Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5418109B2 - Boiler group control method, program, controller, and boiler system - Google Patents
[go: Go Back, main page]

JP5418109B2 - Boiler group control method, program, controller, and boiler system - Google Patents

Boiler group control method, program, controller, and boiler system Download PDF

Info

Publication number
JP5418109B2
JP5418109B2 JP2009218940A JP2009218940A JP5418109B2 JP 5418109 B2 JP5418109 B2 JP 5418109B2 JP 2009218940 A JP2009218940 A JP 2009218940A JP 2009218940 A JP2009218940 A JP 2009218940A JP 5418109 B2 JP5418109 B2 JP 5418109B2
Authority
JP
Japan
Prior art keywords
combustion
boiler
evaporation amount
state
combustion position
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2009218940A
Other languages
Japanese (ja)
Other versions
JP2011069514A (en
Inventor
浩二 三浦
秀朗 安藤
克幸 越智
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Miura Co Ltd
Original Assignee
Miura Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Miura Co Ltd filed Critical Miura Co Ltd
Priority to JP2009218940A priority Critical patent/JP5418109B2/en
Publication of JP2011069514A publication Critical patent/JP2011069514A/en
Application granted granted Critical
Publication of JP5418109B2 publication Critical patent/JP5418109B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Steam Boilers And Waste-Gas Boilers (AREA)

Description

この発明は、複数のボイラからなるボイラ群の制御方法、プログラム、制御器及びボイラシステムに関する。   The present invention relates to a control method, a program, a controller, and a boiler system for a boiler group composed of a plurality of boilers.

従来、複数の段階的な燃焼位置を有するボイラを備えたボイラ群を制御する場合に、各ボイラに優先順位を設定し、要求負荷に応じて、各ボイラを優先順位に従って制御する技術が開示されている(例えば、特許文献1参照。)。   Conventionally, when controlling a boiler group including boilers having a plurality of staged combustion positions, a technique is disclosed in which priority is set for each boiler and each boiler is controlled according to the priority according to a required load. (For example, refer to Patent Document 1).

文献1に記載されるようなボイラ群の制御において、ボイラの燃焼台数を増減する際に、例えば、三位置ボイラでは、燃焼量を増加させる場合には高燃焼位置のボイラを増加することで燃焼台数を減らして高効率とし、燃焼量を減少させる場合には低燃焼位置のボイラを多く確保することで応答性を向上することが一般的に行なわれている。   In the control of the boiler group as described in Document 1, when increasing or decreasing the number of combustion of boilers, for example, in a three-position boiler, when increasing the combustion amount, combustion is performed by increasing the number of boilers at a high combustion position. When reducing the number of units to achieve high efficiency and reducing the amount of combustion, it is common practice to improve the responsiveness by securing a large number of boilers at low combustion positions.

特開2002−81604号公報JP 2002-81604 A

しかしながら、ボイラ群を構成するボイラの応答性は、個々のボイラや燃焼位置によって一様ではなく、燃焼させるボイラ及びその燃焼位置を優先順位等で一律に選択することは、要求負荷に対する応答性を低下させる場合がある。   However, the responsiveness of the boilers constituting the boiler group is not uniform depending on the individual boilers and combustion positions. Selecting the boilers to be burned and their combustion positions uniformly according to the priority order, etc. May decrease.

例えば、図6に示すように、ボイラ群を構成するNo1ボイラ、No2ボイラ、No3ボイラが第2燃焼位置(最高燃焼位置)で燃焼し、No4ボイラが燃焼停止位置、No5ボイラが連続パイロット燃焼状態(P)であり、各ボイラNo1、・・・、5が、各ボイラNo1、・・・、5を表す枠の上に記載した< >内の順番で優先順位が設定されている場合、蒸発量を増加する場合にはNo4を第1燃焼位置に移行し、蒸発量を減少する場合にはNo3が第1燃焼位置に戻ることになる。   For example, as shown in FIG. 6, the No. 1 boiler, No. 2 boiler, and No. 3 boiler constituting the boiler group burn at the second combustion position (maximum combustion position), the No. 4 boiler is the combustion stop position, and the No. 5 boiler is the continuous pilot combustion state. (P), and when each boiler No 1,..., 5 is prioritized in the order in <> described on the frame representing each boiler No 1,. When the amount is increased, No4 is shifted to the first combustion position, and when the amount of evaporation is decreased, No3 is returned to the first combustion position.

このよう場合に、例えば、No1、No2ボイラの第2燃焼位置から第1燃焼位置への移行時間が各8秒、No3ボイラの第2燃焼位置から第1燃焼位置への移行時間が15秒、No4の燃焼停止位置から第1燃焼位置への移行時間が190秒、No5の連続パイロット燃焼状態(P)から第1燃焼位置への移行時間が6秒である場合、蒸発量を増加する場合にはNo4ボイラが上位の燃焼位置に移行し、蒸発量を減少する場合にはNo3ボイラが下位の燃焼位置に移行することとなり、優先順位に基づく移行が応答性の点で不利な場合がある。   In this case, for example, the transition time from the second combustion position of the No1, No2 boiler to the first combustion position is 8 seconds each, the transition time from the second combustion position of the No3 boiler to the first combustion position is 15 seconds, When the transition time from the combustion stop position of No. 4 to the first combustion position is 190 seconds, the transition time from the continuous pilot combustion state (P) of No. 5 to the first combustion position is 6 seconds, and when the evaporation amount is increased When the No. 4 boiler moves to the upper combustion position and the evaporation amount decreases, the No. 3 boiler moves to the lower combustion position, and the transition based on the priority may be disadvantageous in terms of responsiveness.

本発明は、このような事情を考慮してなされたもので、複数の段階的な燃焼位置を有するボイラを備えたボイラ群において、応答性を効率的に向上することが可能なボイラ群の制御方法、プログラム、制御器及びボイラシステムを提供することを目的とする。   The present invention has been made in consideration of such circumstances, and control of a boiler group capable of efficiently improving responsiveness in a boiler group having boilers having a plurality of stepwise combustion positions. It is an object to provide a method, a program, a controller, and a boiler system.

上記課題を解決するために、この発明は以下の手段を提案している。
請求項1に記載の発明は、複数の段階的な燃焼位置を有するボイラを備えたボイラ群を制御するプログラムであって、前記ボイラにおいて他の燃焼位置又は燃焼停止位置に移行する場合に、前記他の燃焼位置又は燃焼停止位置に移行する際の移行時間が最短時間となるように、次に移行する前記他の燃焼位置又は燃焼停止位置を選択し、前記ボイラのうち給蒸移行過程にあるボイラについては、最下位燃焼位置で給蒸するまでの時間を前記移行時間として、次に移行する前記他の燃焼位置又は燃焼停止位置を選択するように構成されていることを特徴とする。
In order to solve the above problems, the present invention proposes the following means.
The invention according to claim 1 is a program for controlling a boiler group including a boiler having a plurality of stepwise combustion positions, and when the boiler moves to another combustion position or a combustion stop position, The other combustion position or the combustion stop position to be transferred next is selected so that the transition time at the time of shifting to another combustion position or the combustion stop position becomes the shortest time, and it is in the steaming transition process of the boiler The boiler is configured to select the other combustion position or the combustion stop position to be transferred next, using the time until steaming at the lowest combustion position as the transition time .

請求項5に記載の発明は、複数の段階的な燃焼位置を有するボイラを備えたボイラ群の制御方法であって、前記ボイラにおいて他の燃焼位置又は燃焼停止位置に移行する場合に、前記他の燃焼位置又は燃焼停止位置に移行する際の移行時間が最短時間となるように、次に移行する前記他の燃焼位置又は燃焼停止位置を選択し、前記ボイラのうち給蒸移行過程にあるボイラについては、最下位燃焼位置で給蒸するまでの時間を前記移行時間として、次に移行する前記他の燃焼位置又は燃焼停止位置を選択することを特徴とする。 The invention according to claim 5 is a control method of a boiler group including a boiler having a plurality of stepwise combustion positions, and when the boiler moves to another combustion position or a combustion stop position, the other The other combustion position or the combustion stop position to be transferred next is selected so that the transition time at the time of shifting to the combustion position or the combustion stop position becomes the shortest time, and the boiler in the steaming transition process among the boilers Is characterized in that the time until steaming at the lowest combustion position is set as the transition time, and the other combustion position or the combustion stop position to be transferred next is selected .

請求項3に記載の発明は、制御器であって、請求項1又は請求項2に記載のプログラムを備えることを特徴とする。 The invention described in claim 3 is a controller, and includes the program described in claim 1 or claim 2 .

請求項4に記載の発明は、ボイラシステムであって、請求項3に記載の制御器を備えることを特徴とする。 A fourth aspect of the present invention is a boiler system, and includes the controller according to the third aspect.

この発明に係るプログラム、制御器、ボイラシステム、ボイラ群の制御方法によれば、ボイラ群において、いずれかのボイラを他の燃焼位置又は燃焼停止位置に移行する際に、移行時間を最短時間とするように他の燃焼位置又は燃焼停止位置を選択するので、ボイラ群の応答性を効率的に向上することができる。
また、いずれかのボイラを他の燃焼位置又は燃焼停止位置に移行する際に、給蒸移行過程にあるボイラについては、他の燃焼位置又は燃焼停止位置に移行する信号が出力されてから最下位燃焼位置で給蒸するまでの時間を移行時間として選択するので、移行時間が最短時間となる他の燃焼位置又は燃焼停止位置を効率的に選択することができる。
According to the program, the controller, the boiler system, and the boiler group control method according to the present invention, when any boiler is shifted to another combustion position or combustion stop position in the boiler group, the transition time is set to the shortest time. Since the other combustion position or the combustion stop position is selected as described above, the responsiveness of the boiler group can be improved efficiently.
In addition, when any boiler is moved to another combustion position or combustion stop position, for the boiler in the steaming transition process, the lowest position is output after a signal to move to another combustion position or combustion stop position is output. Since the time until steaming at the combustion position is selected as the transition time, it is possible to efficiently select another combustion position or combustion stop position at which the transition time is the shortest time.

この明細書において、移行時間とは、他の燃焼位置又は燃焼停止位置への移行を指示する信号が出力されてから、指示された他の燃焼位置又は燃焼停止位置に移行して所定の蒸発量となるまでの時間をいう。   In this specification, the transition time refers to a predetermined evaporation amount after a signal instructing transition to another combustion position or combustion stop position is output and then the transition to the other combustion position or combustion stop position instructed. Time to become.

この明細書において、給蒸移行過程とは、燃焼停止位置において、例えば、パージ(微風パージを含む)、パイロット燃焼(連続パイロット燃焼を含む)状態にあるボイラが燃焼開始してから第1燃焼位置における給蒸するまでの過程、低燃焼に対応するバーナが燃焼開始してから第1燃焼位置における給蒸するまでの過程、燃焼を解除されたボイラが燃焼停止位置となり水温が常温に低下するまでの過程を指しており、以下の第1状態から第5状態に分類され、第1状態から第5状態の順に短時間で給蒸可能とされている。
第1状態:低燃焼位置にあり、給蒸していないが圧力を保持している状態
第2状態:低燃焼を解除後、パージ又はパイロット燃焼状態となり、給蒸していないが圧力を保持している状態
第3状態:低燃焼を解除して待機状態となり、給蒸していないが圧力を保持している状態
第4状態:燃焼停止位置から低燃焼位置に移行して水を加熱しているが圧力を保持していない状態(無圧状態)
第5状態:パージ又はパイロット燃焼状態であるが圧力を保持していない状態(無圧状態)
なお、第5状態には、第2状態から圧力低下して無圧状態となった場合と、燃焼停止位置においてパージ又はパイロット燃焼状態となり、無圧状態である場合を含む。
給蒸移行過程のうち、圧力保持状態にある第1状態、第2状態、第3状態から第1燃焼位置への移行は、移行時間を短くするうえで好適である。
なお、連続パイロット燃焼状態とは、ガス焚きボイラにおいて、燃焼信号が出力されるとすぐに着火することができるように、未燃ガスが缶内に滞留させないために行なうパイロットバーナの連続燃焼状態をいう。
なお、微風パージとは、油焚きボイラにおいて、燃焼信号が出力されるとすぐに着火することができるように、未燃ガスが缶内に滞留させないために送風機回転数を減少させて微風量で送風状態を維持することをいう。
In this specification, the steaming transition process is, for example, the first combustion position at the combustion stop position after the boiler in the purge (including light wind purge) and pilot combustion (including continuous pilot combustion) starts combustion. The process from the start of combustion to the steaming in the first combustion position after the start of combustion of the burner corresponding to low combustion until the boiler whose combustion is released becomes the combustion stop position until the water temperature falls to room temperature The following 1st state is classified into the 5th state, and it can be steamed in a short time in the order from the 1st state to the 5th state.
First state: in low combustion position, not steaming but holding pressure Second state: after releasing low combustion, it becomes purge or pilot combustion state, not steaming but holding pressure State 3rd state: Low combustion is released and standby state is entered, steam is not supplied but pressure is maintained 4th state: Water is heated from the combustion stop position to the low combustion position, but pressure is increased State not holding (no pressure state)
Fifth state: purge or pilot combustion state but no pressure (no pressure state)
The fifth state includes a case where the pressure is reduced from the second state to a no-pressure state, and a case where the purge or pilot combustion state is entered at the combustion stop position and the pressure is not applied.
In the steaming transition process, the transition from the first state, the second state, and the third state in the pressure maintaining state to the first combustion position is suitable for shortening the transition time.
The continuous pilot combustion state refers to the continuous combustion state of the pilot burner that is performed in order to prevent unburned gas from staying in the can so that it can be ignited as soon as a combustion signal is output in a gas-fired boiler. Say.
Note that the light air purge is a small air flow rate by reducing the blower rotation speed so that unburned gas does not stay in the can so that it can be ignited as soon as a combustion signal is output in an oil-fired boiler. This means maintaining the air blowing state.

請求項2に記載の発明は、請求項1に記載のプログラムであって、前記ボイラ群における要求負荷と対応する蒸発量を確保するように、次に移行する前記他の燃焼位置又は燃焼停止位置を選択する構成されていることを特徴とする。 Invention of Claim 2 is a program of Claim 1 , Comprising: Said other combustion position or combustion stop position which transfers to the next so that the evaporation amount corresponding to the request | requirement load in the said boiler group may be ensured It is characterized by selecting.

請求項6に記載の発明は、請求項5に記載のボイラ群の制御方法であって、前記ボイラ群における要求負荷と対応する蒸発量を確保するように、次に移行する前記他の燃焼位置又は燃焼停止位置を選択することを特徴とする。 Invention of Claim 6 is a control method of the boiler group of Claim 5 , Comprising: Said other combustion position which transfers to the next so that the evaporation amount corresponding to the request | requirement load in the said boiler group may be ensured. Alternatively, the combustion stop position is selected.

この発明に係るプログラム、ボイラ群の制御方法によれば、ボイラを他の燃焼位置又は燃焼停止位置に移行する場合に、ボイラ群の要求負荷と対応する蒸発量を確保するので、ボイラ群の負荷追従性を効率的に向上することができる。   According to the program and the boiler group control method according to the present invention, when the boiler is moved to another combustion position or the combustion stop position, the evaporation amount corresponding to the required load of the boiler group is ensured. Followability can be improved efficiently.

この発明に係るプログラム、制御器、ボイラシステム、ボイラ群の制御方法によれば、いずれかのボイラを他の燃焼位置又は燃焼停止位置に移行する際に、移行時間を最短時間とするように他の燃焼位置又は燃焼停止位置を選択するので、ボイラ群の応答性を効率的に向上することができる。   According to the program, the controller, the boiler system, and the boiler group control method according to the present invention, when any one of the boilers is transferred to another combustion position or the combustion stop position, the transition time is set to the shortest time. Since the combustion position or the combustion stop position is selected, the response of the boiler group can be improved efficiently.

本発明の一実施形態に係るボイラシステムの概略を示す図である。It is a figure showing the outline of the boiler system concerning one embodiment of the present invention. 一実施形態に係るボイラ群を構成するボイラの概略を説明する図である。It is a figure explaining the outline of the boiler which constitutes the boiler group concerning one embodiment. 一実施形態に係るデータベースの一例を示す図である。It is a figure which shows an example of the database which concerns on one Embodiment. 一実施形態に係るプログラムの一例を説明するフロー図である。It is a flowchart explaining an example of the program which concerns on one Embodiment. 一実施形態に係るボイラシステムの動作の一例を説明する概略図である。It is the schematic explaining an example of operation | movement of the boiler system which concerns on one Embodiment. 従来技術の一例を説明する概略図である。It is the schematic explaining an example of a prior art.

以下、図1から図5を参照し、この発明の一実施形態について説明する。
図1は、本発明に係る制御器の一実施形態を示す図であり、符号1はボイラシステムを示している。
Hereinafter, an embodiment of the present invention will be described with reference to FIGS.
FIG. 1 is a diagram showing an embodiment of a controller according to the present invention, and reference numeral 1 denotes a boiler system.

ボイラシステム1は、複数のボイラから構成されるボイラ群2と、制御部(制御器)4と、スチームヘッダ6と、スチームヘッダ6に設けられた圧力センサ7とを備え、ボイラ群2で発生させた蒸気を蒸気使用設備18に供給するようになっている。
この実施形態において、ボイラ群2は、例えば、第1ボイラ21、第2ボイラ22、第3ボイラ23、第4ボイラ24、第5ボイラ25を備え、5台の蒸気ボイラから構成されている。
The boiler system 1 includes a boiler group 2 composed of a plurality of boilers, a control unit (controller) 4, a steam header 6, and a pressure sensor 7 provided in the steam header 6, and is generated in the boiler group 2. The generated steam is supplied to the steam use facility 18.
In this embodiment, the boiler group 2 includes, for example, a first boiler 21, a second boiler 22, a third boiler 23, a fourth boiler 24, and a fifth boiler 25, and includes five steam boilers.

この実施形態における要求負荷は、圧力センサ7が検出するスチームヘッダ6内の蒸気の圧力(物理量)により代用されており、この圧力に基づいて蒸気使用設備18の消費蒸気量と対応する蒸発量を算出するようになっている。   The required load in this embodiment is substituted by the pressure (physical quantity) of the steam in the steam header 6 detected by the pressure sensor 7, and the amount of evaporation corresponding to the consumed steam quantity of the steam using equipment 18 is calculated based on this pressure. It comes to calculate.

スチームヘッダ6は、第1ボイラ21、・・・、第5ボイラ25と蒸気管11により接続されるとともに、蒸気使用設備18と蒸気管12により接続されており、ボイラ群2で発生させた蒸気を集合し、各ボイラ相互間の圧力差及び圧力変動を調整して蒸気使用設備18に蒸気を供給するようになっている。   The steam header 6 is connected to the first boiler 21,..., The fifth boiler 25 and the steam pipe 11, and is connected to the steam using facility 18 and the steam pipe 12, and steam generated in the boiler group 2. The steam is supplied to the steam using equipment 18 by adjusting the pressure difference and pressure fluctuation between the boilers.

ボイラ群2を構成している各ボイラ21、・・・、25は、例えば、図2に示すように同一構成の三位置制御ボイラとされ、それぞれ燃焼停止状態(燃焼停止位置に対応)、最下位燃焼位置である低燃焼状態(第1燃焼位置に対応)、高燃焼状態(第2燃焼位置に対応)での燃焼が制御可能とされている。   Each of the boilers 21,..., 25 constituting the boiler group 2 is, for example, a three-position control boiler having the same configuration as shown in FIG. Combustion in a low combustion state (corresponding to the first combustion position) and a high combustion state (corresponding to the second combustion position), which are lower combustion positions, can be controlled.

各ボイラ21、・・・、25は、第1差分蒸発量が1000(kg/h)、第2差分蒸発量が1500(kg/h)に設定され、第2燃焼位置で燃焼した場合の蒸発量、すなわち定格蒸発量は2500(kg/h)とされている。   Each of the boilers 21,..., 25 has an evaporation when the first differential evaporation amount is set to 1000 (kg / h), the second differential evaporation amount is set to 1500 (kg / h), and combustion is performed at the second combustion position. The amount, that is, the rated evaporation amount is 2500 (kg / h).

この実施形態において、差分蒸発量とは、ボイラを一段階上位の燃焼位置に移行した場合に増加する蒸発量、すなわち、移行した後の燃焼位置の蒸発量と移行前の燃焼停止位置(又は燃焼位置)の蒸発量との差をいい、一段階上位に移行して第N燃焼位置(Nは、1以上の整数)となることで増加する蒸発量を、「第N燃焼位置の差分蒸発量」、又は「第N差分蒸発量」といい、例えば、燃焼停止位置から第1燃焼位置に移行した場合に増加する蒸発量を「第1燃焼位置の差分蒸発量」、又は「第1差分蒸発量」と、第1燃焼位置から第2燃焼位置に移行した場合に増加する蒸発量を「第2燃焼位置の差分蒸発量」、又は「第2差分蒸発量」という。   In this embodiment, the difference evaporation amount is an evaporation amount that increases when the boiler is moved to a higher combustion position, that is, an evaporation amount at the combustion position after the transition and a combustion stop position (or combustion before the transition). The difference between the amount of evaporation at the position) and the amount of evaporation that increases as a result of shifting to a higher stage and becoming the Nth combustion position (N is an integer of 1 or more) Or the “Nth differential evaporation amount”. For example, the evaporation amount that increases when the combustion shifts from the combustion stop position to the first combustion position is the “differential evaporation amount at the first combustion position” or “first differential evaporation”. The amount of evaporation and the amount of evaporation that increases when the first combustion position shifts to the second combustion position are referred to as “differential evaporation amount at the second combustion position” or “second differential evaporation amount”.

第1ボイラ21は、例えば、燃焼停止位置から第1燃焼位置への移行時間は190.0秒、第1燃焼位置から第2燃焼位置への移行時間は5.0秒、第2燃焼位置から第1燃焼位置への移行時間は4.5秒、第1燃焼位置から第2燃焼位置への移行時間は5.0秒とされている。
また、第2ボイラ22、第3ボイラ23、第4ボイラ24、第5ボイラ25は、例えば、燃焼停止位置から第1燃焼位置への移行時間は190.0秒、第1燃焼位置から第2燃焼位置への移行時間は5.0秒、第2燃焼位置から第1燃焼位置への移行時間は4.0秒、第1燃焼位置から第2燃焼位置への移行時間は5.0秒とされている。
For example, the first boiler 21 has a transition time from the combustion stop position to the first combustion position of 190.0 seconds, a transition time from the first combustion position to the second combustion position of 5.0 seconds, and from the second combustion position. The transition time to the first combustion position is 4.5 seconds, and the transition time from the first combustion position to the second combustion position is 5.0 seconds.
The second boiler 22, the third boiler 23, the fourth boiler 24, and the fifth boiler 25, for example, have a transition time from the combustion stop position to the first combustion position of 190.0 seconds and from the first combustion position to the second. The transition time to the combustion position is 5.0 seconds, the transition time from the second combustion position to the first combustion position is 4.0 seconds, and the transition time from the first combustion position to the second combustion position is 5.0 seconds. Has been.

また、各ボイラ21、・・・、25における燃焼停止位置から最下位燃焼位置である第1燃焼位置に到達して給蒸されるまでの間を給蒸移行過程といい、給蒸移行過程は、以下の第1状態から第5状態(第1状態から第5状態の間はいずれかの状態に含むものとする)に分類することができる。
(1)第1状態:低燃焼位置にあり、給蒸していないが圧力を保持している状態
(2)第2状態:低燃焼を解除後、連続パイロット燃焼状態となり、給蒸していないが圧力を保持している状態
(3)第3状態:低燃焼を解除して待機状態となり、給蒸していないが圧力を保持している状態
(4)第4状態:燃焼停止位置から低燃焼位置に移行して水を加熱しているが圧力は保持していない状態(無圧状態)
(5)第5状態:連続パイロット燃焼状態であるが圧力は保持していない状態(無圧状態)
The period from the combustion stop position in each of the boilers 21,..., 25 to the first combustion position that is the lowest combustion position and steaming is referred to as a steaming transition process. The first state can be classified into the fifth state (the state between the first state and the fifth state is included in any state).
(1) First state: in a low combustion position, not steamed but maintaining pressure (2) Second state: after releasing low combustion, it becomes a continuous pilot combustion state, not steamed but pressure (3) Third state: Canceling low combustion to enter standby state, not steaming but holding pressure (4) Fourth state: From combustion stop position to low combustion position The state where the water has been transferred and heated, but the pressure is not maintained (no pressure state)
(5) Fifth state: Continuous pilot combustion state but no pressure maintained (no pressure state)

この実施形態において、各ボイラ21、・・・、25は、給蒸移行過程の各状態に維持することが可能とされ、各状態から第1燃焼位置に移行可能とされている。
各ボイラ21、・・・、25が、給蒸移行過程の各状態から第1燃焼位置に移行して給蒸するまでの移行時間は、例えば、第1状態が6.0秒、第2状態が8.0秒、第3状態が15.0秒、第4状態が120.0秒、第5状態が180.0秒とされている。
以上のように、給蒸移行過程の圧力保持状態にある第1状態、第2状態、第3状態から第1燃焼位置への移行は、移行時間が短くなる点で好適である。なお、この実施形態においては、移行時間に基づき第1燃焼位置に移行させる給蒸移行過程の算出対象が、第1状態、第2状態に設定されている。
In this embodiment, each of the boilers 21,..., 25 can be maintained in each state of the steaming transition process, and can be shifted from each state to the first combustion position.
The transition time from when each boiler 21,..., 25 transitions from each state of the steaming transition process to the first combustion position and steams is, for example, 6.0 seconds for the first state and the second state. Is 8.0 seconds, the third state is 15.0 seconds, the fourth state is 120.0 seconds, and the fifth state is 180.0 seconds.
As described above, the transition from the first state, the second state, and the third state in the pressure holding state during the steaming transition process to the first combustion position is preferable in that the transition time is shortened. In this embodiment, the calculation target of the steaming transition process for shifting to the first combustion position based on the transition time is set to the first state and the second state.

また、各ボイラ21、・・・、25は、例えば、周知の燃焼位置制御技術により、要求負荷に応じて燃焼位置又は燃焼停止位置を移行させることが可能とされており、例えば、スチームヘッダ6の圧力が高くなった場合には蒸発量を減少させ、圧力が低くなった場合には蒸発量を増加させるようになっている。   Further, each of the boilers 21,..., 25 can be shifted to a combustion position or a combustion stop position according to a required load by, for example, a well-known combustion position control technique. When the pressure becomes higher, the evaporation amount is decreased, and when the pressure becomes lower, the evaporation amount is increased.

制御部4は、入力部41と、メモリ42と、演算部43と、ハードディスク44と、出力部46と、通信線47とを備え、入力部41、メモリ42、演算部43、ハードディスク44、出力部46は通信線47により相互にデータ等を通信可能に接続され、ハードディスク44にはデータベース45が格納されている。   The control unit 4 includes an input unit 41, a memory 42, a calculation unit 43, a hard disk 44, an output unit 46, and a communication line 47, and includes an input unit 41, a memory 42, a calculation unit 43, a hard disk 44, and an output. The units 46 are connected to each other via a communication line 47 so that data and the like can be communicated with each other, and a database 45 is stored in the hard disk 44.

入力部41は、例えば、図示しないキーボード等のデータ入力機器を有していて設定等を演算部43に出力可能とされるとともに、圧力センサ7、各ボイラ21、・・・、25と信号線13、信号線16により接続され、圧力センサ7から入力された圧力信号及び各ボイラ21、・・・、25から入力された信号(例えば、燃焼位置等の情報)を演算部43に出力するようになっている。
出力部46は、各ボイラ21、・・・、25と信号線14により接続され、演算部43から出力された制御信号を各ボイラ21、・・・、25に出力するようになっている。
The input unit 41 includes, for example, a data input device such as a keyboard (not shown) and can output settings and the like to the calculation unit 43. The pressure sensor 7, the boilers 21,... 13. Connected by the signal line 16, and outputs the pressure signal input from the pressure sensor 7 and the signals input from the boilers 21,..., 25 (for example, information such as the combustion position) to the calculation unit 43. It has become.
The output unit 46 is connected to the boilers 21,..., 25 by the signal line 14, and outputs the control signal output from the calculation unit 43 to the boilers 21,.

演算部43は、メモリ42の記憶媒体(例えば、ROM)に格納されたプログラムを読み込んで実行し、例えば、要求負荷に対応する蒸発量の算出、入力部41から入力された各ボイラの運転状態に関する情報等に基づいて、各ボイラ21、・・・、25を他の燃焼位置または燃焼停止位置に移行させる場合に、その要否の判断、要求負荷に対応する必要蒸発量を満足する総蒸発量を確保することが可能な他の燃焼位置または燃焼停止位置の選択、その結果に基づいて出力部46を介して各ボイラ21、・・・、25への信号を出力するようになっている。   The calculation unit 43 reads and executes a program stored in a storage medium (for example, ROM) of the memory 42, for example, calculates the evaporation amount corresponding to the required load, and the operating state of each boiler input from the input unit 41 When the boilers 21,..., 25 are moved to other combustion positions or combustion stop positions based on the information on the above, etc., the total evaporation that satisfies the necessary evaporation corresponding to the required load corresponding to the required load is determined. Selection of another combustion position or combustion stop position where the amount can be secured, and a signal to each boiler 21,..., 25 is output via the output unit 46 based on the result. .

データベース45は、第1のデータベース45Aと、第2のデータベース45Bと、第3のデータベース45Cとを備えている。
第1のデータベース45Aは、圧力信号(mV)と圧力(Pa)との関係を示すデータテーブルが数値データとして格納されており、演算部43は、第1のデータベース45Aを参照して、圧力センサ7からの圧力信号(mV)に基づいてスチームヘッダ6内の圧力(Pa)を算出するようになっている。
The database 45 includes a first database 45A, a second database 45B, and a third database 45C.
In the first database 45A, a data table indicating the relationship between the pressure signal (mV) and the pressure (Pa) is stored as numerical data, and the calculation unit 43 refers to the first database 45A and refers to the pressure sensor. The pressure (Pa) in the steam header 6 is calculated based on the pressure signal (mV) from 7.

また、第2のデータベース45Bは、例えば、各ボイラ21、・・・、25の第1差分蒸発量、第2差分蒸発量、定格蒸発量がデータテーブルの形式で格納されており、演算部43が、第2のデータベース45Bを参照して総蒸発量を算出することが可能とされている。また、対象のボイラが、給蒸移行過程にある場合には、第1差分蒸発量を対象に総蒸発量を算出するようになっている。   The second database 45B stores, for example, the first differential evaporation amount, the second differential evaporation amount, and the rated evaporation amount of each boiler 21,..., 25 in the form of a data table. However, the total evaporation amount can be calculated with reference to the second database 45B. Further, when the target boiler is in the steaming transition process, the total evaporation amount is calculated with respect to the first differential evaporation amount.

また、第3のデータベース45Cは、例えば、図3に示すように、各ボイラ21、・・・、25の給蒸移行過程の各状態(第1状態から第5状態)から第1燃焼位置で給蒸するまでの移行時間及び、燃焼停止位置、第1燃焼位置、第2燃焼位置相互間を移行する場合の移行時間がデータテーブルの形式で格納されている。   Further, as shown in FIG. 3, for example, the third database 45C has a first combustion position from each state (first state to fifth state) in the steaming transition process of each boiler 21,... The transition time until steaming and the transition time when transitioning between the combustion stop position, the first combustion position, and the second combustion position are stored in the form of a data table.

一実施形態に係るプログラムは、圧力センサ7が検出したスチームヘッダ6の圧力に基づいて、要求負荷に応じた必要蒸発量を算出し、ボイラ群2の総蒸発量が必要蒸発量を満足するように、次に移行する他の燃焼位置又は燃焼停止位置をリストアップし、このリストアップした燃焼位置又は燃焼停止位置のなかから、移行時間が最短時間となる燃焼位置又は燃焼停止位置を選択するようになっている。   The program according to the embodiment calculates a required evaporation amount corresponding to the required load based on the pressure of the steam header 6 detected by the pressure sensor 7 so that the total evaporation amount of the boiler group 2 satisfies the required evaporation amount. In addition, another combustion position or combustion stop position to be transferred next is listed, and a combustion position or combustion stop position at which the transition time is the shortest time is selected from the listed combustion positions or combustion stop positions. It has become.

また、必要に応じて、各ボイラ21、・・・、25を給蒸移行過程の各状態に維持し、給蒸移行過程にあるボイラを第1燃焼位置に移行する場合に、第3のデータベース45Cに格納された給蒸移行過程の各状態に対応する移行時間に基づいて算出するようになっている。   In addition, when the boilers 21,..., 25 are maintained in the respective states of the steaming transition process as required, and the boiler in the steaming transition process is shifted to the first combustion position, the third database Calculation is based on the transition time corresponding to each state of the steaming transition process stored in 45C.

プログラムは、例えば、図4に示すフロー図のような概略構成とされている。
なお、プログラムにおける、圧力センサ7の圧力信号に基づく燃焼位置又は燃焼停止位置の移行については、上述のように周知の燃焼位置制御技術によるものとし、説明を省略する。
For example, the program has a schematic configuration as shown in the flowchart of FIG.
Note that the transition of the combustion position or the combustion stop position based on the pressure signal of the pressure sensor 7 in the program is based on the well-known combustion position control technique as described above, and the description thereof is omitted.

以下、図4を参照して、プログラムの一例に係るフロー図について説明する。
(1)まず、ボイラ群2の要求負荷と対応する必要蒸発量JN、及びボイラ群2の各ボイラ21、・・・、25の蒸発量を合計した総蒸発量JRに、それぞれ初期値(=0)を設定する(S1)。
(2)ボイラ群2が運転中かどうかを判断する(S2)。
ボイラ群2が運転中の場合にはS3に移行し、運転が停止している場合にはプログラムを終了する。
(3)演算部43は、入力部41を介して取得した圧力センサ7の圧力信号に基づいて、必要蒸発量JNを算出する(S3)。
(4)演算部43は、S3において算出した必要蒸発量JNを、メモリ42に格納された必要蒸発量JNと比較して、必要蒸発量JNに所定値以上の変動があるかどうかを判断する(S4)。また、S3において算出した必要蒸発量JNをメモリ42に格納する。
必要蒸発量JNに所定以上の変動がある場合はS5に移行し、ない場合はS2に移行する。ここで、必要蒸発量JNに係る所定量は、任意に設定可能であり、例えば、100(kg/h)とされている。
(5)演算部43は、必要蒸発量JNの変動が、増加かどうかを判断する(S5)。
必要蒸発量JNの変動が、増加である場合はS6に移行し、増加ではなく減少である場合はS12に移行する。
(6)演算部43は、必要蒸発量JNとボイラ群2の総蒸発量JRとを比較する(S6)。
必要蒸発量JN>総蒸発量JRである場合はS7に移行し、必要蒸発量JN≦総蒸発量JRである場合はS2に移行する。
(7)演算部43は、各ボイラ21、・・・、25を上位の燃焼位置に移行した場合に、ボイラ群2が、必要蒸発量JN≦総蒸発量JRを満足する移行可能な上位の燃焼位置(又は燃焼位置の組合せ)をリストアップする(S7)。
(8)S7において、移行可能な上位の燃焼位置(又は燃焼位置の組合せ)が存在するかどうかを判断する(S8)。
移行可能な上位の燃焼位置(又は燃焼位置の組合せ)が存在する場合はS9に移行し、存在しない場合はS2に移行する。
(9)演算部43は、第3のデータベース45Cを参照して、S7においてリストアップした燃焼位置(又は燃焼位置の組合せ)のなかから、移行時間が最短時間であるものを選択する(S9)。
(10)演算部43は、選択した燃焼位置(又は燃焼位置の組合せ)に移行するための信号を出力する(S10)。
(11)演算部43は、選択した燃焼位置(又は燃焼位置の組合せ)に移行した場合の総蒸発量JRを算出して、メモリ42に格納する(S11)。
S11を実行したら、S2に移行する。
(12)演算部43は、必要蒸発量JN≦総蒸発量JRを満足しつつ、燃焼を解除して下位に移行させることが可能な燃焼位置の有無を判断する(S12)。
必要蒸発量JN≦総蒸発量JRを満足しつつ、燃焼を解除して下位に移行させることが可能な燃焼位置がある場合にはS13に移行し、存在しない場合はS2に移行する。
(13)演算部43は、各ボイラ21、・・・、25を下位に移行させることが可能な燃焼位置(又は燃焼位置の組合せ)をリストアップする(S13)。
(14)演算部43は、S13においてリストアップした下位に移行可能な燃焼位置(又は燃焼位置の組合せ)のなかから、移行時間が最短時間のものを選択する(S14)。
(15)演算部43は、選択した燃焼位置(又は燃焼位置の組合せ)に移行するための信号を出力する(S15)。
(16)演算部43は、選択した燃焼位置(又は燃焼位置の組合せ)に移行した場合の総蒸発量JRを算出して、メモリ42に格納する(S16)。
S16を実行したら、S2に移行する。
上記(2)から(16)を繰り返して実行する。
Hereinafter, with reference to FIG. 4, a flowchart according to an example of the program will be described.
(1) First, the initial evaporation value (=) is set to the total evaporation amount JR obtained by adding up the required evaporation amount JN corresponding to the required load of the boiler group 2 and the evaporation amounts of the boilers 21,. 0) is set (S1).
(2) It is determined whether the boiler group 2 is in operation (S2).
When the boiler group 2 is operating, the process proceeds to S3, and when the operation is stopped, the program is terminated.
(3) The computing unit 43 calculates the required evaporation amount JN based on the pressure signal of the pressure sensor 7 acquired via the input unit 41 (S3).
(4) The computing unit 43 compares the required evaporation amount JN calculated in S3 with the required evaporation amount JN stored in the memory 42, and determines whether or not the required evaporation amount JN has a variation of a predetermined value or more. (S4). Further, the required evaporation amount JN calculated in S3 is stored in the memory 42.
If the required evaporation amount JN varies more than a predetermined amount, the process proceeds to S5, and if not, the process proceeds to S2. Here, the predetermined amount related to the required evaporation amount JN can be arbitrarily set, and is set to 100 (kg / h), for example.
(5) The computing unit 43 determines whether or not the change in the required evaporation amount JN is an increase (S5).
If the change in the required evaporation amount JN is an increase, the process proceeds to S6, and if it is not an increase but a decrease, the process proceeds to S12.
(6) The computing unit 43 compares the required evaporation amount JN with the total evaporation amount JR of the boiler group 2 (S6).
When the required evaporation amount JN> the total evaporation amount JR, the process proceeds to S7, and when the required evaporation amount JN ≦ the total evaporation amount JR, the process proceeds to S2.
(7) When each of the boilers 21,..., 25 shifts to a higher combustion position, the calculation unit 43 has a higher transitionable upper level that satisfies the required evaporation amount JN ≦ total evaporation amount JR. List combustion positions (or combinations of combustion positions) (S7).
(8) In S7, it is determined whether there is an upper combustion position (or combination of combustion positions) that can be transferred (S8).
If there is a higher combustion position (or combination of combustion positions) that can be transferred, the process proceeds to S9, and if not, the process proceeds to S2.
(9) The computing unit 43 refers to the third database 45C, and selects the combustion position (or combination of combustion positions) listed in S7 that has the shortest transition time (S9). .
(10) The computing unit 43 outputs a signal for shifting to the selected combustion position (or combination of combustion positions) (S10).
(11) The computing unit 43 calculates the total evaporation amount JR when the combustion position (or combination of combustion positions) is selected and stores it in the memory 42 (S11).
If S11 is performed, it will transfer to S2.
(12) The computing unit 43 determines whether or not there is a combustion position that can cancel the combustion and shift to the lower level while satisfying the required evaporation amount JN ≦ total evaporation amount JR (S12).
If there is a combustion position where the required evaporation amount JN ≦ total evaporation amount JR can be satisfied and combustion can be canceled and shifted to a lower position, the process proceeds to S13, and if not, the process proceeds to S2.
(13) The computing unit 43 lists combustion positions (or combinations of combustion positions) at which the boilers 21,..., 25 can be shifted to the lower order (S13).
(14) The computing unit 43 selects the combustion position (or combination of combustion positions) that can be shifted to the lower order listed in S13 and that has the shortest transition time (S14).
(15) The computing unit 43 outputs a signal for shifting to the selected combustion position (or combination of combustion positions) (S15).
(16) The computing unit 43 calculates the total evaporation amount JR when the combustion position (or combination of combustion positions) is selected and stores it in the memory 42 (S16).
If S16 is performed, it will transfer to S2.
The above (2) to (16) are repeatedly executed.

次に、図5を参照して、ボイラシステム1の作用について説明する。
図5は、プログラムを用いてボイラ群2を制御する場合の各ボイラ21、・・・、25の状態を示す概略図であり、四角枠は各ボイラ21、・・・、25の第1燃焼位置、第2燃焼位置の燃焼状態を、左側に示した数値1000、1500は第1差分蒸発量及び第2差分蒸発量を示している。
また、図5において網かけを施した部分は給蒸中の燃焼位置を、「P1」を記した部分は給蒸移行過程の第1状態にある燃焼位置を、「P2」を記した部分は給蒸移行過程の第2状態にある燃焼位置を示している。
Next, the operation of the boiler system 1 will be described with reference to FIG.
FIG. 5 is a schematic diagram showing the states of the boilers 21,..., 25 when the boiler group 2 is controlled using a program, and a square frame indicates the first combustion of the boilers 21,. Numerical values 1000 and 1500 indicating the combustion state at the position and the second combustion position on the left side indicate the first differential evaporation amount and the second differential evaporation amount.
In FIG. 5, the shaded portion indicates the combustion position during steaming, the portion marked “P1” indicates the combustion position in the first state of the steaming transition process, and the portion marked “P2” The combustion position in the 2nd state of the steaming transfer process is shown.

また、便宜のため、図5(A)に示すように、第1ボイラ21、第2ボイラ22が第2燃焼位置で給蒸し、第3ボイラ23が給蒸移行過程の第2状態に、第4ボイラ24が給蒸移行過程の第1状態にある場合を例に説明する。   For convenience, as shown in FIG. 5A, the first boiler 21 and the second boiler 22 are steamed at the second combustion position, and the third boiler 23 is in the second state of the steaming transition process. A case where the four boilers 24 are in the first state of the steaming transition process will be described as an example.

(1)まず、図5(A)は、上述のように、第1ボイラ21及び第2ボイラ22が第2燃焼位置で給蒸し、第3ボイラ23が給蒸移行過程の第2状態、第4ボイラ24が給蒸移行過程の第1状態にあることを示している。
ここで、便宜のため、必要蒸発量JNは、5000(kg/h)、総蒸発量JR5000(kg/h)とし、必要蒸発量JNと総蒸発量は等しいものとする。
(2)次に、ボイラ群2の要求負荷が増加し、例えば、必要蒸発量JNが1000(kg/h)増加したものとする。
演算部43は、S2を経由して、必要蒸発量JNが6000(kg/h)を算出する(S3)。
(3)演算部43は、S3において算出した必要蒸発量JNを、メモリ42に格納された必要蒸発量JN(=5000(kg/h))と比較して、必要蒸発量JNに所定値以上の変動があると判断(S4)されるのでS5に移行する。
(4)演算部43は、必要蒸発量JNの変動が、増加であると判断(S5)してS6に移行する。
(5)演算部43は、必要蒸発量JN(6000(kg/h))を、図5(A)におけるボイラ群2の総蒸発量JR(=5000(kg/h))と比較して、必要蒸発量JN>総蒸発量JRと判断する(S6)。
(6)演算部43は、各ボイラ21、・・・、25の少なくとも1台を上位の燃焼位置に移行することにより、(必要蒸発量JN≦総蒸発量JR)を満足する上位の燃焼位置(又は燃焼位置の組合せ)をリストアップする(S7)。
具体的には、例えば、以下の手順でリストアップする。
まず、入力部41を介して入力される各ボイラ21、・・・、25のそれぞれの状態に基づき、データベースを参照して、各ボイラ21、・・・、25を上位の燃焼位置に移行した場合の差分蒸発量と移行時間を算出する。
ここで、図5(A)における各ボイラ21、・・・、25の状態は、以下の通りである。
第1ボイラ21、第2ボイラ22は、第2燃焼位置にあるため、移行可能な上位の燃焼位置は存在しない。
第3ボイラ23は、給蒸移行過程の第2状態であるため、第1燃焼位置又は第2燃焼位置に移行可能であり、第1燃焼位置に移行した場合は、蒸発量の増加は1000(kg/h)、移行時間は8.0秒であり、第2燃焼位置に移行した場合は、蒸発量の増加は2500(kg/h)、移行時間は13.0秒(=8.0+5.0秒)である。
第4ボイラ24は、給蒸移行過程の第1状態であるため、第1燃焼位置又は第2燃焼位置に移行可能であり、第1燃焼位置に移行した場合は、蒸発量の増加は1000(kg/h)、移行時間は6.0秒であり、第2燃焼位置に移行した場合は、蒸発量の増加は2500(kg/h)、移行時間は11.0秒(=6.0+5.0秒)である。
第5ボイラ25は、燃焼停止位置にあるため、第1燃焼位置又は第2燃焼位置に移行可能であり、第1燃焼位置に移行した場合は、蒸発量の増加は1000(kg/h)、移行時間は190.0秒であり、第2燃焼位置に移行した場合は、蒸発量の増加は2500(kg/h))、移行時間は195.0秒(=190.0+5.0秒)である。
ここで、上位に移行可能な第3ボイラ23、第4ボイラ24、第5ボイラ25のいずれも燃焼位置を1段階上位に移行した場合には、ボイラ群2の総蒸発量JRは、必要蒸発量JN6000(kg/h)を満足するので、
1)第3ボイラ23を第1燃焼位置に移行 (移行時間、8.0秒)
2)第4ボイラ24を第1燃焼位置に移行 (移行時間、6.0秒)
3)第5ボイラ25を第1燃焼位置に移行 (移行時間、190.0秒)
をリストアップする(S7)。
(7)演算部43は、移行可能な上位の燃焼位置が存在すると判断する(S8)。
(8)S7においてリストアップした候補から、移行時間が最短時間である、2)第4ボイラ24を第1燃焼位置に移行、を選択する(S9)。
(9)次いで、S9において選択した、1)第4ボイラ24を第1燃焼位置に移行する信号を出力する(S10)。
その結果、図5(B)に示すように、第4ボイラ24が第1燃焼位置に移行する。
(10)次いで、演算部43は、第4ボイラ24が第1燃焼位置に移行した後の総蒸発量JR(=6000(kg/h))を算出(S11)してメモリ42に格納して、S2に移行する。
このとき、
必要蒸発量JNは、6000(kg/h)
総蒸発量JRは、6000(kg/h)
である。
(1) First, as described above, FIG. 5A shows that the first boiler 21 and the second boiler 22 are steamed at the second combustion position, and the third boiler 23 is in the second state of the steaming transition process. It shows that the four boilers 24 are in the first state of the steaming transition process.
Here, for convenience, the required evaporation amount JN is 5000 (kg / h) and the total evaporation amount JR5000 (kg / h), and the required evaporation amount JN and the total evaporation amount are equal.
(2) Next, it is assumed that the required load of the boiler group 2 is increased, for example, the required evaporation amount JN is increased by 1000 (kg / h).
The computing unit 43 calculates the required evaporation amount JN of 6000 (kg / h) via S2 (S3).
(3) The computing unit 43 compares the required evaporation amount JN calculated in S3 with the required evaporation amount JN (= 5000 (kg / h)) stored in the memory 42, and the required evaporation amount JN is equal to or greater than a predetermined value. Is determined (S4), the process proceeds to S5.
(4) The computing unit 43 determines that the change in the required evaporation amount JN is an increase (S5), and proceeds to S6.
(5) The calculation unit 43 compares the required evaporation amount JN (6000 (kg / h)) with the total evaporation amount JR (= 5000 (kg / h)) of the boiler group 2 in FIG. It is determined that required evaporation amount JN> total evaporation amount JR (S6).
(6) The calculation unit 43 shifts at least one of the boilers 21,..., 25 to a higher combustion position, thereby achieving a higher combustion position that satisfies (required evaporation amount JN ≦ total evaporation amount JR). (Or combination of combustion positions) is listed (S7).
Specifically, for example, the list is listed in the following procedure.
First, based on the state of each boiler 21,..., 25 input via the input unit 41, each boiler 21,. In this case, the difference evaporation amount and the transition time are calculated.
Here, the states of the boilers 21 to 25 in FIG. 5A are as follows.
Since the first boiler 21 and the second boiler 22 are in the second combustion position, there is no upper combustion position that can be transferred.
Since the 3rd boiler 23 is the 2nd state of the steaming transition process, it can transfer to the 1st combustion position or the 2nd combustion position, and when it shifts to the 1st combustion position, the increase in the amount of evaporation is 1000 ( kg / h) and the transition time is 8.0 seconds. When the transition is made to the second combustion position, the increase in evaporation amount is 2500 (kg / h), and the transition time is 13.0 seconds (= 8.0 + 5. 0 seconds).
Since the 4th boiler 24 is the 1st state of the steaming transition process, it can shift to the 1st combustion position or the 2nd combustion position, and when it shifts to the 1st combustion position, the increase in evaporation amount is 1000 ( kg / h), the transition time is 6.0 seconds, and when the transition is made to the second combustion position, the increase in evaporation amount is 2500 (kg / h), and the transition time is 11.0 seconds (= 6.0 + 5. 0 seconds).
Since the 5th boiler 25 is in a combustion stop position, it can transfer to the 1st combustion position or the 2nd combustion position, and when changing to the 1st combustion position, the increase in evaporation amount is 1000 (kg / h), The transition time is 190.0 seconds. When transitioning to the second combustion position, the increase in evaporation amount is 2500 (kg / h)), and the transition time is 195.0 seconds (= 190.0 + 5.0 seconds). is there.
Here, when any of the third boiler 23, the fourth boiler 24, and the fifth boiler 25 that can be shifted to the upper level shifts the combustion position to one level higher, the total evaporation amount JR of the boiler group 2 is the required evaporation. Since the amount JN6000 (kg / h) is satisfied,
1) Transition the third boiler 23 to the first combustion position (transition time, 8.0 seconds)
2) Move the fourth boiler 24 to the first combustion position (transition time, 6.0 seconds)
3) Move the fifth boiler 25 to the first combustion position (transition time, 190.0 seconds)
Are listed (S7).
(7) The computing unit 43 determines that there is an upper combustion position that can be transferred (S8).
(8) From the candidates listed in S7, the transition time is the shortest time, and 2) the fourth boiler 24 is shifted to the first combustion position (S9).
(9) Next, the signal selected in S9 is output. 1) A signal for shifting the fourth boiler 24 to the first combustion position is output (S10).
As a result, as shown in FIG. 5B, the fourth boiler 24 moves to the first combustion position.
(10) Next, the calculation unit 43 calculates the total evaporation amount JR (= 6000 (kg / h)) after the fourth boiler 24 has moved to the first combustion position (S11), and stores it in the memory 42. To S2.
At this time,
Necessary evaporation amount JN is 6000 (kg / h)
Total evaporation amount JR is 6000 (kg / h)
It is.

(11)次に、ボイラ群2の要求負荷が減少し、例えば、必要蒸発量JNが1600(kg/h)減少したものとする。
演算部43は、S2を経由して、必要蒸発量JNが4400(kg/h)を算出する(S3)。
(12)演算部43は、S3において算出した必要蒸発量JN(=4400(kg/h))を、メモリ42に格納された必要蒸発量JN(=6000(kg/h)と比較して、必要蒸発量JNに所定値以上の変動があると判断(S4)してS5に移行する。
(13)演算部43は、必要蒸発量JNの変動が、減少であると判断(S5)してS12に移行する。
(14)演算部43は、必要蒸発量JN(4400(kg/h))、ボイラ群2の総蒸発量JR(=6000(kg/h))と、各ボイラ21、・・・、25の第1差分蒸発量1000(kg/h)、第2差分蒸発量1500(kg/h)に基づき、燃焼を解除して下位に移行させても、必要蒸発量JN(=4400(kg/h)≦総蒸発量JRを満足することが可能な燃焼位置として、第1ボイラ21の第2燃焼位置、第2ボイラ22の第2燃焼位置、及び第4ボイラ24の第1燃焼位置が存在すると判断する(S12)。
必要蒸発量JN≦総蒸発量JRを満足しつつ燃焼を解除して下位に移行させることが可能な燃焼位置が存在するためS13に移行する。
(15)演算部43は、各ボイラ21、・・・、25のなかから、下位に移行させることが可能な燃焼位置(又は燃焼位置の組合せ)をリストアップする(S13)。
具体的には、例えば、以下の手順でリストアップされる。
まず、入力部41を介して入力される各ボイラ21、・・・、25の状態に基づき、データベースを参照して、各ボイラ21、・・・、25において、下位の燃焼位置又は燃焼停止位置に移行した場合の差分蒸発量と移行時間を算出する。
ここで、図5(B)における各ボイラ21、・・・、25の状態は、以下の通りである。
第1ボイラ21、第2ボイラ22は、第2燃焼位置にあるため、第1ボイラ21、第2ボイラ22のいずれかを第1燃焼位置に移行した場合には、総蒸発量JRが4500(kg/h)となり、必要蒸発量JN(=4400(kg/h)を確保することができる。また、第1ボイラ21、第2ボイラ22を、第1燃焼位置に移行する移行時間は、それぞれ4.5秒(第1ボイラ21)、4.0秒(第2ボイラ)である。
また、第1ボイラ21、第2ボイラ22は、第2燃焼位置から燃焼停止位置に移行した場合に、それぞれ総蒸発量JRが3500(kg/h)に減少するため必要蒸発量JN(=4400(kg/h)を確保することが不可能となるので、いずれも燃焼停止位置への移行は不可能である。
第3ボイラ23は、給蒸移行過程(第2状態)であり、第5ボイラ25は燃焼停止位置にあるため下位に移行させることは不可能である。
第4ボイラ24は、第1燃焼位置にあるため、燃焼停止位置に移行可能であり、その場合、総蒸発量JRは5000(kg/h)となるため、必要蒸発量JN(=4400(kg/h))を確保可能である。また、第4ボイラ24が燃焼停止位置に移行する場合の移行時間は、5.0秒である。
ここで、第1ボイラ21、第2ボイラ22、第4ボイラ24のなかから、任意の複数の燃焼位置を下位に移行させた場合、最小でも総蒸発量JRが2500(kg/h)減少して3500(kg/h)となり、必要蒸発量JN(=4400)を確保することが不可能であるため、第1ボイラ21、第2ボイラ22、第4ボイラ24から選択するボイラの燃焼位置を下位に1段階移行させることのみが可能である。
したがって、演算部43は、
1)第1ボイラ21を第1燃焼位置に移行 (移行時間、4.5秒)
2)第2ボイラ22を第1燃焼位置に移行 (移行時間、4.0秒)
3)第4ボイラ24を燃焼停止位置に移行 (移行時間、5.0秒)
をリストアップする(S13)。
(16)S13においてリストアップしたなかから、移行時間が最短時間である、2)第2ボイラ22を第1燃焼位置に移行、を選択する(S14)。
(17)次いで、S14において選択した、2)第2ボイラ22を第1燃焼位置に移行する信号を出力する(S15)。
その結果、図5(C)に示すように、第2ボイラ22が第1燃焼位置に移行する。
(18)演算部43は、第2ボイラ22を第1燃焼位置に移行した後の総蒸発量JR(=4500(kg/h))を算出(S16)してメモリ42に格納し、S2に移行する。
このとき、
必要蒸発量JNは、4400(kg/h)
総蒸発量JRは、4500(kg/h)
である。
(11) Next, it is assumed that the required load of the boiler group 2 is reduced, for example, the required evaporation amount JN is reduced by 1600 (kg / h).
The calculation unit 43 calculates 4400 (kg / h) as the required evaporation amount JN via S2 (S3).
(12) The calculation unit 43 compares the required evaporation amount JN (= 4400 (kg / h)) calculated in S3 with the required evaporation amount JN (= 6000 (kg / h)) stored in the memory 42, It is determined that the required evaporation amount JN has a fluctuation of a predetermined value or more (S4), and the process proceeds to S5.
(13) The calculation unit 43 determines that the change in the required evaporation amount JN is a decrease (S5), and proceeds to S12.
(14) The calculation unit 43 calculates the required evaporation amount JN (4400 (kg / h)), the total evaporation amount JR (= 6000 (kg / h)) of the boiler group 2, and the boilers 21,. Based on the first differential evaporation amount 1000 (kg / h) and the second differential evaporation amount 1500 (kg / h), the required evaporation amount JN (= 4400 (kg / h)) ≦ Determining that the second combustion position of the first boiler 21, the second combustion position of the second boiler 22, and the first combustion position of the fourth boiler 24 exist as combustion positions that can satisfy the total evaporation amount JR. (S12).
Since there exists a combustion position where the combustion can be canceled and shifted to the lower position while satisfying the required evaporation amount JN ≦ total evaporation amount JR, the routine proceeds to S13.
(15) The calculation unit 43 lists the combustion positions (or combinations of combustion positions) that can be shifted to the lower order from among the boilers 21,..., 25 (S13).
Specifically, for example, it is listed in the following procedure.
First, referring to the database based on the state of each boiler 21,..., 25 input via the input unit 41, the lower combustion position or combustion stop position in each boiler 21,. The difference evaporation amount and the transition time when the transition is made are calculated.
Here, the states of the boilers 21 to 25 in FIG. 5B are as follows.
Since the first boiler 21 and the second boiler 22 are at the second combustion position, when either the first boiler 21 or the second boiler 22 is shifted to the first combustion position, the total evaporation amount JR is 4500 ( kg / h), and the required evaporation amount JN (= 4400 (kg / h) can be secured. Further, the transition times for shifting the first boiler 21 and the second boiler 22 to the first combustion position are respectively 4.5 seconds (first boiler 21) and 4.0 seconds (second boiler).
Further, when the first boiler 21 and the second boiler 22 shift from the second combustion position to the combustion stop position, the total evaporation amount JR decreases to 3500 (kg / h), respectively, so the required evaporation amount JN (= 4400). Since it is impossible to ensure (kg / h), it is impossible to shift to the combustion stop position in any case.
The third boiler 23 is in the steaming transition process (second state), and since the fifth boiler 25 is in the combustion stop position, it cannot be shifted to the lower level.
Since the 4th boiler 24 is in the 1st combustion position, it can shift to a combustion stop position, and since total evaporation amount JR will be 5000 (kg / h) in that case, required evaporation amount JN (= 4400 (kg) / H)) can be secured. The transition time when the fourth boiler 24 transitions to the combustion stop position is 5.0 seconds.
Here, when an arbitrary plurality of combustion positions are shifted to the lower order from the first boiler 21, the second boiler 22, and the fourth boiler 24, the total evaporation amount JR is reduced by 2500 (kg / h) even at the minimum. 3500 (kg / h), and it is impossible to secure the required evaporation amount JN (= 4400). Therefore, the combustion position of the boiler selected from the first boiler 21, the second boiler 22, and the fourth boiler 24 is determined. It is only possible to shift one step down.
Therefore, the calculation unit 43
1) Transition the first boiler 21 to the first combustion position (transition time, 4.5 seconds)
2) Transition the second boiler 22 to the first combustion position (transition time, 4.0 seconds)
3) Move the fourth boiler 24 to the combustion stop position (transition time, 5.0 seconds)
Are listed (S13).
(16) From the list in S13, the transition time is the shortest time, and 2) the second boiler 22 is moved to the first combustion position (S14).
(17) Next, 2) selected in S14, 2) A signal for shifting the second boiler 22 to the first combustion position is output (S15).
As a result, as shown in FIG. 5C, the second boiler 22 moves to the first combustion position.
(18) The calculation unit 43 calculates (S16) the total evaporation amount JR (= 4500 (kg / h)) after the second boiler 22 is moved to the first combustion position, stores it in the memory 42, and stores it in S2. Transition.
At this time,
The required evaporation amount JN is 4400 (kg / h)
Total evaporation amount JR is 4500 (kg / h)
It is.

上記実施形態に係るボイラシステム1によれば、ボイラ群2において、各ボイラ21、・・・、25を他の燃焼位置又は燃焼停止位置に移行する際に、移行時間を最短時間とするように他の燃焼位置又は燃焼停止位置を選択するので、ボイラ群2の応答性を効率的に向上することができる。   According to the boiler system 1 according to the above-described embodiment, in the boiler group 2, when the boilers 21,..., 25 are transferred to other combustion positions or combustion stop positions, the transition time is set to the shortest time. Since another combustion position or combustion stop position is selected, the responsiveness of the boiler group 2 can be improved efficiently.

また、各ボイラ21、・・・、25を他の燃焼位置又は燃焼停止位置に移行する際に、給蒸移行過程にあるボイラについて、他の燃焼位置又は燃焼停止位置に移行する信号を出力してから第1燃焼位置に移行して給蒸するまでの時間を移行時間として算出するので、移行時間が最短時間となる燃焼位置又は燃焼停止位置を効率的に選択することができる。   Further, when each boiler 21,..., 25 is shifted to another combustion position or combustion stop position, a signal for shifting to another combustion position or combustion stop position is output for the boiler in the steaming transition process. Since the time from the first combustion position to the first combustion position until steaming is calculated as the transition time, the combustion position or the combustion stop position at which the transition time is the shortest time can be efficiently selected.

また、要求負荷と対応する必要蒸発量JNを満足する総蒸発量JRが確保されるように、各ボイラ21、・・・、25を他の燃焼位置又は燃焼停止位置に移行するので、負荷追従性を効率的に向上することができる。   Further, since each boiler 21,..., 25 is shifted to another combustion position or combustion stop position so that a total evaporation amount JR that satisfies the required evaporation amount JN corresponding to the required load is secured, load follow-up is performed. Efficiency can be improved efficiently.

なお、本発明は、上記実施の形態に限定されるものではなく、発明の趣旨を逸脱しない範囲において、種々の変更をすることが可能である。
例えば、上記実施の形態においては、ボイラシステム1を構成するボイラ群2が、5台の三位置制御ボイラから構成される場合について説明したが、ボイラ群2を形成するボイラの構成、及びボイラの台数は任意に設定可能であり、例えば、四位置制御ボイラや、それ以上の燃焼位置を有するボイラを用いてもよいし、燃焼位置数や、蒸発量等の構成が異なるボイラを組み合わせてボイラ群を構成してもよいことはいうまでもない。
また、ボイラ群2を構成するボイラのうちの一部が、故障、修理等により計画停止されている場合に稼動可能な一部のボイラを対象として燃焼制御してもよい。
Note that the present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the invention.
For example, in the said embodiment, although the boiler group 2 which comprises the boiler system 1 demonstrated the case where it comprised from five three position control boilers, the structure of the boiler which forms the boiler group 2, and a boiler The number of units can be arbitrarily set. For example, a four-position control boiler or a boiler having a combustion position higher than that may be used, or a combination of boilers having different configurations such as the number of combustion positions and the amount of evaporation, etc. It goes without saying that may be configured.
Moreover, you may carry out combustion control for the one part boiler which can operate when some of the boilers which comprise the boiler group 2 are planned stop by failure, repair, etc. object.

また、上記実施の形態においては、移行時間に基づき第1燃焼位置に移行する給蒸移行過程の算出対象が、第1状態、第2状態である場合について説明したが、移行時間に基づき第1燃焼位置に移行する給蒸移行過程の算出対象は、第1状態、第2状態、第3状態、第4状態、第5状態のなかから任意に設定可能である。
また、上記実施の形態においては、給蒸移行過程の第5状態が、連続パイロット燃焼状態で無圧状態である場合について説明したが、連続パイロット燃焼状態に代えて、又は連続パイロット燃焼状態とともに、第2状態から圧力低下して無圧状態となった場合、燃焼停止位置においてパージ又はパイロット燃焼状態となり無圧状態である場合のなかから任意に設定してもよい。
Moreover, in the said embodiment, although the calculation object of the steaming transfer process which transfers to a 1st combustion position based on transfer time was demonstrated to the 1st state and the 2nd state, 1st based on transfer time was demonstrated. The calculation target of the steaming transition process that shifts to the combustion position can be arbitrarily set from among the first state, the second state, the third state, the fourth state, and the fifth state.
In the above-described embodiment, the case where the fifth state of the steaming transition process is the continuous pilot combustion state and the non-pressure state has been described, but instead of the continuous pilot combustion state or together with the continuous pilot combustion state, When the pressure is reduced from the second state to the no-pressure state, the pressure may be arbitrarily set from the case of the purge or pilot combustion state at the combustion stop position and the no-pressure state.

また、上記実施の形態においては、他の燃焼位置又は燃焼停止位置がひとつの燃焼位置又は燃焼停止位置により構成される場合について説明したが、他の燃焼位置又は燃焼停止位置を、複数の燃焼位置又は燃焼停止位置により構成してもよい。
また、他の燃焼位置又は燃焼停止位置を、複数の燃焼位置又は燃焼停止位置により構成する場合に、燃焼位置又は燃焼停止位置を、順番に順次移行させて、各燃焼位置又は燃焼停止位置間の移行時間を合計することでボイラ群2の応答性を判断をしてもよいし、移行動作の一部又は全部を並行して行なって、物理的に実現可能な最短の移行時間によりボイラ群2の応答性を判断してもよい。
また、例えば、他の燃焼位置に移行する場合に、燃焼停止位置から第1燃焼位置への移行と、第1燃焼位置から第2燃焼位置への移行と、第2燃焼位置から第3燃焼位置への移行を並行して行なうことで実質的な移行時間を短縮してもよい。なお、かかる場合に、並行する移行動作が同時に開始される必要がないことはいうまでもない。
In the above embodiment, the case where the other combustion position or the combustion stop position is configured by one combustion position or the combustion stop position has been described. However, the other combustion position or the combustion stop position is defined as a plurality of combustion positions. Or you may comprise by a combustion stop position.
In addition, when other combustion positions or combustion stop positions are configured by a plurality of combustion positions or combustion stop positions, the combustion positions or combustion stop positions are sequentially shifted in order, and each combustion position or combustion stop position is The responsiveness of the boiler group 2 may be determined by summing the transition times, or the boiler group 2 may be determined with the shortest transition time physically realizable by performing part or all of the transition operations in parallel. The responsiveness may be determined.
Further, for example, when shifting to another combustion position, the transition from the combustion stop position to the first combustion position, the transition from the first combustion position to the second combustion position, and the second combustion position to the third combustion position. The substantial transition time may be shortened by performing the transition to (1) in parallel. In such a case, it goes without saying that parallel migration operations need not be started at the same time.

また、他の燃焼位置又は燃焼停止位置を選択するうえで、例えば、必要蒸発量JNを確保するために必要な時間を、ボイラ群2の応答性を判断する際の移行時間としてもよい。
具体的には、例えば、第1燃焼位置から第2燃焼位置に移行することで6.0秒で蒸発量が1500(kg/h)増加する燃焼位置の移行と、給蒸移行過程の第1状態から第1燃焼位置に移行することで5.0秒で蒸発量が1000(kg/h)する燃焼位置の移行が選択可能とされる状況下で、必要蒸発量JN=800(kg/h)を確保する場合に、燃焼位置の移行動作は後者が5.0秒で短いが、必要蒸発量JN=750(kg/h)を確保するためには、前者が3.0秒で、後者が3.75秒であるため、前者のほうが優位であり、かかる場合にいずれを選択するかは、任意に設定してもよい。
Further, when selecting another combustion position or combustion stop position, for example, the time required to ensure the required evaporation amount JN may be used as the transition time when determining the responsiveness of the boiler group 2.
Specifically, for example, by shifting from the first combustion position to the second combustion position, the transition of the combustion position where the evaporation amount increases by 1500 (kg / h) in 6.0 seconds, and the first stage of the steaming transition process The required evaporation amount JN = 800 (kg / h) under the situation where the shift from the state to the first combustion position makes it possible to select the combustion position shift where the evaporation amount is 1000 (kg / h) in 5.0 seconds. ), The latter is short in 5.0 seconds for the latter, but in order to ensure the required evaporation amount JN = 750 (kg / h), the former is 3.0 seconds and the latter Is 3.75 seconds, the former is more dominant, and in this case, which one to select may be arbitrarily set.

また、上記実施の形態においては、給蒸移行過程にあるボイラのうち、給蒸までの時間が短いボイラを、選択する場合について説明したが、各燃焼位置を、給蒸までの時間に基づいて複数のランク(例えば、現在の状態から給蒸までの時間が5秒以下である燃焼位置をAランク、現在の状態から給蒸までの時間が5秒を超え7秒以下である燃焼位置をBランク、・・・)に分けて、候補とされる燃焼位置のなかから、給蒸までの時間が短いAランクに属する燃焼位置を選択可能な場合にはAランクの燃焼位置を選択し、Aランクの燃焼位置が存在しなくなったらBランクの燃焼位置を選択するというように、燃焼効率が高いランクに属する燃焼位置を優先的に選択、移行する構成してもよい。
また、かかる場合に、給蒸までの時間が所定の範囲に属する燃焼位置のみをランク分けし、残りの燃焼位置については給蒸までの時間に基づいて選択するように構成してもよい。
Moreover, in the said embodiment, although the case where the boiler with short time to steaming was selected among the boilers in a steaming transition process was demonstrated, each combustion position is based on the time until steaming. Multiple ranks (for example, a combustion position where the time from the current state to steaming is 5 seconds or less is rank A, and a combustion position where the time from the current state to steaming is more than 5 seconds and is 7 seconds or less is B If the combustion position belonging to rank A, which has a short time to steaming, can be selected from the candidate combustion positions, the combustion position of rank A is selected. A combustion position belonging to a rank having a high combustion efficiency may be preferentially selected and transferred, such as selecting a combustion position of rank B when the combustion position of rank does not exist.
In such a case, only the combustion positions belonging to a predetermined range in the time until steaming may be ranked, and the remaining combustion positions may be selected based on the time until steaming.

また、上記実施の形態においては、給蒸移行過程にあるボイラのうち、給蒸までの時間が短いボイラを、第3のデータベース45Cを参照して選択する場合について説明したが、演算等データベース以外の手段により選択することが可能である。   Moreover, in the said embodiment, although the case where a boiler with short time to steaming was selected with reference to the 3rd database 45C among the boilers in a steaming transition process was demonstrated, it is other than databases, such as calculation It is possible to select by the means.

また、上記実施の形態においては、プログラムが、他の燃焼位置又は燃焼停止位置に移行した後に、ボイラ群2の総蒸発量JRが必要蒸発量JNを確保するように、他の燃焼位置又は燃焼停止位置をリストアップする場合について説明したが、必要蒸発量JNに代えて、総蒸発量JRが必要蒸発量JNの所定範囲内となるように、他の燃焼位置又は燃焼停止位置を選択してもよいし、総蒸発量JRを考慮することなく移行時間を最短時間にすることのみに基づいてボイラ群2を制御してもよい。   In the above embodiment, after the program shifts to another combustion position or combustion stop position, another combustion position or combustion is set so that the total evaporation amount JR of the boiler group 2 secures the required evaporation amount JN. Although the case where the stop position is listed has been described, instead of the required evaporation amount JN, another combustion position or the combustion stop position is selected so that the total evaporation amount JR is within a predetermined range of the required evaporation amount JN. Alternatively, the boiler group 2 may be controlled based only on setting the transition time to the shortest time without considering the total evaporation amount JR.

また、上記実施の形態においては、各ボイラ21、・・・、25が、給蒸移行過程に維持可能とされ、給蒸移行過程の各状態に対応する移行時間を算出して各ボイラ21、・・・、252を制御する場合について説明したが、各ボイラ21、・・・、25のうち、いずれのボイラを給蒸移行過程に維持可能とするか、また、給蒸移行過程の各状態(第1状態から第5状態)のうち、いずれを燃焼停止状態から第1燃焼位置への移行時間を燃焼停止位置からの移行時間と区別して算出するかは任意に設定可能である。   Moreover, in the said embodiment, each boiler 21, ..., 25 can be maintained in a steaming transition process, the transition time corresponding to each state of a steaming transition process is calculated, and each boiler 21, ..., 252 is controlled, but among the boilers 21, ..., 25, which boiler can be maintained in the steaming transition process, and each state of the steaming transition process It can be arbitrarily set which of (from the first state to the fifth state) is calculated by distinguishing the transition time from the combustion stop state to the first combustion position from the transition time from the combustion stop position.

また、上記実施の形態においては、蒸発量と対応する物理量としてスチームヘッダ6内の蒸気の圧力及び目標圧力を用いて蒸発量を制御する場合について説明したが、圧力に代えて蒸気使用設備18における蒸気の使用量等、蒸発量又は蒸発量と対応する他の物理量を用いて蒸発量を制御してもよい。   Moreover, in the said embodiment, although the case where the evaporation amount was controlled using the steam pressure and the target pressure in the steam header 6 as a physical quantity corresponding to the evaporation amount was described, the vapor use facility 18 replaces the pressure. The evaporation amount may be controlled using the evaporation amount or other physical quantity corresponding to the evaporation amount such as the amount of steam used.

また、この発明に係るプログラムの概略構成の一例を、図4にフロー図として示したが、上記フロー図以外の方法(アルゴリズム)を用いてプログラムを構成してもよいことはいうまでもない。   An example of the schematic configuration of the program according to the present invention is shown as a flowchart in FIG. 4, but it goes without saying that the program may be configured using a method (algorithm) other than the above flowchart.

また、上記実施の形態においては、本発明に係る制御をプログラムによって行なう場合について説明したが、プログラムによらずオペアンプ等を用いたアナログ制御によって行なってもよいことは当然である。
また、上記ボイラ群の制御方法の実行に際して、例えば、調圧器等の機械的な手段を一部又は全部に用いてもよい。
In the above-described embodiment, the case where the control according to the present invention is performed by a program has been described. However, it is natural that the control may be performed by analog control using an operational amplifier or the like regardless of the program.
In executing the boiler group control method, for example, mechanical means such as a pressure regulator may be used in part or in whole.

また、上記実施の形態においては、プログラムを格納するための記憶媒体がROMである場合について説明したが、ROM以外にも、例えば、EP−ROM、 ハードディスク、フレキシブルディスク、光ディスク、光磁気ディスク、CD−ROM、CD−R、磁気テープ、不揮発性のメモリカードなどを用いてもよい。また、演算部が読出したプログラムを実行することにより上記実施形態の作用が実現されるだけでなく、そのプログラムの指示に基づき、演算部で稼働しているOS(オペレーティングシステム)などが実際の処理の一部または全部を行い、その処理によって上記実施形態の作用が実現される場合も含まれる。さらに、記憶媒体から読出されたプログラムが、演算部に挿入された機能拡張ボードや演算部に接続された機能拡張ユニットに備わるメモリに書込まれた後、そのプログラムの指示に基づき、その機能拡張ボードや機能拡張ユニットに備わるCPUなどが実際の処理の一部または全部を行い、その処理によって前述した実施形態の作用が実現される場合も含まれることはいうまでもない。   In the above embodiment, the case where the storage medium for storing the program is the ROM has been described. However, in addition to the ROM, for example, EP-ROM, hard disk, flexible disk, optical disk, magneto-optical disk, CD A ROM, CD-R, magnetic tape, nonvolatile memory card, or the like may be used. Further, not only the operation of the above-described embodiment is realized by executing the program read out by the arithmetic unit, but an OS (operating system) operating in the arithmetic unit based on an instruction of the program performs actual processing. This includes a case where the operation of the above embodiment is realized by performing part or all of the above. Furthermore, after the program read from the storage medium is written to the memory provided in the function expansion board inserted in the operation unit or the function expansion unit connected to the operation unit, the function expansion is performed based on the instructions of the program. It goes without saying that the case where the CPU or the like provided in the board or the function expansion unit performs part or all of the actual processing and the operation of the above-described embodiment is realized by the processing.

ボイラ群において、他の燃焼位置又は燃焼停止位置に移行する場合に、最短時間で移行することにより応答性が向上するので、産業上利用可能である。   In the boiler group, when shifting to another combustion position or combustion stop position, the response is improved by shifting in the shortest time, and therefore, it can be used industrially.

1 ボイラシステム
2 ボイラ群
4 制御部(制御器)
21、22、23、24、25 ボイラ
1 Boiler system 2 Boiler group 4 Controller (controller)
21, 22, 23, 24, 25 Boiler

Claims (6)

複数の段階的な燃焼位置を有するボイラを備えたボイラ群を制御するプログラムであって、
前記ボイラにおいて他の燃焼位置又は燃焼停止位置に移行する場合に、
前記他の燃焼位置又は燃焼停止位置に移行する際の移行時間が最短時間となるように、次に移行する前記他の燃焼位置又は燃焼停止位置を選択し、
前記ボイラのうち給蒸移行過程にあるボイラについては、最下位燃焼位置で給蒸するまでの時間を前記移行時間として、次に移行する前記他の燃焼位置又は燃焼停止位置を選択するように構成されていることを特徴とするプログラム。
A program for controlling a boiler group including a boiler having a plurality of stepwise combustion positions,
When shifting to another combustion position or combustion stop position in the boiler,
Selecting the other combustion position or the combustion stop position to be transferred next so that the transition time when shifting to the other combustion position or the combustion stop position is the shortest time ;
Among the boilers, the boiler that is in the steaming transition process is configured to select the other combustion position or the combustion stop position to be transitioned next, using the time until steaming at the lowest combustion position as the transition time. A program characterized by being.
請求項1に記載のプログラムであって、
前記ボイラ群における要求負荷と対応する蒸発量を確保するように、次に移行する前記他の燃焼位置又は燃焼停止位置を選択するように構成されていることを特徴とするプログラム。
The program according to claim 1 ,
A program configured to select the other combustion position or combustion stop position to be transferred next so as to ensure an evaporation amount corresponding to a required load in the boiler group.
請求項1又は2に記載のプログラムを備えることを特徴とする制御器。 Controller, characterized in that it comprises a program according to claim 1 or 2. 請求項3に記載の制御器を備えることを特徴とするボイラシステム。 A boiler system comprising the controller according to claim 3 . 複数の段階的な燃焼位置を有するボイラを備えたボイラ群の制御方法であって、
前記ボイラにおいて他の燃焼位置又は燃焼停止位置に移行する場合に、
前記他の燃焼位置又は燃焼停止位置に移行する際の移行時間が最短時間となるように、次に移行する前記他の燃焼位置又は燃焼停止位置を選択し、
前記ボイラのうち給蒸移行過程にあるボイラについては、最下位燃焼位置で給蒸するまでの時間を前記移行時間として、次に移行する前記他の燃焼位置又は燃焼停止位置を選択することを特徴とするボイラ群の制御方法。
A boiler group control method including a boiler having a plurality of stepwise combustion positions,
When shifting to another combustion position or combustion stop position in the boiler,
Selecting the other combustion position or the combustion stop position to be transferred next so that the transition time when shifting to the other combustion position or the combustion stop position is the shortest time ;
For the boiler that is in the steaming transition process among the boilers, the other combustion position or the combustion stop position to be transitioned next is selected using the transition time as the time until steaming at the lowest combustion position. The boiler group control method.
請求項5に記載のボイラ群の制御方法であって、
前記ボイラ群における要求負荷と対応する蒸発量を確保するように、次に移行する前記他の燃焼位置又は燃焼停止位置を選択することを特徴とするボイラ群の制御方法。
The boiler group control method according to claim 5 ,
A control method for a boiler group, wherein the other combustion position or combustion stop position to be transferred next is selected so as to secure an evaporation amount corresponding to a required load in the boiler group.
JP2009218940A 2009-09-24 2009-09-24 Boiler group control method, program, controller, and boiler system Expired - Fee Related JP5418109B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2009218940A JP5418109B2 (en) 2009-09-24 2009-09-24 Boiler group control method, program, controller, and boiler system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2009218940A JP5418109B2 (en) 2009-09-24 2009-09-24 Boiler group control method, program, controller, and boiler system

Publications (2)

Publication Number Publication Date
JP2011069514A JP2011069514A (en) 2011-04-07
JP5418109B2 true JP5418109B2 (en) 2014-02-19

Family

ID=44014949

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2009218940A Expired - Fee Related JP5418109B2 (en) 2009-09-24 2009-09-24 Boiler group control method, program, controller, and boiler system

Country Status (1)

Country Link
JP (1) JP5418109B2 (en)

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4032515B2 (en) * 1998-06-30 2008-01-16 三浦工業株式会社 Automatic boiler number control method

Also Published As

Publication number Publication date
JP2011069514A (en) 2011-04-07

Similar Documents

Publication Publication Date Title
JP5621365B2 (en) Program, controller and boiler system
JP5251356B2 (en) Control system, control system program, combustion control method, and boiler system
JP5447083B2 (en) Program, controller and boiler system
JP5434728B2 (en) Program, controller and boiler system
JP4985964B2 (en) Number control device and multi-can installation system
JP5277849B2 (en) Control program, control system, boiler system, and control method
JP5440069B2 (en) Boiler group control method, program, controller, and boiler system
JP5598139B2 (en) Program, controller and boiler system
JP5418109B2 (en) Boiler group control method, program, controller, and boiler system
JP5678614B2 (en) Program, controller, boiler and boiler system
JP5593895B2 (en) Program, controller and boiler system
JP2011069516A (en) Method for controlling boiler group, program, controller and boiler system
JP5768525B2 (en) Program, controller and boiler system
JP5440607B2 (en) Program, controller and boiler system
JP5455165B2 (en) Program, controller and boiler system
JP5729242B2 (en) Control device and boiler system
JP5991156B2 (en) Boiler system
JP5585007B2 (en) Boiler group control method, program, controller, and boiler system
JP7140356B2 (en) Multi-can boiler
JP6044314B2 (en) Boiler system
JP6550999B2 (en) Boiler system
WO2018074310A1 (en) Boiler system

Legal Events

Date Code Title Description
A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20110714

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20120622

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20130711

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20130716

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130809

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20131022

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20131104

R150 Certificate of patent or registration of utility model

Ref document number: 5418109

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees