Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6562858B2 - Waste charging device and waste processing device - Google Patents
[go: Go Back, main page]

JP6562858B2 - Waste charging device and waste processing device - Google Patents

Waste charging device and waste processing device Download PDF

Info

Publication number
JP6562858B2
JP6562858B2 JP2016057334A JP2016057334A JP6562858B2 JP 6562858 B2 JP6562858 B2 JP 6562858B2 JP 2016057334 A JP2016057334 A JP 2016057334A JP 2016057334 A JP2016057334 A JP 2016057334A JP 6562858 B2 JP6562858 B2 JP 6562858B2
Authority
JP
Japan
Prior art keywords
waste
damper
valve
seal valve
load
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016057334A
Other languages
Japanese (ja)
Other versions
JP2017170304A (en
Inventor
将也 坂詰
将也 坂詰
陽太 ▲高▼木
陽太 ▲高▼木
義弘 大野
義弘 大野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Engineering Co Ltd
Nippon Steel Plant Designing Corp
Original Assignee
Nippon Steel Engineering Co Ltd
Nippon Steel Plant Designing Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Engineering Co Ltd, Nippon Steel Plant Designing Corp filed Critical Nippon Steel Engineering Co Ltd
Priority to JP2016057334A priority Critical patent/JP6562858B2/en
Publication of JP2017170304A publication Critical patent/JP2017170304A/en
Application granted granted Critical
Publication of JP6562858B2 publication Critical patent/JP6562858B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Description

本開示は、廃棄物装入装置及び廃棄物処理装置に関する。   The present disclosure relates to a waste charging apparatus and a waste processing apparatus.

特許文献1には、上下方向に沿って延在する筒状の側壁を有する廃棄物溶融炉に、上方から廃棄物を装入する廃棄物装入装置が開示されている。この廃棄物装入装置は、廃棄物を下方に送り出す下側開口部と、水平な軸まわりに回転して下側開口部を開閉する下側シール弁とを備える。   Patent Document 1 discloses a waste charging apparatus for charging waste from above into a waste melting furnace having a cylindrical side wall extending in the vertical direction. The waste charging device includes a lower opening for sending waste downward, and a lower seal valve that rotates around a horizontal axis to open and close the lower opening.

特開2014−126232号公報JP 2014-126232 A

例えば放射性廃棄物のように、有害物質を含む廃棄物を処理対象とする場合に、廃棄物を収容したフレキシブルコンテナバッグを開梱せずに廃棄物処理炉に装入する場合がある(以下、この装入方式を「未開梱装入方式」という)。この場合、廃棄物がフレキシブルコンテナバッグによって一体化された状態で落下するので、フレキシブルコンテナバッグを開梱して廃棄物を装入する場合に比べ、シール弁にかかる負荷が大きくなることが予測される。負荷の増大によりシール弁に破壊が生じると、廃棄物処理炉内のガスが漏えいすることになる。このため、シール弁の疲労破壊を防止することが重要である。特に、廃棄物が有害物質を含む場合には、シール弁の疲労破壊を防止することがより一層重要となる。このため、未開梱装入方式による廃棄物の装入を繰り返す場合、シール弁の疲労状態を把握し、シール弁の疲労破壊に先立ってメンテナンスを行うことが望まれる。   For example, when waste containing hazardous substances such as radioactive waste is to be treated, the flexible container bag containing the waste may be loaded into the waste treatment furnace without unpacking (hereinafter, This charging method is called “unpacking charging method”). In this case, since the waste falls in an integrated state by the flexible container bag, it is predicted that the load applied to the seal valve will be larger than when the flexible container bag is unpacked and the waste is loaded. The When the seal valve is broken due to an increase in load, gas in the waste treatment furnace leaks. For this reason, it is important to prevent fatigue failure of the seal valve. In particular, when the waste contains harmful substances, it is even more important to prevent fatigue failure of the seal valve. For this reason, when repeating the loading of the waste by the unpacking charging method, it is desired to grasp the fatigue state of the seal valve and perform maintenance prior to the fatigue failure of the seal valve.

本開示は、装置構成の複雑化を抑制しつつ、シール弁の疲労状態を把握できる装置を提供することを目的とする。   An object of this indication is to provide the device which can grasp | ascertain the fatigue state of a seal valve, suppressing complication of an apparatus configuration.

本開示に係る廃棄物装入装置は、廃棄物を廃棄物溶融炉内に装入するための経路にて下方に開口した装入口を下方から開閉する弁本体と、油圧式のアクチュエータを動力源として弁本体を閉状態に拘束する弁ロック機構と、を有する第一シール弁と、廃棄物が弁本体上に落下した際に第一シール弁にかかった負荷をアクチュエータの油圧に基づいて導出し、当該負荷の大きさと、廃棄物が弁本体上に落下した回数とに基づいて、第一シール弁の疲労状態に関する指標を導出する監視装置と、を備える。   A waste charging device according to the present disclosure includes a valve body that opens and closes a charging port that opens downward in a path for charging waste into a waste melting furnace, and a hydraulic actuator that is a power source. And a valve locking mechanism for restraining the valve body in a closed state, and a load applied to the first seal valve when waste falls on the valve body is derived based on the hydraulic pressure of the actuator. And a monitoring device for deriving an index related to the fatigue state of the first seal valve based on the magnitude of the load and the number of times the waste has dropped on the valve body.

この廃棄物装入装置において、弁本体は、弁ロック機構のアクチュエータの油圧に応じた力で閉状態に拘束される。このため、アクチュエータの油圧は、弁本体に対する廃棄物の落下衝撃に応じて変動する。そこで、弁ロック機構のアクチュエータの油圧に基づくことで、廃棄物が弁本体上に落下した際に第一シール弁にかかった負荷を把握することが可能である。第一シール弁の疲労状態は、上記負荷の大きさ及び廃棄物が弁本体上に落下した回数に関連する傾向がある。このため、上記負荷の大きさ及び上記回数に基づくことで、第一シール弁の疲労状態に関する指標を導出できる。すなわち、弁ロック機構のアクチュエータを利用して第一シール弁の疲労状態に関する情報を導出できる。従って、装置構成の複雑化を抑制しつつ、第一シール弁の疲労状態を把握できる。   In this waste charging apparatus, the valve body is restrained to the closed state by a force corresponding to the hydraulic pressure of the actuator of the valve lock mechanism. For this reason, the hydraulic pressure of the actuator fluctuates according to the drop impact of the waste on the valve body. Therefore, based on the hydraulic pressure of the actuator of the valve lock mechanism, it is possible to grasp the load applied to the first seal valve when waste falls on the valve body. The fatigue state of the first seal valve tends to be related to the magnitude of the load and the number of times waste has fallen on the valve body. For this reason, the index regarding the fatigue state of the first seal valve can be derived based on the magnitude of the load and the number of times. That is, information on the fatigue state of the first seal valve can be derived using the actuator of the valve lock mechanism. Therefore, the fatigue state of the first seal valve can be grasped while suppressing the complication of the device configuration.

廃棄物装入装置は、第一シール弁よりも上方に配置され、装入口に向かう経路を開閉する第二シール弁と、第二シール弁を基準にして第一シール弁の逆側に設けられ、廃棄物の落下を妨げた後に再度落下させることで廃棄物の落下速度を低減するダンパと、を更に備えてもよい。   The waste charging device is disposed above the first seal valve, and is provided on the opposite side of the first seal valve with respect to the second seal valve that opens and closes the path toward the charging port. And a damper that reduces the falling speed of the waste by dropping it again after preventing the falling of the waste.

廃棄物装入装置は、ダンパにより落下を妨げられた廃棄物に対して破袋処理を施す破袋装置を更に備えてもよい。この場合、破袋処理を施すことで、弁本体上に落下する際の廃棄物の変形分散を促し、当該変形によって落下衝撃を緩和することができる。従って、第一シール弁における疲労蓄積を更に抑制できる。   The waste charging device may further include a bag breaking device that performs a bag breaking process on the waste that is prevented from dropping by the damper. In this case, by performing the bag breaking process, it is possible to promote deformation and dispersion of the waste when falling on the valve body, and to reduce the drop impact by the deformation. Therefore, fatigue accumulation in the first seal valve can be further suppressed.

廃棄物装入装置は、ダンパに作用する負荷が所定の閾値を超えている場合に、廃棄物に対して破袋処理を施し、ダンパに作用する負荷が閾値を超えていない場合には廃棄物に対して破袋処理を施さないように破袋装置を制御するコントローラを更に備えてもよい。   The waste charging device applies a bag-breaking process to the waste when the load acting on the damper exceeds a predetermined threshold, and the waste is charged if the load acting on the damper does not exceed the threshold. There may be further provided a controller for controlling the bag breaking apparatus so as not to perform the bag breaking process.

ダンパに作用する負荷が小さい場合には、第一シール弁に作用する負荷も小さいので、破袋処理を省略したとしても第一シール弁の疲労状態への影響は小さい。一方で、破袋処理を省略すると、廃棄物の処理効率が高まる。従って、ダンパに作用する負荷が所定の閾値を超えているか否かに基づいて破袋処理の有無を切り替えることで、廃棄物の処理効率の低下抑制と、第一シール弁における疲労蓄積の抑制との両立を図ることができる。   When the load acting on the damper is small, the load acting on the first seal valve is also small. Therefore, even if the bag breaking process is omitted, the influence on the fatigue state of the first seal valve is small. On the other hand, if the bag breaking process is omitted, the processing efficiency of waste increases. Therefore, by switching the presence or absence of the bag breaking process based on whether or not the load acting on the damper exceeds a predetermined threshold, the reduction in waste processing efficiency and the suppression of fatigue accumulation in the first seal valve Can be achieved.

ダンパは、装入口に向かう経路を開閉するダンパ本体と、油圧式のアクチュエータを動力源としてダンパ本体を閉状態に拘束するダンパロック機構と、を有してもよく、コントローラは、ダンパロック機構のアクチュエータの油圧に基づいてダンパに作用する負荷を検出するように構成されていてもよい。この場合、ダンパに作用する負荷に応じて破袋処理の有無を切り替える構成において、装置構成の複雑化をより確実に抑制できる。   The damper may include a damper main body that opens and closes a path toward the loading port, and a damper lock mechanism that restrains the damper main body in a closed state by using a hydraulic actuator as a power source. You may be comprised so that the load which acts on a damper may be detected based on the hydraulic pressure of an actuator. In this case, in the configuration in which the presence or absence of the bag breaking process is switched according to the load acting on the damper, it is possible to more reliably suppress the complication of the device configuration.

廃棄物装入装置は、監視装置により導出された指標を表示する表示装置を更に備えてもよい。   The waste charging device may further include a display device that displays the index derived by the monitoring device.

本開示に係る廃棄物処理装置は、廃棄物処理炉と、廃棄物処理炉内に廃棄物を装入する廃棄物装入装置と、を備え、廃棄物装入装置は、下方に開口し、廃棄物処理炉内に廃棄物を送出する装入口を下方から開閉する弁本体と、油圧式のアクチュエータを動力源として弁本体を閉状態に拘束する弁ロック機構と、を有する第一シール弁と、廃棄物が弁本体上に落下した際に第一シール弁にかかった負荷をアクチュエータの油圧に基づいて導出し、当該負荷の大きさと、廃棄物が弁本体上に落下した回数とに基づいて、第一シール弁の疲労状態に関する指標を導出する監視装置と、を備える。   A waste treatment apparatus according to the present disclosure includes a waste treatment furnace and a waste charge apparatus that charges the waste into the waste treatment furnace, the waste charge apparatus opens downward, A first seal valve comprising: a valve body that opens and closes an inlet for sending waste into the waste treatment furnace from below; and a valve lock mechanism that restrains the valve body in a closed state using a hydraulic actuator as a power source; The load applied to the first seal valve when waste falls on the valve body is derived based on the hydraulic pressure of the actuator, and based on the magnitude of the load and the number of times waste falls on the valve body. And a monitoring device for deriving an index related to the fatigue state of the first seal valve.

本開示によれば、装置構成の複雑化を抑制しつつ、シール弁の疲労状態を把握できる。   According to the present disclosure, it is possible to grasp the fatigue state of the seal valve while suppressing the complexity of the device configuration.

廃棄物処理装置の概略構成を示す模式図である。It is a schematic diagram which shows schematic structure of a waste disposal apparatus. 出力軸とロック爪との固定構造を例示する断面図である。It is sectional drawing which illustrates the fixation structure of an output shaft and a lock nail | claw. 監視装置及びコントローラのハードウェア構成を例示するブロック図である。It is a block diagram which illustrates the hardware constitutions of a monitoring apparatus and a controller. 廃棄物の装入手順を示すフローチャートである。It is a flowchart which shows the charging procedure of a waste material. 第一シール弁にかかる負荷の大きさ及び廃棄物の落下回数に関する記憶内容を例示する図である。It is a figure which illustrates the memory content regarding the magnitude | size of the load concerning a 1st seal valve, and the frequency | count of a fall of a waste. S−N曲線を例示するグラフである。It is a graph which illustrates a SN curve.

以下、図面を参照しつつ、実施形態について詳細に説明する。説明において、同一要素又は同一機能を有する要素には同一の符号を付し、重複する説明を省略する。   Hereinafter, embodiments will be described in detail with reference to the drawings. In the description, the same elements or elements having the same functions are denoted by the same reference numerals, and redundant description is omitted.

1.廃棄物処理装置
図1に示す廃棄物処理装置1は、廃棄物Gを熱エネルギーにより減容化する装置である。廃棄物Gは、例えば一般廃棄物又は産業廃棄物等である。廃棄物処理装置1は、フレキシブルコンベアバッグ等の梱包資材により梱包された廃棄物Gを開梱することなく処理可能である。以下、開梱されていない廃棄物Gを「未開梱の廃棄物G」という。
1. Waste Processing Device The waste processing device 1 shown in FIG. 1 is a device that reduces the volume of the waste G with heat energy. The waste G is, for example, general waste or industrial waste. The waste treatment apparatus 1 can process the waste G packed with packing materials such as a flexible conveyor bag without unpacking. Hereinafter, the unopened waste G is referred to as “unopened waste G”.

廃棄物処理装置1は、廃棄物処理炉2と、揚重装置3と、廃棄物装入装置4とを備える。廃棄物処理炉2は、廃棄物Gを受け入れ、熱エネルギーにより減容化して排出する。廃棄物処理炉2の具体例としては、焼却炉及び廃棄物溶融炉等が挙げられる。焼却炉は、加熱により廃棄物を燃焼させて減容化する。ガス化溶融炉は、還元雰囲気下で廃棄物中の可燃物を熱分解してガス化し、灰分・不燃物等を溶融する。一例として、廃棄物処理炉2は、廃棄物を上方から受け入れるように構成されている。   The waste treatment apparatus 1 includes a waste treatment furnace 2, a lifting device 3, and a waste charging device 4. The waste treatment furnace 2 receives the waste G, reduces its volume with thermal energy, and discharges it. Specific examples of the waste treatment furnace 2 include an incinerator and a waste melting furnace. Incinerators reduce the volume by burning waste by heating. A gasification melting furnace thermally decomposes and combusts combustibles in waste under a reducing atmosphere to melt ash, incombustibles, and the like. As an example, the waste treatment furnace 2 is configured to receive waste from above.

揚重装置3は、廃棄物処理炉2の近傍に配置されており、廃棄物Gを廃棄物処理炉2よりも上方まで上昇させる。廃棄物Gは、例えばホイルローダ等によって揚重装置3まで搬送される。   The lifting device 3 is disposed in the vicinity of the waste treatment furnace 2 and raises the waste G to a position higher than the waste treatment furnace 2. The waste G is conveyed to the lifting device 3 by a wheel loader or the like, for example.

廃棄物装入装置4は、揚重装置3が上昇させた廃棄物を廃棄物処理炉2内に導く。廃棄物装入装置4は、未開梱の廃棄物Gを受け入れ可能となるように構成されており、少なくとも第一シール弁22と監視装置110とを有する。第一シール弁22は、少なくとも弁本体24と弁ロック機構25とを有する。弁本体24は、廃棄物Gを廃棄物処理炉2内に装入するための経路R1にて下方に開口した装入口21aを下方から開閉する。弁ロック機構25は、油圧式のアクチュエータ34を動力源として弁本体24を閉状態に拘束する。監視装置110は、廃棄物Gが弁本体24上に落下したことをアクチュエータ34の油圧に基づいて検知し、廃棄物Gが弁本体24上に落下した際に第一シール弁22にかかる負荷をアクチュエータ34の油圧に基づいて検出し、当該負荷の大きさと、廃棄物Gが弁本体24上に落下した回数とに基づいて、第一シール弁22の疲労状態に関する指標を導出する。   The waste charging device 4 guides the waste raised by the lifting device 3 into the waste treatment furnace 2. The waste charging device 4 is configured to be able to receive the unopened waste G, and includes at least the first seal valve 22 and the monitoring device 110. The first seal valve 22 has at least a valve body 24 and a valve lock mechanism 25. The valve main body 24 opens and closes the charging inlet 21a that opens downward in the path R1 for charging the waste G into the waste treatment furnace 2 from below. The valve lock mechanism 25 restrains the valve main body 24 in a closed state by using a hydraulic actuator 34 as a power source. The monitoring device 110 detects that the waste G has fallen on the valve body 24 based on the hydraulic pressure of the actuator 34, and loads the first seal valve 22 when the waste G falls on the valve body 24. Based on the hydraulic pressure of the actuator 34, an index relating to the fatigue state of the first seal valve 22 is derived based on the magnitude of the load and the number of times the waste G has dropped onto the valve body 24.

2.廃棄物装入装置
以下、廃棄物装入装置4の具体的な構成例をより詳細に説明する。廃棄物装入装置4は、第一シュート10と、開閉装置20と、第二シュート40と、第三シュート50とを有する。第三シュート50、第二シュート40、開閉装置20及び第一シュート10は、上方から下方に順に連なり、揚重装置3が上昇させた廃棄物Gを廃棄物処理炉2内に装入するための経路R1を構成する。
2. Waste Charging Device Hereinafter, a specific configuration example of the waste charging device 4 will be described in more detail. The waste charging device 4 includes a first chute 10, an opening / closing device 20, a second chute 40, and a third chute 50. The third chute 50, the second chute 40, the opening / closing device 20 and the first chute 10 are connected in order from the upper side to the lower side, and the waste G raised by the lifting device 3 is charged into the waste treatment furnace 2. Route R1.

(1)第一シュート
第一シュート10は廃棄物処理炉2の上に設けられており、上方から廃棄物Gを受け入れて廃棄物処理炉2内に導入する。第一シュート10は、第一部分11と第二部分12とを有し、廃棄物処理炉2の上に設けられている。第一部分11は、上下方向に沿った筒状部であり、廃棄物処理炉2内に挿入されている。第一部分11の下端部は、廃棄物処理炉2内において下方に開口している。第二部分12は第一部分11の上に連なっており、上方へ向かうに従って拡がった内部空間を有する。
(1) First Chute The first chute 10 is provided on the waste treatment furnace 2 and receives the waste G from above and introduces it into the waste treatment furnace 2. The first chute 10 has a first portion 11 and a second portion 12 and is provided on the waste treatment furnace 2. The first part 11 is a cylindrical part along the vertical direction and is inserted into the waste treatment furnace 2. A lower end portion of the first portion 11 is opened downward in the waste treatment furnace 2. The second portion 12 is continuous with the first portion 11 and has an internal space that expands upward.

(2)開閉装置
開閉装置20は、第一シュート10の上に設けられており、経路R1を開閉する。開閉装置20は、中継シュート21と、第一シール弁22と、第二シール弁23とを有する。
(2) Opening / closing device The opening / closing device 20 is provided on the first chute 10 and opens / closes the path R1. The opening / closing device 20 includes a relay chute 21, a first seal valve 22, and a second seal valve 23.

中継シュート21は、上下方向に沿った筒状体であり、その下部は第一シュート10の第二部分12内に挿入されている。中継シュート21の中心軸線CL2は、第一シュート10の第一部分11の中心軸線CL1に比べて揚重装置3側に位置している。中継シュート21の下部は、経路R1にて下方に開口した装入口21aを構成する。中継シュート21の上部は、経路R1にて上方に開口した受入口21bを構成する。   The relay chute 21 is a cylindrical body along the vertical direction, and the lower part thereof is inserted into the second portion 12 of the first chute 10. The center axis CL2 of the relay chute 21 is located closer to the lifting device 3 than the center axis CL1 of the first portion 11 of the first chute 10. The lower part of the relay chute 21 constitutes an inlet 21a that opens downward along the route R1. The upper part of the relay chute 21 constitutes a receiving port 21b that opens upward in the route R1.

第一シール弁22は、弁本体24と、弁ロック機構25とを有する。   The first seal valve 22 has a valve body 24 and a valve lock mechanism 25.

弁本体24は、装入口21aを下方から開閉する。例えば弁本体24は、装入口21aを覆うように設けられた板状体であり、装入口21aの周囲を通る水平な回転軸線Ax1まわりに回転可能となっている。一例として、回転軸線Ax1は、装入口21aの周囲のうち、第一部分11の中心軸線CL1の逆側(すなわち揚重装置3側)の部分を通っている。以下、弁本体24の基端部とは回転軸線Ax1側の部分を意味し、弁本体24の先端部とは回転軸線Ax1の逆側の部分を意味する。弁本体24は、例えば油圧式のアクチュエータ(不図示)等を動力源として回転軸線Ax1まわりに回転し、略水平となっているときに装入口21aを閉じ、下方に回転して装入口21aを開く。   The valve body 24 opens and closes the loading port 21a from below. For example, the valve body 24 is a plate-like body provided so as to cover the charging port 21a, and is rotatable around a horizontal rotation axis Ax1 passing through the charging port 21a. As an example, the rotation axis Ax1 passes through a portion of the periphery of the loading inlet 21a that is opposite to the center axis CL1 of the first portion 11 (that is, the lifting device 3 side). Hereinafter, the base end portion of the valve body 24 means a portion on the rotation axis Ax1 side, and the tip end portion of the valve body 24 means a portion on the opposite side of the rotation axis Ax1. The valve body 24 rotates around the rotation axis Ax1 using, for example, a hydraulic actuator (not shown) as a power source, closes the inlet 21a when it is substantially horizontal, and rotates downward to open the inlet 21a. open.

弁ロック機構25は、油圧式のアクチュエータ34を動力源として弁本体24を閉状態に拘束する。例えば弁ロック機構25は、ロック爪31と、アクチュエータ34と、圧力計38とを有する。   The valve lock mechanism 25 restrains the valve main body 24 in a closed state by using a hydraulic actuator 34 as a power source. For example, the valve lock mechanism 25 includes a lock claw 31, an actuator 34, and a pressure gauge 38.

ロック爪31は、装入口21aを閉じた弁本体24の下に掛かるように設けられており、装入口21aの周囲を通る水平な回転軸線Ax2まわりに回転可能となっている。一例として、ロック爪31は弁本体24の先端部の下に掛かるように設けられている。回転軸線Ax2は、装入口21aの周囲のうち、第一部分11の中心軸線CL1側(すなわち揚重装置3の逆側)の部分を通っており、回転軸線Ax1に対して平行となっている。換言すると、回転軸線Ax2は、回転軸線Ax1との間に装入口21a(経路R1)を挟む位置を通っている。以下、ロック爪31の基端部とは回転軸線Ax2側の部分を意味し、ロック爪31の先端部とは回転軸線Ax2の逆側の部分を意味する。   The lock claw 31 is provided so as to hang under the valve main body 24 with the loading port 21a closed, and is rotatable around a horizontal rotation axis Ax2 passing through the periphery of the loading port 21a. As an example, the lock claw 31 is provided so as to hang under the distal end portion of the valve body 24. The rotation axis Ax2 passes through the portion of the first portion 11 on the central axis CL1 side (that is, the opposite side of the lifting device 3) around the loading port 21a, and is parallel to the rotation axis Ax1. In other words, the rotation axis Ax2 passes through a position where the loading port 21a (path R1) is sandwiched between the rotation axis Ax2 and the rotation axis Ax1. Hereinafter, the base end portion of the lock claw 31 means a portion on the rotation axis Ax2 side, and the tip end portion of the lock claw 31 means a portion on the opposite side of the rotation axis Ax2.

アクチュエータ34は、油圧シリンダ35と、出力軸36と、リンク37とを有する。油圧シリンダ35は、油圧に応じて伸縮する。出力軸36は、回転軸線Ax2まわりに回転可能となっており、ロック爪31の基端部に固定されている。   The actuator 34 has a hydraulic cylinder 35, an output shaft 36, and a link 37. The hydraulic cylinder 35 expands and contracts according to the hydraulic pressure. The output shaft 36 is rotatable around the rotation axis Ax2, and is fixed to the proximal end portion of the lock claw 31.

図2に例示するように、ロック爪31は、その基端部に筒状部33を有する。筒状部33は、回転軸線Ax2に沿っており、出力軸36に嵌合している。筒状部33の内周面には回転軸線Ax2に沿ったキー溝36aが設けられており、これに対応して出力軸36の外周面にも回転軸線Ax2に沿ったキー溝33aが設けられている。筒状部33と出力軸36との間にはキー39が配置されており、キー39はキー溝33a,36aの両方に嵌合している。これにより、出力軸36がロック爪31の基端部に固定されている。   As illustrated in FIG. 2, the lock claw 31 has a cylindrical portion 33 at its proximal end. The cylindrical portion 33 is along the rotation axis Ax2 and is fitted to the output shaft 36. A key groove 36a along the rotation axis Ax2 is provided on the inner peripheral surface of the cylindrical portion 33, and a key groove 33a along the rotation axis Ax2 is provided on the outer peripheral surface of the output shaft 36 correspondingly. ing. A key 39 is disposed between the cylindrical portion 33 and the output shaft 36, and the key 39 is fitted in both of the key grooves 33a and 36a. Thereby, the output shaft 36 is fixed to the proximal end portion of the lock claw 31.

リンク37は、油圧シリンダ35と出力軸36とに接続されており、油圧シリンダ35の伸縮を出力軸36の回転に変換する。この構成により、油圧シリンダ35の伸縮に応じてロック爪31が回転する。   The link 37 is connected to the hydraulic cylinder 35 and the output shaft 36, and converts expansion / contraction of the hydraulic cylinder 35 into rotation of the output shaft 36. With this configuration, the lock claw 31 rotates according to the expansion and contraction of the hydraulic cylinder 35.

圧力計38は、油圧シリンダ35内の油圧を検出し、検出結果を例えば電気信号として出力する。   The pressure gauge 38 detects the hydraulic pressure in the hydraulic cylinder 35 and outputs the detection result as an electric signal, for example.

弁ロック機構25は、弁本体24を閉状態に拘束する際に、油圧シリンダ35を伸長又は短縮(図示の例では短縮)させることでロック爪31を弁本体24の下に掛ける。この状態で弁本体24に対して下方に負荷が作用すると、弁ロック機構25は、油圧シリンダ35の伸長力又は短縮力(図示の例では短縮力)によってロック爪31の位置を保ち、弁本体24を閉状態に保つ。このため、圧力計38により検出される油圧シリンダ35内の油圧は、弁本体24に作用する負荷(第一シール弁22に作用する負荷)に相関する。   When the valve lock mechanism 25 restrains the valve body 24 in the closed state, the lock claw 31 is hung under the valve body 24 by extending or shortening (shortening in the illustrated example) the hydraulic cylinder 35. When a downward load is applied to the valve body 24 in this state, the valve lock mechanism 25 maintains the position of the lock pawl 31 by the extension force or shortening force (shortening force in the illustrated example) of the hydraulic cylinder 35, and the valve body 24 is kept closed. For this reason, the hydraulic pressure in the hydraulic cylinder 35 detected by the pressure gauge 38 correlates with a load acting on the valve body 24 (a load acting on the first seal valve 22).

図1に戻り、第二シール弁23は、第一シール弁22よりも上方に配置され、装入口21aに向かう経路R1を開閉する。例えば第二シール弁23は、弁本体26を有する。弁本体26は、受入口21bを覆うように設けられた板状体であり、水平方向にスライド可能となっている。弁本体26、例えば油圧式又は電動式のアクチュエータ(不図示)を動力源として水平方向にスライドし、受入口21bを覆った状態で経路R1を閉じ、受入口21b上から退避して経路R1を開く。   Returning to FIG. 1, the second seal valve 23 is disposed above the first seal valve 22, and opens and closes the path R <b> 1 toward the loading port 21 a. For example, the second seal valve 23 has a valve body 26. The valve body 26 is a plate-like body provided so as to cover the receiving port 21b and is slidable in the horizontal direction. The valve body 26, for example, a hydraulic or electric actuator (not shown) is slid in the horizontal direction as a power source, the path R1 is closed with the receiving port 21b covered, and the path R1 is retracted from the receiving port 21b. open.

(3)第二シュート
第二シュート40は、開閉装置20の上に設けられており、廃棄物Gを開閉装置20の中継シュート21内に導入する。第二シュート40は、第一部分41と第二部分42とを有する。第一部分41は、上下方向に沿った筒状部であり、その中心軸線CL3は中継シュート21の中心軸線CL2に一致している。第二部分42は第一部分41の上に連なり、上方へ向かうに従って拡がった内部空間を有する。
(3) Second Chute The second chute 40 is provided on the switching device 20 and introduces the waste G into the relay chute 21 of the switching device 20. The second chute 40 has a first portion 41 and a second portion 42. The first portion 41 is a cylindrical portion along the vertical direction, and the central axis CL3 thereof coincides with the central axis CL2 of the relay chute 21. The second part 42 is connected to the first part 41 and has an internal space that expands upward.

(4)第三シュート
第三シュート50は、第二シュート40の上に設けられており、揚重装置3が上昇させた廃棄物Gを上方から受け入れて第二シュート40内に導入する。第三シュート50は、第一部分51と第二部分52とを有する。第一部分51は、上方へ向かうに従って揚重装置3に近付くように傾斜した筒状部であり、その下部は第二シュート40の第二部分42内に挿入されている。第二部分52は第一部分51の上に連なり、揚重装置3の上端部に隣接した位置で上方に開口している。
(4) Third Chute The third chute 50 is provided on the second chute 40 and receives the waste G raised by the lifting device 3 from above and introduces it into the second chute 40. The third chute 50 has a first portion 51 and a second portion 52. The first portion 51 is a cylindrical portion that is inclined so as to approach the lifting device 3 as it goes upward, and its lower portion is inserted into the second portion 42 of the second chute 40. The second part 52 is continuous with the first part 51 and opens upward at a position adjacent to the upper end of the lifting device 3.

(5)ダンパ
廃棄物装入装置4は、ダンパ60を更に有してもよい。ダンパ60は、第二シール弁23を基準にして第一シール弁22の逆側に設けられ、廃棄物Gの落下を妨げた後に再度落下させることで廃棄物Gの落下速度を低減する。例えばダンパ60は、第二シュート40の第二部分42内に設けられており、第一部分51からの廃棄物Gの落下を妨げる。
(5) Damper The waste charging device 4 may further include a damper 60. The damper 60 is provided on the opposite side of the first seal valve 22 with respect to the second seal valve 23, and reduces the fall speed of the waste G by dropping it again after preventing the drop of the waste G. For example, the damper 60 is provided in the second portion 42 of the second chute 40 and prevents the waste G from dropping from the first portion 51.

ダンパ60は、例えばダンパ本体61とダンパロック機構62とを有する。   The damper 60 includes, for example, a damper main body 61 and a damper lock mechanism 62.

ダンパ本体61は、装入口21aに向かう経路R1を開閉する。例えばダンパ本体61は、第一部分51の下端の開口51aを覆うように設けられた板状体であり、開口51aの周囲を通る水平な回転軸線Ax3まわりに回転可能となっている。一例として、回転軸線Ax3は、開口51aの周囲のうち、第一部分11の中心軸線CL1側(すなわち揚重装置3の逆側)の部分を通っている。以下、ダンパ本体61の基端部とは回転軸線Ax3側の部分を意味し、ダンパ本体61の先端部とは回転軸線Ax3の逆側の部分を意味する。ダンパ本体61は、例えば油圧式のアクチュエータ(不図示)等を動力源として回転軸線Ax3回りに回転し、第一部分51の下端面に沿っているときに経路R1を閉じ、下方に回転して経路R1を開く。開口51aを閉じた状態におけるダンパ本体61の向き(ダンパ本体61の先端部の突出方向)は、装入口21aを閉じた状態における弁本体24の向き(弁本体24の先端部の突出方向)に対して逆になっている。   The damper main body 61 opens and closes the path R1 toward the loading port 21a. For example, the damper main body 61 is a plate-like body provided so as to cover the opening 51a at the lower end of the first portion 51, and is rotatable around a horizontal rotation axis Ax3 that passes around the opening 51a. As an example, the rotation axis Ax3 passes through a portion of the periphery of the opening 51a on the central axis CL1 side of the first portion 11 (that is, the opposite side of the lifting device 3). Hereinafter, the base end portion of the damper main body 61 means a portion on the rotation axis Ax3 side, and the tip end portion of the damper main body 61 means a portion on the opposite side of the rotation axis Ax3. The damper main body 61 rotates around the rotation axis Ax3 using, for example, a hydraulic actuator (not shown) as a power source, closes the path R1 when it is along the lower end surface of the first portion 51, and rotates downward to pass the path. Open R1. The direction of the damper main body 61 when the opening 51a is closed (the protruding direction of the tip of the damper main body 61) is the same as the direction of the valve main body 24 when the inlet 21a is closed (the protruding direction of the tip of the valve main body 24). The opposite is true.

ダンパロック機構62は、油圧式のアクチュエータ64を動力源としてダンパ本体61を閉状態に拘束する。例えばダンパロック機構62は、ロック爪63と、アクチュエータ64と、圧力計68とを有する。   The damper lock mechanism 62 restrains the damper main body 61 in a closed state by using a hydraulic actuator 64 as a power source. For example, the damper lock mechanism 62 includes a lock claw 63, an actuator 64, and a pressure gauge 68.

ロック爪63は、開口51aを閉じたダンパ本体61の下に掛かるように設けられており、開口51aの周囲を通る水平な回転軸線Ax4まわりに回転可能となっている。一例として、ロック爪63はダンパ本体61の先端部の下に掛かるように設けられている。回転軸線Ax4は、開口51aの周囲のうち、第一部分11の中心軸線CL1の逆側(すなわち揚重装置3側)の部分を通っており、回転軸線Ax3に対して平行となっている。換言すると、回転軸線Ax4は、回転軸線Ax3との間に開口51a(経路R1)を挟む位置を通っている。以下、ロック爪63の基端部とは回転軸線Ax4側の部分を意味し、ロック爪63の先端部とは回転軸線Ax4の逆側の部分を意味する。   The lock claw 63 is provided so as to hang under the damper main body 61 with the opening 51a closed, and is rotatable around a horizontal rotation axis Ax4 passing through the periphery of the opening 51a. As an example, the lock claw 63 is provided to hang under the tip of the damper main body 61. The rotation axis Ax4 passes through a portion of the periphery of the opening 51a that is opposite to the center axis CL1 of the first portion 11 (that is, the lifting device 3 side), and is parallel to the rotation axis Ax3. In other words, the rotation axis Ax4 passes through a position where the opening 51a (path R1) is sandwiched between the rotation axis Ax3 and the rotation axis Ax3. Hereinafter, the base end portion of the lock claw 63 means a portion on the rotation axis Ax4 side, and the tip end portion of the lock claw 63 means a portion on the opposite side of the rotation axis Ax4.

アクチュエータ64は、油圧シリンダ65と、出力軸66と、リンク67とを有する。
油圧シリンダ65は、油圧に応じて伸縮する。出力軸66は、回転軸線Ax4まわりに回転可能となっており、ロック爪63の基端部に固定されている。リンク67は、油圧シリンダ65と出力軸66とに接続されており、油圧シリンダ65の伸縮を出力軸66の回転に変換する。この構成により、油圧シリンダ65の伸縮に応じてロック爪63が回転する。
The actuator 64 has a hydraulic cylinder 65, an output shaft 66, and a link 67.
The hydraulic cylinder 65 expands and contracts according to the hydraulic pressure. The output shaft 66 is rotatable around the rotation axis Ax4 and is fixed to the proximal end portion of the lock claw 63. The link 67 is connected to the hydraulic cylinder 65 and the output shaft 66, and converts expansion / contraction of the hydraulic cylinder 65 into rotation of the output shaft 66. With this configuration, the lock claw 63 rotates according to the expansion and contraction of the hydraulic cylinder 65.

圧力計68は、油圧シリンダ65内の油圧を検出し、検出結果を例えば電気信号として出力する。   The pressure gauge 68 detects the hydraulic pressure in the hydraulic cylinder 65 and outputs the detection result as an electric signal, for example.

ダンパロック機構62は、ダンパ本体61を閉状態に拘束する際に、油圧シリンダ65を伸長又は短縮(図示の例では短縮)させることでロック爪63をダンパ本体61の下に掛ける。この状態でダンパ本体61に対して下方に負荷が作用すると、ダンパロック機構62は、油圧シリンダ65の伸長力又は短縮力(図示の例では短縮力)によってロック爪63の位置を保ち、ダンパ本体61を閉状態に保つ。このため、圧力計68により検出される油圧シリンダ65内の油圧は、ダンパ本体61に作用する負荷(ダンパ60に作用する負荷)に相関する。   The damper lock mechanism 62 hangs the lock claw 63 under the damper body 61 by extending or shortening (shortening in the illustrated example) the hydraulic cylinder 65 when restraining the damper body 61 in the closed state. When a load is applied downward to the damper main body 61 in this state, the damper lock mechanism 62 keeps the position of the lock claw 63 by the extension force or shortening force (shortening force in the illustrated example) of the hydraulic cylinder 65, and the damper main body 61 61 is kept closed. For this reason, the hydraulic pressure in the hydraulic cylinder 65 detected by the pressure gauge 68 correlates with a load acting on the damper main body 61 (a load acting on the damper 60).

(6)破袋装置
廃棄物装入装置4は、破袋装置70を更に備えてもよい。破袋装置70は、ダンパ60により落下を妨げられた廃棄物Gに対して破袋処理を施す。破袋処理は、廃棄物Gの梱包資材の少なくとも一部に孔又は切り込みを形成する処理を含み、廃棄物を囲む環状線の全周に沿って梱包資材を断裂させ、二体に分離する処理をも含む。
(6) Bag-breaking device The waste charging device 4 may further include a bag-breaking device 70. The bag breaking device 70 performs a bag breaking process on the waste G whose fall is prevented by the damper 60. The bag breaking process includes a process of forming a hole or a cut in at least a part of the packaging material of the waste G, and the packaging material is torn along the entire circumference of the annular line surrounding the waste and separated into two bodies. Is also included.

一例として、破袋装置70は、ブレード71と、アクチュエータ72と、ブレード収容部73とを有する。ブレード収容部73は、第一部分51の下端部の周壁から外周側(例えば揚重装置3の逆側)に膨出している。ブレード71は、尖った刃先部を有し、当該刃先部が経路R1側に向いた状態でブレード収容部73内に配置される。アクチュエータ72は、例えば油圧式のアクチュエータであり、ブレード収容部73内から第一部分51内にブレード71を押し出し、第一部分51内からブレード収容部73内にブレード71を引き戻す。   As an example, the bag breaking device 70 includes a blade 71, an actuator 72, and a blade accommodating portion 73. The blade accommodating portion 73 bulges from the peripheral wall at the lower end of the first portion 51 to the outer peripheral side (for example, the opposite side of the lifting device 3). The blade 71 has a sharp blade edge portion, and is disposed in the blade housing portion 73 with the blade edge portion facing the path R1. The actuator 72 is, for example, a hydraulic actuator, and pushes out the blade 71 from the blade housing portion 73 into the first portion 51 and pulls the blade 71 back from the first portion 51 into the blade housing portion 73.

廃棄物Gがダンパ60により落下を妨げられた状態でアクチュエータ72がブレード71を第一部分51内に押し出すと、ブレード71が廃棄物Gに押し付けられる。これにより、廃棄物Gの梱包資材の少なくとも一部が断裂する。   When the actuator 72 pushes the blade 71 into the first portion 51 in a state where the waste G is prevented from dropping by the damper 60, the blade 71 is pressed against the waste G. Thereby, at least a part of the packaging material of the waste G is torn.

(7)監視装置
監視装置110は、廃棄物Gが弁本体24上に落下した際に第一シール弁22にかかった負荷をアクチュエータ34の油圧に基づいて導出し、当該負荷の大きさと、廃棄物Gが弁本体24上に落下した回数とに基づいて、第一シール弁22の疲労状態に関する指標を導出する。
(7) Monitoring device The monitoring device 110 derives the load applied to the first seal valve 22 when the waste G falls on the valve body 24 based on the hydraulic pressure of the actuator 34, and determines the magnitude of the load and the disposal. Based on the number of times the object G has dropped onto the valve body 24, an index relating to the fatigue state of the first seal valve 22 is derived.

例えば監視装置110は、機能モジュールとして、油圧情報取得部111と、負荷導出部112と、落下時データ蓄積部113と、データ記憶部114と、損傷度算出部115とを有する。   For example, the monitoring device 110 includes a hydraulic pressure information acquisition unit 111, a load derivation unit 112, a drop data storage unit 113, a data storage unit 114, and a damage degree calculation unit 115 as functional modules.

油圧情報取得部111は、アクチュエータ34の油圧に関する情報(以下、これを「アクチュエータ34の油圧情報」という。)として、圧力計38により検出された油圧の値を取得する。   The hydraulic pressure information acquisition unit 111 acquires the value of the hydraulic pressure detected by the pressure gauge 38 as information related to the hydraulic pressure of the actuator 34 (hereinafter referred to as “hydraulic pressure information of the actuator 34”).

負荷導出部112は、廃棄物Gが弁本体24上に落下した際に第一シール弁22にかかった負荷を導出する。例えば負荷導出部112は、油圧情報取得部111により所定時間繰り返し取得されたアクチュエータ34の油圧情報の最大値を上記負荷として導出する。   The load deriving unit 112 derives a load applied to the first seal valve 22 when the waste G falls on the valve body 24. For example, the load deriving unit 112 derives the maximum value of the hydraulic pressure information of the actuator 34 repeatedly acquired by the hydraulic pressure information acquiring unit 111 for a predetermined time as the load.

落下時データ蓄積部113は、油圧情報取得部111により取得されたアクチュエータ34の油圧情報と、負荷導出部112による検知結果とに基づいて、廃棄物Gが弁本体24上に落下した際に第一シール弁22にかかる負荷を検出し、検出結果をデータ記憶部114に送る。   The data storage unit 113 at the time of falling is the first when the waste G falls on the valve body 24 based on the hydraulic pressure information of the actuator 34 acquired by the hydraulic pressure information acquisition unit 111 and the detection result by the load deriving unit 112. The load applied to one seal valve 22 is detected, and the detection result is sent to the data storage unit 114.

データ記憶部114は、廃棄物Gが弁本体24に落下した際に第一シール弁22に作用する負荷の大きさと、廃棄物Gが弁本体24上に落下した回数とを記録し、落下時データ蓄積部113から上記検出結果が送られる度に記録内容を更新する。   The data storage unit 114 records the magnitude of the load acting on the first seal valve 22 when the waste G falls on the valve body 24 and the number of times the waste G falls on the valve body 24. Every time the detection result is sent from the data storage unit 113, the recorded content is updated.

損傷度算出部115は、データ記憶部114に記録されたデータに基づいて、第一シール弁22の疲労状態に関する指標(以下、これを「疲労損傷度」という。)を導出する。   The damage degree calculation unit 115 derives an index related to the fatigue state of the first seal valve 22 (hereinafter referred to as “fatigue damage degree”) based on the data recorded in the data storage unit 114.

廃棄物装入装置4は、監視装置110により導出された疲労損傷度を表示する表示装置を更に備えてもよい。表示装置は、例えば液晶モニタのように、疲労損傷度を数値、文字、又はグラフとして表示可能なものであってもよいし、疲労損傷度が所定の閾値を超え場合に点灯する警告灯であってもよい。   The waste charging device 4 may further include a display device that displays the fatigue damage degree derived by the monitoring device 110. The display device may be capable of displaying the fatigue damage degree as a numerical value, a character, or a graph, such as a liquid crystal monitor, and is a warning light that is turned on when the fatigue damage degree exceeds a predetermined threshold. May be.

(8)コントローラ
廃棄物装入装置4は、コントローラ120を更に備えてもよい。コントローラ120は、ダンパ60に作用する負荷が所定の閾値(以下、「負荷閾値」という。)を超えている場合に、廃棄物Gに対して破袋処理を施し、ダンパ60に作用する負荷が当該負荷閾値を超えていない場合には廃棄物Gに対して破袋処理を施さないように破袋装置70を制御する。
(8) Controller The waste charging device 4 may further include a controller 120. When the load acting on the damper 60 exceeds a predetermined threshold value (hereinafter referred to as “load threshold value”), the controller 120 performs a bag breaking process on the waste G, and the load acting on the damper 60 is reduced. If the load threshold is not exceeded, the bag breaking device 70 is controlled so that the waste G is not subjected to the bag breaking process.

コントローラ120は、ダンパロック機構62のアクチュエータ64の油圧に基づいてダンパ60に作用する負荷を検出するように構成されていてもよい。   The controller 120 may be configured to detect a load acting on the damper 60 based on the hydraulic pressure of the actuator 64 of the damper lock mechanism 62.

コントローラ120は、破袋装置70の制御と、第一シール弁22、第二シール弁23及びダンパ60の制御とを合わせて実行するものであってもよい。   The controller 120 may execute the control of the bag breaking device 70 and the control of the first seal valve 22, the second seal valve 23, and the damper 60 in combination.

例えばコントローラ120は、機能モジュールとして、破袋制御部121と開閉制御部122とを有する。   For example, the controller 120 includes a bag breaking control unit 121 and an opening / closing control unit 122 as functional modules.

破袋制御部121は、油圧情報取得部123と、落下判定部124と、破袋処理判定部125と、破袋指令出力部126とを有する。   The bag breakage control unit 121 includes a hydraulic pressure information acquisition unit 123, a drop determination unit 124, a bag breakage processing determination unit 125, and a bag breakage command output unit 126.

油圧情報取得部123は、アクチュエータ64の油圧に関する情報(以下、これを「アクチュエータ64の油圧情報」という。)として、圧力計68により検出された油圧の値を取得する。   The hydraulic pressure information acquisition unit 123 acquires the value of the hydraulic pressure detected by the pressure gauge 68 as information related to the hydraulic pressure of the actuator 64 (hereinafter referred to as “hydraulic pressure information of the actuator 64”).

落下判定部124は、油圧情報取得部123により取得されたアクチュエータ64の油圧情報に基づいて、廃棄物Gがダンパ本体61上に落下したか否かを判定する。   The drop determination unit 124 determines whether the waste G has dropped on the damper main body 61 based on the hydraulic pressure information of the actuator 64 acquired by the hydraulic pressure information acquisition unit 123.

破袋処理判定部125は、油圧情報取得部123により取得されたアクチュエータ64の油圧情報と、油圧情報取得部123による検知結果とに基づいて、廃棄物Gがダンパ本体61上に落下した際にダンパ60に作用する負荷を検出し、当該負荷が上記負荷閾値を超えているか否かに基づいて破袋処理の要否を判定する。   When the waste G falls on the damper main body 61 based on the hydraulic pressure information of the actuator 64 acquired by the hydraulic pressure information acquisition unit 123 and the detection result by the hydraulic pressure information acquisition unit 123, the bag breaking process determination unit 125 A load acting on the damper 60 is detected, and whether or not the bag breaking process is necessary is determined based on whether or not the load exceeds the load threshold.

破袋指令出力部126は、破袋処理判定部125により破袋処理が必要と判定された場合に、破袋処理の実行指令を破袋装置70に出力する。   The bag breaking instruction output unit 126 outputs an execution command for the bag breaking process to the bag breaking apparatus 70 when the bag breaking process determination unit 125 determines that the bag breaking process is necessary.

開閉制御部122は、廃棄物Gの落下を妨げた後に再度落下させるようにダンパ60を制御し、ダンパ60から第一シール弁22への廃棄物Gの移動前後に受入口21bを開閉するように第二シール弁23を制御し、装入口21aを開閉して廃棄物Gを廃棄物処理炉2内に送出するように第一シール弁22を制御する。   The opening / closing control unit 122 controls the damper 60 so that the waste G is dropped after being prevented from dropping, and opens and closes the receiving port 21b before and after the movement of the waste G from the damper 60 to the first seal valve 22. The second seal valve 23 is controlled, and the first seal valve 22 is controlled so as to open and close the charging inlet 21 a and send the waste G into the waste treatment furnace 2.

例えば開閉制御部122は、ダンパ本体61上への廃棄物Gの落下を示す情報を破袋制御部121から取得し、当該情報に基づいてダンパ60及び第二シール弁23を制御する。また、開閉制御部122は、弁本体24上への廃棄物Gの落下を示す情報を監視装置110から取得し、当該情報に基づいて第一シール弁22を制御する。   For example, the opening / closing control unit 122 acquires information indicating the fall of the waste G on the damper main body 61 from the bag breaking control unit 121, and controls the damper 60 and the second seal valve 23 based on the information. In addition, the opening / closing control unit 122 acquires information indicating the fall of the waste G on the valve body 24 from the monitoring device 110, and controls the first seal valve 22 based on the information.

(9)監視装置及びコントローラのハードウェア構成
監視装置110及びコントローラ120は、互いに分離したハードウェアにより構成されていてもよいし、一つのハードウェアにより構成されていてもよい。例えば廃棄物装入装置4は、監視装置110及びコントローラ120を構成するハードウェアとして、図3に示す回路130を有する。
(9) Hardware configuration of monitoring device and controller The monitoring device 110 and the controller 120 may be configured by hardware separated from each other, or may be configured by one piece of hardware. For example, the waste charging device 4 includes a circuit 130 illustrated in FIG. 3 as hardware constituting the monitoring device 110 and the controller 120.

回路130は、一つ又は複数のプロセッサ131と、メモリ132と、ストレージ133と、入出力ポート134とを有する。入出力ポート134は、ダンパ本体61、アクチュエータ64、圧力計68、破袋装置70、弁本体24、アクチュエータ34、圧力計38及び第二シール弁23との間で電気信号の入出力を行う。ストレージ133は、監視装置110及びコントローラ120の各機能モジュールを構成するためのプログラムを記録している。ストレージ133は、コンピュータ読み取り可能であればどのようなものであってもよい。具体例として、ハードディスク、不揮発性の半導体メモリ、磁気ディスク及び光ディスク等が挙げられる。メモリ132は、ストレージ133からロードしたプログラム及びプロセッサ131の演算結果等を一時的に記憶する。プロセッサ131は、メモリ132と協働してプログラムを実行することで、上述した各機能モジュールを構成する。   The circuit 130 includes one or more processors 131, a memory 132, a storage 133, and an input / output port 134. The input / output port 134 inputs and outputs electrical signals between the damper main body 61, the actuator 64, the pressure gauge 68, the bag breaking device 70, the valve main body 24, the actuator 34, the pressure gauge 38, and the second seal valve 23. The storage 133 records a program for configuring each functional module of the monitoring device 110 and the controller 120. The storage 133 may be anything as long as it can be read by a computer. Specific examples include a hard disk, a nonvolatile semiconductor memory, a magnetic disk, and an optical disk. The memory 132 temporarily stores the program loaded from the storage 133, the calculation result of the processor 131, and the like. The processor 131 executes the program in cooperation with the memory 132, thereby configuring each functional module described above.

なお、監視装置110及びコントローラ120のハードウェア構成は、必ずしもプログラムにより各機能モジュールを構成するものに限られない。例えば監視装置110及びコントローラ120の各機能モジュールは、専用の論理回路又はこれを集積したASIC(Application Specific Integrated Circuit)により構成されていてもよい。   Note that the hardware configurations of the monitoring device 110 and the controller 120 are not necessarily limited to those configuring each functional module by a program. For example, each functional module of the monitoring device 110 and the controller 120 may be configured by a dedicated logic circuit or an ASIC (Application Specific Integrated Circuit) in which the logic modules are integrated.

2.廃棄物装入手順
続いて、廃棄物装入方法の一例として、廃棄物装入装置4により実行される廃棄物装入手順を説明する。ここでは、当該手順が監視装置110及びコントローラ120により自動的に実行される場合を説明する。
2. Waste Charging Procedure Next, a waste charging procedure executed by the waste charging device 4 will be described as an example of the waste charging method. Here, a case where the procedure is automatically executed by the monitoring device 110 and the controller 120 will be described.

図4に示すように、まずコントローラ120がステップS01〜S05を実行する。   As shown in FIG. 4, first, the controller 120 executes steps S01 to S05.

ステップS01では、油圧情報取得部123により取得されたアクチュエータ64の油圧情報に基づいて、廃棄物Gがダンパ本体61上に落下したか否かを落下判定部124が判定する。落下判定部124は、アクチュエータ64の油圧情報が所定の閾値(以下、これを「第一の落下判定閾値」という。)を超えている場合に、廃棄物Gがダンパ本体61上に落下したと判定し、アクチュエータ64の油圧情報が第一の落下判定閾値を超えていない場合に、廃棄物Gがダンパ本体61上に落下していないと判定してもよい。また、落下判定部124は、アクチュエータ64の油圧情報の上昇量が所定の閾値(以下、これを「第二の落下判定閾値」という。)を超えている場合に、廃棄物Gがダンパ本体61上に落下したと判定し、アクチュエータ64の油圧情報の上昇量が第二の落下判定閾値を超えていない場合に、廃棄物Gがダンパ本体61上に落下していないと判定してもよい。第一の落下判定閾値及び第二の落下判定閾値は、実験又はシミュレーションにより適宜設定可能である。   In step S <b> 01, the fall determination unit 124 determines whether or not the waste G has dropped on the damper main body 61 based on the hydraulic pressure information of the actuator 64 acquired by the hydraulic pressure information acquisition unit 123. When the hydraulic pressure information of the actuator 64 exceeds a predetermined threshold (hereinafter referred to as “first drop determination threshold”), the drop determination unit 124 determines that the waste G has dropped on the damper main body 61. If the hydraulic pressure information of the actuator 64 does not exceed the first drop determination threshold, it may be determined that the waste G has not dropped on the damper main body 61. Further, the drop determination unit 124 determines that the waste G is contained in the damper main body 61 when the amount of increase in the hydraulic pressure information of the actuator 64 exceeds a predetermined threshold (hereinafter referred to as “second drop determination threshold”). It may be determined that the waste G has not dropped onto the damper body 61 when it is determined that the hydraulic pressure information of the actuator 64 has not exceeded the second drop determination threshold value. The first drop determination threshold and the second drop determination threshold can be set as appropriate through experiments or simulations.

ステップS01において、ダンパ本体61上に廃棄物Gが落下していると判定されるまで、コントローラ120はステップS01を繰り返す。ステップS01において、ダンパ本体61上に廃棄物Gが落下したことが検知されると、コントローラ120はステップS02を実行する。ステップS02では、廃棄物Gがダンパ本体61上に落下した際にダンパ60に作用する負荷が上記負荷閾値を超えているか否かに基づいて、破袋処理の要否を破袋処理判定部125が判定する。   In step S01, the controller 120 repeats step S01 until it is determined that the waste G is falling on the damper main body 61. When it is detected in step S01 that the waste G has dropped on the damper main body 61, the controller 120 executes step S02. In step S02, whether or not the bag breaking process is necessary is determined based on whether or not the load that acts on the damper 60 when the waste G falls on the damper main body 61 exceeds the load threshold. Judgment.

破袋処理判定部125は、ダンパ本体61上に廃棄物Gが落下していることを落下判定部124が検知した際の油圧情報を上記負荷として用いてもよい。「廃棄物Gが落下していることを落下判定部124が検知した際の油圧情報」は、落下判定部124により上記第一の落下判定閾値を超えていると判定された油圧情報であってもよいし、落下判定部124により上記第一の落下判定閾値を超えていると判定されたときを含む所定期間において、油圧情報取得部123により取得された油圧情報の最大値を上記負荷として用いてもよい。また、破袋処理判定部125は、油圧情報取得部123により取得された油圧情報に所定の演算を施した値を上記負荷として用いてもよい。例えば破袋処理判定部125は、上記油圧情報又は上記油圧情報の最大値に基づいて出力軸66に作用するトルクを算出し、当該トルクを上記負荷として用いてもよい。   The bag breaking process determination unit 125 may use the hydraulic pressure information when the drop determination unit 124 detects that the waste G is falling on the damper main body 61 as the load. “Hydraulic information when the drop determination unit 124 detects that the waste G is falling” is the hydraulic information determined by the drop determination unit 124 as exceeding the first drop determination threshold. Alternatively, the maximum value of the hydraulic pressure information acquired by the hydraulic pressure information acquisition unit 123 is used as the load in a predetermined period including when the drop determination unit 124 determines that the first drop determination threshold is exceeded. May be. Further, the bag breaking process determination unit 125 may use a value obtained by performing a predetermined calculation on the hydraulic pressure information acquired by the hydraulic pressure information acquisition unit 123 as the load. For example, the bag breaking process determination unit 125 may calculate a torque acting on the output shaft 66 based on the hydraulic pressure information or the maximum value of the hydraulic pressure information, and use the torque as the load.

負荷閾値は、例えば第一シール弁22のアクチュエータ34の耐圧(例えば仕様上の最大耐圧又は定格耐圧)に基づいて設定可能である。例えば、負荷閾値は、廃棄物Gの落下に際してダンパ60に作用する負荷が当該閾値以下であれば、当該廃棄物Gが弁本体24上に落下した際のアクチュエータ34の油圧が上記耐圧以下となるように設定される。   The load threshold can be set based on, for example, the pressure resistance of the actuator 34 of the first seal valve 22 (for example, the maximum pressure resistance or the rated pressure resistance in the specification). For example, if the load acting on the damper 60 when the waste G falls is equal to or less than the threshold, the hydraulic pressure of the actuator 34 when the waste G falls on the valve body 24 is equal to or less than the pressure resistance. Is set as follows.

ダンパ60に作用する負荷が上記負荷閾値以下である場合、破袋処理判定部125は破袋処理が不要であると判定する。ダンパ60に作用する負荷が上記負荷閾値を超えている場合、破袋処理判定部125は破袋処理が必要であると判定する。   When the load acting on the damper 60 is equal to or less than the load threshold, the bag breaking process determination unit 125 determines that the bag breaking process is unnecessary. If the load acting on the damper 60 exceeds the load threshold, the bag breaking process determination unit 125 determines that the bag breaking process is necessary.

ステップS02において、破袋処理が必要であると判定された場合、コントローラ120はステップS03を実行した後に処理をステップS04に進める。ステップS03では、破袋指令出力部126が、破袋処理の実行指令を破袋装置70に出力する。破袋装置70は、破袋指令出力部126からの実行指令に応じて破袋処理を実行する。ステップS04において、破袋処理が不要であると判定された場合、コントローラ120はステップS03を実行することなく処理をステップS04に進める。このように、本手順は、ダンパ60に作用する負荷が負荷閾値を超えている場合に、廃棄物Gに対して破袋処理を施し、ダンパ60に作用する負荷が当該負荷閾値を超えていない場合には廃棄物Gに対して破袋処理を施さないように破袋装置70を制御することを含む。   If it is determined in step S02 that the bag breaking process is necessary, the controller 120 advances the process to step S04 after executing step S03. In step S <b> 03, the bag breaking command output unit 126 outputs an execution command for bag breaking processing to the bag breaking device 70. The bag breaking device 70 executes a bag breaking process in response to an execution command from the bag breaking command output unit 126. If it is determined in step S04 that the bag breaking process is unnecessary, the controller 120 advances the process to step S04 without executing step S03. Thus, in this procedure, when the load acting on the damper 60 exceeds the load threshold, the bag G is subjected to the bag breaking process, and the load acting on the damper 60 does not exceed the load threshold. The case includes controlling the bag breaking device 70 so that the waste G is not broken.

ステップS04では、開閉制御部122が、受入口21bを開くように第二シール弁23を制御する。これにより、ダンパ60と第一シール弁22との間において経路R1が開放される。   In step S04, the opening / closing control unit 122 controls the second seal valve 23 so as to open the receiving port 21b. Thereby, the path R <b> 1 is opened between the damper 60 and the first seal valve 22.

次に、監視装置110がステップS05を実行する。ステップS05では、廃棄物Gが弁本体24上に落下した際に第一シール弁22にかかる負荷の導出を負荷導出部112が開始する。例えば、負荷導出部112は、アクチュエータ34の油圧情報の最大値を上記負荷として導出する。具体的に負荷導出部112は、所定値(例えばゼロ)を初期の記憶値として、上記油圧情報の最大値の導出を開始する。以後、負荷導出部112は、油圧情報取得部111によりアクチュエータ34の油圧情報が取得される度に、取得された油圧情報と記憶値とを比較し、取得された油圧情報が記憶値を超えている場合には、当該油圧情報によって記憶値を上書きする。   Next, the monitoring device 110 executes Step S05. In step S05, the load deriving unit 112 starts deriving the load applied to the first seal valve 22 when the waste G falls on the valve body 24. For example, the load deriving unit 112 derives the maximum value of the hydraulic pressure information of the actuator 34 as the load. Specifically, the load deriving unit 112 starts deriving the maximum value of the hydraulic pressure information using a predetermined value (for example, zero) as an initial stored value. Thereafter, each time the hydraulic pressure information acquisition unit 111 acquires the hydraulic pressure information of the actuator 34, the load deriving unit 112 compares the acquired hydraulic pressure information with the stored value, and the acquired hydraulic pressure information exceeds the stored value. If there is, the stored value is overwritten with the hydraulic pressure information.

次に、コントローラ120がステップS06を実行する。ステップS06では、開閉制御部122が、開口51aを開くようにダンパ60を制御する。これにより、廃棄物Gが弁本体24上に落下する。   Next, the controller 120 executes step S06. In step S06, the opening / closing control unit 122 controls the damper 60 to open the opening 51a. Thereby, the waste G falls on the valve body 24.

次に、監視装置110がステップS07を実行する。ステップS07では、負荷導出部112が、所定時間の経過まで上記油圧情報の最大値の導出を継続する。所定時間は、ダンパ60が開口51aを開いた後、廃棄物Gが弁本体24上に落下するまでの時間よりも長く設定される。所定時間の値は、事前実験又はシミュレーションなどによって適宜設定可能である。   Next, the monitoring device 110 executes Step S07. In step S07, the load deriving unit 112 continues to derive the maximum value of the hydraulic pressure information until a predetermined time elapses. The predetermined time is set longer than the time until the waste G falls on the valve body 24 after the damper 60 opens the opening 51a. The value of the predetermined time can be appropriately set by a prior experiment or simulation.

次に、監視装置110はステップS08を実行する。ステップS08では、負荷導出部112が、上記油圧情報の最大値の導出を完了する。負荷導出部112はここまでの処理で導出された上記油圧情報の最大値を上記負荷としてもよいし、上記油圧情報の最大値に所定の演算を施した値を上記負荷として導出してもよい。例えば負荷導出部112は、上記油圧情報の最大値に基づいて出力軸36に作用するトルクを算出し、当該トルクを上記負荷としてもよいし、出力軸36に作用するトルクに基づいてキー39に作用するせん断応力を更に算出し、当該せん断応力を上記負荷としてもよい。   Next, the monitoring device 110 executes Step S08. In step S08, the load deriving unit 112 completes the derivation of the maximum value of the hydraulic pressure information. The load deriving unit 112 may use the maximum value of the hydraulic pressure information derived in the process so far as the load, or may derive a value obtained by performing a predetermined calculation on the maximum value of the hydraulic pressure information as the load. . For example, the load deriving unit 112 calculates a torque acting on the output shaft 36 based on the maximum value of the hydraulic pressure information, and the torque may be used as the load, or may be applied to the key 39 based on the torque acting on the output shaft 36. The acting shear stress may be further calculated, and the shear stress may be set as the load.

次に、監視装置110はステップS09を実行する。ステップS09では、負荷導出部112により導出された上記負荷をデータ記憶部114に送ることを落下時データ蓄積部113が実行する。   Next, the monitoring device 110 executes Step S09. In step S09, the falling-time data storage unit 113 executes sending the load derived by the load deriving unit 112 to the data storage unit 114.

データ記憶部114は、落下時データ蓄積部113から送られた検出結果に応じて記録内容を更新する。図5は、データ記憶部114の記録内容を例示するテーブルである。図5に例示されるように、データ記憶部114は、負荷の大きさを複数の帯域(クラス)に区分し、弁本体24上に廃棄物Gが落下した回数を、クラスごとに分けて記録してもよい。データ記憶部114は、落下時データ蓄積部113から検出結果を受領すると、当該検出結果を帯域内に含むクラスの回数に1を加算する。   The data storage unit 114 updates the recorded contents in accordance with the detection result sent from the drop time data storage unit 113. FIG. 5 is a table illustrating the recorded contents of the data storage unit 114. As illustrated in FIG. 5, the data storage unit 114 divides the magnitude of the load into a plurality of bands (classes), and records the number of times the waste G has dropped on the valve body 24 for each class. May be. When the data storage unit 114 receives the detection result from the fall time data storage unit 113, the data storage unit 114 adds 1 to the number of classes in which the detection result is included in the band.

ここに例示したように、廃棄物Gが弁本体24に落下した際に第一シール弁22に作用する負荷の大きさと、廃棄物Gが弁本体24上に落下した回数とを記録することは、弁本体24上に廃棄物Gが落下した回数をクラスごとに分けて記録することをも含む。なお、落下時データ蓄積部113による検出結果がいずれのクラスに該当するかの判定を落下時データ蓄積部113が実行してもよい。この場合、落下時データ蓄積部113は、第一シール弁22に作用する負荷の大きさを示す情報として、クラスの識別コード(例えばクラスの番号)をデータ記憶部114に送る。   As illustrated here, it is possible to record the magnitude of the load acting on the first seal valve 22 when the waste G falls on the valve body 24 and the number of times the waste G has dropped on the valve body 24. In addition, the number of times the waste G has fallen on the valve body 24 is recorded separately for each class. It should be noted that the fall time data storage unit 113 may determine which class the detection result of the fall time data storage unit 113 corresponds to. In this case, the drop data storage unit 113 sends a class identification code (for example, a class number) to the data storage unit 114 as information indicating the magnitude of the load acting on the first seal valve 22.

次に、監視装置110はステップS10を実行する。ステップS10では、損傷度算出部115が、データ記憶部114に記録された-データに基づいて上記疲労損傷度を導出する。疲労損傷度は、例えばマイナー則又は修正マイナー則等の累積損傷則に基づいて、次式により算出可能である。
D=n1/N1+n2/N2+n3/N3+n4/N4+・・・ni/Ni
D:疲労損傷度
i:負荷の大きさのクラス
ni:クラスiに分類された廃棄物Gの落下回数
Ni:クラスiにおいて許容される落下回数
Next, the monitoring device 110 executes Step S10. In step S <b> 10, the damage degree calculation unit 115 derives the fatigue damage degree based on the −data recorded in the data storage unit 114. The degree of fatigue damage can be calculated by the following equation based on a cumulative damage rule such as a minor rule or a modified minor rule.
D = n1 / N1 + n2 / N2 + n3 / N3 + n4 / N4 +... Ni / Ni
D: Fatigue damage degree i: Load magnitude class ni: Number of drops of waste G classified in class i Ni: Number of drops allowed in class i

上記Niは、図6に例示するS−N曲線に基づいて導出可能である。図6の横軸は、許容される繰り返し回数(以下、「許容回数」という。)を示す。図6の縦軸は、応力を示す。例えば、負荷の集中が想定される部分(例えばキー39)に作用する応力をクラスごとに求め、当該応力に対応する許容回数を図6のグラフから求めることで、上記Niを導出することができる。   The Ni can be derived based on the SN curve illustrated in FIG. The abscissa in FIG. 6 indicates the allowable number of repetitions (hereinafter referred to as “allowable number”). The vertical axis | shaft of FIG. 6 shows stress. For example, the Ni can be derived by obtaining the stress acting on the portion where the load concentration is assumed (for example, the key 39) for each class and obtaining the allowable number of times corresponding to the stress from the graph of FIG. .

疲労損傷度Dに基づけば、疲労破壊の発生可能性を推定できる。例えば、疲労損傷度Dが1未満であれば疲労破壊の発生可能性は低いと推定され、疲労損傷度Dが1以上であれば疲労破壊の可能性が高いと推定される。   Based on the fatigue damage degree D, the possibility of occurrence of fatigue failure can be estimated. For example, if the fatigue damage degree D is less than 1, it is estimated that the possibility of fatigue failure is low, and if the fatigue damage degree D is 1 or more, it is estimated that the possibility of fatigue failure is high.

次に、監視装置110はステップS11を実行する。ステップS11では、損傷度算出部115が、疲労損傷度の算出結果を表示装置200に出力する。表示装置200は、損傷度算出部115により出力された疲労損傷度を表示する。   Next, the monitoring device 110 executes Step S11. In step S <b> 11, the damage degree calculation unit 115 outputs the calculation result of the fatigue damage degree to the display device 200. The display device 200 displays the fatigue damage level output by the damage level calculation unit 115.

次に、コントローラ120がステップS12〜S14を実行する。   Next, the controller 120 executes steps S12 to S14.

ステップS12では、開閉制御部122が、受入口21bを閉じるように油圧情報取得部123を制御する。ステップS13では、開閉制御部122が、開口51aを閉じるようにダンパ60を制御する。ステップS14では、開閉制御部122が、装入口21aを開いて廃棄物Gを廃棄物処理炉2内に装入し、その後装入口21aを閉じるように第一シール弁22を制御する。以上で廃棄物の装入手順が完了する。   In step S12, the opening / closing control unit 122 controls the hydraulic pressure information acquisition unit 123 so as to close the receiving port 21b. In step S13, the opening / closing control unit 122 controls the damper 60 so as to close the opening 51a. In step S14, the opening / closing control unit 122 controls the first seal valve 22 so as to open the charging port 21a, load the waste G into the waste treatment furnace 2, and then close the charging port 21a. This completes the waste charging procedure.

なお、ステップS12,S13の実行順序は逆転していてもよい。ステップS12,S13は、ステップS08の後、ステップS14の実行前に実行されればよいので、例えばステップS09に先立って実行されてもよい。ステップS14は、ステップS08,S12,S13の後に実行されればよいので、例えばステップS12,S13がステップS09に先立って実行される場合には、ステップS14もステップS09に先立って実行されてよい。   Note that the execution order of steps S12 and S13 may be reversed. Steps S12 and S13 may be executed after step S08 and before execution of step S14, and may be executed prior to step S09, for example. Step S14 may be executed after steps S08, S12, and S13. Therefore, for example, when steps S12 and S13 are executed prior to step S09, step S14 may also be executed prior to step S09.

3.本実施形態の効果
以上に説明したように、本開示に係る廃棄物装入装置4は、廃棄物Gを廃棄物処理炉2内に装入するための経路R1にて下方に開口した装入口21aを下方から開閉する弁本体24と、油圧式のアクチュエータ34を動力源として弁本体24を閉状態に拘束する弁ロック機構25と、を有する第一シール弁22と、廃棄物Gが弁本体24上に落下した際に第一シール弁22にかかった負荷をアクチュエータ34の油圧に基づいて導出し、当該負荷の大きさと、廃棄物Gが弁本体24上に落下した回数とに基づいて、第一シール弁22の疲労状態に関する指標を導出する監視装置110と、を備える。
3. As described above, the waste charging device 4 according to the present disclosure has the charging port opened downward in the path R1 for charging the waste G into the waste processing furnace 2. A first seal valve 22 having a valve body 24 that opens and closes 21a from below; a valve lock mechanism 25 that restrains the valve body 24 in a closed state by using a hydraulic actuator 34 as a power source; Based on the hydraulic pressure of the actuator 34, the load applied to the first seal valve 22 when falling onto the valve 24 is derived, and based on the magnitude of the load and the number of times the waste G has dropped onto the valve body 24, And a monitoring device 110 for deriving an index related to the fatigue state of the first seal valve 22.

この廃棄物装入装置4において、弁本体24は、弁ロック機構25のアクチュエータ34の油圧に応じた力で閉状態に拘束される。このため、アクチュエータ34の油圧は、弁本体24に対する廃棄物Gの落下衝撃に応じて変動する。そこで、弁ロック機構25のアクチュエータ34の油圧に基づくことで、廃棄物Gが弁本体24上に落下した際に第一シール弁22にかかった負荷を把握することが可能である。第一シール弁22の疲労状態は、上記負荷の大きさ及び廃棄物Gが弁本体24上に落下した回数に関連する傾向がある。このため、上記負荷の大きさ及び上記回数に基づくことで、第一シール弁22の疲労状態に関する指標を導出できる。すなわち、弁ロック機構25のアクチュエータ34を活用して第一シール弁22の疲労状態に関する情報を導出できる。従って、装置構成の複雑化を抑制しつつ、第一シール弁22の疲労状態を把握できる。   In the waste charging device 4, the valve main body 24 is restrained to a closed state by a force corresponding to the hydraulic pressure of the actuator 34 of the valve lock mechanism 25. For this reason, the hydraulic pressure of the actuator 34 varies according to the drop impact of the waste G on the valve body 24. Therefore, based on the hydraulic pressure of the actuator 34 of the valve lock mechanism 25, it is possible to grasp the load applied to the first seal valve 22 when the waste G falls on the valve main body 24. The fatigue state of the first seal valve 22 tends to be related to the magnitude of the load and the number of times the waste G has dropped onto the valve body 24. For this reason, the index regarding the fatigue state of the first seal valve 22 can be derived based on the magnitude of the load and the number of times. That is, the information regarding the fatigue state of the first seal valve 22 can be derived by utilizing the actuator 34 of the valve lock mechanism 25. Therefore, the fatigue state of the first seal valve 22 can be grasped while suppressing the complication of the device configuration.

廃棄物装入装置4は、第一シール弁22よりも上方に配置され、装入口21aに向かう経路R1を開閉する第二シール弁23と、第二シール弁23を基準にして第一シール弁22の逆側に設けられ、廃棄物Gの落下を妨げた後に再度落下させることで廃棄物Gの落下速度を低減するダンパ60と、を更に備えてもよい。   The waste charging device 4 is disposed above the first seal valve 22 and has a second seal valve 23 that opens and closes a path R1 toward the charging port 21a. The first seal valve is based on the second seal valve 23. And a damper 60 that is provided on the opposite side of 22 and reduces the falling speed of the waste G by dropping the waste G again after preventing the falling of the waste G.

この場合、第一シール弁22と第二シール弁23とで開放タイミングをずらすことにより、炉内ガスの大気中への放散をより確実に防止することができる。ダンパ60により廃棄物Gの落下速度を低減することで、第一シール弁22に対する廃棄物Gの落下衝撃を抑制し、第一シール弁22における疲労蓄積を抑制できる。ここで、ダンパ60は、第二シール弁23を基準にして第一シール弁22の逆側に設けられる。このため、第二シール弁23を基準にして第一シール弁22側にダンパ60を設ける場合に比べ、第二シール弁23を第一シール弁22に近付け、ダンパ60を第一シール弁22から離すことができる。第二シール弁23を第一シール弁22に近付けることで、第一シール弁22と第二シール弁23との間の空間を小さくすることができる。当該空間を小さくすると、第一シール弁22の開放前に当該空間内のガスを大気中へ放散可能な状態にするためのパージガス量を削減できる。また、当該空間内のガスにパージガスを供給する期間も短縮できる。一方、ダンパ60を第一シール弁22から離すことにより、ダンパ60に対する廃棄物Gの落下衝撃をも抑制できる。従って、炉内ガスの漏出防止と、廃棄物装入装置4の耐久性向上との両立を図ることができる。   In this case, by shifting the opening timing between the first seal valve 22 and the second seal valve 23, it is possible to more reliably prevent the gas in the furnace from being diffused into the atmosphere. By reducing the falling speed of the waste G by the damper 60, it is possible to suppress the drop impact of the waste G on the first seal valve 22 and to suppress fatigue accumulation in the first seal valve 22. Here, the damper 60 is provided on the opposite side of the first seal valve 22 with respect to the second seal valve 23. For this reason, compared with the case where the damper 60 is provided on the first seal valve 22 side with respect to the second seal valve 23, the second seal valve 23 is moved closer to the first seal valve 22, and the damper 60 is moved away from the first seal valve 22. Can be released. The space between the first seal valve 22 and the second seal valve 23 can be reduced by bringing the second seal valve 23 closer to the first seal valve 22. If the space is made small, the amount of purge gas for making the gas in the space dissipate into the atmosphere before opening the first seal valve 22 can be reduced. In addition, the period for supplying the purge gas to the gas in the space can be shortened. On the other hand, by separating the damper 60 from the first seal valve 22, it is possible to suppress the drop impact of the waste G on the damper 60. Therefore, it is possible to achieve both the prevention of leakage of gas in the furnace and the improvement of the durability of the waste charging device 4.

廃棄物装入装置4は、ダンパ60により落下を妨げられた廃棄物Gに対して破袋処理を施す破袋装置70を更に備えてもよい。この場合、破袋処理を施すことで、弁本体24上に落下する際の廃棄物Gの変形を促し、当該変形によって落下衝撃を緩和することができる。従って、第一シール弁22における疲労蓄積を更に抑制できる。   The waste charging device 4 may further include a bag breaking device 70 that performs a bag breaking process on the waste G that is prevented from dropping by the damper 60. In this case, by performing the bag breaking process, it is possible to promote the deformation of the waste G when falling onto the valve body 24, and to reduce the drop impact by the deformation. Therefore, fatigue accumulation in the first seal valve 22 can be further suppressed.

廃棄物装入装置4は、ダンパ60に作用する負荷が所定の閾値を超えている場合に、廃棄物Gに対して破袋処理を施し、ダンパ60に作用する負荷が閾値を超えていない場合には廃棄物Gに対して破袋処理を施さないように破袋装置70を制御するコントローラ120を更に備えてもよい。   When the load acting on the damper 60 exceeds a predetermined threshold value, the waste charging device 4 performs a bag breaking process on the waste G, and the load acting on the damper 60 does not exceed the threshold value. May further include a controller 120 that controls the bag breaking device 70 so that the waste G is not subjected to the bag breaking process.

ダンパ60に作用する負荷が小さい場合には、第一シール弁22に作用する負荷も小さいので、破袋処理を省略したとしても第一シール弁22の疲労状態への影響は小さい。一方で、破袋処理を省略すると、廃棄物Gの処理効率が高まる。従って、ダンパ60に作用する負荷が所定の閾値を超えているか否かに基づいて破袋処理の有無を切り替えることで、廃棄物Gの処理効率の低下抑制と、第一シール弁22における疲労蓄積の抑制との両立を図ることができる。   When the load acting on the damper 60 is small, the load acting on the first seal valve 22 is also small. Therefore, even if the bag breaking process is omitted, the influence on the fatigue state of the first seal valve 22 is small. On the other hand, if the bag breaking process is omitted, the processing efficiency of the waste G increases. Therefore, by switching the presence / absence of the bag breaking process based on whether or not the load acting on the damper 60 exceeds a predetermined threshold value, it is possible to suppress the reduction in the processing efficiency of the waste G and to accumulate fatigue in the first seal valve 22. It is possible to achieve coexistence with suppression.

ダンパ60は、装入口21aに向かう経路R1を開閉するダンパ本体61と、油圧式のアクチュエータ64を動力源としてダンパ本体61を閉状態に拘束するダンパロック機構62と、を有してもよく、コントローラ120は、ダンパロック機構62のアクチュエータ64の油圧に基づいてダンパ60に作用する負荷を検出するように構成されていてもよい。この場合、ダンパ60に作用する負荷に応じて破袋処理の有無を切り替える構成において、装置構成の複雑化をより確実に抑制できる。   The damper 60 may include a damper main body 61 that opens and closes the path R1 toward the loading port 21a, and a damper lock mechanism 62 that restrains the damper main body 61 in a closed state using a hydraulic actuator 64 as a power source. The controller 120 may be configured to detect a load acting on the damper 60 based on the hydraulic pressure of the actuator 64 of the damper lock mechanism 62. In this case, in the configuration in which the presence or absence of the bag breaking process is switched according to the load acting on the damper 60, the complication of the device configuration can be more reliably suppressed.

以上、実施形態について説明したが、本発明は必ずしも上述した実施形態に限定されるものではなく、その要旨を逸脱しない範囲で様々な変更が可能である。   Although the embodiment has been described above, the present invention is not necessarily limited to the above-described embodiment, and various modifications can be made without departing from the scope of the invention.

1…廃棄物処理装置、2…廃棄物処理炉、4…廃棄物装入装置、21a…装入口、22…第一シール弁、23…第二シール弁、24…弁本体、25…弁ロック機構、34…アクチュエータ、60…ダンパ、61…ダンパ本体、62…ダンパロック機構、64…アクチュエータ、70…破袋装置、110…監視装置、120…コントローラ、200…表示装置。   DESCRIPTION OF SYMBOLS 1 ... Waste processing apparatus, 2 ... Waste processing furnace, 4 ... Waste charging apparatus, 21a ... Charge inlet, 22 ... First seal valve, 23 ... Second seal valve, 24 ... Valve body, 25 ... Valve lock Mechanism: 34 ... Actuator, 60 ... Damper, 61 ... Damper main body, 62 ... Damper lock mechanism, 64 ... Actuator, 70 ... Bag breaking device, 110 ... Monitoring device, 120 ... Controller, 200 ... Display device.

Claims (7)

廃棄物を廃棄物溶融炉内に装入するための経路にて下方に開口した装入口を下方から開閉する弁本体と、
油圧式のアクチュエータを動力源として前記弁本体を閉状態に拘束する弁ロック機構と、を有する第一シール弁と、
前記廃棄物が前記弁本体上に落下した際に前記第一シール弁にかかった負荷を前記アクチュエータの油圧に基づいて導出し、当該負荷の大きさと、前記廃棄物が前記弁本体上に落下した回数とに基づいて、前記第一シール弁の疲労状態に関する指標を導出する監視装置と、を備える廃棄物装入装置。
A valve body that opens and closes a charging port that opens downward in a path for charging waste into the waste melting furnace;
A first lock valve having a valve locking mechanism that restrains the valve body in a closed state using a hydraulic actuator as a power source;
The load applied to the first seal valve when the waste falls on the valve body is derived based on the hydraulic pressure of the actuator, and the size of the load and the waste fall on the valve body. And a monitoring device for deriving an index relating to a fatigue state of the first seal valve based on the number of times.
前記第一シール弁よりも上方に配置され、前記装入口に向かう経路を開閉する第二シール弁と、
前記第二シール弁を基準にして前記第一シール弁の逆側に設けられ、前記廃棄物の落下を妨げた後に再度落下させることで前記廃棄物の落下速度を低減するダンパと、を更に備える、請求項1記載の廃棄物装入装置。
A second seal valve that is disposed above the first seal valve and opens and closes a path toward the loading port;
A damper that is provided on the opposite side of the first seal valve with respect to the second seal valve, and that reduces the fall speed of the waste by dropping again after preventing the fall of the waste. The waste charging apparatus according to claim 1.
前記ダンパにより落下を妨げられた前記廃棄物に対して破袋処理を施す破袋装置を更に備える、請求項2記載の廃棄物装入装置。   The waste charging device according to claim 2, further comprising a bag-breaking device that performs bag-breaking processing on the waste that has been prevented from dropping by the damper. 前記ダンパに作用する負荷が所定の閾値を超えている場合に、前記廃棄物に対して前記破袋処理を施し、前記ダンパに作用する負荷が前記閾値を超えていない場合には前記廃棄物に対して前記破袋処理を施さないように前記破袋装置を制御するコントローラを更に備える、請求項3記載の廃棄物装入装置。   When the load acting on the damper exceeds a predetermined threshold, the bag breaking process is performed on the waste, and when the load acting on the damper does not exceed the threshold, the waste is The waste charging apparatus according to claim 3, further comprising a controller that controls the bag breaking apparatus so as not to perform the bag breaking process. 前記ダンパは、
前記装入口に向かう経路を開閉するダンパ本体と、
油圧式のアクチュエータを動力源として前記ダンパ本体を閉状態に拘束するダンパロック機構と、を有し、
前記コントローラは、前記ダンパロック機構の前記アクチュエータの油圧に基づいて前記ダンパに作用する負荷を検出するように構成されている、請求項4記載の廃棄物装入装置。
The damper is
A damper body that opens and closes a path toward the loading port;
A damper lock mechanism that restrains the damper main body in a closed state using a hydraulic actuator as a power source;
The waste charging device according to claim 4, wherein the controller is configured to detect a load acting on the damper based on a hydraulic pressure of the actuator of the damper lock mechanism.
前記監視装置により導出された前記指標を表示する表示装置を更に備える、請求項1〜5のいずれか一項記載の廃棄物装入装置。   The waste charging device according to any one of claims 1 to 5, further comprising a display device that displays the index derived by the monitoring device. 廃棄物処理炉と、
前記廃棄物処理炉内に前記廃棄物を装入する廃棄物装入装置と、を備え、
前記廃棄物装入装置は、
下方に開口し、前記廃棄物処理炉内に廃棄物を送出する装入口を下方から開閉する弁本体と、
油圧式のアクチュエータを動力源として前記弁本体を閉状態に拘束する弁ロック機構と、を有する第一シール弁と、
前記廃棄物が前記弁本体上に落下した際に前記第一シール弁にかかった負荷を前記アクチュエータの油圧に基づいて導出し、当該負荷の大きさと、前記廃棄物が前記弁本体上に落下した回数とに基づいて、前記第一シール弁の疲労状態に関する指標を導出する監視装置と、を備える廃棄物処理装置。
A waste treatment furnace;
A waste charging device for charging the waste into the waste treatment furnace,
The waste charging device is:
A valve body that opens downward and opens and closes a loading port for sending waste into the waste treatment furnace from below;
A first lock valve having a valve locking mechanism that restrains the valve body in a closed state using a hydraulic actuator as a power source;
The load applied to the first seal valve when the waste falls on the valve body is derived based on the hydraulic pressure of the actuator, and the size of the load and the waste fall on the valve body. And a monitoring device that derives an index related to a fatigue state of the first seal valve based on the number of times.
JP2016057334A 2016-03-22 2016-03-22 Waste charging device and waste processing device Active JP6562858B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016057334A JP6562858B2 (en) 2016-03-22 2016-03-22 Waste charging device and waste processing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016057334A JP6562858B2 (en) 2016-03-22 2016-03-22 Waste charging device and waste processing device

Publications (2)

Publication Number Publication Date
JP2017170304A JP2017170304A (en) 2017-09-28
JP6562858B2 true JP6562858B2 (en) 2019-08-21

Family

ID=59969874

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016057334A Active JP6562858B2 (en) 2016-03-22 2016-03-22 Waste charging device and waste processing device

Country Status (1)

Country Link
JP (1) JP6562858B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7814268B2 (en) * 2022-08-19 2026-02-16 日鉄エンジニアリング株式会社 Waste charging device and waste charging method

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3793302B2 (en) * 1996-12-18 2006-07-05 新日本製鐵株式会社 Waste charging equipment for waste melting furnace
JP2004205188A (en) * 2002-11-07 2004-07-22 Tokyo Elex Kk Waste treatment method and treatment equipment
JP4176570B2 (en) * 2003-07-24 2008-11-05 東京環境エレックス株式会社 Waste treatment apparatus and treatment method
JP4829939B2 (en) * 2007-09-18 2011-12-07 株式会社神鋼環境ソリューション Waste supply method
JP6029458B2 (en) * 2012-12-25 2016-11-24 新日鉄住金エンジニアリング株式会社 Waste charging device and waste charging method

Also Published As

Publication number Publication date
JP2017170304A (en) 2017-09-28

Similar Documents

Publication Publication Date Title
EP3709386A1 (en) Battery pack storage device and control method therefor
JP6562858B2 (en) Waste charging device and waste processing device
US20150132616A1 (en) Method and device for triggering at least one safety function in the event of a state of an electrochemical store that is critical with regard to safety, and electrochemical energy storage system
JP2003142551A5 (en)
CN108242574A (en) The security feature of energy storage device
JP5575441B2 (en) CHARGE CONTROL DEVICE, CHARGE CONTROL METHOD, PROGRAM, AND RECORDING MEDIUM
JP2017083444A (en) Cooling air quantity regulation apparatus for concrete cask, and concrete cask
NO328200B1 (en) Vibration logging in computers
JP2010107148A (en) Gas burning appliance control device
JP6262354B2 (en) Method for inspecting an overspeed protection device of a single axis system
JP2019501343A5 (en)
JPH07130115A (en) Information processing equipment
WO2016146759A1 (en) Cylinder damage response system
CN105210287B (en) Control device of electric motor and motor control system
JP5222085B2 (en) Earthquake signal processing apparatus and earthquake signal processing method
JP7271657B2 (en) Pressure relief systems, containers, buildings, enclosures or cubicles containing pressure relief systems and methods for relieving pressure from containers, buildings, enclosures or cubicles
JP6379193B2 (en) Burst device for high voltage devices
WO2019010306A1 (en) Emergency braking of flywheel
JP4922325B2 (en) Spent fuel pool equipment
EP4386934B1 (en) System and method for detecting thermal runaway using acoustic and gas sensors
MY152629A (en) A voyage data recorder capsule unit
US20240332727A1 (en) Gas detection in batteries
KR101355169B1 (en) Apparatus for storing dangerous article
US20160069515A1 (en) Emergency disposal of storage containers
KR101444840B1 (en) Flare line and monitoring system thereof

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20181105

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190702

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190628

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190723

R150 Certificate of patent or registration of utility model

Ref document number: 6562858

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250