクの施工方法は、底版と、該底版の周囲に沿って構築された側壁と、該側壁の上部を覆う本体屋根と、を備え、前記底版と前記側壁とが地中に埋設された地下タンクの施工方法であって、地盤中に筒状の地中連続壁を構築する地中連続壁構築工程と、前記本体屋根となる屋根部と該屋根部の外周に該屋根部と分離可能に設けられた分離部とを備えた屋根を地盤上に設置する屋根組立工程と、前記屋根を設置した後に、前記地中連続壁の内部を掘削する内部掘削工程と、前記底版を構築する底版構築工程と、前記側壁を地盤面よりも上方の高さまで構築する側壁構築工程と、前記屋根部と前記分離部とを分離すると共に、前記屋根部を前記側壁の上端部に固定する本体屋根設置工程と、を備え、前記本体屋根設置工程は、前記側壁構築工程で側壁が構築された後に、前記屋根部を上昇させて前記側壁の上端部に固定することを特徴とする。 In order to achieve the above object, an underground tank construction method according to the present invention includes a bottom plate, a side wall constructed along the periphery of the bottom plate, and a main body roof covering an upper portion of the side wall, and the bottom plate, A method of constructing an underground tank in which the side wall is buried in the ground, a continuous underground wall construction step for constructing a cylindrical underground continuous wall in the ground, a roof portion serving as the main body roof, and the roof A roof assembling step for installing on the ground a roof provided with a separation part separable from the roof part on the outer periphery of the part, and an interior for excavating the inside of the underground continuous wall after installing the roof Excavating step, bottom plate building step for building the bottom plate, side wall building step for building the side wall to a height above the ground surface, separating the roof portion and the separating portion, and and a body roof installation step of fixing the upper end of the side wall, Serial body roof installation process, after the side wall is constructed in the side wall construction process, characterized in that fixed to the upper end of the side wall is raised to the roof.

また、本発明に係る地下タンクの施工方法は底版と、該底版の周囲に沿って構築された側壁と、該側壁の上部を覆う本体屋根と、を備え、前記底版と前記側壁とが地中に埋設された地下タンクの施工方法であって、地盤中に筒状の地中連続壁を構築する地中連続壁構築工程と、前記本体屋根となる屋根部と該屋根部の外周に該屋根部と分離可能に設けられた分離部とを備えた屋根を地盤上に設置する屋根組立工程と、前記屋根を設置した後に、前記地中連続壁の内部を掘削する内部掘削工程と、前記底版を構築する底版構築工程と、前記側壁を地盤面よりも上方の高さまで構築する側壁構築工程と、前記屋根部と前記分離部とを分離すると共に、前記屋根部を前記側壁の上端部に固定する本体屋根設置工程と、を備え、前記側壁構築工程は、前記側壁の地盤面よりも下部側を構築する第1側壁構築工程と、該第1側壁構築工程の後の前記側壁の地盤面よりも上部側を構築する第2側壁構築工程と、を備え、前記本体屋根設置工程では、第1側壁構築工程と第2側壁構築工程との間に、前記屋根を上昇させて前記側壁の上端部よりも上側に仮設し、前記第2側壁構築工程の後に、前記屋根部と前記分離部とを分離すると共に、前記屋根部を前記側壁の上端部に固定することを特徴とするAlso, construction how underground tank according to the present invention includes a bottom plate, a side wall constructed along the periphery of the bottom plate, comprising a body roof covering an upper portion of said side wall, a, is said and said bottom plate side wall A method for constructing an underground tank buried in the ground, comprising a continuous underground wall construction step for constructing a cylindrical underground continuous wall in the ground, and a roof part to be the main body roof and an outer periphery of the roof part. A roof assembling step of installing on the ground a roof comprising the roof portion and a separation portion provided in a separable manner, and an internal excavation step of excavating the inside of the underground continuous wall after the roof is installed; A bottom plate construction step for constructing the bottom plate, a side wall construction step for constructing the side wall up to a height above the ground surface, the roof portion and the separation portion are separated, and the roof portion is an upper end portion of the side wall. and a body roof installation step of fixing the said side wall construction process A first side wall construction step of constructing a lower side than the ground surface of the side wall, and a second side wall construction step of constructing an upper side from the ground surface of the side wall after the first side wall construction step, In the main body roof installation step, between the first side wall construction step and the second side wall construction step, the roof is raised and temporarily installed above the upper end portion of the side wall, and after the second side wall construction step, While separating the said roof part and the said separation part, the said roof part is fixed to the upper end part of the said side wall, It is characterized by the above-mentioned .

また、本発明に係る地下タンクの施工方法は底版と、該底版の周囲に沿って構築された側壁と、該側壁の上部を覆う本体屋根と、を備え、前記底版と前記側壁とが地中に埋設された地下タンクの施工方法であって、地盤中に筒状の地中連続壁を構築する地中連続壁構築工程と、前記本体屋根となる屋根部と該屋根部の外周に該屋根部と分離可能に設けられた分離部とを備えた屋根を地盤上に設置する屋根組立工程と、前記屋根を設置した後に、前記地中連続壁の内部を掘削する内部掘削工程と、前記底版を構築する底版構築工程と、前記側壁を地盤面よりも上方の高さまで構築する側壁構築工程と、前記屋根部と前記分離部とを分離すると共に、前記屋根部を前記側壁の上端部に固定する本体屋根設置工程と、を備え、前記側壁構築工程は、前記側壁の地盤面よりも下部側を構築する第1側壁構築工程と、該第1側壁構築工程の後の前記側壁の地盤面よりも上部側を構築する第2側壁構築工程と、を備え、前記第2側壁構築工程では、前記側壁を下方から上方へ段階的に構築し、前記本体屋根設置工程では、前記第2側壁構築工程の段階毎に前記屋根を上昇させて直後の段階で構築される前記側壁の上端部よりも上側に仮設し、前記第2側壁構築工程の後に、前記屋根部と前記分離部とを分離すると共に、前記屋根部を前記側壁の上端部に固定することを特徴とする
Also, construction how underground tank according to the present invention includes a bottom plate, a side wall constructed along the periphery of the bottom plate, comprising a body roof covering an upper portion of said side wall, a, is said and said bottom plate side wall A method for constructing an underground tank buried in the ground, comprising a continuous underground wall construction step for constructing a cylindrical underground continuous wall in the ground, and a roof part to be the main body roof and an outer periphery of the roof part. A roof assembling step of installing on the ground a roof comprising the roof portion and a separation portion provided in a separable manner, and an internal excavation step of excavating the inside of the underground continuous wall after the roof is installed; A bottom plate construction step for constructing the bottom plate, a side wall construction step for constructing the side wall up to a height above the ground surface, the roof portion and the separation portion are separated, and the roof portion is an upper end portion of the side wall. and a body roof installation step of fixing the said side wall construction process A first side wall construction step of constructing a lower side than the ground surface of the side wall, and a second side wall construction step of constructing an upper side from the ground surface of the side wall after the first side wall construction step, In the second side wall construction process, the side walls are constructed in stages from the bottom to the top, and in the main body roof installation process, the roof is raised for each stage of the second side wall construction process, and is constructed at a stage immediately after. And temporarily separating the roof portion and the separation portion after the second sidewall construction step, and fixing the roof portion to the upper end portion of the sidewall. And

本発明によれば、側壁の上部側が地下タンクが構築される前の地盤面よりも上方に位置する地下タンクであっても、屋根のある状態で内部掘削工程、底版構築工程よび側壁構築工程を行うことができることにより、工事が天候に左右されることがないため、工期短縮やコスト削減を実現することができる。   According to the present invention, even if the upper side of the side wall is an underground tank located above the ground surface before the underground tank is constructed, the internal excavation process, the bottom slab construction process, and the side wall construction process are performed with the roof. By being able to carry out the work, the construction is not affected by the weather, so the construction period can be shortened and the cost can be reduced.

本発明の実施形態による地下タンクの一例を示す図である。It is a figure which shows an example of the underground tank by embodiment of this invention. 地盤改良工程および地盤表層部掘削工程を説明する図である。It is a figure explaining a ground improvement process and a ground surface layer part excavation process. ガイドウォール構築工程および地中連続壁構築工程を説明する図である。It is a figure explaining a guide wall construction process and an underground continuous wall construction process. (a)は仮設屋根設置工程を説明する図、(b)は(a)の上面図である。(A) is a figure explaining a temporary roof installation process, (b) is a top view of (a). (a)は仮設屋根の工事用開口部を説明する図、(b)は仮設屋根に設けられた足場を示す図、(c)は(b)に示す足場の挙動を説明する図である。(A) is a figure explaining the construction opening part of a temporary roof, (b) is a figure which shows the scaffold provided in the temporary roof, (c) is a figure explaining the behavior of the scaffold shown in (b). 内部掘削工程を説明する図である。It is a figure explaining an internal excavation process. 底版構築工程を説明する図である。It is a figure explaining a bottom plate construction process. 側壁構築工程を説明する図である。It is a figure explaining a side wall construction process. 屋根設置工程を説明する図である。It is a figure explaining a roof installation process.

(第1実施形態)
以下、本発明の第1実施形態による地下タンクの施工方法について、図1乃至図9に基づいて説明する。
(地下タンク)
図1に示すように、本実施形態による地下タンク1は、例えば、LNG貯蔵タンクとして使用されるものであり、地盤G面より下方に配された平面視略円形状の底版2と、略円筒状の側壁3と、側壁3の上端部3aに支持されたドーム状の本体屋根4と、を備えている。
(First embodiment)
Hereinafter, an underground tank construction method according to a first embodiment of the present invention will be described with reference to FIGS. 1 to 9.
(Underground tank)
As shown in FIG. 1, the underground tank 1 according to the present embodiment is used as, for example, an LNG storage tank, and has a bottom plate 2 having a substantially circular shape in plan view disposed below the ground G surface, and a substantially cylindrical shape. And a dome-shaped main roof 4 supported by an upper end 3 a of the side wall 3.

また、側壁3の下端部3b側の外周の地盤Gには、側壁3の外周面に沿った形状で平面視円環状の地中連続壁5が設けられていて、地中連続壁5の外周の地盤Gには、地盤改良体6が施工されている。また、地中連続壁5と地盤改良体6との間には、地下タンク1施工時に後述する屋根21(図4参照)を支持していたガイドウォール7と、側部ヒーター8とを備えている。
なお、ガイドウォール7は、地中連続壁5を構築する際の定規となるものである。
Further, the ground G on the outer periphery of the side wall 3 on the lower end 3b side is provided with an underground continuous wall 5 having a shape along the outer peripheral surface of the side wall 3 and having an annular shape in plan view. The ground improvement body 6 is constructed on the ground G. Moreover, between the underground continuous wall 5 and the ground improvement body 6, the guide wall 7 which supported the roof 21 (refer FIG. 4) mentioned later at the time of underground tank 1 construction, and the side heater 8 are provided. Yes.
The guide wall 7 serves as a ruler when the underground continuous wall 5 is constructed.

底版2は、鉄筋コンクリート造で、掘削された地盤G上に設けられた砕石層11の上部に構築されている。底版2の内部には、地下タンク1内の温度調整を行う底部ヒーター12が設置されている。
側壁3は、鉄筋コンクリート造で、下端部3bが底版2の外縁部2aに剛に接合されて、底版2および側壁3は有底円筒状に構成されている。
この地下タンク1が施工される前の地盤面を施工前地盤面Gaとすると、側壁3は、下部側が施工前地盤面Gaの下方に位置し、上部側が施工前地盤面Gaの上方に位置している。
そして、側壁3の上部側の外周には地下タンク1の施工中に盛土されているため、地下タンク1は地下に配された構成となっている。
The bottom slab 2 is made of reinforced concrete, and is constructed on the crushed stone layer 11 provided on the ground G excavated. A bottom heater 12 that adjusts the temperature in the underground tank 1 is installed inside the bottom plate 2.
The side wall 3 is made of reinforced concrete, the lower end 3b is rigidly joined to the outer edge 2a of the bottom plate 2, and the bottom plate 2 and the side wall 3 are formed in a bottomed cylindrical shape.
If the ground surface before this underground tank 1 is constructed is the pre-construction ground surface Ga, the side wall 3 is located below the pre-construction ground surface Ga and the upper side is located above the pre-construction ground surface Ga. ing.
And since the embankment is carried out in the outer periphery of the upper side of the side wall 3 during construction of the underground tank 1, the underground tank 1 has the structure distribute | arranged underground.

地中連続壁5は、土留めとして地盤Gの崩落を防ぐ機能や止水機能を備えている。地中連続壁5は、地下タンク1の底版2よりもさらに深く構築されており、下端部5bは難透水層(洪積粘性土層)13まで達している。
地中連続壁5は、例えば、コンクリートなどで構築されている。
地盤改良体6は、例えば、サンドコンパクションパイル工法などにより形成されていて、地下タンク1の周辺の地盤Gの液状化対策として設けられている。
The underground continuous wall 5 has a function of preventing the ground G from collapsing and a water stop function as a soil retaining. The underground continuous wall 5 is constructed deeper than the bottom slab 2 of the underground tank 1, and the lower end portion 5 b reaches the hardly permeable layer (cold clay layer) 13.
The underground continuous wall 5 is constructed of, for example, concrete.
The ground improvement body 6 is formed by, for example, a sand compaction pile method or the like, and is provided as a countermeasure against liquefaction of the ground G around the underground tank 1.

本体屋根4は、平面視において円形状に形成され、側壁3の上端部3aに架設される複数の骨組材15と、骨組材15の下側に配される保冷材16と、骨組材15の上側に配される屋根材17と、を備えている。
底版2と側壁3との内面には、図示しない保冷材と、この保冷材の内側に取り付けられた例えば、ステンレス薄鋼板製のメンブレン材とを備える保冷層(内槽)18が形成されている。
The main body roof 4 is formed in a circular shape in plan view, and includes a plurality of frame members 15 installed on the upper end portion 3 a of the side wall 3, a cold insulation material 16 disposed below the frame members 15, and the frame members 15. And a roofing material 17 disposed on the upper side.
On the inner surfaces of the bottom plate 2 and the side wall 3, a cold insulation layer (inner tub) 18 including a cold insulation material (not shown) and a membrane material made of, for example, a stainless steel sheet attached inside the cold insulation material is formed. .

(地下タンクの施工方法)
次に、上述した地下タンク1の施工方法について図面を用いて説明する。
本実施形態による地下タンクの施工方法は、図1に示す地下タンク1が構築される地中連続壁5の内側の地盤Gの掘削や、底版2や側壁3などの躯体の構築に先行して、図4に示すように地盤G上に屋根21を配設するものである。
(地盤改良工程)
まず、図2に示すように、地下タンク1外周側の地盤Gの地盤改良を行う。
この地盤改良は、例えば、サンドコンパクションパイル工法などにより行う。地盤改良体6の形状や大きさは、地下タンク1の形状や地盤Gの強度を考慮して決定する。
(Underground tank construction method)
Next, the construction method of the underground tank 1 mentioned above is demonstrated using drawing.
The underground tank construction method according to the present embodiment precedes excavation of the ground G inside the underground continuous wall 5 where the underground tank 1 shown in FIG. As shown in FIG. 4, the roof 21 is disposed on the ground G.
(Ground improvement process)
First, as shown in FIG. 2, the ground of the ground G on the outer periphery side of the underground tank 1 is improved.
This ground improvement is performed by, for example, a sand compaction pile method. The shape and size of the ground improvement body 6 are determined in consideration of the shape of the underground tank 1 and the strength of the ground G.

(地盤表層部掘削工程)
続いて、地下タンク1が配設される領域およびその外周近傍の地盤Gの表層部Gbを、盤下げ掘削し、周囲の地盤Gよりも低くなるようにする。
本実施形態による地下タンク1の施工方法では、屋根21(図4(a)参照)を、この地盤Gの表層部Gbが掘削された盤下げ領域に設置するため、屋根21の周囲が地盤Gで囲まれた状態となり、工事中に屋根21に当たる風を少なくすることができると共に、資機材の搬入を容易に行うことができる。ひいては、作業の安全性を高めることができる。
この地盤Gの表層部Gbの盤下げ掘削の深さは、仮設屋根21の形状や、地形などを考慮して決定する。
(Surface surface layer excavation process)
Subsequently, the region where the underground tank 1 is disposed and the surface layer portion Gb of the ground G in the vicinity of the outer periphery thereof are excavated down so as to be lower than the surrounding ground G.
In the construction method of the underground tank 1 according to the present embodiment, the roof 21 (see FIG. 4A) is installed in the lowering region where the surface layer Gb of the ground G is excavated. As a result, the wind hitting the roof 21 during construction can be reduced, and materials and equipment can be easily carried in. As a result, the safety of work can be improved.
The depth of the ground excavation of the surface layer portion Gb of the ground G is determined in consideration of the shape of the temporary roof 21 and the topography.

(ガイドウォール設置工程)
続いて、図3に示すように、地中連続壁5を施工するための定規であると共に、屋根21(図4(a)参照)の外周部を支持する基礎でもあるガイドウォール7を設置する。
ガイドウォール7は、地中連続壁5の外側に位置する外側ガイドウォール7aと、地中連続壁5の内側に位置する内側ガイドウォール7bと、から構成されている。外側ガイドウォール7aと内側ガイドウォール7bとは、地中連続壁5を挟むように設置され、コンクリートなどで平面視円環状に形成されている。
なお、内側ガイドウォール7bは、後の内部掘削工程で、地中連続壁5内部の地盤Gとともに撤去され、外側ガイドウォール7aのみが地下タンク1完成後も地盤G中に残されている。
ガイドウォール設置工程では、外側ガイドウォール7aの内周面と内側ガイドウォール7bの外周面との間に、地中連続壁5の厚さに相当する間隔があくように、外側ガイドウォール7aおよび内側ガイドウォール7bを設置する。
(Guide wall installation process)
Subsequently, as shown in FIG. 3, a guide wall 7 which is a ruler for constructing the underground continuous wall 5 and is also a foundation for supporting the outer peripheral portion of the roof 21 (see FIG. 4A) is installed. .
The guide wall 7 includes an outer guide wall 7 a positioned outside the underground continuous wall 5 and an inner guide wall 7 b positioned inside the underground continuous wall 5. The outer guide wall 7a and the inner guide wall 7b are installed so as to sandwich the underground continuous wall 5, and are formed in an annular shape in plan view with concrete or the like.
The inner guide wall 7b is removed together with the ground G inside the underground continuous wall 5 in a later internal excavation step, and only the outer guide wall 7a remains in the ground G even after the underground tank 1 is completed.
In the guide wall installation step, the outer guide wall 7a and the inner guide wall 7a and the inner guide wall 7a are spaced so that there is an interval corresponding to the thickness of the underground continuous wall 5 between the inner peripheral surface of the outer guide wall 7a and the outer peripheral surface of the inner guide wall 7b. A guide wall 7b is installed.

(地中連続壁設置工程)
続いて、間隔をおいて設置された外側ガイドウォール7aと内側ガイドウォール7bとの間に、地中連続壁5を構築する。
地中連続壁5の構築は、地下タンク1の設置予定箇所の周囲に沿って掘削溝を設け、その溝内に鉄筋を配してコンクリートを打設する周知技術により構築する。このとき、下端部5bが難透水層13に達するように地中連続壁5を構築する。
(Underground continuous wall installation process)
Subsequently, the underground continuous wall 5 is constructed between the outer guide wall 7a and the inner guide wall 7b installed at intervals.
The underground continuous wall 5 is constructed by a well-known technique in which excavation grooves are provided along the periphery of the planned installation location of the underground tank 1 and concrete is placed by placing reinforcing bars in the grooves. At this time, the underground continuous wall 5 is constructed so that the lower end 5b reaches the hardly water-permeable layer 13.

(屋根組立工程)
続いて、図4(a)および(b)に示すように、屋根21を設置する。屋根21は、本体屋根4(図1参照)が部分的に構築された屋根部22と、屋根部22の外周部に設けられて屋根部22と分離可能な分離部23とから構成されている。
(Roof assembly process)
Subsequently, as shown in FIGS. 4A and 4B, a roof 21 is installed. The roof 21 includes a roof portion 22 in which the main body roof 4 (see FIG. 1) is partially constructed, and a separation portion 23 provided on the outer peripheral portion of the roof portion 22 and separable from the roof portion 22. .

屋根部22は、骨組材15と、保冷材16(図1参照)のうち、平面視で径方向中心側付近に配された保冷材16aと、屋根材17(図1参照)のうち、平面視で径方向中心側に配されると共に外周側に部分的に配された屋根材17aと、を備えている。この屋根材17aの外周側端部の位置は、側壁3の内周側近傍の位置となるように配されている。   The roof portion 22 is a plane among the frame material 15 and the cold insulation material 16 (see FIG. 1), the cold insulation material 16a disposed near the radial center in plan view, and the roof material 17 (see FIG. 1). And a roof material 17a partially disposed on the outer peripheral side as viewed from the radial center. The position of the outer peripheral side end portion of the roof material 17 a is arranged so as to be a position in the vicinity of the inner peripheral side of the side wall 3.

また、屋根部22の屋根材17aが配されていない部分には、工事用開口部24が形成されている。工事用開口部24は、施工中の資機材の搬出入や、土砂を搬出するための開口部として使用される。そして、図5(a)に示すように、この工事用開口部24は、着脱自在な覆い材25で覆われていて、必要に応じて開閉されている。
なお、この覆い材25は、例えば、シート状の部材とし、作業(使用)時には、覆い材25をロール状に巻き取って工事用開口部24を開口させ、作業休止(未使用)時には、工事用開口部24に被せて工事用開口部24を塞ぐようにしてもよい。
また、覆い材25は、例えば、工事用開口部24よりも若干大大きく組み立てられた枠体と、この枠体に張り付けられたシートを備える部材とし、この覆い材25全体を移動させて、工事用開口部24を開口させたり塞いだりするようにしてもよい。
また、屋根21の分離部23にも、別途でシート状の覆い材を設けて、屋根21全体に降雨対策が施されているようにする。
A construction opening 24 is formed in a portion of the roof portion 22 where the roof material 17a is not disposed. The construction opening 24 is used as an opening for carrying in / out materials and equipment during construction and for carrying out earth and sand. And as shown to Fig.5 (a), this construction opening part 24 is covered with the detachable covering material 25, and is opened and closed as needed.
The covering material 25 is, for example, a sheet-like member. When working (use), the covering material 25 is wound up in a roll shape to open the construction opening 24, and when the work is suspended (unused) The construction opening 24 may be covered with the construction opening 24.
Further, the covering material 25 is, for example, a member including a frame assembled slightly larger than the construction opening 24 and a sheet attached to the frame, and the entire covering material 25 is moved to construct the frame. The opening 24 for use may be opened or closed.
Further, a separate sheet-like covering material is also provided on the separation portion 23 of the roof 21 so that the entire roof 21 is protected against rain.

図4に示すように、分離部23は、屋根部22の骨組材15と連結している骨組材からなり、屋根部22の骨組材15との連結側の反対側(外周部)が、外側ガイドウォール7aに支持されている。屋根部22と分離部23との連結位置は、側壁3の内周面近傍の位置とする。
屋根部22と分離部23との連結は、一体化して連結されていてもよく、またボルトなどの連結具で連結されていてもよい。なお、いずれの場合も、屋根部22と分離部23とは、分離可能に構成されている。例えば、屋根部22と分離部23とが、一体化して連結されている場合は、切断すること分離され、ボルトなどの連結具で連結されている場合は、連結具を外すことで分離される。
As shown in FIG. 4, the separation part 23 is made of a frame material connected to the frame material 15 of the roof part 22, and the opposite side (outer peripheral part) of the connection side of the roof part 22 to the frame material 15 is the outer side. It is supported by the guide wall 7a. The connection position between the roof portion 22 and the separation portion 23 is a position in the vicinity of the inner peripheral surface of the side wall 3.
The connection between the roof portion 22 and the separation portion 23 may be integrally connected or may be connected with a connecting tool such as a bolt. In any case, the roof portion 22 and the separation portion 23 are configured to be separable. For example, when the roof portion 22 and the separation portion 23 are integrally connected, they are separated by cutting, and when they are connected by a connector such as a bolt, they are separated by removing the connector. .

そして、屋根組立工程では、分離部23の外周部が外側ガイドウォール7aに支持されるように設置すると共に、屋根部22の骨組材15を配設する。このとき、骨組材15と分離部23とを連結した状態にする。   And in a roof assembly process, while installing so that the outer peripheral part of the isolation | separation part 23 may be supported by the outer side guide wall 7a, the frame material 15 of the roof part 22 is arrange | positioned. At this time, the frame material 15 and the separation part 23 are connected.

続いて、保冷材16aおよび屋根材17aを設置する。
保冷材16aを設置する際には、図5(b)および(c)に示すような屋根部22の半径と略同じ長さで、屋根部22の曲率にあわせて形成された足場31を使用する。この足場31は、骨組材15に支持されて屋根部22の周方向に同心円状に延びる複数のガイドレール32に摺動自在に支持されており、屋根部22の周方向に沿って回転可能に構成されている。
そして、保冷材16aの設置は、この足場31を回転させながら行う。
屋根材17aの設置は、クレーンなどで屋根材17aを吊り上げて骨組材15の上部に設置する。
Subsequently, the cold insulating material 16a and the roof material 17a are installed.
When installing the cold insulation material 16a, a scaffold 31 is used which is substantially the same length as the radius of the roof portion 22 as shown in FIGS. 5B and 5C and is formed in accordance with the curvature of the roof portion 22. To do. The scaffold 31 is supported by the frame member 15 and is slidably supported by a plurality of guide rails 32 extending concentrically in the circumferential direction of the roof portion 22, and is rotatable along the circumferential direction of the roof portion 22. It is configured.
The cold insulator 16a is installed while the scaffold 31 is rotated.
The roof material 17a is installed by lifting the roof material 17a with a crane or the like and installing it on the upper part of the frame material 15.

(内部掘削工程)
続いて、図6に示すように、地下タンク1の内部の地盤Gの掘削を行う。
この工程では、地中連続壁5の内側を所定の深さまで掘削する。このとき、地中連続壁5の内側に配された内側ガイドウォール7bは、この掘削と共に撤去される。
このとき、掘削機材や掘削土砂などの搬出入は、屋根21に形成された工事用開口部24から行う。
(Internal drilling process)
Subsequently, as shown in FIG. 6, the ground G inside the underground tank 1 is excavated.
In this step, the inside of the underground continuous wall 5 is excavated to a predetermined depth. At this time, the inner guide wall 7b arranged inside the underground continuous wall 5 is removed together with the excavation.
At this time, the excavation equipment and excavated earth and sand are carried in and out through a construction opening 24 formed in the roof 21.

(底版構築工程)
続いて、図7に示すように、内部掘削工程で掘削された地盤G上に底版2を構築する。
底版2の構築は、地盤G上に砕石層11を配し、その上部に鉄筋を配してコンクリートを打設することで底版2を構築する。このとき、底版2に底部ヒーター12を設置する。
底版構築工程においても資機材の搬出入は、屋根21の工事用開口部24から行う。
(Bottom plate construction process)
Subsequently, as shown in FIG. 7, the bottom slab 2 is constructed on the ground G excavated in the internal excavation process.
The bottom plate 2 is constructed by placing the crushed stone layer 11 on the ground G, placing a reinforcing bar on the top thereof, and placing concrete into the bottom plate 2. At this time, the bottom heater 12 is installed on the bottom plate 2.
In the bottom plate construction process, materials and equipment are carried in and out through the construction opening 24 of the roof 21.

(側壁構築工程)
続いて、図8に示すように、側壁3を構築する。
側壁3は、底版2と一体化させ、下端部3b側から上端部3a側に向って、所定高さ毎に鉄筋を配してコンクリートを順次打ち継いで打設することで構築する。このとき、側壁3の上端部3a側は、地盤G面よりも高いため、屋根21の分離部23を巻き込むように施工する。このとき、覆い材25(図5(a)参照)を外した状態で側壁3を施工することになる。
(Sidewall construction process)
Then, as shown in FIG. 8, the side wall 3 is constructed.
The side wall 3 is constructed by integrating with the bottom plate 2 and placing the reinforcing bars at predetermined heights from the lower end portion 3b side to the upper end portion 3a side, and successively casting concrete. At this time, since the upper end portion 3a side of the side wall 3 is higher than the ground G surface, the side wall 3 is constructed so as to involve the separation portion 23 of the roof 21. At this time, the side wall 3 is constructed with the covering material 25 (see FIG. 5A) removed.

(本体屋根設置工程)
続いて、図9に示すように、屋根部22を側壁3の上端部3aに設置する。
まず、側壁3の上端部3aに、屋根固定装置26を取り付ける。そして、屋根部22を側壁3の上端部3aまで上昇させるための、例えばジャッキなどの上昇装置27を所定の位置に設置する。
そして、屋根部22を上昇できるように、上昇装置27と屋根部22とをセットした後に、屋根21を屋根部22と分離部23とに分離する。また、このとき、屋根部22の保冷材16や屋根材17が施工されていない部分の一部に、保冷材16や屋根材17を施工してもよい。
(Main body roof installation process)
Subsequently, as shown in FIG. 9, the roof portion 22 is installed on the upper end portion 3 a of the side wall 3.
First, the roof fixing device 26 is attached to the upper end 3 a of the side wall 3. And the raising device 27, such as a jack, for raising the roof part 22 to the upper end part 3a of the side wall 3 is installed in a predetermined position.
And after setting the raising device 27 and the roof part 22 so that the roof part 22 can be raised, the roof 21 is separated into the roof part 22 and the separation part 23. At this time, the cold insulation material 16 and the roof material 17 may be applied to a part of the portion of the roof portion 22 where the cold insulation material 16 and the roof material 17 are not applied.

次に、上昇装置27の駆動により、屋根部22を側壁3の上端部3aの高さまで上昇させ、屋根固定装置26に固定する。これにより、屋根部22が本体屋根4となる。
また、分離部23を、側壁3のコンクリートに巻き込まれている部分を除き撤去する。
なお、外側ガイドウォール7aは、そのまま地盤G上に残す。
そして、この本体屋根設置工程と同時に、側壁3の内周側に保冷材およびメンブレンを設置する内槽工事を行う。そして、最後に、屋根の工事用開口部24に保冷材16や屋根材17を施すことで閉塞し、本体屋根4を完成させる。
Next, by driving the lifting device 27, the roof portion 22 is raised to the height of the upper end portion 3 a of the side wall 3 and fixed to the roof fixing device 26. Thereby, the roof part 22 becomes the main body roof 4.
Further, the separation part 23 is removed except for the part of the side wall 3 that is caught in the concrete.
The outer guide wall 7a is left on the ground G as it is.
And simultaneously with this main body roof installation process, the inner tank construction which installs a cold insulating material and a membrane in the inner peripheral side of the side wall 3 is performed. Finally, the roof 24 is closed by applying the cold insulation material 16 and the roof material 17 to the opening 24 for construction, and the main body roof 4 is completed.

(盛土工程)
続いて、図1に戻り、側壁3の上部側外周の盛土を行う。
また、盛土工程において、側部ヒーター8の設置を行う。
このとき、側壁3の外周面が地中に埋設されるように、側壁3の上端部3a付近の高さまで盛土を行う。図1において、盛土された地盤GをGcと示す
この盛土に使用する土砂は、内部掘削工程で掘削されたの土砂とすることが好ましい。このように、内部掘削工程で掘削されたの土砂を盛土に使用することで、内部掘削工程において生じた土砂の処分量を削減することができる。
また、このとき、外側ガイドウォール7aと地中連続壁5と側壁3とが一体となっていれば、外側ガイドウォール7a上部の盛土と外側ガイドウォール7aと地中連続壁5の重量を、地下タンク1の重量として見込むことが可能となる。
なお、この盛土工程は、本体屋根設置工程と並行して行ってもよい。
(Filling process)
Subsequently, returning to FIG. 1, embankment of the outer periphery on the upper side of the side wall 3 is performed.
Moreover, the side heater 8 is installed in the embankment process.
At this time, embankment is performed to the height near the upper end 3a of the side wall 3 so that the outer peripheral surface of the side wall 3 is buried in the ground. In FIG. 1, the ground G that has been embanked is denoted as Gc. The earth and sand used for this embankment is preferably the earth and sand excavated in the internal excavation process. In this way, by using the earth and sand excavated in the internal excavation process as the embankment, it is possible to reduce the amount of sediment generated in the internal excavation process.
At this time, if the outer guide wall 7a, the underground continuous wall 5 and the side wall 3 are integrated, the embankment above the outer guide wall 7a and the weight of the outer guide wall 7a and the underground continuous wall 5 are It can be estimated as the weight of the tank 1.
In addition, you may perform this embankment process in parallel with a main body roof installation process.

第1実施形態による地下タンク1の施工方法によれば、内部掘削工程、底版構築工程および側壁構築工程を、屋根21がある状態で行うことができるため、天候に左右されず、工期短縮を図ることができると共に、コストを削減することができる。
また、底版2や側壁3のコンクリート打設などに降雨の影響がないため、地下タンク1の品質を向上することができる。
また、本体屋根4となる屋根21の組み立てを地盤G上で行うため、作業性および安全性を向上させることができる。
また、側壁3を構築した後に屋根部22を上昇させていることにより、屋根部22の上昇作業の効率をあげることができる。
According to the construction method of the underground tank 1 according to the first embodiment, the internal excavation process, the bottom slab construction process, and the side wall construction process can be performed in a state where the roof 21 is present, so that the construction period is shortened regardless of the weather. And cost can be reduced.
Moreover, since there is no influence of rainfall on the concrete placement of the bottom plate 2 and the side wall 3, the quality of the underground tank 1 can be improved.
In addition, since the roof 21 to be the main body roof 4 is assembled on the ground G, workability and safety can be improved.
Moreover, the efficiency of the raising operation | work of the roof part 22 can be raised by raising the roof part 22 after constructing | assembling the side wall 3. FIG.

以上、本発明による地下タンクの施工方法の実施形態について説明したが、本発明は上記の実施形態に限定されるものではなく、その趣旨を逸脱しない範囲で適宜変更可能である。
例えば、上述した実施形態では、地盤Gの表層部Gbを盤下げ掘削して、表層部Gbが掘削された地盤Gに屋根21を設置しているが、地盤Gの表層部Gbを掘削せずに仮設屋根21を設置してもよい。
また、上述した実施形態では、地下タンク1が構築される地盤Gの周囲の地盤Gを地盤改良しているが、地盤改良は行わなくてもよい。
また、上述した実施形態では、屋根部22を上昇させる際にジャッキを使用しているが、ジャッキに代わって、屋根部22の周辺に複数のクレーンを設置して、複数のクレーンで屋根4を吊って上昇させてもよい。
As mentioned above, although embodiment of the construction method of the underground tank by this invention was described, this invention is not limited to said embodiment, In the range which does not deviate from the meaning, it can change suitably.
For example, in the embodiment described above, the surface layer Gb of the ground G is excavated and the roof 21 is installed on the ground G from which the surface layer Gb is excavated, but the surface layer Gb of the ground G is not excavated. A temporary roof 21 may be installed on the roof.
In the above-described embodiment, the ground G around the ground G where the underground tank 1 is built is improved, but the ground may not be improved.
Moreover, in embodiment mentioned above, although the jack is used when raising the roof part 22, instead of a jack, a several crane is installed in the periphery of the roof part 22, and the roof 4 is covered with a some crane. It may be hung and raised.

また、上述した実施の形態では、側壁構築工程で側壁が構築された後に、屋根部を上昇させて側壁の上端部に固定しているが、側壁構築工程を側壁3の地盤G面よりも下方の下部側を構築する第1側壁構築工程と、第1側壁構築工程の後の側壁3の地盤G面よりも上方の上部側を構築する第2側壁構築工程とに分け、第1側壁構築工程がほぼ完了した後に、本体屋根設置工程の屋根21を上昇させて仮設する工程を行ってもよい。   In the above-described embodiment, after the side wall is constructed in the side wall construction process, the roof portion is raised and fixed to the upper end of the side wall, but the side wall construction process is performed below the ground G surface of the side wall 3. The first side wall construction step is divided into a first side wall construction step of constructing the lower side of the first side wall construction step and a second side wall construction step of constructing the upper side above the ground G surface of the side wall 3 after the first side wall construction step After the step is almost completed, a step of temporarily raising the roof 21 in the main body roof installation step may be performed.

この本体屋根設置工程の屋根21を上昇させて仮設する工程は、第2側壁構築工程による側壁の打ち上がりと共に順次屋根21を上昇させ、その高さ毎に仮設してもよいし、第1側壁構築工程の後に、一気に側壁3の上端部の上側の高さまで上昇させて仮設してもよい。
このようにすることによって、分離部23を側壁3のコンクリート中に巻き込むことがなくなるため、側壁3の型枠や鉄筋に細工をする必要がなく効率的に側壁を構築することができる。
また、第2側壁構築工程においても、常に屋根がある状態で工事を行うことができるため、全工程を天候に左右されずに行うことができる。
The step of raising the roof 21 in the main body roof installation step to temporarily install the roof 21 may be sequentially raised along with the rise of the side wall in the second side wall construction step, and may be temporarily installed at each height. After the construction process, it may be temporarily set up to the height above the upper end of the side wall 3.
By doing in this way, since the separation part 23 is not caught in the concrete of the side wall 3, it is not necessary to work on the formwork or the reinforcing bar of the side wall 3, and the side wall can be constructed efficiently.
In the second side wall construction process, the construction can always be performed with a roof, so that the entire process can be performed regardless of the weather.

この場合の屋根21を順次上昇させる工程の一例について説明する。
第1側壁構築工程が完了した後に、まず、屋根21の分離部23と外側ガイドウォール7aとの連結を切る。このとき、屋根部22と分離部23とは連結されている。
そして、屋根21をジャッキやクレーンなどで所定の高さに上昇させ、この高さにスペーサなどの支持材で保持する。続いて、屋根21の下側の高さまで側壁3を構築し、更に高い位置へ屋根21を上昇させ、その高さに保持する。そして、屋根21の上昇と側壁3の構築を交互に行い、側壁3が完成したら、屋根21から分離部23を分離させて屋根部22を側壁3の上端部に設置された屋根固定装置26に固定する。
An example of the process of sequentially raising the roof 21 in this case will be described.
After the first side wall construction process is completed, first, the separation part 23 of the roof 21 and the outer guide wall 7a are disconnected. At this time, the roof portion 22 and the separation portion 23 are connected.
Then, the roof 21 is raised to a predetermined height by a jack, a crane, or the like, and held at this height by a support member such as a spacer. Subsequently, the side wall 3 is constructed to a height below the roof 21, and the roof 21 is raised to a higher position and held at that height. Then, the rising of the roof 21 and the construction of the side wall 3 are alternately performed. When the side wall 3 is completed, the separation part 23 is separated from the roof 21 and the roof part 22 is installed on the roof fixing device 26 installed at the upper end of the side wall 3. Fix it.

屋根21の順次上昇させる他の方法としては、平面視円形状の屋根21の外周の周方向所定間隔で、側壁3の高さよりも高い複数の仮設柱状構造物を地盤上に立設し、この仮設柱状構造物の頂部と分離部23あるいは屋根部22との間をワイヤなどの引っ張り材で連結し、この引張材を順次引き上げることで屋根を上昇させてもよい。   As another method of sequentially raising the roof 21, a plurality of temporary columnar structures higher than the height of the side wall 3 are erected on the ground at predetermined intervals in the circumferential direction of the outer periphery of the circular roof 21 in plan view. The top of the temporary columnar structure and the separation part 23 or the roof part 22 may be connected by a pulling material such as a wire, and the tensile material may be pulled up sequentially to raise the roof.

なお、上記の順次上昇の仮設柱状構造物を用いる他の方法においては、順次上昇でなくてもよい。つまり、屋根21を側壁3の上端よりも若干高い位置まで一気に上昇させることも可能である。このようにすれば、屋根上昇させる工程と第2側壁構築工程という異なる工種間の複数にわたる調整を避けることができる。   In addition, in the other method using the above-mentioned temporary rising temporary columnar structure, it does not need to be sequentially increased. That is, it is possible to raise the roof 21 at a stretch to a position slightly higher than the upper end of the side wall 3. In this way, it is possible to avoid a plurality of adjustments between different types of work, that is, the step of raising the roof and the second side wall construction step.

また、上記の実施の形態では、側壁3の内周側に保冷材とメンブレンとからなる内槽の工事は、側壁3の施工が完了した後に着手するようにしている。しかし、更に工程短縮を図るためには、側壁3のコンクリートがある程度打ち上がったら、底版2での内槽工事に着手すること、さらには、側壁3のコンクリートの打ちあがりに伴って、その下方で側壁3部分の内槽工事を施工することも考えられる。この場合、側壁工事と内槽工事とが上下作業とならないように、平面視における施工箇所を異なるようにしたり、上下作業となる場合には側壁工事と内槽工事との間に防護材を設けたりするなどの安全上の配慮が必要と考えられる。   Moreover, in said embodiment, the construction of the inner tank which consists of a cold insulating material and a membrane on the inner peripheral side of the side wall 3 is started after the construction of the side wall 3 is completed. However, in order to further shorten the process, when the concrete on the side wall 3 is launched to a certain extent, the construction of the inner tub on the bottom plate 2 is started, and further, as the concrete on the side wall 3 is driven, It is also conceivable to construct an inner tank for the three side walls. In this case, in order to prevent the side wall work and the inner tank work from being up and down work, the construction site in the plan view is different, or in the case of vertical work, a protective material is provided between the side wall work and the inner tank work. It is considered necessary to consider safety such as

1 地下タンク
2 底版
3 側壁
3a 上端部
3b 下端部
4 本体屋根
5 地中連続壁
6 地盤改良体
21 屋根
22 屋根部
23 分離部
24 工事用開口部
27 上昇装置
G 地盤

DESCRIPTION OF SYMBOLS 1 Basement tank 2 Bottom plate 3 Side wall 3a Upper end part 3b Lower end part 4 Main body roof 5 Underground continuous wall 6 Ground improvement body 21 Roof 22 Roof part 23 Separation part 24 Construction opening part 27 Lifting device G Ground

Claims (3)

底版と、
該底版の周囲に沿って構築された側壁と、
該側壁の上部を覆う本体屋根と、を備え、
前記底版と前記側壁とが地中に埋設された地下タンクの施工方法であって、
地盤中に筒状の地中連続壁を構築する地中連続壁構築工程と、
前記本体屋根となる屋根部と該屋根部の外周に該屋根部と分離可能に設けられた分離部とを備えた屋根を地盤上に設置する屋根組立工程と、
前記屋根を設置した後に、前記地中連続壁の内部を掘削する内部掘削工程と、
前記底版を構築する底版構築工程と、
前記側壁を地盤面よりも上方の高さまで構築する側壁構築工程と、
前記屋根部と前記分離部とを分離すると共に、前記屋根部を前記側壁の上端部に固定する本体屋根設置工程と、を備え
前記本体屋根設置工程は、前記側壁構築工程で側壁が構築された後に、前記屋根部を上昇させて前記側壁の上端部に固定することを特徴とする地下タンクの施工方法。
The bottom plate,
Side walls built around the perimeter of the bottom plate,
A main body roof covering the upper part of the side wall,
It is a construction method of an underground tank in which the bottom plate and the side wall are buried in the ground,
Underground continuous wall construction process of constructing a cylindrical underground continuous wall in the ground,
A roof assembling step of installing on the ground a roof provided with a roof part to be the main body roof and a separation part provided on the outer periphery of the roof part so as to be separable from the roof part;
After installing the roof, an internal excavation process for excavating the interior of the underground continuous wall;
A bottom plate construction step of constructing the bottom plate;
A side wall construction step of constructing the side wall to a height above the ground surface;
A main body roof installation step for separating the roof portion and the separation portion and fixing the roof portion to an upper end portion of the side wall , and
In the main body roof installation process, after the side wall is constructed in the side wall construction process, the roof part is raised and fixed to the upper end part of the side wall .
底版と、
該底版の周囲に沿って構築された側壁と、
該側壁の上部を覆う本体屋根と、を備え、
前記底版と前記側壁とが地中に埋設された地下タンクの施工方法であって、
地盤中に筒状の地中連続壁を構築する地中連続壁構築工程と、
前記本体屋根となる屋根部と該屋根部の外周に該屋根部と分離可能に設けられた分離部とを備えた屋根を地盤上に設置する屋根組立工程と、
前記屋根を設置した後に、前記地中連続壁の内部を掘削する内部掘削工程と、
前記底版を構築する底版構築工程と、
前記側壁を地盤面よりも上方の高さまで構築する側壁構築工程と、
前記屋根部と前記分離部とを分離すると共に、前記屋根部を前記側壁の上端部に固定する本体屋根設置工程と、を備え、
前記側壁構築工程は、前記側壁の地盤面よりも下部側を構築する第1側壁構築工程と、該第1側壁構築工程の後の前記側壁の地盤面よりも上部側を構築する第2側壁構築工程と、を備え、
前記本体屋根設置工程では、第1側壁構築工程と第2側壁構築工程との間に、前記屋根を上昇させて前記側壁の上端部よりも上側に仮設し、前記第2側壁構築工程の後に、前記屋根部と前記分離部とを分離すると共に、前記屋根部を前記側壁の上端部に固定することを特徴とする地下タンクの施工方法。
The bottom plate,
Side walls built around the perimeter of the bottom plate,
A main body roof covering the upper part of the side wall,
It is a construction method of an underground tank in which the bottom plate and the side wall are buried in the ground,
Underground continuous wall construction process of constructing a cylindrical underground continuous wall in the ground,
A roof assembling step of installing on the ground a roof provided with a roof part to be the main body roof and a separation part provided on the outer periphery of the roof part so as to be separable from the roof part;
After installing the roof, an internal excavation process for excavating the interior of the underground continuous wall;
A bottom plate construction step of constructing the bottom plate;
A side wall construction step of constructing the side wall to a height above the ground surface;
A main body roof installation step for separating the roof portion and the separation portion and fixing the roof portion to an upper end portion of the side wall, and
The side wall construction step includes a first side wall construction step of constructing a lower side than the ground surface of the side wall, and a second side wall construction of constructing an upper side from the ground surface of the side wall after the first side wall construction step. A process,
In the main body roof installation step, between the first side wall construction step and the second side wall construction step, the roof is raised and temporarily installed above the upper end portion of the side wall, and after the second side wall construction step, while separating the separation unit and the roof unit, the construction method of the underground tank you characterized by securing the roof portion to an upper end of the side wall.
底版と、
該底版の周囲に沿って構築された側壁と、
該側壁の上部を覆う本体屋根と、を備え、
前記底版と前記側壁とが地中に埋設された地下タンクの施工方法であって、
地盤中に筒状の地中連続壁を構築する地中連続壁構築工程と、
前記本体屋根となる屋根部と該屋根部の外周に該屋根部と分離可能に設けられた分離部とを備えた屋根を地盤上に設置する屋根組立工程と、
前記屋根を設置した後に、前記地中連続壁の内部を掘削する内部掘削工程と、
前記底版を構築する底版構築工程と、
前記側壁を地盤面よりも上方の高さまで構築する側壁構築工程と、
前記屋根部と前記分離部とを分離すると共に、前記屋根部を前記側壁の上端部に固定する本体屋根設置工程と、を備え、
前記側壁構築工程は、前記側壁の地盤面よりも下部側を構築する第1側壁構築工程と、該第1側壁構築工程の後の前記側壁の地盤面よりも上部側を構築する第2側壁構築工程と、を備え、
前記第2側壁構築工程では、前記側壁を下方から上方へ段階的に構築し、
前記本体屋根設置工程では、前記第2側壁構築工程の段階毎に前記屋根を上昇させて直後の段階で構築される前記側壁の上端部よりも上側に仮設し、前記第2側壁構築工程の後に、前記屋根部と前記分離部とを分離すると共に、前記屋根部を前記側壁の上端部に固定することを特徴とする地下タンクの施工方法。
The bottom plate,
Side walls built around the perimeter of the bottom plate,
A main body roof covering the upper part of the side wall,
It is a construction method of an underground tank in which the bottom plate and the side wall are buried in the ground,
Underground continuous wall construction process of constructing a cylindrical underground continuous wall in the ground,
A roof assembling step of installing on the ground a roof provided with a roof part to be the main body roof and a separation part provided on the outer periphery of the roof part so as to be separable from the roof part;
After installing the roof, an internal excavation process for excavating the interior of the underground continuous wall;
A bottom plate construction step of constructing the bottom plate;
A side wall construction step of constructing the side wall to a height above the ground surface;
A main body roof installation step for separating the roof portion and the separation portion and fixing the roof portion to an upper end portion of the side wall, and
The side wall construction step includes a first side wall construction step of constructing a lower side than the ground surface of the side wall, and a second side wall construction of constructing an upper side from the ground surface of the side wall after the first side wall construction step. A process,
In the second side wall construction step, the side wall is constructed stepwise from below to above,
In the main body roof installation process, the roof is raised for each stage of the second side wall construction process, temporarily installed above the upper end of the side wall constructed in the stage immediately after, and after the second side wall construction process , together with separating the said roof portion the separation unit, the construction method of the underground tank you characterized by securing the roof portion to an upper end of the side wall.
JP2010143781A 2010-06-24 2010-06-24 Construction method of underground tank Expired - Fee Related JP5207086B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010143781A JP5207086B2 (en) 2010-06-24 2010-06-24 Construction method of underground tank

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010143781A JP5207086B2 (en) 2010-06-24 2010-06-24 Construction method of underground tank

Publications (2)

Publication Number Publication Date
JP2012007371A JP2012007371A (en) 2012-01-12
JP5207086B2 true JP5207086B2 (en) 2013-06-12

Family

ID=45538211

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010143781A Expired - Fee Related JP5207086B2 (en) 2010-06-24 2010-06-24 Construction method of underground tank

Country Status (1)

Country Link
JP (1) JP5207086B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6374736B2 (en) * 2014-09-17 2018-08-15 大成建設株式会社 Underground structure and construction method of underground structure
CN114351675A (en) * 2022-01-14 2022-04-15 江苏盐城水利建设有限公司 Heat-insulation construction method for lock chamber wall of integrally combined large steel mould ship lock

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5827384B2 (en) * 1979-11-06 1983-06-09 川崎重工業株式会社 Construction method of underground tank
JP3435611B2 (en) * 1994-04-15 2003-08-11 大成建設株式会社 How to build an underground storage tank
JP2000087371A (en) * 1998-09-11 2000-03-28 Kumagai Gumi Co Ltd Execution of underground tank

Also Published As

Publication number Publication date
JP2012007371A (en) 2012-01-12

Similar Documents

Publication Publication Date Title
KR101341679B1 (en) Device for constructing an underground structure and method thereof
JP2010106501A (en) Construction method of low-temperature storage tank
KR100967497B1 (en) Method for constructing an underground structure
KR101044441B1 (en) Reverse construction method of underground structure
JP5937488B2 (en) Temporary support method for foundation
KR101646027B1 (en) Installation Method and Structure of PC House for Pile-Cap
JP2015036493A (en) Method for constructing underground storage tank
KR20160000702A (en) Fastening member used in concrete filled steel tube and its using concrete filled steel tube mounting structure and method and its includes build underground structure and method
JP5207086B2 (en) Construction method of underground tank
JP5038170B2 (en) How to rebuild a structure
JP5131645B2 (en) Construction method of steel tower foundation
KR20140058951A (en) Caisson tube water-tight structure and under water structure construction method for soft ground
EP2553176B1 (en) Seismic insulating structure for existing buildings
KR101296856B1 (en) Reinforcement structure for wall of underground structure and construction method of underground structure using the same
JP2010126900A (en) Construction method for mounting base-isolating device
JP6418683B2 (en) Temporary support method
JP5223701B2 (en) Construction method of side wall of underground tank structure
KR100967496B1 (en) Device for constructing an underground structure
JP4475116B2 (en) Vertical shaft structure and its construction method
JP2012036661A (en) Method for constructing underground tank
KR102174966B1 (en) Foundation structure of air dome in waste landfill site and construction method thereof
AU2020100004A4 (en) A Method Of Constructing A Column, A Subterranean Structure, And A Structure Made From The Method
KR101154623B1 (en) Device for constructing pier in the water and pier constructing method using the same
KR101077242B1 (en) Construction method of basement structure using retaining wall and steel column
JP6534026B2 (en) Seismic isolation building and its construction method

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20120424

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120925

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20121109

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130115

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130206

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160301

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees