JP5622987B2 - Finishing material removal method - Google Patents
[go: Go Back, main page]

JP5622987B2 - Finishing material removal method - Google Patents

Finishing material removal method Download PDF

Info

Publication number
JP5622987B2
JP5622987B2 JP2010208944A JP2010208944A JP5622987B2 JP 5622987 B2 JP5622987 B2 JP 5622987B2 JP 2010208944 A JP2010208944 A JP 2010208944A JP 2010208944 A JP2010208944 A JP 2010208944A JP 5622987 B2 JP5622987 B2 JP 5622987B2
Authority
JP
Japan
Prior art keywords
removal
finishing material
hole
horizontal direction
site
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2010208944A
Other languages
Japanese (ja)
Other versions
JP2012062714A (en
Inventor
清彦 籠田
清彦 籠田
敏治 中村
敏治 中村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2010208944A priority Critical patent/JP5622987B2/en
Publication of JP2012062714A publication Critical patent/JP2012062714A/en
Application granted granted Critical
Publication of JP5622987B2 publication Critical patent/JP5622987B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Working Measures On Existing Buildindgs (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)

Description

本発明は、仕上材撤去方法に関する。詳しくは、鉄筋コンクリート躯体の表面に設けられたモルタル層を撤去する仕上材撤去方法に関する。   The present invention relates to a finishing material removal method. In detail, it is related with the finishing material removal method which removes the mortar layer provided in the surface of the reinforced concrete frame.

従来より、塗装やクロス貼りの下地として、鉄筋コンクリート壁の表面にモルタル層を設けることが多いが、仕上げの改修工事や耐震補強工事を行う場合には、このモルタル層を撤去する。
具体的には、チッパーやハンマードリルなどの打撃工具によりモルタル層に打撃を加えて破壊することで、モルタル層を撤去する。
Conventionally, a mortar layer is often provided on the surface of a reinforced concrete wall as the groundwork for painting or cloth application. However, when finishing repair work or seismic reinforcement work, this mortar layer is removed.
Specifically, the mortar layer is removed by hitting and destroying the mortar layer with an impact tool such as a chipper or a hammer drill.

しかしながら、この方法では、モルタル層に打撃を加える際に、騒音、振動、粉塵が発生するため、作業環境が過酷になり、作業効率が低い、という問題があった。
また、モルタル層を徹去した後の壁表面には、打撃工具により、打撃痕やクラックなどの損傷が生じてしまい、構造的に問題となる揚合がある。
However, in this method, noise, vibration, and dust are generated when hitting the mortar layer, so that the work environment becomes severe and the work efficiency is low.
Further, the wall surface after the mortar layer has been removed has damage such as hitting marks and cracks caused by the hitting tool, resulting in a structural problem.

そこで、モルタル層に穴を開けて、剥離装置により穴を拡げるように力を加えることで、モルタル層をコンクリート面から剥離させる方法が提案されている(特許文献1参照)。
この方法によれば、モルタル層に打撃を加えないため、躯体表面の損傷を抑制できるうえに、振動・騒音・粉塵の発生を抑制できる。
Therefore, a method has been proposed in which a mortar layer is peeled from a concrete surface by making a hole in the mortar layer and applying a force to widen the hole with a peeling device (see Patent Document 1).
According to this method, no damage is applied to the mortar layer, so that damage to the housing surface can be suppressed and generation of vibration, noise, and dust can be suppressed.

特開2002−70330号公報JP 2002-70330 A

しかしながら、特許文献1に示された方法では、撤去対象のみを確実に撤去することが困難であった。すなわち、モルタル層の付着力や強度は均一ではないため、剥離装置により穴を拡げると、撤去対象でない部分まで剥離させてしまう場合があった。   However, with the method disclosed in Patent Document 1, it has been difficult to reliably remove only the object to be removed. That is, since the adhesive force and strength of the mortar layer are not uniform, when the hole is expanded by the peeling device, the portion that is not the object of removal may be peeled off.

本発明は、仕上材の撤去対象の部分のみを確実に撤去できる仕上材撤去方法を提供することを目的とする。   An object of this invention is to provide the finishing material removal method which can remove reliably only the part of removal target of finishing material.

請求項1に記載の仕上材撤去方法は、躯体表面に取り付けられた仕上材を撤去する仕上材撤去方法であって、前記仕上材のうち少なくとも一部を撤去対象とし、前記撤去対象と前記周縁部との境界は、略水平方向に延びる2辺および略鉛直方向に延びる2辺からなる矩形状であり前記境界の4辺のうち1辺を除いてスリットを形成するとともに、当該除いた1辺の略中央のみに穴を形成し、当該穴を拡げるように力を加えて前記撤去対象を取り外すことを特徴とする。 The finishing material removal method according to claim 1 is a finishing material removal method for removing a finishing material attached to a housing surface, wherein at least a part of the finishing material is to be removed, and the removal object and the peripheral edge The boundary with the part is a rectangular shape composed of two sides extending in a substantially horizontal direction and two sides extending in a substantially vertical direction. A slit is formed except for one of the four sides of the boundary , and the removed 1 A hole is formed only at substantially the center of the side, and the removal target is removed by applying a force so as to expand the hole.

本発明では、前記躯体は、鉄筋コンクリート造の壁であり、前記仕上材は、壁面に塗り付けられたモルタル層であることが好ましい。 In the present invention, it is preferable that the casing is a reinforced concrete wall, and the finishing material is a mortar layer applied to a wall surface .

この発明によれば、撤去対象とこの撤去対象の周縁部との境界に沿ってスリットを形成することにより、撤去対象と周縁部との縁を切る。
そして、残った境界の一部の所定位置に穴を形成し、この穴に工具を挿入して、穴を拡げるように力を加える。すると、この加えた力は、周縁部に反力をとって、撤去対象を躯体表面からずらすように作用する。これにより、躯体表面から撤去対象が取り外される。
According to this invention, the edge of a removal object and a peripheral part is cut by forming a slit along the boundary of the removal object and the peripheral part of this removal object.
Then, a hole is formed at a predetermined position on a part of the remaining boundary, a tool is inserted into the hole, and a force is applied to expand the hole. Then, the applied force acts so as to shift the removal object from the surface of the housing by taking a reaction force on the peripheral edge. Thereby, the removal object is removed from the housing surface.

よって、従来のように打撃を加えず、スリット形成作業・穴開け作業・穴の拡張作業のみで撤去対象を取り外すことができるので、振動・騒音・粉塵の発生を抑制できる。また、撤去対象に打撃を加えないため、躯体表面の損傷を抑制できる。   Therefore, since the removal target can be removed only by slit forming work, drilling work, and hole expanding work without hitting as in the conventional case, generation of vibration, noise, and dust can be suppressed. Moreover, since damage is not applied to the removal target, damage to the surface of the housing can be suppressed.

また、撤去対象と周縁部との境界にスリットを形成して、撤去対象である部分と撤去対象でない部分とを分離させたので、撤去対象の部分のみを確実に撤去できる。   Moreover, since the slit was formed in the boundary of a removal object and a peripheral part, and the part which is removal object and the part which is not removal object were isolate | separated, only the part of removal object can be removed reliably.

請求項に記載の仕上材撤去方法は、躯体表面に取り付けられた仕上材を撤去する仕上材撤去方法であって、前記仕上材のうち少なくとも一部を撤去対象とし、前記撤去対象と当該撤去対象の周縁部との境界は、略水平方向に延びる2辺および略鉛直方向に延びる2辺からなる矩形状であり、当該撤去対象を、水平方向に並ぶ複数の撤去部位に区切っておき、特定の撤去部位の辺に沿って、次の撤去部位に隣接する辺を除いてスリットを形成するとともに、当該除いた辺の略中央のみに穴を形成し、当該穴を拡げるように力を加えて前記特定の撤去部位を取り外す作業を、一端側から順に各撤去部位について繰り返すことを特徴とする。 The finishing material removal method according to claim 2 is a finishing material removal method for removing the finishing material attached to the surface of the housing, wherein at least a part of the finishing material is to be removed, and the removal object and the removal The boundary with the peripheral part of the object is a rectangular shape composed of two sides extending in a substantially horizontal direction and two sides extending in a substantially vertical direction, and the removal target is divided into a plurality of removal parts arranged in the horizontal direction, and specified. A slit is formed along the side of the removed site, except for the side adjacent to the next removed site, and a hole is formed only at the approximate center of the removed side, and a force is applied to expand the hole. The operation of removing the specific removal site is repeated for each removal site in order from one end side.

この発明によれば、略水平方向に延びる撤去対象を、振動・騒音・粉塵の発生を抑制しつつ、確実に撤去できる。   According to the present invention, it is possible to reliably remove a removal object extending in a substantially horizontal direction while suppressing generation of vibration, noise, and dust.

請求項に記載の仕上材撤去方法は、躯体表面に取り付けられた仕上材を撤去する仕上材撤去方法であって、前記仕上材のうち少なくとも一部を撤去対象とし、前記撤去対象と当該撤去対象の周縁部との境界は、略水平方向に延びる2辺および略鉛直方向に延びる2辺からなる矩形状であり、当該撤去対象を、水平方向に並ぶ複数の撤去部位に区切っておき、前記撤去対象の略水平方向に延びる2辺および一端側の略鉛直方向に延びる1辺に沿ってスリットを形成しておき、特定の撤去部位について、次の撤去部位に隣接する辺の略中央のみに穴を形成し、当該穴を拡げるように力を加えて前記特定の撤去部位を取り外す作業を、一端側から順に各撤去部位について繰り返すことを特徴とする。 The finishing material removal method according to claim 3 is a finishing material removal method for removing the finishing material attached to the surface of the housing, wherein at least a part of the finishing material is to be removed, and the removal object and the removal The boundary with the peripheral edge of the object is a rectangular shape composed of two sides extending in a substantially horizontal direction and two sides extending in a substantially vertical direction, and the removal object is divided into a plurality of removal sites arranged in a horizontal direction, A slit is formed along two sides extending in a substantially horizontal direction to be removed and one side extending in a substantially vertical direction on one end side, and for a specific removal site, only at the approximate center of the side adjacent to the next removal site. The operation of forming a hole and removing the specific removal site by applying a force so as to expand the hole is repeated for each removal site in order from one end side.

この発明によれば、略水平方向に延びる撤去対象を、振動・騒音・粉塵の発生を抑制しつつ、確実に撤去できる。
また、スリット形成作業を最初に完了させて、その後は、穴開け作業および穴の拡張作業を繰り返すため、作業工数を低減できるから、撤去作業を迅速に行うことができる。
According to the present invention, it is possible to reliably remove a removal object extending in a substantially horizontal direction while suppressing generation of vibration, noise, and dust.
In addition, since the slit forming operation is first completed, and thereafter the drilling operation and the hole expansion operation are repeated, the number of work steps can be reduced, and therefore the removal operation can be performed quickly.

本発明によれば、従来のように打撃を加えず、スリット形成作業・穴開け作業・穴の拡張作業のみで撤去対象を取り外すことができるので、振動・騒音・粉塵の発生を抑制できる。また、撤去対象に打撃を加えないため、躯体表面の損傷を抑制できる。   According to the present invention, since the removal target can be removed only by slit forming work, drilling work, and hole expanding work without hitting as in the conventional case, generation of vibration, noise, and dust can be suppressed. Moreover, since damage is not applied to the removal target, damage to the surface of the housing can be suppressed.

本発明の第1実施形態に係る仕上材撤去方法が適用される壁の正面図である。It is a front view of the wall where the finishing material removal method concerning a 1st embodiment of the present invention is applied. 前記実施形態に係る仕上材撤去方法を説明するための壁の正面図である。It is a front view of the wall for demonstrating the finishing material removal method which concerns on the said embodiment. 前記実施形態に係る仕上材撤去方法を説明するための壁の断面図である。It is sectional drawing of the wall for demonstrating the finishing material removal method which concerns on the said embodiment. 本発明の第2実施形態に係る仕上材撤去方法が適用される壁の正面図である。It is a front view of the wall to which the finishing material removal method which concerns on 2nd Embodiment of this invention is applied. 前記実施形態に係る仕上材撤去方法を説明するための壁の正面図である。It is a front view of the wall for demonstrating the finishing material removal method which concerns on the said embodiment. 本発明の第3実施形態に係る仕上材撤去方法を説明するための壁の正面図である。It is a front view of the wall for demonstrating the finishing material removal method which concerns on 3rd Embodiment of this invention.

以下、本発明の実施形態を図面に基づいて説明する。なお、以下の実施形態の説明にあたって、同一構成要件については同一符号を付し、その説明を省略もしくは簡略化する。
〔第1実施形態〕
図1は、本発明の第1実施形態に係る仕上材撤去方法が適用される建物1の壁10の正面図である。
建物1は、鉄筋コンクリート造であり、この建物1の躯体としての壁10は、梁2、柱3に囲まれた矩形状である。
壁10の表面には、モルタルが塗り付けられて仕上材としてのモルタル層20が形成されている。
Hereinafter, embodiments of the present invention will be described with reference to the drawings. In the following description of the embodiments, the same constituent elements are denoted by the same reference numerals, and the description thereof is omitted or simplified.
[First Embodiment]
FIG. 1 is a front view of a wall 10 of a building 1 to which a finishing material removal method according to a first embodiment of the present invention is applied.
The building 1 is made of reinforced concrete, and the wall 10 as a frame of the building 1 has a rectangular shape surrounded by beams 2 and columns 3.
On the surface of the wall 10, mortar is applied to form a mortar layer 20 as a finishing material.

このモルタル層20を撤去対象として、以下の手順で撤去する。
撤去対象としてのモルタル層20と、この撤去対象の周囲の周縁部としての梁2および柱3との境界は、略水平方向に延びる2辺21、23および略鉛直方向に延びる2辺22、24からなる矩形状である。
The mortar layer 20 is removed, and the removal is performed according to the following procedure.
The boundary between the mortar layer 20 as the removal target and the beam 2 and the pillar 3 as the peripheral edge around the removal target has two sides 21 and 23 extending in a substantially horizontal direction and two sides 22 and 24 extending in a substantially vertical direction. Is a rectangular shape.

まず、図2(a)および図3(a)に示すように、コンクリートカッターなどの切削工具を用いて、4辺21〜24のうち辺24を除く辺21〜23に沿ってスリット31を形成する。また、コアドリルなどの削孔工具を用いて、この除いた辺24の略中央に穴32を形成する。
次に、図2(b)および図3(b)に示すように、拡張工具33を用意し、この工具33を穴32に挿入して、穴32を拡げるように力を加える。
First, as shown to Fig.2 (a) and FIG.3 (a), slit 31 is formed along the sides 21-23 except the side 24 among the four sides 21-24 using cutting tools, such as a concrete cutter. To do. Further, using a drilling tool such as a core drill, a hole 32 is formed in the approximate center of the removed side 24.
Next, as shown in FIGS. 2B and 3B, an expansion tool 33 is prepared, and the tool 33 is inserted into the hole 32 and a force is applied so as to expand the hole 32.

ここで、拡張工具33は、図3(b)に示すように、円筒形状の筒部331と、この筒部331の内部に挿入された棒体332と、を備える。筒部331は、先端に向かうに従って内径が狭くなっており、先端側に複数のスリットが形成されている。棒体332の外径は、筒部331の先端側の内径よりも大きいが、筒部331の基端側の内径よりも小さくなっている。   Here, as shown in FIG. 3B, the expansion tool 33 includes a cylindrical tube portion 331 and a rod body 332 inserted into the tube portion 331. The cylindrical portion 331 has an inner diameter that becomes narrower toward the tip, and a plurality of slits are formed on the tip side. The outer diameter of the rod body 332 is larger than the inner diameter on the distal end side of the cylindrical portion 331, but smaller than the inner diameter on the proximal end side of the cylindrical portion 331.

拡張工具33の先端を穴32に挿入し、この状態で、ハンマーなどで棒体332の基端側に打撃を加えて、棒体332を筒部331内に深く挿入する。すると、棒体332に押されて、筒部331の先端側が拡張し、穴32を拡げる方向に力が加わる。   The distal end of the extension tool 33 is inserted into the hole 32, and in this state, a hammer is applied to the proximal end side of the rod body 332 to insert the rod body 332 deeply into the cylindrical portion 331. Then, it is pushed by the rod body 332, the tip end side of the cylindrical portion 331 is expanded, and a force is applied in the direction of expanding the hole 32.

本実施形態によれば、以下のような効果がある。
(1)モルタル層20と梁2および柱3との境界である辺21〜23に沿ってスリット31を形成することにより、モルタル層20と梁2および柱3との縁を切る。
そして、残った辺24の略中央に穴32を形成し、この穴32に工具33を挿入して、穴32を拡げるように力を加える。すると、この加えた力は、梁2および柱3に反力をとって、モルタル層20を壁10の表面からずらすように作用する。これにより、壁10の表面からモルタル層20が取り外される。
According to this embodiment, there are the following effects.
(1) The edges of the mortar layer 20, the beam 2 and the column 3 are cut by forming the slits 31 along the sides 21 to 23 which are the boundaries between the mortar layer 20 and the beam 2 and the column 3.
Then, a hole 32 is formed in the approximate center of the remaining side 24, and a tool 33 is inserted into the hole 32 to apply a force so as to expand the hole 32. Then, the applied force acts as a reaction force on the beam 2 and the column 3 to shift the mortar layer 20 from the surface of the wall 10. Thereby, the mortar layer 20 is removed from the surface of the wall 10.

よって、従来のように打撃を加えず、スリット形成作業・穴開け作業・穴の拡張作業のみで撤去対象を取り外すことができるので、振動・騒音・粉塵の発生を抑制できる。また、モルタル層20に打撃を加えないため、壁10の表面の損傷を抑制できる。   Therefore, since the removal target can be removed only by slit forming work, drilling work, and hole expanding work without hitting as in the conventional case, generation of vibration, noise, and dust can be suppressed. Further, since the mortar layer 20 is not hit, damage to the surface of the wall 10 can be suppressed.

撤去対象であるモルタル層20と撤去対象でない梁2および柱3との境界である辺21〜23にスリット31を形成して、撤去対象である部分と撤去対象でない部分とを分離させたので、撤去対象の部分のみを確実に撤去できる。   Since the slits 31 are formed in the sides 21 to 23 that are the boundaries between the mortar layer 20 that is the removal target and the beams 2 and the pillars 3 that are not the removal target, the part that is the removal target and the part that is not the removal target are separated. Only the part to be removed can be removed reliably.

〔第2実施形態〕
図4は、本発明の第2実施形態に係る仕上材撤去方法が適用される建物1の壁10Aの正面図である。
本実施形態では、柱3のスパンが長いため、壁10Aが水平方向に長く、モルタル層40を複数回に分けて撤去する点が、第1実施形態と異なる。
すなわち、モルタル層40は、水平方向に長い矩形状である。
[Second Embodiment]
FIG. 4 is a front view of the wall 10A of the building 1 to which the finishing material removal method according to the second embodiment of the present invention is applied.
In this embodiment, since the span of the pillar 3 is long, the wall 10A is long in the horizontal direction, and the point that the mortar layer 40 is removed in a plurality of times is different from the first embodiment.
That is, the mortar layer 40 has a rectangular shape that is long in the horizontal direction.

そこで、この撤去対象であるモルタル層40を水平方向に3分割し、以下の手順で3回に分けて撤去する。
撤去対象としてのモルタル層40と、この撤去対象の周囲の周縁部としての梁2および柱3との境界は、略水平方向に延びる2辺41、43および略鉛直方向に延びる2辺42、44からなる矩形状である。
Therefore, the mortar layer 40 to be removed is divided into three in the horizontal direction and removed in three steps according to the following procedure.
The boundary between the mortar layer 40 as the removal target and the beam 2 and the column 3 as the peripheral edge around the removal target has two sides 41 and 43 extending in a substantially horizontal direction and two sides 42 and 44 extending in a substantially vertical direction. Is a rectangular shape.

ここで、モルタル層40を、水平方向に並ぶ3つの撤去部位40A、40B、40Cに区切る。これにより、辺41は、411、412、413に3分割され、辺42は、421、422、423に3分割される。また、各撤去部位40A〜40C同士の境界を、辺45、46とする。   Here, the mortar layer 40 is divided into three removal sites 40A, 40B, and 40C arranged in the horizontal direction. Thus, the side 41 is divided into three parts 411, 412, and 413, and the side 42 is divided into three parts 421, 422, and 423. Further, the boundaries between the removed parts 40 </ b> A to 40 </ b> C are referred to as sides 45 and 46.

まず、図5(a)に示すように、モルタル層40の一端側に位置する撤去部位40Aについて、次の撤去部位40Bに隣接する辺45を除き、3辺411、42、431に沿ってスリット51を形成する。また、この除いた辺45の略中央に穴52を形成する。
次に、この穴52に上述の拡張工具33を挿入して、穴52を拡げるように力を加えて、撤去部位40Aを撤去する。
これらの作業を、図5(b)および図5(c)に示すように、撤去部位40B、40Cについても順に繰り返す。
First, as shown to Fig.5 (a), about the removal site | part 40A located in the one end side of the mortar layer 40, except the edge | side 45 adjacent to the next removal site | part 40B, it is slit along 3 sides 411, 42, and 431. 51 is formed. Further, a hole 52 is formed in the approximate center of the removed side 45.
Next, the above-described expansion tool 33 is inserted into the hole 52, and a force is applied to expand the hole 52, thereby removing the removal portion 40A.
These operations are repeated in order for the removal sites 40B and 40C as shown in FIGS. 5 (b) and 5 (c).

本実施形態によれば、以下のような効果がある。
(2)略水平方向に延びるモルタル層40を、振動・騒音・粉塵の発生を抑制しつつ、確実に撤去できる。
According to this embodiment, there are the following effects.
(2) The mortar layer 40 extending in a substantially horizontal direction can be reliably removed while suppressing generation of vibration, noise, and dust.

〔第3実施形態〕
本実施形態では、第2実施形態と同様にモルタル層40を3回に分けて撤去するが、スリットを最初に全て形成しておく点が、第2実施形態と異なる。
[Third Embodiment]
In the present embodiment, the mortar layer 40 is removed in three steps in the same manner as in the second embodiment, but differs from the second embodiment in that all slits are formed first.

まず、図6(a)に示すように、モルタル層40の3辺41、42、43に沿ってスリット51を形成する。   First, as shown in FIG. 6A, slits 51 are formed along the three sides 41, 42, and 43 of the mortar layer 40.

次に、撤去部位40Aについて、次の撤去部位40Bに隣接する辺45の略中央に穴52を形成し、この穴52に拡張工具33を挿入して、穴52を拡げるように力を加えて、撤去部位40Aを撤去する。
これらの作業を、図6(b)および図6(c)に示すように、撤去部位40B、40Cについても順に繰り返す。
Next, about removal site | part 40A, the hole 52 is formed in the approximate center of the edge | side 45 adjacent to the next removal site | part 40B, the expansion tool 33 is inserted in this hole 52, and force is applied so that the hole 52 may be expanded. The removal site 40A is removed.
These operations are repeated in order for the removal sites 40B and 40C as shown in FIGS. 6 (b) and 6 (c).

本実施形態によれば、以下のような効果がある。
(2)略水平方向に延びるモルタル層40を、振動・騒音・粉塵の発生を抑制しつつ、確実に撤去できる。
また、スリット形成作業を最初に完了させて、その後は、穴開け作業および穴の拡張作業を繰り返すため、作業工数を低減できるから、撤去作業を迅速に行うことができる。
According to this embodiment, there are the following effects.
(2) The mortar layer 40 extending in a substantially horizontal direction can be reliably removed while suppressing generation of vibration, noise, and dust.
In addition, since the slit forming operation is first completed, and thereafter the drilling operation and the hole expansion operation are repeated, the number of work steps can be reduced, and therefore the removal operation can be performed quickly.

なお、本発明は前記実施形態に限定されるものではなく、本発明の目的を達成できる範囲での変形、改良等は本発明に含まれるものである。   It should be noted that the present invention is not limited to the above-described embodiment, and modifications, improvements, etc. within a scope that can achieve the object of the present invention are included in the present invention.

例えば、上述の第1実施形態では、モルタル層20を一度に撤去し、第2、3実施形態では、モルタル層20を水平方向に3分割して撤去したが、これに限らない。例えば、モルタル層20を水平方向に分割することに加えて、上下方向にも複数に分割して撤去してもよい。   For example, in the first embodiment described above, the mortar layer 20 is removed at a time, and in the second and third embodiments, the mortar layer 20 is removed by dividing it into three in the horizontal direction, but this is not restrictive. For example, in addition to dividing the mortar layer 20 in the horizontal direction, the mortar layer 20 may be divided into a plurality of parts in the vertical direction and removed.

また、上述の各実施形態では、コンクリートカッターなどの切削工具を用いてスリット31を形成したが、実際には、梁2および柱3の入隅部にコンクリートカッターを入れることができず、スリット31が入隅部よりも内側寄りに形成され、モルタル層の一部が残ってしまう場合がある。この場合、本発明の仕上材撤去方法によりモルタル層20の大部分を撤去し、その後、この残ったモルタル層を、グラインダなどの切削工具で削り取ってもよい。   Further, in each of the above-described embodiments, the slit 31 is formed using a cutting tool such as a concrete cutter. However, in practice, the concrete cutter cannot be put into the corners of the beam 2 and the column 3, and the slit 31 May be formed closer to the inner side than the corners, and a part of the mortar layer may remain. In this case, most of the mortar layer 20 may be removed by the finishing material removing method of the present invention, and then the remaining mortar layer may be scraped off with a cutting tool such as a grinder.

また、スリット31の形成、穴32の形成、穴32の拡張を行う際、作業箇所に水や泡を供給してもよいし、作業箇所で発生した粉塵を集塵装置で回収してもよい。このようにすれば、粉塵が周囲に飛散するのを防止できる。   Moreover, when forming the slit 31, forming the hole 32, and expanding the hole 32, water or foam may be supplied to the work location, and dust generated at the work location may be collected by the dust collector. . In this way, dust can be prevented from scattering around.

1…建物
2…梁(周縁部)
3…柱(周縁部)
10、10A…壁(躯体)
20、40…モルタル層(仕上材)
21、22、23、24、41、42、43、44、45、46…辺
411、412、413、431、432、433…分割した辺
31、51…スリット
32、52…穴
33…拡張工具
40A、40B、40C 撤去部位
331…筒部
332…棒体
1 ... Building 2 ... Beam (periphery)
3 ... Pillar (periphery)
10, 10A ... Wall (frame)
20, 40 ... Mortar layer (finishing material)
21, 22, 23, 24, 41, 42, 43, 44, 45, 46 ... sides 411, 412, 413, 431, 432, 433 ... divided sides 31, 51 ... slits 32, 52 ... holes 33 ... expansion tools 40A, 40B, 40C Removal part 331 ... Tube part 332 ... Rod

Claims (3)

躯体表面に取り付けられた仕上材を撤去する仕上材撤去方法であって、
前記仕上材のうち少なくとも一部を撤去対象とし、
前記撤去対象と前記周縁部との境界は、略水平方向に延びる2辺および略鉛直方向に延びる2辺からなる矩形状であり、
前記境界の4辺のうち1辺を除いてスリットを形成するとともに、当該除いた1辺の略中央のみに穴を形成し、
当該穴を拡げるように力を加えて前記撤去対象を取り外すことを特徴とする仕上材撤去方法
A finishing material removal method for removing the finishing material attached to the surface of the housing,
At least a part of the finishing material is to be removed,
The boundary between the removal object and the peripheral edge is a rectangular shape composed of two sides extending in a substantially horizontal direction and two sides extending in a substantially vertical direction,
A slit is formed except for one side of the four sides of the boundary, and a hole is formed only in the approximate center of the removed one side.
A finishing material removing method, wherein a force is applied so as to expand the hole and the removal object is removed .
躯体表面に取り付けられた仕上材を撤去する仕上材撤去方法であって、
前記仕上材のうち少なくとも一部を撤去対象とし、
前記撤去対象と当該撤去対象の周縁部との境界は、略水平方向に延びる2辺および略鉛直方向に延びる2辺からなる矩形状であり、
当該撤去対象を、水平方向に並ぶ複数の撤去部位に区切っておき、
特定の撤去部位の辺に沿って、次の撤去部位に隣接する辺を除いてスリットを形成するとともに、当該除いた辺の略中央のみに穴を形成し、当該穴を拡げるように力を加えて前記特定の撤去部位を取り外す作業を、一端側から順に各撤去部位について繰り返すことを特徴とする仕上材撤去方法。
A finishing material removal method for removing the finishing material attached to the surface of the housing,
At least a part of the finishing material is to be removed,
The boundary between the removal object and the peripheral edge of the removal object is a rectangular shape composed of two sides extending in a substantially horizontal direction and two sides extending in a substantially vertical direction,
The removal object is divided into a plurality of removal parts arranged in the horizontal direction,
A slit is formed along the side of a specific removal site except for the side adjacent to the next removal site, and a hole is formed only at the approximate center of the removed side, and force is applied to expand the hole. The finishing material removing method is characterized in that the operation of removing the specific removal site is repeated for each removal site in order from one end side.
躯体表面に取り付けられた仕上材を撤去する仕上材撤去方法であって、
前記仕上材のうち少なくとも一部を撤去対象とし、
前記撤去対象と当該撤去対象の周縁部との境界は、略水平方向に延びる2辺および略鉛直方向に延びる2辺からなる矩形状であり、
当該撤去対象を、水平方向に並ぶ複数の撤去部位に区切っておき、
前記撤去対象の略水平方向に延びる2辺および一端側の略鉛直方向に延びる1辺に沿ってスリットを形成しておき、
特定の撤去部位について、次の撤去部位に隣接する辺の略中央のみに穴を形成し、当該穴を拡げるように力を加えて前記特定の撤去部位を取り外す作業を、一端側から順に各撤去部位について繰り返すことを特徴とする仕上材撤去方法。
A finishing material removal method for removing the finishing material attached to the surface of the housing,
At least a part of the finishing material is to be removed,
The boundary between the removal object and the peripheral edge of the removal object is a rectangular shape composed of two sides extending in a substantially horizontal direction and two sides extending in a substantially vertical direction,
The removal object is divided into a plurality of removal parts arranged in the horizontal direction,
A slit is formed along two sides extending in a substantially horizontal direction to be removed and one side extending in a substantially vertical direction on one end side,
For a specific removal site, form a hole only in the approximate center of the side adjacent to the next removal site, and remove each of the specific removal sites by applying force to expand the hole. Finishing material removal method characterized by repeating about site | part.
JP2010208944A 2010-09-17 2010-09-17 Finishing material removal method Expired - Fee Related JP5622987B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010208944A JP5622987B2 (en) 2010-09-17 2010-09-17 Finishing material removal method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010208944A JP5622987B2 (en) 2010-09-17 2010-09-17 Finishing material removal method

Publications (2)

Publication Number Publication Date
JP2012062714A JP2012062714A (en) 2012-03-29
JP5622987B2 true JP5622987B2 (en) 2014-11-12

Family

ID=46058691

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010208944A Expired - Fee Related JP5622987B2 (en) 2010-09-17 2010-09-17 Finishing material removal method

Country Status (1)

Country Link
JP (1) JP5622987B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111173304A (en) * 2018-11-13 2020-05-19 杭州固力建筑工程有限公司 A kind of reinforcement method of adding door opening to the load-bearing wall of brick-concrete structure house renovation

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6294658A (en) * 1985-10-18 1987-05-01 沖長 紘光 Method for disassembling and releasing surface layer material of concrete
JP4034639B2 (en) * 2002-11-07 2008-01-16 東興建設株式会社 Delineation removal method for lining layer and demolition removal apparatus used therefor

Also Published As

Publication number Publication date
JP2012062714A (en) 2012-03-29

Similar Documents

Publication Publication Date Title
US20140318335A1 (en) Steel-structure demolition method
JP5762877B2 (en) Drilling bit, excavator and concrete structure using the same, rock drilling method and crushing method
JP5622987B2 (en) Finishing material removal method
JP2009235809A (en) Construction method for dismantlement and removal of underground structure having foundation pile
JP5034001B1 (en) Centering method and crushing apparatus used therefor
JP6208090B2 (en) Temporary support structure for seismic isolation work and seismic isolation method for existing buildings
JP5567929B2 (en) Anchor construction method and coarse bit
JP6411048B2 (en) Dismantling method
JP6194206B2 (en) Pile head processing method and lifting jig
JP2009007832A (en) Crushing apparatus
JP6403394B2 (en) Anchor bolt construction method
JP4390780B2 (en) Drilling method of continuous groove in reinforced concrete structure
JP5817284B2 (en) Method of dividing concrete structure
JP5986512B2 (en) Dismantling method
JP5614640B2 (en) Concrete core removal method
JP2011169088A (en) Method for stripping mortar or the like
KR100981679B1 (en) Perforation Device
JP6768587B2 (en) Cutting method and removal method of the object
JP2010216160A (en) Removal method
JP5869388B2 (en) How to construct a retaining wall
JP6770878B2 (en) Concrete processing method, crushing jig, concrete processing system
JP6817512B1 (en) Breaking rock tool and crushing method using the tool
JP6283207B2 (en) Blade mouth device and propulsion method using the blade mouth device
JP5731928B2 (en) Injection stiffening member for maintenance repair of mortar spray
JP6696808B2 (en) Ground improvement structure and ground excavation method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130219

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131213

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20131217

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140120

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140627

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140627

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140922

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140923

R150 Certificate of patent or registration of utility model

Ref document number: 5622987

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees