JP5930580B2 - Earth retaining wall and method of constructing earth retaining wall - Google Patents
[go: Go Back, main page]

JP5930580B2 - Earth retaining wall and method of constructing earth retaining wall - Google Patents

Earth retaining wall and method of constructing earth retaining wall Download PDF

Info

Publication number
JP5930580B2
JP5930580B2 JP2010258113A JP2010258113A JP5930580B2 JP 5930580 B2 JP5930580 B2 JP 5930580B2 JP 2010258113 A JP2010258113 A JP 2010258113A JP 2010258113 A JP2010258113 A JP 2010258113A JP 5930580 B2 JP5930580 B2 JP 5930580B2
Authority
JP
Japan
Prior art keywords
excavation
retaining wall
soil
soil layer
earth retaining
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2010258113A
Other languages
Japanese (ja)
Other versions
JP2012107444A (en
Inventor
勝士 玉井
勝士 玉井
光生 伊藤
光生 伊藤
昭次 山川
昭次 山川
一彦 和田
一彦 和田
光一 豊田
光一 豊田
鈴木 秀之
秀之 鈴木
裕司 田屋
裕司 田屋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP2010258113A priority Critical patent/JP5930580B2/en
Publication of JP2012107444A publication Critical patent/JP2012107444A/en
Application granted granted Critical
Publication of JP5930580B2 publication Critical patent/JP5930580B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

本発明は、土留め壁及び土留め壁の構築方法に関する。   The present invention relates to a retaining wall and a method for constructing a retaining wall.

従来、土留め壁に遮水機能が要求される場合には、原位置の地盤とセメントミルクを混合攪拌して構築された地盤改良体の土留め壁が採用され、遮水機能が要求されない場合には、親杭横矢板工法で構築された土留め壁が採用されている。即ち、土留め壁として遮水機能が要求されるか否かで、いずれかを選択せざるを得ないため、掘削面の一部に遮水機能が要求される土層が存在しても、掘削面の全面に、地盤改良体の土留め壁を採用する必要があった。これにより、施工コストの上昇を招いていた。   Conventionally, when a water barrier function is required for the earth retaining wall, the earth retaining wall of the ground improvement body constructed by mixing and stirring the original ground and cement milk is adopted, and the water shielding function is not required The earth retaining wall constructed by the main pile side sheet pile method is adopted. That is, depending on whether or not a water barrier function is required as a retaining wall, it is necessary to select either, so even if there is a soil layer that requires a water barrier function on a part of the excavation surface, It was necessary to adopt earth retaining walls for ground improvement over the entire excavation surface. This has led to an increase in construction costs.

そこで、遮水機能が要求される部分にのみ遮水部を設ける、親杭横矢板工法の土留め壁が提案されている(特許文献1)。   Then, the earth retaining wall of the parent pile horizontal sheet pile method which provides a water-impervious part only in the part for which a water-impervious function is required has been proposed (Patent Document 1).

図5に示すように、特許文献1に記載の親杭横矢板工法の土留め壁70は、所定の間隔で地盤72内に打設される親杭73と、親杭73の間に設置される横矢板74を有し、地盤72の遮水が不要な土層77の間に存在する遮水が必要な帯水層76、78の位置に、地下水の流れを遮断する遮水部75が形成されている。 As shown in FIG. 5, the retaining wall 70 of the parent pile lateral sheet pile method described in Patent Document 1 is installed between the parent pile 73 placed in the ground 72 at a predetermined interval and the parent pile 73. There is a water shielding portion 75 that blocks the flow of groundwater at the position of the aquifers 76 and 78 that need to be shielded and exist between the soil layers 77 that do not need to be shielded from the ground 72. Is formed.

ここに、遮水部75は、土留め壁70の外側の地盤中に設けられ、帯水層76、78の上面のやや上部から、帯水層76、78の下面のやや下部までの範囲に渡り、ゲル状の遮水材を地盤に圧入して形成される。
しかし、特許文献1に記載の土留め壁は、地下水の回り込みによる遮水性能の低下、ゲル状の遮水材の圧入による施工工程の増加等の問題を有している。
Here, the water-impervious portion 75 is provided in the ground outside the retaining wall 70 and ranges from a slightly upper part of the upper surface of the aquifers 76 and 78 to a slightly lower part of the lower surface of the aquifers 76 and 78. It is formed by pressing a gel-like water shielding material into the ground.
However, the earth retaining wall described in Patent Document 1 has problems such as a decrease in water-blocking performance due to groundwater wrapping and an increase in construction process due to press-fitting of a gel-like water-blocking material.

特開2009−68203号公報JP 2009-68203 A

本発明は、上記事実に鑑み、掘削面に遮水が必要な土層がある場合に、その部分のみに遮水機能を持たせることのできる土留め壁を提供することを目的とする。   An object of this invention is to provide the earth retaining wall which can give a water-blocking function only to the part, when there exists a soil layer which needs water-blocking in an excavation surface in view of the said fact.

請求項1に記載の発明に係る土留め壁は、遮水が必要な土層を含む掘削部の周囲に、外周部をラップさせずに間をあけて掘削穴が設けられ、前記掘削穴の全てに建て込まれる親杭と、前記土層に位置する全ての前記掘削穴の部位に設けられた拡径部の外周部同士がラップして連続した部分に設けられ、セメントミルク及び掘削土で形成された壁状のソイルセメントコラム遮水部と、を有することを特徴としている。 The earth retaining wall according to the invention of claim 1 is provided with an excavation hole around the excavation part including a soil layer that needs water shielding without wrapping the outer peripheral part. It is provided in a part where the outer piles of the main piles built in all and the enlarged diameter parts provided in all the excavation hole portions located in the soil layer are wrapped and continuous, with cement milk and excavated soil. And a wall-shaped soil cement column impermeable portion.

請求項1に記載の発明によれば、拡径した掘削穴の外周部を、隣り合う掘削穴の外周部とラップさせたソイルセメントコラム遮水部が、遮水の必要な土層を遮水する。即ち、遮水が必要な土層のみに、遮水機能を有する遮水壁を構築することができる。
これにより、掘削面の一部に遮水機能が要求される土層があっても、その部分のみに遮水機能を持たせることのできる親杭横矢板工法の土留め壁を提供できる。
According to the first aspect of the present invention, the soil cement column water shielding portion obtained by wrapping the outer peripheral portion of the expanded excavation hole with the outer peripheral portion of the adjacent excavation hole, To do. That is, it is possible to construct a water shielding wall having a water shielding function only on a soil layer that needs water shielding.
Thereby, even if there is a soil layer that requires a water shielding function on a part of the excavation surface, it is possible to provide a retaining wall of the parent pile lateral sheet pile method that can have a water shielding function only on that part.

請求項2に記載の発明は、請求項1に記載の土留め壁において、前記掘削部の掘削面には、前記ソイルセメントコラム遮水部が構築された部分を除き、前記親杭の間に横矢板が架け渡されていることを特徴としている。   According to a second aspect of the present invention, in the earth retaining wall according to the first aspect, the excavation surface of the excavation part is between the parent piles except for a part where the soil cement column water-impervious part is constructed. It is characterized by a crossed sheet pile.

請求項2に記載の発明によれば、遮水が必要な土層の範囲にのみ、遮水機能を有するソイルセメントコラム遮水部が構築され、遮水が不要な部分には、親杭の間に横矢板が架け渡されている。
これにより、遮水が不要な部分を親杭横矢板工法で施工でき、施工コストの低減が図れる。
According to the invention described in claim 2, a soil cement column water-impervious portion having a water-impervious function is constructed only in the range of the soil layer that needs to be impermeable. There is a sheet pile between them.
Thereby, the part which does not need water-blocking can be constructed by the parent pile horizontal sheet pile method, and the construction cost can be reduced.

請求項3に記載の発明は、請求項1又は2に記載の土留め壁において、前記親杭はH形鋼とされ、前記ソイルセメントコラム遮水部の掘削面は、前記H形鋼のフランジ面と平行に切り取られていることを特徴としている。
請求項3に記載の発明によれば、ソイルセメントコラム遮水部は、掘削された地盤側に突き出ることはない。即ち、親杭横矢板工法の作業内容を大きく変更することなく、遮水が必要な部分のみを遮水する土留め壁が提供できる。
According to a third aspect of the present invention, in the earth retaining wall according to the first or second aspect, the parent pile is an H-shaped steel, and the excavation surface of the soil cement column water shielding portion is a flange of the H-shaped steel. It is characterized by being cut parallel to the surface.
According to the invention described in claim 3, the soil cement column water-impervious portion does not protrude toward the excavated ground side. That is, it is possible to provide a retaining wall that shields only a portion that needs water shielding without greatly changing the work contents of the main pile sheet pile method.

請求項4に記載の発明に係る土留め壁の構築方法は、遮水が必要な土層を含む掘削部の周囲に外周部をラップさせずに間をあけて、所定の深度まで、親杭を建て込む掘削穴を掘削する工程と、前記土層の範囲に構築され、全ての前記掘削穴を拡径しながらセメントミルクと掘削土を混合攪拌し、隣り合う拡径された前記掘削穴の外周部同士をラップさせ、前記掘削部を取り囲むソイルセメントコラム遮水部を構築する工程と、前記ソイルセメントコラム遮水部の前記セメントミルクが固化する前に、前記掘削穴の全てにH形鋼を建て込む工程と、前記掘削部を掘削しながら、前記ソイルセメントコラム遮水部を前記H形鋼のフランジ面と平行に切り取る工程と、を有することを特徴としている。 According to a fourth aspect of the present invention, there is provided a method for constructing a retaining wall, in which an outer peripheral portion is not wrapped around an excavation portion including a soil layer that needs water shielding, and a parent pile is formed to a predetermined depth. A step of excavating the excavation hole to be built, and mixing and stirring the cement milk and excavated soil while expanding the diameter of all the excavation holes, the outer peripheral portions is wrapped, the step of constructing a soil cement column water shielding portion surrounding the excavated portion, the before said cement milk soil cement column water shielding portion is solidified, all H-beam of the wellbore And a step of cutting the soil cement column water-impervious portion in parallel with the flange surface of the H-shaped steel while excavating the excavation portion.

本、土留め壁の構築方法を用いることにより、掘削面に遮水機能が要求される土層があっても、その土層のみに遮水機能を持たせることのできる親杭横矢板工法の土留め壁を提供できる。   By using this method of building a retaining wall, even if there is a soil layer that requires a water shielding function on the excavation surface, only the soil layer can have a water shielding function. Can provide a retaining wall.

本発明は、上記構成としてあるので、掘削面に遮水が必要な土層がある場合に、その部分のみに遮水機能を持たせることのできる土留め壁を提供できる。   Since this invention is set as the said structure, when there exists a soil layer which needs water shielding on an excavation surface, the earth retaining wall which can give a water shielding function only to the part can be provided.

本発明の実施の形態に係る土留め壁の基本構成を示す斜視図である。It is a perspective view which shows the basic composition of the earth retaining wall which concerns on embodiment of this invention. 本発明の実施の形態に係る土留め壁の平面図及び側面断面図である。It is the top view and side sectional drawing of the earth retaining wall which concern on embodiment of this invention. 本発明の実施の形態に係る土留め壁の施工手順を示す側面断面図である。It is side surface sectional drawing which shows the construction procedure of the earth retaining wall which concerns on embodiment of this invention. 本発明の実施の形態に係る土留め壁の展開例の平面図及び側面断面図である。It is the top view and side sectional view of an example of deployment of a retaining wall concerning an embodiment of the invention. 従来例の土留め壁の基本構成を示す図である。It is a figure which shows the basic composition of the earth retaining wall of a prior art example.

図1、2を用いて実施の形態に係る土留め壁10について説明する。図1は斜視図であり、図2(A)は平面図、図2(B)は地盤の断面図、図2(C)は土留め壁の断面図である。   The retaining wall 10 according to the embodiment will be described with reference to FIGS. 1 is a perspective view, FIG. 2A is a plan view, FIG. 2B is a cross-sectional view of the ground, and FIG. 2C is a cross-sectional view of a retaining wall.

土留め壁10は、地盤の掘削部を囲む掘削面16に構築されている。土留め壁10は、地表面42と掘削部の掘削底面34の間に、高さH1で形成されている。掘削面16の一部には、遮水が必要な砂質土層12が存在しており、土留め壁10に遮水性能が要求されている。   The earth retaining wall 10 is constructed on the excavation surface 16 surrounding the excavation part of the ground. The earth retaining wall 10 is formed at a height H1 between the ground surface 42 and the excavation bottom surface 34 of the excavation part. A sandy soil layer 12 that needs water shielding is present on a part of the excavation surface 16, and the earth retaining wall 10 is required to have a water shielding performance.

砂質土層12の上部と下部には、粘性土層14、15が形成されている。この粘性土層14、15は、水を通過させない層であり、土留め壁10に遮水性能は要求されない。粘性土層15の下には、更に砂質土層13が存在するが、土留め壁10の深さH1は、粘性土層15まであり、砂質土層13は土留め壁10に直接影響を及ぼすものではない。   On the upper and lower portions of the sandy soil layer 12, viscous soil layers 14 and 15 are formed. The viscous soil layers 14 and 15 are layers that do not allow water to pass therethrough, and the water retaining performance is not required for the retaining wall 10. A sandy soil layer 13 further exists under the cohesive soil layer 15, but the depth H 1 of the retaining wall 10 extends to the viscous soil layer 15, and the sandy soil layer 13 directly affects the retaining wall 10. It does not affect.

土留め壁10はH形鋼20を有しており、H形鋼20が背面地盤からの土圧に抵抗している。H形鋼20は、後述するオーガヘッドで掘削された掘削穴18に建て込まれ、根固めされている。
掘削穴18は円柱状とされ、砂質土層13に至る深さH2まで直径D1で掘削されている。但し、掘削穴18が砂質土層12を貫通する部分では、掘削径が直径D2に拡径されている。
The earth retaining wall 10 has an H-section steel 20, and the H-section steel 20 resists earth pressure from the back ground. The H-section steel 20 is built into a drilling hole 18 excavated by an auger head described later and solidified.
The excavation hole 18 has a cylindrical shape and is excavated with a diameter D1 to a depth H2 reaching the sandy soil layer 13. However, in the portion where the excavation hole 18 penetrates the sandy soil layer 12, the excavation diameter is expanded to the diameter D2.

掘削穴18の内部には、セメントミルクと掘削土を混合攪拌したソイルセメントコラム26が構築され、掘削穴18に建て込まれたH形鋼20は、ソイルセメントコラム26で根固めされている。
このとき、掘削穴18の直径D2に拡径された円柱状部分は、隣り合う外周部がラップされ、壁状に、ソイルセメントコラム遮水部22が構築されている。これにより、砂質土層12を土留め壁10で塞ぎ、遮水機能を確保することができる。
Inside the excavation hole 18, a soil cement column 26 in which cement milk and excavation soil are mixed and stirred is constructed, and the H-section steel 20 built in the excavation hole 18 is solidified by the soil cement column 26.
At this time, the cylindrical portion expanded to the diameter D2 of the excavation hole 18 is wrapped around the adjacent outer peripheral portion, and the soil cement column water shielding portion 22 is constructed in a wall shape. Thereby, the sandy soil layer 12 can be closed with the earth retaining wall 10 and the water shielding function can be secured.

なお、ソイルセメントコラム遮水部22の上部掘削穴28には、セメントミルクを吐出せずに、原地盤(粘性土層14)をそのまま埋め戻している。
ここに、ソイルセメントコラム遮水部22は、砂質土層13の底面より更に深さH3だけ深い位置から構築され、砂質土層13の上面より更に深さH4だけ浅い位置まで構築されている。ここに、深さH3は500mm程度が望ましい。これにより、上下端部からの水漏れを防ぐことができる。
The upper ground excavation hole 28 of the soil cement column impermeable portion 22 is backfilled with the original ground (cohesive soil layer 14) as it is without discharging cement milk.
Here, the soil cement column impermeable portion 22 is constructed from a position deeper than the bottom surface of the sandy soil layer 13 by a depth H3, and further constructed to a position shallower than the top surface of the sandy soil layer 13 by a depth H4. Yes. Here, the depth H3 is preferably about 500 mm. Thereby, the water leak from an upper-lower-end part can be prevented.

掘削面16は、ソイルセメントコラム遮水部22の掘削部側を切り取り、平板状に形成されている。即ち、ソイルセメントコラム遮水部22は、H形鋼20のフランジ面と平行な方向に、フランジ面が露出される位置まで切り取られている。この結果、ソイルセメントコラム遮水部22が掘削部側に突き出ることはない。   The excavation surface 16 is formed in a flat plate shape by cutting the excavation part side of the soil cement column impermeable part 22. That is, the soil cement column water-impervious portion 22 is cut in a direction parallel to the flange surface of the H-section steel 20 to a position where the flange surface is exposed. As a result, the soil cement column impermeable part 22 does not protrude to the excavation part side.

また、掘削面16の上部、即ち、ソイルセメントコラム遮水部22の上には、横矢板24が設けられている。横矢板24は合板製とされ、H形鋼20の間に積み重ねて架け渡され、粘性土層14の土圧を受けている。   In addition, a lateral sheet pile 24 is provided above the excavation surface 16, that is, on the soil cement column water shielding portion 22. The lateral sheet piles 24 are made of plywood, are stacked and bridged between the H-section steels 20, and receive the earth pressure of the viscous soil layer 14.

以上説明したように、遮水が必要な砂質土層12を塞ぐ範囲に、外周部をラップさせソイルセメントコラム遮水部22を構築することで、遮水機能を備えた土留め壁10が提供できる。また、遮水が不要な粘性土層14、15に対しては、H形鋼20の間に横矢板24を架け渡すことで、土留め機能が確保される。   As described above, the soil retaining wall 10 having a water shielding function can be obtained by constructing the soil cement column water shielding portion 22 by wrapping the outer peripheral portion in a range where the sandy soil layer 12 that needs water shielding is blocked. Can be provided. Further, for the viscous soil layers 14 and 15 that do not require water shielding, a soil retaining function is secured by bridging the cross sheet pile 24 between the H-section steel 20.

これにより、従来の親杭横矢板工法の作業内容を大きく変更することなく、遮水が必要な砂質土層12のみを遮水する親杭横矢板工法の土留め壁10を提供できる。この結果、施工コストの低減が図れる。   Thereby, the earth retaining wall 10 of the parent pile horizontal sheet pile method which can insulate only the sandy soil layer 12 which needs water shielding can be provided, without changing the work content of the conventional parent pile horizontal sheet pile method greatly. As a result, the construction cost can be reduced.

なお、遮水が必要な土層は、砂質土層12を代表例に説明したが、これに限定されることはなく、他の土層であっても遮水できる。一方、砂質土層12であっても、遮水が不要な場合は、当然、遮水機能を持たせる必要はない。
また、掘削面16が粘性土層14の範囲では、遮水は不要であり、横矢板24をH形鋼20の間に架け渡したが、崩落の危険性がない粘性土層14においては、横矢板24を省略してもよい。
In addition, although the soil layer which needs water shielding demonstrated the sandy soil layer 12 to the representative example, it is not limited to this, Even if it is another soil layer, it can shield. On the other hand, even if it is the sandy soil layer 12, when water shielding is unnecessary, naturally it is not necessary to give a water shielding function.
Moreover, in the range where the excavation surface 16 is the viscous soil layer 14, water shielding is unnecessary, and the cross sheet pile 24 is bridged between the H-section steels 20, but in the viscous soil layer 14 where there is no risk of collapse, The lateral sheet pile 24 may be omitted.

また、H形鋼20を全ての掘削穴18に建て込んだ状態で説明したが、必ずしも全ての掘削穴18に建て込む必要はなく、背面地盤からの土圧に応じて建て込む密度(本数)を決定すればよい。   Moreover, although the H-shaped steel 20 was demonstrated in the state built in all the excavation holes 18, it does not necessarily need to be constructed in all the excavation holes 18, but the density (number) according to the earth pressure from a back ground. Can be determined.

また、ソイルセメントコラム遮水部22の上部掘削穴28には、セメントミルクを吐出せずに、原地盤(粘性土層14)をそのまま埋め戻しているが、セメントミルクを吐出して、ソイルセメントコラムを構築してもよい。   The upper excavation hole 28 of the soil cement column impermeable portion 22 is filled with the original ground (viscous soil layer 14) as it is without discharging cement milk. You may build a column.

次に、土留め壁10の構築方法について、図3を用いて説明する。
先ず、図3(A)に示す掘削穴の掘削工程を実行する。即ち、掘削穴18の位置に、先端にオーガヘッド30を取り付けた掘削ロッド40をセットする。オーガヘッド30を回転させ、先端から掘削水を吐出させながら、深さH2まで、直径D1で掘削穴18を掘削する。掘削穴18は、遮水が必要な土層である砂質土層12を、鉛直方向に貫通して形成される。
Next, the construction method of the earth retaining wall 10 will be described with reference to FIG.
First, the excavation process of an excavation hole shown in FIG. That is, the excavation rod 40 with the auger head 30 attached to the tip is set at the position of the excavation hole 18. The auger head 30 is rotated and the excavation hole 18 is excavated with the diameter D1 to the depth H2 while discharging the excavation water from the tip. The excavation hole 18 is formed by penetrating the sandy soil layer 12 that is a soil layer that needs water shielding in the vertical direction.

次に、図3(B)に示すソイルセメントコラム遮水部の構築工程を実行する。即ち、オーガヘッド30を、砂質土層12の位置(矢印H1の範囲)まで移動させ、オーガヘッド30で掘削穴18を拡径掘削する。   Next, the construction process of the soil cement column water shielding part shown in FIG. 3 (B) is executed. That is, the auger head 30 is moved to the position of the sandy soil layer 12 (the range of the arrow H1), and the excavation hole 18 is subjected to diameter expansion excavation with the auger head 30.

オーガヘッド30は、逆回転させることで拡大掘削が可能な構成である。具体的には、図3(A)の掘削方向がオーガヘッド30の正回転であり、直径D1で掘削穴18を掘削する。続いてオーガヘッド30を逆回転させることにより、折り畳まれたオーガヘッド30の先端部31が広がり、掘削穴18を直径D2に拡径して掘削する。これにより、隣り合う拡径された掘削穴22の外周部が、互いにラップされる。   The auger head 30 is configured to be capable of expanding excavation by rotating in reverse. Specifically, the excavation direction in FIG. 3A is the forward rotation of the auger head 30, and the excavation hole 18 is excavated with the diameter D1. Subsequently, by rotating the auger head 30 in the reverse direction, the tip 31 of the folded auger head 30 expands, and the excavation hole 18 is expanded to a diameter D2 for excavation. Thereby, the outer peripheral part of the adjacent digging hole 22 expanded in diameter is overlapped with each other.

次に、図3(C)に示すように、掘削穴18の内部にソイルセメントコラムを構築する。即ち、オーガヘッド30を再度正回転に戻して回転させながら、掘削穴18の下部に沈降した掘削土を再度掘削し、穴壁の安定性を確認する。その後、正回転のままオーガヘッド30の先端からセメントミルクを吐出させ、引き上げながらセメントミルクと掘削土を混合攪拌させる。拡径された掘削穴18の上面の位置までセメントミルクを注入した後、注入を終了して掘削ロッド40を掘削穴18から引き出す。   Next, as shown in FIG. 3C, a soil cement column is constructed inside the excavation hole 18. That is, while the auger head 30 is returned to the normal rotation again and rotated, the excavated soil settled in the lower portion of the excavation hole 18 is excavated again to confirm the stability of the hole wall. Thereafter, the cement milk is discharged from the tip of the auger head 30 while rotating forward, and the cement milk and the excavated soil are mixed and stirred while being pulled up. After the cement milk is injected up to the position of the upper surface of the expanded excavation hole 18, the injection is finished and the excavation rod 40 is pulled out from the excavation hole 18.

次に、図3(D)に示すH形鋼20の建て込み工程を実行する。即ち、セメントミルクが固化する前に、掘削穴18にH形鋼20を建て込み保持する。これにより、H形鋼20がソイルセメントコラムで根固めされる。また、セメントミルクが固化することでソイルセメントコラム遮水部22が、連続した柱体として構築される。その後、掘削穴18の上部28に地盤14を埋め戻す。   Next, the erection process of the H-section steel 20 shown in FIG. That is, before the cement milk is solidified, the H-section steel 20 is built and held in the excavation hole 18. Thereby, the H-section steel 20 is solidified by the soil cement column. Moreover, the soil cement column water-impervious portion 22 is constructed as a continuous column by solidifying the cement milk. Thereafter, the ground 14 is buried back in the upper portion 28 of the excavation hole 18.

最後に、図3(E)に示す切り取り工程を実行する。即ち、地盤の掘削部を地表面42から掘削底面32まで掘削する。このとき、粘性土層14が崩落しないように、横矢板24をH形鋼20の間に架け渡しながら掘削する。また、ソイルセメントコラム遮水部22においては、掘削部側をH形鋼のフランジ面と平行に、フランジ面が露出する位置まで切り取る。   Finally, the cutting process shown in FIG. That is, the ground excavation part is excavated from the ground surface 42 to the excavation bottom surface 32. At this time, the horizontal sheet pile 24 is excavated while being bridged between the H-section steels 20 so that the viscous soil layer 14 does not collapse. Moreover, in the soil cement column water-impervious portion 22, the excavated portion side is cut out in parallel with the flange surface of the H-section steel to a position where the flange surface is exposed.

以上説明した方法で土留め壁10を構築することにより、掘削面16に遮水機能が要求される砂質土層12が存在しても、その砂質土層12の範囲のみを遮水する土留め壁10を提供できる。   By constructing the earth retaining wall 10 by the method described above, even if the sandy soil layer 12 requiring a water shielding function exists on the excavation surface 16, only the range of the sandy soil layer 12 is shielded. The earth retaining wall 10 can be provided.

なお、拡径された掘削穴22は、逆回転して拡径掘削が可能な機能を備えたオーガヘッド30を用いた例について説明した。しかし、掘削穴18を拡径できればよく、これに限定されるものではない。例えば、掘削水やセメントミルクを、横方向にジェット流として吐出させ、ジェット流の吐出圧力で掘削穴18を横方向に掘削し、拡径する方法を用いてもよい。   In addition, the example which used the auger head 30 provided with the function in which the diameter-expanded excavation hole 22 was reversely rotated and diameter expansion excavation was demonstrated was demonstrated. However, it is only necessary that the diameter of the excavation hole 18 can be increased, and the present invention is not limited to this. For example, a method may be used in which drilling water or cement milk is discharged as a jet flow in the lateral direction, the drill hole 18 is drilled in the horizontal direction with the jet flow discharge pressure, and the diameter is expanded.

次に、展開例について説明する。
図4に示すように、土留め壁50は、地盤の掘削部を囲む掘削面16に構築されている。土留め壁50は、地表面42と掘削部の掘削底面34の間に、高さH1で形成されている。掘削面16の一部には、遮水が必要な砂質土層12、36が存在しており、土留め壁10に遮水性能が要求されている。
Next, a development example will be described.
As shown in FIG. 4, the earth retaining wall 50 is constructed on the excavation surface 16 surrounding the excavation part of the ground. The earth retaining wall 50 is formed at a height H1 between the ground surface 42 and the excavation bottom surface 34 of the excavation part. Sandy soil layers 12 and 36 that need to be water-blocked exist in a part of the excavation surface 16, and the water-blocking performance is required for the earth retaining wall 10.

砂質土層36の上部には粘性土層14が、下部には粘性土層38が形成されている。また、粘性土層38の下には砂質土層12が形成され、砂質土層12の下には、粘性土層15が形成されている。即ち、掘削面16に砂質土層12、36の2層が存在している。   A viscous soil layer 14 is formed above the sandy soil layer 36, and a viscous soil layer 38 is formed below the sandy soil layer 36. Further, a sandy soil layer 12 is formed under the viscous soil layer 38, and a viscous soil layer 15 is formed under the sandy soil layer 12. That is, two layers of sandy soil layers 12 and 36 exist on the excavation surface 16.

これに対応して、土留め壁50のソイルセメントコラム遮水部52は、砂質土層12の底面より更に深さH3だけ深い位置から構築され、砂質土層36の上面より更に深さH3だけ浅い位置まで構築されている。ここに、深さH3は500mm程度が望ましい。   Correspondingly, the soil cement column impermeable portion 52 of the earth retaining wall 50 is constructed from a position deeper than the bottom surface of the sandy soil layer 12 by a depth H3, and is further deeper than the upper surface of the sandy soil layer 36. It is built to a position shallower by H3. Here, the depth H3 is preferably about 500 mm.

このように、砂質土層12、36が上下方向に複数ある場合には、ソイルセメントコラム遮水部52を、複数の砂質土層12、36を跨いで連続して塞ぐ寸法に構築してもよい。これにより、施工コストを低減できる。
他の構成は、上述した実施の形態と同じであり説明は省略する。
As described above, when there are a plurality of sandy soil layers 12 and 36 in the vertical direction, the soil cement column water-impervious portion 52 is constructed so as to continuously cover the plurality of sandy soil layers 12 and 36. May be. Thereby, construction cost can be reduced.
Other configurations are the same as those in the above-described embodiment, and a description thereof will be omitted.

10 土留め壁
12 砂質土層(遮水が必要な土層)
16 掘削面
18 掘削穴
20 H形鋼(親杭)
22 ソイルセメントコラム遮水部
10 Earth retaining wall 12 Sandy soil layer (soil layer that needs water shielding)
16 Drilling surface 18 Drilling hole 20 H-section steel (parent pile)
22 Soil cement column

Claims (4)

遮水が必要な土層を含む掘削部の周囲に、外周部をラップさせずに間をあけて掘削穴が設けられ、前記掘削穴の全てに建て込まれる親杭と、
前記土層に位置する全ての前記掘削穴の部位に設けられた拡径部の外周部同士がラップして連続した部分に設けられ、セメントミルク及び掘削土で形成された壁状のソイルセメントコラム遮水部と、
を有する土留め壁。
Around the excavation part including the soil layer that needs water shielding, a drilling hole is provided without wrapping the outer peripheral part, and a parent pile built in all of the excavation hole,
A wall-shaped soil cement column formed of cement milk and excavated soil, which is provided in a continuous portion by wrapping the outer peripheral portions of the enlarged diameter portions provided in all the excavation hole portions located in the soil layer A water shielding part,
With earth retaining wall.
前記掘削部の掘削面には、前記ソイルセメントコラム遮水部が構築された部分を除き、前記親杭の間に横矢板が架け渡されている請求項1に記載の土留め壁。   The earth retaining wall according to claim 1, wherein a lateral sheet pile is bridged between the parent piles on the excavation surface of the excavation part except for a portion where the soil cement column impermeable part is constructed. 前記親杭はH形鋼とされ、前記ソイルセメントコラム遮水部の掘削面は、前記H形鋼のフランジ面と平行に切り取られている請求項1又は2に記載の土留め壁。   The earth retaining wall according to claim 1 or 2, wherein the parent pile is an H-shaped steel, and an excavation surface of the soil cement column water shielding portion is cut in parallel with a flange surface of the H-shaped steel. 遮水が必要な土層を含む掘削部の周囲に外周部をラップさせずに間をあけて、所定の深度まで、親杭を建て込む掘削穴を掘削する工程と、
前記土層の範囲に構築され、全ての前記掘削穴を拡径しながらセメントミルクと掘削土を混合攪拌し、隣り合う拡径された前記掘削穴の外周部同士をラップさせ、前記掘削部を取り囲むソイルセメントコラム遮水部を構築する工程と、
前記ソイルセメントコラム遮水部の前記セメントミルクが固化する前に、前記掘削穴の全てにH形鋼を建て込む工程と、
前記掘削部を掘削しながら、前記ソイルセメントコラム遮水部を前記H形鋼のフランジ面と平行に切り取る工程と、
を有する土留め壁の構築方法。
Drilling a drilling hole to build a parent pile up to a predetermined depth, without wrapping the outer peripheral part around the excavation part including a soil layer that needs water shielding,
Constructed in the range of the soil layer, mixing and agitating cement milk and excavated soil while expanding all the excavation holes, wrapping the outer peripheral portions of the adjacent expanded excavation holes, A process for constructing a surrounding soil cement column water-impervious part;
Before the cement milk of the soil cement column impermeable part is solidified, a step of building H-shaped steel in all of the excavation holes;
Cutting the soil cement column impermeable part parallel to the flange surface of the H-shaped steel while excavating the excavation part;
A method for constructing a retaining wall.
JP2010258113A 2010-11-18 2010-11-18 Earth retaining wall and method of constructing earth retaining wall Active JP5930580B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010258113A JP5930580B2 (en) 2010-11-18 2010-11-18 Earth retaining wall and method of constructing earth retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010258113A JP5930580B2 (en) 2010-11-18 2010-11-18 Earth retaining wall and method of constructing earth retaining wall

Publications (2)

Publication Number Publication Date
JP2012107444A JP2012107444A (en) 2012-06-07
JP5930580B2 true JP5930580B2 (en) 2016-06-08

Family

ID=46493323

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010258113A Active JP5930580B2 (en) 2010-11-18 2010-11-18 Earth retaining wall and method of constructing earth retaining wall

Country Status (1)

Country Link
JP (1) JP5930580B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6166072B2 (en) * 2013-03-19 2017-07-19 鹿島建設株式会社 Earth retaining structure and earth retaining method
CN105804067A (en) * 2016-03-25 2016-07-27 上海十三冶建设有限公司 Construction method for structural steel cemented soil stirring pile stand column used for deep foundation pit support
CN108071118A (en) * 2018-01-12 2018-05-25 上海岩土工程勘察设计研究院有限公司 A kind of supporting construction and its construction method and the overlapping piling wall for also serving as supporting construction
JP7212981B1 (en) 2022-08-24 2023-01-26 合同会社天神サービス Earth retaining structure and construction method of earth retaining structure

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06341140A (en) * 1993-02-04 1994-12-13 Fusao Sakano Construction method by which column-wall holes are bored within approximate line by 10-700mm from boundary by intermittent work and continuous wall, connection wall, butt-joint wall, superposed wall, and cut-off wall are erected by use of the hole, and these walls
JPH10325138A (en) * 1997-05-26 1998-12-08 Kazuharu Fujito Method for constructing earth retaining wall and earth auger device
JPH11222848A (en) * 1998-02-04 1999-08-17 Taisei Corp Construction method of water stoppage retaining wall
JP2002047653A (en) * 2000-08-07 2002-02-15 Kiyota Kido Kogyo Kk Construction method for mortar pile
US20020071725A1 (en) * 2000-12-07 2002-06-13 Jakiel Robert L. Earth support and permanent structural foundation wall
JP5043731B2 (en) * 2008-03-26 2012-10-10 清水建設株式会社 Construction method of impermeable walls

Also Published As

Publication number Publication date
JP2012107444A (en) 2012-06-07

Similar Documents

Publication Publication Date Title
JP5930580B2 (en) Earth retaining wall and method of constructing earth retaining wall
KR101812265B1 (en) A Foundation Method Of Continuous and Cut Off wall By Overlap Casing
KR101021915B1 (en) Order temporary construction method for earthquake construction
WO2014107058A1 (en) Self-enlargeable pile and construction method therefor
KR20000006650A (en) a pole for mud wall and constrution method of fence for mud
JP6615465B2 (en) Yamadome wall
JP2004204581A (en) Water-blocking method for managed revetment
JP6225458B2 (en) Retaining wall and its construction method
JP3714395B2 (en) Reinforcement method for the ground below existing structures
JP4888293B2 (en) Earth retaining wall made of parent pile sheet pile, water stop structure of earth retaining wall made of parent pile side sheet pile, construction method of earth retaining wall made of parent pile side sheet pile, and retaining wall of earth retaining wall made of parent pile side sheet pile Water method
KR20080076015A (en) Joule soil wall using an enlarged section pile unit with thumb pile
KR101649448B1 (en) An assembly for retaining sheet pile wall
KR101807366B1 (en) A Foundation Method Of Continuous and Cut Off wall By Overlap Casing
KR101021913B1 (en) Order temporary construction method for earthquake construction
JP6767542B1 (en) Construction method of support pile
JP6730121B2 (en) Underground wall construction method
CN105714832A (en) Deep-foundation-pit large-sized precast building envelope and construction method
JP6259271B2 (en) Caisson installation method and underground column body group
JP6340248B2 (en) Mountain retaining wall, how to construct a mountain retaining wall
WO2009139510A1 (en) Construction method for continuous cut-off wall using overlap casing
JPS5936058B2 (en) How to construct a structure using underground continuous walls
US20220341118A1 (en) Secant concrete shoring using helical piles for depth
JP7212981B1 (en) Earth retaining structure and construction method of earth retaining structure
JPH09111754A (en) Parent pile water stop wall construction method
CA3115957C (en) Pile wall system

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130926

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140515

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20140520

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140715

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20141216

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20150212

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20150804

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20151002

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20160405

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20160426

R150 Certificate of patent (=grant) or registration of utility model

Ref document number: 5930580

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150