Construction method of underground tankInfo
- Publication number
- JPS5827384B2 JPS5827384B2 JP54142774A JP14277479A JPS5827384B2 JP S5827384 B2 JPS5827384 B2 JP S5827384B2 JP 54142774 A JP54142774 A JP 54142774A JP 14277479 A JP14277479 A JP 14277479A JP S5827384 B2 JPS5827384 B2 JP S5827384B2
- Authority
- JP
- Japan
- Prior art keywords
- roof
- tank
- construction
- constructed
- constructing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Description
【発明の詳細な説明】
開示技術はメンブレンL′MGタンク等の地下タンクの
施工に際し屋根を先行施工して該屋根下において高能率
にタンク施工を行う技術分野に属する。DETAILED DESCRIPTION OF THE INVENTION The disclosed technology belongs to the technical field of constructing an underground tank such as a membrane L'MG tank by first constructing a roof and then constructing the tank under the roof with high efficiency.
而して、この発明は地盤に対して地下水比氷壁の施工後
ドーム屋根等の屋根を先行施工し、次いで地盤掘削及び
コンクリート工事の後コンクリート側壁、底版を施工す
るようにした方法に関する発明であり、特に、地下水止
水壁施工後設定地盤上に仮支持体を設立し、該支持体上
に屋根をまず先行施工組立し、該屋根の施工着工後、或
は、完成後その下部にて掘削等の土木工事を行い、又、
該掘削穴部に配筋、コンクリート打設等を行いコンクリ
ート側壁、底版を形成させ、該底版の形成、或は、タン
ク本体施工々事に前後してコンクリート側壁上に前記屋
根を仮支持体から持ち代えて載置組付けしタンク完成す
るようにした地下タンクの施工法に係る発明である。Therefore, this invention relates to a method in which a roof such as a dome roof is constructed in advance after construction of a groundwater ice wall on the ground, and then concrete side walls and bottom slab are constructed after ground excavation and concrete work. In particular, after constructing a groundwater cut-off wall, a temporary support is established on the ground, a roof is first constructed and assembled on the support, and excavation is carried out under the roof after the construction of the roof starts or after completion. We carry out civil engineering works such as
Reinforcement is placed in the excavated hole, concrete is placed, etc. to form a concrete side wall and a bottom slab, and the roof is placed on the concrete side wall from a temporary support before and after forming the bottom slab, or before and after construction of the tank body. This invention relates to a method of constructing an underground tank in which the tank is completed by mounting and assembling the tank in turn.
周知の如く、近時エネルギー需要の拡大、備蓄増強等の
見地から石油タンク、LNG等貯蔵タンクが建造される
様になり、しかも、次第にその容量が大型化される傾向
にある。As is well known, oil tanks, LNG storage tanks, etc. have recently been constructed from the viewpoint of expanding energy demand and increasing stockpiles, and their capacities are gradually increasing.
而して、核種タンクは近時の公害、防災、景観等の観点
に於て地下タンクが多く設計、建造される様になって来
ている。In view of pollution, disaster prevention, landscape, etc., many underground nuclide tanks are now being designed and constructed.
そして、地下タンクの建造に於ては一般に設定地盤に対
して強度板式であれ、揚水式であれ、地下水比氷壁の施
工後オープンカットで止水壁内の掘削を行い、その後配
筋、コンクリート打設等の施工を行ってコンクリート躯
体の施工を行い、次いでドーム屋根、及び、本体等の工
事を行う様にされて来た。In general, when constructing an underground tank, whether it is a strength plate type or a pumped type, the underground tank is constructed by excavating the inside of the cutoff wall using an open cut after constructing the groundwater ice wall, and then reinforcing and concrete pouring. After constructing the facilities, the concrete frame was constructed, and then the dome roof, main body, etc. were constructed.
さりながら、上記在来工法に於ては屋根施工が後工程の
工事になるため、それまでの土木工事及び一部のタンク
本体工事がオープンタイプで行われ、従って、風雨に曝
された状態の基で諸作業が行われ、作業能率が極めて悪
い欠点があり、その上危険性もある不利点があった。However, in the conventional construction method mentioned above, the roof construction is a post-process work, so the civil engineering work and some of the tank body work up to that point were done in an open type, and therefore the tank was exposed to the wind and rain. Various works were carried out at the base, which had the disadvantage of extremely low work efficiency and was also dangerous.
更に、タンクが大型になると掘削、タンク躯体のコンク
リート打設に伴う機材搬入等に於て足場等が上部に欠除
されているため、しばしば搬出入が困難である難点があ
った。Furthermore, as the tank becomes larger, it is often difficult to carry in and out of the tank due to the lack of scaffolding at the top when carrying in equipment for excavation and concrete pouring of the tank body.
この発明の目的は上述在来技術に基づく地下タンク施工
の問題点を解決すべき技術的課題とし、設定地盤に対し
て地下水比氷壁を施工し、しかも、先行施工の屋根の下
でタンク穴の掘削が風雨の影響を受けずに行われ、タン
クに対する土木、建設工事がスムーズに施工計画通りに
行えるようにして貯蔵産業におけるタンク利用分野に益
する優れた地下タンクの施工法を提供せんとするもので
ある。The purpose of this invention is to solve the problems of underground tank construction based on the above-mentioned conventional technology, and to construct a groundwater ice wall on the ground where the tank hole is constructed under the roof of the previous construction. To provide an excellent underground tank construction method that benefits the field of tank use in the storage industry by allowing excavation to be carried out without being affected by wind and rain, and by allowing civil engineering and construction work for the tank to be carried out smoothly and according to the construction plan. It is something.
上述目的に沿うこの発明の構成は前述問題点を解決する
ために設定地盤に対してこれまでとは逆に地下水止水連
続壁の施工後予め、該設定地盤上に設立した仮支持体に
対して屋根を本屋根、或は、該本屋根及びその周囲の仮
屋根を載置先行施工し、該屋根の下部で地盤掘削、配筋
、コンクリート打設等を行い、その間機材振出人、排土
等は上記仮支持体開口部及び上記屋根を足場として機能
的に行い、風雨を遮蔽すると共に地盤側壁からの地下水
を遮断して高効率裡に作原を進め、コンクリート側壁及
び底版、及び、タンク本体を形成し、側壁上に前記本屋
根を持ち代える様にし、タンクを完成することが出来る
ようにした技術的手段を講じたことを要旨とするもので
ある。In order to solve the above-mentioned problems, the structure of the present invention in accordance with the above-mentioned purpose is that, contrary to the conventional method, after the construction of a continuous underground water-stopping wall, a temporary support that has been established on the ground is constructed. The roof will be constructed in advance by installing the permanent roof, or the permanent roof and a temporary roof around it, and excavating the ground, placing reinforcement, placing concrete, etc. under the roof, and in the meantime, the equipment operator and soil removal The opening of the temporary support and the roof are used as scaffolding to function as a foothold, shielding from wind and rain and blocking groundwater from the side wall of the ground, allowing construction to proceed with high efficiency. The gist of this invention is to take technical measures that enable the tank to be completed by forming the main body and replacing the main roof on the side walls.
次にこの発明のメンブレン式地下タンクの場合の実施例
を図面にしたがって説明すれば以下の通りである。Next, an embodiment of a membrane type underground tank according to the present invention will be described below with reference to the drawings.
第1図に示す様に、設定構築予定地の地盤1に対し第2
図の如く地下水止水のための止水壁としての連続地中壁
Cを施工し、設計タンク外径より設定径だけ大きい円の
周に沿って適宜基礎2,2・・・を設け、該基礎2,2
・・・上に支持体としての支柱3.3・・・を設立し、
その状態で第3図に示す様に該支柱3,3・・・を足場
に利用してドーム屋根4を先行施工裡に構築する。As shown in Figure 1, the ground 1 of the planned construction site is
As shown in the figure, a continuous underground wall C is constructed as a water stop wall to stop underground water, and foundations 2, 2, etc. are installed as appropriate along the circumference of a circle that is larger than the design tank outer diameter by a set diameter. Basics 2, 2
Establish a pillar 3.3 as a support on top of...
In this state, as shown in FIG. 3, the dome roof 4 is constructed during the preliminary construction using the pillars 3, 3, . . . as scaffolding.
而して、該屋根4はタンク上に完成時に載置される本屋
根4′とその外縁仮屋根4“とに組合わされ、該仮屋根
4“は該本屋根4′に対し後工程で取外し可能に施工さ
れるものである。Thus, the roof 4 is combined with the main roof 4' which is placed on the tank when completed, and its outer edge temporary roof 4", and the temporary roof 4" is removed from the main roof 4' in a subsequent process. It is possible to construct it.
したがって、該屋根4の支柱3,3・・・に上置組付構
築された状態に於ては図示する様に支柱3゜3・・・間
に間隙開口部5,5・・・が形成され、次工程に於ける
機材搬出入口及び排土口に用いられる。Therefore, when the roof 4 is mounted on the pillars 3, 3, and constructed, gap openings 5, 5, and so on are formed between the pillars 3 and 3, as shown in the figure. It is used as the entrance for carrying in and out of equipment and the opening for discharging soil in the next process.
このようにして屋根4がカバー構築されると該開口部5
,5・・・から所定機材を搬入し、該屋根4の下部の地
盤1に対し該屋根4と同心裡に設定径のタンク穴6を地
盤1側壁からの地下水を遮断して掘削し、その掘削土砂
は該屋根4の骨組7,7・・・を用いて適宜ウィンチ、
チルホイール等8を介し、ワイヤ等の治具9にて上記開
口5,5・・・より糸外に排土する。When the roof 4 is covered in this way, the opening 5
, 5..., and excavate a tank hole 6 of a set diameter in the ground 1 under the roof 4 concentrically with the roof 4, blocking groundwater from the side wall of the ground 1. The excavated earth and sand can be excavated using a winch or
The soil is removed from the openings 5, 5, .
この問屋根4にカバーされて施工は風雨に何ら影響され
ない。Covered by the roof 4, the construction will not be affected by wind and rain.
そして、該タンク穴6の掘削に併工して第5図に示す様
に配筋10を行うと共に型枠11を吊込んでコンクリー
トを打設し側壁12を形成していく。At the same time as the tank hole 6 is excavated, reinforcing bars 10 are placed as shown in FIG. 5, and the formwork 11 is suspended and concrete is poured to form the side wall 12.
尚、該側壁12形成プロセスに於て掘削との施工条件に
よりコンクリート打設については逆巻施工でも順巻施工
でも適宜採用可能である。In addition, in the process of forming the side wall 12, depending on the excavation and construction conditions, either reverse winding construction or forward winding construction can be adopted as appropriate for concrete pouring.
このようにして側壁12が所定に形成され機材を搬出す
ると共に底版13が形成される前後に於て適宜施工の設
計に基づいて第6図に示す様に側壁12上端から支持側
板14を上置して設け、上記屋根4の本屋根4′の外端
に下から固定すると共に仮屋根4“を取外し、前記支柱
3,3・・・と共に適宜撤去することによりタンク躯体
Aが形成完了される。In this way, the side wall 12 is formed in a predetermined manner and the equipment is carried out. Before and after the bottom plate 13 is formed, the support side plate 14 is placed on top of the upper end of the side wall 12 as shown in FIG. 6 based on the construction design. The formation of the tank frame A is completed by fixing it to the outer end of the main roof 4' of the roof 4 from below, removing the temporary roof 4'', and removing it together with the pillars 3, 3, etc. as appropriate. .
尚、上述プロセスにおいて屋根4′の仮支持体3からタ
ンク側壁12に持ち代えるに支持側板14を省略して置
設側壁12上端に持ち代えるようにしても良い。In the above-described process, when the temporary support 3 of the roof 4' is transferred to the tank side wall 12, the support side plate 14 may be omitted and transferred to the upper end of the installation side wall 12.
又、上述プロセスにおいて、仮支持体を高目にして施工
中の屋根位置を機材搬入、及び、工事に有利な様に図り
、完成時にジヤツキ等により屋根を低下させてもよい。Further, in the above process, the temporary support may be made higher to position the roof during construction to be advantageous for carrying in equipment and construction work, and upon completion, the roof may be lowered by jacking or the like.
このようにしてコンクリート躯体Aの施工が終了すると
第7図に示す様に側壁12、底版13に保冷材15、メ
ンブレン16等を添設させ屋根4′からデツキプレート
17を吊下させ保冷材18等の工事を行いタンク本体B
の工事を完了する。When the construction of the concrete frame A is completed in this way, as shown in FIG. Tank body B
construction work will be completed.
尚、この発明の実施態様は上述実施例に限るものでない
ことは勿論であり、種々の態様が採用可能である。It goes without saying that the embodiments of the present invention are not limited to the above-mentioned embodiments, and various embodiments can be adopted.
又、タンク本体工事の施工後仮屋根4“を除去すること
も可能である。Furthermore, it is also possible to remove the temporary roof 4'' after construction of the tank body.
そして、対象地下タンクもLNGメンブレンタンクに限
ることなく、屋根付一般地下タンクに適用可能であるこ
とも勿論である。It goes without saying that the target underground tank is not limited to an LNG membrane tank, but can also be applied to a general underground tank with a roof.
以上前述のこの発明によれば、地下タンクの施工法に於
て、まず、設定地盤に対して地下水火氷壁を施工し、次
いで地盤面に仮支持体を設立し、該仮支持体に対して屋
根を先行施工するようにしたことにより、該屋根の施工
が極めて行い易くしかも安全に高能率裡に行える優れた
効果があり、しかも、該屋根の建造が速やかに出来るた
めタンク建造に於ける工期短縮が連がるメリットもある
6又、該仮支持体に対して屋根を設けた後にタンク穴を
その下の地盤に掘削するのでその土木施工及びその後の
配筋、コンクリート打設が風雨の影響を受けずに行え、
それだけ該風雨による障害が無く、その点からもタンク
本体の建造がより能率良く、スムースに出来、施工計画
通りに行える優れた効果がある。According to the invention described above, in the method of constructing an underground tank, first, a groundwater fire and ice wall is constructed on the ground, then a temporary support is established on the ground surface, and the temporary support is By constructing the roof in advance, there is an excellent effect that construction of the roof is extremely easy and can be done safely and efficiently.Moreover, since the roof can be constructed quickly, the construction period for tank construction can be reduced. There is also the advantage of being shortened 6. Also, since the tank hole is excavated in the ground below after the roof is installed on the temporary support, the civil engineering work, subsequent reinforcement arrangement, and concrete pouring will be affected by wind and rain. Do it without receiving
There are no obstacles caused by wind and rain, and from this point of view, the construction of the tank body can be done more efficiently and smoothly, and has the excellent effect of being able to be carried out according to the construction plan.
更に、前記屋根の下でタンクに対する土木、建設工事を
行うことが出来るため該屋根の骨組を利用して機材の吊
込振出人、建材治具の組付、セット、リセットがし易く
、大型クレーン等が不要になり、その点でも作業がし易
い効果がある。Furthermore, since civil engineering and construction work for the tank can be carried out under the roof, the framework of the roof can be used to easily hang equipment, assemble, set, and reset building material jigs, and it is easy to use large cranes. etc. are no longer necessary, which also has the effect of making work easier.
而して、先行施工した屋根は側壁の上部に単に持ち代え
れば良く、特にジヤツキアップ、サイドスライド等を行
うことなく、静置持ち代えで良いので精度修正等を行う
ことも無い優れた効果がある。Therefore, the pre-constructed roof can be simply transferred to the top of the side wall, and it can be replaced without having to jack it up or side slide, which is an excellent effect without having to correct the accuracy. .
加えて、設定地盤に対して予め地下水止水壁を施工して
いることにより、地盤側壁からの地下水がタンク穴に侵
入されることなく遮断され、タンク穴の地盤掘削がスム
ーズに行われるメリットがある。In addition, by constructing a groundwater cut-off wall in advance on the ground, groundwater from the side walls of the ground is blocked without entering the tank hole, which has the advantage of allowing smooth ground excavation for the tank hole. be.
図面はこの発明の実施例を示すものであり、第1〜7図
は1実施例の施工プロセス説明図である。
C・・・・・・地下水止水壁、4・・・・・・屋根、1
2・・・・・・コンクリート壁、13・・・・・・底版
、1・・・・・・地盤、3・・・・・・仮支持体、B・
・・・・・タンク本体。The drawings show an embodiment of the present invention, and FIGS. 1 to 7 are explanatory drawings of the construction process of one embodiment. C...Groundwater cutoff wall, 4...Roof, 1
2... Concrete wall, 13... Bottom plate, 1... Ground, 3... Temporary support, B.
...tank body.
Claims (1)
施工法において、地下水比氷壁を施工後設定地盤上に仮
支持体を設立し該仮支持体上に所定寸法より大きいドー
ム屋根を先行施工し、該先行屋根施工着工より後に該屋
根下にて土木工事及びタンク本体工事のゐ工を行い、該
タンク本体工事に前後して上記ドーム屋根を前記仮支持
体より上記側板上に持ち代えて載置組付けするようにし
たことを特徴とする地下タンクの施工法。1. In the underground tank construction method, which consists of civil engineering work and tank body construction, after constructing the groundwater ice wall, a temporary support is established on the set ground, and a dome roof larger than the specified size is pre-constructed on the temporary support. After the preliminary roof construction begins, civil engineering work and tank body work are carried out under the roof, and before and after the tank body work, the dome roof is transferred from the temporary support to the side plate and placed and assembled. A method of constructing an underground tank characterized by attaching the tank to the tank.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP54142774A JPS5827384B2 (en) | 1979-11-06 | 1979-11-06 | Construction method of underground tank |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP54142774A JPS5827384B2 (en) | 1979-11-06 | 1979-11-06 | Construction method of underground tank |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPS5667062A JPS5667062A (en) | 1981-06-05 |
| JPS5827384B2 true JPS5827384B2 (en) | 1983-06-09 |
Family
ID=15323269
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP54142774A Expired JPS5827384B2 (en) | 1979-11-06 | 1979-11-06 | Construction method of underground tank |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JPS5827384B2 (en) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP5239634B2 (en) * | 2008-08-27 | 2013-07-17 | 株式会社大林組 | Construction method of underground tank structure |
| JP5207086B2 (en) * | 2010-06-24 | 2013-06-12 | 清水建設株式会社 | Construction method of underground tank |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS53131518A (en) * | 1977-04-22 | 1978-11-16 | Kahee Shimomura | Underground storage tank and method of building same |
-
1979
- 1979-11-06 JP JP54142774A patent/JPS5827384B2/en not_active Expired
Also Published As
| Publication number | Publication date |
|---|---|
| JPS5667062A (en) | 1981-06-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107542108B (en) | A reverse construction method of a building basement structure | |
| CN111305218A (en) | Construction method for foundation pit excavation | |
| KR100618597B1 (en) | Cast-in-place concrete pile using inner tube and concrete rise prevention device and construction method | |
| KR20160000702A (en) | Fastening member used in concrete filled steel tube and its using concrete filled steel tube mounting structure and method and its includes build underground structure and method | |
| JP3453664B2 (en) | Shaft construction method | |
| CN104775439A (en) | Foundation pit support and water stop integrated structure and construction method thereof | |
| CN209723033U (en) | Pipe jacking working well applicable to desert waterless sand layer area | |
| CN220365046U (en) | Tower crane foundation structure at post-pouring zone of raft foundation | |
| JPS5827384B2 (en) | Construction method of underground tank | |
| CN111894010A (en) | A foundation pit enclosure structure and construction method based on prefabricated slabs and diagonal braces | |
| JP2001241287A (en) | Construction method of shaft, assembly method of structural body used for construction method, and assembly device used for assembly method | |
| JP2845060B2 (en) | Construction method of underground construction by fully automatic building construction system | |
| JP4475116B2 (en) | Vertical shaft structure and its construction method | |
| JP3091859B2 (en) | Piling method for shafts with openings at the top | |
| JPS58143020A (en) | Slope protection work | |
| CN223481854U (en) | Shaped steel retaining wall node of foundation ditch support and ground connection | |
| CN217811059U (en) | Combined temporary foundation pit supporting structure | |
| CN216616426U (en) | An integrated structure of the outer wall of a deep foundation pit | |
| JP2002188159A (en) | Construction method for underwater structures | |
| CN223458823U (en) | A foundation pit support structure for a pipe gallery section | |
| JPS6335923A (en) | Basement and its construction | |
| JPH0584773B2 (en) | ||
| JPH04194277A (en) | Building demolition method | |
| JPS5841118A (en) | Sheathing and protecting method for long-sized slope | |
| JP2878525B2 (en) | Bridge pier and its construction method |