JP5720041B2 - Tunnel support construction method - Google Patents
[go: Go Back, main page]

JP5720041B2 - Tunnel support construction method - Google Patents

Tunnel support construction method Download PDF

Info

Publication number
JP5720041B2
JP5720041B2 JP2011060729A JP2011060729A JP5720041B2 JP 5720041 B2 JP5720041 B2 JP 5720041B2 JP 2011060729 A JP2011060729 A JP 2011060729A JP 2011060729 A JP2011060729 A JP 2011060729A JP 5720041 B2 JP5720041 B2 JP 5720041B2
Authority
JP
Japan
Prior art keywords
support
target
erector
targets
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2011060729A
Other languages
Japanese (ja)
Other versions
JP2012197559A (en
Inventor
佐藤 政昭
政昭 佐藤
晃洋 重永
晃洋 重永
伊藤 裕二
裕二 伊藤
佳則 福家
佳則 福家
智寿 萩原
智寿 萩原
政芳 田中
政芳 田中
伸二 今岡
伸二 今岡
晃司 宣原
晃司 宣原
将司 冨田
将司 冨田
柏 忠信
忠信 柏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2011060729A priority Critical patent/JP5720041B2/en
Publication of JP2012197559A publication Critical patent/JP2012197559A/en
Application granted granted Critical
Publication of JP5720041B2 publication Critical patent/JP5720041B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

本発明は、支保工をエレクタ装置の把持部により把持してトンネルの切羽近くに誘導し建て込むトンネル支保工誘導建て込み方法に関する。   The present invention relates to a tunnel support guide installation method in which a support is gripped by a grip portion of an elector device and guided and built near a face of a tunnel.

NATM(New Austrian Tunneling Method)は、地山の持つ支保能力、強度を有効に利用してトンネルの安定を保つという考え方のもとに、吹き付けコンクリート、ロックボルト、鋼製支保工等の支保材を適宜に用いて、地山と一体化したトンネル構造物を建設する工法である。   NATM (New Austrian Tunneling Method) uses support materials such as spray concrete, rock bolts, steel support works, etc., based on the concept of maintaining the stability of the tunnel by effectively using the support capacity and strength of natural ground. It is a method of constructing a tunnel structure that is used as appropriate and integrated with natural ground.

トンネル断面の崩落を防ぎ、断面を安定に支保する支保工は、半馬蹄形に分割された一対のH鋼からなり、その建て込み作業が切羽近くで行われる。トンネル支保工建て込み作業では、支保工を把持して切羽に向けて移動させるエレクター装置を備えた作業車が用いられる。   The support work that prevents the collapse of the tunnel cross section and stably supports the cross section is made of a pair of H steels divided into half horseshoe shape, and the erection work is performed near the face. In tunnel support construction work, a work vehicle equipped with an erector device that grips the support work and moves it toward the face is used.

従来、作業車に一対のターゲットを設置し座標既知地点からレーザ測距機によりそれぞれ視準して、ターゲット座標値を求め、支保工の設置座標値に設置する設置方法が提案されている(例えば、特許文献1参照)。このトンネル支保工の設置方法では、ターゲット座標値と支保工の設置座標値とに基づきエレクター装置の移動量を設定することにより一対の支保工を中央部で相互に連結するように切羽近くに設置する。この方法によれば、支保工の正確な建て込み、危険な作業の排除、重機の移動回数の低減、施工能率と安全性の向上を図れるとされている。   Conventionally, an installation method has been proposed in which a pair of targets are installed on a work vehicle, collimated by a laser rangefinder from a known coordinate point, a target coordinate value is obtained, and the target coordinate value is installed at a support construction value (for example, , See Patent Document 1). In this tunnel support installation method, by setting the amount of movement of the erector device based on the target coordinate value and the installation coordinate value of the support work, the pair of support works are installed close to the face so as to be connected to each other in the center. To do. According to this method, it is said that accurate construction of support works, elimination of dangerous work, reduction of the number of heavy equipment movements, improvement of construction efficiency and safety can be achieved.

また、支保工の左、右および上中央の3箇所にターゲットを取り付け、トータルステーションによりターゲットを自動追尾して、エレクター装置により支保工を設計値に調整する建て込み方法が提案されている(例えば、特許文献2参照)。このトンネル支保工の建て込み方法では、3箇所のターゲットのそれぞれについてトンネル中心からの距離を測量して予め入力したターゲットの設置高さ分を差し引いて支保工の設計値と比較してその誤差をモニタに表示する。このモニタの表示を見ながら、エレクター装置の操縦者が設定値以下の誤差になるようにハンドを動かし支保工の位置を調整する。この方法によれば、支保工が傾いたりローリングしても、所定のトンネル内空断面を確保でき、トンネル中心からの距離(半径)が全周にわたり設計通りになり、誤差のない支保工を施工できるとされている。   In addition, an installation method has been proposed in which a target is attached to the left, right, and upper center of the support work, the target is automatically tracked by a total station, and the support work is adjusted to a design value by an erector device (for example, Patent Document 2). In this tunnel support construction method, the distance from the tunnel center is measured for each of the three targets, and the target installation height is subtracted in advance, and the error is compared with the design value of the support. Display on the monitor. While watching the display on this monitor, the operator of the erector device moves the hand so that the error is less than the set value, and adjusts the position of the support work. According to this method, even if the support is tilted or rolled, a predetermined cross-section in the tunnel can be secured, and the distance (radius) from the center of the tunnel will be as designed over the entire circumference, so that there will be no error-free support. It is supposed to be possible.

特許第3381606号公報Japanese Patent No. 3381606 特許第4559346号公報Japanese Patent No. 4559346

上記従来のトンネル支保工の設置方法では、エレクター装置が支保工を毎回同じ条件で把持することが難しくムラがあり、さらに支保工の把持状態にずれを生じることがあり、ターゲットの位置と支保工の実際の位置との位置関係が固定しない。そのため、ターゲットの位置が支保工ごとに大きく異なったり、途中でずれてしまい、レーザ測距機により測量したターゲット座標値と支保工の実際の位置との対応がとれず、支保工の設置位置が大きくずれるなどの問題がある。   In the conventional tunnel support installation method described above, it is difficult for the erector device to grip the support work under the same conditions every time, and there is a variation in the gripping state of the support work. The positional relationship with the actual position is not fixed. Therefore, the position of the target differs greatly from one support work to another, or shifts in the middle, and the target coordinate value measured by the laser rangefinder cannot correspond to the actual position of the support work. There are problems such as large deviation.

また、上記従来の建て込み方法は、上記トンネル支保工の設置方法の問題を解決するものとして提案されたものであるが、左右の支保工を組み立ててアーチ形の支保工とし支保工の左、右および上中央の3箇所にターゲットを取り付け、左右のハンドで支保工を保持して3箇所のターゲットを自動追尾するので、測量、演算の負荷が大きく、支保工の位置の調整にも時間がかかるなどの問題がある。   In addition, the conventional erection method was proposed as a solution to the problem of the installation method of the tunnel support work, but the left and right support works are assembled by assembling the left and right support works. The target is attached to the right and upper three locations, and the support work is held by the left and right hands, and the three targets are automatically tracked. Therefore, the load of surveying and calculation is heavy, and it takes time to adjust the position of the support work. There are problems such as this.

すなわち、3箇所のターゲットを自動追尾してそれぞれの測量を行って演算を行い、設計値との誤差を求めるので、1、2箇所のターゲットを自動追尾するよりも演算処理の負担が大きくなる。さらに、アーチ形に組み立てた支保工をエレクター装置の左右のハンドで把持し、操縦者は、モニタに表示された誤差を見ながら、誤差が設定値以下になるように左右のハンドを操作しなければならず、操縦者の負担も大きい。   In other words, since the three targets are automatically tracked and the respective surveys are performed for calculation and an error from the design value is obtained, the burden of calculation processing becomes larger than the automatic tracking of one or two targets. In addition, the support work assembled in an arch shape is gripped by the left and right hands of the erector device, and the operator must operate the left and right hands so that the error is less than the set value while watching the error displayed on the monitor. In addition, the burden on the operator is heavy.

本発明は、上記の課題を解決するものであって、支保工を円滑に所定の位置に誘導できるようにし、支保工建て込みの作業効率の向上を図りつつ、支保工建て込みの位置精度の向上を図るものである。   The present invention solves the above-described problems, and allows the support work to be smoothly guided to a predetermined position, improving the work efficiency of the support work, and improving the position accuracy of the support work. It is intended to improve.

そのため本発明は、伸縮機構、傾動機構、揺動機構、回動機構を有し先端に把持部を支持するブームを自走するエレクタ台車に備えたエレクタ装置により前記把持部に支保工を把持してトンネルの切羽近くに誘導し建て込むトンネル支保工誘導建て込み方法であって、前記把持部にエレクタターゲットを取り付けると共に、前記支保工の上端部と下端部に支保工ターゲットを取り付け、前記エレクタターゲットの位置を計測して前記エレクタ装置を制御しエレクタターゲット目標位置に前記エレクタターゲットの位置を誘導することにより前記支保工を概略誘導した後、前記エレクタターゲットの位置を固定にし、前記支保工ターゲットの位置を計測して前記エレクタ装置を制御し前記エレクタターゲットの位置を中心に回転操作して支保工の上端部または下端部のターゲット目標位置に前記上端部または下端部の支保工ターゲットの位置を誘導することにより前記支保工を詳細誘導して、前記支保工を設計位置に建て込むことを特徴とする。 For this reason, the present invention grips a support work on the gripping portion by an erector device provided on an erector cart that has a telescopic mechanism, a tilting mechanism, a swinging mechanism, and a rotation mechanism and that has a boom that supports the gripping portion at the tip. A tunnel support guide installation method for guiding and building near the face of the tunnel, wherein an erector target is attached to the grip portion, and a support target is attached to an upper end portion and a lower end portion of the support work. after schematic induce the支保Engineering by the position by measuring inducing position of the erector target controlled erecta target target position the erector device, the position of the erector target and the fixed, of the shoring target position by measuring controlling the erector device shoring and rotating operation about the position of the erector target An upper end portion or to induce detail the支保Engineering by inducing targeted target position of the lower end position of the shoring target of the upper portion or a lower end portion, characterized in that Tatekomu the design position of the支保Engineering .

さらに、前記支保工の仮置き場で前記支保工の上端部と下端部に支保工ターゲットを取り付けたとき、前記支保工のセンターライン、上端、下端からのオフセット量を管理コンピュータに入力することを特徴とし、前作業として、前記エレクタ装置の把持部に前記支保工を把持した状態における前記エレクタターゲットおよび前記支保工ターゲットの位置を計測して前記支保工との位置関係を求めた後、前記概略誘導することを特徴とする。   Furthermore, when the support target is attached to the upper end and the lower end of the support in the temporary storage area of the support, the offset amount from the center line, the upper end, and the lower end of the support is input to the management computer. And, as a pre-operation, after measuring the position of the erector target and the support target in a state where the support work is gripped by the grip portion of the elector device and obtaining the positional relationship with the support work, the rough guidance It is characterized by doing.

本発明によれば、支保工の上端部、下端部に支保工ターゲットを取り付けると共に、支保工を把持し誘導するエレクタ装置の把持部にもエレクタターゲットを取り付けて、支保工をエレクタターゲットの位置に基づき建て込む切羽近くまで概略誘導するので、支保工を切羽近くまで速やかに誘導することができる。また、トータルステーションにより2つのエレクタターゲットを計測して座標を求め、誘導を行うので、管理コンピュータによる演算処理の負荷を軽減し、誘導作業も軽減することができる。さらに、切羽近くまで概略誘導した支保工を支保工ターゲットの位置に基づき設計位置に詳細誘導するので、設計位置への誘導を精度よく行うことができる。   According to the present invention, the support target is attached to the upper end and the lower end of the support work, and the erector target is also attached to the grip portion of the elector apparatus that holds and guides the support work, so that the support work is positioned at the position of the erecta target. Since it is guided roughly to the vicinity of the face to be built, the support work can be promptly guided to the vicinity of the face. In addition, since the coordinates are obtained by measuring two erector targets by the total station and guiding is performed, it is possible to reduce the calculation processing load by the management computer and to reduce the guiding work. Further, since the support work that is roughly guided to the vicinity of the face is guided in detail to the design position based on the position of the support work target, the guide to the design position can be performed with high accuracy.

本発明に係るトンネル支保工誘導建て込み方法の実施形態を説明する図である。It is a figure explaining embodiment of the tunnel support construction guidance construction method concerning the present invention. 本発明に係るトンネル支保工誘導建て込み作業全体の手順を説明する図である。It is a figure explaining the procedure of the tunnel support construction guidance erection work concerning this invention. 支保工誘導建て込み作業に先立つ前作業の手順を説明する図である。It is a figure explaining the procedure of the previous work prior to the support work guidance erection work. 支保工誘導建て込み作業の詳細な手順を説明する図である。It is a figure explaining the detailed procedure of a support construction guidance erection work. 支保工ターゲットのオフセット量とその入力画面の例を示す図である。It is a figure which shows the offset amount of a support work target, and the example of the input screen. 支保工誘導建て込み作業時のターゲット位置計測画面の例を示す図である。It is a figure which shows the example of the target position measurement screen at the time of a support construction guidance construction work.

以下、本発明の実施形態を図面を参照しつつ説明する。図1は本発明に係るトンネル支保工誘導建て込み方法の実施形態を説明する図である。図中、1はエレクタ装置、2−1、2−2はトータルステーション、3−1、3−2は基準ターゲット、4L、4Rは支保工、5は切羽、11はエレクタ台車、12L、12Rはブーム、S1〜S4は支保工ターゲット、E1、E2はエレクタターゲットを示す。   Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a diagram for explaining an embodiment of a tunnel support construction guiding and building method according to the present invention. In the figure, 1 is an erector device, 2-1 and 2-2 are total stations, 3-1 and 3-2 are reference targets, 4L and 4R are supporters, 5 is a face, 11 is an erector carriage, and 12L and 12R are booms. , S1 to S4 indicate support targets, and E1 and E2 indicate erector targets.

図1において、エレクタ装置1は、自走するエレクタ台車11にブーム12L、12Rを備えたものである。ブーム12L、12Rは、それぞれ伸縮機構、傾動機構、揺動機構、回動機構を有するブームであって、先端に把持部を支持している。ブーム12Lに支持された把持部は左支保工4Lを把持し、ブーム12Rに支持された把持部は右支保工4Rを把持するものであり、それぞれの把持部にはエレクタターゲットE1、E2が取り付けられる。このエレクタ装置1において、エレクタ台車11の走行、ブーム12L、12Rの伸縮、傾動、揺動、回動を制御して、左右の支保工4L、4Rを設計位置に誘導し建て込む。   In FIG. 1, the erector apparatus 1 is provided with booms 12L and 12R on a self-propelled erector carriage 11. The booms 12L and 12R are booms each having a telescopic mechanism, a tilting mechanism, a swinging mechanism, and a rotating mechanism, and support a grip portion at the tip. The gripping part supported by the boom 12L grips the left support work 4L, and the gripping part supported by the boom 12R grips the right support work 4R. Elector targets E1 and E2 are attached to each gripping part. It is done. In this erector apparatus 1, the left and right supporters 4L, 4R are guided and built in the design position by controlling the travel of the erector carriage 11 and the expansion / contraction, tilting, swinging, and rotation of the booms 12L, 12R.

トータルステーション2−1、2−2は、レーザ測距、測角によりプリズムや反射シートなどのターゲットを取り付けた位置の座標測定を行うものであり、レーザ照射、視準、視準の自動追尾、自動整準補正などの機能を備える。トータルステーション2−1は、切羽5の後方、支保工4L、4Rの建て込み位置よりもトンネルの坑口側の位置に、例えば壁面に固定設置される。トータルステーション2−2は、切羽5の後方、支保工4L、4Rの建て込み位置よりもトンネルの坑口側の位置に、例えば三脚などの支持部材の上に適宜移動可能に設置される。   The total stations 2-1 and 2-2 measure the coordinates of the position where a target such as a prism or a reflection sheet is attached by laser distance measurement and angle measurement. Laser irradiation, collimation, automatic collimation tracking, automatic Functions such as leveling correction are provided. The total station 2-1 is fixedly installed on the wall surface, for example, at a position closer to the tunnel entrance than the position where the supporters 4 </ b> L and 4 </ b> R are built behind the face 5. The total station 2-2 is movably installed on a support member such as a tripod, for example, at a position closer to the tunnel entrance than the position where the supporters 4L and 4R are built, behind the face 5.

基準ターゲット3−1、3−2は、トンネルの坑口側の既知座標位置に設置される。トータルステーション2−1、2−2は、これら2点の基準ターゲット3−1、3−2が視準可能な位置に設置される。トータルステーション2−1、2−2の自己設置位置の3次元座標(x,y,z)は、これら2点の基準ターゲット3−1、3−2を視準して測距、測角データを取得し、後方交会法により求められる。   The reference targets 3-1 and 3-2 are installed at known coordinate positions on the wellhead side of the tunnel. The total stations 2-1 and 2-2 are installed at positions where these two reference targets 3-1 and 3-2 can be collimated. The three-dimensional coordinates (x, y, z) of the self-installation positions of the total stations 2-1 and 2-2 are obtained by collimating these two reference targets 3-1, 3-2, Obtained and required by the backward association law.

支保工4L、4Rは、馬蹄形(円弧状、アーチ状)のH鋼が分割された一対の鋼材であり、切羽5の近傍に誘導し中央上部で相互に連結して設計位置に建て込み設置される。支保工4Lは、切羽5に向かって左側の分割された鋼材であって、設計位置に誘導し建て込むため、位置を計測する支保工ターゲットS1が下端部に、支保工ターゲットS2が上端部にそれぞれ取り付けられる。同様に支保工4Rは、切羽5に向かって右側の分割された鋼材であって、設計位置に誘導し建て込むため、位置を計測する支保工ターゲットS4が下端部に、支保工ターゲットS3が上端部にそれぞれ取り付けられる。   The supporters 4L and 4R are a pair of steel materials in which horseshoe-shaped (arc-shaped, arch-shaped) H steel is divided, guided near the face 5 and connected to each other at the upper center to be installed at the design position. The The support work 4L is a steel material divided on the left side toward the face 5, and is guided and built at the design position. Therefore, the support work target S1 for measuring the position is at the lower end and the support work target S2 is at the upper end. Each can be attached. Similarly, the support 4R is a steel material divided on the right side toward the face 5 and is guided and built at the design position. Therefore, the support target S4 for measuring the position is at the lower end, and the support target S3 is at the upper end. It is attached to each part.

支保工ターゲットS1〜S4は、トータルステーション2−1、2−2により支保工4L、4Rの位置を計測するためそれぞれの上端部と下端部に取り付ける、例えばマグネット付プリズムである。マグネット付プリズムを用いた支保工ターゲットS1〜S4は、底部を磁石で構成することにより、鋼材の支保工4L、4Rに吸着し簡便に着脱が可能になっている。また、エレクタターゲットE1、E2は、ブーム12L、12Rに支持された把持部に取り付ける、例えばプリズムである。   The support targets S1 to S4 are prisms with magnets, for example, which are attached to the upper and lower ends of the support stations 4L and 4R for measuring the positions of the support works 4L and 4R by the total stations 2-1, 2-2. Supporting targets S1 to S4 using prisms with magnets can be easily attached and detached by being attracted to steel supporting members 4L and 4R by constituting the bottom with magnets. Further, the erector targets E1 and E2 are, for example, prisms that are attached to the grip portions supported by the booms 12L and 12R.

エレクタ装置1およびトータルステーション2−1、2−2の制御と測距、測角データの演算、演算結果の表示を行う管理コンピュータは、図示しないが、エレクタ装置1のエレクタ台車11の操作台やエレクタ操作室に配置される。管理コンピュータには、トンネ
ル線形情報やトンネル断面情報その他の設計情報に関するデータが格納され、それらの情報、エレクタ装置1およびトータルステーション2−1、2−2の制御、計測情報に基づき作業に必要な情報が演算され、モニタに表示される。管理コンピュータによるエレクタ装置1およびトータルステーション2−1、2−2の制御は、それぞれに無線装置を内臓して無線通信機能を持たせることにより遠隔操作を可能にする。機器間の相互の通信は勿論、無線または有線のいずれであってもよい。
Although not shown, the management computer for controlling and measuring the distance between the elector device 1 and the total stations 2-1 and 2-2, calculating the angle measurement data, and displaying the calculation results is not shown. Located in the operation room. The management computer stores data related to tunnel alignment information, tunnel cross-section information, and other design information, and information necessary for work based on such information, control of the elector device 1 and the total stations 2-1 and 2-2, and measurement information. Is calculated and displayed on the monitor. Control of the erector apparatus 1 and the total stations 2-1 and 2-2 by the management computer enables remote operation by incorporating a wireless apparatus and providing a wireless communication function. Of course, mutual communication between devices may be either wireless or wired.

本実施形態のトンネル支保工誘導建て込み方法においては、例えば仮置き場に仮置きされている状態の支保工4L、4Rに対して、誘導建て込み作業に先立って支保工ターゲットS1〜S4が取り付けられる。その支保工4L、4Rが、エレクタ装置1のブーム12L、12Rに支持された把持部により把持され、切羽5の近傍まで概略誘導され、さらに設計位置に詳細誘導され建て込まれる。   In the tunnel support construction guide building method according to the present embodiment, for example, the support works S1 to S4 are attached to the support works 4L and 4R that are temporarily placed in the temporary storage place prior to the guide construction work. . The supporting works 4L and 4R are gripped by the gripping parts supported by the booms 12L and 12R of the erector apparatus 1, guided roughly to the vicinity of the face 5, and further guided and built in detail at the design position.

また、トータルステーション2−1、2−2においては、基準ターゲット3−1、3−2を計測して管理コンピュータにより演算して、自己の設置位置の3次元座標(x,y,z)を求める。その後、支保工の仮置き場においてエレクタ装置1のブーム12L、12Rに支持された把持部により支保工4L、4Rを把持すると、支保工ターゲットS1〜S4、エレクタターゲットE1、E2を計測して管理コンピュータにより演算し、支保工ターゲットS1〜S4、エレクタターゲットE1、E2と支保工4L、4Rの位置関係を求める。   Further, in the total stations 2-1 and 2-2, the reference targets 3-1 and 3-2 are measured and calculated by the management computer, and the three-dimensional coordinates (x, y, z) of the own installation position are obtained. . Thereafter, when the supporters 4L and 4R are gripped by the gripping parts supported by the booms 12L and 12R of the erector apparatus 1 in the temporary storage place of the supporter, the support computers S1 to S4 and the erector targets E1 and E2 are measured and managed. To obtain the positional relationship between the support targets S1 to S4, the erector targets E1 and E2, and the support members 4L and 4R.

これらの位置関係に基づきエレクタターゲットE1、E2の位置につき目標位置を設定して、トータルステーション2−1、2−2の視準をエレクタターゲットE1、E2にロックする。このロックにより、トータルステーション2−1、2−2がエレクタターゲットE1、E2を視準、自動追尾して、それらの座標を求め、エレクタターゲットE1、E2の位置を目標位置まで誘導することにより支保工4L、4Rの概略誘導を行う。   Based on these positional relationships, a target position is set for the positions of the erector targets E1 and E2, and the collimation of the total stations 2-1 and 2-2 is locked to the erector targets E1 and E2. With this lock, the total stations 2-1 and 2-2 collimate and automatically track the erector targets E1 and E2, obtain their coordinates, and guide the positions of the erector targets E1 and E2 to the target position. Approximate 4L, 4R guidance is performed.

支保工4L、4RをエレクタターゲットE1、E2に基づき概略誘導すると、支保工4L、4Rの上端部の支保工ターゲットS2、S3または下端部の支保工ターゲットS1、S4につき目標位置を設定する。さらに、トータルステーション2−1、2−2の視準をを支保工4L、4Rの上端部の支保工ターゲットS2、S3または下端部の支保工ターゲットS1、S4にロックする。また、概略誘導によりエレクタターゲットE1、E2は目標位置にあるので、エレクタターゲットの位置を固定にする。 When the supporters 4L and 4R are roughly guided based on the erector targets E1 and E2, target positions are set for the support targets S2 and S3 at the upper ends of the supporters 4L and 4R or the support targets S1 and S4 at the lower ends. Furthermore, the collimation of the total stations 2-1 and 2-2 is locked to the support targets S2 and S3 at the upper ends of the support works 4L and 4R or the support targets S1 and S4 at the lower ends. Moreover, since the erector targets E1 and E2 are at the target position by the rough guidance, the position of the erector target is fixed.

そして、トータルステーション2−1、2−2により支保工4L、4Rの上端部の支保工ターゲットS2、S3または下端部の支保工ターゲットS1、S4を視準、自動追尾して、それらの座標を求め、支保工4L、4Rの上端部の支保工ターゲットS2、S3または下端部の支保工ターゲットS1、S4の位置を目標位置まで誘導することにより支保工4L、4Rの詳細誘導を行う。このとき、エレクタターゲットは、その位置が固定されているので、支保工4L、4Rはエレクタターゲットの位置を中心に回転操作される。 Then, the total stations 2-1 and 2-2 collimate and automatically track the support targets S2 and S3 at the upper end of the support 4L and 4R or the support targets S1 and S4 at the lower end to obtain their coordinates. The guides 4L and 4R are guided in detail by guiding the positions of the support targets S2 and S3 at the upper ends of the supporters 4L and 4R or the support targets S1 and S4 at the lower ends to the target position. At this time, since the position of the erector target is fixed, the support works 4L and 4R are rotated around the position of the erector target .

このようにエレクタターゲットE1、E2を視準、自動追尾して概略誘導を行い、続けて支保工4L、4Rの上端部の支保工ターゲットS2、S3または下端部の支保工ターゲットS1、S4を視準、自動追尾して詳細誘導を行うことにより支保工4L、4Rを設計位置に誘導して建て込む。   In this way, the erector targets E1 and E2 are collimated and automatically tracked for rough guidance, and then the support targets S2 and S3 at the upper end of the support 4L and 4R or the support targets S1 and S4 at the lower end are viewed. By carrying out semi-automatic tracking and performing detailed guidance, the supporting works 4L and 4R are guided to the design position and built.

本実施形態によれば、まず、エレクタターゲットE1、E2による支保工4L、4Rの概略誘導の目標位置を設定し、2つのエレクタターゲットE1、E2を視準、自動追尾してそれらの座標に基づき概略誘導する。したがって、トータルステーション2−1、2−2により座標計測を行う処理負担を軽減して迅速に効率よく設計位置近傍まで支保工4L
、4Rを誘導することができる。
According to the present embodiment, first, the target positions for the approximate guidance of the support works 4L and 4R by the elector targets E1 and E2 are set, and the two elector targets E1 and E2 are collimated and automatically tracked based on their coordinates. Guide roughly. Therefore, the processing load for coordinate measurement by the total stations 2-1 and 2-2 is reduced, and the supporting work 4L is quickly and efficiently brought to the vicinity of the design position.
4R can be induced.

次に、目標位置の設定をエレクタターゲットE1、E2に対する概略誘導の目標位置から支保工ターゲットS2、S3または支保工ターゲットS1、S4に対する詳細誘導の目標位置に切り替え、支保工4L、4Rの上端部の支保工ターゲットS2、S3または下端部の支保工ターゲットS1、S4を視準、自動追尾してそれらの座標に基づき支保工4L、4Rを設計位置に詳細誘導する。したがって、設計位置に精度よく支保工4L、4Rを誘導し建て込むことができ、作業効率を高めつつ、作業精度を高めることができる。   Next, the setting of the target position is switched from the target position of the general guidance for the erector targets E1 and E2 to the target position of the detailed guidance for the support targets S2 and S3 or the support targets S1 and S4, and the upper ends of the support works 4L and 4R. The support targets S2 and S3 or the support targets S1 and S4 at the lower end are collimated and automatically tracked, and the support 4L and 4R are guided in detail to the design position based on their coordinates. Therefore, the support works 4L and 4R can be guided and built with high accuracy at the design position, and the work accuracy can be improved while improving the work efficiency.

さらに、具体的な作業手順により本実施形態のトンネル支保工誘導建て込み方法を説明する。図2は本発明に係るトンネル支保工誘導建て込み作業全体の手順を説明する図、図3は支保工誘導建て込み作業に先立つ前作業の手順を説明する図、図4は支保工誘導建て込み作業の詳細な手順を説明する図、図5は支保工ターゲットのオフセット量とその入力画面の例を示す図、図6は支保工誘導建て込み作業時のターゲット位置計測画面の例を示す図である。   Furthermore, the tunnel support construction guide construction method of this embodiment is demonstrated with a specific work procedure. FIG. 2 is a diagram for explaining the procedure of the entire tunnel support construction work according to the present invention, FIG. 3 is a diagram for explaining the procedure of the previous work prior to the support construction guidance work, and FIG. FIG. 5 is a diagram illustrating a detailed procedure of the work, FIG. 5 is a diagram illustrating an example of an offset amount of a support target and an input screen thereof, and FIG. 6 is a diagram illustrating an example of a target position measurement screen at the time of support guide construction work. is there.

トンネル支保工誘導建て込み作業全体の手順は、例えば図2に示すように仮置き場で誘導建て込み対象の支保工4L、4Rに対するターゲットの取り付け、オフセット量その他誘導に必要な設定データの入力などの前作業を行い(ステップst11)、しかる後、支保工4L、4Rをエレクタ装置1のブーム12L、12Rに支持された把持部により把持して仮置き場から概略誘導、詳細誘導の切り替えを行って切羽5の近傍の設計位置までの誘導建て込み作業を行う(ステップst12)。   For example, as shown in FIG. 2, the procedure for the entire tunnel support guide erection work is as follows: installation of targets for the support works 4L and 4R to be guided erection at the temporary storage site, input of offset amount and other setting data necessary for guidance, etc. A pre-operation is performed (step st11), and then the supporters 4L and 4R are gripped by the gripping portions supported by the booms 12L and 12R of the erector apparatus 1 so that the rough guidance and the detailed guidance are switched from the temporary storage place. Guide construction to a design position near 5 is performed (step st12).

前作業は、誘導建て込み対象とする左右の支保工4L、4Rの上端部と下端部のそれぞれに支保工ターゲットS1〜S4を取り付ける毎に行う作業である。なお、支保工4L、4Rの形状や誘導作業の際に目標となる支保工4L、4Rの設計位置、その他の各支保工4L、4Rの誘導建て込みに共通する情報は、基本データとして前作業の実行に先立って既に管理コンピュータに入力されている。   The pre-operation is an operation performed each time the support targets S1 to S4 are attached to the upper and lower ends of the left and right supporters 4L and 4R to be guided and built. In addition, the shape of the support works 4L and 4R, the design positions of the support works 4L and 4R, which are the targets for the guide work, and other information common to the guide construction of each support work 4L and 4R are the basic data. Has already been entered into the management computer prior to execution.

ステップst11の前作業の具体的な手順では、例えば図3に示すように仮置き場で誘導建て込み対象とする左右の支保工4L、4Rの上端部と下端部のそれぞれに支保工ターゲットS1〜S4を取り付ける(ステップst21)。そして、ターゲット取り付け位置の位置出しをしてオフセット量を入力する(ステップst22)。さらに、上げ越し、広げ越し、サーチ範囲などの初期設定値を入力する(ステップst23)。それらの入力画面の例を示したのが図5であり、支保工のセンターラインCLからターゲットまでの寸法A、C、端部からの寸法B、上げ越し量、広げ越し量、サーチ範囲を入力した画面の例である。   In the specific procedure of the pre-operation in step st11, for example, as shown in FIG. 3, the support targets S1 to S4 are respectively provided on the upper and lower ends of the left and right supporters 4L and 4R to be guided and built in the temporary storage site. Is attached (step st21). Then, the target mounting position is located and the offset amount is input (step st22). Further, initial setting values such as over-range, over-range, and search range are input (step st23). Fig. 5 shows an example of those input screens. Enter the dimensions A and C from the support center line CL to the target, the dimension B from the end, the amount of lift, the amount of spread, and the search range. It is an example of the screen.

ステップst12の誘導建て込み作業の具体的な手順では、例えば図4に示すようにエレクタ装置1のブーム12L、12Rに支持された把持部により支保工4L、4Rを把持して(ステップst31)、把持状態でのエレクタターゲットE1、E2、支保工ターゲットS1〜S4をトータルステーション2−1、2−2により計測してそれぞれの位置座標を求める(ステップst32)。さらに、求めたエレクタターゲットE1、E2、支保工ターゲットS1〜S4の位置関係とオフセット量に基づき支保工4L、4Rの誘導建て込み設計位置におけるエレクタターゲットE1、E2、支保工ターゲットS1〜S4の位置を概略誘導、詳細誘導を行うときの目標位置として求める(ステップst33)。   In the specific procedure of the guide erection work in step st12, for example, as shown in FIG. 4, the supporters 4L and 4R are gripped by the gripping portions supported by the booms 12L and 12R of the erector apparatus 1 (step st31). The erector targets E1 and E2 and the supporting work targets S1 to S4 in the gripping state are measured by the total stations 2-1 and 2-2 to obtain respective position coordinates (step st32). Further, the positions of the erector targets E1, E2 and the support targets S1 to S4 at the guide built-in design positions of the support works 4L and 4R based on the positional relationship and the offset amount of the obtained erector targets E1 and E2 and the support work targets S1 to S4. Is obtained as a target position when performing rough guidance and detailed guidance (step st33).

エレクタ装置1のブーム12L、12Rに支持された把持部により左右の支保工4L、4Rを把持したときの状態は、いつも同じではなく把持ムラがあり把持毎に違う。そこで、本実施形態では、トータルステーション2−1、2−2により計測し管理コンピュータ
によりエレクタターゲットE1、E2、支保工ターゲットS1〜S4、支保工4L、4Rの位置関係を演算処理している。なお、先に述べたように支保工4L、4Rのセンターライン、上端、下端と支保工ターゲットS1〜S4との位置関係(オフセット量)は前処理作業により入力されている。
The state when the left and right supporters 4L and 4R are gripped by the gripping portions supported by the booms 12L and 12R of the erector apparatus 1 is not always the same, and there is gripping unevenness, and is different for each gripping. Therefore, in the present embodiment, measurement is performed by the total stations 2-1 and 2-2, and the positional relationship among the elector targets E 1 and E 2, the support targets S 1 to S 4, and the support methods 4 L and 4 R is calculated by the management computer. As described above, the positional relationship (offset amount) between the center lines, upper and lower ends of the supporters 4L and 4R and the support targets S1 to S4 is input by the preprocessing operation.

次に、ステップst33により求めたエレクタターゲットE1、E2の位置を目標位置として設定し(ステップst34)、支保工4L、4Rの概略誘導としてエレクタターゲットE1、E2の位置を目標位置に誘導する(ステップst35、st36)。この概略誘導では、支保工ターゲットS1〜S4の位置、支保工4L、4Rの把持姿勢に関係なく、これらを無視して、エレクタターゲットE1、E2の位置が目標位置にくるように把持部の位置が移動操作される。   Next, the positions of the erector targets E1 and E2 obtained in step st33 are set as target positions (step st34), and the positions of the erector targets E1 and E2 are guided to the target positions as rough guidance of the supporting works 4L and 4R (steps). st35, st36). In this general guidance, regardless of the positions of the support targets S1 to S4 and the holding postures of the support works 4L and 4R, the positions of the gripping portions are ignored so that the positions of the erector targets E1 and E2 are at the target positions. Is moved.

しかる後、エレクタターゲットの位置を固定にして、ステップst33により求めた下端部の支保工ターゲットS1、S4の位置を目標位置として設定し(ステップst37)、支保工4L、4Rの下端部の詳細誘導として、エレクタターゲットの位置を固定するモードで、下端部の支保工ターゲットS1、S4の位置を目標位置に誘導する(ステップst38、st39)。この詳細誘導では、エレクタターゲットの位置を支点として、下端部の支保工ターゲットS1、S4の位置が目標位置にくるように支保工4L、4Rが回転操作される。 Thereafter, the position of the erector target is fixed, the positions of the support targets S1 and S4 at the lower end obtained in step st33 are set as target positions (step st37), and detailed guidance of the lower ends of the supports 4L and 4R is performed. In the mode for fixing the position of the erector target, the positions of the support targets S1 and S4 at the lower end are guided to the target position (steps st38 and st39). In this detailed guidance, the supporters 4L and 4R are rotated with the position of the erector target as a fulcrum so that the positions of the support targets S1 and S4 at the lower end are at the target position.

この支保工4L、4Rの下端が設計位置に詳細誘導された状態で、まず、支保工4L、4Rの下端部にコンクリートを吹き付けて下端部を固定する(ステップst40)。そして、ステップst33により求めた上端部の支保工ターゲットS2、S3の位置を目標位置に設定して(ステップst41)、上端部の支保工ターゲットS2、S3の位置が目標位置にあるか否かを判定する(ステップst42)。   In a state where the lower ends of the supporters 4L and 4R are guided in detail to the design position, first, concrete is sprayed on the lower ends of the supporters 4L and 4R to fix the lower ends (step st40). And the position of the support target S2, S3 of the upper end part calculated | required by step st33 is set to a target position (step st41), and it is determined whether the position of the support target S2, S3 of an upper end part exists in a target position. Determination is made (step st42).

ステップst42による判定の結果、上端部の支保工ターゲットS2、S3の位置が目標位置にあるときは、4L、4Rの誘導作業を終了する。ステップst38、st39により、下端部の支保工ターゲットS1、S4の位置を目標位置に誘導すると、通常は、先に概略誘導によりエレクタターゲットの位置が目標位置に誘導された固定されているので、もう一方の上端部の支保工ターゲットS3、S4の位置もその目標位置に誘導される。 As a result of the determination in step st42, when the positions of the support work targets S2 and S3 on the upper end portion are at the target positions, the 4L and 4R guidance operations are ended. When the positions of the support targets S1 and S4 at the lower end are guided to the target position in steps st38 and st39, normally, the position of the erector target is guided and fixed to the target position by rough guidance first. The positions of the support targets S3 and S4 on one upper end are also guided to the target position.

しかし、上端部の支保工ターゲットS2、S3の位置に目標位置からのずれが生じてしまったときは、ステップst42による判定の結果、さらに、支保工4L、4Rの上端部の詳細誘導として、エレクタターゲットの位置の固定を解除し、上端部の支保工ターゲットS2、S3の位置を目標位置に誘導して(ステップst43、st44)、4L、4Rの誘導作業を終了する。 However, if the positions of the support targets S2 and S3 at the upper end have deviated from the target position, as a result of the determination at step st42, as further detailed guidance for the upper end of the support 4L and 4R, The fixation of the target position is released, and the positions of the support targets S2 and S3 at the upper end are guided to the target position (steps st43 and st44), and the 4L and 4R guiding operations are completed.

概略誘導、詳細誘導では、トータルステーション2−1、2−2によりエレクタターゲットE1、E2、支保工ターゲットS1〜S4の計測を行い管理コンピュータにより演算したそれぞれの位置と目標位置との差、支保工4L、4Rの位置と設計位置との差を適宜モニタに表示する。トータルステーション2−1、2−2によりエレクタターゲットE1、E2、支保工ターゲットS1〜S4の計測を行い管理コンピュータにより演算してそれぞれのデータを表示する位置計測表示画面の例を示したのが図6である。   In rough guidance and detailed guidance, the total stations 2-1 and 2-2 measure the elector targets E1, E2, and the support targets S1 to S4, and the difference between the respective positions calculated by the management computer and the target position, the support work 4L. The difference between the 4R position and the design position is appropriately displayed on the monitor. FIG. 6 shows an example of a position measurement display screen in which the total stations 2-1 and 2-2 measure the erector targets E1 and E2 and the support targets S1 to S4 and perform calculation by the management computer to display the respective data. It is.

本実施形態によれば、まず、トンネル線形情報やトンネル断面情報その他の設計情報に関するデータに加え、支保工4L、4Rの上端部、下端部に支保工ターゲットS1〜S4を取り付けて、支保工4L、4Rのセンターライン、上端、下端からのオフセット量が管理コンピュータに入力される。   According to the present embodiment, first, in addition to data relating to tunnel alignment information, tunnel cross-section information, and other design information, the support targets S1 to S4 are attached to the upper and lower ends of the support works 4L and 4R, and the support work 4L. The offset amount from the 4R center line, the upper end, and the lower end is input to the management computer.

さらに、エレクタ装置1のブーム12L、12Rに支持された把持部により支保工4L
、4Rを把持した状態でトータルステーション2−1、2−2により支保工ターゲットS1〜S4、エレクタターゲットE1、E2を計測しコンピュータにより演算処理して、支保工4L、4R、支保工ターゲットS1〜S4、エレクタターゲットE1、E2の位置関係の情報が求められる。
Furthermore, the support 4L is supported by the gripping parts supported by the booms 12L and 12R of the electre device 1.
In the state where 4R is gripped, the support targets S1 to S4 and the erector targets E1 and E2 are measured by the total stations 2-1 and 2-2, and are calculated by a computer, and the support works 4L and 4R and the support targets S1 to S4 are processed. Information on the positional relationship between the erector targets E1 and E2 is obtained.

これらの情報を利用して、概略誘導によりエレクタターゲットE1、E2の位置に基づきエレクタ装置1を制御して仮置き場から切羽5の近傍の目標位置まで支保工4L、4Rを誘導するので、管理コンピュータによる演算処理の負荷を軽減し、それぞれの支保工4L、4Rに対してエレクタターゲットE1、E2の位置に基づき操作することで誘導作業も軽減することができる。   By using these pieces of information, the erector apparatus 1 is controlled based on the positions of the erector targets E1 and E2 by rough guidance to guide the supporting works 4L and 4R from the temporary storage site to the target position near the face 5, so that the management computer It is possible to reduce the load of the arithmetic processing by, and to reduce the guidance work by operating each support work 4L, 4R based on the positions of the erector targets E1, E2.

そして、詳細誘導により目標位置に誘導したエレクタターゲットの位置を固定にして支保工4L、4Rの下端部の支保工ターゲットS1、S4の位置に基づきエレクタ装置1を制御して設計位置に支保工4L、4Rを誘導し建て込みを行うので、作業を単純化して支保工4L、4Rを設計位置へ精度よく誘導することができる。 Then, the position of the erector target guided to the target position by the detailed guidance is fixed, and the erector device 1 is controlled based on the position of the support targets S1 and S4 at the lower ends of the support works 4L and 4R to support the support work 4L at the design position. Since the 4R is guided and built, the work can be simplified and the supporters 4L and 4R can be accurately guided to the design position.

なお、本発明は、上記実施形態に限定されるものではなく、種々の変形が可能である。例えば上記実施形態では、エレクタターゲットE1、E2の位置を概略誘導した後、下端部の支保工ターゲットS1、S4の位置を詳細誘導した後、さらに上端部の支保工ターゲットS2、S3の位置を目標位置にあるか否かの確認を行ったが、高い制御精度で詳細誘導ができるエレクタ装置1である場合には、ステップst41以降の作業を省くこともできる。この場合には、上端部の支保工ターゲットS2、S3の位置に代えて下端部の支保工ターゲットS1、S4の位置を詳細誘導してもよい。また、エレクタ装置1のブーム12L、12Rに支持された把持部による把持毎に支保工4L、4Rの把持状態が違う点に鑑み、その把持状態でのエレクタターゲットE1、E2、支保工ターゲットS1〜S4の位置関係に基づき概略誘導における目標位置を求めた(ステップst33)。しかし、把持ムラを許容する値により支保工4L、4Rの設計位置に基づき概略誘導における目標位置を設定して、基本データと共に前作業の実行に先立って入力しておいてもよい。また、トータルステーション2−1は、壁面に固定配置され、トータルステーション2−2は、移動可能に配置されているが、それらは移動可能な配置または固定配置のいずれの配置であってもよい。   In addition, this invention is not limited to the said embodiment, A various deformation | transformation is possible. For example, in the above-described embodiment, after roughly guiding the positions of the erector targets E1 and E2, the position of the support targets S1 and S4 at the lower end is guided in detail, and then the positions of the support targets S2 and S3 at the upper end are set as targets. Whether or not it is in the position has been confirmed, but in the case of the erector apparatus 1 capable of performing detailed guidance with high control accuracy, the work after step st41 can be omitted. In this case, the positions of the support targets S1 and S4 at the lower end may be guided in detail instead of the positions of the support targets S2 and S3 at the upper end. In view of the fact that the gripping state of the supporters 4L and 4R is different for each gripping by the gripping parts supported by the booms 12L and 12R of the elector device 1, the elector targets E1 and E2 and the supporter targets S1 to S1 in the gripping state are different. Based on the positional relationship of S4, the target position in the approximate guidance was obtained (step st33). However, the target position in the rough guidance may be set based on the design positions of the support works 4L and 4R with a value that allows gripping unevenness, and may be input together with the basic data prior to the execution of the previous work. Further, the total station 2-1 is fixedly disposed on the wall surface, and the total station 2-2 is movably disposed. However, the total station 2-1 may be movable or fixed.

1…エレクタ装置、2−1、2−2…トータルステーション、3−1、3−2…基準ターゲット、4L、4R…支保工、5…切羽、11…エレクタ台車、12L、12R…ブーム、S1〜S4…支保工ターゲット、E1、E2…エレクタターゲット   DESCRIPTION OF SYMBOLS 1 ... Electa device, 2-1, 2-2 ... Total station, 3-1, 3-2 ... Reference target, 4L, 4R ... Supporting work, 5 ... Face, 11 ... Erecta cart, 12L, 12R ... Boom, S1- S4: Supporting target, E1, E2 ... Electa target

Claims (3)

伸縮機構、傾動機構、揺動機構、回動機構を有し先端に把持部を支持するブームを自走するエレクタ台車に備えたエレクタ装置により前記把持部に支保工を把持してトンネルの切羽近くに誘導し建て込むトンネル支保工誘導建て込み方法であって、前記把持部にエレクタターゲットを取り付けると共に、前記支保工の上端部と下端部に支保工ターゲットを取り付け、前記エレクタターゲットの位置を計測して前記エレクタ装置を制御しエレクタターゲット目標位置に前記エレクタターゲットの位置を誘導することにより前記支保工を概略誘導した後、前記エレクタターゲットの位置を固定にし、前記支保工ターゲットの位置を計測して前記エレクタ装置を制御し前記エレクタターゲットの位置を中心に回転操作して支保工の上端部または下端部のターゲット目標位置に前記上端部または下端部の支保工ターゲットの位置を誘導することにより前記支保工を詳細誘導して、前記支保工を設計位置に建て込むことを特徴とするトンネル支保工誘導建て込み方法。 A telescopic mechanism, tilting mechanism, swinging mechanism, and rotating mechanism that has a boom that supports the gripping part at the tip and that supports the gripping part by an erector device that grips the supporting part in the gripping part, close to the face of the tunnel A tunnel support construction guide erection method that guides and builds in, and attaches an erector target to the grip portion, attaches a support target to the upper end and lower end of the support, and measures the position of the erector target. And then guiding the position of the erector target to the target position of the erector target by roughly guiding the support, then fixing the position of the erector target and measuring the position of the support target. an upper end portion or a lower end of the shoring and rotating operation about the position of the erector target controls the erector device Of the targeted target position upper or induce detail the支保Engineering by inducing position of shoring target lower end portion, the tunnel shoring induction denominated, characterized in that Tatekomu the design position of the支保Engineering Method. 前記支保工の仮置き場で前記支保工の上端部と下端部に支保工ターゲットを取り付けたとき、前記支保工のセンターライン、上端、下端からのオフセット量を管理コンピュータに入力することを特徴とする請求項1に記載のトンネル支保工誘導建て込み方法。   When a support target is attached to the upper end and the lower end of the support in the temporary storage area of the support, the offset amount from the center line, the upper end, and the lower end of the support is input to a management computer. The tunnel support construction induction method according to claim 1. 前作業として、前記エレクタ装置の把持部に前記支保工を把持した状態における前記エレクタターゲットおよび前記支保工ターゲットの位置を計測して前記支保工との位置関係を求めた後、前記概略誘導することを特徴とする請求項1又は2のいずれかに記載のトンネル支保工誘導建て込み方法。   As a pre-operation, after measuring the position of the erector target and the support target in a state where the support work is gripped by the grip portion of the elector device and obtaining the positional relationship with the support work, the rough guidance The tunnel support construction guidance erection method according to claim 1, wherein
JP2011060729A 2011-03-18 2011-03-18 Tunnel support construction method Active JP5720041B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011060729A JP5720041B2 (en) 2011-03-18 2011-03-18 Tunnel support construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011060729A JP5720041B2 (en) 2011-03-18 2011-03-18 Tunnel support construction method

Publications (2)

Publication Number Publication Date
JP2012197559A JP2012197559A (en) 2012-10-18
JP5720041B2 true JP5720041B2 (en) 2015-05-20

Family

ID=47180052

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011060729A Active JP5720041B2 (en) 2011-03-18 2011-03-18 Tunnel support construction method

Country Status (1)

Country Link
JP (1) JP5720041B2 (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6420231B2 (en) * 2015-12-24 2018-11-07 前田建設工業株式会社 Tunnel support construction method and system
JP6374051B1 (en) * 2017-04-07 2018-08-15 前田建設工業株式会社 How to build a tunnel
JP6374050B1 (en) * 2017-04-07 2018-08-15 前田建設工業株式会社 Steel support construction connection structure, connection method, and erection method
JP6666976B2 (en) * 2018-10-11 2020-03-18 前田建設工業株式会社 Tunnel shoring method and system
JP2020070617A (en) * 2018-10-31 2020-05-07 株式会社大林組 Center and method for surveying center
JP7364185B2 (en) * 2019-07-24 2023-10-18 大成建設株式会社 Shoring erection method and shoring erection system
JP7231531B2 (en) * 2019-11-27 2023-03-01 大成建設株式会社 Steel shoring erection method
JP7328659B2 (en) * 2019-12-27 2023-08-17 古河ロックドリル株式会社 Shoring erection device and shoring erection method using the same
JP7687890B2 (en) * 2021-07-09 2025-06-03 清水建設株式会社 Tunnel face safety monitoring system and tunnel face safety monitoring method
JP7686505B2 (en) * 2021-09-03 2025-06-02 前田建設工業株式会社 Shoring erection system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4559346B2 (en) * 2005-11-15 2010-10-06 前田建設工業株式会社 Support construction method and support construction system
JP5201947B2 (en) * 2007-11-07 2013-06-05 鹿島建設株式会社 How to build support structures

Also Published As

Publication number Publication date
JP2012197559A (en) 2012-10-18

Similar Documents

Publication Publication Date Title
JP5720041B2 (en) Tunnel support construction method
JP4559346B2 (en) Support construction method and support construction system
EP1329689B1 (en) Method and apparatus for surveying the geometry of tunnels
JP6420231B2 (en) Tunnel support construction method and system
JP3410465B1 (en) Surveying method and program for displaying the surveying results
JP6224659B2 (en) Construction work support program, construction work support apparatus, construction work support method, and construction work support system
JP7707510B2 (en) Surveying system, method for supporting installation of stakes, and program for supporting installation of stakes
JP2019167678A (en) Tunnel spray control method
JP7505957B2 (en) Measurement method for winding space in tunnel construction
JP2020033762A (en) Installation height management system and installation height management method
CN102849092B (en) Visible positioning monitoring system of tunnel trolley
JP2020026697A (en) Tunnel construction system and tunnel construction support method
JP2020070617A (en) Center and method for surveying center
JP7364185B2 (en) Shoring erection method and shoring erection system
JP2015007567A (en) Tunnel measuring system
JP7328659B2 (en) Shoring erection device and shoring erection method using the same
JP2017025633A (en) Road auxiliary equipment construction method and moving direction instruction program
US9335169B2 (en) Stud mapping and layout method
JP2021085205A (en) Steel support construction method
JP2004317406A (en) Light receiving jig for light wave measuring instrument
JP5201947B2 (en) How to build support structures
CN109297453A (en) Linear measurement method of curved formwork for lining trolley
JP2022044495A (en) Tunnel supporting installation device
JP2021139800A (en) Anti-vibration pedestal for installing measuring instruments on construction machines, construction machines equipped with the anti-vibration pedestals, and vibration isolation methods for measuring instruments
JP2619604B2 (en) Method and apparatus for adjusting the installation of legs for steel tower structures

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130913

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140310

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140319

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140516

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150107

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150126

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150218

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20150225

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150225

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A821

Effective date: 20150227

R150 Certificate of patent or registration of utility model

Ref document number: 5720041

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250