Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP5537779B2 - Current interrupt device - Google Patents
[go: Go Back, main page]

JP5537779B2 - Current interrupt device - Google Patents

Current interrupt device Download PDF

Info

Publication number
JP5537779B2
JP5537779B2 JP2008044383A JP2008044383A JP5537779B2 JP 5537779 B2 JP5537779 B2 JP 5537779B2 JP 2008044383 A JP2008044383 A JP 2008044383A JP 2008044383 A JP2008044383 A JP 2008044383A JP 5537779 B2 JP5537779 B2 JP 5537779B2
Authority
JP
Japan
Prior art keywords
current
time
value
load
current value
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2008044383A
Other languages
Japanese (ja)
Other versions
JP2008295285A (en
Inventor
繁 飛田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2008044383A priority Critical patent/JP5537779B2/en
Publication of JP2008295285A publication Critical patent/JP2008295285A/en
Application granted granted Critical
Publication of JP5537779B2 publication Critical patent/JP5537779B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Emergency Protection Circuit Devices (AREA)
  • Keying Circuit Devices (AREA)

Description

本発明は、設定された電流値を超える負荷がかかると電流を遮断する開閉器を介して、複数の電気負荷設備に対して電流を流す電気回路に組み込まれる電流遮断装置に関する。   The present invention relates to a current interrupting device incorporated in an electric circuit for supplying current to a plurality of electric load facilities via a switch that interrupts the current when a load exceeding a set current value is applied.

現在、工場で主に使用される電気負荷設備が動力(三相200V)である場合の電気料金は、実際の電気使用量の他に、動力毎に基本料金がかかっている。
又、前記基本料金は、電力会社との「負荷設備契約」、及び「主開閉器契約」の2種類の契約方式により決定されている。
At present, when the electric load equipment mainly used in factories is powered (three-phase 200V), the basic charge for each power is in addition to the actual amount of electricity used.
Further, the basic charge is determined by two types of contract methods: “load equipment contract” and “main switch contract” with an electric power company.

前記「負荷設備契約」は、全ての電気負荷設備の最大動力(モーター)容量(KW)の合計を契約容量(KW)とし、この契約容量に単価(円)を掛けた数値を基本料金(円)とするものである。   In the “load equipment contract”, the sum of the maximum power (motor) capacity (KW) of all electric load equipment is defined as the contract capacity (KW), and the value obtained by multiplying the contract capacity by the unit price (yen) is the basic charge (yen ).

前記「主開閉器契約」は、全ての電気負荷設備の動力容量にかかわらず、電気負荷設備の稼動時に、工場の主開閉器に実際に流れる電流値を基にして契約容量(KW)とし、この契約容量に単価(円)を掛けた数値を基本料金(円)とするものである。   The “main switch contract” is the contract capacity (KW) based on the current value actually flowing to the main switch in the factory when the electric load equipment is in operation, regardless of the power capacity of all the electric load equipment. The basic charge (yen) is obtained by multiplying the contracted capacity by the unit price (yen).

尚、前記単価(円)は、各電力会社によって異なるが、基本的には「負荷設備契約」と「主開閉器契約」ともに同額である。
又、前記基本料金は、実際には、力率割引や消費税がかかるため、

基本料金(円)=契約容量(KW)×単価(円)×95%(力率割引)×1.05%(消費税)

という算定式により算定される。
The unit price (yen) differs depending on each electric power company, but is basically the same for both the “load equipment contract” and the “main switch contract”.
In addition, the basic charge is actually subject to a power factor discount and consumption tax.

Basic charge (yen) = Contracted capacity (KW) x Unit price (yen) x 95% (power factor discount) x 1.05% (consumption tax)

It is calculated by the following formula.

この「主開閉器契約」の契約容量は、

契約容量(KW)=主開閉器の定格電流(A)×電圧(200V)×1.732(係数)×力率(100%)÷1000

という算定式で算定される。
The contract capacity of this "Main Switch Contract"

Contracted capacity (KW) = rated current of main switch (A) x voltage (200V) x 1.732 (coefficient) x power factor (100%) ÷ 1000

It is calculated by the following formula.

例えば、下記の表1に示す電気負荷設備を備えた施設における基本料金を、前記の算定式で算定して比較すると、「主開閉器契約」の基本料金は、「負荷設備契約」の基本料金に比べて約半分となるため、工場稼動における電気料金のコスト削減に効果的である。
尚、下記の算定式における980(円)は、ある電力会社の単価(円)を例示したものであり、電力会社によって異なる可能性はある。
For example, when the basic charge for facilities with electrical load equipment shown in Table 1 below is calculated using the above formula, the basic charge for the “main switch contract” is the basic charge for the “load equipment contract”. It is about half that compared to, so it is effective in reducing the cost of electricity during factory operation.
In addition, 980 (yen) in the following calculation formula is an example of a unit price (yen) of a certain electric power company, and may vary depending on the electric power company.

「負荷設備契約」では、表1の電気負荷設備の総動力容量が34KWであるので、その契約容量は34KWとなり、これを前記算定式に当てはめて基本料金を算定すると、

34(KW)×980(円)×95(%)×1.05(%)=33,236円

となる。
In the “load equipment contract”, the total power capacity of the electrical load equipment in Table 1 is 34 KW, so the contract capacity is 34 KW, and this is applied to the above formula to calculate the basic charge.

34 (KW) x 980 (yen) x 95 (%) x 1.05 (%) = 33,236 yen

It becomes.

「主開閉器契約」では、表1の電気負荷設備の総電流値が50Aであるので、契約する主開閉器の最小定格電流値を50Aとし、この数値を主開閉器の契約容量を前記算定式に当てはめて算定すると、

50(A)×200(V)×1.732(係数)×100(%)÷1000=17.32(KW)

となり、小数点以下は、切り捨てられるので、その契約容量は17KWとなる。
そして、この17KWを前記算定式に当てはめて基本料金を算定すると、

17(KW)×980(円)×95(%)×1.05(%)=16,618円

となる。
In the “Main switch contract”, the total current value of the electrical load equipment in Table 1 is 50A, so the minimum rated current value of the contracted main switch is 50A, and this value is used to calculate the contract capacity of the main switch. When calculated by applying to the formula,

50 (A) × 200 (V) × 1.732 (Coefficient) × 100 (%) ÷ 1000 = 17.32 (KW)

Since the decimal part is rounded down, the contract capacity is 17KW.
And when calculating the basic charge by applying this 17KW to the above formula,

17 (KW) x 980 (yen) x 95 (%) x 1.05 (%) = 16,618 yen

It becomes.

Figure 0005537779
Figure 0005537779

ところで、「主開閉器契約」の基本料金は、前記算定式の通り、主開閉器の定格電流値の大きさによって増減するため、基本料金を好適なものにするには、電気負荷設備の総電流値に比例して主開閉器の定格電流値を変更する必要がある。
基本的に主開閉器の定格電流値の設定は、全ての電気負荷設備を最大能力で稼動させたり、電気負荷設備の動力始動時において、定格電流値以上の電流が瞬間的に流れたりしてもトリップ(電流が遮断する状態)しないようにするため、主開閉器の最小定格電流値を電気負荷設備の総電流値と同等としている。
又、主開閉器は、漏電事故を検知し除去する目的で、瞬時動作、又は時延動作を選択して設置されるものであるが、通常、工場で使用されている主開閉器は、突然のトリップや火災防止のために、時延動作するものが使用されている。
By the way, the basic charge of the “main switch contract” increases / decreases depending on the rated current value of the main switch as shown in the above calculation formula. It is necessary to change the rated current value of the main switch in proportion to the current value.
Basically, the rated current value of the main switch is set by operating all the electrical load equipment at its maximum capacity or by instantaneously flowing a current exceeding the rated current value when starting the power of the electrical load equipment. Therefore, the minimum rated current value of the main switch is equivalent to the total current value of the electrical load equipment so that the trip (state where the current is interrupted) is not caused.
In addition, the main switch is installed by selecting the instantaneous operation or the time delay operation for the purpose of detecting and removing the electric leakage accident. Usually, the main switch used in the factory suddenly In order to prevent trips and fires, those that operate for a while are used.

前記時延動作する開閉器として、例えば、設定された電流値を超える電流値(負荷)がかかると同時に時間計測が開始され、あらかじめ設定された時間に達すると電流の遮断動作を行い、前記設定された時間前に前記負荷が設定された電流値以下になると、時間計測が停止されると共に、該時間が計測開始時の値にリセットされる電子制御式の開閉器がある。(例えば、非特許文献1参照)。   As the switch that operates in a time-delayed manner, for example, time measurement is started at the same time when a current value (load) exceeding a set current value is applied, and when the preset time is reached, a current cut-off operation is performed, and the setting is performed. There is an electronically controlled switch in which time measurement is stopped and the time is reset to the value at the start of measurement when the load falls below a set current value before the set time. (For example, refer nonpatent literature 1).

前記非特許文献1に記載の開閉器は、カタログに添付されている「配線用遮断機動作表」に示すように、開閉器に定格電流値(A)を上回る電流値(負荷)がかかった際に、その電流値の大きさ毎に遮断操作までの時間が設定されていて、この設定された時間に達すると、遮断動作を行うようにしたものであり、更に、定格電流値を上回る電流値の率が、定格電流値に対して0〜124%の範囲であれば、遮断動作が行われないようにもしている。
すなわち、この開閉器は、該開閉器に対して定格電流値を上回る電流値がかかっても、設定された時間はトリップしないので、その時間内に、現状において運転しなくても問題の少ない電気負荷設備の電源を切れば、開閉器にかかる負荷を下げることができるので、開閉器のトリップを防止することができる。
したがって、開閉器に対して定格電流値を上回る電流値がかかった際に、突然トリップすることが防止されているので、余裕のある最小定格電流値とする主開閉器契約とする必要がなく、「主開閉器契約」のメリットを最大限生かすこと、すなわち電気料金の基本料金の低減を図ることができる。
尚、下記表2において、非特許文献1に記載の開閉器の「配線用遮断機動作表」の一部を抜粋して示す。
In the switch described in Non-Patent Document 1, a current value (load) exceeding the rated current value (A) was applied to the switch as shown in the “Circuit Breaker Operation Table” attached to the catalog. At this time, the time until the shut-off operation is set for each magnitude of the current value, and when the set time is reached, the shut-off operation is performed, and further, the current exceeding the rated current value. If the rate of the value is in the range of 0 to 124% with respect to the rated current value, the blocking operation is not performed.
In other words, this switch does not trip for a set time even when a current value exceeding the rated current value is applied to the switch, so that there is little problem even if the current operation is not performed within that time. If the load facility is turned off, the load on the switch can be reduced, so that the trip of the switch can be prevented.
Therefore, when a current value exceeding the rated current value is applied to the switch, it is prevented from suddenly tripping, so there is no need to make a main switch contract with a minimum rated current value with a margin, It is possible to make the most of the merits of the “Main Switch Contract”, that is, to reduce the basic charge of electricity charges.
In addition, in the following Table 2, a part of the “breaker operation table for wiring” of the switch described in Non-Patent Document 1 is extracted and shown.

Figure 0005537779
Figure 0005537779

しかしながら、前記電子制御式の開閉器を使用した場合、該開閉器に対して過負荷がかかった際に、前記設定された時間内に、いずれかの電気負荷設備の電源を手動により切断する必要があるため、表2における「過負荷1」や「過負荷2」のように、電流遮断までの時間がある程度余裕がある場合には、余裕を持って電源切断可能な電気負荷設備を探し、該電気負荷設備の電源切断作業を行うことができるが、表2における「過負荷4」〜「過負荷6」のように、電流遮断までの時間が数十秒〜数秒程度の短時間である場合には、時間的な余裕がないために、電気負荷設備の電源切断が間に合わなかったり、誤って作動を続けなければならない電気負荷設備の電源を切断してしまったりする可能性がある。
すなわち、電気負荷設備の電源切断が間に合わない場合には、開閉器がトリップして全ての電気負荷設備が停止してしまい、作動を続けなければならない電気負荷設備の電源を切断すると、必要な作業に支障を来たし、更に、電気負荷設備の電源を切断するために工場内を急いで移動することによる事故の発生という虞もある。
However, when the electronically controlled switch is used, when an overload is applied to the switch, it is necessary to manually disconnect the power source of any electrical load equipment within the set time. Therefore, if there is a certain amount of time until current interruption, such as “Overload 1” and “Overload 2” in Table 2, look for an electrical load facility that can be turned off with sufficient margin. Although the electric load equipment can be turned off, the time until current interruption is a short time of about several tens of seconds to several seconds as shown in “Overload 4” to “Overload 6” in Table 2. In some cases, because there is no time, there is a possibility that the power supply of the electrical load equipment cannot be cut off in time, or the power supply of the electrical load equipment that must continue to operate by mistake may be cut off.
In other words, if the electrical load equipment cannot be powered off in time, the switch trips and all electrical load equipment stops, and if the electrical load equipment that must continue to operate is turned off, the necessary work In addition, there is a risk that an accident may occur due to a sudden movement in the factory in order to cut off the power supply of the electrical load equipment.

株式会社NEO CPU制御主開閉器内蔵型電力管理装置 N−EB seriesのカタログNEO Co., Ltd. CPU control main switch built-in type power management device N-EB series catalog

本発明は、定格電流値を超える負荷が作用した際における時延動作式の開閉器のトリップを防止して、電気負荷設備を連続的に、且つ効率的に稼動させることを課題とし、この課題を解決する電流遮断装置の提供を目的とする。   An object of the present invention is to prevent tripping of a time delay operation type switch when a load exceeding a rated current value is applied, and to continuously and efficiently operate an electric load facility. An object of the present invention is to provide a current interrupting device that solves the problem.

前記目的を達成するため、本発明に係る電流遮断装置は、以下の構成を少なくとも具備する。   In order to achieve the above object, a current interrupting device according to the present invention comprises at least the following configuration.

すなわち、定格電流値を超える負荷の大きさを複数の範囲に分割すると共に、この複数の範囲毎に電流遮断動作までの時間が設定され、定格電流値を超える負荷がかかったときに、該負荷が含まれる範囲に設定された時間の経過後に電流遮断動作を行う時延動作式の開閉器であり、且つ、計測された時間が設定された時間に達すると電流遮断動作を行い、設定された時間前に前記負荷が定格電流値以下になると時間計測が停止されると共に、該時間が計測開始時の値にリセットされ、更に、電流遮断動作が行われる前に、該電流遮断動作が行われることを警報する警報手段に対して電流を出力する警報回路を有する開閉器を介して、複数の電気負荷設備に対して電流を流す電気回路に組み込まれる電流遮断装置であって、
前記電流遮断装置は、第一の電流遮断装置と、第二の電流遮断装置とを備え、これら二つの電流遮断装置の一方の電流遮断動作を行うまでの時間よりも、他方の電流遮断動作を行うまでの時間が長くなるように設定され、
前記第一の電流遮断装置は、前記警報回路からの電流を検出すると共に、この検出結果を出力する制御手段を備え
前記第二の電流遮断装置は、前記電気回路中の電流値を検出する電流値検出手段と、
前記電流値検出手段に接続され、該電流値検出手段で検出された電流値と、電流が流れている時間を計測し、この計測結果を出力する制御手段とを備え、
前記第一の電流遮断装置の前記制御手段及び前記第二の電流遮断装置の前記制御手段が、前記開閉器の2次側と電気負荷設備のうち選択された1、又は複数の電気負荷設備に亘る電気配線道中に接続され、電気負荷設備に対して電流遮断、及び電流遮断解除すると共に、前記制御手段の出力結果に基づいて、前記電気負荷設備に対する電流遮断動作、及び電流遮断解除動作が制御される接続手段に接続され
前記第一の電流遮断装置における前記制御手段は、前記警報回路からの電流を検出したときに、前記接続手段に対して電流遮断動作をさせる制御と、電流が遮断された状態から前記警報回路からの電流が検出されなくなったときに、前記接続手段に対して電流遮断解除動作させる制御とを行ない、
前記第二の電流遮断装置における前記制御手段は、前記電流値検出手段で計測された電流値が、前記複数の範囲のいずれかに含まれるものであるかを判定する制御と、前記定格電流値を超える負荷であるときに、電流が流れている時間の計測を開始する制御と、前記電流が流れている時間が、前記判定された範囲に設定された電流遮断動作を行う時間に達する時間以前の時間に達したときに、前記接続手段に対して電流遮断動作させる制御と、前記電流遮断動作を行う時間に達する時間以前の時間を設定する制御と、前記電流遮断動作と同時に、電流が流れている時間の計測を停止すると共に、該時間を計測開始時の値にリセットする制御と、前記リセットと同時に又は後に、電流が流れている時間の計測を開始すると共に、前記接続手段に対して電流遮断解除動作させる制御と、前記電流遮断動作を行う時間に達する時間以前の時間の前に、負荷が定格電流値未満になったときに、電流が流れている時間の計測を停止すると共に、該時間を計測開始時の値にリセットする制御とを行なうことを特徴とする。
That is, the load size exceeding the rated current value is divided into a plurality of ranges, and the time until the current interrupting operation is set for each of the plurality of ranges, and when a load exceeding the rated current value is applied, the load Is a time delay operation type switch that performs a current interrupting operation after the lapse of a set time, and when the measured time reaches the set time, the current interrupting operation is performed and set If the load falls below the rated current value before the time, the time measurement is stopped, the time is reset to the value at the start of the measurement, and further, the current interruption operation is performed before the current interruption operation is performed. A current interrupting device incorporated in an electric circuit for supplying current to a plurality of electric load facilities via a switch having an alarm circuit for outputting current to an alarm means for alarming that,
The current interrupting device includes a first current interrupting device and a second current interrupting device, and the current interrupting operation of the other current interrupting device is performed more than the time until the current interrupting operation of one of these two current interrupting devices is performed. Set to take longer to do,
The first current interrupt device includes a control means for detecting a current from the alarm circuit and outputting the detection result,
The second current interrupt device includes a current value detecting means for detecting a current value in the electric circuit,
A current value detected by the current value detecting means, connected to the current value detecting means, and a control means for measuring the time during which the current flows and outputting the measurement result;
The control means of the first current interrupting device and the control means of the second current interrupting device may be one or more selected from the secondary side of the switch and the electrical load equipment. Connected in the electric wiring path, and cuts off the current for the electric load equipment and releases the current cut, and controls the current cut-off operation and the current cut-off release operation for the electric load equipment based on the output result of the control means. is connected to the connection means being,
The control means in the first current interrupt device is configured to control the connection means to perform a current interrupt operation when detecting a current from the alarm circuit, and from the alarm circuit from a state where the current is interrupted. When the current is no longer detected, the connection means is controlled to release the current interruption ,
The control means in the second current interrupting device includes control for determining whether the current value measured by the current value detecting means is included in any of the plurality of ranges, and the rated current value Before starting the measurement of the time during which the current flows when the load exceeds the load, and the time during which the current is flowing reaches the time for performing the current interrupting operation set in the determined range When the time reaches, the control for causing the connection means to cut off the current, the control for setting the time before the time for performing the current cut-off operation, and the current cut-off operation, current flows simultaneously. Control to reset the time to the value at the start of measurement, and simultaneously with or after the reset, the measurement of the time during which the current flows is started, and the connection means And stop the measurement of the time during which the current is flowing when the load becomes less than the rated current value before the time before the time to reach the time to perform the current interruption operation and the control to release the current interruption operation. together, and wherein the the control to reset the said time to a value of the time of measurement start line of TURMERIC.

前記電気負荷設備の負荷増により生じる遅れ無効電力値が、あらかじめ設定された値を超えたときに、開閉器の2次側の電気配線道中に進相コンデンサを接続することにより、該電気配線道中を進み力率状態とし、この進み力率状態により生じる進み無効電力が、あらかじめ設定された値を越えたときに、進相コンデンサの接続を遮断する力率制御装置を備えていることを特徴とする。 By connecting a phase advance capacitor in the electrical wiring path on the secondary side of the switch when the delayed reactive power value caused by the load increase of the electrical load equipment exceeds a preset value, and a leading power factor state, leading reactive power generated by the leading power factor state, when it exceeds a preset value, and features that you have provided a power factor controller to cut off the connection of the phase advance capacitor To do.

本発明でいう開閉器は、時延動作する形式のものであれば、非特許文献1で例示した電子制御式のものや、電磁式等、その形式は限定するものではない。
又、本発明でいう、電気負荷設備は、三相(200V)の動力と呼ばれるもの全てを含み、例えば、工場で使用されるNC旋盤・NCフライス・旋盤等の各種工作機械や、エアコンディショナー等の各種空調設備、コンベア・エレベーター等の各種運搬設備等が例示できる。
又、本発明の接続手段と接続される電気負荷設備は、例えば、工場内において、停止しても生産活動に影響を及ぼさないものを1、又は複数、任意に選択する。
As long as the switch referred to in the present invention is of a type that operates in a time-delayed manner, the type of the electronic control type illustrated in Non-Patent Document 1, the electromagnetic type, or the like is not limited.
In addition, the electrical load equipment referred to in the present invention includes all what is called three-phase (200V) power, for example, various machine tools such as NC lathes, NC milling machines, and lathes used in factories, air conditioners, etc. The various air-conditioning equipment, and various transport equipment such as conveyors and elevators can be exemplified.
Further, for the electrical load equipment connected to the connection means of the present invention, for example, one or a plurality of electrical load equipment that does not affect the production activity even if it is stopped is selected in the factory.

本発明によれば、定格電流値を超える負荷が作用した際における時延動作式の開閉器のトリップを防止して、電気負荷設備を連続的に、且つ効率的に稼動させることができる電流遮断装置を提供できる。   According to the present invention, a current interruption capable of continuously and efficiently operating an electrical load facility by preventing tripping of a time delay operation type switch when a load exceeding a rated current value is applied. Equipment can be provided.

以下、本発明に係る電流遮断装置Aを実施するための最良の形態を図面に基づいて説明する。
図1〜図3は、本発明に係る電流遮断装置Aを示す模式的な電気回路図であり、図4、図5、電流遮断装置Aの動作を示すフローチャートである。
電流遮断装置Aは、第一の電流遮断装置Dと第二の電流遮断装置Eからなる。
Hereinafter, the best mode for carrying out the current interrupting device A according to the present invention will be described with reference to the drawings.
1 to 3, a schematic electrical circuit diagram showing a current cutoff device A according to the present invention, FIG. 4, FIG. 5 is a flowchart showing the operation of the current interrupting device A.
The current interrupt device A includes a first current interrupt device D and a second current interrupt device E.

本形態で例示する電気回路は、図1〜図3に示すように、一次側の電源V(3相200v)から二次側の複数(図示では5個)の電気負荷設備M1〜M5までの配線道中に、一次側から二次側へ順に、電力量計1、後述の力率制御装置Bの一部を構成する変流器B1、ELB(漏電遮断機)を内蔵した周知の開閉器2、電子制御により時延動作する主開閉器(開閉器)3が接続されている。   As shown in FIGS. 1 to 3, the electric circuit exemplified in this embodiment includes a power supply V (three-phase 200 v) on the primary side to a plurality (five in the drawing) of electric load equipment M1 to M5 on the secondary side. A well-known switch 2 having a built-in watt-hour meter 1, a current transformer B1 that constitutes a part of a power factor control device B, which will be described later, and an ELB (leakage breaker) in order from the primary side to the secondary side in the wiring path. A main switch (switch) 3 that is operated by electronic control for a time delay is connected.

尚、以下では、図1〜図2において、電流が流れている配線を実線にし、電流が流れていない配線を破線にして図示する。   In the following, in FIGS. 1 to 2, the wiring through which current flows is shown as a solid line, and the wiring through which no current flows is shown as a broken line.

本形態の前記主開閉器3は、定格電流値を超える負荷を複数の範囲に分割すると共に、この複数の範囲毎に電流遮断動作までの時間が設定され、定格電流値を超える負荷がかかったときに、該負荷が含まれる範囲に設定された時間の経過後に電流遮断動作を行う時延動作式の開閉器であり、且つ、計測された時間が設定された時間に達すると電流遮断動作を行い、設定された時間前に前記負荷が定格電流値以下になると時間計測が停止されると共に、該時間が計測開始時の値にリセットされ、更に、電流遮断動作が行われる前に、該電流遮断動作が行われることを警報する警報手段Cに対して電流を出力する警報回路Pを有する周知のものである。   The main switch 3 according to this embodiment divides a load exceeding the rated current value into a plurality of ranges, and sets a time until the current interruption operation for each of the plurality of ranges, and a load exceeding the rated current value is applied. Sometimes a time delay operation type switch that performs a current interrupting operation after the lapse of a time set in a range including the load, and performs a current interrupting operation when the measured time reaches a set time. If the load falls below the rated current value before the set time, the time measurement is stopped, the time is reset to the value at the start of measurement, and before the current interrupting operation is performed, the current It is a well-known one having an alarm circuit P that outputs a current to an alarm means C that alarms that a shut-off operation is performed.

警報回路Pは、例えば、図5に示すようなスイッチ回路であり、主開閉器3に流れる電流値を検出する検出手段P1と、該検出手段P1で検出された電流値が低格電流値を超えるものであるときに、前記検出手段P1によりON状態にされるスイッチP2と、該スイッチP2をON/OFF動作させると共に、ON状態の回路内に電力を供給する電源P3と、から構成される。   The alarm circuit P is, for example, a switch circuit as shown in FIG. 5, and a detection means P1 for detecting a current value flowing through the main switch 3, and a current value detected by the detection means P1 indicates a low current value. A switch P2 that is turned on by the detection means P1, and a power supply P3 that turns the switch P2 on and off and supplies power to the circuit in the ON state. .

この警報回路Pは、検出手段P1が低格電流値を超えた電流値を検出したときに、スイッチP2をON状態にして電源P3からの電力を回路内に供給し、検出手段P1が低格電流値未満の電流値を検出したときに、スイッチP2をOFF状態にして電源P3からの電力の供給を停止するものである。
すなわち、スイッチP2のON状態では、前記電流遮断装置A、並びに前記警報手段Cに対して電流が出力され、スイッチP2のOFF状態では、前記電流遮断装置A、並びに前記警報手段Cに対して電流が出力されない。
又、警報回路PのスイッチP2をONするタイミングは、例えば、主開閉器3の電流が遮断される時間(表2参照)の数秒〜数十秒前で任意に設定できる。
This alarm circuit P turns on the switch P2 to supply power from the power source P3 into the circuit when the detection means P1 detects a current value exceeding the low current value, and the detection means P1 is low. When a current value less than the current value is detected, the switch P2 is turned off and the supply of power from the power source P3 is stopped.
That is, when the switch P2 is ON, a current is output to the current interrupt device A and the alarm means C, and when the switch P2 is OFF, current is output to the current interrupt device A and the alarm means C. Is not output.
The timing for turning on the switch P2 of the alarm circuit P can be arbitrarily set, for example, several seconds to several tens of seconds before the time when the current of the main switch 3 is cut off (see Table 2).

前記電流遮断装置は、前記警報回路Pに接続され、該警報回路Pから出力された電流検出したときに電荷負荷設備M5に流れる電流を遮断するものである。
前記電流遮断装置Aは、図1〜図3に示すように、電流リレーA1及びタイマA2を備えた制御手段A’と、接続手段の一例である電磁接触器A3とを備え、電流リレーA1がタイマA2に接続され、タイマA2に電磁接触器A3が接続されている。
The current interrupt device D is connected to the alarm circuit P, and interrupts the current flowing through the charge load facility M5 when the current output from the alarm circuit P is detected .
As shown in FIGS. 1 to 3, the current interrupt device A includes a control means A ′ having a current relay A1 and a timer A2, and an electromagnetic contactor A3 which is an example of a connection means. It is connected to the timer A2, and the electromagnetic contactor A3 is connected to the timer A2.

制御手段A'は、基本的には、前記警報回路Pから出力された電流を検出すると、前記電磁接触器A3を電流遮断解除、及び電流遮断解除状態を維持するように制御するものである。
前記電磁接触器A3は、前記主開閉器3の二次側から前記電気負荷設備M5に亘る配線道中に接続されており、前記制御手段A'の制御に基づいて、電気負荷設備M5に対する電流遮断、及び電流遮断解除するものである。
Basically, when the current output from the alarm circuit P is detected, the control means A ′ controls the electromagnetic contactor A3 so as to release the current interruption and maintain the current interruption release state.
The electromagnetic contactor A3 is connected in a wiring path extending from the secondary side of the main switch 3 to the electric load facility M5, and based on the control of the control means A ′, interrupts the current to the electric load facility M5. , And canceling the current interruption.

ここで、制御手段A’の動作を説明すると、警報回路Pから出力される電流を電流リレーA1が検出すると、電磁接触器A3が電磁接触器A3を電気負荷設備M5への電流を遮断する(電流遮断)。
そして、警報回路Pの電流が出力されず、電流リレーA1が電流の出力を検出しなくなると、電磁接触器A3電気負荷設備M5への電流の遮断を解除する(電流遮断解除)。
前記タイマA2は、電気負荷設備M5を電流遮断状態から電流遮断解除状態に復帰させるときに、ある程度時間をおいてから電流遮断解除状態にするためのものであり、その時間を0秒〜任意の秒数まで設定できる。
タイマ2の時間を0秒に設定した場合、電気負荷設備M5を電流遮断状態から直ちに電流遮断解除状態に復帰させることができる。
Here, the operation of the control means A ′ will be described. When the current relay A1 detects the current output from the alarm circuit P, the electromagnetic contactor A3 cuts off the current to the electric load equipment M5 from the electromagnetic contactor A3 ( Current interruption).
The alarm circuit current is not output P, the current relay A1 does not detect the output current, electric release to (current interruption releasing) the interruption of current in the magnetic contactor A3 is the electrical load equipment M5.
The timer A2 is for setting the electric load equipment M5 from the current interruption state to the current interruption release state after a certain period of time, and setting the time from 0 second to an arbitrary interruption. You can set up to seconds.
When the time of the timer 2 is set to 0 seconds, the electric load equipment M5 can be immediately returned from the current interruption state to the current interruption release state.

前記力率制御装置Bは、回路内の力率を常に最適なものに制御するためのものであり、該力率が遅れ力率であるときに進相コンデンサB2の電荷(電気エネルギー)を回路内に投入するものである。
力率制御装置Bは、基本的には、遅れ無効電力が発生する電気負荷設備を使用する電気回路において該遅れ無効電力により、回路内が遅れ力率状態になったとき、進相コンデンサから電荷(電気エネルギー)を投入することにより生じる進み力率で遅れ力率を打ち消して、電力を効率的に使用するようにした周知のものが使用できる。
The power factor control device B is for always controlling the power factor in the circuit to an optimum one, and when the power factor is a lagging power factor, the charge (electric energy) of the phase advance capacitor B2 is a circuit. To be put in.
Basically, the power factor control device B is configured to charge the phase shift capacitor from the phase advance capacitor when the circuit is in a delayed power factor state due to the delayed reactive power in an electrical circuit using an electrical load facility that generates delayed reactive power. A well-known device can be used in which the power factor is efficiently used by canceling the delay power factor with the leading power factor generated by applying (electrical energy).

本形態の力率制御装置Bは、図3に示すように、前述の変流器B1と、電流リレーB3と、電磁接触器B4と、前述の進相コンデンサB2とが一次側(変流器A4側)から二次側(電気負荷設備M1〜M4側)に順に接続されてなる。
又、前記電磁接触器B4は、前記主開閉器3の二次側から前記進相コンデンサB2に亘る配線道中に接続されている。
又、本形態では、前記変流器B1が検出した電流値を力率に換算し、該力率があらかじめ設定された一定の力率以下であることを電流リレーB3が計測すると、該電流リレーB3が、回路内が遅れ力率状態となったと判定すると共に、前記電磁接触器B4に対して主開閉器3の二次側と進相コンデンサB2とが接続状態(図3参照)となるように出力するようにしている。
又、力率が設定された力率以上〜100%であることを電流リレーB3が計測すると、該電流リレーB3が、回路内の遅れ力率状態が解除されたと判定すると共に、前記電磁接触器B4に対して主開閉器3の二次側と進相コンデンサB2とが非接続状態(図1参照)となるように出力するようにしている。
すなわち、回路内が遅れ力率状態になった際に、自動的に進相コンデンサB2の電荷を回路内に投入することにより、回路内の力率を常に最適なものに保持することができる。
尚、前記設定された一定の力率は、電気料金において力率割引が設定される95%以上であることが好ましい。
As shown in FIG. 3, the power factor control device B of this embodiment is configured such that the current transformer B <b> 1, the current relay B <b> 3, the electromagnetic contactor B <b> 4, and the phase advance capacitor B <b> 2 are the primary side (current transformer). A4 side) is connected in order from the secondary side (electric load equipment M1 to M4 side).
The electromagnetic contactor B4 is connected in a wiring path extending from the secondary side of the main switch 3 to the phase advance capacitor B2.
In this embodiment, the current value detected by the current transformer B1 is converted into a power factor, and when the current relay B3 measures that the power factor is equal to or less than a predetermined power factor, the current relay B3 determines that the circuit is in a delayed power factor state, and the secondary side of the main switch 3 and the phase advance capacitor B2 are connected to the electromagnetic contactor B4 (see FIG. 3). To output.
When the current relay B3 measures that the power factor is equal to or greater than the set power factor to 100%, the current relay B3 determines that the delayed power factor state in the circuit has been released, and the electromagnetic contactor. Output is performed so that the secondary side of the main switch 3 and the phase advance capacitor B2 are not connected to B4 (see FIG. 1).
That is, when the circuit is in a delayed power factor state, the power factor in the circuit can always be kept optimal by automatically charging the phase advance capacitor B2 into the circuit.
The set constant power factor is preferably 95% or more at which a power factor discount is set in the electricity bill.

本形態の力率制御装置Bを配設することによれば、下記のように主開閉器3の定格電流値を下げることができる。
例えば、前記電気負荷設備M1〜M5が75%の遅れ力率のものである場合、該電気負荷設備M1〜M5の電流値が40Aであるとき、実際には、この40Aの25%である10A分が無効電力となり、30A分が有効電力となるため、主開閉器3の定格電流値を30Aとすることが可能となる。
すなわち、前記したように「主開閉器契約」の基本料金は、主開閉器の定格電流値の大きさによって増減するため、主開閉器3の定格電流値を10A下げることができれば、その分基本料金を低減することができる。
そして、前記電流遮断装置Aによる基本料金の低減に加えて、この力率制御装置Bによる基本料金の低減ができるので、より経済的な電気回路とすることができる。
By arranging the power factor control device B of this embodiment, the rated current value of the main switch 3 can be lowered as follows.
For example, when the electric load equipment M1 to M5 has a delay power factor of 75%, when the current value of the electric load equipment M1 to M5 is 40A, actually, 10A which is 25% of the 40A. Since the minute becomes reactive power and 30A becomes active power, the rated current value of the main switch 3 can be set to 30A.
That is, as described above, the basic charge of the “main switch contract” increases and decreases depending on the rated current value of the main switch. Therefore, if the rated current value of the main switch 3 can be reduced by 10 A, the basic charge is increased accordingly. Charges can be reduced.
In addition to the reduction of the basic charge by the current interrupting device A, the basic charge can be reduced by the power factor control device B, so that a more economical electric circuit can be obtained.

警報手段Cは、前記警報回路Pに接続され、該警報回路Pから出力された電流に基づいて、主開閉器3に定格電流値を超える負荷がかかっていることを作業者に知らせるための警報手段である。
前記警報手段Cは、基本的には、警報回路Pから電流が出力されたときに、各作業者に警報するという観点から、警報動作する周知のものが使用できる。
ちなみに、本形態の警報手段Cは、前記電流遮断装置Aの電流リレーA1の一次側に接続された電流リレーC1と、該電流リレーC1に接続された回転灯C2、及びブザーC3とからなる。
The alarm means C is connected to the alarm circuit P, and based on the current output from the alarm circuit P, an alarm for notifying the operator that a load exceeding the rated current value is applied to the main switch 3. Means .
As the alarm means C, a known device that performs an alarm operation can be used from the viewpoint of alarming each worker when current is output from the alarm circuit P.
Incidentally, the alarm means C of this embodiment includes a current relay C1 connected to the primary side of the current relay A1 of the current interrupting device A, a rotating lamp C2 connected to the current relay C1, and a buzzer C3.

本形態の前記電流リレーC1は、警報回路Pから出力された電流に基づき、前記回転灯C2、及びブザーC3を作動(図示せず)させるように出力するようにしている。
又、警報回路Pからの電流の出力が停止したときに電流リレーC1が前記回転灯C2、及びブザーC3の作動を停止(図1参照)させるように出力するようにしている。
すなわち、回路内の電流が過負荷状態になると、作業者に対して視覚的、及び聴覚的に警報を出すことにより、作業者は、この警報に基づいて、回路内の現在の負荷状態を知ることができる。
そして、作業者が回路内の現在の負荷状態を知ることができれば、例えば、該作業者が新たな電気負荷設備の稼動をさせようとした際に、過負荷状態が解除されるまで待つことができる。
Based on the current output from the alarm circuit P, the current relay C1 of the present embodiment is configured to output the rotary lamp C2 and the buzzer C3 to operate (not shown).
Further, when the output of the current from the alarm circuit P stops, the current relay C1 outputs so as to stop the operation of the rotating lamp C2 and the buzzer C3 (see FIG. 1).
That is, when the current in the circuit is overloaded, the worker knows the current load state in the circuit based on this alarm by giving a visual and audible alarm to the worker. be able to.
If the worker can know the current load state in the circuit, for example, when the worker tries to operate a new electric load facility, the worker can wait until the overload state is released. it can.

以下、本形態の電流遮断装置の具体的な動作を、図1〜図の電気回路図、及び図のフローチャートに基づいて説明する。 Hereinafter, a specific operation of the current interrupt device D of the present embodiment will be described based on the electric circuit diagrams of FIGS. 1 to 3 and the flowchart of FIG. 4 .

先ず、電流遮断装置が、電気負荷設備M5に対する電流を遮断する条件を表3に示す。
尚、表中、負荷率は、主開閉器3の定格電流値を100%としたとき、これを超える電流値の率を示している。
又、表中Aは、警報回路PのスイッチP2がONされる時間を示し、Bは主開閉器3が電流遮断動作するまでの時間を示している。
First, Table 3 shows conditions for the current interrupt device D to interrupt the current to the electrical load equipment M5.
In the table, the load factor indicates the rate of the current value exceeding this when the rated current value of the main switch 3 is 100%.
In the table, A indicates the time for which the switch P2 of the alarm circuit P is turned ON, and B indicates the time until the main switch 3 performs the current interruption operation.

Figure 0005537779
Figure 0005537779

前記警報回路Pにおける検出手段P1には、表3に示す定格電流値を超える負荷率を、主開閉器3に設定されている負荷率と同範囲、且つ同数で設定し、設定された負荷率に対応する計測時間(表3A欄)を、主開閉器3に設定されている時間(表3B欄)よりも短い時間でスイッチP2をON状態に動作するように設定している。
尚、本形態では、負荷率が124%までは、検出手段P1がスイッチP2をOFF状態にし、これを超えた負荷率のときにスイッチP2をON状態にするようにしている。
又、表3A欄に示す、前記検出手段P1がスイッチP2をON状態にする時間は、本発明における一例であり、この時間は、検出手段P1に対して任意に設定できる。
又、電流遮断装置Aで制御される電気負荷設備M5は、電流が遮断されると、主開閉器3の定格電流値以下、又は、表3に示す番号1の負荷率になる程度の容量のもので、且つ例えば、工場等において稼動していなくても問題がないものを選択する。
又、本形態では、電流遮断装置で電流遮断制御される電気負荷設備を1個として例示しているが、これは、2個以上としてもよく、主開閉器の定格電流値や、工場等において稼動していなくても問題がないもの等を考慮して決定する。
For the detection means P1 in the alarm circuit P, the load factor exceeding the rated current value shown in Table 3 is set in the same range and in the same number as the load factor set in the main switch 3, and the set load factor is set. Is set to operate the switch P2 in the ON state in a time shorter than the time set in the main switch 3 (Table 3B column).
In this embodiment, the detection means P1 turns off the switch P2 until the load factor is 124%, and the switch P2 is turned on when the load factor exceeds this.
Also, the time shown in Table 3A for the detection means P1 to turn on the switch P2 is an example in the present invention, and this time can be arbitrarily set for the detection means P1.
Further, the electrical load equipment M5 controlled by the current interrupting device A has a capacity that is equal to or less than the rated current value of the main switch 3 or the load factor of No. 1 shown in Table 3 when the current is interrupted. For example, a device that does not have a problem even if it is not operating in a factory or the like is selected.
Further, in this embodiment, the electric load equipment that is controlled to cut off the current by the current cut-off device D is illustrated as one, but this may be two or more, such as the rated current value of the main switch, the factory, etc. In consideration of things that do not have any problems even if they are not in operation.

次に、電流遮断装置の動作を図4のフローチャートに基づいて説明する。
電気負荷設備M1〜M5を起動させると、検出手段P1の主開閉器3に流れる電流値の検出が開始される(ステップS1)。
検出した電流値が、表3B欄の番号2〜番号6に示す負荷率を超えるものであるか否かを判定する(ステップS2〜S6)。
判定結果が、表3B欄の番号2〜番号6に示す負荷率を超えるものである場合、その負荷率に対応する表3A欄の番号2〜番号6のいずれかの時間までの計測を開始する(ステップS7)。
Next, operation | movement of the electric current interruption apparatus D is demonstrated based on the flowchart of FIG.
When the electric load equipment M1 to M5 is activated, detection of the value of the current flowing through the main switch 3 of the detection means P1 is started (step S1).
It is determined whether or not the detected current value exceeds the load factor indicated by numbers 2 to 6 in Table 3B (steps S2 to S6).
When the determination result exceeds the load factor shown in the numbers 2 to 6 in the column 3B, the measurement is started until any time in the numbers 2 to 6 in the column 3A corresponding to the load factor. (Step S7).

この時間の計測中に電流値が表3B欄の番号1以下の負荷率になる(ステップS8)と、前記ステップS3における時間の計測が停止し(ステップS9)、計測された時間を計測開始時の値(初期状態)にリセットする(ステップS10)。   If the current value becomes a load factor equal to or lower than number 1 in Table 3B during this time measurement (step S8), the time measurement in step S3 is stopped (step S9), and the measured time is measured at the start of measurement. To the initial value (step S10).

ステップS3で計測された時間が、主開閉器3にかかる負荷率に対応する表3A欄の番号2〜番号6のいずれかの時間に至る(ステップS11)と、検出手段P1がスイッチP2をON状態にする(ステップS12)。
スイッチP2がON状態になると、警報回路P中に電流が流れ、この電流が電流リレーA1及び警報手段Cに出力される(ステップS13)。
電流が出力されると電流リレーA1が電磁接触器A3を電流遮断状態にし(ステップS14)、電流リレーC1が前記回転灯C2、及びブザーC3を作動させる(ステップS15)。
このとき前記電気負荷設備M5は、電磁接触器A3が電流遮断状態となるので、その稼動が停止する(図2参照)。
そして、電気負荷設備M5の稼動が停止することにより、稼動している電気負荷設備M1〜M4の総電流値が主開閉器3の定格電流値以下、又は、表3A欄に示す番号1の負荷率以下になるので、主開閉器3が設定された時間(表3B欄)を経過してもトリップすることはない。
更に、稼動している電気負荷設備M1〜M4の総電流値が主開閉器3の定格電流値以下、又は、表3A欄に示す番号1の負荷率以下になる(ステップS16)と、計測された時間を計測開始時の値(初期状態)にリセットし(ステップS17)、該リセット後に、ステップS2において定格電流値の125%以上の負荷率であるか否かの計測を初期状態から計測する。
When the time measured in step S3 reaches one of the numbers 2 to 6 in the column 3A corresponding to the load factor applied to the main switch 3 (step S11), the detection means P1 turns on the switch P2. The state is set (step S12).
When the switch P2 is turned on, a current flows in the alarm circuit P, and this current is output to the current relay A1 and the alarm means C (step S13).
When the current is output, the current relay A1 sets the electromagnetic contactor A3 in the current interruption state (step S14), and the current relay C1 operates the rotating lamp C2 and the buzzer C3 (step S15).
At this time, the operation of the electrical load equipment M5 is stopped because the magnetic contactor A3 is in a current interruption state (see FIG. 2).
Then, when the operation of the electric load equipment M5 is stopped, the total current value of the electric load equipment M1 to M4 in operation is equal to or less than the rated current value of the main switch 3, or the load of No. 1 shown in the column of Table 3A. Since it becomes less than the rate, the main switch 3 will not trip even if the set time (Table 3B column) elapses.
Furthermore, it is measured when the total current value of the operating electrical load equipment M1 to M4 is less than the rated current value of the main switch 3 or less than the load factor of No. 1 shown in the Table 3A column (step S16). The measured time is reset to the value at the start of measurement (initial state) (step S17), and after the reset, whether or not the load factor is 125% or more of the rated current value is measured from the initial state in step S2. .

稼動している電気負荷設備M1〜M4の総電流値が主開閉器3の定格電流値以下、又は、表3A欄に示す番号1の負荷率以下になると、検出手段P1がスイッチP2をOFF状態にして、警報回路Pから電流の出力を停止する(ステップS18)。
警報回路Pから電流の出力が停止されると、電流リレーC1が回転灯C2、及びブザーC3の作動を停止させ(ステップS19)、タイマA2が設定された時間の計測を開始する(ステップS20)。
タイマA2が計測する時間が設定した時間に達する(ステップS21)と、電流リレーA1が電磁接触器A3に対する電流遮断状態を解除する(ステップS22)。
このとき、前記電気負荷設備M5は、電磁接触器A3が電流遮断解除状態となるので、その稼動が再開する(図2参照)。
そして、電気負荷設備M1〜M5の全ての作動を停止するまで、再びステップS1からの動作が繰り返される。
When the total current value of the operating electrical load equipment M1 to M4 is less than the rated current value of the main switch 3 or less than the load factor of No. 1 shown in the Table 3A column, the detection means P1 turns off the switch P2. Then, the output of current from the alarm circuit P is stopped (step S18).
When the output of current from the alarm circuit P is stopped, the current relay C1 stops the operation of the rotating lamp C2 and the buzzer C3 (step S19), and the timer A2 starts measuring the set time (step S20). .
When the time measured by the timer A2 reaches the set time (step S21), the current relay A1 releases the current interruption state for the electromagnetic contactor A3 (step S22).
At this time, the operation of the electrical load equipment M5 is resumed because the electromagnetic contactor A3 is in a current interruption release state (see FIG. 2).
And the operation | movement from step S1 is repeated again until all the operation | movement of the electrical load equipment M1-M5 is stopped.

本形態のタイマA2の設定によれば、電磁接触器A3の電流の遮断状態から、ある程度時間をおいて電流の遮断解除状態にすることにより、回路に対して連続的に過負荷を作用させることを防止することができる。
尚、タイマA2の設定を0秒にしたり、又、タイマA2を作動不能状態にしたりすることで、直ちに電磁接触器A3を電流遮断解除状態にするようにしてもよい。
このような構成によっても、電気負荷設備M1〜M5の電流値が主開閉器3の定格電流値を超える負荷率となっても、主開閉器3のトリップを防止することができる。
According to the setting of the timer A2 of this embodiment, a continuous overload is applied to the circuit by changing the current from the current interruption state of the magnetic contactor A3 to a current interruption release state after a certain time. Can be prevented.
Note that the electromagnetic contactor A3 may be immediately brought into the current interruption release state by setting the timer A2 to 0 seconds or disabling the timer A2.
Even with such a configuration, tripping of the main switch 3 can be prevented even when the current value of the electrical load equipment M1 to M5 becomes a load factor that exceeds the rated current value of the main switch 3.

第二の電流遮断装置は、電気回路中の電流値を検出する変流器A4を備え、該変流器A4が定格電流値を超える負荷を検出した際に、電荷負荷設備M5に流れる電流を遮断するものである。 The second current interrupting device E includes a current transformer A4 that detects a current value in the electric circuit, and when the current transformer A4 detects a load that exceeds the rated current value, a current that flows through the charge load facility M5. Is to shut off.

第二の電流遮断装置は、主開閉器3の一次側に接続された前記変流器A4が、電流遮断装置Dと同構成の制御手段A”の電流リレーA1’に接続されてなる。
前記変流器A4は、主開閉器3の一次側で電気回路中の電流値を常時検出するものであり、この検出した結果を前記電流リレーA1’に出力するものである。
すなわち、本形態における制御手段Aの制御は、前記変流器A4で計測された電流値に基づいて、前記電磁接触器A3が電流遮断解除、及び電流遮断解除状態を維持するように制御するものである。
又、本形態のタイマA2、負荷の大きさ毎に設定された主開閉器3の遮断動作の時間(表4B欄参照)に達する前の時間までの時間を計測し、この時間が計測された時点で、電磁接触器A3を電気負荷設備M5への電流を遮断する状態にするものである。
又、タイマA2の時間計測中に、変流器A4で検出した電流値が、定格電流値以下の負荷であると前記電流リレーA1’が計測したときには、タイマA2は、時間計測を停止すると共に、タイマA2の時間が計測開始時(初期状態)の値にリセットされる。
又、電磁接触器A3の電流遮断後には、前記タイマA2の時間が計測開始時の値にリセットされる。
又、変流器A4で検出している電流値が、定格電流値以下の負荷であるときには、タイマA2は作動せず、電磁接触器A3の電流遮断解除状態を維持するものである。
The second current interrupt device E is formed by connecting the current transformer A4 connected to the primary side of the main switch 3 to a current relay A 1 ′ of the control means A ″ having the same configuration as the current interrupt device D. .
The current transformer A4 constantly detects the current value in the electric circuit on the primary side of the main switch 3, and outputs the detected result to the current relay A1 .
That is, the control of the control means A in this embodiment is controlled so that the magnetic contactor A3 maintains the current interruption release state and the current interruption release state based on the current value measured by the current transformer A4. Is.
Further, this embodiment of the timer A2 'measures a time before the time to reach the cutoff operation time of the main switch 3, which is set for each size of the load (see Table 4B column), this time At the time of measurement, the electromagnetic contactor A3 is brought into a state of interrupting the current to the electric load facility M5.
Also, 'during time measurement, the current value detected by the current transformer A4 is, the current relay A 1 as the following load rated current' timer A2 when the measured, the timer A2 'is a time measurement At the same time, the timer A2 ' time is reset to the value at the start of measurement (initial state).
Further, after the current interruption of the magnetic contactor A3, the time of the timer A2 ' is reset to the value at the start of measurement.
Further, when the current value detected by the current transformer A4 is a load equal to or lower than the rated current value, the timer A2 ' does not operate, and the current interruption release state of the magnetic contactor A3 is maintained.

以下、本形態の電流遮断装置の具体的な動作を、図〜図の電気回路図、及び図のフローチャートに基づいて説明する。 Hereinafter, a specific operation of the current interruption device E of this embodiment, the electrical circuit diagram of FIGS. 1-3, and will be described with reference to the flowchart of FIG.

先ず、電流遮断装置が、電気負荷設備M5に対する電流を遮断する条件を表4に示す。
尚、表中、負荷率は、主開閉器3の定格電流値を100%としたとき、これを超える電流値の率を示している。
又、表中Aは、電流遮断装置が電気負荷設備M5に対する電流を遮断する動作までの時間を示し、Bは主開閉器3が電流遮断動作するまでの時間を示している。
First, Table 4 shows conditions for the current interrupt device E to interrupt the current to the electrical load equipment M5.
In the table, the load factor indicates the rate of the current value exceeding this when the rated current value of the main switch 3 is 100%.
In the table, A indicates the time until the current interrupting device E operates to interrupt the current to the electric load equipment M5, and B indicates the time until the main switch 3 performs the current interrupting operation.

Figure 0005537779
Figure 0005537779

前記制御手段Aには、表4示す定格電流値を超える負荷率を、主開閉器3に設定されている負荷率と同範囲、且つ同数で設定し、設定された負荷率に対応する計測時間(表A欄)を、主開閉器3に設定されている時間(表4B欄)よりも短い時間で電流遮断動作するように設定している。
尚、本形態では、負荷率が124%までは、電流遮断装置が動作せず、これを超えた負荷率のときに動作するようにしている。
又、表4A欄に示す、電流遮断装置が電気負荷設備M5に対する電流を遮断するまでの時間は、本発明における一例であり、この時間は、制御手段Aに対して任意に設定できる。
In the control means A , a load factor exceeding the rated current value shown in Table 4 is set in the same range and in the same number as the load factor set in the main switch 3, and the measurement corresponding to the set load factor is performed. time is set (Table 4 a column), the main switch 3 have been set time to work current interruption in a shorter time than (Table 4B column).
In this embodiment, the current interrupt device E does not operate up to a load factor of 124%, but operates when the load factor exceeds this.
Moreover, the time until the current interrupting device E interrupts the electric current to the electric load equipment M5 shown in Table 4A is an example in the present invention, and this time can be arbitrarily set for the control means A .

次に、本形態の電流遮断装置の動作を図のフローチャートに基づいて説明する。
電気負荷設備M1〜M5を起動させると、変流器A4が電流値の検出を開始する(ステップS1)。
このとき、電磁接続器A4は、制御手段Aにより、制御される電気負荷設備M5に対して電流を流す状態(電流遮断解除状態)にされており、前記電気負荷設備M5が稼動状態にある(図6参照)。
Next, the operation of the current interrupting device E of this embodiment will be described with reference to the flowchart of FIG.
When the electric load facilities M1 to M5 are activated, the current transformer A4 starts detecting the current value (step S1).
At this time, the electromagnetic connector A4 is brought into a state in which a current is passed to the controlled electrical load equipment M5 (current interruption release state) by the control means A , and the electrical load equipment M5 is in an operating state. (See FIG. 6).

変流器A4で検出した電流値が、主開閉器3の定格電流値の125%以上の負荷率であるか否かを計測する(ステップS2)。
計測された負荷率が125%以上である場合、その負荷率が表3で示すどの番号に含まれるかを判定する(ステップS3〜S7)。
番号が判定されると、タイマA2の時間計測が開始される(ステップS8)。
It is measured whether or not the current value detected by the current transformer A4 is a load factor of 125% or more of the rated current value of the main switch 3 (step S2).
When the measured load factor is 125% or more, it is determined to which number shown in Table 3 the load factor is included (steps S3 to S7).
When the number is determined, the time measurement of the timer A2 is started (step S8).

判定された番号に対応するA欄の時間(制御手段Aに設定された時間)が経過すると(ステップS9)、タイマA2の時間計測を停止(ステップS10)し、該時間を計測開始時(初期状態)の値にリセットする(ステップ11)と共に、電磁接触器A3を電流遮断状態にする(ステップS12)。
このとき前記電気負荷設備M5は、電磁接触器A3が電流遮断状態となるので、その稼動が停止する(図参照)。
そして、電気負荷設備M5の稼動が停止することにより、稼動している電気負荷設備M1〜M4の総電流値が主開閉器3の定格電流値以下、又は、表3に示す番号1の負荷率になるので、主開閉器3が設定された時間(表B欄)を経過してもトリップすることはない。
When the time in the A column corresponding to the determined number (the time set in the control means A ) has elapsed (step S9), the time measurement of the timer A2 is stopped (step S10), and the time is measured. The value is reset to the (initial state) value (step 11), and the electromagnetic contactor A3 is brought into a current interruption state (step S12).
At this time, the operation of the electrical load equipment M5 is stopped because the magnetic contactor A3 is in a current interruption state (see FIG. 2 ).
Then, when the operation of the electric load facility M5 is stopped, the total current value of the operating electric load facilities M1 to M4 is equal to or less than the rated current value of the main switch 3, or the load factor of No. 1 shown in Table 3 since the, does not trip even after the main switch 3 is set time (Table 4 B column).

本形態では、前記ステップS11でリセットされたタイマA2を、再び時間計測動作(ステップS13)させて、任意の時間経過後(ステップS14)に、再びタイマA2の時間計測を停止する(ステップS15)と共に、タイマA2の時間を計測開始時(初期状態)の値にリセットし(ステップS16)、電磁接触器A3を電流の遮断解除状態にする(ステップS17)(図1参照)制御をする。
そして、該リセット後に、ステップS2において定格電流値の125%以上の負荷率であるか否かの計測を初期状態から計測する。
In the present embodiment, the timer A2 reset in the step S11 is caused to again measure time (step S13), and the time measurement of the timer A2 is again stopped after an arbitrary time has elapsed (step S14) (step S14). with S15), it resets the time of the timer A2 'to the value of the measurement at the start (initial state) (step S16), and the electromagnetic contactor A3 to unblocking state of the current (step S17) (see FIG. 1) control To do.
Then, after the resetting, in step S2, whether or not the load factor is 125% or more of the rated current value is measured from the initial state.

すなわち、電磁接触器A3の電流の遮断状態から、ある程度時間をおいて電流の遮断解除状態にすることにより、回路に対して連続的に過負荷を作用させることを防止することができる。
尚、前記ステップS11でのタイマA2のリセット後に、直ちに電磁接触器A3を電流遮断解除状態にするようにしてもよく、このような構成によっても、電気負荷設備M1〜M5の電流値が主開閉器3の定格電流値を超える負荷率となっても、タイマA2の時間計測が初期状態から開始されるので、主開閉器3のトリップを防止することができる。
That is, it is possible to prevent an overload from being continuously applied to the circuit by changing the current interruption state of the magnetic contactor A3 from the current interruption state to a state where the current interruption is released after a certain amount of time.
It should be noted that the electromagnetic contactor A3 may be immediately released from the current interruption state after the timer A2 ' is reset in the step S11. With such a configuration, the current values of the electric load equipments M1 to M5 are the main values. Even when the load factor exceeds the rated current value of the switch 3, the time measurement of the timer A 2 is started from the initial state, so that the trip of the main switch 3 can be prevented.

又、時間経過前に、負荷率が125%未満になる(ステップS18)と、タイマA2の時間計測を停止する(ステップS19)と共に、タイマA2の時間を計測開始時(初期状態)の値にリセットし(ステップS20)、該リセット後に、ステップS2において定格電流値の125%以上の負荷率であるか否かの計測を初期状態から再開する。 If the load factor becomes less than 125% before the time elapses (step S18), the time measurement of the timer A2 ' is stopped (step S19) and the time of the timer A2 ' is started (initial state). The value is reset (step S20), and after the reset, measurement of whether or not the load factor is 125% or more of the rated current value is restarted from the initial state in step S2.

以上の電流遮断装置D、Eによれば、主開閉器3の定格電流値を全ての電気負荷設備M1〜M5の総電流値よりも低いものにした場合、電気負荷設備M1〜M5の電流値が、主開閉器3の定格電流値を超える負荷率となっても、電気負荷設備M5に流れる電流を、主開閉器3に設定された時間の前に自動的に遮断することができると共に、遮断された電流を電気負荷設備M5に再び流すことができる。
したがって、前記したように「主開閉器契約」の基本料金は、主開閉器の定格電流値の大きさによって増減するため、主開閉器3の定格電流値を全ての電気負荷設備M1〜M5の総電流値よりも低い値にすれば、その分基本料金を低減することができ、しかも、電流遮断装置Aにより、主開閉器3のトリップが防止されているので、必要な電気負荷設備を停止させることなく、連続的な稼動をさせることができる。
According to the above current interrupting devices D and E, when the rated current value of the main switch 3 is lower than the total current value of all the electric load facilities M1 to M5, the current values of the electric load facilities M1 to M5 However, even if the load factor exceeds the rated current value of the main switch 3, the current flowing through the electrical load equipment M5 can be automatically cut off before the time set in the main switch 3, The interrupted current can be supplied again to the electric load equipment M5.
Therefore, as described above, since the basic charge of the “main switch contract” increases and decreases depending on the rated current value of the main switch, the rated current value of the main switch 3 is set for all the electric load equipments M1 to M5. If the value is lower than the total current value, the basic charge can be reduced by that amount, and the tripping of the main switch 3 is prevented by the current interrupting device A, so the necessary electrical load equipment is stopped. It is possible to operate continuously without making it happen.

第二の電流遮断装置Eは、第一の電流遮断装置Dのバックアップ用として使用するものであり、主として使用する電流遮断装置が故障等で作動しなくなっても、バックアップ用の電流遮断装置Eで電流遮断制御を行なうことができると共に、主として使用する電流遮断装置Dが作動しないときに、これを監視して自動的にバックアップ用の電流遮断装置Eが作動できるようにされている。 Second current blocking device E is for use as a backup of the first current blocking device D, even if the current interrupting device D used primarily not function in failure or the like, the current interrupting device E for backup it is possible to perform current cutoff control in, and is mainly when no operating current interrupting device D to be used, which allow automatically actuated current interrupt device E for backup and monitoring.

電流遮断装置Dが作動しないことを監視する方法としては、例えば、バックアップ用の電流遮断装置の電流リレーA1’及びタイマA2’を利用する方法が挙げられる。 As a method for monitoring that the current interrupting device D does not operate , for example, a method using the current relay A1 ′ and the timer A2 ′ of the backup current interrupting device E can be cited.

本形態では、表5に示すように、電流遮断装置Eが電流遮断動作する時間(表5B欄参照)を、電流遮断装置Dが電流遮断動作する時間(表5A欄参照)よりも長くなるように設定しておき、電流遮断装置Dが電流遮断動作する時間に至っても、副装置Eの変流器A4が検出する電流値が低下しないときに、電流遮断装置Dに異常があったものと判断して電流遮断装置Eが電流遮断動作するようにしたものである。
又、表5B欄に示す時間の設定は、電流遮断装置EのタイマA2の設定により行なうことができる。
したがって、電流遮断装置Dが故障等で作動しなくなっても、電流遮断装置Eが電流遮断制御を行なうため、主開閉器3のトリップを確実に防止することができる。
In this embodiment, as shown in Table 5, the time during which the current interrupting device E performs the current interrupting operation (see Table 5B column) is longer than the time during which the current interrupting device D performs the current interrupting operation (see Table 5A column). If the current value detected by the current transformer A4 of the auxiliary device E does not decrease even when the current interrupting device D reaches the current interrupting operation time, the current interrupting device D is abnormal. The current interruption device E is judged to perform a current interruption operation.
The time setting shown in Table 5B can be set by setting the timer A2 ' of the current interrupting device E.
Therefore, even if the current interrupting device D stops operating due to a failure or the like, the current interrupting device E performs the current interrupting control, so that the trip of the main switch 3 can be reliably prevented.

尚、本形態では、第一の電流遮断装置を主として使用する装置とし、第二の電流遮断装置バックアップ用に使用する装置として例示したが、本発明では、主として使用する装置とバックアップ用に使用する装置の関係を逆にしてもよく、いずれの場合でも、バックアップ用に使用する装置が電流遮断する時間を主として使用する装置が電流遮断する時間よりも長くすればよい。
又、表5A欄及び表5B欄に示す時間は、本発明における一例であり、この時間は任意に設定できる。
In the present embodiment, a device using a first current cut-off device D as the main, have been exemplified as a device that uses the second current cut-off device E for backup, in the present invention, apparatus and a backup to be used primarily it may be the relationship between the device to be used for use Conversely, in any case, may be longer than the time unit to be used as a main time for interrupting device current used for backup to current interruption.
The time shown in Table 5A column and Table 5 B column is an example of the present invention, this time can be set arbitrarily.

Figure 0005537779
Figure 0005537779

尚、本発明は、例示した実施の形態に限定するものでは無く、特許請求の範囲の各項に記載された内容から逸脱しない範囲の構成による実施が可能である。
例えば、本形態では、電磁接触器A3の作動を制御する制御手段が、電流リレーA1、A1’とタイマA2、A2’を用いた構造のものを例示したが、本発明では、例示した構造に限定されるものではなく、例えば、CPUを用いた制御手段、すなわち、装置全体の制御を司るCPUと、該CPUが実行する制御プログラムや、電流値、負荷率、時間、電流遮断動作、電流遮断解除動作等の各種データを記憶するROMと、電流値、負荷率、時間、電流遮断動作パターン、電流遮断解除動作パターン等の各種データ、及び各種入力情報及び演算結果等を一時的に記憶するRAMと、各種時間を計測するタイマと、各種編集を行うスイッチ類と、各種編集画面や各種情報等を表示するディスプレイと、前記制御プログラムを含む各種アプリケーションプログラムや各種データ等を記憶する記憶装置等を含む制御手段が挙げられる。
又、前記CPUを用いた制御手段により、力率制御装置及び警報手段Cの制御を行うようにしてもよい。
It should be noted that the present invention is not limited to the illustrated embodiments, and can be implemented with configurations within a range that does not deviate from the contents described in the respective claims.
For example, in the present embodiment, the control means for controlling the operation of the electromagnetic contactor A3 is exemplified as a structure using the current relays A1, A1 ′ and the timers A2, A2 ′. For example, the control means using the CPU, that is, the CPU that controls the entire apparatus, the control program executed by the CPU, the current value, the load factor, the time, the current cutoff operation, the current cutoff ROM that stores various data such as release operation, RAM that temporarily stores various data such as current value, load factor, time, current interruption operation pattern, current interruption release operation pattern, and various input information and calculation results A timer for measuring various times, switches for performing various editing, a display for displaying various editing screens and various information, and various applications including the control program. Control means including a storage device for storing the emissions programs and various data, and the like.
Further, the power factor control device B and the alarm means C may be controlled by the control means using the CPU.

本発明に係る電流遮断装置を適用した電気回路図。The electric circuit diagram to which the current interrupting device concerning the present invention is applied. 電気負荷設備に対して電流遮断状態とした電気回路図。The electric circuit diagram made into the electric current interruption state with respect to electrical load equipment. 進相コンデンサの電荷を投入した状態の電気回路図。The electric circuit diagram of the state which injected the electric charge of a phase advance capacitor. 第一の電流遮断装置の動作を示すフローチャート。 The flowchart which shows operation | movement of a 1st electric current interruption apparatus. 第二の電流遮断装置の動作を示すフローチャート。The flowchart which shows operation | movement of a 2nd electric current interruption apparatus. 警報回路図。Alarm circuit diagram.

符号の説明Explanation of symbols

A:電流遮断装置
A1:電流リレー
A2:タイマ
A1’:電流リレー
A2’:タイマ
A3:電磁接触器
A4:変流器
A’:制御手段
A”:制御手段
B:力率制御装置
B2:進相コンデンサ
M1:電気負荷設備
M2:電気負荷設備
M3:電気負荷設備
M4:電気負荷設備
M5:電気負荷設備
3:主開閉器(開閉器)
C:警報手段
P:警報回路
D:第一の電流遮断
E:第一の電流遮断
A: Current interrupter A1: Current relay A2: Timer
A1 ': Current relay
A2 ': Timer A3: Electromagnetic contactor A4: Current transformer A': Control means
A ": Control means B: Power factor control device B2: Phase advance capacitor M1: Electric load equipment M2: Electric load equipment M3: Electric load equipment M4: Electric load equipment M5: Electric load equipment 3: Main switch (switch)
C: alarm means P: alarm circuit D: the first current blocking equipment E: first current blocking equipment

Claims (2)

定格電流値を超える負荷の大きさを複数の範囲に分割すると共に、この複数の範囲毎に電流遮断動作までの時間が設定され、定格電流値を超える負荷がかかったときに、該負荷が含まれる範囲に設定された時間の経過後に電流遮断動作を行う時延動作式の開閉器であり、且つ、計測された時間が設定された時間に達すると電流遮断動作を行い、設定された時間前に前記負荷が定格電流値以下になると時間計測が停止されると共に、該時間が計測開始時の値にリセットされ、更に、電流遮断動作が行われる前に、該電流遮断動作が行われることを警報する警報手段に対して電流を出力する警報回路を有する開閉器を介して、複数の電気負荷設備に対して電流を流す電気回路に組み込まれる電流遮断装置であって、
前記電流遮断装置は、第一の電流遮断装置と、第二の電流遮断装置とを備え、これら二つの電流遮断装置の一方の電流遮断動作を行うまでの時間よりも、他方の電流遮断動作を行うまでの時間が長くなるように設定され、
前記第一の電流遮断装置は、前記警報回路からの電流を検出すると共に、この検出結果を出力する制御手段を備え
前記第二の電流遮断装置は、前記電気回路中の電流値を検出する電流値検出手段と、
前記電流値検出手段に接続され、該電流値検出手段で検出された電流値と、電流が流れている時間を計測し、この計測結果を出力する制御手段とを備え、
前記第一の電流遮断装置の前記制御手段及び前記第二の電流遮断装置の前記制御手段が、前記開閉器の2次側と電気負荷設備のうち選択された1、又は複数の電気負荷設備に亘る電気配線道中に接続され、電気負荷設備に対して電流遮断、及び電流遮断解除すると共に、前記制御手段の出力結果に基づいて、前記電気負荷設備に対する電流遮断動作、及び電流遮断解除動作が制御される接続手段に接続され
前記第一の電流遮断装置における前記制御手段は、前記警報回路からの電流を検出したときに、前記接続手段に対して電流遮断動作をさせる制御と、電流が遮断された状態から前記警報回路からの電流が検出されなくなったときに、前記接続手段に対して電流遮断解除動作させる制御とを行ない、
前記第二の電流遮断装置における前記制御手段は、前記電流値検出手段で計測された電流値が、前記複数の範囲のいずれかに含まれるものであるかを判定する制御と、前記定格電流値を超える負荷であるときに、電流が流れている時間の計測を開始する制御と、前記電流が流れている時間が、前記判定された範囲に設定された電流遮断動作を行う時間に達する時間以前の時間に達したときに、前記接続手段に対して電流遮断動作させる制御と、前記電流遮断動作を行う時間に達する時間以前の時間を設定する制御と、前記電流遮断動作と同時に、電流が流れている時間の計測を停止すると共に、該時間を計測開始時の値にリセットする制御と、前記リセットと同時に又は後に、電流が流れている時間の計測を開始すると共に、前記接続手段に対して電流遮断解除動作させる制御と、前記電流遮断動作を行う時間に達する時間以前の時間の前に、負荷が定格電流値未満になったときに、電流が流れている時間の計測を停止すると共に、該時間を計測開始時の値にリセットする制御とを行なうことを特徴とする電流遮断装置。
The load size exceeding the rated current value is divided into multiple ranges, and the time until the current interruption operation is set for each of the multiple ranges, and the load is included when a load exceeding the rated current value is applied. This is a time-delayed type switch that performs a current interruption operation after the set time has elapsed, and performs a current interruption operation when the measured time reaches the set time. When the load falls below the rated current value, the time measurement is stopped, the time is reset to the value at the start of measurement, and the current interrupting operation is performed before the current interrupting operation is performed. A current interrupting device incorporated in an electric circuit for supplying current to a plurality of electric load facilities via a switch having an alarm circuit for outputting current to alarm means for alarming,
The current interrupting device includes a first current interrupting device and a second current interrupting device, and the current interrupting operation of the other current interrupting device is performed more than the time until the current interrupting operation of one of these two current interrupting devices is performed. Set to take longer to do,
The first current interrupt device includes a control means for detecting a current from the alarm circuit and outputting the detection result,
The second current interrupt device includes a current value detecting means for detecting a current value in the electric circuit,
A current value detected by the current value detecting means, connected to the current value detecting means, and a control means for measuring the time during which the current flows and outputting the measurement result;
The control means of the first current interrupting device and the control means of the second current interrupting device may be one or more selected from the secondary side of the switch and the electrical load equipment. Connected in the electric wiring path, and cuts off the current for the electric load equipment and releases the current cut, and controls the current cut-off operation and the current cut-off release operation for the electric load equipment based on the output result of the control means. is connected to the connection means being,
The control means in the first current interrupt device is configured to control the connection means to perform a current interrupt operation when detecting a current from the alarm circuit, and from the alarm circuit from a state where the current is interrupted. When the current is no longer detected, the connection means is controlled to release the current interruption ,
The control means in the second current interrupting device includes control for determining whether the current value measured by the current value detecting means is included in any of the plurality of ranges, and the rated current value Before starting the measurement of the time during which the current flows when the load exceeds the load, and the time during which the current is flowing reaches the time for performing the current interrupting operation set in the determined range When the time reaches, the control for causing the connection means to cut off the current, the control for setting the time before the time for performing the current cut-off operation, and the current cut-off operation, current flows simultaneously. Control to reset the time to the value at the start of measurement, and simultaneously with or after the reset, the measurement of the time during which the current flows is started, and the connection means And stop the measurement of the time during which the current is flowing when the load becomes less than the rated current value before the time before the time to reach the time to perform the current interruption operation and the control to release the current interruption operation. with current interrupting device comprising a a control for resetting the said time to a value of the time of measurement start line of TURMERIC.
前記電気負荷設備の負荷増により生じる遅れ無効電力値が、あらかじめ設定された値を超えたときに、開閉器の2次側の電気配線道中に進相コンデンサを接続することにより、該電気配線道中を進み力率状態とし、この進み力率状態により生じる進み無効電力が、あらかじめ設定された値を越えたときに、進相コンデンサの接続を遮断する力率制御装置を備えていることを特徴とする請求項1に記載の電流遮断装置。 By connecting a phase advance capacitor in the electrical wiring path on the secondary side of the switch when the delayed reactive power value caused by the load increase of the electrical load equipment exceeds a preset value, and a leading power factor state, leading reactive power generated by the leading power factor state, when it exceeds a preset value, and features that you have provided a power factor controller to cut off the connection of the phase advance capacitor The current interrupting device according to claim 1.
JP2008044383A 2007-04-23 2008-02-26 Current interrupt device Expired - Fee Related JP5537779B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2008044383A JP5537779B2 (en) 2007-04-23 2008-02-26 Current interrupt device

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2007113000 2007-04-23
JP2007113000 2007-04-23
JP2008044383A JP5537779B2 (en) 2007-04-23 2008-02-26 Current interrupt device

Publications (2)

Publication Number Publication Date
JP2008295285A JP2008295285A (en) 2008-12-04
JP5537779B2 true JP5537779B2 (en) 2014-07-02

Family

ID=40169435

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2008044383A Expired - Fee Related JP5537779B2 (en) 2007-04-23 2008-02-26 Current interrupt device

Country Status (1)

Country Link
JP (1) JP5537779B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5941968B2 (en) * 2014-12-09 2016-06-29 株式会社Nttファシリティーズ Power supply system and power supply method

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0315221A (en) * 1989-06-09 1991-01-23 Takenaka Komuten Co Ltd Power distribution controller
JPH10136554A (en) * 1996-10-31 1998-05-22 Fuji Electric Co Ltd Circuit breaker
JP4457379B2 (en) * 2003-12-19 2010-04-28 株式会社ネオインターナショナル Electronic breaker

Also Published As

Publication number Publication date
JP2008295285A (en) 2008-12-04

Similar Documents

Publication Publication Date Title
JP6386579B2 (en) Power control apparatus and power control system including the same
US10910873B2 (en) Method of identifying when to initiate control sequences
JP5537779B2 (en) Current interrupt device
JP6301206B2 (en) Power storage device and control program
CN115776093A (en) Method for monitoring and controlling current distribution in a device
JP2018518006A (en) Power distribution system for connection to AC voltage network
KR101902169B1 (en) Apparatus and Method for Controlling Fault Monitoring and Fault Prevention of Power Supply System
JP5496246B2 (en) Power storage control system and power storage control method
US11791622B2 (en) Time-admittance fault detection and isolation system
JP3138275U (en) Electronic breaker
EP2408078A2 (en) Centrally controlled protection system having reduced energy let-through mode
KR100824051B1 (en) MC with uninterruptible power supply
JP6354400B2 (en) Protection method and protection device for uninterruptible power supply
JP2010063247A (en) Working state monitoring controller and circuit breaker
KR100699352B1 (en) Power generation system performing power peak control and control method thereof
JP2009207331A (en) Power supply protection control circuit
KR20170096369A (en) Fault current limiter with circuit breaker
KR101313011B1 (en) Driving control method for energy conservation high and low voltage switchgear
CN103999314B (en) Method for voltage regulation and parallelism between different high voltage sources
JP6540082B2 (en) Control system and control program for an isolated power plant
JP5941967B2 (en) Circuit breaker, power supply system, interruption method, and interruption program
JP5145172B2 (en) Circuit breaker
JP5178570B2 (en) Electric circuit switching device, outlet box, and electric circuit switching method
JP4227552B2 (en) Isolated operation prevention method and isolated operation prevention apparatus using the same
JP2002218658A (en) Reverse power flow prevention device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20110208

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20121203

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20121225

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20130416

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20130716

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20130723

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20130913

R150 Certificate of patent or registration of utility model

Ref document number: 5537779

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140428

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees