JP5285362B2 - Simulation device, simulation control method, and simulation control program - Google Patents
[go: Go Back, main page]

JP5285362B2 - Simulation device, simulation control method, and simulation control program - Google Patents

Simulation device, simulation control method, and simulation control program Download PDF

Info

Publication number
JP5285362B2
JP5285362B2 JP2008222866A JP2008222866A JP5285362B2 JP 5285362 B2 JP5285362 B2 JP 5285362B2 JP 2008222866 A JP2008222866 A JP 2008222866A JP 2008222866 A JP2008222866 A JP 2008222866A JP 5285362 B2 JP5285362 B2 JP 5285362B2
Authority
JP
Japan
Prior art keywords
simulation
information
devices
substation
interlocking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2008222866A
Other languages
Japanese (ja)
Other versions
JP2010057346A (en
Inventor
晃 武井
敏行 品田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Industry and Control Solutions Co Ltd
Original Assignee
Hitachi Information and Control Solutions Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Information and Control Solutions Ltd filed Critical Hitachi Information and Control Solutions Ltd
Priority to JP2008222866A priority Critical patent/JP5285362B2/en
Publication of JP2010057346A publication Critical patent/JP2010057346A/en
Application granted granted Critical
Publication of JP5285362B2 publication Critical patent/JP5285362B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Description

本発明は、模擬装置、模擬制御方法および模擬制御プログラムの技術に関する。   The present invention relates to a simulation device, a simulation control method, and a simulation control program.

従来の電鉄電力管理システムにおける中央処理装置の模擬(シミュレーション)では、変電所内の機器(以下、機器と記載する)の制御応動模擬や、保護継電器の動作模擬を行うものであり、中央処理装置による制御処理を行う場合、機器の動作結果は、機器の動作シーケンスに頼るものであった。また、中央処理装置による機器への制御論理の検証(つまり模擬結果の検証)は、実際の機器との組み合わせの中で検証されてきた。   In the simulation (simulation) of the central processing unit in the conventional electric railway power management system, the control response simulation of the equipment in the substation (hereinafter referred to as equipment) and the operation simulation of the protective relay are performed. When the control process is performed, the operation result of the device depends on the operation sequence of the device. In addition, verification of control logic (that is, verification of simulation results) for devices by the central processing unit has been verified in combination with actual devices.

このような模擬を行う際の技術として、模擬試験時における接続作業を省略することができる電鉄用変電所監視装置(例えば、特許文献1参照)や、物理的な設置スペースを節約でき、応動解析やシステム試験を容易に行える変電所監視制御保護システム(例えば、特許文献2参照)などが開示されている。
特開2006-42494号公報 特開2002-233059号公報
As a technique for performing such a simulation, a railway substation monitoring device (for example, refer to Patent Document 1) that can omit the connection work during the simulation test, a physical installation space can be saved, and a response analysis is performed. And a substation monitoring control protection system (for example, see Patent Document 2) that can easily perform system tests.
JP 2006-42494 A JP 2002-233059 A

このような技術における電鉄電力管理システムの中央処理装置による機器の模擬では、制御論理が変電所における機器の動作シーケンス(連動)について配慮されておらず、例えば、操作員の教育訓練における模擬において操作員が誤った制御指示を行った場合にも、その誤りを検証することができない問題がある。このため、操作員の教育訓練装置の機能としては不十分である。
また、中央処理装置における模擬の制御論理が誤っていた場合においても、この制御論理の誤りを実際の変電所の機器との組み合わせを実施するまで検証することができない問題がある。つまり、中央処理装置において模擬を実行した場合、この模擬結果における動作シーケンスが正しいか否かを、実際の変電所の機器との組み合わせを実施するまで検証することができないという問題がある。
In the simulation of equipment by the central processing unit of the electric power management system in such technology, the control logic does not consider the operation sequence (interlocking) of the equipment in the substation. Even when an operator gives an incorrect control instruction, there is a problem that the error cannot be verified. For this reason, it is inadequate as a function of an operator training apparatus.
Further, even if the simulated control logic in the central processing unit is incorrect, there is a problem that the error in the control logic cannot be verified until the combination with the actual substation equipment is performed. That is, when simulation is executed in the central processing unit, there is a problem that whether or not the operation sequence in the simulation result is correct cannot be verified until combination with actual substation equipment is performed.

例えば、特許文献1に記載の技術では、模擬が各電鉄用変電所で行われている上、模擬結果に対する検証機能がないため、例えばプログラミングにおけるミスや、中央処理所(中央制御所)における操作員からの指令に対する受電用遮断器などの動作シーケンスが正しいか否かを検証することができないという問題がある。   For example, in the technique described in Patent Document 1, simulation is performed at each electric railway substation and there is no verification function for the simulation result. For example, programming errors and operations at the central processing station (central control station) There is a problem that it is not possible to verify whether or not the operation sequence of the power receiving circuit breaker in response to the command from the staff is correct.

また、特許文献2に記載されているシステムの試験などを想定した模擬では、過去、実際に変電所において発生した系統現象を変電所情報として用いるため、過去に発生していない事象などには対応できないという問題がある。   In addition, in the simulation assuming the system test described in Patent Document 2, since the system phenomenon that occurred in the past and actually in the substation is used as the substation information, it corresponds to the event that has not occurred in the past. There is a problem that you can not.

このような背景に鑑みて本発明がなされたのであり、本発明は、変電所における模擬の動作シーケンスの妥当性を検証した上で、中央制御所において模擬を実行することを目的とする。   The present invention has been made in view of such a background, and an object of the present invention is to execute simulation at a central control station after verifying the validity of a simulated operation sequence at a substation.

前記課題を解決するため、本発明は、電鉄用変電所の模擬を実行し、模擬結果を出力する模擬装置であって、複数の前記電鉄用変電所を統括管理する中央制御所において操作および結果の表示が可能に設置されており、前記電鉄用変電所内の機器間の動作関係を示す情報である連動情報が格納されている記憶部と、入力部を介して入力された、前記電鉄用変電所の模擬における機器間の動作関係を示す情報である模擬連動情報と、前記記憶部の連動情報とを比較し、前記模擬連動情報における機器間の動作が正しいか否かを判定することによって、機器動作の妥当性を判定する判定部と、前記妥当性の判定の結果、前記機器間の動作が正しいと判定された場合、前記電鉄用変電所における機器群の動作模擬を行う模擬処理部と、前記妥当性の判定の結果、前記機器間の動作が正しくないと判定された場合、表示部にエラー表示を行うとともに、前記機器群の動作模擬を行わずに処理を終了する制御部とを有することを特徴とする。 In order to solve the above-mentioned problem, the present invention is a simulation device that performs simulation of a railway substation and outputs a simulation result, and the operation and result at a central control station that collectively manages the plurality of railway substations. The storage substation for the electric railway, which is input via the input section, and a storage section in which interlocking information, which is information indicating an operational relationship between devices in the electric railway substation, is stored. By comparing the simulated interlocking information that is information indicating the operational relationship between the devices in the simulation of the place and the interlocking information of the storage unit, by determining whether the operation between the devices in the simulated interlocking information is correct , A determination unit for determining the appropriateness of the device operation, and a simulation processing unit for simulating the operation of the device group in the railway substation when it is determined that the operation between the devices is correct as a result of the determination of the appropriateness; , of the validity Constant results, and characterized in that when the operation between the device is determined to be incorrect, it performs an error display on the display unit, and a control unit for the processing ends without performing the operation simulation of the equipment group To do.

本発明によれば、変電所における模擬の動作シーケンスの妥当性を検証した上で、中央制御所において模擬を実行することが可能となる。   According to the present invention, it is possible to execute simulation at the central control station after verifying the validity of the simulated operation sequence at the substation.

次に、本発明を実施するための最良の形態(「実施形態」という)について、適宜図面を参照しながら詳細に説明する。   Next, the best mode for carrying out the present invention (referred to as “embodiment”) will be described in detail with reference to the drawings as appropriate.

(システム構成)
図1は、本実施形態に係る電鉄電力管理システムの構成例を示す概略図である。
電鉄電力管理システム10は、変電所の監視制御を行ったり、変電所における機器の動作の模擬を行ったりする中央処理装置2(模擬装置)と、電鉄用変電所(以下、変電所と記載する)の機器動作の模擬における動作シーケンスを検証するための連動情報を中央処理装置2へ伝送する連動情報処理装置3を有する。中央処理装置2および連動情報処理装置3は、サーバと呼ばれる計算機でもパーソナルコンピュータなどの装置でもよい。また、中央処理装置2および連動情報処理装置3は、図示しない複数の変電所を統括管理する中央制御所1に設置されている(操作および結果の表示が可能にされている)。
(System configuration)
FIG. 1 is a schematic diagram illustrating a configuration example of a railway power management system according to the present embodiment.
The electric railway power management system 10 includes a central processing unit 2 (simulation apparatus) for monitoring and controlling a substation and simulating the operation of equipment in the substation, and an electric railway substation (hereinafter referred to as a substation). ) Includes an interlocking information processing apparatus 3 that transmits interlocking information for verifying the operation sequence in the simulation of the device operation to the central processing unit 2. The central processing unit 2 and the linked information processing device 3 may be a computer called a server or a device such as a personal computer. The central processing unit 2 and the interlocking information processing device 3 are installed in the central control station 1 that manages and manages a plurality of substations (not shown) (operations and results can be displayed).

中央処理装置2は、変電所に対する制御を実行したり、模擬(シミュレーション)を実行したりする制御部21(判定部および模擬処理部)、制御部21から出力される制御信号を変電所へ伝送したり、連動情報処理装置3から伝送された連動情報(後記)を受信したりするための入出力部22、および情報を記憶する記憶部23を有する。   The central processing unit 2 executes control on the substation and executes simulation (simulation), and transmits a control signal output from the control unit 21 to the substation. And an input / output unit 22 for receiving linked information (described later) transmitted from the linked information processing apparatus 3 and a storage unit 23 for storing information.

連動情報処理装置3は、機器動作の模擬に対する検証の比較対象である連動情報を生成・出力する連動情報処理部31、連動情報処理部31が出力した連動情報を中央処理装置2へ伝送したり、各情報を連動情報処理部31へ入力するための入出力部32、機器の操作ロック関係および保護連動関係を記述した保護連動・操作ロックデータベース33、および機器の保護連動・操作ロックデータベース33を更新保守したり、連動情報作成のための設定情報を連動情報処理部31へ入力するための設定部34より構成される。なお、保護連動とは、保護継電器が動作する際における機器の開放状態である。また、操作ロックとは、ある機器を投入する際に、必要となる他の機器における投入または開放状態を指す。保護連動および操作ロックの詳細な説明は、図2および図3を参照して後記する。   The interlocking information processing device 3 generates and outputs interlocking information that is a comparison target for verification with respect to simulation of device operation, and transmits the interlocking information output by the interlocking information processing unit 31 to the central processing unit 2. An input / output unit 32 for inputting each information to the interlocking information processing unit 31, a protection interlocking / operation lock database 33 describing the operation lock relationship and protection interlocking relationship of the device, and a protection interlocking / operation lock database 33 of the device It comprises a setting unit 34 for performing update maintenance and inputting setting information for creating linked information to the linked information processing unit 31. The protection interlock is an open state of the device when the protection relay operates. The operation lock refers to an on / off state in another device that is required when a certain device is turned on. Detailed description of the protection interlock and the operation lock will be described later with reference to FIGS.

また、本実施形態では、中央処理装置2と、連動情報処理装置3とを別の装置としているが、一体の装置としてもよい。また、中央処理装置2と、連動情報処理装置3とは、中央制御所1に設置されていなくてもよく、各変電所など、中央制御所1以外の場所に設置されていてもよい。このとき、入出力部22が、中央制御所1に設置されており、制御部21や、記憶部23は、各変電所など、中央制御所1以外の箇所に設置されていてもよい。   In the present embodiment, the central processing unit 2 and the linked information processing device 3 are separate devices, but may be integrated devices. Moreover, the central processing unit 2 and the interlocking information processing device 3 do not have to be installed at the central control station 1, and may be installed at a place other than the central control station 1, such as each substation. At this time, the input / output unit 22 is installed in the central control station 1, and the control unit 21 and the storage unit 23 may be installed in places other than the central control station 1, such as each substation.

中央処理装置2における各部21,22および連動情報処理装置3における各部31,32,34は、図示しないROM(Read Only Memory)や、図示しないHD(Hard Disk)に格納されたプログラム(模擬制御プログラム)が、図示しないRAM(Random Access Memory)に展開され、図示しないCPU(Central Processing Unit)によって実行されることによって具現化する。   The units 21 and 22 in the central processing unit 2 and the units 31, 32 and 34 in the interlocking information processing device 3 are programs (simulation control programs) stored in a ROM (Read Only Memory) not shown or a HD (Hard Disk) not shown. ) Is implemented in a RAM (Random Access Memory) (not shown) and executed by a CPU (Central Processing Unit) (not shown).

(保護連動データベース)
図2は、保護連動データベースの構成例を示す図である。
保護連動データベース33aは、保護継電器により保護される機器群をマトリクス化したものであり、保護連動・操作ロックデータベース33(図1)を構成するものである。
変電所番号は、変電所毎に割り振られる番号である。保護継電器番号は、保護継電器毎に割り振られる番号である。機器番号は、各変電所に設置されている機器毎に割り振られる番号である。欄内に記述されている「○」は、該当する機器に過剰な電流が流れたりした場合、その機器が投入状態であれば、対応する保護継電器が動作することを示している。
(Protection-linked database)
FIG. 2 is a diagram illustrating a configuration example of the protection-linked database.
The protection interlocking database 33a is a matrix of devices protected by the protection relay, and constitutes the protection interlocking / operation lock database 33 (FIG. 1).
The substation number is a number assigned to each substation. The protection relay number is a number assigned to each protection relay. The device number is a number assigned to each device installed in each substation. “◯” described in the column indicates that when an excessive current flows through the corresponding device, the corresponding protective relay operates if the device is in the on state.

例えば、行101を参照すると、「機器A」に過剰な電流が流れた場合、その「機器A」が投入状態であれば、「保護継電器A」は「機器A」に接続されている遮断器に遮断指示を送り、遮断指示を送られた「機器A」に接続している遮断器は、「機器A」への回路を開放し電流を遮断する。つまり、「保護継電器A」は、「機器A」を過剰電流などから保護している。
同様に、行102を参照すると、「機器B」または「機器C」に過剰な電流が流れた場合、「機器B」および「機器C」のいずれか一方が投入状態であれば、「保護継電器B」は、「機器B」および「機器C」に流れる電流を遮断するよう動作することを示している。
なお、空欄の箇所は、該当する保護継電器の動作に影響を及ぼさない機器であることを示している。つまり、「保護継電器B」は、「機器B」および「機器C」を過剰電流などから保護している。
For example, referring to row 101, if an excessive current flows through “device A” and “device A” is turned on, “protective relay A” is connected to “device A”. The circuit breaker connected to the “device A” to which the disconnection instruction is sent opens the circuit to the “device A” and interrupts the current. That is, the “protective relay A” protects the “device A” from excessive current and the like.
Similarly, referring to row 102, if an excessive current flows through “device B” or “device C”, if either “device B” or “device C” is in the on state, “protective relay” “B” indicates that operation is performed to cut off the current flowing through “device B” and “device C”.
In addition, the blank part has shown that it is an apparatus which does not affect the operation | movement of a corresponding protective relay. That is, the “protective relay B” protects the “device B” and the “device C” from excess current and the like.

すなわち、保護連動データベース33aは、機器に異常が生じたときに、当該異常が生じた機器への電力供給遮断を指示する保護継電器と、前記保護継電器によって保護される機器との動作関係の情報を格納している。   That is, the protection-linked database 33a stores information on the operational relationship between a protective relay instructing to cut off power supply to a device in which an abnormality has occurred and a device protected by the protective relay when an abnormality has occurred in the device. Storing.

(操作ロックデータベース)
図3は、操作ロックデータベースの構成例を示す図である。
操作ロックデータベース33bは、対象となる被制御所の操作機器毎に投入・開放時の他の機器群の状態条件をマトリクス化したものであり、保護連動・操作ロックデータベース33(図1)を構成するものである。
変電所番号は、変電所毎に割り振られる番号である。操作機器番号は、変電所内に設置される機器で操作判別の対象となる機器の番号である。可能操作は、後記する操作可能条件を満たすことによって操作機器が行うことのできる操作内容を示している。可能操作には、「投入」や、「開放」などが記述される。機器番号は、各変電所に設置されている機器毎に割り振られる番号であり、この機器番号に該当する各欄には、操作可能条件の各値が記述される。
(Operation lock database)
FIG. 3 is a diagram illustrating a configuration example of the operation lock database.
The operation lock database 33b is a matrix of state conditions of other device groups at the time of input / release for each operation device of the target controlled station, and constitutes the protection interlock / operation lock database 33 (FIG. 1). To do.
The substation number is a number assigned to each substation. The operation device number is the number of a device that is a target of operation discrimination among devices installed in a substation. The possible operation indicates the content of operation that can be performed by the operating device by satisfying the operable condition described later. Possible operations include “input”, “open”, and the like. The device number is a number assigned to each device installed in each substation, and each value of the operable condition is described in each column corresponding to this device number.

例えば、図3の行201を参照すると「機器A」の投入可能条件(可能操作)は、「機器C」が「入」状態であり、「機器B」および「機器D」が「切」状態であることが必要である。また、行202を参照すると「機器B」の投入可能条件(可能操作)は、「機器D」が「入」状態であり、「機器A」および「機器C」が「切」状態であることが必要である。これらの条件を満たさない場合、各機器の投入操作は不可であるとする。なお、「入」状態とは、機器が投入されている状態を指し、「切」状態とは、機器が開放されている状態を指す。また、図3では、行201における「機器A」および行202における「機器B」が「−」となっているが、これは自身の機器については、操作可能条件(投入可能条件)を考慮しないことを示している。さらに、「機器E」〜「機器G」がすべて「−」となっているが、これは、他の変電所に設置されている機器であり、操作可能条件(投入可能条件)に該当しないことを示している。   For example, referring to the row 201 in FIG. 3, the “device A” can be turned on (possible operation) is “device C” in the “on” state and “device B” and “device D” in the “off” state. It is necessary to be. Further, referring to the row 202, the “device B” can be turned on (possible operation) is that “device D” is in the “on” state, and “device A” and “device C” are in the “off” state. is necessary. When these conditions are not satisfied, it is assumed that the input operation of each device is impossible. Note that the “ON” state refers to a state in which the device is turned on, and the “OFF” state refers to a state in which the device is open. In FIG. 3, “device A” in the row 201 and “device B” in the row 202 are “−”, but this does not take into consideration the operable condition (input possible condition) for the own device. It is shown that. Furthermore, “Equipment E” to “Equipment G” are all “−”, but this is equipment installed in other substations and does not correspond to the operable conditions (inputable conditions). Is shown.

つまり、操作ロックデータベース33bは、投入または開放しようとする機器と、当該機器の投入または開放に必要な他の機器の投入状態に関する情報を格納している。   In other words, the operation lock database 33b stores information on a device to be turned on or released and information on the turn-on state of other devices necessary for turning on or opening the device.

(連動情報作成処理)
次に、図1〜図3を参照しつつ、図4および図5に沿って本実施形態に係る各処理の説明を行う。
図4は、本実施形態に係る連動情報作成処理の流れを示すフローチャートである。
なお、図4に示す連動情報作成処理は連動情報処理装置3で実行される処理である。
まず、設定部34および入出力部32を介して、連動情報処理装置3に模擬種別情報および変電所情報が入力される(S101)。変電所情報には、模擬を行いたい変電所番号や、機器番号などが含まれている。なお、変電所情報は、機器番号を含まなくてもよい。模擬種別情報は、ユーザがこれから行おうとする模擬の種別に関する情報が格納されており、具体的には保護連動か操作ロックかの情報が格納されている。
次に、連動情報処理部31は、ステップS101で入力された模擬種別情報が保護連動か、操作ロックかを判定する模擬種別判定を行う(S102)。
ステップS102の結果、保護連動であった場合(S102→保護連動)、連動情報処理部31は、保護連動情報を作成する保護連動情報作成処理を行う(S103)。ステップS103において、連動情報処理部31は、ステップS101で入力された変電所情報に対応する保護連動情報を保護連動データベース33aから抽出する。すなわち、連動情報処理部31は、保護連動データベース33aから該当する変電所番号に対応する行を抽出する。このとき、連動情報処理部31は、変電所情報に含まれる機器番号を基に、さらに保護連動情報を機器番号で絞り込んでもよい。このようにして作成された保護連動情報は、変電所の保護継電器情報および機器状態変化による系統変化に対応する。
(Linked information creation process)
Next, each process according to the present embodiment will be described with reference to FIGS. 4 and 5 with reference to FIGS.
FIG. 4 is a flowchart showing the flow of the interlocking information creation process according to the present embodiment.
The interlocking information creation process shown in FIG. 4 is a process executed by the interlocking information processing apparatus 3.
First, simulated type information and substation information are input to the interlocking information processing apparatus 3 via the setting unit 34 and the input / output unit 32 (S101). The substation information includes a substation number to be simulated and a device number. The substation information may not include the device number. The simulation type information stores information on the type of simulation that the user is going to perform. Specifically, information on whether the operation is protection interlock or operation lock is stored.
Next, the interlock information processing unit 31 performs a simulation type determination that determines whether the simulation type information input in step S101 is protection interlock or operation lock (S102).
If the result of step S102 is protection interlock (S102 → protection interlock), the interlock information processing unit 31 performs protection interlock information creation processing for creating protection interlock information (S103). In step S103, the link information processing unit 31 extracts protection link information corresponding to the substation information input in step S101 from the protection link database 33a. That is, the linkage information processing unit 31 extracts a row corresponding to the corresponding substation number from the protection linkage database 33a. At this time, the interlocking information processing unit 31 may further narrow down the protection interlocking information by the device number based on the device number included in the substation information. The protection interlocking information created in this way corresponds to the system change due to the protection relay information of the substation and the equipment state change.

ステップS102の結果、操作ロックであった場合(S102→操作ロック)、連動情報処理部31は、操作ロック情報を作成する操作ロック情報作成処理を行う(S104)。ステップS104において、連動情報処理部31は、ステップS101で入力された変電所情報に対応する操作ロック情報を操作ロックデータベース33bから抽出する。すなわち、連動情報処理部31は、操作ロックデータベース33bから該当する変電所番号に対応する行を抽出する。このとき、連動情報処理部31は、変電所情報に含まれる機器番号を基に、さらに操作ロック情報を機器番号で絞り込んでもよい。しかし、登録されていない変電所番号や、機器番号などが入力された場合、連動情報処理部31は、操作ロック情報を作成しない。   If the result of step S102 is an operation lock (S102 → operation lock), the interlock information processing section 31 performs an operation lock information creation process for creating operation lock information (S104). In step S104, the interlock information processing unit 31 extracts operation lock information corresponding to the substation information input in step S101 from the operation lock database 33b. That is, the interlocking information processing unit 31 extracts a row corresponding to the corresponding substation number from the operation lock database 33b. At this time, the interlocking information processing unit 31 may further narrow down the operation lock information by the device number based on the device number included in the substation information. However, when an unregistered substation number, device number, or the like is input, the interlock information processing unit 31 does not create operation lock information.

ステップS103またはステップS104の後、入出力部32は、中央処理装置2へ保護連動情報または操作ロック情報(連動情報)を中央処理装置2へ伝送する(S105)。   After step S103 or step S104, the input / output unit 32 transmits the protection interlocking information or the operation lock information (interlocking information) to the central processing unit 2 to the central processing unit 2 (S105).

図5は、本実施形態に係る検証処理の流れを示すフローチャートである。
図5に示す検証処理は、中央処理装置2で実行される処理である。
まず、制御部21は、入出力部22を介して図4のステップS105で伝送された連動情報を取得する(S201)。制御部21は、取得した連動情報を記憶部23に格納する。
次に、制御部21は、入出力部22を介して、模擬における変電所内の機器や、保護継電器の動作シーケンスである模擬連動情報(模擬動作情報)を取得する(S202)。模擬連動情報とは、例えば、模擬プログラムを中央処理装置2に入力する際、一緒に入力される動作リストであったり、操作員が教育訓練を行ったりする際に、中央処理装置2に入力される動作手順である。また、制御部21は、ステップS202の段階で模擬プログラムを実行し、その結果出力される模擬結果を模擬連動情報としてもよい。模擬連動情報の具体的な内容は、例えば、模擬結果において保護継電器を投入しようとしたときの各機器の投入状態や、ある機器を投入しようとしたときの他の機器の投入状態である。
FIG. 5 is a flowchart showing the flow of verification processing according to the present embodiment.
The verification process shown in FIG. 5 is a process executed by the central processing unit 2.
First, the control unit 21 acquires the interlocking information transmitted in step S105 of FIG. 4 via the input / output unit 22 (S201). The control unit 21 stores the acquired interlocking information in the storage unit 23.
Next, the control unit 21 acquires simulated interlocking information (simulated operation information) that is an operation sequence of the devices in the substation and the protection relay in the simulation through the input / output unit 22 (S202). The simulation interlocking information is, for example, an operation list that is input together when a simulation program is input to the central processing unit 2 or is input to the central processing unit 2 when an operator conducts education and training. This is an operation procedure. Further, the control unit 21 may execute a simulation program at the stage of step S202, and use the simulation result output as simulation interlock information. The specific contents of the simulation interlocking information are, for example, the input state of each device when trying to turn on the protective relay in the simulation result, and the input state of another device when trying to input a certain device.

そして、制御部21は、模擬連動情報と、連動情報とを比較し、制御条件判定を行う(S203)。具体的には、模擬連動情報が保護継電器を投入しようとしたときの各機器の投入状態である場合、制御部21は、この情報を保護連動情報における各機器の投入状態と比較し、一致するか否かを判定する。また、模擬連動情報がある機器を投入しようとしたときの他の機器の投入状態である場合、制御部21は、この情報を操作ロック情報と比較し、一致するか否かを判定する。保護連動情報を用いるか、操作ロック情報を用いるかは、図4のステップS102の結果に従う。
ステップS203において、不合理であると判定された場合(S203→不合理)、つまり、模擬連動情報の内容が連動情報と一致しない場合、制御部21は、ディスプレイなどの入出力部22にエラー表示を行わせ、異常結果である旨を出力する(S204)。
ステップS203において、合理であると判定された場合(S203→合理)、つまり、模擬連動情報の内容が連動情報と一致する場合、制御部21は、模擬プログラム(シミュレーションプログラム)を起動して、模擬を実行する(S205)。
なお、ステップS202の段階で、模擬プログラムを実行している場合、ステップS205では、制御部21は、模擬を行わず、ディスプレイなどの入出力部22に「模擬結果OK」の旨を表示させてもよい。
Then, the control unit 21 compares the simulated interlocking information with the interlocking information and performs control condition determination (S203). Specifically, when the simulated interlocking information is the input state of each device when the protection relay is to be turned on, the control unit 21 compares this information with the input state of each device in the protection interlocking information and agrees. It is determined whether or not. In addition, when it is in the input state of another device when an attempt is made to input a device with simulated interlocking information, the control unit 21 compares this information with the operation lock information and determines whether or not they match. Whether protection interlocking information or operation lock information is used depends on the result of step S102 in FIG.
In step S203, when it is determined that it is irrational (S203 → irrational), that is, when the content of the simulated interlocking information does not match the interlocking information, the control unit 21 displays an error on the input / output unit 22 such as a display. To output that the result is abnormal (S204).
If it is determined in step S203 that it is reasonable (S203 → reasonable), that is, if the content of the simulated interlocking information matches the interlocking information, the control unit 21 activates a simulation program (simulation program) and simulates it. Is executed (S205).
If the simulation program is being executed at the stage of step S202, in step S205, the control unit 21 does not perform the simulation and displays “simulation result OK” on the input / output unit 22 such as a display. Also good.

なお、本実施形態では、連動情報処理装置3で保護連動・操作ロックデータベース33から必要な情報を抽出した後、中央処理装置2へ伝送しているが、これに限らず、保護連動・操作ロックデータベース33を、そのまま中央処理装置2へ伝送するか、中央処理装置2の記憶部23に保護連動・操作ロックデータベース33を予め格納しておいてもよい。
これらのような場合、模擬連動情報とともに模擬種別や、変電所情報などが入出力部22を介して入力され、制御部21が模擬種別や、変電所情報などをキーとして、保護連動・操作ロックデータベース33に対し、図5のステップS203の処理を行ってもよい。
In the present embodiment, necessary information is extracted from the protection interlocking / operation lock database 33 by the interlocking information processing apparatus 3 and then transmitted to the central processing unit 2. However, the present invention is not limited to this. The database 33 may be transmitted to the central processing unit 2 as it is, or the protection interlock / operation lock database 33 may be stored in the storage unit 23 of the central processing unit 2 in advance.
In such cases, simulation type, substation information, and the like are input via the input / output unit 22 together with the simulation link information, and the control unit 21 uses the simulation type, substation information, and the like as keys to protect interlock / operation lock. The processing in step S203 in FIG. 5 may be performed on the database 33.

また、本実施形態によれば、中央制御所1における模擬において、さらに中央処理装置2に接続される連動情報処理装置3から伝送される機器の操作ロック情報および保護連動情報を基に、模擬プログラムが出力する動作シーケンスを検証可能とすることにより、操作員の教育訓練装置としての機能を満たすとともに中央処理装置2の制御論理の妥当性(つまり、模擬プログラムが出力する動作シーケンス)を早期に検証することが可能となり誤った模擬結果出力の防止に効果がある。
さらに、操作員の教育訓練における模擬においても、操作員の入力した動作シーケンスなどが正しいか否かを自動的に検証することが可能となる。
Further, according to the present embodiment, in the simulation at the central control station 1, the simulation program is further based on the operation lock information and the protection interlocking information of the equipment transmitted from the interlocking information processing device 3 connected to the central processing unit 2. By making it possible to verify the operation sequence output by the operator, the function of the operator training and training device is satisfied and the validity of the control logic of the central processing unit 2 (that is, the operation sequence output by the simulation program) is verified early. This is effective in preventing erroneous simulation result output.
Furthermore, it is possible to automatically verify whether the operation sequence input by the operator is correct or not in the simulation in the training of the operator.

さらに、過去において実際に発生した系統現象に関する情報を用いることなく、模擬が可能である。   Furthermore, simulation is possible without using information on system phenomena that have actually occurred in the past.

本実施形態に係る電鉄電力管理システムの構成例を示す概略図である。It is the schematic which shows the structural example of the electric railway power management system which concerns on this embodiment. 保護連動データベースの構成例を示す図である。It is a figure which shows the structural example of a protection interlocking database. 操作ロックデータベースの構成例を示す図である。It is a figure which shows the structural example of an operation lock database. 本実施形態に係る連動情報作成処理の流れを示すフローチャートである。It is a flowchart which shows the flow of the interlocking | linkage information preparation process which concerns on this embodiment. 本実施形態に係る検証処理の流れを示すフローチャートである。It is a flowchart which shows the flow of the verification process which concerns on this embodiment.

符号の説明Explanation of symbols

1 中央制御所
2 中央処理装置(模擬装置)
3 連動情報処理装置
10 電鉄電力管理システム
21 制御部(判定部、模擬処理部)
22 入出力部(入力部:中央処理装置)
31 連動情報処理部
32 入出力部(連動情報処理部)
33 保護連動・操作ロックデータベース
33a 保護連動データベース
33b 操作ロックデータベース
34 設定部

1 Central control station 2 Central processing unit (simulation device)
3 Linked information processing device 10 Electric railway power management system 21 Control unit (determination unit, simulation processing unit)
22 Input / output unit (input unit: central processing unit)
31 Interlocking Information Processing Unit 32 Input / Output Unit (Interlocking Information Processing Unit)
33 Protection interlocking / operation lock database 33a Protection interlocking database 33b Operation lock database 34 Setting section

Claims (5)

電鉄用変電所の模擬を実行し、模擬結果を出力する模擬装置であって、
複数の前記電鉄用変電所を統括管理する中央制御所において操作および結果の表示が可能に設置されており、
前記電鉄用変電所内の機器間の動作関係を示す情報である連動情報が格納されている記憶部と、
入力部を介して入力された、前記電鉄用変電所の模擬における機器間の動作関係を示す情報である模擬連動情報と、前記記憶部の連動情報とを比較し、前記模擬連動情報における機器間の動作が正しいか否かを判定することによって、機器動作の妥当性を判定する判定部と、
前記妥当性の判定の結果、前記機器間の動作が正しいと判定された場合、前記電鉄用変電所における機器群の動作模擬を行う模擬処理部と、
前記妥当性の判定の結果、前記機器間の動作が正しくないと判定された場合、表示部にエラー表示を行うとともに、前記機器群の動作模擬を行わずに処理を終了する制御部と
を有することを特徴とする模擬装置。
A simulation device that simulates a railway substation and outputs simulation results,
In the central control station that oversees and manages the plurality of substations for railways, operation and display of results are possible.
A storage unit storing interlocking information that is information indicating an operational relationship between devices in the railway substation;
Comparison between simulated interlocking information, which is input via the input unit, is information indicating an operational relationship between devices in the simulation of the electric railway substation, and the interlocking information in the storage unit, and between the devices in the simulated interlocking information A determination unit that determines the validity of the device operation by determining whether the operation of the device is correct;
As a result of the validity determination, when it is determined that the operation between the devices is correct, a simulation processing unit that simulates the operation of the device group in the railway substation,
As a result of the validity determination, when it is determined that the operation between the devices is not correct, an error is displayed on the display unit, and the control unit terminates the process without simulating the operation of the device group. A simulation apparatus characterized by that.
前記連動情報および前記模擬連動情報は、ともに、機器に異常が生じたときに、当該異常が生じた機器への電力供給遮断を指示する保護継電器と、当該保護継電器によって保護される機器の動作との対応情報であることを特徴とする請求項1に記載の模擬装置。   The interlocking information and the simulated interlocking information both include a protective relay that instructs to cut off the power supply to the device in which the abnormality has occurred, and the operation of the device protected by the protective relay when an abnormality occurs in the device. The simulation apparatus according to claim 1, wherein the corresponding information is the following information. 前記連動情報および前記模擬連動情報は、ともに、投入または開放しようとする機器の投入状態と、当該機器の投入または開放に必要な他の機器の投入状態との対応情報であることを特徴とする請求項1に記載の模擬装置。   Both the interlocking information and the simulated interlocking information are correspondence information between the input state of a device to be turned on or released and the input state of another device necessary for turning on or releasing the device. The simulation apparatus according to claim 1. 電鉄用変電所の模擬を実行し、模擬結果を出力する模擬装置による模擬制御方法であって、
前記模擬装置は、
複数の前記電鉄用変電所を統括管理する中央制御所において操作および結果の表示が可能にされており、
記憶部に前記電鉄用変電所内の機器間の動作関係を示す情報である連動情報が格納されており、
入力部を介して入力された、前記電鉄用変電所の模擬における機器間の動作関係を示す情報である模擬連動情報と、前記記憶部の連動情報とを比較し、前記模擬連動情報における機器間の動作が正しいか否かを判定することによって、機器動作の妥当性を判定し、
前記妥当性の判定の結果、前記機器間の動作が正しいと判定された場合、前記電鉄用変電所における機器群の動作模擬を行い、
前記妥当性の判定の結果、前記機器間の動作が正しくないと判定された場合、表示部にエラー表示を行うとともに、前記機器群の動作模擬を行わずに処理を終了する
ことを特徴とする模擬制御方法。
A simulation control method using a simulation device that simulates a substation for electric railways and outputs a simulation result,
The simulator is
Operation and display of results are possible at a central control station that oversees the plurality of railway substations.
Interlocking information that is information indicating the operational relationship between the devices in the railway substation is stored in the storage unit,
Comparison between simulated interlocking information, which is input via the input unit, is information indicating an operational relationship between devices in the simulation of the electric railway substation, and the interlocking information in the storage unit, and between the devices in the simulated interlocking information By determining whether the operation of the device is correct, determine the validity of the device operation ,
As a result of the validity determination, when it is determined that the operation between the devices is correct, the operation of the device group in the railway substation is simulated,
As a result of the validity determination, when it is determined that the operation between the devices is not correct, an error is displayed on the display unit, and the process is terminated without simulating the operation of the device group. Simulated control method.
請求項4に記載の模擬制御方法をコンピュータに実行させることを特徴とする模擬制御プログラム。   A simulation control program for causing a computer to execute the simulation control method according to claim 4.
JP2008222866A 2008-08-29 2008-08-29 Simulation device, simulation control method, and simulation control program Expired - Fee Related JP5285362B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008222866A JP5285362B2 (en) 2008-08-29 2008-08-29 Simulation device, simulation control method, and simulation control program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2008222866A JP5285362B2 (en) 2008-08-29 2008-08-29 Simulation device, simulation control method, and simulation control program

Publications (2)

Publication Number Publication Date
JP2010057346A JP2010057346A (en) 2010-03-11
JP5285362B2 true JP5285362B2 (en) 2013-09-11

Family

ID=42072673

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008222866A Expired - Fee Related JP5285362B2 (en) 2008-08-29 2008-08-29 Simulation device, simulation control method, and simulation control program

Country Status (1)

Country Link
JP (1) JP5285362B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5455827B2 (en) * 2010-07-14 2014-03-26 三菱電機株式会社 Electric railway substation monitoring and control system, electric railway substation monitoring and control apparatus, and electric railway substation monitoring and control method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60247711A (en) * 1984-05-23 1985-12-07 Hitachi Ltd Simulator device
JP2732836B2 (en) * 1987-03-20 1998-03-30 東京電力 株式会社 Simulated execution method immediately before switch operation of power system
JP3710619B2 (en) * 1998-03-09 2005-10-26 三菱電機株式会社 Monitoring control system test equipment
JP4762066B2 (en) * 2006-07-10 2011-08-31 中国電力株式会社 Circuit breaker operation judgment system

Also Published As

Publication number Publication date
JP2010057346A (en) 2010-03-11

Similar Documents

Publication Publication Date Title
CN102403788B (en) Test system applicable to southern power grid communication guaranteeing system
CN103377110B (en) The method and system used in condition monitoring
JP6789848B2 (en) Isolation management system and isolation management method
EP3336625B1 (en) Setting apparatus and setting method
Kottmann et al. A human operator model for simulation-based resilience assessment of power grid restoration operations
CN102692876A (en) System and method of simulating input/output modules in a control system
KR101837653B1 (en) Power plant simulator
JP5285362B2 (en) Simulation device, simulation control method, and simulation control program
CN111552263B (en) Method, computer readable storage medium and system for inspecting industrial facilities
JP5349194B2 (en) Operation verification test apparatus and method for plant operation monitoring control apparatus
JP6440563B2 (en) Test apparatus and test method
CN103457955A (en) Migration data verification method for power dispatching automation system
JP7517286B2 (en) Information processing device, evaluation method, and evaluation program
JP5111025B2 (en) System planning support system
KR102136956B1 (en) Input output hot-swappable wiring interface providing method and apparatus and system therefor
US11809175B2 (en) Alarm management apparatus, alarm management method, and computer-readable recording medium
KR101626722B1 (en) Spatial distribution adequacy evaluation system and method for safety related equipment to prevent core damage during large area loss at nuclear power plants
Hasnor Hassaruddin Hashim et al. Role of operator training simulator (OTS) in capability building towards the fourth industrial revolution (IR 4.0)
He et al. Architecture design and safety research of a double-triple-channel redundant and fault-tolerant system
CN109240127A (en) Simulation and verification platform and emulation verification method
Altherr et al. On obligations in the development process of resilient systems with algorithmic design methods
Kannan et al. Incident Learning: Addressing the Functional Safety Life Cycle Requirements in PDO
Alrammah The application of probabilistic safety assessment in the preliminary reactor design stage: Challenges and insights
Adams et al. Enhancing power plant safety through coupling plant simulators to cyber digital architecture
Dixon Complementary Design Analysis Techniques

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20100615

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20110808

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20110913

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20111114

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20120724

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20120924

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130521

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130531

R150 Certificate of patent or registration of utility model

Ref document number: 5285362

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313113

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

LAPS Cancellation because of no payment of annual fees