Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5222085B2 - Earthquake signal processing apparatus and earthquake signal processing method - Google Patents
[go: Go Back, main page]

JP5222085B2 - Earthquake signal processing apparatus and earthquake signal processing method - Google Patents

Earthquake signal processing apparatus and earthquake signal processing method Download PDF

Info

Publication number
JP5222085B2
JP5222085B2 JP2008254223A JP2008254223A JP5222085B2 JP 5222085 B2 JP5222085 B2 JP 5222085B2 JP 2008254223 A JP2008254223 A JP 2008254223A JP 2008254223 A JP2008254223 A JP 2008254223A JP 5222085 B2 JP5222085 B2 JP 5222085B2
Authority
JP
Japan
Prior art keywords
detection signal
wave detection
valve
shut
input
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2008254223A
Other languages
Japanese (ja)
Other versions
JP2010084843A (en
Inventor
尚文 今井
健一郎 稲葉
正明 大貫
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Sanso Holdings Corp
Original Assignee
Nippon Sanso Holdings Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Sanso Holdings Corp filed Critical Nippon Sanso Holdings Corp
Priority to JP2008254223A priority Critical patent/JP5222085B2/en
Publication of JP2010084843A publication Critical patent/JP2010084843A/en
Application granted granted Critical
Publication of JP5222085B2 publication Critical patent/JP5222085B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Measurement Of Mechanical Vibrations Or Ultrasonic Waves (AREA)
  • Geophysics And Detection Of Objects (AREA)
  • Pipeline Systems (AREA)

Description

本発明は、地震の発生に応じてガスの供給を遮断する地震信号処理装置および地震信号処理方法に関する。   The present invention relates to an earthquake signal processing apparatus and an earthquake signal processing method for cutting off gas supply in response to an earthquake.

従来、例えば半導体工場などの工場では、色々な種類のガスが使用されており、地震の発生を検知すると、このようなガスが充填されたボンベの遮断弁を閉じて、ガス流路を遮断するよう制御する技術が提案されている。
例えば、特許文献1には、地震計装置が地震を検知すると、電気信号によりガス流路の遮断弁を閉め、残ガスを大気に放出するように制御する装置が提案されている。
特許文献2には、従来のガス供給システムでは地震計装置がS波(主要動)を検知した後に遮断弁を閉じているために、実際にガスの供給を遮断する前に大きな揺れが発生する危険があることに着目し、S波の前に到達するP波(初期微動)を検知することにより遮断弁を閉じる装置が提案されている。
特許文献3には、検知する地震の震度と、その時点でのガス流量とに応じて、ガス流路に設けられる遮断弁を閉じるか否かを判定し、判定結果に応じて遮断弁を動作させる装置が提案されている。
ところで、このようなボンベからのガス供給を利用する工場では、複数のボンベが収納された収納庫であるシリンダーキャビネットが利用されることが一般的である。このようなシリンダーキャビネットは、窒素ガスによるガスパージ、排気系、耐火構造などの機能を持つ。また、収納庫の外部に設置される操作部を操作することにより、収納されるそれぞれのボンベの遮断弁、ガス供給先への遮断弁、排気のための遮断弁などの開閉を行うことが可能となっている。
実用新案登録第3023274号公報 特開平6−160541号公報 特開平8−329369号公報
Conventionally, various types of gas are used in factories such as semiconductor factories, and when an earthquake is detected, the shutoff valve of the cylinder filled with such gas is closed to shut off the gas flow path. Techniques for such control have been proposed.
For example, Patent Document 1 proposes a device that controls an electric signal to close a shut-off valve of a gas flow path and release residual gas to the atmosphere when the seismometer detects an earthquake.
In Patent Document 2, in the conventional gas supply system, since the seismometer device closes the shut-off valve after detecting the S wave (main motion), a large shaking occurs before the gas supply is actually shut off. Focusing on the danger, there has been proposed a device that closes the shut-off valve by detecting a P wave (initial fine movement) that reaches before the S wave.
In Patent Document 3, it is determined whether or not the shutoff valve provided in the gas flow path is closed according to the seismic intensity of the detected earthquake and the gas flow rate at that time, and the shutoff valve is operated according to the judgment result. There has been proposed a device to be used.
By the way, in a factory that uses such gas supply from a cylinder, a cylinder cabinet that is a storage in which a plurality of cylinders are stored is generally used. Such a cylinder cabinet has functions such as a gas purge with nitrogen gas, an exhaust system, and a fireproof structure. In addition, by operating the operation unit installed outside the storage, it is possible to open and close the shut-off valve for each cylinder stored, the shut-off valve to the gas supply destination, the shut-off valve for exhaust, etc. It has become.
Utility Model Registration No. 3023274 JP-A-6-160541 JP-A-8-329369

しかしながら、特許文献2に示される技術では、P波(初期微動)を検知してガス供給の遮断弁を閉じる構成としているが、地震計装置がP波として検知する振動は微動であるため、地震ではない振動を誤って検知したり、地震の震度の大きさを正確に予測することは困難であったりする場合がある。ここで、ガス流路を遮断した後、ガスの供給を再開してガス流路を復帰させるためには一定の時間が必要であり、また地震の検知が誤りであった場合には排気するガスや置換のための窒素ガスを必要以上に消費することから、P波を検知した時点で一律にガス流路の遮断弁を閉じ、完全に遮断してしまうのは必ずしも効率的とはいえない。そこで、ガス流路は、必要のある場合に、必要のある箇所のみを遮断し、P波の検知が誤りであった場合には速やかな復帰を可能とすることが望ましい。   However, the technique disclosed in Patent Document 2 is configured to detect the P wave (initial fine movement) and close the gas supply shut-off valve. However, the vibration detected by the seismometer device as the P wave is a fine movement. In some cases, it may be difficult to detect vibrations that are not correct, or to accurately predict the magnitude of the earthquake. Here, after shutting off the gas flow path, it takes a certain amount of time to restart the gas supply and return the gas flow path, and if the earthquake is detected incorrectly, the gas to be exhausted Since nitrogen gas for replacement is consumed more than necessary, it is not always efficient to close the gas flow path shut-off valve uniformly and completely shut off when the P wave is detected. Therefore, it is desirable that the gas flow path cuts only the necessary portion when necessary, and enables quick return when the detection of the P wave is incorrect.

本発明は、このような状況に鑑みてなされたもので、ガス供給に影響のある地震を検知した場合には速やかにガス流路を遮断しながらも、地震の検知が誤りであった場合の復帰を速やかに行うことを可能とする地震信号処理装置および地震信号処理方法を提供する。   The present invention has been made in view of such circumstances. When an earthquake that affects gas supply is detected, the gas flow path is shut off quickly, but the detection of the earthquake is incorrect. An earthquake signal processing device and an earthquake signal processing method capable of promptly returning.

上述した課題を解決するために、本発明は、ガスが充填されたボンベから配管を通ってガス供給先にガスが供給されるガス供給システムにおいて、配管からガス供給先へガスを供給または遮断する第1の遮断弁と、ボンベから配管へガスを供給または遮断する第2の遮断弁との開閉を制御する地震信号処理装置であって、地震によるP波が検知されたことを示すP波検知信号と、地震によるS波が検知されたことを示すS波検知信号とが入力される入力部と、入力部からP波検知信号が入力されると、第1の遮断弁を閉じてガスの供給を遮断する第1の遮断制御部と、入力部からS波検知信号が入力されると、第2の遮断弁を閉じてガスの供給を遮断する第2の遮断制御部と、入力部にP波検知信号が入力され、第1の遮断制御部によって第1の遮断弁が閉じられた後に入力部にS波検知信号が入力されない場合、閉じられた第1の遮断弁を開けてガスの供給を復帰させる復帰制御部と、を備えることを特徴とする。   In order to solve the above-described problem, the present invention supplies or blocks gas from a pipe to a gas supply destination in a gas supply system in which gas is supplied from a cylinder filled with gas to the gas supply destination through the pipe. A seismic signal processing apparatus for controlling opening and closing of a first shutoff valve and a second shutoff valve for supplying or shutting off gas from a cylinder to a pipe, and detecting a P wave due to an earthquake When a signal and an S wave detection signal indicating that an S wave due to an earthquake has been detected are input, and when a P wave detection signal is input from the input section, the first shut-off valve is closed and the gas A first shut-off control unit that shuts off the supply, a second shut-off control unit that shuts off the gas supply by closing the second shut-off valve when an S-wave detection signal is input from the input unit, and an input unit A P-wave detection signal is input, and the first cutoff control unit If the shut-off valve is not S-wave detection signal to the input unit after being closed input, characterized in that it comprises a return control unit for returning the supply of gas by opening the first shut-off valve closed, the.

また、本発明は、上述の地震信号処理装置が、複数のボンベに対応する第1の遮断弁および第2の遮断弁に接続され、複数のボンベのそれぞれに充填されるガスの種類に対応付けて、P波検知信号が入力された後にガスの種類に対応する第1の遮断弁を閉じるまでの猶予秒数が記憶される記憶部と、をさらに備え、第1の遮断制御部は、入力部からP波検知信号が入力されると、ボンベに充填されたガスの種類に対応する猶予秒数を記憶部から読み出し、読み出した猶予秒数の時間が経過した後、第1の遮断弁を遮断することを特徴とする。   Further, according to the present invention, the above-described seismic signal processing apparatus is connected to the first cutoff valve and the second cutoff valve corresponding to the plurality of cylinders, and is associated with the type of gas filled in each of the plurality of cylinders. And a storage unit for storing a number of grace seconds until the first cutoff valve corresponding to the type of gas is closed after the P-wave detection signal is input. When a P-wave detection signal is input from the unit, the number of grace seconds corresponding to the type of gas charged in the cylinder is read from the storage unit, and after the time of the read grace time has elapsed, the first shut-off valve is turned on. It is characterized by blocking.

また、本発明は、上述の記憶部には、予め定められた設定震度が記憶され、第1の遮断制御部は、入力されるP波検知信号に基づく地震の予測震度と、記憶部に記憶された設定震度とを比較し、予測震度が設定震度を超える場合、第1の遮断弁を遮断することを特徴とする。   Further, in the present invention, a predetermined set seismic intensity is stored in the storage unit described above, and the first cutoff control unit stores the predicted seismic intensity of the earthquake based on the input P wave detection signal and the storage unit. The set seismic intensity is compared, and when the predicted seismic intensity exceeds the set seismic intensity, the first shut-off valve is shut off.

また、本発明は、上述の記憶部には、地震が到達する前に遮断弁を閉じる余裕時間を示す設定予想秒数が予め記憶され、第1の遮断制御部は、入力されるP波検知信号に応じた地震が到達するまでの到達予想秒数と、記憶部に記憶された設定予想秒数とを比較し、到達予想秒数が、設定予想秒数以下である場合、第1の遮断弁を遮断することを特徴とする。   Further, according to the present invention, the above-described storage unit stores in advance a set expected number of seconds indicating a margin time for closing the shut-off valve before the earthquake arrives, and the first shut-off control unit receives the input P wave detection Compare the expected number of seconds until the earthquake corresponding to the signal arrives and the set expected number of seconds stored in the storage unit, and if the expected number of seconds is less than the set expected number of seconds, the first interruption The valve is shut off.

また、本発明は、上述の地震信号処理装置が、P波またはS波を検知してP波検知信号またはS波検知信号を入力部に入力する複数台の地震計装置に接続されており、第1の遮断制御部は、入力部に、複数台の地震計装置のうち定められた台数以上の地震計装置からP波検知信号が入力された場合に、第1の遮断弁を閉じることを特徴とする。   In the present invention, the above-described earthquake signal processing device is connected to a plurality of seismometer devices that detect a P wave or an S wave and input the P wave detection signal or the S wave detection signal to an input unit, The first cutoff control unit closes the first cutoff valve when a P-wave detection signal is input to the input unit from a predetermined number of seismometer devices among a plurality of seismometer devices. Features.

また、本発明は、上述の入力部には、気象庁から配信されるP波検知信号と、P波検知信号が誤報であったことを示すキャンセル信号とが入力され、復帰制御部は、入力部にP波検知信号が入力され第1の遮断制御部によって第1の遮断弁が閉じられた後、入力部にキャンセル信号が入力された場合、閉じられた第1の遮断弁を開けてガスの供給を復帰させることを特徴とする。   Further, according to the present invention, a P-wave detection signal distributed from the Japan Meteorological Agency and a cancel signal indicating that the P-wave detection signal was a false alarm are input to the input unit. When the P-wave detection signal is input to the first shut-off control unit and the first shut-off valve is closed, and then the cancel signal is input to the input unit, the closed first shut-off valve is opened and the gas It is characterized by returning the supply.

また、本発明は、上述のガス供給システムは、ボンベの胴部と遮断弁とのうち少なくとも一方に取り付けられるエアーカバーを備え、前記入力部からP波検知信号が入力されると、エアーカバーにガスを封入して膨張させるエアーカバー制御部を備えることを特徴とする。   Further, according to the present invention, the gas supply system described above includes an air cover attached to at least one of the cylinder body and the shutoff valve, and when a P-wave detection signal is input from the input unit, An air cover control unit for enclosing and inflating gas is provided.

また、本発明は、ガスが充填されたボンベから配管を通ってガス供給先にガスが供給されるガス供給システムにおいて、配管からガス供給先へガスを供給または遮断する第1の遮断弁と、ボンベから配管へガスを供給または遮断する第2の遮断弁との開閉を制御する地震信号処理装置の、入力部に、地震によるP波が検知されたことを示すP波検知信号、または地震によるS波が検知されたことを示すS波検知信号が入力されるステップと、第1の遮断制御部が、入力部からP波検知信号が入力されると、第1の遮断弁を閉じてガスの供給を遮断するステップと、第2の遮断制御部が、入力部からS波検知信号が入力されると、第2の遮断弁を閉じてガスの供給を遮断するステップと、復帰制御部が、入力部にP波検知信号が入力され、第1の遮断制御部によって第1の遮断弁が閉じられた後に入力部にS波検知信号が入力されない場合、閉じられた第1の遮断弁を開けてガスの供給を復帰させるステップと、を備えることを特徴とする。   Further, the present invention provides a gas supply system in which gas is supplied from a cylinder filled with gas to a gas supply destination through a pipe, and a first cutoff valve that supplies or shuts off gas from the pipe to the gas supply destination; A P-wave detection signal indicating that a P-wave due to an earthquake has been detected at the input part of the earthquake signal processing device that controls the opening and closing of a second shut-off valve that supplies or shuts off gas from the cylinder to the pipe, or due to an earthquake When the S wave detection signal indicating that the S wave has been detected is input, and when the first cutoff control unit receives the P wave detection signal from the input unit, the first cutoff valve is closed and the gas A step of shutting off the supply of gas, a step of shutting off the gas supply by closing the second shutoff valve when the second cutoff control unit receives an S-wave detection signal from the input unit, and a return control unit includes: The P wave detection signal is input to the input unit, and the first And when the S-wave detection signal is not input to the input unit after the first shut-off valve is closed by the shut-off control unit, the step of opening the closed first shut-off valve and returning the gas supply is provided. Features.

以上説明したように、本発明によれば、ガスが充填されたボンベから配管を通ってガス供給先にガスが供給されるガス供給システムにおいて、配管からガス供給先へガスを供給または遮断する第1の遮断弁と、ボンベから配管へガスを供給または遮断する第2の遮断弁との開閉を制御する地震信号処理装置が、P波検知信号が入力されると、第1の遮断弁を閉じてガスの供給を遮断し、S波検知信号が入力されると、第2の遮断弁を閉じてガスの供給を遮断し、P波検知信号が入力されて第1の遮断弁を閉じた後にS波検知信号が入力されない場合、閉じられた第1の遮断弁を開けてガスの供給を復帰させるようにした。これにより、P波検知信号を受信した段階では、第1の遮断弁を閉じてガス供給先へのガスの供給を遮断しつつも、第2の遮断弁は閉じずにボンベから配管へのガスの供給は遮断せず配管中のガスを保ち、P波検知信号を受信した後にS波検知信号を受信しない場合には、閉じられた第1の遮断弁を開けるようにしたので、P波検知信号を受信した後、第1の遮断弁が閉じられるのみでボンベから配管への第2の遮断弁は閉じられることがなく、S波検知信号を受信しなかった場合には第1の遮断弁が開けられて、速やかにガスの供給を復帰することが可能となる。   As described above, according to the present invention, in the gas supply system in which the gas is supplied from the cylinder filled with gas to the gas supply destination through the pipe, the gas is supplied to or shut off from the pipe to the gas supply destination. The seismic signal processing device that controls the opening and closing of the first shutoff valve and the second shutoff valve that supplies or shuts off gas from the cylinder to the pipe closes the first shutoff valve when a P-wave detection signal is input. When the gas supply is shut off and the S wave detection signal is input, the second cutoff valve is closed to shut off the gas supply, and after the P wave detection signal is input and the first cutoff valve is closed, When the S wave detection signal is not input, the gas supply is restored by opening the closed first shut-off valve. As a result, when the P-wave detection signal is received, the first shutoff valve is closed to shut off the gas supply to the gas supply destination, but the second shutoff valve is not closed and the gas from the cylinder to the pipe is closed. Since the supply of gas is not shut off, the gas in the pipe is kept, and when the S wave detection signal is not received after receiving the P wave detection signal, the closed first cutoff valve is opened. After receiving the signal, only the first shut-off valve is closed, the second shut-off valve from the cylinder to the pipe is not closed, and if the S-wave detection signal is not received, the first shut-off valve Is opened, and the supply of gas can be promptly restored.

また、本発明によれば、複数のボンベのそれぞれに充填されるガスの種類に対応付けて、P波検知信号を受信してからそのボンベに対応する第1の遮断弁を閉じるまでの猶予秒数が記憶されており、P波検知信号を受信すると、複数のボンベのそれぞれのガスに対応する猶予秒数を読み出し、それぞれのガス毎に読み出した猶予秒数の時間が経過した後、第1の遮断弁を遮断するようにしたので、ガスの種類に応じて遮断弁の開閉を制御し、例えばガスの種類に応じて供給を早めに遮断し、または比較的遅く遮断するなどの制御を行うことが可能となる。   Further, according to the present invention, the delay time from when the P wave detection signal is received until the first shutoff valve corresponding to the cylinder is closed is associated with the type of gas filled in each of the plurality of cylinders. When the P-wave detection signal is received, the number of grace seconds corresponding to each gas of the plurality of cylinders is read, and after the time of the number of grace seconds read for each gas has elapsed, the first Since the shut-off valve is shut off, the opening and closing of the shut-off valve is controlled according to the type of gas, for example, the supply is shut off early or shut off relatively late according to the type of gas. It becomes possible.

また、本発明によれば、入力されるP波検知信号に基づく地震の予測震度と、予め記憶された設定震度とを比較し、予測震度が設定震度を超える場合、第1の遮断弁を遮断するようにしたので、予め定められた設定震度に応じて第1の遮断弁を遮断するように制御することができる。これにより、例えば、予め定められた設定震度を超えない場合には必要以上に遮断弁の制御処理を行わないように制御することができる。   Further, according to the present invention, the predicted seismic intensity of the earthquake based on the input P-wave detection signal is compared with the preset seismic intensity stored in advance, and when the predicted seismic intensity exceeds the set seismic intensity, the first shut-off valve is shut off. Since it did, it can be controlled to shut off the first shut-off valve in accordance with a predetermined seismic intensity. Thereby, for example, when the predetermined seismic intensity is not exceeded, it is possible to perform control so that the control process of the shutoff valve is not performed more than necessary.

また、本発明によれば、入力されるP波検知信号に応じた地震が到達するまでの到達予想秒数と、地震が到達する前に遮断弁を閉じる余裕時間を示す設定予想秒数とを比較し、到達予想秒数が設定予想秒数以下である場合、第1の遮断弁を遮断するようにしたので、予め定められた設定予想秒数に応じて第1の遮断弁を遮断するように制御することができる。これにより、例えば、到達予想秒数が予め定められた設定予想秒数を超える場合には必要以上に遮断弁の制御処理を行わないように制御することができる。     Further, according to the present invention, the expected arrival seconds until the earthquake corresponding to the input P wave detection signal and the set expected seconds indicating the allowance time for closing the shut-off valve before the earthquake reaches are set. In comparison, when the estimated arrival time is less than or equal to the set expected number of seconds, the first shut-off valve is shut off, so that the first shut-off valve is shut off in accordance with the preset set expected number of seconds. Can be controlled. Thereby, for example, when the estimated arrival time exceeds a preset expected number of seconds, control can be performed so that the control process of the shut-off valve is not performed more than necessary.

また、本発明によれば、P波またはS波を検知するとP波検知信号またはS波検知信号を出力する複数台の地震計装置のうち、定められた台数以上の地震計装置からP波検知信号が入力されると、第1の遮断弁を閉じる構成としたので、複数台のうち定められた台数に満たない台数の地震計装置にP波検知信号が入力された場合、誤ってP波を検知したものとして、不用意に第1の遮断弁を閉じてガスの供給を遮断することがないように制御することが可能となる。   Further, according to the present invention, when a P wave or S wave is detected, a P wave is detected from a predetermined number or more of a plurality of seismometer devices that output a P wave detection signal or an S wave detection signal. When a signal is input, the first shut-off valve is closed. Therefore, if P wave detection signals are input to a number of seismometer devices that are less than the set number among a plurality of units, the P wave is erroneously input. As a result of the detection, it is possible to perform control so that the gas supply is not shut off by inadvertently closing the first shutoff valve.

また、本発明によれば、気象庁から配信されるP波検知信号と、P波検知信号が誤報であったことを示すキャンセル信号とが入力され、P波検知信号が入力されて第1の遮断弁を閉じた後、キャンセル信号を受信した場合、閉じられた第1の遮断弁を開けてガスの供給を復帰させるようにしたので、P波検知信号が誤報であった場合に、不用意に第2の遮断弁を閉じずにガスの供給を復帰させるように制御することが可能となる。   In addition, according to the present invention, the P wave detection signal distributed from the Japan Meteorological Agency and the cancel signal indicating that the P wave detection signal was a false alarm are input, and the P wave detection signal is input and the first cutoff is performed. When the cancel signal is received after the valve is closed, the gas supply is restored by opening the closed first shut-off valve. If the P-wave detection signal is false, carelessly It is possible to control to return the gas supply without closing the second shut-off valve.

以下、本発明の一実施形態について、図面を参照して説明する。
図1は、本実施形態によるガス供給システム1の構成を示す図である。ガス供給システム1は、受信PC400と、地震計装置300(地震計装置301、地震計装置302、地震計装置303)と、地震信号処理装置100と、シリンダーキャビネット200とを備えている。
Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
FIG. 1 is a diagram illustrating a configuration of a gas supply system 1 according to the present embodiment. The gas supply system 1 includes a receiving PC 400, a seismometer device 300 (a seismometer device 301, a seismometer device 302, a seismometer device 303), a seismic signal processing device 100, and a cylinder cabinet 200.

受信PC400は、ネットワークを介して、気象庁の気象業務支援センターから送信される緊急地震速報を受信する。緊急地震速報は、全国に配置された気象庁の地震計装置のいずれかの観測点において、P波またはS波に伴い100ガル以上の加速度の揺れが観測されたとき、または気象庁による解析の結果、震源・マグニチュード・各地の予測震度が求められ、そのマグニチュードが3.5以上、または最大予測震度が3以上のときに発せられる地震検知信号である。また、1点の観測点のみの処理結果によってP波検知信号が発せられた後、所定の時間が経過しても2観測点目の処理が行われなかった場合は、先の地震検知がノイズによるものと判断され、P波検知信号から数秒〜10数秒程度でキャンセル信号(キャンセル報)が送信される。また、P波検知信号は、P波を検知している間中、一定間隔で発信され続ける。受信PC400は、受信するP波検知信号に基づいて、地震の到達予想秒数、予測震度などを算出する。   The receiving PC 400 receives the earthquake early warning transmitted from the meteorological service support center of the Japan Meteorological Agency via the network. The Earthquake Early Warning is based on the result of an analysis by the Japan Meteorological Agency when an acceleration fluctuation of 100 gal or more is observed with a P wave or S wave at any observation point of the Japan Meteorological Agency seismograph device. This is an earthquake detection signal that is issued when the seismic center, magnitude, and predicted seismic intensity at each location are obtained, and the magnitude is 3.5 or higher, or the maximum predicted seismic intensity is 3 or higher. In addition, after the P wave detection signal is generated based on the processing result of only one observation point, if the second observation point is not processed even after a predetermined time has elapsed, the previous earthquake detection is detected as noise. Therefore, a cancel signal (cancellation report) is transmitted in about several seconds to several tens of seconds from the P-wave detection signal. Further, the P wave detection signal continues to be transmitted at regular intervals while the P wave is detected. Receiving PC 400 calculates the estimated arrival time of the earthquake, the predicted seismic intensity, and the like based on the received P-wave detection signal.

地震計装置301と、地震計装置302と、地震計装置303とは、シリンダーキャビネット200が備えられる工場の敷地内に設置される地震計装置であり、例えば、加速度計・変位計・速度計などにより地震によるP波またはS波の揺れを検知し、地震検知信号を出力する。本実施形態では、3台の地震計装置300を例として説明するが、1台または複数台を適用して良い。以下、地震計装置301と、地震計装置302と、地震計装置303とを区別しない場合には、地震計装置300と表記して説明する。   The seismometer device 301, the seismometer device 302, and the seismometer device 303 are seismometer devices installed in the site of a factory in which the cylinder cabinet 200 is provided, such as an accelerometer, a displacement meter, and a speedometer. Detects a P wave or S wave shake due to an earthquake and outputs an earthquake detection signal. In the present embodiment, three seismometer devices 300 will be described as an example, but one or more seismometer devices 300 may be applied. Hereinafter, when the seismometer device 301, the seismometer device 302, and the seismometer device 303 are not distinguished, they will be described as the seismometer device 300.

シリンダーキャビネット200は、ガスが充填された1個または複数個のボンベが収納される収納庫であり、窒素ガスによるガスパージ、排気系、耐火構造などの機能を持つ。また、収納庫の外部に設置される操作部を操作することにより、収納されるそれぞれのボンベの遮断弁、ガス供給先への遮断弁、排気のための遮断弁などの開閉を行うことができる。本実施形態では、シリンダーキャビネット200には、ボンベ201と、ボンベ202とが収納されている。ボンベ201は、遮断弁210を介して配管に接続されている。遮断弁210が開けられた状態ではボンベ201に充填されたガスが配管に供給され、遮断弁210が閉じられた状態では配管へのガスの供給が遮断される。   The cylinder cabinet 200 is a storage for storing one or more cylinders filled with gas, and has functions such as a gas purge with nitrogen gas, an exhaust system, and a fireproof structure. Further, by operating an operation unit installed outside the storage, it is possible to open and close a shut-off valve for each cylinder to be stored, a shut-off valve for a gas supply destination, a shut-off valve for exhaust, and the like. . In the present embodiment, a cylinder 201 and a cylinder 202 are accommodated in the cylinder cabinet 200. The cylinder 201 is connected to the piping via the shutoff valve 210. When the shutoff valve 210 is opened, the gas filled in the cylinder 201 is supplied to the pipe, and when the shutoff valve 210 is closed, the gas supply to the pipe is shut off.

ボンベ202は、遮断弁211を介して配管に接続されている。遮断弁211が開けられた状態ではボンベ202に充填されたガスが配管に供給され、遮断弁211が閉じられた状態では配管へのガスの供給が遮断される。ボンベ201とボンベ202とに充填されるガスは、異なる種類のガスとしても良い。ここで、遮断弁210と遮断弁211とに接続される配管は、窒素ガス供給元に接続される遮断弁213と、大気へガスを放出し排気を行う排気口に接続される遮断弁212と、ガス供給先に接続される遮断弁214との間にガス流路を構成する。   The cylinder 202 is connected to the pipe via the shut-off valve 211. When the shut-off valve 211 is opened, the gas filled in the cylinder 202 is supplied to the pipe, and when the shut-off valve 211 is closed, the gas supply to the pipe is shut off. The gas filled in the cylinder 201 and the cylinder 202 may be different types of gas. Here, the piping connected to the shut-off valve 210 and the shut-off valve 211 includes a shut-off valve 213 connected to the nitrogen gas supply source, and a shut-off valve 212 connected to an exhaust port that discharges gas to the atmosphere and exhausts it. A gas flow path is formed between the shutoff valve 214 connected to the gas supply destination.

上述した遮断弁210と、遮断弁211と、遮断弁212と、遮断弁213と、遮断弁214との遮断弁は、制御機器220に接続されており、制御機器220から送信される制御信号に基づいて弁の開閉を行う。図1では、ガス流路を形成する配管が実線で、制御機器220から遮断弁への制御信号を伝送する線が破線で示されている。
制御機器220は、後述する地震信号処理装置100から送信される制御信号に基づいて、遮断弁210と、遮断弁211と、遮断弁212と、遮断弁213と、遮断弁214との遮断弁を開閉させることで、ガス流路の閉止(遮断弁閉)または開放(遮断弁開)を制御する。
The shut-off valves 210, 211, 212, 213, and 214 are connected to the control device 220, and control signals transmitted from the control device 220 are transmitted to the control signals. Based on this, the valve is opened and closed. In FIG. 1, piping that forms the gas flow path is indicated by a solid line, and a line that transmits a control signal from the control device 220 to the shutoff valve is indicated by a broken line.
Based on a control signal transmitted from the seismic signal processing apparatus 100 described later, the control device 220 sets a shut-off valve of the shut-off valve 210, the shut-off valve 211, the shut-off valve 212, the shut-off valve 213, and the shut-off valve 214. By opening and closing, the closing (shutoff valve closing) or opening (shutoff valve opening) of the gas flow path is controlled.

地震信号処理装置100は、受信PC400および地震計装置300から受信するP波検知信号またはS波検知信号を受信し、受信した検知信号に基づいて制御機器220から遮断弁に制御信号を送信させ、シリンダーキャビネット200内の配管のガス流路の閉止または開放を制御する。図2は、地震信号処理装置100の外観の例を示す図である。地震信号処理装置100の外部の表面には、表示ランプ101が備えられている。表示ランプ101は、地震信号処理装置100の状態を示す文字列ごとに区画分けされた表示領域を備えており、地震信号処理装置100の動作状態に該当する区画が光るように構成されている。ユーザは表示ランプ101を目視確認することで、地震信号処理装置100の状態を把握することが可能である。   The seismic signal processing apparatus 100 receives the P wave detection signal or the S wave detection signal received from the receiving PC 400 and the seismometer apparatus 300, and causes the control device 220 to transmit a control signal to the shutoff valve based on the received detection signal. The closing or opening of the gas flow path of the piping in the cylinder cabinet 200 is controlled. FIG. 2 is a diagram illustrating an example of the appearance of the earthquake signal processing apparatus 100. A display lamp 101 is provided on the external surface of the earthquake signal processing apparatus 100. The display lamp 101 includes a display area divided for each character string indicating the state of the seismic signal processing apparatus 100, and is configured so that a section corresponding to the operation state of the seismic signal processing apparatus 100 shines. The user can grasp the state of the earthquake signal processing apparatus 100 by visually checking the display lamp 101.

図3は、地震信号処理装置100の構成を示すブロック図である。地震信号処理装置100は、上述の表示ランプ101と、入力端子台102と、出力端子台103と、パワーサプライ104と、電源105と、メンテナンススイッチ106と、地震訓練用スイッチ107と、制御部110と、記憶部111とを備えている。   FIG. 3 is a block diagram illustrating a configuration of the earthquake signal processing apparatus 100. The earthquake signal processing apparatus 100 includes the display lamp 101, the input terminal block 102, the output terminal block 103, the power supply 104, the power supply 105, the maintenance switch 106, the earthquake training switch 107, and the control unit 110. And a storage unit 111.

入力端子台102は、地震計装置301、地震計装置302、地震計装置303、受信PC400に接続されており、これらの装置から送信されるP波検知信号またはS波検知信号を受信する。
出力端子台103は、シリンダーキャビネット200に接続されており、シリンダーキャビネット200の制御機器220に、遮断弁を開閉させる制御信号を送信する。
The input terminal block 102 is connected to the seismometer device 301, the seismometer device 302, the seismometer device 303, and the receiving PC 400, and receives the P wave detection signal or the S wave detection signal transmitted from these devices.
The output terminal block 103 is connected to the cylinder cabinet 200 and transmits a control signal for opening and closing the shutoff valve to the control device 220 of the cylinder cabinet 200.

電源105とパワーサプライ104とは、地震信号処理装置100が動作するための電源を供給する。メンテナンススイッチ106と、地震訓練用スイッチ107とは、メンテナンス中や訓練中などであることを設定するスイッチである。例えば、これらのスイッチがONである場合には、出力端子台103からシリンダーキャビネット200への制御信号の送信は行わないなどの設定を行うことが可能である。   The power supply 105 and the power supply 104 supply power for operating the earthquake signal processing apparatus 100. The maintenance switch 106 and the earthquake training switch 107 are switches for setting that maintenance is being performed or training is being performed. For example, when these switches are ON, it is possible to perform settings such as not transmitting control signals from the output terminal block 103 to the cylinder cabinet 200.

記憶部111には、予め定められた設定震度が記憶されている。設定震度は、地震信号処理装置100に入力されるP波検知信号に基づく予測震度に応じて地震信号処理装置100が遮断弁の制御処理を行うか否か震度の閾値を示す情報である。例えば、地震信号処理装置100は、入力されるP波検知信号に基づく予測震度が、記憶部111に記憶されている設定震度を超えている場合には遮断弁の制御処理を行い、一方、設定震度を超えていない場合には遮断弁の制御処理を行わない。   The storage unit 111 stores a preset seismic intensity. The set seismic intensity is information indicating a seismic intensity threshold value whether or not the seismic signal processing apparatus 100 performs control processing of the shutoff valve in accordance with the predicted seismic intensity based on the P wave detection signal input to the seismic signal processing apparatus 100. For example, when the predicted seismic intensity based on the input P-wave detection signal exceeds the set seismic intensity stored in the storage unit 111, the seismic signal processing apparatus 100 performs control processing of the shut-off valve, while setting If the seismic intensity is not exceeded, the shutoff valve control process is not performed.

また、記憶部111には、地震が到達する前に遮断弁を閉じる余裕時間を示す設定予想秒数が記憶されている。設定予想秒数とは、P波を検出してS波到達予想秒数が受信PCで求められたときに、地震信号処理装置側でその秒数と比較するための設定時間である。例えば、地震信号処理装置100に入力されたP波検知信号に応じた地震が到達するまでの到達予想秒数が充分大きい場合には、P波検知信号を受信した後にキャンセル報などの訂正信号が送信されることが考えられるために、P波検知信号を受信した後、即時に遮断弁の制御処理を行う必要がない場合があるからである。設定予想秒数は、P波検知信号に応じて制御機器220が遮断弁を閉じる制御信号を送信した後、遮断弁が閉止を完了するために必要な時間を考慮して定められるようにしても良い。   In addition, the storage unit 111 stores a set expected number of seconds indicating an allowance time for closing the shutoff valve before the earthquake arrives. The set expected number of seconds is a set time for comparison with the estimated number of seconds on the seismic signal processing apparatus side when the P wave is detected and the estimated number of seconds to reach the S wave is obtained by the receiving PC. For example, when the expected arrival time until an earthquake corresponding to the P wave detection signal input to the earthquake signal processing apparatus 100 is sufficiently large, a correction signal such as a cancellation report is received after receiving the P wave detection signal. This is because there is a case where it is not necessary to immediately perform the control processing of the shutoff valve after receiving the P-wave detection signal because it is considered to be transmitted. The set expected number of seconds may be determined in consideration of the time required for the shut-off valve to complete closing after the control device 220 transmits a control signal for closing the shut-off valve in response to the P-wave detection signal. good.

このように、設定予想秒数は、地震計装置300または受信PC400によってP波検知信号が検知された後、地震信号処理装置100が遮断弁214の閉止処理に移行する秒数の閾値を示す秒数である。例えば、地震計装置300または受信PC400によってP波検知信号が検知され、地震信号処理装置100に入力されると、P波検知信号に応じた地震が到達するまでの到達予想秒数と、記憶部111に記憶された設定予想秒数とが比較される。地震信号処理装置100は、到達予想秒数が設定予想秒数を超える場合は、遮断弁214の閉止処理を行わない。すなわち、地震信号処理装置100に入力されるP波検知信号に応じた地震の到達予想秒数が充分に大きい場合、以降の遮断弁制御処理を必要以上に行うことを防止するために、また以降にそのP波検知信号が誤検知でありキャンセル報などの訂正信号が送信される可能性があるために、設定予想秒数を超えるまでは遮断弁の閉止処理に移行しないようにする。設定予想秒数は、例えば、「7」秒が設定される。   Thus, the set expected number of seconds is a second indicating the threshold value of the number of seconds at which the seismic signal processing device 100 shifts to the closing process of the shutoff valve 214 after the P wave detection signal is detected by the seismometer device 300 or the receiving PC 400. Is a number. For example, when a P wave detection signal is detected by the seismometer apparatus 300 or the receiving PC 400 and is input to the earthquake signal processing apparatus 100, an expected arrival time until an earthquake corresponding to the P wave detection signal arrives, and a storage unit The set expected number of seconds stored in 111 is compared. The seismic signal processing apparatus 100 does not perform the closing process of the shut-off valve 214 when the expected arrival seconds exceeds the set expected seconds. That is, when the expected arrival time of the earthquake according to the P wave detection signal input to the earthquake signal processing device 100 is sufficiently large, the subsequent shut-off valve control processing is prevented from being performed more than necessary. Since the P-wave detection signal is erroneously detected and a correction signal such as a cancellation report may be transmitted, the process is not shifted to the shut-off valve closing process until the estimated number of seconds is exceeded. For example, “7” seconds are set as the expected setting seconds.

また、記憶部111には、シリンダーキャビネット200に収納されているボンベに充填されているガスの種類毎に、そのガスの危険度等に応じて、P波検知信号を受信してから遮断弁214を閉じるまでの猶予秒数(ディレー時間)が対応付けられて記憶されている。図4は、記憶部111に記憶されるデータ例を示す図である。記憶部111に記憶されるデータテーブルには、ガスの種類毎に、「ガス名」、「緊急地震速報のP波検知信号」、「地震計のP波検知信号」、「検出後弁開閉秒数」(猶予秒数)、「直近地震遮断弁強制閉フラグ」の項目に対応付けられた情報が記憶される。   In addition, the storage unit 111 receives a P-wave detection signal for each type of gas filled in the cylinder stored in the cylinder cabinet 200 according to the risk level of the gas, and then receives the shut-off valve 214. The number of grace seconds (delay time) until closing is stored in association with each other. FIG. 4 is a diagram illustrating an example of data stored in the storage unit 111. The data table stored in the storage unit 111 includes, for each gas type, “gas name”, “P wave detection signal for emergency earthquake warning”, “P wave detection signal for seismometer”, “valve opening / closing seconds after detection” Information associated with the items “number” (number of grace seconds) and “latest earthquake cutoff valve forced closing flag” are stored.

「ガス名」は、シリンダーキャビネット200に収納されるボンベに充填されるガスの名前である。「緊急地震速報のP波検知信号」と「地震計のP波検知信号」とは、受信PC400と地震計装置300とのいずれからのP波検知信号を受信することにより遮断弁を制御するかを示す条件情報である。例えば、「緊急地震速報のP波検知信号」には、受信PC400が気象業務支援センターからP波が検出されたことを示す緊急地震速報を受信したことを条件として、対応するボンベの遮断弁を閉じる場合に、「○」のマークが示される。一方、地震計装置301、地震計装置302、地震計装置303のいずれかから、P波が検出されたことを示すP波検知信号を受信したことを条件として対応するボンベの遮断弁を閉じる場合には、「地震計のP波検知信号」に、「○」のマークが示される。「検出後弁開閉秒数」の項目には、P波検知信号を受信した後、対応する「ガス名」に示されるガスが充填されたボンベの遮断弁の閉止処理を行うまでの設定予想秒数経過後の猶予秒数が記憶されている。「直近地震遮断弁強制閉フラグ」の項目には、直近で地震が発生した場合に、弁開閉秒数の設定があっても強制的に遮断弁214を閉じるか否かのフラグ(0:強制閉しない、1:強制閉する)が記憶されている。   “Gas name” is the name of the gas filled in the cylinder stored in the cylinder cabinet 200. The “P wave detection signal for earthquake early warning” and “P wave detection signal for seismometer” control the shutoff valve by receiving the P wave detection signal from the receiving PC 400 or the seismometer 300 Is condition information indicating For example, in the “P wave detection signal for emergency earthquake warning”, the receiving PC 400 receives an emergency earthquake warning indicating that a P wave has been detected from the weather service support center, and the corresponding cylinder shut-off valve is set. In the case of closing, a mark “◯” is shown. On the other hand, when the shut-off valve of the corresponding cylinder is closed on condition that a P wave detection signal indicating that a P wave has been detected is received from any of the seismometer device 301, the seismometer device 302, and the seismometer device 303 Is marked with “◯” in “P-wave detection signal of seismometer”. In the item “number of seconds for opening / closing the valve after detection”, the expected setting time until the shut-off process of the cylinder filled with the gas indicated by the corresponding “gas name” is performed after receiving the P-wave detection signal The number of grace seconds after the elapse of a number is stored. In the item of “Recent earthquake shut-off valve forced close flag”, a flag indicating whether or not the shut-off valve 214 is forcibly closed even when an earthquake has occurred recently even if the valve opening / closing time is set (0: forced Do not close, 1: Force close) is stored.

例えば、図4の1行目は、「ガス名」が「SiH」であり、「緊急地震速報のP波検知信号」が「○」であり、「検出後弁開閉秒数」が「1」である。この場合、受信PC400が受信したP波検知信号に基づいて算出した予測震度が、記憶部111に記憶された設定震度以上であると判定され、かつ、受信したP検知信号に基づいて算出される揺れの到達予想秒数が記憶部111に記憶された設定予想秒数以下である場合、検出後弁開閉秒数に示される「1」秒が経過した後に、ガス「SiH」が充填されたボンベが収納されるシリンダーキャビネット200の遮断弁214を閉じることを表している。また、震源地が直近である場合、すなわち緊急地震速報のP波を受信する前に地震計装置300がP波を検出した場合には、検出後弁開閉秒数に記憶された設定に関わらず、直ちにガス「SiH」が充填されたボンベが収納されるシリンダーキャビネット200の遮断弁214を閉じることを表している。また、例えば4行目のガス「B」では、危険度が高いために検出後弁開閉秒数として「0」が記憶されており、P波検出信号を受信し、到達予想秒数が設定予想秒数以下である場合、即座に遮断弁を閉じることを表している。また、例えば8行目のガス「N」は、危険度が低く、実際にS波が到達して地震による大きな揺れが発生した場合にも必ずしも供給を閉止する必要がないため、検出後弁開閉秒数として「60」が、「直近地震遮断弁強制閉フラグ」の項目として「0」がそれぞれ記憶されている。 For example, in the first line of FIG. 4, the “gas name” is “SiH 4 ”, the “P wave detection signal of emergency earthquake warning” is “O”, and the “valve opening / closing seconds after detection” is “1”. Is. In this case, it is determined that the predicted seismic intensity calculated based on the P wave detection signal received by the receiving PC 400 is equal to or greater than the set seismic intensity stored in the storage unit 111, and is calculated based on the received P detection signal. When the expected arrival time of shaking is equal to or less than the set expected number of seconds stored in the storage unit 111, the gas “SiH 4 ” was filled after “1” seconds indicated by the valve opening / closing seconds after detection passed. It represents closing the shut-off valve 214 of the cylinder cabinet 200 in which the cylinder is stored. In addition, when the epicenter is in the immediate vicinity, that is, when the seismometer apparatus 300 detects the P wave before receiving the P wave of the earthquake early warning, regardless of the setting stored in the valve opening / closing seconds after detection. This means that the shutoff valve 214 of the cylinder cabinet 200 in which the cylinder filled with the gas “SiH 4 ” is immediately stored is closed. For example, in the gas “B 2 H 6 ” in the fourth row, “0” is stored as the number of seconds for opening and closing the valve after detection because the degree of danger is high. Indicates that the shut-off valve is immediately closed if it is less than the set expected number of seconds. Further, for example, the gas “N 2 ” in the eighth line has a low degree of danger, and it is not always necessary to close the supply even when an S wave arrives and a large shaking occurs due to an earthquake. “60” is stored as the number of seconds for opening and closing, and “0” is stored as the item of “latest earthquake cutoff valve forced closing flag”.

図3に戻り、制御部110は、入力端子台102が受信するP波検知信号またはS波検知信号に応じて、記憶部111に記憶された情報を参照し、出力端子台103を介してシリンダーキャビネット200の制御機器220に制御信号を送信して、遮断弁の制御を行う。また、制御部110は、地震計装置301、地震計装置302、地震計装置303、または受信PC400から送信されるP波検知信号を受信すると、記憶部111に記憶された設定震度および設定予想秒数に応じた比較処理を行い、ボンベ201またはボンベ202に充填されているガスに対応する猶予秒数を記憶部111から読み出し、読み出した猶予秒数の間、待機した後、遮断弁214を閉じる制御信号をシリンダーキャビネット200に送信する。   Returning to FIG. 3, the control unit 110 refers to the information stored in the storage unit 111 according to the P-wave detection signal or the S-wave detection signal received by the input terminal block 102, and the cylinder via the output terminal block 103. A control signal is transmitted to the control device 220 of the cabinet 200 to control the shutoff valve. Further, when the control unit 110 receives a P-wave detection signal transmitted from the seismometer device 301, the seismometer device 302, the seismometer device 303, or the receiving PC 400, the set seismic intensity and the set expected second time stored in the storage unit 111. Comparison processing is performed in accordance with the number, the grace time corresponding to the gas filled in the cylinder 201 or the cylinder 202 is read from the storage unit 111, and after waiting for the read grace time, the shutoff valve 214 is closed. A control signal is transmitted to the cylinder cabinet 200.

また、制御部110は、地震計装置301、地震計装置302、地震計装置303、受信PC400のいずれかから送信されるS波検知信号を受信すると、遮断弁210および遮断弁211を閉じる制御信号をシリンダーキャビネット200に送信する。さらに、受信PC400からP波検知信号を受信して遮断弁214を閉じる制御信号をシリンダーキャビネット200に送信した後、受信PC400からP波のキャンセル信号を受信した場合には、閉じられた遮断弁214を開ける制御信号をシリンダーキャビネット200に送信する。   When control unit 110 receives an S wave detection signal transmitted from any of seismometer device 301, seismometer device 302, seismometer device 303, or receiving PC 400, control signal for closing shutoff valve 210 and shutoff valve 211 is received. Is transmitted to the cylinder cabinet 200. Further, after receiving a P-wave detection signal from the receiving PC 400 and transmitting a control signal for closing the shut-off valve 214 to the cylinder cabinet 200, when a P-wave cancel signal is received from the receiving PC 400, the shut-off valve 214 closed. A control signal for opening is sent to the cylinder cabinet 200.

次に、図5を参照して、本実施形態による地震信号処理装置100の動作例を説明する。まず、地震計からのP波またはS波の検知信号によって動作する場合、地震計装置301、地震計装置302、地震計装置303のいずれかがP波を検知すると(ステップS2)、P波検知信号を地震信号処理装置100に送信する。地震信号処理装置100は、地震計装置300から送信されるP波検知信号を受信する(ステップS5)。ここで、地震信号処理装置100は、接続された複数台の地震計装置300のうち、定められた台数以上の地震計装置300から検知信号を受信するまでは、次のステップに進まないようにしても良い。この場合、複数台の地震計装置300のうち、何台の地震計装置300から検知信号を受信した場合に次のステップに進むかという台数の設定は、ユーザからの値の入力を受付けて、予め入力された値に応じて設定を変更できるようにしても良い。例えば、3台中2台(2 out of 3)から検知信号を受信した場合に、次のステップに進むようにして良い。   Next, an operation example of the earthquake signal processing apparatus 100 according to the present embodiment will be described with reference to FIG. First, in the case of operating by a detection signal of a P wave or S wave from a seismometer, when any of the seismometer device 301, the seismometer device 302, or the seismometer device 303 detects a P wave (step S2), the P wave detection is performed. The signal is transmitted to the earthquake signal processing apparatus 100. The seismic signal processing apparatus 100 receives the P-wave detection signal transmitted from the seismometer apparatus 300 (step S5). Here, the seismic signal processing apparatus 100 does not proceed to the next step until receiving a detection signal from the seismometer apparatus 300 of a predetermined number or more among the plurality of connected seismometer apparatuses 300. May be. In this case, among the plurality of seismometer devices 300, when the detection signal is received from the number of seismometer devices 300, the setting of the number of units to proceed to the next step is to accept the input of the value from the user, You may enable it to change a setting according to the value input previously. For example, when a detection signal is received from 2 out of 3 (2 out of 3), the process may proceed to the next step.

さらに、地震信号処理装置100は、予め定められた条件を満たす場合、次のステップに進むか否かを判定するようにしても良い(ステップS6)。予め定められた条件とは、例えば、受信PC400と地震計装置300とのいずれからもP波検知信号を受信した場合にいずれを優先するかなどの条件である。ステップS6で、定められた条件を満たし次のステップに進むと判定された場合、地震信号処理装置100は、予め受信したP波検知信号に基づく予測震度が、予め定められた設定震度以上であるか否かを判定する(ステップS8)。設定震度は、予め記憶部111に記憶される。ここで、P波検知信号に基づく予測震度が、予め定められた設定震度に満たない場合は(ステップS8:NO)、Aに進み、そのまま処理を終了する(EXIT)。   Furthermore, when the predetermined condition is satisfied, the earthquake signal processing apparatus 100 may determine whether or not to proceed to the next step (step S6). The predetermined condition is, for example, a condition such as which is prioritized when a P wave detection signal is received from either the receiving PC 400 or the seismometer apparatus 300. When it is determined in step S6 that the predetermined condition is satisfied and the process proceeds to the next step, the earthquake signal processing apparatus 100 has a predicted seismic intensity based on the previously received P wave detection signal equal to or greater than a predetermined set seismic intensity. Is determined (step S8). The set seismic intensity is stored in the storage unit 111 in advance. If the predicted seismic intensity based on the P-wave detection signal is less than the predetermined seismic intensity (step S8: NO), the process proceeds to A and the process is terminated as it is (EXIT).

一方、ステップS8で、P波検知信号に基づく予測震度が、予め定められた設定震度以上である場合は(ステップS8:YES)、地震信号処理装置100は、受信PC400から緊急地震速報のP波を受信済みか否かを判断する(ステップS9)。緊急地震速報のP波を受信している場合は(ステップS9:YES)、Cに進む。一方、緊急地震速報のP波を受信していない場合は(ステップS9:NO)、記憶部111に記憶されたデータテーブルから制御対象のガスごとに対応する直近地震遮断弁強制閉フラグを読み出す(ステップS10)。   On the other hand, when the predicted seismic intensity based on the P-wave detection signal is equal to or greater than the predetermined seismic intensity determined in step S8 (step S8: YES), the seismic signal processing apparatus 100 receives the P-wave of the emergency earthquake warning from the receiving PC 400. Is determined (step S9). When the P wave of the earthquake early warning is received (step S9: YES), the process proceeds to C. On the other hand, when the P wave of the earthquake early warning is not received (step S9: NO), the latest earthquake cutoff valve forced close flag corresponding to each control target gas is read from the data table stored in the storage unit 111 ( Step S10).

ここで、読み出した直近地震遮断弁強制閉フラグが「1」の場合には(ステップS10:YES)、Dに進み、遮断弁214を閉める制御信号を直ちにシリンダーキャビネット200に送信する。一方、読み出した直近地震遮断弁強制閉フラグが「0」の場合には(ステップS10:NO)、記憶部111に記憶されたデータテーブルから読み出した猶予秒数の間、処理を待機する(ステップS14)。このとき、地震信号処理装置100の制御部110は、制御対象のガスごとに、待機処理を行う。例えば、地震信号処理装置100の制御部110は、ステップS10でNOと判定されると、自身が備えるタイマーにより秒数のカウントアップを開始する。そして、カウントした秒数と、制御対象のガスごとに対応する猶予秒数とが一致すると、ステップS16に進み、遮断弁214を閉める制御信号をシリンダーキャビネット200に送信する。   If the read latest earthquake cutoff valve forced closing flag is “1” (step S10: YES), the process proceeds to D, and a control signal for closing the cutoff valve 214 is immediately transmitted to the cylinder cabinet 200. On the other hand, if the read latest earthquake cutoff valve forced close flag is “0” (step S10: NO), the process waits for the number of grace seconds read from the data table stored in the storage unit 111 (step S10). S14). At this time, the control unit 110 of the earthquake signal processing apparatus 100 performs standby processing for each gas to be controlled. For example, when it is determined NO in step S10, the control unit 110 of the earthquake signal processing apparatus 100 starts counting up the number of seconds by using a timer provided in itself. When the counted number of seconds matches the number of grace seconds corresponding to each gas to be controlled, the process proceeds to step S16, and a control signal for closing the shutoff valve 214 is transmitted to the cylinder cabinet 200.

例えば、制御対象のボンベに充填されたガスが「SiH」であれば、出力端子台103のSiH用端子を介して、SiHボンベを収納したシリンダーキャビネットの遮断弁を閉じる。このように、シリンダーキャビネット200の制御機器220は、地震信号処理装置100から送信された制御信号を受信すると、遮断弁214を閉じ、配管からガス供給先へのガス流路を閉止し(ステップS16)、処理を終了する(EXIT)。 For example, if the gas charged in the cylinder to be controlled is “SiH 4 ”, the shutoff valve of the cylinder cabinet that houses the SiH 4 cylinder is closed via the SiH 4 terminal of the output terminal block 103. Thus, when the control device 220 of the cylinder cabinet 200 receives the control signal transmitted from the earthquake signal processing apparatus 100, the control device 220 closes the shut-off valve 214 and closes the gas flow path from the pipe to the gas supply destination (step S16). ), The process ends (EXIT).

一方、受信PC400が、気象業務支援センターから送信される緊急地震速報を受信すると(ステップS3)、受信PC400は、受信した緊急地震速報に基づいて、予測地震度や、地震の揺れが到達するまでの秒数を算出する(ステップS4)。地震信号処理装置100の制御部110は、入力端子台102を介して接続された受信PC400から、P波検知信号を受信する。制御部110は、上述のステップS6と同様の判定を行い、ステップS4で算出したP波検知信号の予測震度が、予め定められた設定震度以上であるか否かを判定する(ステップS11)。   On the other hand, when receiving PC 400 receives the earthquake early warning transmitted from the meteorological service support center (step S3), receiving PC 400 is based on the received earthquake early warning until the predicted seismic intensity and the earthquake shake arrive. Is calculated (step S4). The control unit 110 of the seismic signal processing apparatus 100 receives a P-wave detection signal from the reception PC 400 connected via the input terminal block 102. Control unit 110 performs the same determination as in step S6 described above, and determines whether or not the predicted seismic intensity of the P-wave detection signal calculated in step S4 is greater than or equal to a predetermined set seismic intensity (step S11).

ここで、P波検知信号の予測震度が、予め定められた設定震度に満たない場合は(ステップS11:NO)、Aに進み、そのまま処理を終了する(EXIT)。一方、P波検知信号の予測震度が、予め定められた設定震度以上であり(ステップS11:YES)、受信PC400が、気象業務支援センターからP波のキャンセル信号を受信せず(ステップS12:NO)、ステップS4で算出した到達予想が、記憶部111に記憶された設定予想秒数に満たない場合は(ステップS13:NO)、Aに進み、そのまま処理を終了する(EXIT)。一方、ステップS13で、到達予想秒数が、予め定められた設定秒数を超えている場合は(ステップS13:YES)、地震信号処理装置100の制御部110は、記憶部111に記憶されたデータテーブルから読み出した猶予秒数の間、処理を待機した後(ステップS14)、遮断弁214を閉める制御信号をシリンダーキャビネット200に送信する。シリンダーキャビネット200の制御機器220は、地震信号処理装置100から送信された制御信号を受信すると、遮断弁214を閉じ、配管からガス供給先へのガス流路を閉止し(ステップS16)、処理を終了する(EXIT)。   If the predicted seismic intensity of the P-wave detection signal is less than the predetermined seismic intensity (step S11: NO), the process proceeds to A and the process is terminated as it is (EXIT). On the other hand, the predicted seismic intensity of the P wave detection signal is equal to or greater than a predetermined seismic intensity (step S11: YES), and the receiving PC 400 does not receive a P wave cancel signal from the meteorological work support center (step S12: NO). ) If the arrival prediction calculated in step S4 is less than the set expected number of seconds stored in the storage unit 111 (step S13: NO), the process proceeds to A and the process is terminated as it is (EXIT). On the other hand, in step S13, when the expected arrival time exceeds the predetermined set number of seconds (step S13: YES), the control unit 110 of the earthquake signal processing apparatus 100 is stored in the storage unit 111. After waiting for processing for the number of grace seconds read from the data table (step S14), a control signal for closing the shutoff valve 214 is transmitted to the cylinder cabinet 200. When receiving the control signal transmitted from the seismic signal processing apparatus 100, the control device 220 of the cylinder cabinet 200 closes the shut-off valve 214, closes the gas flow path from the pipe to the gas supply destination (step S16), and performs processing. End (EXIT).

また、ステップS3で受信PC400が気象業務支援センターから受信した検知信号がキャンセル信号である場合は、受信PC400は、キャンセル信号を地震信号処理装置100に送信し、ステップS12の判定にて、Bに進み、シリンダーキャビネット200に、遮断弁214を開ける制御信号を送信する(ステップS12:YES)。シリンダーキャビネット200の制御機器220は、地震信号処理装置100から送信された制御信号を受信すると、遮断弁214を開けて、配管からガス供給先へのガス流路を開放する(ステップS17)。遮断弁214を開けた後は、カウントアップしたタイマーをリセットし(ステップS18)、処理を終了する(EXIT)。   If the detection signal received by the receiving PC 400 from the weather service support center in step S3 is a cancel signal, the receiving PC 400 transmits the cancel signal to the seismic signal processing apparatus 100. Then, a control signal for opening the shut-off valve 214 is transmitted to the cylinder cabinet 200 (step S12: YES). When receiving the control signal transmitted from the earthquake signal processing apparatus 100, the control device 220 of the cylinder cabinet 200 opens the shutoff valve 214 and opens the gas flow path from the pipe to the gas supply destination (step S17). After opening the shut-off valve 214, the counted-up timer is reset (step S18), and the process is terminated (EXIT).

さらに、地震計装置301、地震計装置302、地震計装置303のいずれかがS波を検知すると(ステップS1)、S波検知信号を地震信号処理装置100に送信する。地震信号処理装置100は、地震信号処理装置100から送信されるS波検知信号を受信する(ステップS5)。ここで、地震信号処理装置100は、上述のステップS5と同様に、接続された複数台の地震計装置のうち、定められた台数以上の地震計装置から検知信号を受信するまでは、次のステップに進まないようにしても良い。   Furthermore, when any of the seismometer device 301, the seismometer device 302, and the seismometer device 303 detects an S wave (step S1), an S wave detection signal is transmitted to the earthquake signal processing device 100. The earthquake signal processing apparatus 100 receives the S wave detection signal transmitted from the earthquake signal processing apparatus 100 (step S5). Here, the seismic signal processing apparatus 100 is in the same manner as in step S5 described above until the detection signals are received from the seismometer apparatuses of a predetermined number or more among the plurality of connected seismometer apparatuses. It is also possible not to proceed to the step.

地震信号処理装置100は、受信PC400からもS波検知信号を受信していた場合などとの予め定められた条件に応じて、次のステップに進むか否かを判定する(ステップS6)。ステップS6で、定められた条件を満たし、次のステップに進むと判定された場合、地震信号処理装置100は、予め受信したS波検知信号に基づく震度が、予め定められた設定震度以上であるか否かを判定する(ステップS7)。ここで、S波検知信号に基づく震度が、予め定められた設定震度に満たない場合は(ステップS7:NO)、Aに進み、そのまま処理を終了する(EXIT)。一方、ステップS7で、S波検知信号に基づく震度が、予め定められた設定震度以上である場合は(ステップS7:YES)、遮断弁210と遮断弁211とを閉める制御信号をシリンダーキャビネット200に送信する。シリンダーキャビネット200の制御機器220は、地震信号処理装置100から送信された制御信号を受信すると、遮断弁210と遮断弁211を閉じ、配管からガス供給先へのガス流路を閉止し(ステップS15)、処理を終了する(EXIT)。   The earthquake signal processing apparatus 100 determines whether or not to proceed to the next step according to a predetermined condition such as when an S-wave detection signal is also received from the receiving PC 400 (step S6). If it is determined in step S6 that the predetermined condition is satisfied and the process proceeds to the next step, the seismic signal processing apparatus 100 has a seismic intensity based on the previously received S-wave detection signal equal to or greater than a predetermined set seismic intensity. Whether or not (step S7). If the seismic intensity based on the S wave detection signal is less than the predetermined seismic intensity (step S7: NO), the process proceeds to A, and the process is terminated as it is (EXIT). On the other hand, if the seismic intensity based on the S wave detection signal is equal to or higher than a predetermined set seismic intensity in step S7 (step S7: YES), a control signal for closing the shutoff valve 210 and the shutoff valve 211 is sent to the cylinder cabinet 200. Send. When receiving the control signal transmitted from the earthquake signal processing apparatus 100, the control device 220 of the cylinder cabinet 200 closes the shutoff valve 210 and the shutoff valve 211, and closes the gas flow path from the pipe to the gas supply destination (step S15). ), The process ends (EXIT).

次に、地震信号処理装置100の動作例を、タイムチャートを用いて説明する。図6は、受信PC400が、遠方で検知されたP波検知信号を受信した場合の動作例を示すタイムチャートである。ここで、以下の例では、上述の猶予秒数は考慮せずに説明する。
工場の遠方で地震が発生した場合、(a)時点で、受信PC400がP波検知信号を受信する。受信PC400は、受信したP波検知信号に基づいて到達予想秒数を算出する。ここで、設定予想秒数が7秒であったとすると、地震信号処理装置100は、到達予想秒数から7秒前を超える場合は断弁214の制御を行わない。(b)時点、(c)時点も同様に、地震信号処理装置100は遮断弁214の制御を行わない。(d)時点でP波検知信号を受信し、到達予想秒数が設定予想秒数(7秒)以下になると、地震信号処理装置100は、(e)時点で、遮断弁214を閉じる制御信号をシリンダーキャビネット200に送信する。シリンダーキャビネット200は、(f)時点で制御信号を受信すると、遮断弁214を閉じてガス流路を閉止する。さらに、(g)時点で地震信号処理装置100がS波を検知すると、地震信号処理装置100は、遮断弁210および遮断弁211を閉じる制御信号をシリンダーキャビネット200に送信する。シリンダーキャビネット200は、(h)時点で制御信号を受信すると、遮断弁210および遮断弁211を閉じてガス流路を閉止して、ガスの供給を遮断する。
Next, an operation example of the earthquake signal processing apparatus 100 will be described using a time chart. FIG. 6 is a time chart showing an operation example when receiving PC 400 receives a P-wave detection signal detected at a distance. Here, in the following example, it demonstrates without considering the above-mentioned number of grace seconds.
When an earthquake occurs far away from the factory, the receiving PC 400 receives the P-wave detection signal at the point (a). Reception PC 400 calculates the expected number of seconds to reach based on the received P-wave detection signal. Here, assuming that the set expected number of seconds is 7 seconds, the seismic signal processing apparatus 100 does not control the valve shut-off 214 when it exceeds 7 seconds before the expected number of seconds reached. Similarly, at time (b) and time (c), the seismic signal processing apparatus 100 does not control the shut-off valve 214. (D) When the P-wave detection signal is received at the time point and the expected arrival time becomes equal to or less than the set expected number of seconds (7 seconds), the seismic signal processing device 100 controls the control signal to close the shut-off valve 214 at the time point (e). Is transmitted to the cylinder cabinet 200. When receiving the control signal at time (f), the cylinder cabinet 200 closes the shut-off valve 214 and closes the gas flow path. Further, when the seismic signal processing apparatus 100 detects an S wave at the time (g), the seismic signal processing apparatus 100 transmits a control signal for closing the shutoff valve 210 and the shutoff valve 211 to the cylinder cabinet 200. When receiving the control signal at time (h), the cylinder cabinet 200 closes the shutoff valve 210 and the shutoff valve 211 to close the gas flow path, and shuts off the gas supply.

図7は、工場に設置される地震計装置300が、P波検知信号を受信した場合の動作例を示すタイムチャートである。
(a)時点で、工場内の地震計装置300がP波を検知し、P波検知信号を地震信号処理装置100に送信すると、地震信号処理装置100は、遮断弁214を閉じる制御信号を遮断弁214に送信する。(b)時点で、シリンダーキャビネット200が制御信号を受信し、遮断弁214を閉じる。また、(c)時点で地震計装置300がS波を検知して、地震信号処理装置100にS波検知信号を送信する。地震信号処理装置100は、地震計装置300から送信されるS波検知信号を受信すると、遮断弁210および遮断弁211を閉じる制御信号を、シリンダーキャビネット200に送信する。シリンダーキャビネット200は、遮断弁210および遮断弁211を閉じて、ガス流路を閉止してガスの供給を遮断する。
FIG. 7 is a time chart showing an operation example when the seismometer apparatus 300 installed in the factory receives a P-wave detection signal.
(A) When the seismometer apparatus 300 in the factory detects the P wave and transmits the P wave detection signal to the seismic signal processing apparatus 100 at the time point, the seismic signal processing apparatus 100 blocks the control signal for closing the shutoff valve 214. Transmit to valve 214. (B) At the time, the cylinder cabinet 200 receives the control signal and closes the shut-off valve 214. At time (c), the seismometer apparatus 300 detects an S wave and transmits an S wave detection signal to the earthquake signal processing apparatus 100. When the seismic signal processing apparatus 100 receives the S wave detection signal transmitted from the seismometer apparatus 300, the seismic signal processing apparatus 100 transmits a control signal for closing the shutoff valve 210 and the shutoff valve 211 to the cylinder cabinet 200. The cylinder cabinet 200 closes the shut-off valve 210 and the shut-off valve 211, closes the gas flow path, and shuts off the gas supply.

図8は、受信PC400が、遠方で検知されたP波検知信号を受信したが、のちにキャンセル報を受信した場合の動作例を示すタイムチャートである。
(a)時点で、受信PC400がP波検知信号を受信する。受信PC400は、受信したP波検知信号に基づいて到達予想秒数を算出する。地震信号処理装置100は、到達予想秒数が設定予想秒数(例えば、7秒)以下となるまでは遮断弁214の制御を行わない。(b)時点で、受信PC400がP波検知信号を受信した場合も、同様に、地震信号処理装置100は、遮断弁214の制御を行わない。(c)時点で、受信PC400がキャンセル報を受信すると、地震信号処理装置100は、そのまま遮断弁214の制御を行わない。
FIG. 8 is a time chart showing an operation example when the receiving PC 400 receives a P-wave detection signal detected at a long distance but later receives a cancellation report.
(A) At the time, the receiving PC 400 receives the P-wave detection signal. Reception PC 400 calculates the expected number of seconds to reach based on the received P-wave detection signal. The seismic signal processing apparatus 100 does not control the shut-off valve 214 until the expected arrival time is equal to or less than the set expected time (for example, 7 seconds). (B) When the reception PC 400 receives the P-wave detection signal at the time point (b), the seismic signal processing apparatus 100 similarly does not control the cutoff valve 214. At time (c), when the receiving PC 400 receives the cancel information, the seismic signal processing apparatus 100 does not control the shutoff valve 214 as it is.

図9は、震源地を遠方とする検知信号が送信されたが、後にキャンセル報が送信された場合の動作例を示すタイムチャートである。
(a)時点で、受信PC400が、遠方で地震が発生したことを示すP波検知信号を受信する。受信PC400は、受信したP波検知信号に基づいて到達予想秒数を算出する。地震信号処理装置100は、到達予想秒数が設定予想秒数(例えば、7秒)以下となるまでは遮断弁214の制御を行わない。(b)時点、(c)時点も同様に、地震信号処理装置100は遮断弁214の制御を行わない。(d)時点でP波検知信号を受信し、到達予想秒数が設定予想秒数(7秒)以下になると、地震信号処理装置100は、(e)時点で、遮断弁214を閉じる制御信号をシリンダーキャビネット200に送信する。シリンダーキャビネット200は、(f)時点で制御信号を受信すると、遮断弁214を閉じてガス流路を閉止する。その後、(g)時点で受信PC400がキャンセル報を受信すると、地震信号処理装置100は、遮断弁214を開けてガス流路を開放させる制御信号をシリンダーキャビネット200に送信する。(h)時点で、シリンダーキャビネット200は制御信号を受信し、遮断弁214を開けてガス流路を開放して、ガスの供給を復帰させる。
FIG. 9 is a time chart showing an operation example in the case where a detection signal for transmitting the epicenter far is transmitted, but a cancellation report is transmitted later.
(A) At the time, the receiving PC 400 receives a P-wave detection signal indicating that an earthquake has occurred far away. Reception PC 400 calculates the expected number of seconds to reach based on the received P-wave detection signal. The seismic signal processing apparatus 100 does not control the shut-off valve 214 until the expected arrival time is equal to or less than the set expected time (for example, 7 seconds). Similarly, at time (b) and time (c), the seismic signal processing apparatus 100 does not control the shut-off valve 214. (D) When the P-wave detection signal is received at the time point and the expected arrival time becomes equal to or less than the set expected number of seconds (7 seconds), the seismic signal processing device 100 controls the control signal to close the shut-off valve 214 at the time point (e). Is transmitted to the cylinder cabinet 200. When receiving the control signal at time (f), the cylinder cabinet 200 closes the shut-off valve 214 and closes the gas flow path. Thereafter, when the receiving PC 400 receives the cancel information at time (g), the seismic signal processing apparatus 100 transmits a control signal for opening the shut-off valve 214 to open the gas flow path to the cylinder cabinet 200. (H) At the time, the cylinder cabinet 200 receives the control signal, opens the shut-off valve 214, opens the gas flow path, and returns the gas supply.

以上説明したように、本実施形態によれば、受信するP波検知信号が誤報であり、キャンセル信号を受信した場合には、配管中のガスの置換を行わずに済み、早急に復帰することを可能とすることが可能となる。
また、地震発生時に受信PC400や地震計装置300から受信する地震検知信号が示す震度に応じて、また複数の地震検知信号を受信した場合にもそれらの組み合わせに応じた条件設定を予め記憶させることにより、個別に最適な遮断弁の制御を行うことが可能となる。
As described above, according to the present embodiment, when the received P-wave detection signal is a false alarm and a cancel signal is received, it is not necessary to replace the gas in the pipe, and it is possible to quickly return. Can be made possible.
In addition, according to the seismic intensity indicated by the earthquake detection signal received from the receiving PC 400 or the seismometer device 300 when an earthquake occurs, and when a plurality of earthquake detection signals are received, condition settings corresponding to those combinations are stored in advance. Thus, it becomes possible to individually control the optimum shutoff valve.

なお、シリンダーキャビネット200に収納されるボンベ201と、ボンベ202とには、浮き輪のようなエアーカバーを取り付けて、地震信号処理装置100からの制御信号により空気を封入させて膨らませ、地震時の衝撃から保護するようにしても良い。
図10は、ボンベ201の遮断弁210の箇所に取り付けるエアーカバーの例を示す図である。平常時には、(a)に示されるように縮ませておき、地震発生時には、空気を封入して(b)に示されるように膨らませる。図11は、ボンベ201の胴体部に取り付けるエアーカバーの例を示す図である。平常時には、(a)に示されるように縮ませておき、地震発生時には、空気を封入して(b)に示されるように膨らませる。図12は、図10と図11とに示したエアーカバーをボンベ201に取り付けた際の外観の例を示す図である。
In addition, air cylinders such as floating rings are attached to the cylinders 201 and 202 stored in the cylinder cabinet 200, and air is sealed by the control signal from the earthquake signal processing apparatus 100 to inflate the cylinder 201 and the cylinder 202. You may make it protect from an impact.
FIG. 10 is a diagram illustrating an example of an air cover attached to the location of the shutoff valve 210 of the cylinder 201. In normal times, it is shrunk as shown in (a), and when an earthquake occurs, air is enclosed and inflated as shown in (b). FIG. 11 is a diagram illustrating an example of an air cover attached to the body portion of the cylinder 201. In normal times, it is shrunk as shown in (a), and when an earthquake occurs, air is enclosed and inflated as shown in (b). FIG. 12 is a view showing an example of an external appearance when the air cover shown in FIGS. 10 and 11 is attached to the cylinder 201.

エアーカバーは、ボンベ201の転倒防止チェーンやバンドに取り付けるようにしても良い。エアーカバーは、空気や窒素などを封入することで、ボンベ201の曲面に合わせてチューブのような形をしたものが膨らみ、ボンベ201をカバーする。エアーカバーには、図10と図11とに示したように、2種類の形があり、1つはボンベの曲面に合わせて手のように水平に伸び、もう1つは容器上部に取り付けてある容器弁(附属品)の周りを取り囲むように広がりカバーする。このようにすれば、転倒防止チェーンやバンドなどの耐性を超える想定以上の揺れがあった場合にも、シリンダーキャビネット200に収納されているボンベ201と、周辺の機器とが地震の振動により接触することを防止し、ボンベおよび周辺機器の損傷を最小限に抑えることができる。   The air cover may be attached to a fall prevention chain or band of the cylinder 201. The air cover encloses the cylinder 201 by enclosing air, nitrogen, or the like so that a tube-like shape expands in accordance with the curved surface of the cylinder 201. There are two types of air covers, as shown in Fig. 10 and Fig. 11. One is horizontally extending like a hand according to the curved surface of the cylinder, and the other is attached to the top of the container. Cover and spread around a container valve (accessory). In this way, the cylinder 201 stored in the cylinder cabinet 200 and the peripheral equipment come into contact with each other due to the vibration of the earthquake even when there is a swing more than expected that exceeds the resistance of the fall prevention chain or the band. This can prevent damage to cylinders and peripheral equipment.

また、S波の到達前にエアーカバーを膨張させれば、ボンベ201、ボンベ202の胴部やバルブ近傍がエアーカバーで固定されるため、S波の揺れによるボンベ201、ボンベ202の暴れが抑えられ、遮断弁210、遮断弁211を閉じる動作を円滑に行うことができる。S波の到達前にエアーカバーを膨張させるには、例えば、受信PC400から送信される緊急地震速報のP波検知信号または地震計装置300から送信されるP波検知信号を、地震信号処理装置100が受信した後直ちに、或いは、所定の条件が成立して地震信号処理装置100が遮断弁214を閉じる制御信号をシリンダーキャビネット200に送信するのと同時に、エアーカバーを膨張させる制御信号をシリンダーキャビネット200に送信すれば良い。このように、エアーカバーは、P波が検出された時点で空気等の封入を開始することが望ましい。これは、エアーカバーの膨張には時間が掛かるため、遮断弁を閉じる制御と同じタイミングで空気等の封入を開始するとS波が到達するまでに膨張が間に合わない恐れがあるためである。   Further, if the air cover is inflated before the arrival of the S wave, the cylinder 201 and the cylinder 202 and the vicinity of the valve are fixed by the air cover, so that the violence of the cylinder 201 and the cylinder 202 due to the shaking of the S wave is suppressed. Therefore, the operation of closing the shutoff valve 210 and the shutoff valve 211 can be performed smoothly. In order to inflate the air cover before the arrival of the S wave, for example, the P wave detection signal of the emergency earthquake warning transmitted from the receiving PC 400 or the P wave detection signal transmitted from the seismometer apparatus 300 is used as the earthquake signal processing apparatus 100. Immediately after receiving the signal, or at the same time as the seismic signal processing apparatus 100 transmits a control signal for closing the shut-off valve 214 to the cylinder cabinet 200 when a predetermined condition is satisfied, a control signal for inflating the air cover is sent to the cylinder cabinet 200. Just send it to. As described above, it is desirable that the air cover starts sealing of air or the like when the P wave is detected. This is because, since it takes time to expand the air cover, if the start of the sealing of air or the like at the same timing as the control for closing the shut-off valve, the expansion may not be in time until the S wave arrives.

なお、本発明における処理部の機能を実現するためのプログラムをコンピュータ読み取り可能な記録媒体に記録して、この記録媒体に記録されたプログラムをコンピュータシステムに読み込ませ、実行することにより地震信号の処理を行ってもよい。なお、ここでいう「コンピュータシステム」とは、OSや周辺機器等のハードウェアを含むものとする。また、「コンピュータシステム」は、ホームページ提供環境(あるいは表示環境)を備えたWWWシステムも含むものとする。また、「コンピュータ読み取り可能な記録媒体」とは、フレキシブルディスク、光磁気ディスク、ROM、CD−ROM等の可搬媒体、コンピュータシステムに内蔵されるハードディスク等の記憶装置のことをいう。さらに「コンピュータ読み取り可能な記録媒体」とは、インターネット等のネットワークや電話回線等の通信回線を介してプログラムが送信された場合のサーバやクライアントとなるコンピュータシステム内部の揮発性メモリ(RAM)のように、一定時間プログラムを保持しているものも含むものとする。   In addition, the program for realizing the function of the processing unit in the present invention is recorded on a computer-readable recording medium, and the program recorded on the recording medium is read into the computer system and executed to process the earthquake signal. May be performed. Here, the “computer system” includes an OS and hardware such as peripheral devices. The “computer system” includes a WWW system having a homepage providing environment (or display environment). The “computer-readable recording medium” refers to a storage device such as a flexible medium, a magneto-optical disk, a portable medium such as a ROM and a CD-ROM, and a hard disk incorporated in a computer system. Further, the “computer-readable recording medium” refers to a volatile memory (RAM) in a computer system that becomes a server or a client when a program is transmitted via a network such as the Internet or a communication line such as a telephone line. In addition, those holding programs for a certain period of time are also included.

また、上記プログラムは、このプログラムを記憶装置等に格納したコンピュータシステムから、伝送媒体を介して、あるいは、伝送媒体中の伝送波により他のコンピュータシステムに伝送されてもよい。ここで、プログラムを伝送する「伝送媒体」は、インターネット等のネットワーク(通信網)や電話回線等の通信回線(通信線)のように情報を伝送する機能を有する媒体のことをいう。また、上記プログラムは、前述した機能の一部を実現するためのものであっても良い。さらに、前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるもの、いわゆる差分ファイル(差分プログラム)であっても良い。   The program may be transmitted from a computer system storing the program in a storage device or the like to another computer system via a transmission medium or by a transmission wave in the transmission medium. Here, the “transmission medium” for transmitting the program refers to a medium having a function of transmitting information, such as a network (communication network) such as the Internet or a communication line (communication line) such as a telephone line. The program may be for realizing a part of the functions described above. Furthermore, what can implement | achieve the function mentioned above in combination with the program already recorded on the computer system, what is called a difference file (difference program) may be sufficient.

本発明の一実施形態によるガス供給システムのシステム構成を示す図である。It is a figure which shows the system configuration | structure of the gas supply system by one Embodiment of this invention. 本発明の一実施形態による地震信号処理装置の外観を示す図である。It is a figure which shows the external appearance of the earthquake signal processing apparatus by one Embodiment of this invention. 本発明の一実施形態による地震信号処理装置の端末構成を示す図である。It is a figure which shows the terminal structure of the earthquake signal processing apparatus by one Embodiment of this invention. 本発明の一実施形態による地震信号処理装置の記憶部に記憶されるデータ例を示す図である。It is a figure which shows the example of data memorize | stored in the memory | storage part of the earthquake signal processing apparatus by one Embodiment of this invention. 本発明の一実施形態によるガス供給システムの動作例を示すシーケンス図である。It is a sequence diagram which shows the operation example of the gas supply system by one Embodiment of this invention. 本発明の一実施形態によるガス供給システムの動作例を示すタイミングチャートである。It is a timing chart which shows the operation example of the gas supply system by one Embodiment of this invention. 本発明の一実施形態によるガス供給システムの動作例を示すタイミングチャートである。It is a timing chart which shows the operation example of the gas supply system by one Embodiment of this invention. 本発明の一実施形態によるガス供給システムの動作例を示すタイミングチャートである。It is a timing chart which shows the operation example of the gas supply system by one Embodiment of this invention. 本発明の一実施形態によるガス供給システムの動作例を示すタイミングチャートである。It is a timing chart which shows the operation example of the gas supply system by one Embodiment of this invention. 本発明の一実施形態によるエアーカバーの例を示す外観図である。It is an external view which shows the example of the air cover by one Embodiment of this invention. 本発明の一実施形態によるエアーカバーの例を示す外観図である。It is an external view which shows the example of the air cover by one Embodiment of this invention. 本発明の一実施形態によるエアーカバーの例を示す外観図である。It is an external view which shows the example of the air cover by one Embodiment of this invention.

符号の説明Explanation of symbols

1 ガス供給システム
100 地震信号処理装置
101 表示ランプ
102 入力端子台
103 出力端子台
104 パワーサプライ
105 電源
106 メンテナンススイッチ
107 地震訓練用スイッチ
110 制御部
111 記憶部
200 シリンダーキャビネット
201 ボンベ
202 ボンベ
210 遮断弁
211 遮断弁
212 遮断弁
213 遮断弁
214 遮断弁
220 制御機器
301 地震計装置
302 地震計装置
303 地震計装置
400 受信PC
300 地震計装置
DESCRIPTION OF SYMBOLS 1 Gas supply system 100 Earthquake signal processing apparatus 101 Indicator lamp 102 Input terminal block 103 Output terminal block 104 Power supply 105 Power supply 106 Maintenance switch 107 Switch for earthquake training 110 Control part 111 Storage part 200 Cylinder cabinet 201 Cylinder 202 Cylinder 210 Shut-off valve 211 Shut-off valve 212 Shut-off valve 213 Shut-off valve 214 Shut-off valve 220 Control device 301 Seismometer device 302 Seismometer device 303 Seismometer device 400 Receiving PC
300 Seismometer

Claims (8)

ガスが充填されたボンベから配管を通ってガス供給先に前記ガスが供給されるガス供給システムにおいて、前記配管から前記ガス供給先へ前記ガスを供給または遮断する第1の遮断弁と、前記ボンベから前記配管へ前記ガスを供給または遮断する第2の遮断弁との開閉を制御する地震信号処理装置であって、
地震によるP波が検知されたことを示すP波検知信号と、地震によるS波が検知されたことを示すS波検知信号とが入力される入力部と、
前記入力部から前記P波検知信号が入力されると、前記第1の遮断弁を閉じてガスの供給を遮断する第1の遮断制御部と、
前記入力部から前記S波検知信号が入力されると、前記第2の遮断弁を閉じてガスの供給を遮断する第2の遮断制御部と、
前記入力部に前記P波検知信号が入力され、前記第1の遮断制御部によって前記第1の遮断弁が閉じられた後に前記入力部に前記S波検知信号が入力されない場合、閉じられた前記第1の遮断弁を開けてガスの供給を復帰させる復帰制御部と、
を備えることを特徴とする地震信号処理装置。
In a gas supply system in which the gas is supplied from a cylinder filled with gas to a gas supply destination through a pipe, a first cutoff valve for supplying or blocking the gas from the pipe to the gas supply destination; A seismic signal processing device for controlling opening and closing of a second shutoff valve for supplying or shutting off the gas from the pipe,
An input unit to which a P wave detection signal indicating that a P wave due to an earthquake has been detected and an S wave detection signal indicating that an S wave due to an earthquake has been detected;
When the P-wave detection signal is input from the input unit, a first cutoff control unit that closes the first cutoff valve and shuts off the gas supply;
When the S wave detection signal is input from the input unit, a second cutoff control unit that closes the second cutoff valve and shuts off the gas supply;
When the P-wave detection signal is input to the input unit and the first cutoff valve is closed by the first cutoff control unit and the S-wave detection signal is not input to the input unit, the P-wave detection signal is closed. A return control unit for opening the first shut-off valve and returning the gas supply;
An earthquake signal processing apparatus comprising:
前記地震信号処理装置は、複数の前記ボンベに対応する前記第1の遮断弁および前記第2の遮断弁に接続され、
複数の前記ボンベのそれぞれに充填されるガスの種類に対応付けて、前記P波検知信号が入力された後に前記ガスの種類に対応する前記第1の遮断弁を閉じるまでの猶予秒数が記憶される記憶部と、をさらに備え、
前記第1の遮断制御部は、前記入力部から前記P波検知信号が入力されると、前記ボンベに充填されたガスの種類に対応する前記猶予秒数を前記記憶部から読み出し、読み出した前記猶予秒数の時間が経過した後、前記第1の遮断弁を遮断する
ことを特徴とする請求項1に記載の地震信号処理装置。
The seismic signal processing device is connected to the first cutoff valve and the second cutoff valve corresponding to a plurality of the cylinders,
The number of grace seconds until the first shutoff valve corresponding to the gas type is closed after the P-wave detection signal is input is stored in association with the type of gas filled in each of the plurality of cylinders. And a storage unit,
When the first cutoff control unit receives the P-wave detection signal from the input unit, the first cutoff control unit reads the grace seconds corresponding to the type of gas charged in the cylinder from the storage unit, and reads the read-out time. The seismic signal processing apparatus according to claim 1, wherein the first shut-off valve is shut off after a grace time has elapsed.
前記記憶部には、予め定められた設定震度が記憶され、
前記第1の遮断制御部は、入力される前記P波検知信号に基づく前記地震の予測震度と、前記記憶部に記憶された前記設定震度とを比較し、前記予測震度が前記設定震度を超える場合、前記第1の遮断弁を遮断する
ことを特徴とする請求項1または請求項2に記載の地震信号処理装置。
A predetermined set seismic intensity is stored in the storage unit,
The first cutoff control unit compares the predicted seismic intensity of the earthquake based on the input P-wave detection signal with the set seismic intensity stored in the storage unit, and the predicted seismic intensity exceeds the set seismic intensity. 3. The seismic signal processing apparatus according to claim 1, wherein the first shut-off valve is shut off in the case.
前記記憶部には、地震が到達する前に遮断弁を閉じる余裕時間を示す設定予想秒数が予め記憶され、
前記第1の遮断制御部は、入力される前記P波検知信号に応じた地震が到達するまでの到達予想秒数と、前記記憶部に記憶された前記設定予想秒数とを比較し、前記到達予想秒数が、前記設定予想秒数以下である場合、前記第1の遮断弁を遮断する
ことを特徴とする請求項1から請求項3までのいずれか1項に記載の地震信号処理装置。
In the storage unit, a set expected number of seconds indicating a margin time for closing the shutoff valve before the earthquake reaches is stored in advance,
The first cutoff control unit compares the expected number of seconds until an earthquake according to the input P wave detection signal arrives and the set expected number of seconds stored in the storage unit, and The seismic signal processing device according to any one of claims 1 to 3, wherein the first shut-off valve is shut off when an expected arrival time is equal to or less than the set expected seconds. .
前記地震信号処理装置は、P波またはS波を検知してP波検知信号またはS波検知信号を前記入力部に入力する複数台の地震計装置に接続されており、
前記第1の遮断制御部は、前記入力部に、前記複数台の地震計装置のうち定められた台数以上の前記地震計装置から前記P波検知信号が入力された場合に、前記第1の遮断弁を閉じる
ことを特徴とする請求項1から請求項4までのいずれか1項に記載の地震信号処理装置。
The seismic signal processing device is connected to a plurality of seismometer devices that detect a P wave or an S wave and input a P wave detection signal or an S wave detection signal to the input unit,
The first cutoff control unit is configured to input the first wave detection signal when the P wave detection signal is input to the input unit from a predetermined number or more of the plurality of seismometer devices. The shut-off valve is closed. The earthquake signal processing device according to any one of claims 1 to 4, wherein:
前記入力部には、気象庁から配信されるP波検知信号と、当該P波検知信号が誤報であったことを示すキャンセル信号とが入力され、
前記復帰制御部は、前記入力部に前記P波検知信号が入力され前記第1の遮断制御部によって前記第1の遮断弁が閉じられた後、前記入力部に前記キャンセル信号が入力された場合、閉じられた前記第1の遮断弁を開けてガスの供給を復帰させる
ことを特徴とする請求項1から請求項5までのいずれか1項に記載の地震信号処理装置。
The input unit receives a P-wave detection signal distributed from the Japan Meteorological Agency and a cancel signal indicating that the P-wave detection signal was a false alarm,
The return control unit, when the cancel signal is input to the input unit after the P-wave detection signal is input to the input unit and the first cutoff control unit closes the first cutoff valve The earthquake signal processing apparatus according to any one of claims 1 to 5, wherein the gas supply is restored by opening the closed first shutoff valve.
前記ガス供給システムは、前記ボンベの胴部と前記遮断弁とのうち少なくとも一方に取り付けられるエアーカバーを備え、
前記入力部から前記P波検知信号が入力されると、前記エアーカバーにガスを封入して膨張させるエアーカバー制御部を備える
ことを特徴とする請求項1〜請求項6までのいずれか1項に記載の地震信号処理装置。
The gas supply system includes an air cover attached to at least one of the cylinder body and the shutoff valve.
The air cover control part which encloses gas in the air cover and inflates when the P wave detection signal is inputted from the input part is provided. Any one of Claims 1-6 characterized by things. The seismic signal processing device described in 1.
ガスが充填されたボンベから配管を通ってガス供給先に前記ガスが供給されるガス供給システムにおいて、前記配管から前記ガス供給先へ前記ガスを供給または遮断する第1の遮断弁と、前記ボンベから前記配管へ前記ガスを供給または遮断する第2の遮断弁との開閉を制御する地震信号処理装置の、
入力部に、地震によるP波が検知されたことを示すP波検知信号、または地震によるS波が検知されたことを示すS波検知信号が入力されるステップと、
第1の遮断制御部が、前記入力部から前記P波検知信号が入力されると、前記第1の遮断弁を閉じてガスの供給を遮断するステップと、
第2の遮断制御部が、前記入力部から前記S波検知信号が入力されると、前記第2の遮断弁を閉じてガスの供給を遮断するステップと、
復帰制御部が、前記入力部に前記P波検知信号が入力され、前記第1の遮断制御部によって前記第1の遮断弁が閉じられた後に前記入力部に前記S波検知信号が入力されない場合、閉じられた前記第1の遮断弁を開けてガスの供給を復帰させるステップと、
を備えることを特徴とする地震信号処理方法。
In a gas supply system in which the gas is supplied from a cylinder filled with gas to a gas supply destination through a pipe, a first cutoff valve for supplying or blocking the gas from the pipe to the gas supply destination; A seismic signal processing device for controlling opening and closing with a second shutoff valve for supplying or shutting off the gas from the pipe,
A step of inputting a P wave detection signal indicating that a P wave due to an earthquake has been detected or an S wave detection signal indicating that an S wave due to an earthquake has been detected to the input unit;
When the first cutoff control unit receives the P-wave detection signal from the input unit, the step of closing the first cutoff valve to shut off the supply of gas;
When the second cutoff control unit receives the S wave detection signal from the input unit, the step of closing the second cutoff valve to shut off the supply of gas;
When the P-wave detection signal is input to the input unit and the S-wave detection signal is not input to the input unit after the first cutoff valve is closed by the first cutoff control unit Opening the closed first shut-off valve to return the gas supply;
An earthquake signal processing method comprising:
JP2008254223A 2008-09-30 2008-09-30 Earthquake signal processing apparatus and earthquake signal processing method Expired - Fee Related JP5222085B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008254223A JP5222085B2 (en) 2008-09-30 2008-09-30 Earthquake signal processing apparatus and earthquake signal processing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008254223A JP5222085B2 (en) 2008-09-30 2008-09-30 Earthquake signal processing apparatus and earthquake signal processing method

Publications (2)

Publication Number Publication Date
JP2010084843A JP2010084843A (en) 2010-04-15
JP5222085B2 true JP5222085B2 (en) 2013-06-26

Family

ID=42249003

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008254223A Expired - Fee Related JP5222085B2 (en) 2008-09-30 2008-09-30 Earthquake signal processing apparatus and earthquake signal processing method

Country Status (1)

Country Link
JP (1) JP5222085B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6101950B2 (en) * 2013-04-26 2017-03-29 大成建設株式会社 Method and system for predicting major dynamic strength of earthquakes
JP2017011542A (en) * 2015-06-23 2017-01-12 東芝ライテック株式会社 Control system, control method, and program
KR101995361B1 (en) * 2017-05-23 2019-07-02 (주)진솔루션 Gas supplying system equipped with seismic monitoring sensor
JP7123553B2 (en) * 2017-12-15 2022-08-23 旭有機材株式会社 Blocking/opening system for piping members and blocking/opening method for piping members

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09152901A (en) * 1995-11-30 1997-06-10 Matsushita Electric Ind Co Ltd Gas shutoff device
JP3929058B2 (en) * 2004-04-09 2007-06-13 ホーチキ株式会社 Disaster prevention system
JP4491399B2 (en) * 2005-10-13 2010-06-30 Okiセミコンダクタ株式会社 Earthquake disaster prevention system

Also Published As

Publication number Publication date
JP2010084843A (en) 2010-04-15

Similar Documents

Publication Publication Date Title
JP5222085B2 (en) Earthquake signal processing apparatus and earthquake signal processing method
CN108431518B (en) Boiler with gas detection and earthquake detection functions and its control method
KR20120122477A (en) Integrated monitoring system for preventing disaster
GB2434475A (en) Circuit and method for prioritization of hazardous condition messages for interconnected hazardous condition detectors
WO2003100733A3 (en) Operator with transmitter storage overwrite protection and method of use
JP4491399B2 (en) Earthquake disaster prevention system
RU2009126283A (en) METHOD AND DEVICE FOR DATA PROTECTION
WO2006086196A3 (en) Method and system for detecting a predetermined sound event
JP5187880B2 (en) Sprinkler fire extinguishing equipment
JP3929058B2 (en) Disaster prevention system
TW201437782A (en) System and method for mitigating shock failure in an electronic device
US20160354622A1 (en) Gas detection and fire suppression system for hydrogen salt cavern
JP2016176665A (en) Gas supply control device, gas supply control system and control method
KR20060004518A (en) Fire alarm device and method of mobile communication terminal
JP2018204947A (en) Gas supply control system
FR2893700B1 (en) DEVICE AND METHOD FOR PROTECTING A CRYOGENIC RESERVOIR AND RESERVOIR COMPRISING SUCH A DEVICE
MY137229A (en) Method and apparatus for multi-algorithm detection
Roser et al. Investigations of flame front propagation between interconnected process vessels. Development of a new flame front propagation time prediction model
KR20160055607A (en) Apparatus for preventing gas leakage accident and control method thereof
JP2008269439A (en) Gas meter, gas leakage alarm and gas security system
KR101995361B1 (en) Gas supplying system equipped with seismic monitoring sensor
JPH0650535A (en) Gas shutoff system
JP4404349B2 (en) Earthquake disaster prevention radio apparatus and control method thereof in earthquake disaster prevention notification system
KR20160038128A (en) Apparatus and method for valve control by sensing earthquake
JP6562858B2 (en) Waste charging device and waste processing device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110801

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130212

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130308

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160315

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Ref document number: 5222085

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20160315

Year of fee payment: 3

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees