Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6615465B2 - Yamadome wall - Google Patents
[go: Go Back, main page]

JP6615465B2 - Yamadome wall - Google Patents

Yamadome wall Download PDF

Info

Publication number
JP6615465B2
JP6615465B2 JP2015035610A JP2015035610A JP6615465B2 JP 6615465 B2 JP6615465 B2 JP 6615465B2 JP 2015035610 A JP2015035610 A JP 2015035610A JP 2015035610 A JP2015035610 A JP 2015035610A JP 6615465 B2 JP6615465 B2 JP 6615465B2
Authority
JP
Japan
Prior art keywords
excavation
side wall
wall body
ground improvement
constructed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015035610A
Other languages
Japanese (ja)
Other versions
JP2016156216A (en
Inventor
貴穂 河野
昭次 山川
圭史郎 岡本
壮亮 前田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Takenaka Civil Engineering and Construction Co Ltd
Original Assignee
Takenaka Corp
Takenaka Civil Engineering and Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp, Takenaka Civil Engineering and Construction Co Ltd filed Critical Takenaka Corp
Priority to JP2015035610A priority Critical patent/JP6615465B2/en
Publication of JP2016156216A publication Critical patent/JP2016156216A/en
Application granted granted Critical
Publication of JP6615465B2 publication Critical patent/JP6615465B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Description

本発明は、山留壁に関する。   The present invention relates to a mountain retaining wall.

止水機能が要求される山留壁においては、掘削すべき地盤の外側に、掘削土にセメント等の固化材を混合して構築する地盤改良柱体による山留壁が多く用いられている。地盤改良柱体による山留壁は、切梁や腹起しをなくすことができ、オープン掘削による掘削効率の向上が図れる等の長所を有する。
しかし、背面地盤からの土圧や水圧に耐える曲げ剛性を確保するため、隣接する地盤改良柱体同士の一部をラップさせて一体化させ、山留壁となる全範囲に、隙間なく地盤改良柱体を構築していた。
地盤改良柱体で山留壁を構築する際に、山留壁の一部に、地盤のまま残す中抜き部を設ける技術には、例えば特許文献1がある。
In mountain retaining walls that require a water stop function, there are many mountain retaining walls made of ground improvement pillars constructed by mixing solidification materials such as cement with excavated soil outside the ground to be excavated. The mountain retaining wall by the ground improvement column body has the advantages that it is possible to eliminate cut beams and erections and to improve the excavation efficiency by open excavation.
However, in order to secure bending rigidity that can withstand earth pressure and water pressure from the back ground, a part of the adjacent ground improvement pillars are wrapped and integrated to improve the ground without gaps in the entire range of the mountain retaining wall. He was building a pillar.
For example, Patent Document 1 discloses a technique for providing a hollow portion that remains in the ground in a part of the mountain retaining wall when the mountain retaining wall is constructed with the ground improvement column body.

特許文献1は、地盤改良柱体で構築された山留壁が、掘削部と接する掘削側壁体と、背面地盤に設けた背面側壁体を有し、掘削側壁体と背面側壁体とをつなぎ壁体で連結し、つなぎ壁体同士の間に、地盤のまま空隙部(中抜き部)を残した構成である。中抜き部は、つなぎ壁体で、掘削側壁体と交差する方向に、複数に分割されている。   In Patent Document 1, a mountain wall constructed of ground improvement pillars has a drilling side wall body in contact with the excavation part and a rear side wall body provided on the back ground, and connects the excavation side wall body and the rear side wall body. It is the structure which connected with the body and left the space | gap part (hollow part) with the ground between connection wall bodies. The hollow portion is a connecting wall body, and is divided into a plurality in the direction intersecting with the excavation side wall body.

特開平4−85413号公報Japanese Patent Laid-Open No. 4-85413

しかし、特許文献1は、中抜き部からの土圧や水圧を考慮した、具体的な構成は何ら記載されていない。   However, Patent Document 1 does not describe any specific configuration in consideration of earth pressure and water pressure from the hollow portion.

本発明は、上記事実に鑑み、中抜き部からの土圧及び水圧に抵抗できる山留壁を提供することを目的とする。   An object of this invention is to provide the mountain retaining wall which can resist the earth pressure and water pressure from a hollow part in view of the said fact.

請求項1に記載の発明に係る山留壁は、掘削部の外側に地盤改良体で構築された掘削側壁体と、前記掘削側壁体より前記掘削部の外側に、地盤改良体で構築された背面側壁体と、前記掘削側壁体と前記背面側壁体に接続され、前記掘削側壁体と前記背面側壁体の間に形成された地盤改良しない中抜き部を複数に区画し、地盤改良体で構築された複数のつなぎ壁体と、前記掘削側壁体に設けられ、前記中抜き部の水を前記掘削部へ抜く水抜き手段と、を有しており、前記掘削側壁体は、外周部同士がラップされた複数の柱状の前記地盤改良体で構築されており、前記水抜き手段は、前記地盤改良体の前記外周部同士がラップされた部分に設けられた水抜き管である。 The mountain retaining wall according to the first aspect of the present invention is constructed by a ground excavation wall body constructed by a ground improvement body outside the excavation part, and by a ground improvement body outside the excavation part from the excavation side wall body. The back side wall body, the excavation side wall body, and the back side wall body are connected to the back side wall body, and the hollow portion formed between the excavation side wall body and the back side wall body is divided into a plurality of portions and constructed with a ground improvement body. a plurality of connecting walls which are provided on the excavation side walls, the water in said vent unit has a water draining means for disconnecting the said excavation, the excavation sidewalls body, outer circumferential portions built in the soil improvement of the wrapped multiple columnar, said draining means, Ru drain tube der provided in a portion where the outer peripheral portions of the ground improvement body is wrapped.

請求項1に記載の発明によれば、山留壁は、掘削側壁体と背面側壁体が複数のつなぎ壁体で接続され、山留壁の背面地盤からの土圧及び水圧(以下、土水圧と記す。)を受け止めている。また、掘削側壁体、背面側壁体及びつなぎ壁体で囲まれた範囲が、中抜き部とされている。中抜き部は、つなぎ壁体により複数に区画されている。これにより、つなぎ壁体の位置や構築本数等を適切に設定することにより、中抜き部の寸法、形状等を調整することができ、中抜き部からの土水圧を調整することができる。
この結果、従来の、掘削部の外側である掘削側壁体と背面側壁体の間を、全て地盤改良する山留壁に場合に比べ、地盤改良体の構築体積を低減でき、工数及び材料費を低減することができる。
また、掘削側壁体に設けられた水抜き手段により、中抜き部の水位を低下させることができる。水位を低下させることで、掘削側壁体に作用する水圧を低減させる。これにより、曲げ剛性等を低くした掘削側壁体で、土水圧に耐えることができる。
According to the first aspect of the present invention, the mountain retaining wall is constructed by connecting the excavation side wall body and the back side wall body with a plurality of connecting wall bodies, and earth pressure and water pressure (hereinafter referred to as earth water pressure) from the back ground of the mountain retaining wall. ). Further, a range surrounded by the excavation side wall body, the back side wall body, and the connecting wall body is a hollow portion. The hollow portion is divided into a plurality of portions by the connecting wall. Thereby, the dimension, shape, etc. of a hollow part can be adjusted by setting appropriately the position of a connecting wall body, the number of construction, etc., and the earth-water pressure from a hollow part can be adjusted.
As a result, the construction volume of the ground improvement body can be reduced, and the man-hours and material cost can be reduced compared to the case of the conventional retaining wall that improves the ground between the excavation side wall body and the back side wall body that are outside the excavation part. Can be reduced.
Moreover, the water level of a hollow part can be lowered | hung with the water draining means provided in the excavation side wall body. By reducing the water level, the water pressure acting on the excavation sidewall body is reduced. Thereby, it is possible to withstand soil water pressure with the excavation side wall body having low bending rigidity and the like.

求項に記載の発明は、請求項1に記載の山留壁において、前記掘削側壁体の根入れ深さ、又は前記掘削側壁体及び前記つなぎ壁体の前記掘削側壁体と接続される側の根入れ深さが、前記背面側壁体の根入れ深さより深くされている。 The invention described in Motomeko 2, in mountain Tomekabe according to claim 1, is connected to the excavation side wall of the embedment depth, or the drilling side walls of the excavation side walls and the connecting wall The side penetration depth is set to be deeper than that of the back side wall body.

請求項に記載の発明によれば、掘削側壁体の根入れ深さが、背面側壁体の根入れ深さより深くされている。あるいは、掘削側壁体及びつなぎ壁体の掘削側壁体と接続される側の根入れ深さが、背面側壁体の根入れ深さより深くされている。
これにより、背面側壁体が、背面地盤から土水圧を受けることにより生じる、山留壁の回転力に抵抗する抵抗力が増大され、山留壁の転倒が抑制される。
さらに、山留壁の転倒を抑制する効果が高くなるため、掘削側壁体と背面側壁体の距離を短くすることができる。
According to the second aspect of the present invention, the depth of the excavation side wall is deeper than the depth of the back side wall. Alternatively, the depth of penetration of the excavation side wall body and the connecting wall body on the side connected to the excavation side wall body is set to be deeper than that of the back side wall body.
Thereby, the resistance force which resists the rotational force of a mountain retaining wall produced when a back side wall body receives earth-water pressure from a back ground is increased, and the falling of a mountain retaining wall is suppressed.
Furthermore, since the effect of suppressing the falling of the mountain retaining wall is increased, the distance between the excavation side wall body and the back side wall body can be shortened.

請求項に記載の発明は、請求項1又は2に記載の山留壁において、前記掘削側壁体は、前記地盤改良体の内部への補強部材の挿入、前記地盤改良体の厚さの増大、前記地盤改良体の頭部側を、背面側へ傾斜させた傾斜化、又は、前記掘削部に、前記掘削部の床付面から下部に構築されたソイルバットレス、の少なくとも1つにより補強されている According to a third aspect of the present invention, in the mountain retaining wall according to the first or second aspect , the excavation side wall body includes a reinforcement member inserted into the ground improvement body, and an increase in the thickness of the ground improvement body. The ground improvement body is reinforced by at least one of an inclination in which the head side is inclined to the back side, or a soil buttress constructed in the lower part from the floor surface of the excavation part to the excavation part. ing

請求項に記載の発明によれば、掘削側壁体は、次の少なくとも1つにより補強されている。補強手段は、山留壁の構造や中抜き部の形状等により、適切なものを複数選択してもよい。
即ち、掘削側壁体を構成する地盤改良体の内部へ、H形鋼等の補強部材を挿入することができる。補強部材により、掘削側壁体の曲げ剛性が高くなり、中抜き部の土水圧に抵抗することができる。
あるいは、掘削側壁体を構成する地盤改良体の厚さを、従来の掘削側壁体の厚さより大きくしてもよい。具体的には、地盤改良体の径の大径化や、掘削側壁体を構成する地盤改良体と並列に、補強地盤改良体を構築する方法等が考えられる。地盤改良体の厚さを増大させることにより、掘削側壁体の曲げ剛性が高くなり、中抜き部の土水圧に抵抗することができる。
あるいは、掘削側壁体を構成する地盤改良体の頭部側を、背面地盤側へ傾斜させて構築してもよい。地盤改良体を背面地盤側へ傾斜させることで、中抜き部の体積を減少させると共に、背面側から受ける土圧を小さくすることができる。この結果、中抜き部の地盤からの土圧や水圧に抵抗することができる。また、背面側へ傾斜させることで生じた、掘削側の用地や空間を有効活用することができる。
あるいは、掘削側壁体と交差させて、掘削部に、掘削部の床付面から下部にソイルバットレスを構築してもよい。これにより、ソイルバットレスが掘削側壁体を掘削部側から、支保工として支持し、中抜き部の地盤からの土水圧に抵抗することができる。
これらにより、掘削側壁体が補強されるので、つなぎ壁体の間の間隔を大きくする事ができる。
According to invention of Claim 3 , the excavation side wall body is reinforced by at least one of the following. A plurality of appropriate reinforcing means may be selected depending on the structure of the mountain retaining wall and the shape of the hollow portion.
That is, a reinforcing member such as H-shaped steel can be inserted into the ground improvement body constituting the excavation side wall body. By the reinforcing member, the bending rigidity of the excavation side wall body is increased, and it is possible to resist soil water pressure in the hollow portion.
Or you may make the thickness of the ground improvement body which comprises an excavation side wall body larger than the thickness of the conventional excavation side wall body. Specifically, the diameter of the ground improvement body can be increased, and a method of constructing a reinforced ground improvement body in parallel with the ground improvement body constituting the excavation sidewall body can be considered. By increasing the thickness of the ground improvement body, the bending rigidity of the excavation side wall body is increased, and the soil water pressure of the hollow portion can be resisted.
Or you may construct | assemble the head side of the ground improvement body which comprises a digging side wall body inclining to the back ground side. By tilting the ground improvement body to the back ground side, the volume of the hollow portion can be reduced and the earth pressure received from the back side can be reduced. As a result, it is possible to resist earth pressure and water pressure from the ground of the hollow portion. Moreover, the site and space on the excavation side generated by inclining to the back side can be effectively used.
Alternatively, a soil buttress may be constructed in the excavation part from the floor surface of the excavation part to the lower part by intersecting with the excavation side wall body. Thereby, the soil buttress can support the excavation side wall body from the excavation part side as a support, and can resist the soil water pressure from the ground of the hollow part.
As a result, the excavation side wall body is reinforced, so that the interval between the connecting wall bodies can be increased.

本発明は、上記構成としてあるので、中抜き部からの土圧及び水圧に抵抗できる山留壁を提供できる。   Since this invention is set as the said structure, it can provide the mountain retaining wall which can resist the earth pressure and water pressure from a hollow part.

(A)は、本発明の第1実施形態に係る山留壁の基本構成を示す平面図であり、(B)は、(A)のY1−Y1線断面図である。(A) is a top view which shows the basic composition of the mountain retaining wall concerning 1st Embodiment of this invention, (B) is the Y1-Y1 sectional view taken on the line of (A). (A)は、本発明の第1実施形態に係る水抜き手段の構成例を示す断面図であり、(B)は、他の構成例を示す断面図である。(A) is sectional drawing which shows the structural example of the draining means which concerns on 1st Embodiment of this invention, (B) is sectional drawing which shows another structural example. (A)は、本発明の第2実施形態に係る山留壁の基本構成を示す平面図であり、(B)は、(A)のY1−Y1線断面図である。(A) is a top view which shows the basic composition of the mountain retaining wall concerning 2nd Embodiment of this invention, (B) is the Y1-Y1 sectional view taken on the line of (A). (A)は、本発明の第3実施形態に係る山留壁の基本構成を示す平面図であり、(B)は、(A)のY1−Y1線断面図であり、(C)は、(A)のE部を拡大した部分断面図である。(A) is a top view which shows the basic composition of the mountain retaining wall concerning 3rd Embodiment of this invention, (B) is the Y1-Y1 sectional view taken on the line of (A), (C) is It is the fragmentary sectional view which expanded the E section of (A). (A)は、本発明の第4実施形態に係る山留壁の基本構成を示す平面図であり、(B)は、(A)のY1−Y1線断面図であり、(C)は、(B)のE部を拡大した部分断面図である。(A) is a top view which shows the basic composition of the mountain retaining wall which concerns on 4th Embodiment of this invention, (B) is the Y1-Y1 sectional view taken on the line of (A), (C) is It is the fragmentary sectional view which expanded the E section of (B). (A)は、本発明の第5実施形態に係る山留壁の基本構成を示す断面図であり、(B)は、(A)のY1−Y1線断面図である。(A) is sectional drawing which shows the basic composition of the mountain retaining wall which concerns on 5th Embodiment of this invention, (B) is the Y1-Y1 sectional view taken on the line of (A). (A)は、本発明の第6実施形態に係る山留壁の基本構成を示す断面図であり、(B)は、(A)のY1−Y1線断面図である。(A) is sectional drawing which shows the basic composition of the mountain retaining wall concerning 6th Embodiment of this invention, (B) is the Y1-Y1 sectional view taken on the line of (A). (A)は、本発明の第7実施形態に係る山留壁の基本構成を示す断面図であり、(B)は、(A)のY1−Y1線断面図である。(A) is sectional drawing which shows the basic composition of the mountain retaining wall which concerns on 7th Embodiment of this invention, (B) is the Y1-Y1 sectional view taken on the line of (A). (A)は、本発明の第8実施形態に係る山留壁の基本構成を示す断面図であり、(B)は、(A)のY2−Y2線断面図である。(A) is sectional drawing which shows the basic composition of the mountain retaining wall concerning 8th Embodiment of this invention, (B) is the Y2-Y2 sectional view taken on the line of (A). (A)は、本発明の第9実施形態に係る山留壁の構成例を示す断面図であり、(B)は、(A)のY1−Y1線断面図であり、(C)は、(A)のY2−Y2線断面図である。(A) is sectional drawing which shows the structural example of the mountain retaining wall which concerns on 9th Embodiment of this invention, (B) is Y1-Y1 sectional view taken on the line of (A), (C) is It is Y2-Y2 sectional view taken on the line of (A). (A)は本発明の第10実施形態に係る山留壁の構成例を示す断面図であり、(B)は、(A)のY1−Y1線断面図であり、(C)は、(A)のY2−Y2線断面図である。(A) is sectional drawing which shows the structural example of the mountain retaining wall which concerns on 10th Embodiment of this invention, (B) is the Y1-Y1 sectional view taken on the line of (A), (C) is ( It is a Y2-Y2 line sectional view of A).

(第1実施形態)
本発明の第1実施形態に係る山留壁10について、図1(A)〜図2(B)を用いて説明する。ここで、図1(A)は、山留壁10の平面図であり、(B)は、図1(A)のY1−Y1線断面図である。図2(A)、(B)は、いずれも水抜き手段の構成例を示す断面図である。
(First embodiment)
A mountain retaining wall 10 according to a first embodiment of the present invention will be described with reference to FIGS. 1 (A) to 2 (B). Here, FIG. 1A is a plan view of the mountain retaining wall 10, and FIG. 1B is a cross-sectional view taken along line Y1-Y1 of FIG. FIGS. 2A and 2B are cross-sectional views each showing a configuration example of the water draining means.

図1(A)、(B)に示すように、山留壁10は、掘削部12の外側であり、掘削部12と背面地盤30との間に構築されている。
山留壁10は、掘削部12側に構築された掘削側壁体14を有している。
掘削側壁体14は、複数の地盤改良体11の外周部同士をラップさせ、一体化させて壁状に構築されている。地盤改良体11は、現地地盤を掘削しながら、セメントミルクと掘削土を混合撹拌させて構築され、Y軸方向へ連続して柱状に形成されている。
As shown in FIGS. 1A and 1B, the mountain retaining wall 10 is outside the excavation part 12 and is constructed between the excavation part 12 and the back ground 30.
The mountain retaining wall 10 has an excavation side wall body 14 constructed on the excavation part 12 side.
The excavation side wall body 14 is constructed in a wall shape by wrapping and integrating the outer peripheral portions of the plurality of ground improvement bodies 11. The ground improvement body 11 is constructed by mixing and stirring cement milk and excavated soil while excavating the local ground, and is continuously formed in a columnar shape in the Y-axis direction.

掘削側壁体14より掘削部12のX軸方向(背面側)には、背面側壁体16が設けられている。背面側壁体16も、掘削側壁体14と同様に、複数の地盤改良体11の外周部同士をラップさせ、一体化させて壁状に構築されている。背面側壁体16は、掘削側壁体14と距離L1をあけて、掘削側壁体14と平行に、Y軸方向へ壁状に構築されている。   A rear side wall body 16 is provided in the X-axis direction (back side) of the excavation part 12 from the excavation side wall body 14. Similarly to the excavation side wall body 14, the back side wall body 16 is also constructed in a wall shape by wrapping and integrating the outer peripheral portions of the plurality of ground improvement bodies 11. The back side wall body 16 is constructed in a wall shape in the Y-axis direction in parallel to the excavation side wall body 14 with a distance L1 from the excavation side wall body 14.

掘削部12は、Z軸方向の下方へ向かって、掘削側壁体14の略中央の位置まで、深さH1で掘削されている。
また、掘削側壁体14と背面側壁体16は、いずれも、山留壁10の上面から、掘削部12の深さH1より深い、構築深さH2で構築されている。掘削部12の床付面12Gより深い部分を、根入れ深さと呼ぶことにすれば、掘削側壁体14と背面側壁体16の根入れ深さは、いずれも、HN1(HN1=H2−H1)となる。
The excavation part 12 is excavated at a depth H1 to a position substantially at the center of the excavation side wall 14 downward in the Z-axis direction.
Further, the excavation side wall body 14 and the back side wall body 16 are both constructed from the upper surface of the mountain retaining wall 10 at a construction depth H2 that is deeper than the depth H1 of the excavation part 12. If the portion deeper than the floored surface 12G of the excavation part 12 is called a penetration depth, the penetration depth of the excavation sidewall body 14 and the rear sidewall body 16 is HN1 (HN1 = H2-H1). It becomes.

掘削側壁体14と背面側壁体16の間には、複数のつなぎ壁体18が、直線状に構築されている。つなぎ壁体18は、複数の地盤改良体11の外周部同士をラップさせ、一体化させて壁状に構築されている。
つなぎ壁体18は、掘削側壁体14と背面側壁体16の間に、X軸方向に、壁状に構築され、つなぎ壁体18の両端部は、掘削側壁体14と背面側壁体16に、それぞれラップされている。
Between the excavation side wall body 14 and the back side wall body 16, a plurality of connecting wall bodies 18 are constructed in a straight line. The connecting wall body 18 is constructed in a wall shape by wrapping and integrating the outer peripheral portions of the plurality of ground improvement bodies 11.
The connecting wall body 18 is constructed in a wall shape in the X-axis direction between the excavation side wall body 14 and the back side wall body 16, and both ends of the connecting wall body 18 are connected to the excavation side wall body 14 and the back side wall body 16. Each is wrapped.

つなぎ壁体18は、距離(幅)W1をあけて複数壁体が構築され、隣り合うつなぎ壁体18の間には、地盤改良しない中抜き部20が形成されている。即ち、中抜き部20は、X軸方向が距離(奥行)L1、Y軸方向が距離W1の矩形状に、複数のつなぎ壁体18により区画されている。   The connecting wall body 18 is constructed with a plurality of wall bodies with a distance (width) W <b> 1, and between the adjacent connecting wall bodies 18, a hollow portion 20 that does not improve the ground is formed. That is, the hollow portion 20 is partitioned by a plurality of connecting wall bodies 18 into a rectangular shape having a distance (depth) L1 in the X-axis direction and a distance W1 in the Y-axis direction.

中抜き部20は、Y軸方向の距離W1が、X軸方向の距離L1より小さいのが望ましい(W1≦L1)。このように中抜き部20が形成されていても、山留壁10は、掘削側壁体14と背面側壁体16が複数のつなぎ壁体18で接続されているから、山留壁10を構成する地盤改良体11の一体化が維持される。これにより、山留壁10の背面地盤30からの土水圧を受け止めて、山留壁10の曲げ剛性を大きくし、山留壁10の倒壊を防ぐことができる。   In the hollow portion 20, the distance W1 in the Y-axis direction is preferably smaller than the distance L1 in the X-axis direction (W1 ≦ L1). Even if the hollow portion 20 is formed in this manner, the mountain retaining wall 10 constitutes the mountain retaining wall 10 because the excavation side wall body 14 and the rear side wall body 16 are connected by the plurality of connecting wall bodies 18. The integration of the ground improvement body 11 is maintained. Thereby, the earth and water pressure from the back ground 30 of the mountain retaining wall 10 can be received, the bending rigidity of the mountain retaining wall 10 can be increased, and the mountain retaining wall 10 can be prevented from collapsing.

掘削側壁体14には、水抜き管(水抜き手段)22が取付けられている。水抜き管22には中空のパイプ材が用いられ、掘削側壁体14をX軸方向へ貫通する長さを有している。水抜き管22は、掘削部12の地盤表面(床付面)12Gからの高さがH3の位置に設けられている。水抜き管22は、後述するように、外側管34の中央部が掘削側壁体14に固定され、一端が中抜き部20の内部まで挿入され、他端が、掘削部12の空間に開放されている。   A drainage pipe (drainage means) 22 is attached to the excavation sidewall body 14. A hollow pipe material is used for the drain pipe 22 and has a length penetrating the excavation sidewall body 14 in the X-axis direction. The drain pipe 22 is provided at a position where the height from the ground surface (floored surface) 12G of the excavating part 12 is H3. As will be described later, the drain pipe 22 has a central portion of the outer pipe 34 fixed to the excavation side wall 14, one end inserted into the inside of the hollow section 20, and the other end opened to the space of the excavation section 12. ing.

これにより、中抜き部20の水を、掘削部12へ排出させ、中抜き部20の水位26を、背面地盤30の水位28より低い、水抜き管22の位置まで下げることができる。
この結果、中抜き部20からの水圧が低減され、掘削側壁体14に要求される曲げ剛性を小さくできる
Thereby, the water of the hollow part 20 can be discharged to the excavation part 12, and the water level 26 of the hollow part 20 can be lowered to the position of the drain pipe 22 lower than the water level 28 of the back ground 30.
As a result, the water pressure from the hollow portion 20 is reduced, and the bending rigidity required for the excavation sidewall body 14 can be reduced.

なお、中抜き部20の上面に天端コンクリート24を構築し、全ての中抜き部20の上面を天端コンクリート24で覆う構成としても良い。天端コンクリート24により、中抜き部20への雨水の侵入を防止することができる。   In addition, it is good also as a structure which builds the top end concrete 24 on the upper surface of the hollow part 20, and covers the upper surface of all the hollow parts 20 with the top end concrete 24. FIG. The ceiling concrete 24 can prevent rainwater from entering the hollow portion 20.

図2(A)、(B)を用いて、水抜き管22、23について説明する。
図2(A)に示すように、水抜き管22は、外側管34の内部に、取り外し可能に内側管32が挿入された二重管構造とされている。
外側管34は、掘削側壁体14のX軸方向の厚さL2より大きい、長さL3で形成され、掘削側壁体14から両端部を突出した状態で、外周部が掘削側壁体14に接合されている。
内側管32の内部には、排水用のフィルター36が挿入されている。フィルター36は、内側管32の中抜き部20側に設けられ、中抜き部20からの土砂の流出を防止し、水(水分)46のみを内側管32から排出させる。フィルター36は、交換可能に挿入されている。
The drainage pipes 22 and 23 will be described with reference to FIGS.
As shown in FIG. 2A, the drain pipe 22 has a double pipe structure in which an inner pipe 32 is removably inserted into an outer pipe 34.
The outer pipe 34 is formed with a length L3 that is larger than the thickness L2 of the excavation side wall body 14 in the X-axis direction, and the outer peripheral portion is joined to the excavation side wall body 14 with both ends protruding from the excavation side wall body 14. ing.
A drainage filter 36 is inserted into the inner pipe 32. The filter 36 is provided on the side of the hollow portion 20 of the inner pipe 32, prevents outflow of earth and sand from the hollow portion 20, and discharges only water (moisture) 46 from the inner pipe 32. The filter 36 is inserted in a replaceable manner.

外側管34と内側管32の間には、支持及び止水用のシール材33が設けられている。これにより、内側管32が、シール材33を介して外側管34に支持されると共に、外側管34と内側管32の間からの土砂及び水の流出が防止される。
これにより、中抜き部20の水位26を、内側管32の開口部の最下部まで下げることができる。また、シール材33で、内側管32を着脱可能に支持させることにより、フィルター36の交換を容易にすることができる。
Between the outer tube 34 and the inner tube 32, a sealing material 33 for supporting and water stopping is provided. As a result, the inner tube 32 is supported by the outer tube 34 via the seal member 33, and the outflow of earth and sand from between the outer tube 34 and the inner tube 32 is prevented.
Thereby, the water level 26 of the hollow part 20 can be lowered to the lowest part of the opening part of the inner pipe 32. Further, the filter 36 can be easily replaced by supporting the inner tube 32 in a detachable manner with the sealing material 33.

図2(B)に、水抜き管23の断面図を示す。水抜き管23は、外側管34の内部に、フィルター40を充填させた構成である。
外側管34は、掘削側壁体14のX軸方向の厚さL2より大きい、長さL3で形成され、掘削側壁体14から両端部を突出した状態で、外周部が掘削側壁体14に接合されている。外側管34の内部には、排水用のフィルター40が、ほぼ全長に渡り充填されている。フィルター40は、中抜き部20からの土砂の流出を防止し、水(水分)46のみを排出させる。これにより、中抜き部20の水位26を、外側管34の開口部の最下部まで下げることができる。
FIG. 2B shows a cross-sectional view of the drain pipe 23. The drain pipe 23 has a configuration in which the filter 40 is filled in the outer pipe 34.
The outer pipe 34 is formed with a length L3 that is larger than the thickness L2 of the excavation side wall body 14 in the X-axis direction, and the outer peripheral portion is joined to the excavation side wall body 14 with both ends protruding from the excavation side wall body 14. ing. Inside the outer pipe 34, a filter 40 for drainage is filled over almost the entire length. The filter 40 prevents the earth and sand from flowing out from the hollow portion 20 and discharges only water (moisture) 46. Thereby, the water level 26 of the hollow part 20 can be lowered to the lowest part of the opening part of the outer pipe 34.

また、フィルター40の中央部には、X軸方向にフィルター40と一体化された、芯材38が設けられている。これにより、芯材38を手に持って操作することで、フィルター40を交換することができる。
なお、本実施形態においては、水抜き管22、23のいずれを使用してもよい。
In addition, a core member 38 integrated with the filter 40 in the X-axis direction is provided at the center of the filter 40. Thereby, the filter 40 can be exchanged by holding the core member 38 in hand.
In the present embodiment, any one of the drain pipes 22 and 23 may be used.

本構成とすることにより、掘削側壁体14、背面側壁体16及び複数のつなぎ壁体18で構成され、内部に中抜き部20を備えた山留壁10を提供することができる。
また、山留壁10は、内部に、地盤改良しない中抜き部20を有しているので、従来の、掘削側壁体14から背面側壁体の間を、全て地盤改良する山留壁に場合に比べ、地盤改良体11の構築体積を低減でき、工数及び材料費を低減することができる。
By adopting this configuration, it is possible to provide the mountain retaining wall 10 including the excavation side wall body 14, the back side wall body 16, and the plurality of connecting wall bodies 18 and having the hollow portion 20 inside.
Moreover, since the retaining wall 10 has the hollow part 20 which does not improve the ground in the interior, when the conventional retaining wall which improves the ground between the excavation side wall body 14 and the rear side wall body is used. In comparison, the construction volume of the ground improvement body 11 can be reduced, and man-hours and material costs can be reduced.

また、掘削側壁体14に設けられた水抜き管22により、中抜き部20の水が掘削部12へ排出される。これにより、中抜き部20の水位26を水抜き管22の位置まで低下させることができ、掘削側壁体14に作用する水圧を低減させることができる。
この結果、掘削側壁体14に要求される曲げ剛性を、低く抑えることができるので、中抜き部20からの土水圧に抵抗することができる。
Further, the water in the hollow section 20 is discharged to the excavation section 12 by the drain pipe 22 provided in the excavation sidewall body 14. Thereby, the water level 26 of the hollow part 20 can be lowered to the position of the water drain pipe 22, and the water pressure acting on the excavation side wall body 14 can be reduced.
As a result, the bending rigidity required for the excavation side wall body 14 can be kept low, so that the soil water pressure from the hollow portion 20 can be resisted.

(第2実施形態)
本発明の第2実施形態に係る山留壁50について、図3(A)、(B)を用いて説明する。山留壁50は、中抜き部20に井戸(ディープウェル)52を設けた点において、第1実施形態と相違する。相違点を中心に説明する。
ここで、図3(A)は、山留壁50の平面図であり、(B)は、図3(A)のY1−Y1線断面図である。
(Second Embodiment)
A mountain retaining wall 50 according to the second embodiment of the present invention will be described with reference to FIGS. The mountain retaining wall 50 is different from the first embodiment in that a well (deep well) 52 is provided in the hollow portion 20. The difference will be mainly described.
Here, FIG. 3A is a plan view of the mountain retaining wall 50, and FIG. 3B is a cross-sectional view taken along line Y1-Y1 of FIG.

図3(A)、(B)に示すように、中抜き部20には、水を汲みあげる井戸52が形成されている。井戸52は、山留壁50の表面から深さH4で形成されている。深さH4は、水抜き管22が設けられた深さであり、かつ、目標とする水位26(深さH5)より深い位置とされている。   As shown in FIGS. 3A and 3B, the hollow portion 20 is formed with a well 52 for pumping water. The well 52 is formed from the surface of the retaining wall 50 at a depth H4. The depth H4 is a depth at which the drain pipe 22 is provided, and is a position deeper than the target water level 26 (depth H5).

井戸52は、複数の中抜き部20に、1つずつ設けられている。水抜き管22に加え、井戸52を設けることにより、中抜き部20からの排出水量を増大させることができる。
なお、井戸52の数量は、背面地盤30の水位28の高さ等により、必要に応じて決定すればよく、同じ中抜き部20に複数設けてもよい。
One well 52 is provided in each of the plurality of hollow portions 20. By providing the well 52 in addition to the drain pipe 22, the amount of water discharged from the hollow section 20 can be increased.
In addition, what is necessary is just to determine the quantity of the well 52 by the height of the water level 28 of the back ground 30, etc. as needed, and you may provide two or more in the same hollow part 20. FIG.

ここで、土水圧(土圧と水圧を合計した圧力)について説明する。
例えば、背面地盤30の水位28が、表面から深さH6の位置にある場合には、背面側壁体16に作用する土水圧は、図3(B)に示す特性56のような分布となる。特性56は、深くなるほど大きい傾向を示し、傾斜した直線状となる。背面側壁体16は、中抜き部20の内部地盤と接しており、中抜き部20の内部地盤と共に、特性56の土水圧に抵抗する。
Here, the earth water pressure (the sum of earth pressure and water pressure) will be described.
For example, when the water level 28 of the back ground 30 is at a position of a depth H6 from the surface, the soil water pressure acting on the back side wall body 16 has a distribution like a characteristic 56 shown in FIG. The characteristic 56 shows a tendency to increase as the depth increases, and becomes an inclined straight line. The back side wall body 16 is in contact with the internal ground of the hollow portion 20 and resists soil water pressure of the characteristic 56 together with the internal ground of the hollow portion 20.

一方、掘削側壁体14に作用する土水圧は、中抜き部20から水を排出しない場合には、水位は28となる。この場合の土水圧は、一部を二点鎖線で示す特性55となり、掘削側壁体14は、特性55の土水圧に抵抗するために、大きな曲げ剛性が要求される。
ここで、中抜き部20から水を排出すれば、水位は26まで低下する。この場合には、掘削側壁体14に作用する土水圧は、水抜き管より上の範囲においては実線で示す特性54となる。これにより、掘削側壁体14に要求される曲げ剛性を小さくできる。
On the other hand, the soil water pressure acting on the excavation sidewall body 14 has a water level of 28 when water is not discharged from the hollow portion 20. In this case, the soil water pressure has a characteristic 55 partially indicated by a two-dot chain line, and the excavation sidewall body 14 is required to have a large bending rigidity in order to resist the soil water pressure of the characteristic 55.
Here, if water is discharged from the hollow portion 20, the water level drops to 26. In this case, the soil water pressure acting on the excavation sidewall body 14 has a characteristic 54 indicated by a solid line in a range above the drain pipe. Thereby, the bending rigidity requested | required of the excavation side wall body 14 can be made small.

本実施形態においては、掘削側壁体14に作用する土水圧を、特性54まで低減させることができる。この結果、掘削側壁体14に要求される曲げ剛性を、低く抑えることができるので、中抜き部20からの土水圧に抵抗することができる。
つまり、中抜き部20の内部地盤からの土圧のみに抵抗すればよいことになり、曲げ剛性を、低く抑えることができる。なお、土水圧に対する考え方は、第1実施形態、及び後述する全ての実施形態に共通している。他の構成は、第1実施形態と同じであり説明は省略する。
In the present embodiment, the soil water pressure acting on the excavation sidewall body 14 can be reduced to the characteristic 54. As a result, the bending rigidity required for the excavation side wall body 14 can be kept low, so that the soil water pressure from the hollow portion 20 can be resisted.
That is, it is only necessary to resist the earth pressure from the internal ground of the hollow portion 20, and the bending rigidity can be suppressed low. In addition, the idea with respect to soil water pressure is common to 1st Embodiment and all the embodiments mentioned later. Other configurations are the same as those of the first embodiment, and a description thereof will be omitted.

(第3実施形態)
本発明の第3実施形態に係る山留壁60について、図4(A)〜(C)を用いて説明する。山留壁60は、水抜き管22に替えて、掘削側壁体62の一部に親杭横矢板67が構築されている点において、第1実施形態と相違する。相違点を中心に説明する。
図4(A)は、山留壁60の平面図であり、(B)は図4(A)のY1−Y1線断面図であり、(C)は図4(A)のE部を拡大した断面図である。
(Third embodiment)
A mountain retaining wall 60 according to a third embodiment of the present invention will be described with reference to FIGS. The mountain retaining wall 60 is different from the first embodiment in that a main pile horizontal sheet pile 67 is constructed in a part of the excavation sidewall body 62 instead of the drain pipe 22. The difference will be mainly described.
4A is a plan view of the mountain retaining wall 60, FIG. 4B is a cross-sectional view taken along line Y1-Y1 of FIG. 4A, and FIG. 4C is an enlarged view of portion E of FIG. FIG.

図4(A)、(B)に示すように、親杭横矢板67は、親杭(H形鋼65、66)と横矢板68とから構成されている。親杭横矢板67は、掘削側壁体62の一部に設けられている。掘削側壁体62は、複数の地盤改良体11の外周部の一部をラップさせ、一部を除いて、壁状に一体化させて構築されている。
親杭横矢板67は、つなぎ壁体18が接続された接続部の間に、それぞれ1カ所ずつ構築されている(図4(A)のE部)。親杭(H形鋼65、66)は、掘削部深さH1より深い位置まで構築されるが、横矢板68は、床付面12Gよりわずかに深い位置(10cm程度)まで構築されている。なお、第1実施形態で説明した水抜き管22は、設けられていない。
As shown to FIG. 4 (A) and (B), the main pile horizontal sheet pile 67 is comprised from the main pile (H-section steel 65, 66) and the horizontal sheet pile 68. As shown in FIG. The main pile horizontal sheet pile 67 is provided in a part of the excavation side wall body 62. The excavation side wall body 62 is constructed by wrapping a part of the outer peripheral portion of the plurality of ground improvement bodies 11 and integrating them in a wall shape except for a part.
One main pile horizontal sheet pile 67 is constructed between the connecting portions to which the connecting wall body 18 is connected (E portion in FIG. 4A). The parent pile (H-shaped steel 65, 66) is constructed to a position deeper than the excavation part depth H1, but the lateral sheet pile 68 is constructed to a position slightly deeper than the floor surface 12G (about 10 cm). Note that the drain pipe 22 described in the first embodiment is not provided.

図4(C)に示すように、親杭横矢板67は、掘削側壁体62を構成する地盤改良体11の一本分を構築せずに、構築を省略した地盤改良体11の位置に、H形鋼65を埋め込んだ構成である。
さらに、H形鋼65の両隣りの地盤改良体11には、それぞれH形鋼66が挿入されている。H形鋼65、66の間には、横矢板68が差し込まれている。
As shown in FIG. 4 (C), the main pile horizontal sheet pile 67 does not construct one portion of the ground improvement body 11 constituting the excavation side wall body 62, and at the position of the ground improvement body 11 in which the construction is omitted, The H-shaped steel 65 is embedded.
Further, H-section steel 66 is inserted into the ground improvement bodies 11 on both sides of the H-section steel 65 respectively. A horizontal sheet pile 68 is inserted between the H-shaped steels 65 and 66.

これにより、H形鋼65、66と横矢板68との当接部、及び図示しない横矢板68同士の当接部に生じる隙間から、中抜き部20の内部の水が、掘削部12へ排出される。
本構成とすることにより、中抜き部20の水位27を、掘削部12の床付面12Gまで下げることができる。
Thereby, the water inside the hollow part 20 is discharged to the excavation part 12 from the gap generated in the contact part between the H-shaped steels 65 and 66 and the horizontal sheet pile 68 and the contact part between the horizontal sheet piles 68 (not shown). Is done.
By setting it as this structure, the water level 27 of the hollow part 20 can be lowered | hung to the floor surface 12G of the excavation part 12. FIG.

この結果、掘削側壁体62に加わる土水圧を低下させることができ、掘削側壁体14に要求される曲げ剛性を低く抑えることができるので、中抜き部20からの土水圧に抵抗することができる。
なお、排水量が不足する場合には、第2実施形態で説明した井戸52を追加してもよい。他の構成は、第1実施形態と同じであり説明は省略する。
As a result, the earth and water pressure applied to the excavation side wall body 62 can be reduced, and the bending rigidity required for the excavation side wall body 14 can be kept low, so that the earth and water pressure from the hollow portion 20 can be resisted. .
When the amount of drainage is insufficient, the well 52 described in the second embodiment may be added. Other configurations are the same as those of the first embodiment, and a description thereof will be omitted.

(第4実施形態)
本発明の第4実施形態に係る山留壁70について、図5(A)〜(C)を用いて説明する。山留壁70は、掘削側壁体84に、H形鋼72を挿入した点において第1実施形態と相違する。相違点を中心に説明する。
ここで、図5(A)は、山留壁70の平面図であり、(B)は、図5(A)のY1−Y1線断面図であり、(C)は、図5(B)のE部を拡大した断面図である。
(Fourth embodiment)
A mountain retaining wall 70 according to a fourth embodiment of the present invention will be described with reference to FIGS. The mountain retaining wall 70 is different from the first embodiment in that the H-section steel 72 is inserted into the excavation sidewall body 84. The difference will be mainly described.
5A is a plan view of the mountain retaining wall 70, FIG. 5B is a cross-sectional view taken along line Y1-Y1 of FIG. 5A, and FIG. 5C is FIG. It is sectional drawing to which the E section of was expanded.

図5(A)、(B)に示すように、掘削側壁体84は、複数の地盤改良体11の外周部の一部をラップさせ、壁状に一体化させて構築されている。また、地盤改良体11の内部には、補強部材としてのH形鋼72が挿入されている。
H形鋼72は、掘削側壁体84を構成する全ての地盤改良体11に挿入され、地盤改良体11の構築深さH2の全長に渡る深さとされている。なお、H形鋼72の挿入深さは、地盤改良体11の構築深さH2より深くしてもよい。
As shown in FIGS. 5A and 5B, the excavation sidewall body 84 is constructed by wrapping a part of the outer peripheral portion of the plurality of ground improvement bodies 11 and integrating them into a wall shape. Further, an H-section steel 72 as a reinforcing member is inserted into the ground improvement body 11.
The H-section steel 72 is inserted into all the ground improvement bodies 11 constituting the excavation side wall body 84 and has a depth over the entire construction depth H2 of the ground improvement body 11. In addition, the insertion depth of the H-section steel 72 may be deeper than the construction depth H2 of the ground improvement body 11.

これにより、掘削側壁体84の曲げ剛性を高くすることができる。この結果、中抜き部20からの土水圧に抵抗することができる。
なお、H形鋼72は、必ずしも、全ての地盤改良体11に挿入する必要はなく、中抜き部20からの土水圧の大きさに応じて、H形鋼72の寸法や使用数量を調整し、曲げ剛性を決定すればよい。
Thereby, the bending rigidity of the excavation sidewall body 84 can be increased. As a result, the soil water pressure from the hollow portion 20 can be resisted.
The H-section steel 72 does not necessarily need to be inserted into all the ground improvement bodies 11, and the dimensions and quantity of the H-section steel 72 are adjusted according to the magnitude of the earth water pressure from the hollow section 20. What is necessary is just to determine bending rigidity.

本実施形態においては、図5(C)に示すように、掘削側壁体84に腹起し74を設けてもよい。腹起し74は、掘削部12の床付面12Gから、高さH9の位置(掘削部深さH1の中央部付近)において、横方向へ設けられる。
腹起し74は、掘削側壁体84に挿入されたH形鋼72から突出された支持部材76を有し、支持部材76の上にH形鋼78を横方向に取付けている。
In the present embodiment, as shown in FIG. 5 (C), the digging side wall body 84 may be provided with an abdomen 74. The erection 74 is provided in the lateral direction from the floor surface 12G of the excavating part 12 at a height H9 (near the central part of the excavating part depth H1).
The flank 74 has a support member 76 protruding from an H-section steel 72 inserted in the excavation side wall body 84, and an H-section steel 78 is attached to the support member 76 in the lateral direction.

これにより、H形鋼72を挿入しても、掘削側壁体84の曲げ剛性が不足する場合等において、掘削側壁体84の曲げ剛性を、更に高めることができる。この結果、中抜き部20からの土水圧に抵抗することができる。
他の構成は、第1実施形態と同じであり説明は省略する。
Thereby, even if the H-section steel 72 is inserted, the bending rigidity of the excavation side wall body 84 can be further increased in the case where the bending rigidity of the excavation side wall body 84 is insufficient. As a result, the soil water pressure from the hollow portion 20 can be resisted.
Other configurations are the same as those of the first embodiment, and a description thereof will be omitted.

(第5実施形態)
本発明の第5実施形態に係る山留壁80について、図6(A)、(B)を用いて説明する。山留壁80は、掘削側壁体14とラップさせて、補強用の掘削側壁体82を構築した点において、第1実施形態と相違する。相違点を中心に説明する。
図6(A)は、山留壁80の平面図であり、(B)は、図6(A)のY1−Y1線断面図である。
(Fifth embodiment)
A mountain retaining wall 80 according to a fifth embodiment of the present invention will be described with reference to FIGS. The mountain retaining wall 80 is different from the first embodiment in that a reinforcing excavation sidewall body 82 is constructed by wrapping with the excavation sidewall body 14. The difference will be mainly described.
6A is a plan view of the mountain retaining wall 80, and FIG. 6B is a sectional view taken along line Y1-Y1 of FIG. 6A.

図6(A)、(B)に示すように、補強用の掘削側壁体82は、掘削側壁体14の掘削部12側へ、掘削側壁体14と外周部をラップさせて構築されている。
掘削側壁体82は、複数の地盤改良体11の外周部の一部をラップさせ、壁状に一体化させて構築されている。掘削側壁体82は、掘削側壁体14と同じ構築高さH2、同じ根入れ深さHN1に構築されている。また、掘削側壁体82と掘削側壁体14は、外周部同士をラップさせることで一体化されている。
水抜き管22は、掘削側壁体14と掘削側壁体82を貫通する長さに形成され、中抜き部42の水を排出する。
As shown in FIGS. 6A and 6B, the excavation sidewall body 82 for reinforcement is constructed by wrapping the excavation sidewall body 14 and the outer peripheral portion toward the excavation section 12 side of the excavation sidewall body 14.
The excavation side wall 82 is constructed by wrapping a part of the outer peripheral portion of the plurality of ground improvement bodies 11 and integrating them into a wall shape. The excavation sidewall body 82 is constructed at the same construction height H2 and the same penetration depth HN1 as the excavation sidewall body 14. Moreover, the excavation side wall body 82 and the excavation side wall body 14 are integrated by lapping outer peripheral parts.
The drainage pipe 22 is formed to have a length penetrating the excavation side wall body 14 and the excavation side wall body 82, and discharges water from the hollow portion 42.

本実施形態とすることにより、掘削側壁体14が、掘削部12側に構築された掘削側壁体82により補強されるので、つなぎ壁体92の数を減らすことができる。
即ち、つなぎ壁体92の間の間隔を広げ、距離W2とすることができる。ここに、距離W2は、第1実施形態で説明した中抜き部20の距離W1より大きい。
By setting it as this embodiment, since the excavation side wall body 14 is reinforced by the excavation side wall body 82 constructed | assembled by the excavation part 12 side, the number of the connection wall bodies 92 can be reduced.
That is, the distance between the connecting wall bodies 92 can be increased to the distance W2. Here, the distance W2 is larger than the distance W1 of the hollow portion 20 described in the first embodiment.

この結果、中抜き部42の面積S1(S1=L1×W2)を、第1実施形態で説明した中抜き部20の面積S2(S2=L1×W1)より大きくしても、中抜き部42からの土水圧に抵抗することができる。これにより、工数及び材料費を低減できる。
他の構成は、第1実施形態と同じであり説明は省略する。
As a result, even if the area S1 (S1 = L1 × W2) of the hollow portion 42 is larger than the area S2 (S2 = L1 × W1) of the hollow portion 20 described in the first embodiment, the hollow portion 42 is obtained. Can resist soil water pressure from. Thereby, a man-hour and material cost can be reduced.
Other configurations are the same as those of the first embodiment, and a description thereof will be omitted.

(第6実施形態)
本発明の第6実施形態に係る山留壁90について、図7(A)、(B)を用いて説明する。山留壁90は、第1実施形態の山留壁10の掘削側壁体14の位置に、大径の地盤改良体88を有する掘削側壁体86を構築した点において、第1実施形態と相違する。相違点を中心に説明する。
図7(A)は、山留壁90の平面図であり、(B)は、図7(A)のY1−Y1線断面図である。
(Sixth embodiment)
A mountain retaining wall 90 according to a sixth embodiment of the present invention will be described with reference to FIGS. The mountain retaining wall 90 is different from the first embodiment in that an excavation sidewall body 86 having a large-diameter ground improvement body 88 is constructed at the position of the excavation sidewall body 14 of the mountain retaining wall 10 of the first embodiment. . The difference will be mainly described.
7A is a plan view of the mountain retaining wall 90, and FIG. 7B is a cross-sectional view taken along line Y1-Y1 of FIG. 7A.

図7(A)、(B)に示すように、山留壁90の掘削側壁体86は、複数の地盤改良体88の外周部の一部をラップさせ、壁状に一体化させて構築されている。
地盤改良体88は、地盤改良体11の径d1より大径の、径d2で構築され、つなぎ壁体92の間に構築されている。
As shown in FIGS. 7A and 7B, the excavation sidewall body 86 of the retaining wall 90 is constructed by wrapping a part of the outer peripheral portion of the plurality of ground improvement bodies 88 and integrating them into a wall shape. ing.
The ground improvement body 88 is constructed with a diameter d2 that is larger than the diameter d1 of the ground improvement body 11, and is constructed between the connecting wall bodies 92.

掘削側壁体86は、両端部をつなぎ壁体92の掘削部12側の端部とラップさせ、一体化されている。このとき、掘削側壁体86は、地盤改良体11より大径の地盤改良体88で構築されているので、山留壁10の掘削側壁体14よりも、高い曲げ剛性が備えられている。   The excavation side wall 86 is integrated by wrapping both ends with the end of the connecting wall 92 on the excavation part 12 side. At this time, since the excavation side wall body 86 is constructed by the ground improvement body 88 having a larger diameter than the ground improvement body 11, the excavation side wall body 86 has higher bending rigidity than the excavation side wall body 14 of the mountain retaining wall 10.

なお、地盤改良体88は、つなぎ壁体92の間に構築している態様を説明した。しかし、これに限定されることはなく、複数の地盤改良体88を連続して構築した後に、つなぎ壁体92を掘削側壁体86と背面側壁体16の間に、X軸方向に、壁状に構築し、その両端部を、掘削側壁体86と背面側壁体16にそれぞれラップさせてもよい。   In addition, the ground improvement body 88 demonstrated the aspect currently constructed | assembled between the connection wall bodies 92. FIG. However, the present invention is not limited to this, and after the plurality of ground improvement bodies 88 are continuously constructed, the connecting wall body 92 is formed between the excavation side wall body 86 and the back side wall body 16 in the X-axis direction in a wall shape. The both end portions may be wrapped on the excavation side wall body 86 and the back side wall body 16, respectively.

本実施形態の山留壁90は、地盤改良体88の径d2を、地盤改良体11の径d1より大きくしているため、曲げ剛性が増大される。これにより、つなぎ壁体92の数を、山留壁10より減らすことができる。例えば、つなぎ壁体92の間の距離W2を、第1実施形態で説明した中抜き部20の距離W1より広げてもよい。
この結果、中抜き部44の面積S1(S1=L1×W2)を、第1実施形態で説明した中抜き部20の面積S2(S2=L1×W1)より大きくしても、中抜き部44からの土水圧に抵抗することができる。これにより、工数及び材料費を低減できる。
他の構成は、第1実施形態と同じであり説明は省略する。
Since the retaining wall 90 of the present embodiment has the diameter d2 of the ground improvement body 88 larger than the diameter d1 of the ground improvement body 11, the bending rigidity is increased. Thereby, the number of the connecting wall bodies 92 can be reduced from the mountain retaining wall 10. For example, the distance W2 between the connecting wall bodies 92 may be wider than the distance W1 of the hollow portion 20 described in the first embodiment.
As a result, even if the area S1 (S1 = L1 × W2) of the hollow portion 44 is larger than the area S2 (S2 = L1 × W1) of the hollow portion 20 described in the first embodiment, the hollow portion 44. Can resist soil water pressure from. Thereby, a man-hour and material cost can be reduced.
Other configurations are the same as those of the first embodiment, and a description thereof will be omitted.

(第7実施形態)
本発明の第7実施形態に係る山留壁100について、図8(A)、(B)を用いて説明する。山留壁100は、掘削側壁体102の根入れ深さHN2を、背面側壁体16の根入れ深さHN1より深くした点において、第1実施形態と相違する。相違点を中心に説明する。
図8(A)は、山留壁100の平面図であり、(B)は、図8(A)のY1−Y1線断面図である。
(Seventh embodiment)
A mountain retaining wall 100 according to a seventh embodiment of the present invention will be described with reference to FIGS. The mountain retaining wall 100 is different from the first embodiment in that the depth of penetration HN2 of the excavation side wall body 102 is deeper than the depth of penetration HN1 of the back side wall body 16. The difference will be mainly described.
8A is a plan view of the mountain retaining wall 100, and FIG. 8B is a cross-sectional view taken along line Y1-Y1 of FIG. 8A.

図8(A)、(B)に示すように、掘削側壁体102は、複数の地盤改良体104の外周部の一部をラップさせ、壁状に一体化させて構築されている。
掘削側壁体102の根入れ深さHN2は、第1実施形態の掘削側壁体14や背面側壁体16の根入れ深さHN1より深くされている。一方、頭部は、背面側壁体16と同じ高さに構築されている。
As shown in FIGS. 8A and 8B, the excavation sidewall body 102 is constructed by wrapping a part of the outer peripheral portion of the plurality of ground improvement bodies 104 and integrating them into a wall shape.
The depth of penetration HN2 of the excavation sidewall body 102 is set to be deeper than the depth of penetration HN1 of the excavation sidewall body 14 and the back side wall body 16 of the first embodiment. On the other hand, the head is constructed at the same height as the back side wall body 16.

これにより、背面側壁体16が、背面地盤30から土水圧を受けることにより生じる、山留壁100を回転させようとする回転力Mに対し、力の作用点と、回転中心となる支点との距離を離すことができ、回転力Mに抵抗する抵抗力を大きくすることができる。 Thereby, with respect to the rotational force M which is caused when the back side wall body 16 receives the earth and water pressure from the back side ground 30 and tries to rotate the mountain retaining wall 100, the point of action of the force and the fulcrum serving as the center of rotation. The distance can be increased, and the resistance force that resists the rotational force M can be increased.

この結果、山留壁100の転倒に対する抵抗力を大きくし、倒れにくくすることができる。さらに、山留壁100の転倒を抑制する効果が高くなるため、掘削側壁体102と、背面側壁体16の距離L1を短くする事ができる。これにより、工数及び材料費を低減できる。他の構成は、第1実施形態と同じであり説明は省略する。   As a result, it is possible to increase the resistance to falling of the retaining wall 100 and make it difficult to fall. Furthermore, since the effect of suppressing the falling of the retaining wall 100 is increased, the distance L1 between the excavation sidewall body 102 and the back sidewall body 16 can be shortened. Thereby, a man-hour and material cost can be reduced. Other configurations are the same as those of the first embodiment, and a description thereof will be omitted.

(第8実施形態)
本発明の第8実施形態に係る山留壁101について、図9(A)、(B)を用いて説明する。山留壁101は、掘削側壁体102とつなぎ壁体98の一部を、根入れ深さHN2で構築した点において、山留壁100と相違する。相違点を中心に説明する。
ここで、図9(A)は、山留壁101の平面図であり、(B)は、図9(A)のY2−Y2線断面図である。
(Eighth embodiment)
A mountain retaining wall 101 according to an eighth embodiment of the present invention will be described with reference to FIGS. The mountain retaining wall 101 is different from the mountain retaining wall 100 in that a part of the excavation sidewall body 102 and the connecting wall body 98 is constructed with a penetration depth HN2. The difference will be mainly described.
Here, FIG. 9A is a plan view of the mountain retaining wall 101, and FIG. 9B is a sectional view taken along line Y2-Y2 of FIG. 9A.

図9(A)、(B)に示すように、山留壁101は、掘削側壁体102、及び背面側壁体94、つなぎ壁体98を有している。
掘削側壁体102は、複数の地盤改良体104の外周部の一部をラップさせ、Y軸方向に壁状に一体化させて構築されている。掘削側壁体102は、根入れ深さHN2、構築高さH8で構築されている。
背面側壁体94は、複数の地盤改良体96の外周部の一部をラップさせ、Y軸方向に壁状に一体化させて構築されている。背面側壁体94は、構築高さH7で構築されている。
As shown in FIGS. 9A and 9B, the mountain retaining wall 101 includes an excavation side wall body 102, a back side wall body 94, and a connecting wall body 98.
The excavation sidewall body 102 is constructed by wrapping a part of the outer periphery of the plurality of ground improvement bodies 104 and integrating them in a wall shape in the Y-axis direction. The excavation sidewall body 102 is constructed with a penetration depth HN2 and a construction height H8.
The back side wall body 94 is constructed by wrapping a part of the outer periphery of the plurality of ground improvement bodies 96 and integrating them in a wall shape in the Y-axis direction. The back side wall body 94 is constructed with a construction height H7.

つなぎ壁体98は、第1つなぎ壁体126と第2つなぎ壁体128とを有している。
第1つなぎ壁体126は、複数の地盤改良体104の外周部の一部をラップさせ、X軸方向に壁状に一体化させて構築され、第2つなぎ壁体128は、複数の地盤改良体96の外周部の一部をラップさせ、X軸方向に壁状に一体化させて構築されている。
The connecting wall body 98 includes a first connecting wall body 126 and a second connecting wall body 128.
The first connecting wall body 126 is constructed by wrapping a part of the outer periphery of the plurality of ground improvement bodies 104 and integrating them in a wall shape in the X-axis direction, and the second connecting wall body 128 is configured by a plurality of ground improvement bodies. A part of the outer periphery of the body 96 is wrapped and integrated into a wall shape in the X-axis direction.

第1つなぎ壁体126は、根入れ深さHN2、構築高さH8で、掘削側壁体102側に構築され、一端が掘削側壁体102とラップされ、一体化されている。また、第2つなぎ壁体128は、構築高さH7で、背面側壁体94側に構築され、一端が背面側壁体94とラップされ、一体化されている。
第1つなぎ壁体126と第2つなぎ壁体128は、つなぎ壁体98の中央部で、互いに他端部がラップされて一体化されている。
The first connecting wall body 126 has a penetration depth HN2 and a construction height H8, and is constructed on the excavation side wall body 102 side, and one end thereof is overlapped with the excavation side wall body 102 and integrated. The second connecting wall body 128 is constructed at the construction height H7 and is constructed on the back side wall body 94 side, and one end thereof is overlapped with the back side wall body 94 and integrated.
The first connecting wall body 126 and the second connecting wall body 128 are integrated at the central portion of the connecting wall body 98 with the other ends wrapped together.

本構成においては、背面側壁体94の構築深さH7、及び第2つなぎ壁体128の構築深さH7を、山留壁10の背面側壁体16の構築深さH2より、浅くすることができる。
これにより、背面側壁体94が、背面地盤30から土水圧を受けることにより生じる、山留壁101を回転させようとする回転力Mに対し、力の作用点と、回転中心となる支点との距離を離すことができ、回転力Mに抵抗する抵抗力を大きくすることができる。
In this configuration, the construction depth H7 of the back side wall body 94 and the construction depth H7 of the second connecting wall body 128 can be made shallower than the construction depth H2 of the back side wall body 16 of the mountain retaining wall 10. .
Thereby, with respect to the rotational force M that causes the back wall body 94 to rotate the mountain retaining wall 101 caused by receiving earth and water pressure from the back surface ground 30, the point of action of the force and the fulcrum serving as the rotation center The distance can be increased, and the resistance force that resists the rotational force M can be increased.

この結果、山留壁101の転倒に対する抵抗力を大きくし、倒れにくくすることができる。さらに、山留壁101の転倒を抑制する効果が高くなるため、掘削側壁体102と、背面側壁体94の距離L1を短くする事ができる。これにより、工数及び材料費を低減できる。他の構成は、第1実施形態と同じであり説明は省略する。   As a result, it is possible to increase the resistance to falling of the mountain retaining wall 101 and make it difficult to fall. Furthermore, since the effect of suppressing the falling of the mountain retaining wall 101 is increased, the distance L1 between the excavation side wall body 102 and the back side wall body 94 can be shortened. Thereby, a man-hour and material cost can be reduced. Other configurations are the same as those of the first embodiment, and a description thereof will be omitted.

(第9実施形態)
本発明の第9実施形態に係る山留壁110について、図10(A)〜(C)を用いて説明する。山留壁110は、掘削側壁体112を傾斜させて構築した点において、第1実施形態と相違する。相違点を中心に説明する。
図10(A)は、山留壁110の平面図であり、(B)は、図10(A)のY1−Y1線断面図であり、(C)は、図10(A)のY2−Y2線断面図である。
(Ninth embodiment)
A mountain retaining wall 110 according to a ninth embodiment of the present invention will be described with reference to FIGS. The mountain retaining wall 110 is different from the first embodiment in that it is constructed by tilting the excavation sidewall body 112. The difference will be mainly described.
10A is a plan view of the mountain retaining wall 110, FIG. 10B is a cross-sectional view taken along the line Y1-Y1 of FIG. 10A, and FIG. It is a Y2 line sectional view.

図10(A)、(B)に示すように、掘削側壁体112は、複数の地盤改良体108の外周部の一部をラップさせ、壁状に一体化させて構築されている。
掘削側壁体112の根入れ深さHN1は、第1実施形態の掘削側壁体14の根入れ深さと同じとされており、頭部を背面地盤30へ向けて、傾斜させて構築されている。傾斜角度αは、角度45度<α<90度の範囲であればよい。
As shown in FIGS. 10A and 10B, the excavation sidewall body 112 is constructed by wrapping a part of the outer peripheral portion of the plurality of ground improvement bodies 108 and integrating them into a wall shape.
The penetration depth HN1 of the excavation sidewall body 112 is the same as the penetration depth of the excavation sidewall body 14 of the first embodiment, and is constructed with the head inclined toward the back ground 30. The inclination angle α may be in the range of angle 45 degrees <α <90 degrees.

図10(C)に、掘削側壁体112とつなぎ壁体114との接合部の一例を示す。
掘削側壁体112は、傾斜して構築された地盤改良体108の外周部をラップさせ、Y軸方向へ壁状に連結させている。また、つなぎ壁体114は、同じ深さで構築された第1つなぎ壁体130と、深さの異なる第2つなぎ壁体132とを有している。
FIG. 10C illustrates an example of a joint portion between the excavation sidewall body 112 and the connecting wall body 114.
The excavation side wall body 112 wraps the outer peripheral portion of the ground improvement body 108 constructed to be inclined, and is connected in a wall shape in the Y-axis direction. In addition, the connecting wall body 114 includes a first connecting wall body 130 constructed at the same depth and a second connecting wall body 132 having a different depth.

第1つなぎ壁体130は、背面側壁体16と同じ深さで構築される地盤改良体11を、X軸方向へ壁状に連結した構成であり、第2つなぎ壁体132は、深さの異なる地盤改良体116を、X軸方向へ壁状に連結した構成である。
第2つなぎ壁体132は、掘削側壁体112の近くのつなぎ壁体114を構成し、地盤改良体116の頭部を、掘削側壁体112の傾斜を考慮して、掘削側壁体112に近い側を短く構築する。地盤改良体108の構築時に、地盤改良体116の頭部と、地盤改良体108の外周部をラップさせ一体化させる。
The first connecting wall body 130 is a structure in which the ground improvement body 11 constructed at the same depth as the back side wall body 16 is connected in a wall shape in the X-axis direction, and the second connecting wall body 132 has a depth. In this configuration, different ground improvement bodies 116 are connected in a wall shape in the X-axis direction.
The second connecting wall body 132 constitutes a connecting wall body 114 near the excavation side wall body 112, and the head of the ground improvement body 116 is disposed on the side closer to the excavation side wall body 112 in consideration of the inclination of the excavation side wall body 112. Build short. When the ground improvement body 108 is constructed, the head of the ground improvement body 116 and the outer periphery of the ground improvement body 108 are wrapped and integrated.

本実施形態とすることにより、掘削側壁体112を傾斜させた分、中抜き部118の体積を減少させることができる。また、掘削側壁体112を背面側へ傾斜させることで、中抜き部118からの土圧を小さくすることができるので、中抜き部118からの土水圧に抵抗することができる。
更に、背面側へ傾斜させることで生じた掘削部12の用地、及び掘削側壁体112の上の空間ARを、有効活用することができる。
他の構成は、第1実施形態と同じであり説明は省略する。
By setting it as this embodiment, the volume of the hollow part 118 can be reduced by the part which inclined the excavation side wall body 112. FIG. Moreover, since the earth pressure from the hollow part 118 can be made small by inclining the excavation side wall body 112 to the back side, it can resist the soil water pressure from the hollow part 118.
Furthermore, the land of the excavation part 12 produced by inclining to the back side and the space AR above the excavation sidewall body 112 can be effectively utilized.
Other configurations are the same as those of the first embodiment, and a description thereof will be omitted.

(第10実施形態)
本発明の第10実施形態に係る山留壁120について、図11(A)〜(C)を用いて説明する。山留壁120は、掘削部12に、ソイルバットレス122を構築している点において、第1実施形態と相違する。相違点を中心に説明する。
図11(A)は、山留壁120の平面図であり、(B)は、図11(A)のY1−Y1線断面図であり、(C)は、図11(A)のY2−Y2線断面図である。
(10th Embodiment)
A mountain retaining wall 120 according to a tenth embodiment of the present invention will be described with reference to FIGS. The mountain retaining wall 120 is different from the first embodiment in that the soil buttress 122 is constructed in the excavation part 12. The difference will be mainly described.
11A is a plan view of the mountain retaining wall 120, FIG. 11B is a sectional view taken along line Y1-Y1 of FIG. 11A, and FIG. It is a Y2 line sectional view.

図11(A)〜(C)に示すように、ソイルバットレス122は、複数の地盤改良体124の外周部の一部をラップさせ、壁状に一体化させて構築されている。
ソイルバットレス122は、つなぎ壁体18の延長線上に構築され、ソイルバットレス122の掘削側壁体14側の端部は、掘削側壁体14と外周部の一部をラップさせ、一体化されている。
ソイルバットレス122は、掘削側壁体14と同じ根入れ深さHN1で構築され、頭部は、掘削部12の床付面12Gと同じ高さとされている。
As shown in FIGS. 11A to 11C, the soil buttress 122 is constructed by wrapping a part of the outer peripheral portion of the plurality of ground improvement bodies 124 and integrating them in a wall shape.
The soil buttress 122 is constructed on an extension line of the connecting wall body 18, and the end portion of the soil buttress 122 on the side of the excavation side wall body 14 is integrated by wrapping the excavation side wall body 14 and a part of the outer peripheral portion.
The soil buttress 122 is constructed with the same penetration depth HN1 as the excavation side wall body 14, and the head is set to the same height as the floor surface 12G of the excavation part 12.

これにより、ソイルバットレス122が、掘削側壁体14を、掘削部12側から支保工として支持し、中抜き部20の地盤からの土水圧に抵抗する。この結果、掘削側壁体14が補強され、中抜き部20からの土水圧に抵抗することができる。
本実施形態とすることにより、山留壁120の転倒に対する抵抗力を大きくし、倒れにくくすることができる。さらに、山留壁120の転倒を抑制する効果が高くなるため、掘削側壁体14と、背面側壁体16の距離L1を短くする事ができる。この結果、工数及び材料費を低減できる。
他の構成は、第1実施形態と同じであり説明は省略する。
Thereby, the soil buttress 122 supports the excavation side wall body 14 as a support work from the excavation part 12 side, and resists soil water pressure from the ground of the hollow part 20. As a result, the excavation sidewall body 14 is reinforced and can resist the soil water pressure from the hollow portion 20.
By setting it as this embodiment, the resistance force with respect to the fall of the mountain retaining wall 120 can be enlarged, and it can be made hard to fall down. Furthermore, since the effect of suppressing the falling of the mountain retaining wall 120 is increased, the distance L1 between the excavation side wall body 14 and the back side wall body 16 can be shortened. As a result, man-hours and material costs can be reduced.
Other configurations are the same as those of the first embodiment, and a description thereof will be omitted.

以上、第1実施形態から第10実施形態までの実施形態を説明が、これらを適宜に組み合わせても好適に実施できる。例えば、平面視で矩形の掘削部12に対し、一辺は、第3実施形態とし、他の三辺は第1実施形態とする場合も好適である。   As mentioned above, although embodiment from 1st Embodiment to 10th Embodiment is described, even if these are combined suitably, it can implement suitably. For example, with respect to the excavation unit 12 that is rectangular in plan view, it is also preferable that one side is the third embodiment and the other three sides are the first embodiment.

更に、本発明の要旨を逸脱しない範囲において種々なる態様で実施し得ることは言うまでもない。   Furthermore, it cannot be overemphasized that it can implement with a various aspect in the range which does not deviate from the summary of this invention.

10、50、60、70、80、90、100、101、110、120 山留壁
11、88、96、104、108、116、118、124 地盤改良体
12 掘削部
12G 床付面
14、62、82、84、86、102、112 掘削側壁体
16、94 背面側壁体
18、92、98、114、126、128 つなぎ壁体
20、42、44、118 中抜き部
22、23 水抜き管(水抜き手段)
24 天端コンクリート
26 中抜き部内部の水位
28 背面地盤の水位
52 井戸(水抜き手段)
67 親杭横矢板(水抜き手段)
72 H形鋼(補強部材)
122 ソイルバットレス
H1 掘削部深さ
HN1、HN2 根入れ深さ
10, 50, 60, 70, 80, 90, 100, 101, 110, 120 Yamato wall 11, 88, 96, 104, 108, 116, 118, 124 Ground improvement body 12 Excavation part 12G Floor surface 14, 62 , 82, 84, 86, 102, 112 Excavation side wall body 16, 94 Rear side wall body 18, 92, 98, 114, 126, 128 Joint wall body 20, 42, 44, 118 Cavity 22, 23 Drain pipe ( Drainage means)
24 Top concrete 26 Water level inside the hollow section 28 Water level of the back ground 52 Well (water draining means)
67 Parent pile side sheet pile (water draining means)
72 H-section steel (reinforcing member)
122 Soil buttress H1 Excavation depth HN1, HN2 Rooting depth

Claims (3)

掘削部の外側に地盤改良体で構築された掘削側壁体と、
前記掘削側壁体より前記掘削部の外側に、地盤改良体で構築された背面側壁体と、
前記掘削側壁体と前記背面側壁体に接続され、前記掘削側壁体と前記背面側壁体の間に形成された地盤改良しない中抜き部を複数に区画し、地盤改良体で構築された複数のつなぎ壁体と、
前記掘削側壁体に設けられ、前記中抜き部の水を前記掘削部へ抜く水抜き手段と、
を有し、
前記掘削側壁体は、外周部同士がラップされた複数の柱状の前記地盤改良体で構築されており、
前記水抜き手段は、前記地盤改良体の前記外周部同士がラップされた部分に設けられた水抜き管である、
山留壁。
An excavation sidewall body constructed of a ground improvement body outside the excavation part;
Outside the excavation part from the excavation side wall body, a back side wall body constructed with a ground improvement body,
Connected to the excavation side wall body and the back side wall body, a plurality of hollow portions formed between the excavation side wall body and the back side wall body and not improved in ground are divided into a plurality of linkages constructed by a ground improvement body. A wall,
A water draining means provided on the excavation side wall body, for draining water from the hollow section to the excavation section;
Have a,
The excavation side wall body is constructed with a plurality of columnar ground improvement bodies wrapped around each other,
The draining means is a drain pipe provided in a portion where the outer peripheral portions of the ground improvement body are wrapped.
Yamadome wall.
前記掘削側壁体の根入れ深さ、又は、前記掘削側壁体及び前記つなぎ壁体の前記掘削側壁体と接続される側の根入れ深さが、前記背面側壁体の根入れ深さより深くされている請求項1に記載の山留壁。 The penetration depth of the excavation sidewall body or the penetration depth of the excavation sidewall body and the connecting wall body on the side connected to the excavation sidewall body is made deeper than the penetration depth of the back sidewall body. The mountain retaining wall according to claim 1 . 前記掘削側壁体は、
前記地盤改良体の内部への補強部材の挿入、
前記地盤改良体の厚さの増大、
前記地盤改良体の頭部側を、背面側へ傾斜させた傾斜化、
又は、前記掘削部に、前記掘削部の床付面から下部に構築されたソイルバットレス、
の少なくとも1つにより補強されている請求項1又は2に記載の山留壁。
The excavation sidewall body is
Insertion of a reinforcing member into the ground improvement body,
Increase in the thickness of the ground improvement body,
Inclining the head side of the ground improvement body to the back side,
Or, in the excavation part, a soil buttress constructed in the lower part from the floored surface of the excavation part,
The mountain retaining wall according to claim 1 or 2 , which is reinforced by at least one of the following.
JP2015035610A 2015-02-25 2015-02-25 Yamadome wall Active JP6615465B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015035610A JP6615465B2 (en) 2015-02-25 2015-02-25 Yamadome wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015035610A JP6615465B2 (en) 2015-02-25 2015-02-25 Yamadome wall

Publications (2)

Publication Number Publication Date
JP2016156216A JP2016156216A (en) 2016-09-01
JP6615465B2 true JP6615465B2 (en) 2019-12-04

Family

ID=56825398

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015035610A Active JP6615465B2 (en) 2015-02-25 2015-02-25 Yamadome wall

Country Status (1)

Country Link
JP (1) JP6615465B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7137358B2 (en) * 2018-05-25 2022-09-14 公益財団法人鉄道総合技術研究所 Retaining wall support structure
JP7427945B2 (en) * 2019-12-09 2024-02-06 株式会社大林組 Wall-like structure and method for constructing wall-like structure
JP7356889B2 (en) * 2019-12-13 2023-10-05 株式会社竹中工務店 Construction method of structure
CN111549791B (en) * 2020-05-26 2021-08-10 中国十七冶集团有限公司 Foundation pit supporting structure with foundation pit construction parameter measurement function

Family Cites Families (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4162866A (en) * 1978-05-04 1979-07-31 Takeichi Kita H-shaped steel sheet pile wall
JPS56125532A (en) * 1980-03-05 1981-10-01 Yoshiro Wakimura Construction of slope of road, reservoir, etc.
JPH0485413A (en) * 1990-07-27 1992-03-18 Sumitomo Cement Co Ltd Earth retaining method
JPH0657736A (en) * 1992-08-12 1994-03-01 Kajima Corp Still water retaining wall
JP3072403B2 (en) * 1993-11-08 2000-07-31 株式会社竹中工務店 Buttress type retaining digging method
JP3590842B2 (en) * 1995-01-10 2004-11-17 株式会社テノックス Construction method of self-standing mountain retaining wall
JP3521363B2 (en) * 1995-03-29 2004-04-19 清水建設株式会社 Mountain retaining method
JPH0931987A (en) * 1995-07-14 1997-02-04 Hiroshi Suzuki Concrete cage
JP4013182B2 (en) * 1999-04-19 2007-11-28 株式会社竹中工務店 Self-supporting mountain retaining wall method and self-supporting mountain retaining wall
JP4211491B2 (en) * 2003-05-28 2009-01-21 株式会社大林組 Method for constructing wall structure with permanent anchor, wall structure constructed by this method
JP2006299730A (en) * 2005-04-25 2006-11-02 Chem Grouting Co Ltd Ground improvement method
JP5146117B2 (en) * 2008-06-09 2013-02-20 謹治 竹内 Retaining wall structure consisting of ground improvement body and its construction method

Also Published As

Publication number Publication date
JP2016156216A (en) 2016-09-01

Similar Documents

Publication Publication Date Title
KR20100068597A (en) A shoring method using arch plate pile and h-pile
KR100886445B1 (en) Soil tanks
JP6615465B2 (en) Yamadome wall
JP5046742B2 (en) Retaining wall and its supporting method
JP2006233617A (en) Soil cement composite pile with flight
JP6632028B2 (en) Concrete assembly retaining wall
JP2013002078A (en) Foundation structure
JP7094423B2 (en) Underground wall pile structure with expanded bottom
JP6996689B2 (en) Pile head joint structure
JP6119074B2 (en) Construction method and rebuilding method
JP6860895B2 (en) Retaining wall and its construction method
JP5930580B2 (en) Earth retaining wall and method of constructing earth retaining wall
JP5480744B2 (en) Foundation for structure and its construction method
KR100999410B1 (en) Prefabricated bandages using perforated beams and prefabricated sleeves and underground structures for continuous construction of underground retaining walls using them
KR101649448B1 (en) An assembly for retaining sheet pile wall
JP4888293B2 (en) Earth retaining wall made of parent pile sheet pile, water stop structure of earth retaining wall made of parent pile side sheet pile, construction method of earth retaining wall made of parent pile side sheet pile, and retaining wall of earth retaining wall made of parent pile side sheet pile Water method
JP7088818B2 (en) Installation method of rectangular propulsion pipe and manufacturing method of underground structure equipped with rectangular propulsion pipe
JP5169638B2 (en) Construction method of underground structure
JP2010059622A (en) Underground structure and method for constructing the same
JP6774774B2 (en) Pile foundation structure
JP2000355941A (en) Building and its construction method
CN117005421A (en) A construction method of foundation pit supporting structure
KR20200029078A (en) Construction method for earth self-retaining wall using reinforcing member and SCW construction method
KR20190084633A (en) Top-down construction method for concrete building structure using steel pile underground wall and shear support plate
JP5480745B2 (en) Reinforcement method for existing foundations for structures

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20171117

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180718

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180814

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190219

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190314

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190416

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190514

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20191023

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20191106

R150 Certificate of patent or registration of utility model

Ref document number: 6615465

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250