Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5318239B2 - Power system supply and demand control method and information processing apparatus - Google Patents
[go: Go Back, main page]

JP5318239B2 - Power system supply and demand control method and information processing apparatus - Google Patents

Power system supply and demand control method and information processing apparatus Download PDF

Info

Publication number
JP5318239B2
JP5318239B2 JP2012057476A JP2012057476A JP5318239B2 JP 5318239 B2 JP5318239 B2 JP 5318239B2 JP 2012057476 A JP2012057476 A JP 2012057476A JP 2012057476 A JP2012057476 A JP 2012057476A JP 5318239 B2 JP5318239 B2 JP 5318239B2
Authority
JP
Japan
Prior art keywords
information processing
supply
processing apparatus
load
demand
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2012057476A
Other languages
Japanese (ja)
Other versions
JP2013192386A (en
Inventor
明宏 小川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chugoku Electric Power Co Inc
Original Assignee
Chugoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chugoku Electric Power Co Inc filed Critical Chugoku Electric Power Co Inc
Priority to JP2012057476A priority Critical patent/JP5318239B2/en
Publication of JP2013192386A publication Critical patent/JP2013192386A/en
Application granted granted Critical
Publication of JP5318239B2 publication Critical patent/JP5318239B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Description

この発明は、電力系統の需給制御方法、及び情報処理装置に関し、特に、電力系統の需給制御を効率よく行うことができるようにするための技術に関する。   The present invention relates to a power supply and demand control method and an information processing apparatus, and more particularly to a technique for enabling efficient power supply and demand control.

昨今、家庭用太陽光発電機等の自然エネルギーを利用した発電装置が注目されている。しかし自然エネルギーを利用した発電装置は、気象条件等の影響によって出力が変動しやすく、これを電力系統に連携した場合、電圧変動や周波数変動などの電力系統に与える影響が問題となり、需給調整を適切に行うための仕組みが必要となる。   In recent years, a power generation device using natural energy such as a solar power generator for home use has attracted attention. However, the output of power generation devices that use natural energy is likely to fluctuate due to the influence of weather conditions, etc.When this is linked to the power system, the effects on the power system such as voltage fluctuations and frequency fluctuations will be a problem, and supply and demand adjustment will be necessary. A mechanism to do it properly is required.

電力系統における需給調整に関する技術として、例えば、特許文献1には、第1配電線の夫々に発電機の出力及び負荷の電力消費量を取得して夫々の需給差である第1需給差を求める第1情報処理装置を付設し、第2配電線の夫々に夫々の需給差である第2需給差を求める第2情報処理装置を付設し、第3配電線の夫々に夫々の需給差である第3需給差を求める第3情報処理装置を付設し、第1情報処理装置の夫々が、夫々が付設されている第1配電線の直系上位に接続している第2配電線に付設されている第2情報処理装置から第2需給差を、直系上位に接続している第3配電線に付設されている第3情報処理装置から第3需給差を夫々取得し、第1乃至第3需給差に基づき負荷への電力供給を制御することが記載されている。   As a technique related to supply and demand adjustment in the power system, for example, Patent Document 1 obtains the output of the generator and the power consumption of the load for each of the first distribution lines, and obtains the first supply and demand difference that is the difference between the supply and demand. A first information processing device is attached, a second information processing device for obtaining a second supply / demand difference, which is a respective supply / demand difference, is attached to each of the second distribution lines, and a supply / demand difference is provided to each of the third distribution lines. A third information processing device for obtaining a third supply-demand difference is attached, and each of the first information processing devices is attached to a second distribution line connected to a direct higher rank of the first distribution line to which the first information processing apparatus is attached. The second supply / demand difference is obtained from the second information processing device, and the third supply / demand difference is obtained from the third information processing device attached to the third distribution line connected to the upper direct line. It is described that the power supply to the load is controlled based on the difference.

また特許文献2には、第1配電線の夫々に付設される、発電機の出力及び負荷の電力消費量を取得して需給差(第1需給差)を求める第1情報処理装置が、直系上位の第2配電線の需給差である第2需給差と、第2配電線の直系上位の第3配電線の需給差である第3需給差とを取得し、第1需給差に基づく第1階層電力制御、第2需給差に基づく第2階層電力制御、第3需給差に基づく第3階層電力制御を行う際に、他の第1情報処理装置が第1乃至第3階層電力制御の制御権を現在要求中又は取得中であるか否かを示す第1乃至第3他局制御権信号を受信中かを判断し、受信中でなければ自局が第1乃至第3階層電力制御の制御権を現在要求中又は取得中であることを示す第1乃至第3自局制御権信号を送信して電力制御を開始する電力供給システムが記載されている。   Patent Document 2 discloses a first information processing apparatus that is attached to each of the first distribution lines and obtains the output of the generator and the power consumption of the load to obtain the supply-demand difference (first supply-demand difference). Obtain the second supply-demand difference, which is the supply-demand difference for the upper second distribution line, and the third supply-demand difference, which is the supply-demand difference for the third direct distribution line directly above the second distribution line. When performing the first tier power control, the second tier power control based on the second supply / demand difference, and the third tier power control based on the third supply / demand difference, the other first information processing devices perform the first to third tier power control. It is determined whether the first to third other station control right signals indicating whether or not the control right is currently being requested or acquired. If not, the local station performs first to third layer power control. The first to third local control right signals indicating that the control right is currently being requested or acquired and power control is started. System have been described.

特開2011−193645号公報JP 2011-193645 A 特開2011−229243号公報JP 2011-229243 A

ところで、一般に電力系統を構成している発電装置の出力や負荷の消費電力は、個々の発電装置や負荷ごとに異なっているため、発電装置や負荷の個々の調整能力を考慮して需給制御を行うようにすることで、電力系統の需給制御をより効率よく行うことができる。   By the way, in general, the output of the power generators constituting the power system and the power consumption of the load are different for each power generator and the load. Therefore, the supply and demand control is performed in consideration of the individual adjustment capability of the power generator and the load. By doing so, supply and demand control of the power system can be performed more efficiently.

本発明はこのような背景に鑑みてなされたもので、電力系統の需給制御を効率よく行うことが可能な、電力系統の需給制御方法、及び情報処理装置を提供することを目的とする。   The present invention has been made in view of such a background, and an object of the present invention is to provide a power supply and demand control method and an information processing apparatus capable of efficiently performing power supply and demand control.

上記目的を達成するための本発明の一つは、電力系統における需給制御方法であって、電力系統に接続している負荷の夫々に第1情報処理装置を付設し、前記第1情報処理装置は、自身が付設されている負荷である自負荷の現在の消費電力を取得する機能及び前記自負荷の消費電力を制御する機能を有し、前記第1情報処理装置の夫々は、第2情報処理装置と通信可能に接続し、前記第1情報処理装置は、取得した前記消費電力を前記第2情報処理装置に送信し、前記第2情報処理装置は、前記第1情報処理装置から受信した前記消費電力に基づき、前記電力系統に現在生じている需給差を求め、求めた前記需給差を前記消費電力の送信元の前記第1情報処理装置に送信し、前記第1情報処理装置の夫々は、 前記現在生じている需給差を受信すると、自負荷の消費電力を制御した場合における前記電力系統の需給差を、前記受信した現在の需給差、及び自負荷の現在の消費電力に基づき予測し、予測した需給差が小さいほど早期に自負荷の消費電力の制御が開始されるように需給制御の開始予定時刻を設定し、前記開始予定時刻になると、自負荷の消費電力の制御を開始することとする。   One aspect of the present invention for achieving the above object is a supply and demand control method in an electric power system, wherein a first information processing apparatus is attached to each load connected to the electric power system, and the first information processing apparatus is provided. Has a function of acquiring the current power consumption of the self-load that is a load attached to the self-load and a function of controlling the power consumption of the self-load, and each of the first information processing apparatuses includes second information The first information processing apparatus transmits the acquired power consumption to the second information processing apparatus, and the second information processing apparatus receives the first information processing apparatus from the first information processing apparatus. Based on the power consumption, a supply-demand difference currently occurring in the power system is determined, and the determined supply-demand difference is transmitted to the first information processing apparatus that is the transmission source of the power consumption, and each of the first information processing apparatuses Receive the current supply-demand difference Then, when the power consumption of the own load is controlled, the supply / demand difference of the power system is predicted based on the received current supply / demand difference and the current power consumption of the own load. The scheduled start time of supply and demand control is set so that the control of the power consumption of the own load is started, and the control of the power consumption of the own load is started at the scheduled start time.

本発明によれば、第1情報処理装置の夫々は、自身が予測した需給差が小さいほど早い時刻に設定される需給制御開始時刻が到来すると、自負荷の消費電力の制御を開始するので、需給差をより小さくすることができる第1情報処理装置ほどより早期に需給制御を開始させることができる。これにより電力系統における需給差を効率よく解消することができる。   According to the present invention, each of the first information processing devices starts controlling the power consumption of its own load when the supply / demand control start time set earlier is reached as the supply / demand difference predicted by itself decreases. The supply and demand control can be started earlier as the first information processing apparatus that can further reduce the supply and demand difference. Thereby, the supply-demand difference in an electric power system can be eliminated efficiently.

本発明の他の一つは、上記電力系統における需給制御方法であって、前記第1情報処理装置は、自負荷が蓄電池である場合、前記開始予定時刻を、その残容量が少ないほど早期に自負荷の消費電力の制御が開始されるように設定することとする。   Another aspect of the present invention is a supply and demand control method in the power system, wherein the first information processing device sets the scheduled start time earlier as the remaining capacity is smaller when the load is a storage battery. It is set so that control of the power consumption of the own load is started.

本発明によれば、第1情報処理装置は、自負荷が蓄電池である場合、消費電力の制御の開始予定時刻を、その残容量が少ないほど早期に自負荷の消費電力の制御が開始されるように設定するので、残容量が少なく大きな充電電流を消費する負荷(蓄電池)ほど早期に消費電力の制御が開始され、需給差を効率よく解消することができる。また残容量の少ない蓄電池の充電が早期に開始されるので、例えば、電気自動車を早期に利用することができる等、需要家の利便性を向上させつつ、電力系統における需給制御を効率よく行うことができる。   According to the present invention, when the self-load is a storage battery, the first information processing apparatus starts the control of the power consumption of the self-load earlier as the remaining capacity decreases. Thus, the load (storage battery) that has a small remaining capacity and consumes a large charge current starts power consumption control earlier, and can efficiently eliminate the supply-demand difference. In addition, since charging of a storage battery with a small remaining capacity is started early, for example, electric vehicles can be used early, and the supply and demand control in the power system is efficiently performed while improving convenience for consumers. Can do.

本発明の他の一つは、上記電力系統における需給制御方法であって、前記第1情報処理装置は、自負荷が蓄電池である場合、自負荷が前記電力系統から解列される時刻を記憶し、前記開始予定時刻を、自負荷が前記電力系統から解列される時刻が早いほど早期に自負荷の消費電力の制御が開始されるように設定することとする。   Another aspect of the present invention is a supply and demand control method in the power system, wherein the first information processing device stores a time at which the self load is disconnected from the power system when the self load is a storage battery. Then, the scheduled start time is set so that the control of the power consumption of the own load is started earlier as the time at which the own load is disconnected from the power system is earlier.

本発明によれば、第1情報処理装置は、自負荷が蓄電池である場合、消費電力の制御の開始予定時刻を、自負荷が電力系統から解列される時刻が早いほど早期に自負荷の消費電力の制御が開始されるように設定するので、電力系統に接続されている負荷を有効に需給制御に用いることができる。また、蓄電池の利用開始時刻が近づいている場合など、早期に消費電力の制御を開始する必要がある負荷ほど早期に消費電力の制御を開始させることができる。このため、近いうちに使用が予定されている電気自動車の充電を早期に開始させる等、蓄電池を利用する需要家の利便性を向上させつつ、電力系統の需給差の解消を図ることができる。   According to the present invention, when the self-load is a storage battery, the first information processing apparatus determines the scheduled start time of power consumption control as soon as the time when the self-load is disconnected from the power system is earlier. Since the power consumption control is set to be started, the load connected to the power system can be effectively used for supply and demand control. Moreover, when the use start time of the storage battery is approaching, the power consumption control can be started earlier as the load needs to start the power consumption control earlier. For this reason, it is possible to eliminate the power supply / demand difference while improving convenience for consumers using storage batteries, such as starting charging of an electric vehicle scheduled to be used soon.

本発明の他の一つは、上記電力系統における需給制御方法であって、電力系統における需給制御方法であって、前記電力系統に接続している前記発電機に、当該発電機の現在の出力を取得する機能を備える第3情報処理装置を付設し、前記第3情報処理装置は、前記第2情報処理装置と通信可能に接続し、前記第3情報処理装置は、取得した前記現在の出力を前記第2情報処理装置に送信し、前記第2情報処理装置は、前記第3情報処理装置から受信した前記発電機の現在の出力と、前記第1情報処理装置から受信した前記負荷の現在の消費電力とに基づき、前記電力系統における現在の需給差を求めることとする。   Another aspect of the present invention is a supply and demand control method in the power system, which is a supply and demand control method in the power system, wherein the current output of the generator is connected to the generator connected to the power system. A third information processing device having a function of acquiring the first information processing device, the third information processing device communicatively connected to the second information processing device, and the third information processing device acquiring the current output acquired To the second information processing device, and the second information processing device receives the current output of the generator received from the third information processing device and the current load of the load received from the first information processing device. The current supply-demand difference in the power system is obtained based on the power consumption of the power system.

本発明によれば、第2の情報処置装置は、電力系統に接続されている負荷の現在の消費電力と、電力系統に接続されている発電機の現在の出力に基づき需給差を算出するので、電力系統に発生する需給差をより正確に求めることができ、需給制御をより適切に行うことができる。   According to the present invention, the second information processing apparatus calculates the supply-demand difference based on the current power consumption of the load connected to the power system and the current output of the generator connected to the power system. Thus, the supply and demand difference occurring in the power system can be obtained more accurately, and supply and demand control can be performed more appropriately.

その他、本願が開示する課題、及びその解決方法は、発明を実施するための形態の欄、及び図面により明らかにされる。   In addition, the subject which this application discloses, and its solution method are clarified by the column of the form for inventing, and drawing.

本発明によれば、電力系統の需給制御を効率よく行うことができる。   According to the present invention, it is possible to efficiently perform power supply and demand control.

電力系統1の概略的な構成図である。1 is a schematic configuration diagram of a power system 1. FIG. 第1情報処理装置10のハードウエア構成を説明する図である。2 is a diagram illustrating a hardware configuration of a first information processing apparatus 10. FIG. 第1情報処理装置10が備える主な機能を説明する図である。It is a figure explaining the main functions with which the 1st information processor 10 is provided. 識別情報150の一例である。It is an example of the identification information 150. 第1需給情報160の一例である。3 is an example of first supply and demand information 160. 第3情報処理装置30のハードウエア構成を説明する図である。3 is a diagram illustrating a hardware configuration of a third information processing apparatus 30. FIG. 第3情報処理装置30が備える主な機能を説明する図である。It is a figure explaining the main functions with which the 3rd information processor 30 is provided. 識別情報150の一例である。It is an example of the identification information 150. 第3需給情報360の一例である。It is an example of the 3rd supply-and-demand information 360. 第4情報処理装置40のハードウエア構成を説明する図である。It is a figure explaining the hardware constitutions of the 4th information processing apparatus. 第4情報処理装置40が備える主な機能を説明する図である。It is a figure explaining the main functions with which the 4th information processor 40 is provided. 識別情報150の一例である。It is an example of the identification information 150. 第4需給情報460の一例である。It is an example of the 4th demand-and-supply information 460. 第2情報処理装置20のハードウエア構成を説明する図である。It is a figure explaining the hardware constitutions of the 2nd information processor. 第2情報処理装置20が備える主な機能を説明する図である。It is a figure explaining the main functions with which the 2nd information processor 20 is provided. 識別情報150の一例である。It is an example of the identification information 150. 第2需給情報260の一例である。It is an example of the 2nd supply-and-demand information 260. FIG. 消費電力取得処理S1800を説明するフローチャートである。It is a flowchart explaining power consumption acquisition process S1800. 消費電力送信処理S1900を説明するフローチャートである。It is a flowchart explaining power consumption transmission process S1900. 需給差受信処理S2000を説明するフローチャートである。It is a flowchart explaining supply-demand difference reception processing S2000. 需給制御処理S2100を説明するフローチャートである。It is a flowchart explaining supply-and-demand control processing S2100. 残り時間設定処理S2200を説明するフローチャートである。It is a flowchart explaining remaining time setting process S2200. 自負荷制御開始処理S2300を説明するフローチャートである。It is a flowchart explaining self load control start process S2300. 発電機出力取得処理S2400を説明するフローチャートである。It is a flowchart explaining generator output acquisition process S2400. 消費電力受信処理S2500を説明するフローチャートである。It is a flowchart explaining power consumption reception processing S2500. SMグループ地域要求量送信処理S2600を説明するフローチャートである。It is a flowchart explaining SM group area request | requirement amount transmission process S2600. 需給差受信処理S2700を説明するフローチャートである。It is a flowchart explaining supply-demand difference reception processing S2700. 発電機出力取得処理S2800を説明するフローチャートである。It is a flowchart explaining generator output acquisition process S2800. SMグループ地域要求量受信処理S2900を説明するフローチャートである。It is a flowchart explaining SM group area request | requirement amount reception process S2900. MSグループ地域要求量送信処理S3000を説明するフローチャートである。It is a flowchart explaining MS group area request | requirement amount transmission process S3000. 需給差受信処理S3100を説明するフローチャートである。It is a flowchart explaining supply-demand difference reception processing S3100. 発電機出力取得処理S3200を説明するフローチャートである。It is a flowchart explaining generator output acquisition process S3200. MSグループ地域要求量受信処理S3300を説明するフローチャートである。It is a flow chart explaining MS group area demand amount reception processing S3300. 需給差送信処理S3400を説明するフローチャートである。It is a flowchart explaining supply-demand difference transmission processing S3400. 第1情報処理装置10のハードウエア構成である。2 is a hardware configuration of the first information processing apparatus 10. 第1情報処理装置10が備える主な機能である。This is a main function provided in the first information processing apparatus 10. 第1需給情報160の一例である。3 is an example of first supply and demand information 160. 残り時間設定処理S3800を説明するフローチャートである。It is a flowchart explaining remaining time setting process S3800. 第1情報処理装置10が備える主な機能である。This is a main function provided in the first information processing apparatus 10. 第1需給情報160の一例である。3 is an example of first supply and demand information 160. 残り時間設定処理S4100を説明するフローチャートである。It is a flowchart explaining remaining time setting process S4100.

<第1実施形態>
図1に実施形態として説明する電力系統1の概略的な構成を示している。電力系統1は、例えば、商用電力系統やマイクログリッド等であり、複数の負荷6及び複数の発電機5を含む。
<First Embodiment>
FIG. 1 shows a schematic configuration of a power system 1 described as an embodiment. The power system 1 is, for example, a commercial power system or a microgrid, and includes a plurality of loads 6 and a plurality of generators 5.

負荷6は、発電機から供給される電力を利用する装置であり、例えば、電気自動車(EV)のバッテリーなどの蓄電負荷、給湯器や業務用蓄熱式空調などの蓄熱負荷である。   The load 6 is a device that uses electric power supplied from a generator, and is, for example, a storage load such as a battery of an electric vehicle (EV), or a heat storage load such as a water heater or a heat storage air conditioner for business use.

発電機5は、例えば、太陽光発電機、水力発電、風力発電機などの自然エネルギーを利用した発電機や、ディーゼル発電機、ガスタービン発電機、ガスエンジン発電機などのコージェネレーション発電機である。   The generator 5 is, for example, a generator using natural energy such as a solar power generator, a hydroelectric power generator, or a wind power generator, or a cogeneration generator such as a diesel generator, a gas turbine generator, or a gas engine generator. .

同図に示すように、負荷6(1)〜(5)には、夫々第1情報処理装置10A1a,A1b,A2a,A2b,B2aが付設されている。また発電機5(1)〜(3)には、夫々第3情報処理装置30A1,A2,B2が付設されている。また発電機5(4),(5)には、夫々第4情報処理装置40A,Bが付設されている。また発電機5(6)には、第2情報処理装置20GMが付設されている。   As shown in the figure, the first information processing apparatuses 10A1a, A1b, A2a, A2b, and B2a are attached to the loads 6 (1) to (5), respectively. In addition, the third information processing devices 30A1, A2, and B2 are attached to the generators 5 (1) to (3), respectively. The generators 5 (4) and (5) are provided with fourth information processing devices 40A and 40B, respectively. The generator 5 (6) is provided with a second information processing device 20GM.

尚、以下の説明において、第1情報処理装置10のことをSL(SLave)とも称する。また第3情報処理装置30のことをSM(SubMaster)とも称する。また第4情報処理装置40のことをMS(MaSter)とも称する。また第2情報処理装置20のことをGM(GeneralMaster)とも称する。   In the following description, the first information processing apparatus 10 is also referred to as SL (SLave). The third information processing apparatus 30 is also referred to as SM (SubMaster). The fourth information processing apparatus 40 is also referred to as MS (MaSter). The second information processing apparatus 20 is also referred to as GM (General Master).

情報処理装置10,20,30,40は、第2情報処理装置20GMを起点(根)とする樹形図状(ツリー状)の通信ネットワークを構成している。即ち第2情報処理装置20GMは、第4情報処理装置40A,40Bの夫々と通信可能に接続している。またこのうちの第4情報処理装置40Aは、第3情報処理装置30A1,30A2の夫々と通信可能に接続し、このうちの第3情報処理装置30A1は第1情報処理装置10A1a,10A1bの夫々と通信可能に接続し、第3情報処理装置30A2は第1情報処理装置10A2a,10A2bの夫々と通信可能に接続している。また第4情報処理装置40Bは、第3情報処理装置30B2と通信可能に接続し、第3情報処理装置30B2は、第1情報処理装置10B2aと通信可能に接続している。情報処理装置10,20,30,40の間の通信は、例えば、LAN、WAN、インターネット、電力線通信(PLC(Power Line Communication))、専用線、光ファイバなどの、有線又は無線の通信網を介して行われる。   The information processing devices 10, 20, 30, and 40 constitute a tree-shaped communication network (tree shape) starting from the second information processing device 20GM (root). That is, the second information processing device 20GM is communicably connected to each of the fourth information processing devices 40A and 40B. Of these, the fourth information processing apparatus 40A is communicably connected to the third information processing apparatuses 30A1 and 30A2, and the third information processing apparatus 30A1 is connected to each of the first information processing apparatuses 10A1a and 10A1b. The third information processing device 30A2 is communicably connected, and is communicably connected to each of the first information processing devices 10A2a and 10A2b. The fourth information processing device 40B is communicably connected to the third information processing device 30B2, and the third information processing device 30B2 is communicably connected to the first information processing device 10B2a. The communication between the information processing apparatuses 10, 20, 30, 40 is, for example, a wired or wireless communication network such as a LAN, WAN, the Internet, power line communication (PLC), a dedicated line, or an optical fiber. Done through.

以下の説明において、第1情報処理装置30A1、及びこれと通信可能に接続している2つの第1情報処理装置10A1a,10A1bを含むグループのことを「グループA1」と称することとする。また第3情報処理装置30A2、及びこれと通信可能に接続している2つの第1情報処理装置10A2a,10A2bとを含むグループのことを「グループA2」と称することとする。また第4情報処理装置40A、及びこれと通信可能に接続している「グループA1」及び「グループA2」を含むグループのことを「グループA」と称することとする。   In the following description, a group including the first information processing apparatus 30A1 and the two first information processing apparatuses 10A1a and 10A1b that are communicably connected to the first information processing apparatus 30A1 is referred to as “group A1”. A group including the third information processing apparatus 30A2 and the two first information processing apparatuses 10A2a and 10A2b that are communicably connected to the third information processing apparatus 30A2 is referred to as “group A2”. A group including the fourth information processing apparatus 40A and “group A1” and “group A2” connected to be communicable with the fourth information processing apparatus 40A is referred to as “group A”.

また第3情報処理装置30B2、及びこれと通信可能に接続している第1情報処理装置10B2aとを含むグループのことを「グループB2」と称する。また第4情報処理装置40B、及びこれと通信可能に接続している2つの第3情報処理装置30B2,30B2aを含むグループのことを「グループB」と称する。   A group including the third information processing apparatus 30B2 and the first information processing apparatus 10B2a connected to be communicable with the third information processing apparatus 30B2 is referred to as “group B2”. A group including the fourth information processing apparatus 40B and the two third information processing apparatuses 30B2 and 30B2a that are communicably connected thereto is referred to as “group B”.

図2に第1情報処理装置10のハードウエア構成を示している。同図に示すように、第1情報処理装置10は、CPU111、メモリ112(RAM、ROM、NVRAM等)、記憶装置113(ハードディスクやSSD等)、入力装置114(タッチパネルやマウス等)、表示装置115(液晶ディスプレイ等)、通信回路116、RTC(Real Time Clock)等を用いて構成され現在日時等の日時情報(タイムスタンプ)を生成する計時回路117、消費電力計測回路118、及び消費電力制御回路119を備える。   FIG. 2 shows a hardware configuration of the first information processing apparatus 10. As shown in the figure, the first information processing apparatus 10 includes a CPU 111, a memory 112 (RAM, ROM, NVRAM, etc.), a storage device 113 (hard disk, SSD, etc.), an input device 114 (touch panel, mouse, etc.), a display device. 115 (liquid crystal display, etc.), communication circuit 116, RTC (Real Time Clock), etc. are used to generate date and time information (time stamp) such as current date and time, power consumption measuring circuit 118, and power consumption control A circuit 119 is provided.

消費電力計測回路118は、自身が付設されている負荷6(以下、自負荷と称する。)の現在の消費電力を計測する。消費電力制御回路119は、自負荷への電力供給を開始させる制御(以下、オン制御と称する。)、及び自負荷への電力供給を停止させる制御(以下、オフ制御と称する。)を行う。   The power consumption measuring circuit 118 measures the current power consumption of the load 6 (hereinafter referred to as “self load”) to which the power consumption measuring circuit 118 is attached. The power consumption control circuit 119 performs control for starting power supply to the own load (hereinafter referred to as “on control”) and control for stopping power supply to the own load (hereinafter referred to as “off control”).

図3に第1情報処理装置10が備える主な機能を示している。同図に示すように、第1情報処理装置10は、消費電力取得部131、消費電力送信部132、需給差受信部133、需給差予測部134、制御開始予定時刻設定部135、及び需給制御開始部136の各機能を備える。尚、これらの機能は、第1情報処理装置10のハードウエアによって、もしくは、第1情報処理装置10のCPU111が、メモリ112又は記憶装置113に格納されているプログラムを読み出して実行することにより実現される。   FIG. 3 shows main functions of the first information processing apparatus 10. As shown in the figure, the first information processing apparatus 10 includes a power consumption acquisition unit 131, a power consumption transmission unit 132, a supply / demand difference reception unit 133, a supply / demand difference prediction unit 134, a scheduled control start time setting unit 135, and a supply / demand control. Each function of the start unit 136 is provided. These functions are realized by the hardware of the first information processing apparatus 10 or by the CPU 111 of the first information processing apparatus 10 reading and executing a program stored in the memory 112 or the storage device 113. Is done.

図3に示した機能のうち、消費電力取得部131は、自負荷の現在の消費電力を取得する。消費電力送信部132は、消費電力取得部131が取得した消費電力を第2情報処理装置20に送信する。需給差受信部133は、第2情報処理装置20から送られてくる、電力系統1に現在生じている需給差(以下、地域要求量AR(Area Requirement)とも称する。)を受信する。   Among the functions shown in FIG. 3, the power consumption acquisition unit 131 acquires the current power consumption of the own load. The power consumption transmission unit 132 transmits the power consumption acquired by the power consumption acquisition unit 131 to the second information processing apparatus 20. The supply / demand difference receiving unit 133 receives a supply / demand difference (hereinafter also referred to as an area requirement AR (Area Requirement)) that is currently generated in the power system 1 and is sent from the second information processing device 20.

需給差予測部134は、自負荷の消費電力を制御した場合における電力系統1の需給差を、需給差受信部133が受信した需給差、及び消費電力取得部131が取得した自負荷の現在の消費電力に基づいて予測する。   The supply / demand difference prediction unit 134 shows the supply / demand difference of the power system 1 when the power consumption of the own load is controlled, the supply / demand difference received by the supply / demand difference reception unit 133, and the current load of the own load acquired by the power consumption acquisition unit 131. Predict based on power consumption.

制御開始予定時刻設定部135は、需給差予測部134が予測した需給差が小さいほど早期に自負荷の消費電力の制御(例えば、オン制御、オフ制御)が開始されるように、その制御の開始予定時刻(以下、制御開始予定時刻と称する。)を設定する。   The scheduled control start time setting unit 135 is configured so that the control of the power consumption of the own load (eg, on control, off control) is started earlier as the supply / demand difference predicted by the supply / demand difference prediction unit 134 is smaller. A scheduled start time (hereinafter referred to as a scheduled control start time) is set.

需給制御開始部136は、制御開始予定時刻設定部135が設定した開始予定時刻が到来すると、自負荷の消費電力の制御を開始する。   When the scheduled start time set by the scheduled control start time setting unit 135 arrives, the supply and demand control start unit 136 starts controlling the power consumption of the own load.

図3に示しているように、第1情報処理装置10は、識別情報150及び第1需給情報160を管理している。図4にこのうちの識別情報150の一例を示す。同図に示すように、識別情報150は、識別子151、階層152、及び種別153の各項目を含む。   As shown in FIG. 3, the first information processing apparatus 10 manages the identification information 150 and the first supply and demand information 160. FIG. 4 shows an example of the identification information 150 among them. As shown in the figure, the identification information 150 includes items of an identifier 151, a hierarchy 152, and a type 153.

このうち識別子151には、その第1情報処理装置10に割り当てられている識別子が設定される。階層152には、その第1情報処理装置10の階層(その情報処理装置が、第1情報処理装置10、第2情報処理装置20、第3情報処理装置30、及び第4情報処理装置40(Master)のうちのいずれであるのかを示す情報であり、例えば、その情報処理装置が第1情報処理装置10であれば「slave」、第2情報処理装置20であれば「GeneralMaster」、第3情報処理装置30であれば「subMaster」、第4情報処理装置40であれば「Master」となる。)である「slave」が設定される。   Among these, the identifier 151 is set with an identifier assigned to the first information processing apparatus 10. The hierarchy 152 includes the hierarchy of the first information processing apparatus 10 (the information processing apparatuses are the first information processing apparatus 10, the second information processing apparatus 20, the third information processing apparatus 30, and the fourth information processing apparatus 40 ( For example, if the information processing device is the first information processing device 10, “slave”, if the information processing device 20 is the second information processing device 20, “GeneralMaster”, third The information processing device 30 is set to “subMaster”, and the fourth information processing device 40 is set to “Master”.

種別153には、その第1情報処理装置10の種別(その情報処理装置が、負荷6に付設されているのか、発電機5に付設されているのかを示す情報であり、その情報処理装置が負荷6に付設されている場合は「EV」、発電機5に付設されている場合は「PV」となる。)である「EV」が設定される。   The type 153 is information indicating the type of the first information processing device 10 (whether the information processing device is attached to the load 6 or the generator 5). “EV” is set when it is attached to the load 6, and “PV” is set when it is attached to the generator 5).

図5に第1情報処理装置10が管理する第1需給情報160の一例を示す。同図に示すように、第1需給情報160は、時刻161、消費電力162、地域要求量163、及び残り時間166の各項目を含む。   FIG. 5 shows an example of the first supply and demand information 160 managed by the first information processing apparatus 10. As shown in the figure, the first supply and demand information 160 includes items of time 161, power consumption 162, regional requirement 163, and remaining time 166.

このうち時刻161には、現在の時刻が設定される。消費電力162には、自負荷の現在の消費電力が設定される。地域要求量163には、電力系統1に現在生じている需給差(地域要求量AR)が設定される。   Of these, the current time is set at time 161. In the power consumption 162, the current power consumption of the own load is set. In the regional requirement amount 163, a supply-demand difference (regional requirement amount AR) currently occurring in the power system 1 is set.

残り時間166には、現在時刻から前述した制御開始予定時刻までの残り時間が設定される。より詳細には、残り時間166には、オン制御を開始するまでの残り時間(以下、オン制御開始残り時間Tc1と称する。)、又はオフ制御を開始するまでの残り時間(以下、オフ制御開始残り時間Tc2と称する。)が設定される(即ち残り時間166によって自負荷の制御開始予定時刻が決定される。)。尚、オン制御開始残り時間Tc1、及びオン制御開始残り時間Tc2の値は、第1情報処理装置10によってリアルタイムに更新される。   In the remaining time 166, the remaining time from the current time to the aforementioned scheduled control start time is set. More specifically, in the remaining time 166, the remaining time until the on-control is started (hereinafter referred to as on-control start remaining time Tc1), or the remaining time until the off-control is started (hereinafter referred to as off-control start). (Referred to as the remaining time Tc2) (that is, the scheduled start time of the self-load is determined by the remaining time 166). The values of the remaining on-control start time Tc1 and the remaining on-control start time Tc2 are updated by the first information processing apparatus 10 in real time.

図6に、第3情報処理装置30のハードウエア構成を示している。同図に示すように、第3情報処理装置30は、CPU311、メモリ312(RAM、ROM、NVRAM等)、記憶装置313(ハードディスクやSSD等)、入力装置314(タッチパネルやマウス等)、表示装置315(液晶ディスプレイ等)、通信回路316、RTC(Real Time Clock)等を用いて構成され現在日時等の日時情報(タイムスタンプ)を生成する計時回路317、及び自身が付設されている発電機5の現在の出力を計測する出力計測回路318を備える。   FIG. 6 shows a hardware configuration of the third information processing apparatus 30. As shown in the figure, the third information processing device 30 includes a CPU 311, a memory 312 (RAM, ROM, NVRAM, etc.), a storage device 313 (hard disk, SSD, etc.), an input device 314 (touch panel, mouse, etc.), a display device. 315 (liquid crystal display, etc.), communication circuit 316, RTC (Real Time Clock), etc. are used to generate date and time information (time stamp) such as the current date and time, and generator 5 to which it is attached An output measurement circuit 318 is provided for measuring the current output.

図7に第3情報処理装置30が備える主な機能を示している。同図に示すように、第3情報処理装置30は、発電機出力取得部331、発電機出力送信部332、及び需給差受信部333の各機能を備える。尚、これらの機能は、第3情報処理装置30のハードウエアによって、もしくは、第3情報処理装置30のCPU311が、メモリ312又は記憶装置313に格納されているプログラムを読み出して実行することにより実現される。   FIG. 7 shows main functions of the third information processing apparatus 30. As shown in the figure, the third information processing apparatus 30 includes functions of a generator output acquisition unit 331, a generator output transmission unit 332, and a supply / demand difference reception unit 333. Note that these functions are realized by the hardware of the third information processing apparatus 30 or by the CPU 311 of the third information processing apparatus 30 reading and executing a program stored in the memory 312 or the storage device 313. Is done.

図7に示した機能のうち、発電機出力取得部331は、自発電機の現在の出力を取得する。発電機出力送信部332は、発電機出力取得部331が取得した出力を第2情報処理装置20に送信する。需給差受信部333は、第2情報処理装置20から送信されてくる、電力系統1に現在生じている需給差(地域要求量AR)を受信する。   Among the functions shown in FIG. 7, the generator output acquisition unit 331 acquires the current output of the own generator. The generator output transmission unit 332 transmits the output acquired by the generator output acquisition unit 331 to the second information processing apparatus 20. The supply-demand difference receiving unit 333 receives the supply-demand difference (regional requirement amount AR) currently generated in the power system 1 transmitted from the second information processing device 20.

図7に示しているように、第3情報処理装置30は、識別情報150及び第3需給情報360を管理している。図8にこのうちの識別情報150の一例を示す。識別情報150のフォーマットは図4に示したものと同様である。   As illustrated in FIG. 7, the third information processing apparatus 30 manages the identification information 150 and the third supply and demand information 360. FIG. 8 shows an example of the identification information 150 among them. The format of the identification information 150 is the same as that shown in FIG.

同図に示すように、識別子151には、その第3情報処理装置30に割り当てられている識別子が設定される。階層152には、その第3情報処理装置30の階層である「subMaster」が設定される。種別153には、その第1情報処理装置30の種別である「PV」が設定される。   As shown in the figure, the identifier assigned to the third information processing apparatus 30 is set in the identifier 151. In the hierarchy 152, “subMaster” that is the hierarchy of the third information processing apparatus 30 is set. In the type 153, “PV” that is the type of the first information processing apparatus 30 is set.

図9に第3情報処理装置30が管理する第3需給情報360の一例を示している。同図に示すように、第3需給情報360は、時刻361、発電機出力362、SMグループ地域要求量363、及び地域要求量364を含む。   FIG. 9 shows an example of third supply and demand information 360 managed by the third information processing apparatus 30. As shown in the figure, the third supply and demand information 360 includes a time 361, a generator output 362, an SM group regional request amount 363, and a regional request amount 364.

時刻361には、現在の時刻が設定される。発電機出力362には、自発電機の現在の出力が設定される。SMグループ地域要求量363には、自発電機の現在の出力と、第1情報処理装置10から送信されてくる消費電力とに基づき算出される需給差(以下、SMグループ地域要求量と称する。)が設定される。地域要求量364には、電力系統1に現在生じている需給差(地域要求量AR)が設定される。   The current time is set as the time 361. In the generator output 362, the current output of the own generator is set. The SM group regional requirement amount 363 is a supply-demand difference calculated based on the current output of the power generator and the power consumption transmitted from the first information processing apparatus 10 (hereinafter referred to as the SM group regional requirement amount). Is set. The regional demand amount 364 is set with the supply-demand difference (regional demand amount AR) currently occurring in the power system 1.

図10に、第4情報処理装置40のハードウエア構成を示している。同図に示すように、第4情報処理装置40は、CPU411、メモリ412(RAM、ROM、NVRAM等)、記憶装置413(ハードディスクやSSD等)、入力装置414(タッチパネルやマウス等)、表示装置415(液晶ディスプレイ等)、通信回路416、RTC(Real Time Clock)等を用いて構成され現在日時等の日時情報(タイムスタンプ)を生成する計時回路417、及び自身が付設されている発電機5の現在の出力を計測する出力計測回路418を備える。   FIG. 10 shows a hardware configuration of the fourth information processing apparatus 40. As shown in the figure, the fourth information processing apparatus 40 includes a CPU 411, a memory 412 (RAM, ROM, NVRAM, etc.), a storage device 413 (hard disk, SSD, etc.), an input device 414 (touch panel, mouse, etc.), a display device. 415 (liquid crystal display, etc.), communication circuit 416, RTC (Real Time Clock), etc. are used to generate date and time information (time stamp) such as the current date and time, and generator 5 to which it is attached. An output measurement circuit 418 is provided for measuring the current output.

図11に第4情報処理装置40が備える主な機能を示している。同図に示すように、第4情報処理装置40は、発電機出力取得部431、発電機出力送信部432、及び需給差受信部433の各機能を備える。尚、これらの機能は、第4情報処理装置40のハードウエアによって、もしくは、第4情報処理装置40のCPU411が、メモリ412又は記憶装置413に格納されているプログラムを読み出して実行することにより実現される。   FIG. 11 shows main functions of the fourth information processing apparatus 40. As shown in the figure, the fourth information processing apparatus 40 includes functions of a generator output acquisition unit 431, a generator output transmission unit 432, and a supply / demand difference reception unit 433. Note that these functions are realized by the hardware of the fourth information processing device 40 or by the CPU 411 of the fourth information processing device 40 reading and executing a program stored in the memory 412 or the storage device 413. Is done.

同図に示した機能のうち、発電機出力取得部431は、自発電機の現在の出力を取得する。発電機出力送信部432は、取得した出力を第2情報処理装置20に送信する。需給差受信部433は、第2情報処理装置20から送信されてくる、電力系統1に現在生じている需給差(地域要求量AR)を受信する。   Among the functions shown in the figure, the generator output acquisition unit 431 acquires the current output of the own generator. The generator output transmission unit 432 transmits the acquired output to the second information processing apparatus 20. The supply / demand difference receiving unit 433 receives the supply / demand difference (regional requirement amount AR) currently generated in the power system 1 transmitted from the second information processing device 20.

図11に示しているように、第4情報処理装置40は、識別情報150及び第4需給情報460を管理している。図12にこのうちの識別情報150の一例を示す。識別情報150のフォーマットは図4に示したものと同様である。同図に示すように、識別子151には、その第4情報処理装置40に割り当てられている識別子が設定される。階層152には、その第4情報処理装置40の階層である「Master」が設定される。種別153には、その第4情報処理装置40の種別である「PV」が設定される。   As illustrated in FIG. 11, the fourth information processing apparatus 40 manages the identification information 150 and the fourth supply and demand information 460. FIG. 12 shows an example of the identification information 150 among them. The format of the identification information 150 is the same as that shown in FIG. As shown in the figure, the identifier assigned to the fourth information processing apparatus 40 is set in the identifier 151. In the hierarchy 152, “Master” which is the hierarchy of the fourth information processing apparatus 40 is set. In the type 153, “PV” that is the type of the fourth information processing apparatus 40 is set.

図13に第4情報処理装置40が管理する第4需給情報460の一例を示している。同図に示すように、第4需給情報460は、時刻461、発電機出力462、MSグループ地域要求量463、及び地域要求量464を含む。   FIG. 13 shows an example of the fourth supply and demand information 460 managed by the fourth information processing apparatus 40. As shown in the figure, the fourth supply and demand information 460 includes a time 461, a generator output 462, an MS group regional requirement 463, and a regional requirement 464.

このうち時刻461には、現在の時刻が設定される。発電機出力462には、自発電機の現在の出力が設定される。MSグループ地域要求量463には、自発電機の現在の出力と、第3情報処理装置30から送信されてくるSMグループ地域要求量とに基づき算出される需給差(以下、MSグループ地域要求量と称する。)が設定される。地域要求量464には、電力系統1に現在生じている需給差(地域要求量AR)が設定される。   Of these, the current time is set as the time 461. In the generator output 462, the current output of the own generator is set. The MS group regional requirement amount 463 includes a supply-demand difference calculated based on the current output of the power generator and the SM group regional requirement amount transmitted from the third information processing device 30 (hereinafter referred to as the MS group regional requirement amount). Is set). In the regional requirement amount 464, a supply-demand difference (regional requirement amount AR) currently occurring in the power system 1 is set.

図14に、第2情報処理装置20のハードウエア構成を示している。同図に示すように、第2情報処理装置20は、CPU211、メモリ212(RAM、ROM、NVRAM等)、記憶装置213(ハードディスクやSSD等)、入力装置214(タッチパネルやマウス等)、表示装置215(液晶ディスプレイ等)、通信回路216、RTC(Real Time Clock)等を用いて構成され現在日時等の日時情報(タイムスタンプ)を生成する計時回路217、及び自身が付設されている発電機5の現在の出力を計測する出力計測回路218を備える。   FIG. 14 shows a hardware configuration of the second information processing apparatus 20. As shown in the figure, the second information processing device 20 includes a CPU 211, a memory 212 (RAM, ROM, NVRAM, etc.), a storage device 213 (hard disk, SSD, etc.), an input device 214 (touch panel, mouse, etc.), a display device. 215 (liquid crystal display, etc.), communication circuit 216, RTC (Real Time Clock), etc. are used to generate date and time information (time stamp) such as the current date and time, and generator 5 to which it is attached An output measurement circuit 218 for measuring the current output of the output.

図15に第2情報処理装置20が備える主な機能を示している。同図に示すように、第2情報処理装置20は、発電機出力取得部231、消費電力受信部232、発電機出力受信部233、需給差算出部234、及び需給差送信部235の各機能を備える。尚、これらの機能は、第2情報処理装置20のハードウエアによって、もしくは、第2情報処理装置20のCPU211が、メモリ212又は記憶装置213に格納されているプログラムを読み出して実行することにより実現される。   FIG. 15 shows the main functions of the second information processing apparatus 20. As shown in the figure, the second information processing apparatus 20 includes functions of a generator output acquisition unit 231, a power consumption reception unit 232, a generator output reception unit 233, a supply / demand difference calculation unit 234, and a supply / demand difference transmission unit 235. Is provided. Note that these functions are realized by the hardware of the second information processing device 20 or by the CPU 211 of the second information processing device 20 reading and executing a program stored in the memory 212 or the storage device 213. Is done.

同図に示した機能のうち、発電機出力取得部231は、自発電機の現在の出力を取得する。消費電力受信部232は、第1情報処理装置10から送信されてくる消費電力を受信する。発電機出力受信部233は、他の情報処理装置から送信されてくる、その情報処理装置に付設されている発電機5の現在の出力を受信する。   Among the functions shown in the figure, the generator output acquisition unit 231 acquires the current output of the own generator. The power consumption receiver 232 receives the power consumption transmitted from the first information processing apparatus 10. The generator output receiving unit 233 receives the current output of the generator 5 attached to the information processing apparatus transmitted from another information processing apparatus.

需給差算出部234は、消費電力受信部232が受信した消費電力と、発電機出力受信部233が受信した出力とに基づき、電力系統1における需給差を求める。需給差送信部235は、需給差算出部234が求めた需給差(地域要求量AR)を、消費電力の送信元の第1情報処理装置10に送信する。   The supply and demand difference calculation unit 234 obtains the supply and demand difference in the power system 1 based on the power consumption received by the power consumption reception unit 232 and the output received by the generator output reception unit 233. The supply-demand difference transmission unit 235 transmits the supply-demand difference (regional request amount AR) obtained by the supply-demand difference calculation unit 234 to the first information processing apparatus 10 that is the transmission source of power consumption.

図15に示しているように、第2情報処理装置20は、識別情報150及び第2需給情報260を管理している。図16にこのうちの識別情報150の一例を示す。識別情報150のフォーマットは図4に示したものと同様である。同図に示すように、識別子151には、その第2情報処理装置20に割り当てられている識別子が設定される。階層152には、その第2情報処理装置20の階層である「GeneralMaster」が設定される。種別153には、その第2情報処理装置20の種別である「PV」が設定される。   As illustrated in FIG. 15, the second information processing apparatus 20 manages the identification information 150 and the second supply and demand information 260. FIG. 16 shows an example of the identification information 150 among them. The format of the identification information 150 is the same as that shown in FIG. As shown in the figure, the identifier assigned to the second information processing apparatus 20 is set in the identifier 151. In the hierarchy 152, “GeneralMaster” that is the hierarchy of the second information processing apparatus 20 is set. In the type 153, “PV” that is the type of the second information processing apparatus 20 is set.

図17に第2需給情報260の一例を示す。同図に示すように、第2需給情報260は、時刻261、発電機出力262、及び地域要求量263を含む。このうち時刻261には、現在の時刻が設定される。発電機出力262には、自発電機の現在の出力が設定される。地域要求量263には、電力系統1における需給差(地域要求量AR)が設定される。   FIG. 17 shows an example of the second supply and demand information 260. As shown in the figure, the second supply and demand information 260 includes a time 261, a generator output 262, and a regional requirement amount 263. Of these, the current time is set as the time 261. In the generator output 262, the current output of the own generator is set. In the regional requirement amount 263, a supply and demand difference (regional requirement amount AR) in the power system 1 is set.

=処理説明=
次に以上の構成からなる電力系統1において行われる処理について説明する。
= Description of processing =
Next, the process performed in the electric power grid | system 1 which consists of the above structure is demonstrated.

<第1情報処理装置10の処理>
図18は、第1情報処理装置10が行う処理のうち、自負荷の消費電力を取得する処理(以下、消費電力取得処理S1800と称する。)を説明するフローチャートである。
<Processing of the first information processing apparatus 10>
FIG. 18 is a flowchart illustrating a process (hereinafter referred to as a power consumption acquisition process S1800) of acquiring the power consumption of the own load among the processes performed by the first information processing apparatus 10.

同図に示すように、第1情報処理装置10は、随時(例えば所定時間(例えば1秒)ごとにもしくは予めスケジュールされたタイミングが到来した場合)、自負荷の現在の消費電力Peを取得する(S1811)。   As shown in the figure, the first information processing apparatus 10 acquires the current power consumption Pe of its own load at any time (for example, every predetermined time (for example, 1 second) or when a timing scheduled in advance arrives). (S1811).

図19は、第1情報処理装置10が、自負荷の消費電力Peを第3情報処理装置30に送信する処理(以下、消費電力送信処理S1900と称する。)を説明するフローチャートである。   FIG. 19 is a flowchart illustrating a process in which the first information processing apparatus 10 transmits the power consumption Pe of its own load to the third information processing apparatus 30 (hereinafter referred to as power consumption transmission process S1900).

同図に示すように、第1情報処理装置10は、随時(例えば所定時間(例えば1秒)ごとにもしくは予めスケジュールされたタイミングが到来した場合)、消費電力取得処理S1800で取得した自負荷の現在の消費電力Peを、第3情報処理装置30に送信する(S1911)。   As shown in the figure, the first information processing apparatus 10 determines the self-load acquired in the power consumption acquisition process S1800 at any time (for example, every predetermined time (for example, 1 second) or when a scheduled timing arrives). The current power consumption Pe is transmitted to the third information processing apparatus 30 (S1911).

図20は、第1情報処理装置10が、第3情報処理装置30から送信されてくる需給差を受信する処理(以下、需給差受信処理S2000と称する。)を説明するフローチャートである。   FIG. 20 is a flowchart illustrating a process in which the first information processing apparatus 10 receives a supply-demand difference transmitted from the third information processing apparatus 30 (hereinafter referred to as a supply-demand difference reception process S2000).

同図に示すように、第1情報処理装置10は、随時(例えば所定時間(例えば1秒)ごとにもしくは予めスケジュールされたタイミングが到来した場合)、第3情報処理装置30から送信されてくる地域要求量ARを受信する(S2011)。   As shown in the figure, the first information processing apparatus 10 is transmitted from the third information processing apparatus 30 at any time (for example, every predetermined time (for example, 1 second) or when a previously scheduled timing has arrived). The regional request amount AR is received (S2011).

図21乃至図23は、第1情報処理装置10が、消費電力取得処理S1800で取得した消費電力Peと、需給差受信処理S2000で受信した需給差(地域要求量AR)とに基づき、自負荷の制御を行う処理(以下、需給制御処理S2100と称する。)を説明するフローチャートである。尚、第1情報処理装置10は、例えば、自負荷から消費電力Peを取得したタイミングでこの需給制御処理S2100を行う。また例えば、第1情報処理装置10は、第3情報処理装置30から地域要求量ARを受信したタイミングでこの需給制御処理S2100を行う。   FIGS. 21 to 23 show that the first information processing apparatus 10 has its own load based on the power consumption Pe acquired in the power consumption acquisition process S1800 and the supply / demand difference (regional requirement amount AR) received in the supply / demand difference reception process S2000. 5 is a flowchart for explaining a process for performing the control (hereinafter referred to as a supply and demand control process S2100). The first information processing apparatus 10 performs the supply and demand control process S2100 at the timing when the power consumption Pe is acquired from its own load, for example. Further, for example, the first information processing apparatus 10 performs the supply and demand control process S2100 at the timing when the regional request amount AR is received from the third information processing apparatus 30.

第1情報処理装置10は、自負荷の制御を開始するに先立ち、第1需給情報160の残り時間166に値(残り時間)を設定する。   The first information processing apparatus 10 sets a value (remaining time) in the remaining time 166 of the first supply and demand information 160 before starting control of the own load.

図21に示すように、第1情報処理装置10は、需給制御を開始するに先立ちまず第1需給情報160を参照して残り時間166に値が設定されているか否かを判断する(S2111)。残り時間166に値が設定されていない場合は(S2111:NO)S2200の処理(以下、残り時間設定処理S2200と称する。)を実行し、残り時間166に値が設定されている場合は(S2111:YES)S2300の処理(以下、自負荷制御開始処理S2300と称する。)に進む。尚、残り時間設定処理S2200又は自負荷制御開始処理S2300の実行後はS2111の処理に戻る。   As shown in FIG. 21, the first information processing apparatus 10 first determines whether or not a value is set for the remaining time 166 with reference to the first supply and demand information 160 before starting the supply and demand control (S2111). . When no value is set for the remaining time 166 (S2111: NO), the processing of S2200 (hereinafter referred to as remaining time setting processing S2200) is executed, and when a value is set for the remaining time 166 (S2111). : YES) The process proceeds to S2300 (hereinafter referred to as self-load control start process S2300). After the remaining time setting process S2200 or the own load control start process S2300 is executed, the process returns to S2111.

図22は、図21に示した残り時間設定処理S2200の詳細を説明するフローチャートである。残り時間設定処理S2200では、第1情報処理装置10は、自負荷の消費電力を制御した場合における電力系統1の需給差を予測し、予測した需給差が小さいほど早期に自負荷の消費電力の制御が開始されるように残り時間を設定する。   FIG. 22 is a flowchart for explaining details of the remaining time setting process S2200 shown in FIG. In the remaining time setting process S2200, the first information processing apparatus 10 predicts the supply and demand difference of the power system 1 when the power consumption of the own load is controlled. The smaller the predicted supply and demand difference, the earlier the power consumption of the own load. The remaining time is set so that control is started.

同図に示すように、第1情報処理装置10は、第1需給情報160の地域要求量163に設定されている値(地域要求量AR)をAR0として取得し(S2211)、取得したAR0から、消費電力取得処理S1800で取得した消費電力Peを減算した値(以下、需給差ΔARと称する。)を算出する。   As shown in the figure, the first information processing apparatus 10 acquires the value (region request amount AR) set in the region request amount 163 of the first supply and demand information 160 as AR0 (S2211), and from the acquired AR0 Then, a value obtained by subtracting the power consumption Pe acquired in the power consumption acquisition process S1800 (hereinafter referred to as supply-demand difference ΔAR) is calculated.

次に第1情報処理装置10は、算出した需給差ΔARの絶対値|ΔAR|が所定値a(正の定数)より大きいか否かを判断する(S2213)。   Next, the first information processing apparatus 10 determines whether or not the calculated absolute value | ΔAR | of the supply-demand difference ΔAR is larger than a predetermined value a (a positive constant) (S2213).

|ΔAR|が所定値aより大きい場合は(S2213:YES)S2214に進み、|ΔAR|が所定値a以下である場合は(S2213:NO)残り時間設定処理S2200を終了して図21のS2111に戻る。   If | ΔAR | is greater than the predetermined value a (S2213: YES), the process proceeds to S2214. If | ΔAR | Return to.

S2214では、第1情報処理装置10は、S2211で取得したAR0が正値であるか否かを判断し、AR0が正値である場合は(S2214:YES)S2215に進み、AR0が0以下である場合は(S2214:NO)S2221に進む。   In S2214, the first information processing apparatus 10 determines whether or not AR0 acquired in S2211 is a positive value. If AR0 is a positive value (S2214: YES), the process proceeds to S2215, and AR0 is 0 or less. If there is (S2214: NO), the process proceeds to S2221.

S2215では、第1情報処理装置10は、消費電力取得処理S1800で取得した消費電力Peが0であるか否かを判断し、取得した消費電力Peが0である場合は(S2215:YES)S2116に進み、取得した消費電力Peが0でない場合は(S2215:NO)残り時間設定処理S2200を終了して図21のS2111に戻る。   In S2215, the first information processing apparatus 10 determines whether or not the power consumption Pe acquired in the power consumption acquisition process S1800 is 0. If the acquired power consumption Pe is 0 (S2215: YES), S2116. When the acquired power consumption Pe is not 0 (S2215: NO), the remaining time setting process S2200 is terminated and the process returns to S2111 in FIG.

S2216では、第1情報処理装置10は、需給差ΔARが小さいほど早期に自負荷のオン制御が開始されるように、第1需給情報160の残り時間166にオン制御開始残り時間Tc1を設定する。具体的には、残り時間166に、オン制御開始残り時間Tc1(=「α・ΔAR」(αは正の定数))を設定する。その後は図21のS2111に戻る。   In S2216, the first information processing apparatus 10 sets the ON control start remaining time Tc1 to the remaining time 166 of the first supply / demand information 160 so that the ON control of the own load is started earlier as the supply / demand difference ΔAR is smaller. . Specifically, an ON control start remaining time Tc1 (= “α · ΔAR” (α is a positive constant)) is set as the remaining time 166. Thereafter, the process returns to S2111 in FIG.

S2221では、第1情報処理装置10は、消費電力取得処理S1800で取得した消費電力Peが定数aより大きいか否かを判断し、定数aより大きい場合は(S2221:YES)S2222に進み、定数a以下である場合は(S2222:NO)残り時間設定処理S2200は終了して図21のS2111に戻る。   In S2221, the first information processing apparatus 10 determines whether or not the power consumption Pe acquired in the power consumption acquisition process S1800 is larger than a constant a (S2221: YES), the process proceeds to S2222. If it is equal to or less than a (S2222: NO), the remaining time setting process S2200 ends and returns to S2111 in FIG.

S2222では、第1情報処理装置10は、需給差ΔARが小さいほど早期に自負荷の消費電力の制御が開始されるように、第1需給情報160の残り時間166にオフ制御開始残り時間Tc2を設定する。具体的には、残り時間166に、オフ制御開始残り時間Tc2(=「α・ΔAR」(αは正の定数))を設定する。その後は図21のS2111に戻る。   In S <b> 2222, the first information processing apparatus 10 sets the remaining OFF control start remaining time Tc <b> 2 to the remaining time 166 of the first supply / demand information 160 so that the control of the power consumption of the own load is started earlier as the supply / demand difference ΔAR is smaller. Set. Specifically, an OFF control start remaining time Tc2 (= “α · ΔAR” (α is a positive constant)) is set as the remaining time 166. Thereafter, the process returns to S2111 in FIG.

図23は、S2300の処理(以下、自負荷制御開始処理S2300と称する。)の詳細を説明するフローチャートである。   FIG. 23 is a flowchart for explaining the details of the processing of S2300 (hereinafter referred to as self-load control start processing S2300).

同図に示すように、第1情報処理装置10は、第1需給情報160の残り時間166を参照し、自負荷の制御(オン制御、又はオフ制御)までの残り時間が0であるか否かを判断する(S2311)。   As shown in the figure, the first information processing apparatus 10 refers to the remaining time 166 of the first supply and demand information 160 and determines whether or not the remaining time until the self-load control (on control or off control) is zero. Is determined (S2311).

残り時間166が0である場合は(S2311:YES)S2312に進み、残り時間166が0より大きい場合は(S2311:NO(>0))S2321に進む。   If the remaining time 166 is 0 (S2311: YES), the process proceeds to S2312, and if the remaining time 166 is greater than 0 (S2311: NO (> 0)), the process proceeds to S2321.

S2312では、第1情報処理装置10は、自負荷の制御を開始する。具体的には、残り時間166に設定されている制御(残り時間166に「Tc1=」が設定されていればオン制御、残り時間166に「Tc2=」が設定されていればオフ制御)を開始する。その後は図21のS2111に戻る。   In S2312, the first information processing apparatus 10 starts controlling its own load. Specifically, the control set for the remaining time 166 (ON control if “Tc1 =” is set for the remaining time 166, and OFF control if “Tc2 =” is set for the remaining time 166). Start. Thereafter, the process returns to S2111 in FIG.

S2321では、第1情報処理装置10は、第1需給情報160の地域要求量163を参照し、地域要求量ARが変動しているか否かを判断する。具体的には、例えば、地域要求量ARから、残り時間設定処理S2200で取得したAR0を減じた値の絶対値を算出し、算出した絶対値が正の所定値bより大きいか否かを調べることにより地域要求量ARが変動しているか否かを判断する。   In S2321, the first information processing apparatus 10 refers to the regional request amount 163 of the first supply and demand information 160, and determines whether or not the regional request amount AR has changed. Specifically, for example, an absolute value of a value obtained by subtracting AR0 acquired in the remaining time setting process S2200 from the regional request amount AR is calculated, and it is checked whether or not the calculated absolute value is greater than a positive predetermined value b. Thus, it is determined whether or not the regional requirement amount AR is fluctuating.

地域要求量ARが変動している場合には(S2321:YES)S2322に進み、地域要求量ARが変動していない場合には(S2321:NO)自負荷制御開始処理S2300を終了して図21のS2111に戻る。   If the regional requirement amount AR has fluctuated (S2321: YES), the process proceeds to S2322, and if the regional requirement amount AR has not fluctuated (S2321: NO), the self-load control start processing S2300 is terminated and FIG. The process returns to S2111.

S2322では、第1情報処理装置10は、自負荷の制御をキャンセルする。具体的には、残り時間166の設定内容を削除(リセット)する。その後は図21のS2111に戻る。   In S2322, the first information processing apparatus 10 cancels the self-load control. Specifically, the setting content of the remaining time 166 is deleted (reset). Thereafter, the process returns to S2111 in FIG.

このように、第1情報処理装置10は、地域要求量ARが変動していると判断した場合、自負荷の制御をキャンセルするので、例えば、電力系統1において地域要求量ARが安定せず需給制御の効果が持続しないことが予測される場合に不必要に自負荷の制御を行ってしまうのを防ぐことができる。   As described above, when the first information processing apparatus 10 determines that the local requirement amount AR has fluctuated, the first information processing apparatus 10 cancels the self-load control. It is possible to prevent the self-load from being unnecessarily controlled when it is predicted that the control effect will not continue.

<第3情報処理装置30の処理>
図24は、第3情報処理装置30が行う処理のうち、自発電機の出力を取得する処理(以下、発電機出力取得処理S2400と称する。)を説明するフローチャートである。
<Processing of Third Information Processing Device 30>
FIG. 24 is a flowchart illustrating a process of acquiring the output of the own generator (hereinafter referred to as a generator output acquisition process S2400) among the processes performed by the third information processing apparatus 30.

同図に示すように、第3情報処理装置30は、随時(例えば所定時間(例えば1秒)ごとにもしくは予めスケジュールされたタイミングが到来した場合)、自発電機の現在の出力Pgを取得する(S2411)。   As shown in the figure, the third information processing apparatus 30 acquires the current output Pg of the self-generator at any time (for example, every predetermined time (for example, 1 second) or when a pre-scheduled timing arrives) ( S2411).

図25は、第3情報処理装置30が、第1情報処理装置10から送信されてくる消費電力の情報を受信する処理(以下、消費電力受信処理S2500と称する。)を説明するフローチャートである。   FIG. 25 is a flowchart for describing processing in which the third information processing apparatus 30 receives power consumption information transmitted from the first information processing apparatus 10 (hereinafter referred to as power consumption reception processing S2500).

同図に示すように、第3情報処理装置30は、随時(例えば所定時間(例えば1秒)ごとにもしくは予めスケジュールされたタイミングが到来した場合)、第1情報処理装置10から送信されてくる消費電力Peを受信する(S2511)。   As shown in the figure, the third information processing device 30 is transmitted from the first information processing device 10 at any time (for example, every predetermined time (for example, 1 second) or when a pre-scheduled timing has arrived). The power consumption Pe is received (S2511).

図26は、第3情報処理装置30が、随時(例えば所定時間(例えば1秒)ごとにもしくは予めスケジュールされたタイミングが到来した場合)、SMグループ地域要求量を第4情報処理装置40に送信する処理(以下、SMグループ地域要求量送信処理S2600と称する。)を説明するフローチャートである。   FIG. 26 shows that the third information processing apparatus 30 transmits the SM group region request amount to the fourth information processing apparatus 40 at any time (for example, every predetermined time (for example, 1 second) or when a pre-scheduled timing arrives). 6 is a flowchart for explaining the processing (hereinafter referred to as SM group regional request amount transmission processing S2600).

同図に示すように、第3情報処理装置30は、SMグループ地域要求量ARsmを算出する(S2611)。具体的には、発電機出力取得処理S2400で取得した自発電機の現在の出力Pgと、消費電力受信処理S2500で受信した消費電力Peとを合計する。   As shown in the figure, the third information processing apparatus 30 calculates the SM group area request amount ARsm (S2611). Specifically, the current output Pg of the own generator acquired in the generator output acquisition process S2400 and the power consumption Pe received in the power consumption reception process S2500 are summed.

第3情報処理装置30は、算出したSMグループ地域要求量ARsmを第4情報処理装置40に送信する(S2612)。   The third information processing apparatus 30 transmits the calculated SM group area request amount ARsm to the fourth information processing apparatus 40 (S2612).

図27は、第3情報処理装置30が、随時(例えば所定時間(例えば1秒)ごとにもしくは予めスケジュールされたタイミングが到来した場合)、第4情報処理装置40から送信されてくる需給差を受信する処理(以下、需給差受信処理S2700と称する。)を説明するフローチャートである。   FIG. 27 shows the supply-demand difference transmitted from the fourth information processing apparatus 40 at any time (for example, every predetermined time (for example, 1 second) or when a pre-scheduled timing has arrived). It is a flowchart explaining the process (henceforth a supply-demand difference reception process S2700) to receive.

同図に示すように、第3情報処理装置30は、第4情報処理装置40から送信されてくる地域要求量ARを受信する(S2711)。   As shown in the figure, the third information processing apparatus 30 receives the regional request amount AR transmitted from the fourth information processing apparatus 40 (S2711).

第3情報処理装置30は、受信した地域要求量ARを第1情報処理装置10に送信する(S2712)。   The third information processing apparatus 30 transmits the received regional request amount AR to the first information processing apparatus 10 (S2712).

<第4情報処理装置40の処理>
図28は、第4情報処理装置40が行う処理のうち、自発電機の出力を取得する処理(以下、発電機出力取得処理S2800と称する。)を説明するフローチャートである。
<Processing of Fourth Information Processing Device 40>
FIG. 28 is a flowchart illustrating a process of acquiring the output of the own generator (hereinafter referred to as a generator output acquisition process S2800) among the processes performed by the fourth information processing apparatus 40.

同図に示すように、第4情報処理装置40は、随時(例えば所定時間(例えば1秒)ごとにもしくは予めスケジュールされたタイミングが到来した場合)、自発電機の現在の出力Pgを取得する(S2811)。   As shown in the figure, the fourth information processing apparatus 40 acquires the current output Pg of the self-generator at any time (for example, every predetermined time (for example, 1 second) or when a pre-scheduled timing arrives) ( S2811).

図29は、第4情報処理装置40が、第3情報処理装置30から送信されてくるSMグループ地域要求量ARsmを受信する処理(以下、SMグループ地域要求量受信処理S2900と称する。)を説明するフローチャートである。   FIG. 29 illustrates a process in which the fourth information processing apparatus 40 receives the SM group area request amount ARsm transmitted from the third information processing apparatus 30 (hereinafter referred to as an SM group area request amount reception process S2900). It is a flowchart to do.

同図に示すように、第4情報処理装置40は、随時(例えば所定時間(例えば1秒)ごとにもしくは予めスケジュールされたタイミングが到来した場合)、第3情報処理装置30から送信されてくるSMグループ地域要求量ARsmを受信する(S2911)。   As shown in the figure, the fourth information processing apparatus 40 is transmitted from the third information processing apparatus 30 at any time (for example, every predetermined time (for example, 1 second) or when a previously scheduled timing has arrived). The SM group area request amount ARsm is received (S2911).

図30は、第4情報処理装置40が、随時(例えば所定時間(例えば1秒)ごとにもしくは予めスケジュールされたタイミングが到来した場合)、MSグループ地域要求量を第2情報処理装置20に送信する処理(以下、MSグループ地域要求量送信処理S3000と称する。)を説明するフローチャートである。   FIG. 30 shows that the fourth information processing apparatus 40 transmits the MS group area request amount to the second information processing apparatus 20 at any time (for example, every predetermined time (for example, 1 second) or when a pre-scheduled timing has arrived). 6 is a flowchart for explaining the process (hereinafter referred to as MS group regional request amount transmission process S3000).

同図に示すように、第4情報処理装置40は、MSグループ地域要求量ARmsを算出する(S3011)。具体的には、発電機出力取得処理S2800で取得した自発電機の出力Pgと、SMグループ地域要求量受信処理S2900で受信したSMグループ地域要求量ARsmとを合計する。   As shown in the figure, the fourth information processing apparatus 40 calculates the MS group area request amount ARms (S3011). Specifically, the output Pg of the own generator acquired in the generator output acquisition process S2800 and the SM group area request amount ARsm received in the SM group area request amount reception process S2900 are summed.

第3情報処理装置30は、算出したMSグループ地域要求量ARmsを、第2情報処理装置20に送信する(S3012)。   The third information processing apparatus 30 transmits the calculated MS group area request amount ARms to the second information processing apparatus 20 (S3012).

図31は、第4情報処理装置40が、随時(例えば所定時間(例えば1秒)ごとにもしくは予めスケジュールされたタイミングが到来した場合)、第2情報処理装置20から送信されてくる需給差の情報を受信する処理(以下、需給差受信処理S3100と称する。)を説明するフローチャートである。   FIG. 31 shows the difference in the supply-demand difference transmitted from the second information processing device 20 at any time (for example, every predetermined time (for example, 1 second) or when a pre-scheduled timing has arrived). It is a flowchart explaining the process (henceforth a supply-demand difference reception process S3100) which receives information.

同図に示すように、第4情報処理装置40は、第2情報処理装置20から送信されてくる地域要求量ARを受信する(S3111)。   As shown in the figure, the fourth information processing apparatus 40 receives the regional request amount AR transmitted from the second information processing apparatus 20 (S3111).

第4情報処理装置40は、受信した地域要求量ARを第3情報処理装置30に送信する(S3112)。   The fourth information processing apparatus 40 transmits the received regional request amount AR to the third information processing apparatus 30 (S3112).

<第2情報処理装置20の処理>
図32は、第2情報処理装置20が行う処理のうち、自発電機の出力を取得する処理(以下、発電機出力取得処理S3200と称する。)を説明するフローチャートである。
<Processing of Second Information Processing Device 20>
FIG. 32 is a flowchart illustrating a process for acquiring the output of the own generator (hereinafter referred to as a generator output acquisition process S3200) among the processes performed by the second information processing apparatus 20.

同図に示すように、第2情報処理装置20は、随時(例えば所定時間(例えば1秒)ごとにもしくは予めスケジュールされたタイミングが到来した場合)、自発電機の現在の出力Pgを取得する(S3211)。   As shown in the figure, the second information processing apparatus 20 acquires the current output Pg of the self-generator at any time (for example, every predetermined time (for example, 1 second) or when a pre-scheduled timing has arrived) ( S3211).

図33は、第2情報処理装置20が、第4情報処理装置40から送信されてくるMSグループ地域要求量ARmsを受信する処理(以下、MSグループ地域要求量受信処理S3300と称する。)を説明するフローチャートである。   FIG. 33 illustrates a process in which the second information processing apparatus 20 receives the MS group area request amount ARms transmitted from the fourth information processing apparatus 40 (hereinafter referred to as an MS group area request amount reception process S3300). It is a flowchart to do.

同図に示すように、第2情報処理装置20は、随時(例えば所定時間(例えば1秒)ごとにもしくは予めスケジュールされたタイミングが到来した場合)、第4情報処理装置40から送信されてくるMSグループ地域要求量ARmsを受信する(S3311)。   As shown in the figure, the second information processing device 20 is transmitted from the fourth information processing device 40 at any time (for example, every predetermined time (for example, 1 second) or when a pre-scheduled timing has arrived). The MS group area request amount ARms is received (S3311).

図34は、第2情報処理装置20が、随時(例えば所定時間(例えば1秒)ごとにもしくは予めスケジュールされたタイミングが到来した場合)、電力系統1に現在生じている需給差の情報を第4情報処理装置40に送信する処理(以下、需給差送信処理S3400と称する。)を説明するフローチャートである。   FIG. 34 shows the information on the supply-demand difference currently occurring in the power system 1 when the second information processing apparatus 20 is in need (for example, every predetermined time (for example, 1 second) or when a pre-scheduled timing has arrived). 4 is a flowchart for explaining processing to be transmitted to the information processing device 40 (hereinafter referred to as supply-demand difference transmission processing S3400).

同図に示すように、第2情報処理装置20は、地域要求量ARを算出する(S3411)。具体的には、発電機出力取得処理S3200で取得した自発電機の現在の出力Pgと、MSグループ地域要求量受信処理S3300で受信したMSグループ地域要求量ARmsとを合計する。   As shown in the figure, the second information processing apparatus 20 calculates a regional request amount AR (S3411). Specifically, the current output Pg of the own generator acquired in the generator output acquisition process S3200 and the MS group area request amount ARms received in the MS group area request amount reception process S3300 are summed.

第2情報処理装置20は、算出した地域要求量ARを、第4情報処理装置40に送信する(S3412)。   The second information processing device 20 transmits the calculated regional request amount AR to the fourth information processing device 40 (S3412).

以上のように、本実施形態の電力供給システム1によれば、第1情報処理装置10の夫々は、自身が予測した需給差(地域要求量AR)が小さいほど早い時刻に設定される需給制御開始時刻が到来すると自負荷の消費電力の制御を開始するので、需給差(地域要求量AR)をより小さくすることができる第1情報処理装置10ほどより早期に需給制御を開始させることができる。これにより電力系統1における需給差を効率よく解消することができる。   As described above, according to the power supply system 1 of the present embodiment, each of the first information processing apparatuses 10 is configured to supply / demand control that is set at an earlier time as the supply / demand difference (regional requirement AR) predicted by itself is smaller. Since the control of the power consumption of the own load is started when the start time arrives, the supply and demand control can be started earlier as the first information processing apparatus 10 that can further reduce the supply and demand difference (regional requirement amount AR). . Thereby, the supply-demand difference in the electric power grid | system 1 can be eliminated efficiently.

また、第2の情報処置装置20は、電力系統1に接続されている負荷6の現在の消費電力に加えて、電力系統1に接続されている発電機5の現在の出力に基づき需給差を算出するので、電力系統1における需給差を正確に求めることができ、需給制御を適切に行うことができる。   Further, the second information processing apparatus 20 calculates the supply and demand difference based on the current output of the generator 5 connected to the power system 1 in addition to the current power consumption of the load 6 connected to the power system 1. Since it calculates, the supply-demand difference in the electric power grid | system 1 can be calculated | required correctly, and supply-and-demand control can be performed appropriately.

<第2実施形態>
負荷6が蓄電池を備えている場合(例えば負荷6が電気自動車(EV)である場合)には、さらに蓄電池の残容量を考慮して開始予定時刻を設定するようにしてもよい。第2実施形態では蓄電池の残容量を考慮した場合について説明する。
Second Embodiment
When the load 6 includes a storage battery (for example, when the load 6 is an electric vehicle (EV)), the scheduled start time may be set in consideration of the remaining capacity of the storage battery. 2nd Embodiment demonstrates the case where the remaining capacity of a storage battery is considered.

図35に、第2実施形態として説明する第1情報処理装置10のハードウエア構成を示している。同図に示すように、第1情報処理装置10は、CPU111、メモリ112、記憶装置113、入力装置114、表示装置115、通信回路116、計時回路117、消費電力計測回路118、消費電力制御回路119、及び容量計測回路120を備える。このうち容量計測回路120は、自負荷(蓄電池)の残容量を計測する。その他の構成は第1実施形態と同様である。   FIG. 35 shows a hardware configuration of the first information processing apparatus 10 described as the second embodiment. As shown in the figure, the first information processing apparatus 10 includes a CPU 111, a memory 112, a storage device 113, an input device 114, a display device 115, a communication circuit 116, a time measuring circuit 117, a power consumption measuring circuit 118, and a power consumption control circuit. 119 and a capacity measurement circuit 120. Among these, the capacity measurement circuit 120 measures the remaining capacity of the own load (storage battery). Other configurations are the same as those of the first embodiment.

図36に第1情報処理装置10が備える主な機能を示している。同図に示すように、第1情報処理装置10は、消費電力取得部131、消費電力送信部132、需給差受信部133、需給差予測部134、制御開始予定時刻設定部135、需給制御開始部136、及び残容量取得部137の各機能を備える。このうち残容量取得部137は、自負荷(蓄電池)の残容量を取得する。その他は第1実施形態と同様である。   FIG. 36 shows the main functions provided in the first information processing apparatus 10. As shown in the figure, the first information processing apparatus 10 includes a power consumption acquisition unit 131, a power consumption transmission unit 132, a supply / demand difference reception unit 133, a supply / demand difference prediction unit 134, a scheduled control start time setting unit 135, and a supply / demand control start. Unit 136 and remaining capacity acquisition unit 137. Among these, the remaining capacity acquisition unit 137 acquires the remaining capacity of the own load (storage battery). Others are the same as in the first embodiment.

また、同図に示すように、第1情報処理装置10は、識別情報150及び第1需給情報160を管理している。このうち識別情報150は、第1実施形態と同様である。   As shown in the figure, the first information processing apparatus 10 manages the identification information 150 and the first supply and demand information 160. Of these, the identification information 150 is the same as in the first embodiment.

図37に第1需給情報160の一例を示している。同図に示すように、第1需給情報160は、時刻161、消費電力162、地域要求量163、電池残量164、及び残り時間166を含む。このうち、電池残量164には、自負荷の現在の残容量が設定される。その他の内容については第1実施形態と同様である。   FIG. 37 shows an example of the first supply and demand information 160. As shown in the figure, the first supply and demand information 160 includes time 161, power consumption 162, regional requirement amount 163, remaining battery capacity 164, and remaining time 166. Among these, the current remaining capacity of the own load is set as the remaining battery capacity 164. Other contents are the same as in the first embodiment.

図38は、本実施形態に係る第1情報処理装置10が行う残り時間設定処理(以下、残り時間設定処理S3800と称する。)を説明するフローチャートである。同図に示すS3811〜S3815、及びS3821の処理は、第1実施形態(図22のS2211〜S2215、及びS2221)と同様であるので説明を省略する。   FIG. 38 is a flowchart for explaining the remaining time setting process (hereinafter referred to as remaining time setting process S3800) performed by the first information processing apparatus 10 according to the present embodiment. Since the processing of S3811 to S3815 and S3821 shown in the figure is the same as that of the first embodiment (S2211 to S2215 and S2221 of FIG. 22), description thereof is omitted.

S3815に続くS3816では、第1情報処理装置10は、蓄電池の残容量が少ないほど早期に自負荷のオン制御が開始されるように、第1需給情報160の残り時間166にオン制御開始残り時間Tc1を設定する。具体的には、残り時間166に、オン制御開始残り時間Tc1(=α・ΔAR+β・SOC(α、及びβは正の定数であり、SOCは蓄電池の残量(State Of Charge)である。)を設定する。   In S3816 following S3815, the first information processing apparatus 10 starts the on-control remaining time in the remaining time 166 of the first supply and demand information 160 so that the on-control of the self-load is started earlier as the remaining capacity of the storage battery is smaller. Set Tc1. Specifically, at the remaining time 166, the remaining ON control start time Tc1 (= α · ΔAR + β · SOC (α and β are positive constants, and SOC is the remaining amount of battery (State Of Charge)). Set.

S3821に続くS3822では、第1情報処理装置10は、蓄電池の残容量が少ないほど早期に自負荷のオフ制御が開始されるように、第1需給情報160の残り時間166にオフ制御開始残り時間Tc2を設定する。具体的には、残り時間166に、オフ制御開始残り時間Tc2(=α・ΔAR+β・SOC(α、及びβは正の定数であり、SOCは蓄電池の残量(State Of Charge)である。))を設定する。   In S3822 following S3821, the first information processing apparatus 10 starts the off control start remaining time in the remaining time 166 of the first supply and demand information 160 so that the off control of the self-load is started earlier as the remaining capacity of the storage battery is smaller. Set Tc2. Specifically, in the remaining time 166, the OFF control start remaining time Tc2 (= α · ΔAR + β · SOC (α and β are positive constants, and SOC is the remaining amount of battery (State Of Charge)). ) Is set.

以上に説明したように、自負荷が蓄電池である場合、第1情報処理装置10は、消費電力の制御の開始予定時刻を、その残容量が少ないほど早期に自負荷の消費電力の制御が開始されるように設定するので、残容量が少なく大きな充電電流を消費する負荷6(蓄電池)ほど早期に消費電力の制御が開始され、需給差を効率よく解消することができる。また残容量の少ない蓄電池の充電が早期に開始されるので、例えば、電気自動車を早期に利用することができる等、需要家の利便性を向上させつつ、電力系統1における需給制御を効率よく行うことができる。   As described above, when the self-load is a storage battery, the first information processing apparatus 10 starts the control of the power consumption of the self-load earlier as the remaining capacity decreases. Therefore, the load 6 (storage battery) that has a small remaining capacity and consumes a large charging current starts power consumption control earlier, and can efficiently eliminate the supply-demand difference. In addition, since charging of the storage battery with a small remaining capacity is started early, for example, the electric vehicle can be used early, and the supply and demand control in the power system 1 is efficiently performed while improving the convenience for consumers. be able to.

<第3実施形態>
電気自動車(EV:Electronic Vehicle)の使用が近いうちに予定されている場合など、負荷6が電力系統1から所定時間後に解列することが予定されている場合には、さらにその解列時刻を考慮して開始予定時刻を設定するようにしてもよい。第3実施形態では負荷6の解列を考慮した場合について説明する。尚、第3実施形態として説明する第1情報処理装置10のハードウエア構成は、第1実施形態と同様であるので説明を省略する。
<Third Embodiment>
When the load 6 is scheduled to be disconnected from the power system 1 after a predetermined time, such as when an electric vehicle (EV) is scheduled to be used in the near future, the disconnect time is further set. The scheduled start time may be set in consideration. In the third embodiment, a case in which the disconnection of the load 6 is considered will be described. Note that the hardware configuration of the first information processing apparatus 10 described as the third embodiment is the same as that of the first embodiment, and a description thereof will be omitted.

図39に第1情報処理装置10が備える主な機能を示している。同図に示すように、第1情報処理装置10は、消費電力取得部131、消費電力送信部132、需給差受信部133、需給差予測部134、制御開始予定時刻設定部135、需給制御開始部136、及び解列時刻記憶部138の各機能を備える。このうち解列時刻記憶部138は、自負荷が電力系統1から解列される時刻(以下、解列時刻と称する。)を記憶する。その他の機能は第1実施形態と同様である。   FIG. 39 shows the main functions of the first information processing apparatus 10. As shown in the figure, the first information processing apparatus 10 includes a power consumption acquisition unit 131, a power consumption transmission unit 132, a supply / demand difference reception unit 133, a supply / demand difference prediction unit 134, a scheduled control start time setting unit 135, and a supply / demand control start. Each of the functions of the unit 136 and the release time storage unit 138 is provided. Of these, the disconnection time storage unit 138 stores the time at which the load is disconnected from the power system 1 (hereinafter referred to as the disconnection time). Other functions are the same as those in the first embodiment.

同図に示すように、第1情報処理装置10は識別情報150及び第1需給情報160を管理している。このうち識別情報150については第1実施形態と同様である。   As shown in the figure, the first information processing apparatus 10 manages identification information 150 and first supply and demand information 160. Of these, the identification information 150 is the same as in the first embodiment.

図40に第1需給情報160の一例を示している。同図に示すように、第1需給情報160は、時刻161、消費電力162、地域要求量163、解列時間165、及び残り時間166を含む。このうち、解列時間165には、自負荷が解列されるまでの残り時間(以下、解列残時間と称する。)が設定される。その他の内容については第1実施形態と同様である。   FIG. 40 shows an example of the first supply and demand information 160. As shown in the figure, the first supply and demand information 160 includes a time 161, power consumption 162, an area requirement 163, a disconnection time 165, and a remaining time 166. Of these, the remaining time until the self-load is disconnected (hereinafter referred to as the remaining time for disconnection) is set as the disconnection time 165. Other contents are the same as in the first embodiment.

図41は、本実施形態に係る第1情報処理装置10が行う残り時間設定処理(以下、残り時間設定処理S4100と称する。)を説明するフローチャートである。同図に示すS4111〜S4115、及びS4121の処理は、第1実施形態(図21のS2111〜S2115、及びS2121)と同様であるので説明を省略する。   FIG. 41 is a flowchart illustrating a remaining time setting process (hereinafter referred to as remaining time setting process S4100) performed by the first information processing apparatus 10 according to the present embodiment. Since the processing of S4111-S4115 and S4121 shown in the figure is the same as that of the first embodiment (S2111-S2115 and S2121 in FIG. 21), description thereof will be omitted.

S4115に続くS4116では、第1情報処理装置10は、自負荷が電力系統1から解列される時刻が早いほど早期に自負荷のオン制御が開始されるように、第1需給情報160の残り時間166にオン制御開始残り時間Tc1を設定する。具体的には、残り時間166に、オン制御開始残り時間Tc1(=α・ΔAR+γ・P(α、及びγは正の定数であり、Pは自負荷の解列残時間である。)を設定する。   In S4116 following S4115, the first information processing apparatus 10 includes the remaining first supply / demand information 160 so that the on-control of the own load is started earlier as the time at which the own load is disconnected from the power system 1 is earlier. At time 166, the remaining ON control start time Tc1 is set. Specifically, the remaining on-control start remaining time Tc1 (= α · ΔAR + γ · P (α and γ are positive constants, and P is the remaining time of self-loading) is set in the remaining time 166. To do.

S4121に続くS4122では、第1情報処理装置10は、自負荷が電力系統1から解列される時刻が早いほど早期に自負荷のオフ制御が開始されるように、第1需給情報160の残り時間166にオフ制御開始残り時間Tc2を設定する。具体的には、残り時間166に、オフ残り時間Tc2(=α・ΔAR+γ・P(α、及びγは正の定数であり、Pは自負荷の解列残時間である。)を設定する。   In S4122 following S4121, the first information processing apparatus 10 includes the remaining first supply and demand information 160 so that the off-control of the own load is started earlier as the time at which the own load is disconnected from the power system 1 is earlier. At time 166, the remaining OFF control start time Tc2 is set. Specifically, an OFF remaining time Tc2 (= α · ΔAR + γ · P (α and γ are positive constants, and P is a self-loading remaining time) is set as the remaining time 166.

このように、自負荷が蓄電池である場合、第1情報処理装置10は、消費電力の制御の開始予定時刻を、自負荷が電力系統1から解列される時刻が早いほど早期に自負荷の消費電力の制御が開始されるように設定するので、電力系統1に接続されている負荷6を有効に需給制御に用いることができる。また、蓄電池の利用開始時刻が近づいている場合など、早期に消費電力の制御を開始する必要がある負荷6ほど早期に消費電力の制御を開始させることができる。このため、近いうちに使用が予定されている電気自動車の充電を早期に開始させる等、蓄電池を利用する需要家の利便性を向上させつつ、電力系統1の需給差の解消を図ることができる。   As described above, when the self-load is a storage battery, the first information processing apparatus 10 determines the scheduled start time of power consumption control as soon as the time at which the self-load is disconnected from the power system 1 is earlier. Since the power consumption control is set to start, the load 6 connected to the power system 1 can be effectively used for supply and demand control. Further, when the storage battery utilization start time is approaching, the power consumption control can be started earlier as the load 6 needs to start the power consumption control earlier. For this reason, it is possible to eliminate the supply-demand difference of the electric power system 1 while improving convenience for consumers using the storage battery, such as starting charging of an electric vehicle scheduled to be used soon. .

ところで、以上に説明した実施の形態は、本発明の理解を容易にするためのものであり、本発明を限定するものではない。本発明は、その趣旨を逸脱することなく、変更、改良され得ると共に、本発明にはその等価物が含まれることは勿論である。   By the way, the embodiment described above is for facilitating the understanding of the present invention, and does not limit the present invention. The present invention can be changed and improved without departing from the gist thereof, and the present invention includes the equivalents thereof.

例えば、第2実施形態と第3実施形態とを組み合わせ、第1情報処理装置10が、第1需給情報160の残り時間166に、オン制御開始残り時間Tc1として「α・ΔAR+β・SOC+γ・P」(α、β、及びγは正の定数であり、SOCは蓄電池の電池残量(State Of Charge)であり、Pは自負荷の解列残時間である。)を設定するようにしてもよい。   For example, by combining the second embodiment and the third embodiment, the first information processing apparatus 10 sets “α · ΔAR + β · SOC + γ · P” as the remaining on-control start time Tc1 in the remaining time 166 of the first supply and demand information 160. (Α, β, and γ are positive constants, SOC is the remaining battery level of the storage battery (State Of Charge), and P is the remaining load disconnection time). .

また例えば、第1情報処理装置10が、第1需給情報160の残り時間166に、オフ制御開始残り時間Tc2として「α・ΔAR+β・SOC+γ・P」(α、β、及びγは正の定数であり、SOCは蓄電池の電池残量(State Of Charge)であり、Pは自負荷の解列残時間である。)を設定するようにしてもよい。   Further, for example, the first information processing apparatus 10 determines that “α · ΔAR + β · SOC + γ · P” (α, β, and γ are positive constants) as the remaining OFF control start time Tc2 in the remaining time 166 of the first supply and demand information 160. Yes, the SOC may be the battery remaining amount (State Of Charge) of the storage battery, and P may be the self-load disconnection remaining time.

また、以上に説明した第1実施形態乃至第3実施形態では、subMaster、Master、及びGeneralMasterがいずれも発電機5に付設されていたが、これらの情報処理装置を負荷6に付設するようにしても良い。尚、この場合、各情報処理装置は自負荷の現在の消費電力を取得することになる。   In the first to third embodiments described above, subMaster, Master, and GeneralMaster are all attached to the generator 5, but these information processing devices are attached to the load 6. Also good. In this case, each information processing apparatus acquires the current power consumption of its own load.

また以上では4階層の情報処理装置が存在する場合の需給制御について説明したが、本発明はn階層(n=5,6,・・・)の情報処理装置が存在する場合に拡張して適用することができる。   In addition, the supply and demand control in the case where there are four layers of information processing apparatuses has been described above, but the present invention is extended and applied to the case where there are n layers (n = 5, 6,...) Of information processing apparatuses. can do.

1 電力系統
5 発電機
6 負荷
10 第1情報処理装置
20 第2情報処理装置
30 第3情報処理装置
131 消費電力取得部
132 消費電力送信部
133 需給差受信部
134 需給差予測部
135 制御開始予定時刻設定部
136 需給制御開始部
S2000 需給差受信処理
S2100 需給制御処理
S2200 残り時間設定処理
S2300 自負荷制御開始処理
DESCRIPTION OF SYMBOLS 1 Power system 5 Generator 6 Load 10 1st information processing apparatus 20 2nd information processing apparatus 30 3rd information processing apparatus 131 Power consumption acquisition part 132 Power consumption transmission part 133 Supply / demand difference reception part 134 Supply / demand difference prediction part 135 Scheduled control start Time setting unit 136 Supply / demand control start unit S2000 Supply / demand difference reception process S2100 Supply / demand control process S2200 Remaining time setting process S2300 Self-load control start process

Claims (6)

電力系統における需給制御方法であって、
電力系統に接続している負荷の夫々に第1情報処理装置を付設し、
前記第1情報処理装置は、自身が付設されている負荷である自負荷の現在の消費電力を取得する機能及び前記自負荷の消費電力を制御する機能を有し、
前記第1情報処理装置の夫々は、第2情報処理装置と通信可能に接続し、
前記第1情報処理装置は、取得した前記消費電力を前記第2情報処理装置に送信し、
前記第2情報処理装置は、
前記第1情報処理装置から受信した前記消費電力に基づき、前記電力系統に現在生じている需給差を求め、求めた前記需給差を前記消費電力の送信元の前記第1情報処理装置に送信し、
前記第1情報処理装置の夫々は、
前記現在生じている需給差を受信すると、
自負荷の消費電力を制御した場合における前記電力系統の需給差を、前記受信した現在の需給差、及び自負荷の現在の消費電力に基づき予測し、
予測した需給差が小さいほど早期に自負荷の消費電力の制御が開始されるように需給制御の開始予定時刻を設定し、
前記開始予定時刻になると、自負荷の消費電力の制御を開始する
ことを特徴とする電力系統における需給制御方法。
A supply and demand control method in an electric power system,
A first information processing device is attached to each of the loads connected to the power system,
The first information processing apparatus has a function of acquiring current power consumption of a self-load that is a load attached to the first information processing apparatus and a function of controlling power consumption of the self-load,
Each of the first information processing devices is communicably connected to the second information processing device,
The first information processing apparatus transmits the acquired power consumption to the second information processing apparatus,
The second information processing apparatus
Based on the power consumption received from the first information processing apparatus, a supply-demand difference currently occurring in the power system is determined, and the determined supply-demand difference is transmitted to the first information processing apparatus that is the transmission source of the power consumption. ,
Each of the first information processing apparatuses is
When the current supply-demand difference is received,
Predicting the supply and demand difference of the power system when controlling the power consumption of the own load based on the received current supply and demand difference and the current power consumption of the own load,
Set the scheduled supply and demand control start time so that the power supply control of the self-load is started earlier as the predicted supply and demand difference is smaller,
The supply and demand control method in the electric power system, wherein the control of the power consumption of the own load is started at the scheduled start time.
請求項1に記載の電力系統における需給制御方法であって、
前記第1情報処理装置は、自負荷が蓄電池である場合、前記開始予定時刻を、その残容量が少ないほど早期に自負荷の消費電力の制御が開始されるように設定する
ことを特徴とする電力系統における需給制御方法。
It is the supply-and-demand control method in the electric power system of Claim 1,
When the self-load is a storage battery, the first information processing apparatus sets the scheduled start time so that the control of the power consumption of the self-load is started earlier as the remaining capacity is smaller. Supply and demand control method in power system.
請求項1に記載の電力系統における需給制御方法であって、
前記第1情報処理装置は、自負荷が蓄電池である場合、自負荷が前記電力系統から解列される時刻を記憶し、前記開始予定時刻を、自負荷が前記電力系統から解列される時刻が早いほど早期に自負荷の消費電力の制御が開始されるように設定する
ことを特徴とする電力系統における需給制御方法。
It is the supply-and-demand control method in the electric power system of Claim 1,
When the self-load is a storage battery, the first information processing apparatus stores a time when the self-load is disconnected from the power system, and the scheduled start time is a time when the self-load is disconnected from the power system. A method for controlling supply and demand in an electric power system, characterized in that control is made so that the control of the power consumption of the self-load is started earlier as the speed becomes faster.
請求項1乃至3のいずれか1項に記載の電力系統における需給制御方法であって、
前記電力系統に接続している前記発電機に、当該発電機の現在の出力を取得する機能を備える第3情報処理装置を付設し、
前記第3情報処理装置は、前記第2情報処理装置と通信可能に接続し、
前記第3情報処理装置は、取得した前記現在の出力を前記第2情報処理装置に送信し、
前記第2情報処理装置は、
前記第3情報処理装置から受信した前記発電機の現在の出力と、前記第1情報処理装置から受信した前記負荷の現在の消費電力とに基づき、前記電力系統における現在の需給差を求める
ことを特徴とする電力系統における需給制御方法。
A supply and demand control method for a power system according to any one of claims 1 to 3,
Attached to the generator connected to the power system is a third information processing device having a function of acquiring the current output of the generator,
The third information processing device is connected to the second information processing device so as to be communicable,
The third information processing apparatus transmits the acquired current output to the second information processing apparatus,
The second information processing apparatus
Obtaining a current supply-demand difference in the power system based on a current output of the generator received from the third information processing device and a current power consumption of the load received from the first information processing device. A supply and demand control method in a power system that is characterized.
請求項1乃至4のいずれか1項に記載の電力系統における需給制御方法に用いる前記第1情報処理装置であって、
自身が付設されている負荷である自負荷の現在の消費電力を取得する機能及び前記自負荷の消費電力を制御する機能を有し、
第2情報処理装置と通信可能に接続し、
取得した前記消費電力を前記第2情報処理装置に送信し、
前記電力系統に前記現在生じている需給差を受信すると、
自負荷の消費電力を制御した場合における前記電力系統の需給差を、前記受信した現在の需給差、及び自負荷の現在の消費電力に基づき予測し、
予測した需給差が小さいほど早期に自負荷の消費電力の制御が開始されるように需給制御の開始予定時刻を設定し、
前記開始予定時刻になると、自負荷の消費電力の制御を開始する
ことを特徴とする情報処理装置。
The first information processing apparatus used in the supply and demand control method for an electric power system according to any one of claims 1 to 4,
A function of acquiring current power consumption of a self-load that is a load attached to the self-load and a function of controlling power consumption of the self-load;
A communicable connection with the second information processing device,
Transmitting the acquired power consumption to the second information processing apparatus;
Upon receiving the current supply-demand difference in the power system,
Predicting the supply and demand difference of the power system when controlling the power consumption of the own load based on the received current supply and demand difference and the current power consumption of the own load,
Set the scheduled supply and demand control start time so that the power supply control of the self-load is started earlier as the predicted supply and demand difference is smaller,
Control of power consumption of the self-load is started at the scheduled start time.
請求項1乃至5のいずれか1項に記載の電力系統における需給制御方法に用いる前記第2情報処理装置であって、
前記第1情報処理装置から受信した前記消費電力に基づき、前記電力系統に現在生じている需給差を求め、求めた前記需給差を前記消費電力の送信元の前記第1情報処理装置に送信する
ことを特徴とする情報処理装置。
The second information processing apparatus used for the supply and demand control method in the power system according to any one of claims 1 to 5,
Based on the power consumption received from the first information processing apparatus, a supply-demand difference currently occurring in the power system is determined, and the determined supply-demand difference is transmitted to the first information processing apparatus that is the transmission source of the power consumption. An information processing apparatus characterized by that.
JP2012057476A 2012-03-14 2012-03-14 Power system supply and demand control method and information processing apparatus Expired - Fee Related JP5318239B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2012057476A JP5318239B2 (en) 2012-03-14 2012-03-14 Power system supply and demand control method and information processing apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2012057476A JP5318239B2 (en) 2012-03-14 2012-03-14 Power system supply and demand control method and information processing apparatus

Publications (2)

Publication Number Publication Date
JP2013192386A JP2013192386A (en) 2013-09-26
JP5318239B2 true JP5318239B2 (en) 2013-10-16

Family

ID=49392107

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2012057476A Expired - Fee Related JP5318239B2 (en) 2012-03-14 2012-03-14 Power system supply and demand control method and information processing apparatus

Country Status (1)

Country Link
JP (1) JP5318239B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9898787B2 (en) * 2014-10-16 2018-02-20 Honeywell International Inc. Allocation of energy production changes to meet demand changes

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09135536A (en) * 1995-11-07 1997-05-20 Hitachi Ltd Grid connection system
JP5110603B2 (en) * 2008-08-13 2012-12-26 独立行政法人産業技術総合研究所 Direct load control system
JP2010213411A (en) * 2009-03-09 2010-09-24 A-One Meditec Co Ltd Power management system
JP2011083086A (en) * 2009-10-05 2011-04-21 Panasonic Electric Works Co Ltd Electric power distribution system
JP5268977B2 (en) * 2010-03-15 2013-08-21 中国電力株式会社 Power supply system control method and power supply system
JP5415347B2 (en) * 2010-04-16 2014-02-12 中国電力株式会社 Power supply system control method and power supply system

Also Published As

Publication number Publication date
JP2013192386A (en) 2013-09-26

Similar Documents

Publication Publication Date Title
Srivastava et al. IOT based controlling of hybrid energy system using ESP8266
Samanta et al. Internet of things based smart energy management in a vanadium redox flow battery storage integrated bio-solar microgrid
CN107851994B (en) Power supply and demand prediction system, method, and computer-readable storage medium
WO2019053941A1 (en) Distributed power supply system
US20140163756A1 (en) Systems and methods for minimizing energy costs for a power consumption system that has access to off-grid resources
JP6029713B1 (en) POWER MANAGEMENT DEVICE, DEVICE SYSTEM, POWER MANAGEMENT METHOD, AND PROGRAM
JP2012532583A (en) High-speed feedback for power load reduction using variable generators
JP7452451B2 (en) Server, power management method
JP7102182B2 (en) Power systems, controls, power management methods, programs, and power management servers
JP2017089970A (en) Electric water heater and boiling method
WO2013172430A1 (en) Alert presentation device and alert presentation method
KR20110070748A (en) Remote power management method and remote power management device therefor
WO2015001767A1 (en) Control device and power management system
Diefenderfer et al. Application of power sensors in the control and monitoring of a residential microgrid
JP2015023794A (en) Energy management system
JP5318239B2 (en) Power system supply and demand control method and information processing apparatus
Sanduleac et al. Integrating the electrical vehicles in the smart grid through unbundled smart metering and multi-objective virtual power plants
JP6246091B2 (en) Power supply system
JP2019004546A (en) Control device, power management system, control method and program
JP5964668B2 (en) Backup power supply system
KR20120000026A (en) Network system
US20210263578A1 (en) Photovoltaic smart power distribution box and controller
KR20220026387A (en) Energy management system using environment and status information of renewable power generation
JP2016126983A (en) Fuel cell controller, fuel cell control system, fuel cell control method and computer program
JP5851359B2 (en) Storage battery control system

Legal Events

Date Code Title Description
TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20130702

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20130709

R150 Certificate of patent or registration of utility model

Ref document number: 5318239

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees