JP5414838B2 - Steel pipe pile, composite pile and composite pile manufacturing method - Google Patents
Steel pipe pile, composite pile and composite pile manufacturing method Download PDFInfo
- Publication number
- JP5414838B2 JP5414838B2 JP2012106429A JP2012106429A JP5414838B2 JP 5414838 B2 JP5414838 B2 JP 5414838B2 JP 2012106429 A JP2012106429 A JP 2012106429A JP 2012106429 A JP2012106429 A JP 2012106429A JP 5414838 B2 JP5414838 B2 JP 5414838B2
- Authority
- JP
- Japan
- Prior art keywords
- blade
- steel pipe
- pile
- ground
- blades
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 title claims description 182
- 239000010959 steel Substances 0.000 title claims description 182
- 239000002131 composite material Substances 0.000 title claims description 48
- 238000004519 manufacturing process Methods 0.000 title claims description 14
- 239000004568 cement Substances 0.000 claims description 44
- 238000000034 method Methods 0.000 claims description 33
- 239000002689 soil Substances 0.000 claims description 33
- 239000000463 material Substances 0.000 claims description 25
- 230000008569 process Effects 0.000 claims description 23
- 230000002093 peripheral effect Effects 0.000 claims description 20
- 239000008267 milk Substances 0.000 claims description 16
- 210000004080 milk Anatomy 0.000 claims description 16
- 235000013336 milk Nutrition 0.000 claims description 16
- 238000003756 stirring Methods 0.000 claims description 12
- 230000000149 penetrating effect Effects 0.000 claims description 8
- 230000005484 gravity Effects 0.000 claims description 5
- 238000007711 solidification Methods 0.000 claims description 5
- 230000008023 solidification Effects 0.000 claims description 5
- 238000003860 storage Methods 0.000 claims description 4
- 230000035515 penetration Effects 0.000 description 15
- 230000000694 effects Effects 0.000 description 10
- 238000010276 construction Methods 0.000 description 9
- 239000010410 layer Substances 0.000 description 6
- 230000009471 action Effects 0.000 description 4
- 238000009412 basement excavation Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 3
- 239000003795 chemical substances by application Substances 0.000 description 2
- 239000011248 coating agent Substances 0.000 description 2
- 238000000576 coating method Methods 0.000 description 2
- 238000007596 consolidation process Methods 0.000 description 2
- 239000011162 core material Substances 0.000 description 2
- 238000005536 corrosion prevention Methods 0.000 description 2
- 238000005520 cutting process Methods 0.000 description 2
- 230000007423 decrease Effects 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 230000002708 enhancing effect Effects 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- JEIPFZHSYJVQDO-UHFFFAOYSA-N iron(III) oxide Inorganic materials O=[Fe]O[Fe]=O JEIPFZHSYJVQDO-UHFFFAOYSA-N 0.000 description 2
- 238000003825 pressing Methods 0.000 description 2
- 239000011800 void material Substances 0.000 description 2
- 239000011247 coating layer Substances 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 238000002156 mixing Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 230000001141 propulsive effect Effects 0.000 description 1
- 239000004576 sand Substances 0.000 description 1
- 238000007790 scraping Methods 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Piles And Underground Anchors (AREA)
Description
本発明は、特に、中低層の建築構造物の地盤改良に使用する鋼管杭と、該鋼管杭を備える地中に構築される鋼管ソイルセメント複合杭と、該複合杭の製造方法に関するものである。 In particular, the present invention relates to a steel pipe pile used for ground improvement of a low-rise building structure, a steel pipe soil cement composite pile constructed in the ground including the steel pipe pile, and a method for manufacturing the composite pile. .
中低層建築物の地盤改良に好適な鋼管杭工法として、スーパーミニドリル(SMD)杭工法が知られている。SMD杭工法は、くい先端部の外周に杭径の2倍から3倍程度の大きさの螺旋翼(外翼)を取り付けた鋼管杭を右回転により回転貫入させる工法である。鋼管杭の貫入は、杭頭部に回転トルクを与えることで、外翼が地盤から推進力を受けるため、地上部には無排土の状態で回転貫入されるものである。また、SMD杭工法は、セメントミルクを使用しないという特徴を有する。 A super mini drill (SMD) pile construction method is known as a steel pipe pile construction method suitable for ground improvement of medium- and low-rise buildings. The SMD pile construction method is a construction method in which a steel pipe pile having a spiral wing (outer wing) having a size of about 2 to 3 times the pile diameter is attached to the outer periphery of the rake tip by rotating clockwise. The penetration of the steel pipe pile is rotationally penetrating into the ground part in an undrained state because the outer wing receives a propulsive force from the ground by giving a rotational torque to the pile head. Moreover, the SMD pile construction method has a feature that cement milk is not used.
また、軟弱地盤中にセメント系固化材スラリ−と原位置土を処理機を用いて攪拌混合し、所定の強度に固化する深層混合処理(CDM)工法が知られている。CDM工法で形成された改良杭は、柱状固化処理杭あるいはソイルセメントコラム等と称され、各種構造物の基礎地盤改良として用いられる他、山留め壁、掘削時の地盤安定確保のような仮設構造物としての用途もある。 Further, a deep layer mixing (CDM) method is known in which a cement-based solidifying material slurry and an in-situ soil are stirred and mixed in a soft ground using a processing machine and solidified to a predetermined strength. The improved piles formed by the CDM method are called column-solidified piles or soil cement columns, and are used for improving the foundation ground of various structures, as well as temporary structures such as retaining walls and securing ground stability during excavation. There are also uses.
一方、鋼管杭は長い年月が経過するにつれ、鋼管表面に錆が発生し、初期の強度が維持できなくなるという問題がある。また、従来の鋼管杭は、先端の螺旋羽根が通過した軌道は空隙のままであり、杭径の周回りの摩擦力が低下すると共に、杭周辺地盤に空隙が発生するという問題がある。一方、柱状固化処理杭は、鋼管杭ほどの強度がなく、強度を付与するために、固化処理杭の杭径が大きくなってしまうという問題がある。このような問題を解決するものとして、鋼管杭の周りにソイルセメントを形成する鋼管ソイルセメント複合杭が知られている。複合杭は、鋼管の周りがアルカリセメントであるため、鋼管表面の錆を防止し、初期の杭強度を保持する。また、複合杭の芯材が鋼管であるため、全体の杭強度が高くなるため、全体の杭径を小さくできる。 On the other hand, steel pipe piles have a problem that as the years pass, rust is generated on the steel pipe surface and the initial strength cannot be maintained. Moreover, the conventional steel pipe pile has the problem that the trajectory through which the spiral blade at the tip has passed remains a gap, and the frictional force around the circumference of the pile diameter is reduced, and a void is generated in the ground around the pile. On the other hand, columnar solidified piles are not as strong as steel pipe piles, and there is a problem that the pile diameter of the solidified piles is increased in order to impart strength. As a solution to such a problem, a steel pipe soil cement composite pile in which a soil cement is formed around the steel pipe pile is known. Since the composite pile has an alkaline cement around the steel pipe, it prevents rust on the surface of the steel pipe and maintains the initial pile strength. Moreover, since the core material of a composite pile is a steel pipe, since the whole pile strength becomes high, the whole pile diameter can be made small.
このような鋼管ソイルセメント複合杭としては、ソイルセメント杭の芯材として鋼管の外周に一定間隔をもって縞をなす凹溝を形成した鋼管を使用してなる鋼管ソイルセメント複合杭が知られている(特開2007−191990号公報)。特開2007−191990号公報の複合杭の施工に際しては、掘削、撹拌ロッドにより、先端部よりセメントミルク等の固化剤を注入しながら掘孔し、土壌と固化剤とを混合撹拌してソイルセメント化し、次いで前記未硬化のソイルセメント中に鋼管を挿入、埋設するというものである。 As such a steel pipe soil cement composite pile, a steel pipe soil cement composite pile using a steel pipe in which concave grooves forming stripes at regular intervals on the outer periphery of the steel pipe as a core material of the soil cement pile is known ( JP 2007-191990 A). When constructing a composite pile disclosed in Japanese Patent Application Laid-Open No. 2007-191990, excavation and agitating rods are used to inject a solidifying agent such as cement milk from the tip, and the soil and the solidifying agent are mixed and stirred to form soil cement. Then, a steel pipe is inserted and embedded in the uncured soil cement.
しかしながら、特開2007−191990号公報記載の複合杭の施工方法は、未硬化のソイルセメント中に鋼管を挿入、埋設するため、複合杭の中心に鋼管を設置することはほとんど不可能であるか、中心に設置するために多くの工程が必要となり、コストアップは避けられないという問題がある。また、中心部の鋼管は、複合杭の先端まで到達せず、途中で止まり埋没している。このため、従来の複合杭は、鋼管の硬質地盤への根入れができないため、支持杭としての機能はなく、摩擦杭として機能するのみであるという問題があった。 However, since the construction method of the composite pile described in JP 2007-191990A inserts and embeds the steel pipe in uncured soil cement, is it almost impossible to install the steel pipe at the center of the composite pile? In order to install in the center, many processes are required, and there is a problem that an increase in cost is inevitable. Moreover, the steel pipe at the center does not reach the tip of the composite pile, but stops and is buried in the middle. For this reason, since the conventional composite pile cannot be embedded in the hard ground of a steel pipe, there is a problem that it does not function as a support pile but only functions as a friction pile.
従って、本発明の目的は、支持杭として機能する複合杭を提供すること、簡易な方法により、複合杭の中心に鋼管を正しく設置できる複合杭の施工方法を提供すること、及びそれに使用される新規な構造の鋼管杭を提供することにある。 Accordingly, an object of the present invention is to provide a composite pile that functions as a support pile, to provide a construction method for a composite pile that can correctly install a steel pipe at the center of the composite pile, and to be used for it. It is to provide a steel pipe pile having a new structure.
かかる実情において、本発明者等は鋭意検討を行った結果、中空の鋼管の軸方向における一端部の外周面に、当該鋼管の軸方向と垂直な方向に対して、傾斜角度α0で螺旋状の第1羽根を付設し、該第1羽根の上方の外周面に、傾斜角度α0と異なる傾斜角度αnを有する1つ以上の第2羽根を形成する鋼管杭とすれば、硬質地盤への根入れ施工が可能になることで支持杭が得られること、固化材の重力流下という簡易な方法により、複合杭の中心に鋼管を正しく設置することができること等を見出し、本発明を完成するに至った。 In such a situation, the present inventors have conducted intensive studies, and as a result, the outer peripheral surface of one end portion in the axial direction of the hollow steel pipe has a spiral shape with an inclination angle α 0 with respect to the direction perpendicular to the axial direction of the steel pipe. If a steel pipe pile that forms one or more second blades having an inclination angle α n different from the inclination angle α 0 on the outer peripheral surface above the first blade is provided to the hard ground It is found that a support pile can be obtained by enabling the rooting construction of the steel, and that a steel pipe can be correctly installed at the center of the composite pile by a simple method of gravity flow of the solidified material, and the present invention is completed. It came to.
すなわち、本発明は、中空の鋼管の軸方向における一端部の外周面に、当該鋼管の軸方向と垂直な方向に対して、傾斜角度α0で螺旋状の第1羽根を付設し、該第1羽根の上方の外周面に、傾斜角度α0と異なる傾斜角度αxを有する地盤を撹拌又は撹乱する第2羽根を1つ以上形成したものであり、該第1羽根の直上の第2羽根の傾斜角度は、傾斜角度α 0 より大であることを特徴とする鋼管杭を提供するものである。 That is, according to the present invention, a spiral first blade is attached to the outer peripheral surface of one end portion in the axial direction of a hollow steel pipe at an inclination angle α 0 with respect to a direction perpendicular to the axial direction of the steel pipe. the outer peripheral surface of the upper first blade, the inclination angle alpha 0 and are those in which the second blade to form one or more stirring or disturb the soil having different tilt angles .alpha.x, the second blade directly above the first blade the inclination angle is to provide a steel pipe, which is a larger than the inclination angle alpha 0.
また、本発明は、中空の鋼管の軸方向における一端部の外周面に、羽根の始点と終点間の鉛直方向長さがH0の螺旋状の第1羽根を付設し、該第1羽根の上方の外周面に、H0と異なる羽根の始点と終点間の鉛直方向長さHxを有する地盤を撹拌又は撹乱する第2羽根を1つ以上形成したものであり、該第1羽根の直上の第2羽根の羽根の始点と終点間の鉛直方向長さは、H 0 より大であることを特徴とする鋼管杭を提供するものである。 In the present invention, a spiral first blade having a vertical length H 0 between the start point and the end point of the blade is attached to the outer peripheral surface of one end portion in the axial direction of the hollow steel pipe. One or more second blades that stir or disturb the ground having a vertical length Hx between the start point and the end point of the blades different from H 0 are formed on the upper outer peripheral surface, immediately above the first blades. The length in the vertical direction between the start point and the end point of the blades of the second blades is greater than H 0 , thereby providing a steel pipe pile.
また、本発明は、前記鋼管杭と、該鋼管杭の鋼管の外周面周りに形成されるソイルセメントからなることを特徴とする複合杭を提供するものである。 The present invention also provides a composite pile comprising the steel pipe pile and a soil cement formed around the outer peripheral surface of the steel pipe pile.
また、本発明は、前記鋼管杭を地中に正回転で貫入させながら、固化材を該鋼管杭の鋼管周りに供給する工程を有することを特徴とする複合杭の製造方法を提供するものである。 Moreover, this invention provides the manufacturing method of the composite pile characterized by having the process of supplying the solidification material around the steel pipe of this steel pipe pile, penetrating the said steel pipe pile in the ground by normal rotation. is there.
本発明の鋼管杭によれば、鋼管周りの地盤に対して、第2羽根の軌道が第1羽根と異なる多様な方向に入るため、当該地盤を大きく撹乱できる。また、第2羽根は第1羽根と異なる異形羽根であるため、下方向と横方向への押圧力が高まり、それぞれ下部地盤及び周辺地盤への圧密効果が大となる。また、本発明の鋼管杭は、従来のSMD杭等の公知の鋼管杭に新たに第2羽根を溶接又は部品化された羽根をボルト締めするだけで製作できる。 According to the steel pipe pile of the present invention, since the orbit of the second blade enters various directions different from the first blade with respect to the ground around the steel pipe, the ground can be greatly disturbed. Moreover, since the 2nd blade | wing is a different shaped blade | wing different from a 1st blade | wing, the pressing force to a downward direction and a horizontal direction increases, and the consolidation effect to a lower ground and a surrounding ground respectively becomes large. Moreover, the steel pipe pile of this invention can be manufactured only by bolting the blade | wing which newly welded the 2nd blade | wing or the components to well-known steel pipe piles, such as the conventional SMD pile.
また、本発明の複合杭によれば、鋼管の先端を硬質地盤に根入れできるため、摩擦杭と支持杭の両機能を有する。また、鋼管杭が複合杭の中心に位置するため、安定した支持強度を発現できる。また、鋼管杭周りがアルカリ性のセメントであるため、鋼管の防食効果が高い。 Moreover, according to the composite pile of this invention, since the front-end | tip of a steel pipe can be rooted in hard ground, it has both functions of a friction pile and a support pile. Moreover, since a steel pipe pile is located in the center of a composite pile, stable support strength can be expressed. Moreover, since the steel pipe pile circumference is alkaline cement, the corrosion prevention effect of a steel pipe is high.
また、本発明の複合杭の製造方法によれば、上記の鋼管杭と同様の効果を奏する他、鋼管周りに地表から固化材を投入しつつ、鋼管杭を回転させるという簡易な方法により、中心に鋼管が正しく配置された複合杭を製造することができる。 Further, according to the composite pile manufacturing method of the present invention, in addition to the same effect as the steel pipe pile described above, a simple method of rotating the steel pipe pile while introducing the solidified material from the ground surface around the steel pipe, It is possible to manufacture composite piles in which steel pipes are correctly arranged.
(鋼管杭の説明)
本発明の鋼管杭は、中空の鋼管の軸方向における一端部の外周面に、鋼管の軸方向と垂直な方向に対して、傾斜角度α0で螺旋状の第1羽根を付設し、第1羽根の上方の外周面に、傾斜角度α0と異なる傾斜角度αxを有する1つ以上の第2羽根を形成したものである。
(Description of steel pipe pile)
In the steel pipe pile of the present invention, a spiral first blade is attached to the outer peripheral surface of one end portion in the axial direction of the hollow steel pipe at a tilt angle α 0 with respect to a direction perpendicular to the axial direction of the steel pipe. One or more second blades having an inclination angle α x different from the inclination angle α 0 are formed on the outer peripheral surface above the blade.
本発明において、第1羽根は、螺旋状の羽根であり、従来のSMD杭の先端羽根と同様のものでよく、正規螺旋状羽根及び非正規螺旋状羽根が挙げられる。第1羽根を螺旋状とすることで、地盤への食い込みが可能となり、鋼管杭の地盤への貫入を容易にする。正規螺旋状の羽根とは、1周巻き又は2周巻き以上の螺旋羽根であって、螺旋羽根の全ての位置において、同じ傾斜角度α0を有するものである。非正規螺旋状の羽根とは、例えば図7に示すように、螺旋状の全ての位置において、同じ傾斜角度α0を有するものではなく、一部に水平部331や緩傾斜部を含む羽根を言う。本発明において、螺旋状羽根を傾斜角度で規定する場合、正規螺旋状羽根及び正規螺旋状羽根に準ずる羽根が対象となる。正規螺旋状羽根に準ずる羽根とは、図5及び図6に示す部分螺旋状羽根31A、32Aであり、正規螺旋状羽根の一部を省略したもので、当該省略した部分を繋げれば正規螺旋状羽根となるものである。
In the present invention, the first blade is a spiral blade and may be the same as the tip blade of a conventional SMD pile, and examples thereof include a regular spiral blade and an irregular spiral blade. By making the first blade spiral, it is possible to bite into the ground and facilitate the penetration of the steel pipe pile into the ground. A regular spiral blade is a spiral blade of one or more turns, and has the same inclination angle α 0 at all positions of the spiral blade. For example, as shown in FIG. 7, the non-regular spiral blade does not have the same inclination angle α 0 at all the positions of the spiral, but includes a blade including a
第1羽根の螺旋の傾斜角度α0は、5〜52度が好ましい。第1羽根の傾斜角度α0が上記範囲内であって、且つ小さい角度を採る場合、鋼管杭の食い込みがよく、且つ従来のSMD杭の先端羽根をそのまま利用できる点で好ましい。 The inclination angle α 0 of the spiral of the first blade is preferably 5 to 52 degrees. When the inclination angle α 0 of the first blade is within the above range and a small angle is taken, it is preferable in that the steel pipe pile can bite well and the tip blade of the conventional SMD pile can be used as it is.
本発明において、第2羽根は、第1羽根と傾斜角度が異なるものであれば、特に制限されず、例えば、螺旋状羽根、部分螺旋状羽根及び水平羽根が挙げられる。第2羽根は、鋼管回りの地盤を撹乱(撹拌)すると共に、複合杭においてはソイルセメントとの付着性を高める機能を奏する。なお、部分螺旋状羽根には、所謂傾斜羽根が含まれる。これらの第2羽根は、鋼管の周面に溶接又は部品化された羽根をボルト締めにて設置すればよい。第2羽根の傾斜角度αxは0〜52度、好ましくは0〜40度で且つ第1羽根と異なる値で適宜決定される。傾斜角度0とは、水平羽根を言う。水平羽根の場合、螺旋状の第1羽根とは明らかに傾斜角度が異なり、地盤の撹乱に寄与する。特に、鋼管杭10の上下運動工程(III工程)を行う際、地盤の撹乱を一層高め、セメントミルクの注入を容易にする。
In the present invention, the second blade is not particularly limited as long as it has an inclination angle different from that of the first blade, and examples thereof include a spiral blade, a partial spiral blade, and a horizontal blade. The second blade has a function of disturbing (stirring) the ground around the steel pipe and enhancing the adhesion to the soil cement in the composite pile. The partially spiral blade includes a so-called inclined blade. These second blades may be installed by bolting a blade welded or partized on the peripheral surface of the steel pipe. The inclination angle α x of the second blade is appropriately determined as 0 to 52 degrees, preferably 0 to 40 degrees, and a value different from that of the first blade. An inclination angle of 0 means a horizontal blade. In the case of a horizontal blade, the inclination angle is clearly different from that of the spiral first blade, which contributes to disturbance of the ground. In particular, when performing the up-and-down motion process (III process) of the
第1羽根と直上の第2羽根の傾斜角度は、1.5倍〜2.5倍、好ましくは1.8〜2.3倍、特に好ましくは2倍相違していることが好ましく、複数の第2羽根の場合、第2羽根間のそれぞれの傾斜角度は、互いに1.2倍〜1.7倍、好ましくは1.3〜1.6倍相違していることが好ましい。羽根間の傾斜角度の比率が小さ過ぎると撹拌効果が低下し、傾斜比率が大き過ぎると、羽根の設置数が制限される。なお、第2羽根が2つ以上の場合、全ての第2羽根の傾斜角度は、第1羽根の傾斜角度α0と異なると共に、それぞれが異なる傾斜角度のものが好ましい。第2羽根が2枚の3段羽根の場合、傾斜角度α0:α1:α2比率は好ましくは1:1.7〜2.3:2.7〜3.3であり、特に好ましくは、1:2:3である(図2参照)。例えば、第2羽根が2枚の3段羽根であって、傾斜角度α0:α1:α2比率が1:2:3であり、且つ第1羽根の1回転による深進寸法が1/3径(径は鋼管杭の径)とした場合、傾斜角度α0は9度、傾斜角度α1は18度、傾斜角度α2は27度である。また、第2羽根が2枚の3段羽根であって、傾斜角度比率α0:α1:α2が1:2:3であり、且つ第1羽根の1回転による深進寸法が1/2径とした場合、傾斜角度α0は14度、傾斜角度α1は28度、傾斜角度α2は42度である。また、第1羽根の1回転による深進寸法が6cm、杭径が89.1〜318.5mmの場合、第1羽根の傾斜角度α0は6〜19度、傾斜角度α1は11〜34度、傾斜角度α2は16〜45度である。また、第1羽根の1回転による深進寸法が7.5cm、杭径が89.1〜318.5mmの場合、第1羽根の傾斜角度α0は7〜23度、傾斜角度α1は13〜40度、傾斜角度α2は20〜48度である。また、第1羽根の上方に、第2羽根とは別途の、第1羽根の傾斜角度α0と同一の傾斜角度α0を有する羽根が形成されていてもよい。 The inclination angle of the first blade and the second blade directly above is preferably 1.5 to 2.5 times, preferably 1.8 to 2.3 times, particularly preferably 2 times, In the case of the second blade, the respective inclination angles between the second blades are preferably different from each other by 1.2 to 1.7 times, preferably 1.3 to 1.6 times. If the ratio of the inclination angle between the blades is too small, the stirring effect is lowered, and if the inclination ratio is too large, the number of blades installed is limited. Incidentally, when the second blade is two or more, the inclination angle of all of the second blade, with a different inclination angle alpha 0 of the first blade, preferably those each having different inclination angles. When the second blade is two three-stage blades, the inclination angle α 0 : α 1 : α 2 ratio is preferably 1: 1.7 to 2.3: 2.7 to 3.3, particularly preferably. 1: 2: 3 (see FIG. 2). For example, the second blade is two three-stage blades, the inclination angle α 0 : α 1 : α 2 ratio is 1: 2: 3, and the depth dimension by one rotation of the first blade is 1 / When the diameter is 3 (the diameter is the diameter of the steel pipe pile), the inclination angle α 0 is 9 degrees, the inclination angle α 1 is 18 degrees, and the inclination angle α 2 is 27 degrees. Further, the second blade is two three-stage blades, the inclination angle ratio α 0 : α 1 : α 2 is 1: 2: 3, and the depth dimension by one rotation of the first blade is 1 / In the case of two diameters, the inclination angle α 0 is 14 degrees, the inclination angle α 1 is 28 degrees, and the inclination angle α 2 is 42 degrees. In addition, when the depth dimension by one rotation of the first blade is 6 cm and the pile diameter is 89.1 to 138.5 mm, the inclination angle α 0 of the first blade is 6 to 19 degrees, and the inclination angle α 1 is 11 to 34. degrees, the inclination angle alpha 2 is 16 to 45 degrees. When the depth dimension of the first blade by one rotation is 7.5 cm and the pile diameter is 89.1 to 138.5 mm, the inclination angle α 0 of the first blade is 7 to 23 degrees and the inclination angle α 1 is 13 40 degrees, the inclination angle alpha 2 is 20-48 degrees. Further, above the first blade, separate from the second blade, the blade having the same inclination angle alpha 0 and the inclination angle alpha 0 of the first blade may be formed.
本発明において、第2羽根が2つの場合の第1羽根と第2羽根の傾斜角度α0:α1:α2比率が1:2:3の変形例としては、傾斜角度α0:α1:α2比率が1:3:2、2:1:3、2:3:1、3:1:2、3:2:1のものが挙げられる。 In the present invention, as a modified example in which the ratio of the inclination angle α 0 : α 1 : α 2 between the first blade and the second blade in the case of two second blades is 1: 2: 3, the inclination angle α 0 : α 1 : alpha 2 ratio of 1: 3: 2, 2: 1: 3, 2: 3: 1, 3: 1: 2,3: 2: 1 are mentioned.
また、本発明の鋼管杭は、中空の鋼管の軸方向における一端部の外周面に、羽根の始点と終点間の鉛直方向長さ(以下、単に「鉛直方向長さ」とも言う。)がH0の螺旋状の第1羽根を付設し、第1羽根の上方の外周面に、H0と異なる羽根の鉛直方向長さHxを有する第2羽根を1つ以上形成したものである。本発明において、第2羽根が傾斜角度で規定し難い羽根の場合、このような羽根の鉛直方向長さで規定することができる。第2羽根の始点と終点は、軸方向(鉛直方向)の同一線上にある。従って、第2羽根の始点と終点が、軸方向(鉛直方向)の同一線上にない場合、先端を羽根形状に沿って延長した仮想線によって決定される。 In the steel pipe pile of the present invention, the vertical length between the start point and the end point of the blade (hereinafter also simply referred to as “vertical direction length”) is H on the outer peripheral surface of one end portion in the axial direction of the hollow steel pipe. A spiral first blade of 0 is attached, and one or more second blades having a vertical length H x of the blade different from H 0 are formed on the outer peripheral surface above the first blade. In the present invention, when the second blade is a blade that is difficult to define by an inclination angle, it can be defined by the vertical length of such a blade. The start point and end point of the second blade are on the same line in the axial direction (vertical direction). Accordingly, when the start point and the end point of the second blade are not on the same line in the axial direction (vertical direction), the second blade is determined by an imaginary line whose tip extends along the blade shape.
第1羽根(螺旋状羽根)の鉛直方向長さH0は、5〜45cmが好ましい。第1羽根の鉛直方向長さH0が上記範囲であって、且つ小さい長さを採る場合、鋼管杭の食い込みがよく、且つ従来のSMD杭等の鋼管杭の先端羽根をそのまま利用できる点で好ましい。 The vertical length H 0 of the first blade (spiral blade) is preferably 5 to 45 cm. When the vertical length H 0 of the first blade is in the above range and takes a small length, the steel pipe pile bites well, and the tip blade of the steel pipe pile such as a conventional SMD pile can be used as it is. preferable.
本発明において、第2羽根は、第1羽根と鉛直方向長さが異なるものであれば、特に制限されず、例えば、螺旋状羽根、部分螺旋状羽根及び水平羽根が挙げられる。第2羽根は、鋼管回りの地盤を撹乱(撹拌)すると共に、複合杭においてはソイルセメントとの付着性を高める機能を奏する。第2羽根の鉛直方向長さHxは0〜45cm、好ましくは0〜30cmで且つ第1羽根と異なる値で適宜決定される。鉛直方向長さ0とは、水平羽根を言う。水平羽根の場合、螺旋状の第1羽根とは明らかに鉛直方向長さが異なり、地盤の撹乱に寄与する。 In the present invention, the second blade is not particularly limited as long as it has a different vertical length from the first blade, and examples thereof include a spiral blade, a partial spiral blade, and a horizontal blade. The second blade has a function of disturbing (stirring) the ground around the steel pipe and enhancing the adhesion to the soil cement in the composite pile. The vertical length Hx of the second blade is appropriately determined as a value different from that of the first blade in the range of 0 to 45 cm, preferably 0 to 30 cm. A vertical length of 0 refers to a horizontal blade. In the case of a horizontal blade, the length in the vertical direction is clearly different from that of the spiral first blade, which contributes to ground disturbance.
第1羽根と直上の第2羽根の鉛直方向長さは、1.5倍〜2.5倍、好ましくは1.8〜2.3倍、特に好ましくは2倍相違していることが好ましく、複数の第2羽根の場合、第2羽根間のそれぞれの鉛直方向長さは、互いに1.2倍〜1.7倍、好ましくは1.3〜1.6倍相違していることが好ましい。羽根間の鉛直方向長さの比率が小さ過ぎると撹拌効果が低下し、鉛直方向長さ比率が大き過ぎると、羽根の設置数が制限される。なお、第2羽根が2つ以上の場合、全ての第2羽根の鉛直方向長さは、第1羽根の鉛直方向長さH0と異なると共に、それぞれが異なる鉛直方向長さのものが好ましい。第2羽根が2枚の3段羽根の場合、鉛直方向長さH0:H1:H2比率は好ましくは1:1.7〜2.3:2.7〜3.3であり、特に好ましくは、1:2:3である。また、第1羽根の上方に、第2羽根とは別途の、第1羽根の鉛直方向長さH0と同一の鉛直方向長さH0を有する羽根が形成されていてもよい。 The vertical length of the first blade and the second blade directly above is preferably 1.5 times to 2.5 times, preferably 1.8 to 2.3 times, and particularly preferably twice as long, In the case of a plurality of second blades, the vertical lengths between the second blades are preferably different from each other by 1.2 times to 1.7 times, preferably 1.3 to 1.6 times. If the ratio of the lengths in the vertical direction between the blades is too small, the stirring effect is reduced, and if the length ratio in the vertical direction is too large, the number of blades installed is limited. When there are two or more second blades, it is preferable that the vertical lengths of all the second blades are different from the vertical length H 0 of the first blades, and the vertical lengths are different from each other. When the second blade is two three-stage blades, the vertical length H 0 : H 1 : H 2 ratio is preferably from 1: 1.7 to 2.3: 2.7 to 3.3, particularly Preferably, it is 1: 2: 3. Further, above the first blade, separate from the second blade, the vertical length H 0 and the blade having the same vertical length H 0 of the first blade may be formed.
本発明において、第2羽根が2つの場合の第1羽根と第2羽根の鉛直方向長さH0:H1:H2比率が1:2:3の変形例としては、鉛直方向長さH0:H1:H2比率が1:3:2、2:1:3、2:3:1、3:1:2、3:2:1のものが挙げられる。 In the present invention, as a modification example in which the vertical length H 0 : H 1 : H 2 ratio of the first blade and the second blade in the case of two second blades is 1: 2: 3, the vertical length H Examples include 0 : H 1 : H 2 ratios of 1: 3: 2, 2: 1: 3, 2: 3: 1, 3: 1: 2 and 3: 2: 1.
本発明において、第2羽根の設置個数は1以上であり、好ましくは1〜4個、特に好ましくは1〜3個である。第2羽根1個は、第1羽根を含めて2段羽根を意味し、第2羽根2個は、第1羽根を含めて3段羽根を意味し、第2羽根3個は、第1羽根を含めて4段羽根を意味する。第2羽根が0の鋼管杭は、第1羽根のみ(従来のSMD杭)であり、羽根が通過する領域を撹乱することができず、本発明の効果を奏することができない。第2羽根の設置個数は、鋼管杭長さ及び土質などにより適宜決定する。第2羽根の設置個数が増えるほど、地盤の撹乱効果が大きくなる一方で、貫入に負荷がかかる。上方羽根と直下の下方羽根との間隔は、羽根の設置個数、鋼管杭長さ及び土質などにより適宜決定されるが、概ね0〜Hy/2(Hyは当該間隔を形成する下方羽根の鉛直方向長さを言う。)、好ましくは0〜Hy/3である。上方羽根と直下の下方羽根との間隔が大き過ぎると、羽根の設置数が制限される。なお、全ての羽根は、先端から約1mの間に設置することが、施工深さとの関係で好ましい。 In the present invention, the number of installed second blades is 1 or more, preferably 1 to 4, and particularly preferably 1 to 3. One second blade means a two-stage blade including the first blade, two second blades mean a three-stage blade including the first blade, and three second blades are the first blade. Means four-stage blades. The steel pipe pile with the second blade of 0 is only the first blade (conventional SMD pile), the region through which the blade passes cannot be disturbed, and the effect of the present invention cannot be achieved. The number of second blades to be installed is appropriately determined depending on the length of the steel pipe pile and the soil quality. As the number of installed second blades increases, the ground disturbance effect increases, while the load is increased. The distance between the lower blade immediately below the upper blade, placed the number of blades is appropriately determined by such pipe pile length and soil, generally 0~H y / 2 (H y is the lower wing that forms the gap Vertical length)), preferably 0 to H y / 3. If the distance between the upper blade and the lower blade directly below is too large, the number of blades installed is limited. In addition, it is preferable to install all the blades within about 1 m from the tip in relation to the construction depth.
本発明の鋼管杭において、第1羽根及び第2羽根の羽根径は、鋼管杭の長さや土質によっても異なり、一概に決定できないものの、最大で鋼管径の3倍、最小で鋼管径+(4cm)が好ましい。すなわち、複合杭において、ソイルセメントの被覆の厚みは、少なくとも2cmとなる。この程度のソイルセメントの被覆層があれば、鋼管の腐食防止は十分である。なお、第1羽根の羽根径と第2羽根の羽根径とは同じが好ましい。 In the steel pipe pile of the present invention, the blade diameters of the first blade and the second blade vary depending on the length and soil quality of the steel pipe pile, and cannot be determined unconditionally, but at most three times the steel pipe diameter and at the minimum the steel pipe diameter + (4 cm ) Is preferred. That is, in the composite pile, the thickness of the soil cement coating is at least 2 cm. If there is a coating layer of this level of soil cement, corrosion prevention of the steel pipe is sufficient. The blade diameter of the first blade and the blade diameter of the second blade are preferably the same.
次に、本発明の第1の実施の形態における鋼管杭を図1及び図2を参照して説明する。鋼管杭10は、中空の鋼管1の軸方向における一端部の外周面11に、鋼管1の軸方向と垂直な方向に対して、傾斜角度α0で螺旋状の第1羽根2を付設し、第1羽根2の上方の外周面に、傾斜角度α0より大の傾斜角度α1を有する第2羽根3aを、第2羽根3aの上方の外周面に、傾斜角度α1より大の傾斜角度α2を有する第2羽根3bをそれぞれ所定の間隔をおいて形成したものである。
Next, the steel pipe pile in the 1st Embodiment of this invention is demonstrated with reference to FIG.1 and FIG.2. The
鋼管杭10において、第2羽根は2個に限定されず、m個(mは1以上の整数)であってもよい。この場合、第2羽根(n)の傾斜角度αn(nはmの任意の整数)は、直下の羽根(n−1)の傾斜角度αn−1より大であり、但し、mが1の場合、上方羽根の傾斜角度α1はその直下の羽根の傾斜角度α0より大と定義できる。すなわち、mが3個の場合、一番上(4段目)の羽根の傾斜角度α3はその直下の羽根(3段目)の傾斜角度α2より大であり、3段目の羽根の傾斜角度α2はその直下の羽根(2段目)の傾斜角度α1より大であり、2段目の羽根の傾斜角度α1はその直下の第1羽根(最下段)の傾斜角度α0より大である。また、図1及び図2に示すように、mが2個の場合、一番上(3段目)の羽根の傾斜角度α2はその直下の羽根(2段目)の傾斜角度α1より大であり、2段目の羽根の傾斜角度α1はその直下の第1羽根(最下段)の傾斜角度α0より大である。
In the
鋼管杭10において、上方羽根の傾斜角度は、好ましくは、その直下の羽根の傾斜角度の1.2〜2.5倍、好ましくは、1.3〜2.3である。また、上方羽根の鉛直方向長さは、好ましくは、その直下の羽根の鉛直方向長さの1.2〜2.5倍、好ましくは、1.3〜2.3である。このような傾斜角度や鉛直方向長さの異なる羽根が第1羽根を含めて、2段以上、好ましくは3段以上あれば、鋼管周りの地盤を十分撹乱できる。鋼管杭10の先端は、開口又は閉塞口のいずれであってもよい。先端が開口の場合、鋼管の内側に内羽根や内掘削刃が形成されていてもよい。鋼管杭10の先端が開口の場合、開口は貫入途中で土で閉塞され、貫入が安定する。
In the
また、鋼管杭10は、上方の羽根(n)の始点と終点間の鉛直方向長さHn(nはmの任意の整数)は、直下の羽根(n−1)の始点と終点間の鉛直方向長さHn−1より大であり、但し、mが1の場合、上方羽根の該鉛直方向長さH1はその直下の羽根の鉛直方向長さH0より大であると定義できる。すなわち、mが3個の場合、一番上(4段目)の羽根の鉛直方向長さH3はその直下の羽根(3段目)の当該長さH2より大であり、3段目の羽根の鉛直方向長さH2はその直下の羽根(2段目)の当該長さH1より大であり、2段目の羽根の鉛直方向長さH1はその直下の第1羽根(最下段)の当該長さH0より大である。また、図1及び図2に示すように、mが2個の場合、一番上(3段目)の羽根3bの始点31bと終点32b間の鉛直方向長さH2はその直下の羽根(2段目)の当該長さH1より大であり、2段目の羽根3aの始点31aと終点32a間の鉛直方向長さH1はその直下の第1羽根(最下段)の始点21と終点22間の鉛直方向当該長さH0より大である。
Further, the
なお、鋼管杭10において、第1羽根2の始点21、第2羽根3aの始点31a、第2羽根3bの31bの位置は、平面視において同一点に存在する(同一鉛直方向に存在する)が、これに限定されず、それぞれの始点は、平面視において異なった位置にあってもよい。具体的には、第2羽根3aの始点31aは、第1羽根2の始点21より70度〜126度、好ましくは70度、第2羽根3bの始点31bは、第2羽根3aの始点31aより70度〜126度、好ましくは70度離れていてもよい。これにより、撹拌不良部分が無くなり、撹拌効率が向上する。
In addition, in the
次に、鋼管杭10における羽根の地盤撹乱作用について説明する。鋼管杭10は正回転(符号X方向)しながら、地中へ貫入される。第1羽根2は螺旋羽根であり、鋼管の1回転で地中に深さH0分貫入する。第2番目の羽根(最初の第2羽根)3aが地中に入るまで、地中には第1羽根2の螺旋形状の軌道が切られ、当該軌道部分を空洞化する。次いで、第2羽根3aが地中に入り込む。第2羽根3aが通る地盤は第1羽根2が通過した地盤であるため、処女地盤ではない。このため、第1羽根2の軌道が律速となり、第2羽根3aは、それ単独羽根なら1回転でH1分進むところがH0分しか進まない。すなわち、第2羽根3aは、螺旋形状通りには回転せず、横方向にずれながら進行することになる。この際、第2羽根3aは、通過地盤を削ることになり、当該地盤を撹乱できる。第2羽根3aは、更に下方と横方向に押圧力が作用するため、下部地盤及び周辺地盤への圧密効果が発現する。次いで、第2羽根3bが地中に入り込む。第2羽根3bが通る地盤は第1羽根2及び第2羽根3aが通過した地盤であるため、撹乱された地盤である。このため、第1羽根2の軌道が律速となり、第2羽根3bは、それ単独羽根なら1回転でH2分進むところがH0分しか進まない。すなわち、第2羽根3bは、螺旋形状通りには回転せず、横方向にずれながらH0分進行することになる。この際、第2羽根3bは、通過地盤を削ることになり、当該地盤を大きく撹乱できる。第2羽根3bは、更に下方と横方向に押圧力が作用するため、下部地盤及び周辺地盤への圧密効果が発現する。
Next, the ground disturbing action of the blades in the
次に、本発明の第2の実施の形態における鋼管杭を図3を参照して説明する。図3において、図2と同一構成要素には同一符号を付して、その説明を省略し、異なる点について主に説明する。図3の鋼管杭10Aにおいて、図2の鋼管杭10と異なる点は、第1羽根及び第2羽根の傾斜角度及び羽根の鉛直方向長さである。すなわち、鋼管杭10Aは、一番上(3段目)の羽根23bの傾斜角度α2はその直下の羽根(2段目)23aの傾斜角度α1より小であり、2段目の羽根23aの傾斜角度α1はその直下の第1羽根(最下段)2aの傾斜角度α0より小である。また、一番上(3段目)の羽根23bの鉛直方向長さH2はその直下の羽根(2段目)23aの当該長さH1より小であり、2段目の羽根23aの鉛直方向長さH1はその直下の第1羽根(最下段)2aの鉛直方向当該長さH0より小である。すなわち、鋼管杭10は上方に向けて、複数羽根の傾斜角度が順次、大となっていくのに対して、鋼管杭10Aは上方に向けて、複数羽根の傾斜角度が順次、小となっていくものである。
Next, the steel pipe pile in the 2nd Embodiment of this invention is demonstrated with reference to FIG. In FIG. 3, the same components as those in FIG. 2 are denoted by the same reference numerals, description thereof is omitted, and different points will be mainly described. 3 differs from the
次に、鋼管杭10Aにおける羽根の地盤撹乱作用について説明する。鋼管杭10Aは正回転しながら、地中へ貫入される。第1羽根2aは螺旋羽根であり、鋼管の1回転で地中に深さH0分貫入する。第2番目の羽根(最初の第2羽根)23aが地中に入るまで、地中には第1羽根2aの螺旋形状の軌道が切られ、当該軌道部分を空洞化する。次いで、第2羽根23aが地中に入り込む。第2羽根23aが通る地盤は第1羽根2aが通過した地盤であるため、処女地盤ではない。このため、第1羽根2aの軌道が律速となり、第2羽根23aは、これの単独羽根なら1回転でH1分しか進まないところが、それより長いH0分進む。すなわち、第2羽根23aは、螺旋形状通りには回転せず、下方の地盤を削りながら進行することになる。次いで、第2羽根23bが地中に入り込む。第2羽根23bが通る地盤は第1羽根2a及び第2羽根23aが通過した地盤であるため、撹乱された地盤である。このため、第1羽根2aの軌道が律速となり、第2羽根23bは、これの単独羽根なら1回転でH2分しか進まないところが、それより長いH0分進む。すなわち、第2羽根23bは、螺旋形状通りには回転せず、下方の地盤を削りながらH0分進行することになる。このように、第2羽根23a、23bは、通過地盤を削ることになり、当該地盤を大きく撹乱できる。
Next, the ground disturbing action of the blades in the
次に、本発明の第3の実施の形態における鋼管杭を図4を参照して説明する。図4において、図2と同一構成要素には同一符号を付して、その説明を省略し、異なる点について主に説明する。図4の鋼管杭10Bにおいて、図2の鋼管杭10と異なる点は、第1羽根及び第2羽根の傾斜角度及び羽根の鉛直方向長さである。すなわち、鋼管杭10Bは、一番上(3段目)の羽根33bの傾斜角度α2はその直下の羽根(2段目)33aの傾斜角度α1より小であり、第1羽根(最下段)2bの傾斜角度α0より大である。また、2段目の羽根33aの傾斜角度α1はその直下の第1羽根(最下段)2bの傾斜角度α0より大である。また、一番上(3段目)の羽根33bの鉛直方向長さH2はその直下の羽根(2段目)33aの当該長さH1より小であり、第1羽根(最下段)2bの鉛直方向長さH0より大である。2段目の羽根33aの鉛直方向長さH1はその直下の第1羽根(最下段)2bの鉛直方向当該長さH0より大である。すなわち、鋼管杭10Bは上方に向けて、複数羽根の傾斜角度が小から大となり、次いで小となるものである。
Next, the steel pipe pile in the 3rd Embodiment of this invention is demonstrated with reference to FIG. 4, the same components as those in FIG. 2 are denoted by the same reference numerals, description thereof will be omitted, and different points will be mainly described. 4 differs from the
次に、鋼管杭10Bにおける羽根の地盤撹乱作用について説明する。鋼管杭10Bは正回転しながら、地中へ貫入される。第1羽根2bは螺旋羽根であり、鋼管の1回転で地中に深さH0分貫入する。第2番目の羽根(最初の第2羽根)33aが地中に入るまで、地中には第1羽根2bの螺旋形状の軌道が切られ、当該軌道部分を空洞化する。次いで、第2羽根33aが地中に入り込む。第2羽根33aが通る地盤は第1羽根2bが通過した地盤であるため、処女地盤ではない。このため、第1羽根2bの軌道が律速となり、第2羽根33aは、これの単独羽根なら1回転でH1分進むところが、それより短いH0分しか進まない。すなわち、第2羽根33aは、螺旋形状通りには回転せず、横方向の地盤を削りながら進行することになる。次いで、第2羽根33bが地中に入り込む。第2羽根33bが通る地盤は第1羽根2b及び第2羽根33aが通過した地盤であるため、撹乱された地盤である。このため、第1羽根2bの軌道が律速となり、第2羽根33bは、これの単独羽根なら1回転でH2分進むところが、それより短いH0分しか進まない。すなわち、第2羽根33bは、螺旋形状通りには回転せず、横方向の地盤を削りながらH0分しか進まない。このように、第2羽根33a、33bは、通過地盤を削ることになり、当該地盤を大きく撹乱できる。
Next, the ground disturbing action of the blades in the
本発明の鋼管杭は、上記実施の形態例に限定されず、鋼管杭10のように、上方に行くにつれて、傾斜角度が漸次、大となる形態や、鋼管杭10Aのように、その逆の、傾斜角度が漸次、小となる形態のように、規則性はなくてよく、傾斜角度の異なる羽根が交互またはランダムに形成されるものでもよい。また、第2羽根が複数の場合、隣接する羽根間の距離(ピッチ)は、全ての羽根間で同じであっても、異なるものでもよい。
The steel pipe pile of the present invention is not limited to the above-described embodiment, and as the
(複合杭の製造方法の説明)
本発明の複合杭の製造方法は、前記鋼管杭を地中に正回転で貫入させながら、固化材を該鋼管杭の鋼管周りに供給する工程(I工程)を有する。固化材の鋼管杭周りの供給方法は、固化材貯留槽からの重力流下によるものが好ましい。固化材としては、粉末状固化材またはセメントミルクが挙げられる。
(Description of composite pile manufacturing method)
The manufacturing method of the composite pile of this invention has the process (I process) which supplies a solidification material to the surroundings of the steel pipe of this steel pipe pile, penetrating the said steel pipe pile in the ground by normal rotation. The method of supplying the solidified material around the steel pipe pile is preferably based on gravity flow from the solidified material storage tank. Examples of the solidifying material include powdery solidifying material or cement milk.
次いで、本発明の複合杭の製造方法の一例を図8〜図10を参照して説明する。図10中、符号71は軟弱地盤、符号72は硬質地盤(支持地盤)である。鋼管杭10を貫入するに先立ち、貫入箇所を含んで上下が貫通した円筒缶(固化材貯留槽)4を地表面に設置する。円筒缶4は地表面に単に置くだけでよい。その円筒缶4内に鋼管杭10を立て(図8)、設計量の固化材5を円筒缶4内に投入する。本例では、固化材5はセメントミルクである。次いで、杭頭部に回転トルクを与えて、鋼管杭10を地盤7中に正回転で貫入させる。鋼管杭10における羽根の地盤撹乱作用は、前記の通りであり、鋼管杭10の貫入と共に、第2羽根は周辺地盤を圧密しながら、鋼管11回りで且つ羽根径内の地盤を撹乱し、当該地盤中に空隙を形成していくことになる。撹乱中の地盤中には、円筒缶4内のセメントミルク5が重力流下する。すなわち、セメントミルク5は、鋼管杭10の貫入と共に、鋼管11周りの地盤中に充填される(I工程)。セメントミルク5は、鋼管杭10の貫入と同期して充填されるため、撹乱された土砂と十分に混合される(図9)。
Then, an example of the manufacturing method of the composite pile of this invention is demonstrated with reference to FIGS. In FIG. 10, the code |
I工程を実施する途中に、地盤の撹乱を更に加速するために、羽根の軌道を修正する貫入始点変更工程(II工程)を実施してもよい。II工程は、次のように実施される。すなわち、I工程を実施する途中において、鋼管杭10の貫入を停止する。鋼管杭10を停止させたままの状態で、所定の長さ分上方に引き上げ、その後、鋼管杭10を回転させながら、再貫入を行う。引き上げる長さは、第1羽根2の鉛直方向長さH0以下の適宜の長さが好ましい。特に好ましくは、1/3H0〜1/5H0である。停止した鋼管杭10を所定の長さを引き上げることで、第1羽根2の貫入の始点が変更される。すなわち、再貫入においては、最初の螺旋軌道とは異なる螺旋軌道をとることになり、地盤の撹乱が促進される。引き上げ長さがH0と同じでは、再貫入において、最初の螺旋軌道と同じ螺旋軌道となってしまい、地盤の撹乱の促進とはならない。また、鋼管杭10を所定長さ引き上げる際、第1羽根2と第2羽根3a、3bで更に地盤を撹乱すると共に、地盤とセメントミルクを混合できる。II工程は、I工程の途中、1回以上、好ましくは2回〜5回程度行うことができる。
In order to further accelerate the disturbance of the ground during the process I, an intrusion start point changing process (process II) for correcting the blade trajectory may be performed. Step II is performed as follows. That is, penetration of the
I工程を実施する途中に、地盤の撹乱を強制的に行うために、鋼管杭10の上下運動工程(III工程)を実施してもよい。III工程は、I工程を実施する途中において、鋼管杭10の貫入を停止し、鋼管杭10を停止させたままの状態で、大きなストロークで鋼管杭10を上下運動させるものである。引き上げるストロークは、鋼管杭10の先端から最上の第2羽根までの長さが好ましい。鋼管杭10を上下運動させて地盤を撹拌することで、当該撹拌地盤へのセメントミルクの流下が容易となる。鋼管杭10の再貫入は、いずれの地点から実施してもよい。III工程は、I工程の途中、1回以上、好ましくは2回〜5回程度行うことができる。
In order to forcibly disturb the ground during the process I, the vertical movement process (III process) of the
本発明の製造方法において、第1羽根2は、硬質地盤層72に根入れしてもよい。硬質地盤層72に貫入する根入れ部9を設けることで、鋼管杭10の先端支持力が向上する。なお、根入れ部9には固化材5が浸透するものの、根入れ部9には、固化材5が浸透していなくてもよい。また、鋼管杭10の根入れ工程は、任意の工程であり、省略してもよい。鋼管杭10の設計長さまでの貫入と、セメントミルク5の供給が終了することで、I工程は終了する。なお、セメントミルク5が十分に供給されているか否かは、鋼管杭10の貫入途中において、円筒缶4内のセメントミルク5の減り具合を観察することで判断できる。セメントミルク5の供給が不十分の場合、I工程の途中で、II工程又はIII工程を実施すればよい。鋼管杭10の貫入が完了し、鋼管11の回りに未硬化のソイルセメントが形成され、未硬化ソイルセメントが硬化して鋼管ソイルセメント複合杭20となる(図10)。なお、円筒缶4は地表面に置かれているだけであり、容易に撤去できる。本発明の複合杭20の製造方法によれば、鋼管11周りに地表から固化材を重力流下しつつ、鋼管杭10を回転させるという簡易な方法により、中心に鋼管11を正しく配置することができる。
In the manufacturing method of the present invention, the
(複合杭の説明)
本発明の複合杭は、鋼管杭と、該鋼管杭の鋼管の外周面周りに形成されるソイルセメントからなる。ソイルセメントは、鋼管周りの原地盤土と固化材の混合物が硬化したものである。また、図10に示すように、ソイルセメント6中には、鋼管杭10の第1羽根2及び第2羽根3a、3bが埋まっており、鋼管杭10とソイルセメント6の密着性を高めている。また、複合杭は、図10に示すような硬質地盤層72に根入れ部9を有するものの他、先端が硬質地盤層72に未到達で根入れ部9を有さないものであってもよい。硬質地盤層72に根入れ部9を有する複合杭20は、摩擦杭のみならず、支持杭として機能する。
(Description of composite pile)
The composite pile of this invention consists of a steel pipe pile and the soil cement formed around the outer peripheral surface of the steel pipe of this steel pipe pile. Soil cement is a hardened mixture of ground soil and solidified material around steel pipes. Moreover, as shown in FIG. 10, the 1st blade |
複合杭20の杭径は、第1羽根及び第2羽根の羽根径と概ね同じであり、具体的には、最大で鋼管径の3倍、最小で鋼管径+(4cm)が好ましい。ソイルセメント6の被覆の厚みが、2cmもあれば、鋼管の腐食防止は十分であると共に、支持機能があるため、複合杭20の杭径としては、十分である。また、複合杭20は、その周辺地盤が圧密されており、摩擦杭として高い支持力を有する。
The pile diameter of the
本発明の鋼管杭は、これまでにない斬新な構造であるにも拘わらず、従来のSMD杭に新たに第2羽根を溶接するだけで製作できるため、コストを抑制できる。複合杭は、鋼管杭を貫入しつつ、その鋼管周りに固化材を重力流下で供給すればよく、固化材供給手段はドラムの半切りもので足りる。このため、極めて簡易な方法により、中心に鋼管が正しく配置された複合杭を安価で製造できる。また、鋼管周りにアルカリ性のセメントが被覆されており、鋼管の防食効果が高い。また、支持杭として機能する複合杭は、長期間に亘り安定した支持力を提供できる。 The steel pipe pile according to the present invention can be manufactured by simply welding the second blade to the conventional SMD pile, although it has an unprecedented structure. The composite pile only needs to supply the solidified material around the steel pipe under gravity flow while penetrating the steel pipe pile, and the solidified material supply means may be a half-cut drum. For this reason, the composite pile in which the steel pipe is correctly arranged at the center can be manufactured at a low cost by an extremely simple method. Moreover, the alkaline cement is coat | covered around the steel pipe, and the anticorrosion effect of a steel pipe is high. Moreover, the composite pile which functions as a support pile can provide the stable support force over a long period of time.
1 鋼管
2、2a、2b 第1羽根
3a、3b、23a、23b、33a、33b 第2羽根
4 円筒缶(固化材貯留槽)
5 固化材(セメントミルク)
6 ソイルセメント
7 地盤
9 根入れ部
10、10A、10B 鋼管杭
20 複合杭
DESCRIPTION OF SYMBOLS 1
5 Solidifying material (cemented milk)
6
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2012106429A JP5414838B2 (en) | 2012-05-08 | 2012-05-08 | Steel pipe pile, composite pile and composite pile manufacturing method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2012106429A JP5414838B2 (en) | 2012-05-08 | 2012-05-08 | Steel pipe pile, composite pile and composite pile manufacturing method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2013234463A JP2013234463A (en) | 2013-11-21 |
| JP5414838B2 true JP5414838B2 (en) | 2014-02-12 |
Family
ID=49760786
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2012106429A Expired - Fee Related JP5414838B2 (en) | 2012-05-08 | 2012-05-08 | Steel pipe pile, composite pile and composite pile manufacturing method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP5414838B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109518682B (en) * | 2018-12-21 | 2023-09-22 | 西南交通大学 | Spiral steel pile with logarithmic spiral vane structure |
| JP6989880B1 (en) | 2020-12-25 | 2022-01-12 | ジェコス株式会社 | Temporary gantry using rotary piles for gantry piles |
| JP7376854B2 (en) * | 2021-05-18 | 2023-11-09 | Jfeスチール株式会社 | Screw-in steel pipe pile, its design method, and construction method |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPS6225612A (en) * | 1985-07-26 | 1987-02-03 | Eijiro Kurahashi | Pile |
| JPH0694658B2 (en) * | 1988-10-25 | 1994-11-24 | 有限会社福栄重機 | How to bury a spiral pile |
| JP3356905B2 (en) * | 1995-04-17 | 2002-12-16 | 住友金属工業株式会社 | Steel pipe pile with spiral wings |
| JP4626916B2 (en) * | 2000-03-03 | 2011-02-09 | 旭化成建材株式会社 | Construction method of soil cement composite pile |
| JP2004011204A (en) * | 2002-06-05 | 2004-01-15 | Asahi Kasei Corp | Steel pipe pile |
| JP2005240508A (en) * | 2004-02-27 | 2005-09-08 | Kanematsu Nnk Corp | Rotatively driven pile and widening member for rotatively driven pile |
-
2012
- 2012-05-08 JP JP2012106429A patent/JP5414838B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2013234463A (en) | 2013-11-21 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP5932124B1 (en) | Steel pipe pile construction method | |
| JP3133466U (en) | Drilling head of ground improvement column construction equipment | |
| JP5414838B2 (en) | Steel pipe pile, composite pile and composite pile manufacturing method | |
| JP7094423B2 (en) | Underground wall pile structure with expanded bottom | |
| JP6004565B2 (en) | Banded blade member for steel pipe pile, steel pipe pile, composite pile, and composite pile manufacturing method | |
| KR101424736B1 (en) | Pile molding apparatus | |
| JP2007032044A (en) | Support structure for foundation pile and steel pipe pile | |
| JP5281213B1 (en) | Core material and soil cement continuous wall method using the same | |
| JP5963301B2 (en) | Assembled blade member for steel pipe pile, steel pipe pile, composite pile and method for manufacturing composite pile | |
| CN214787402U (en) | A combined vertical miniature steel flower tube pile structure | |
| JP4099199B2 (en) | Open-ended type ready-made pile and excavation head used therefor | |
| CN213805342U (en) | Stirring drill bit with guiding and anti-locking drilling functions | |
| JP4837849B2 (en) | Construction method of soil cement composite pile | |
| JP2009191453A (en) | Synthetic friction pile | |
| JP5247289B2 (en) | Rotating embedding method of bladed pile | |
| JP4741414B2 (en) | Construction method and construction equipment for ground improved composite pile structure | |
| JP5894421B2 (en) | Composite pile and composite pile construction method | |
| JP2021021235A (en) | Foundation pile and foundation pile driving method | |
| CN103939020A (en) | Anti-winding deep mixing pile drill bit | |
| JP3748024B2 (en) | Method for reducing soil discharge of synthetic steel pipe piles | |
| JP4566400B2 (en) | Construction method of soil cement synthetic pile and soil cement synthetic pile | |
| CN101761348A (en) | Multi-directional anchor pile one-step formed drilling tool | |
| CN113802602A (en) | Embedded anchoring-buttress combined retaining wall structure and construction method | |
| CN113605924A (en) | Combined vertical miniature steel flower pipe pile structure and construction method | |
| JP5777424B2 (en) | Ground excavation method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| TRDD | Decision of grant or rejection written | ||
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20131112 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 5414838 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| LAPS | Cancellation because of no payment of annual fees |