Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6232675B2 - Headboard construction member and headboard construction method - Google Patents
[go: Go Back, main page]

JP6232675B2 - Headboard construction member and headboard construction method - Google Patents

Headboard construction member and headboard construction method Download PDF

Info

Publication number
JP6232675B2
JP6232675B2 JP2013080781A JP2013080781A JP6232675B2 JP 6232675 B2 JP6232675 B2 JP 6232675B2 JP 2013080781 A JP2013080781 A JP 2013080781A JP 2013080781 A JP2013080781 A JP 2013080781A JP 6232675 B2 JP6232675 B2 JP 6232675B2
Authority
JP
Japan
Prior art keywords
headboard
cap
construction
main body
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2013080781A
Other languages
Japanese (ja)
Other versions
JP2014202015A (en
Inventor
伊藤 英
英 伊藤
田中 大介
大介 田中
健二郎 里▲崎▼
健二郎 里▲崎▼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fukuvi Chemical Industry Co Ltd
Sumitomo Forestry Co Ltd
Original Assignee
Fukuvi Chemical Industry Co Ltd
Sumitomo Forestry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fukuvi Chemical Industry Co Ltd, Sumitomo Forestry Co Ltd filed Critical Fukuvi Chemical Industry Co Ltd
Priority to JP2013080781A priority Critical patent/JP6232675B2/en
Publication of JP2014202015A publication Critical patent/JP2014202015A/en
Application granted granted Critical
Publication of JP6232675B2 publication Critical patent/JP6232675B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Fencing (AREA)

Description

この発明は、例えば建物の外構に設けられた塀等に、笠木を施工する際に用いる笠木施工用部材および笠木施工方法に関するものである。   The present invention relates to a member for constructing a cap and a method for constructing a cap, which are used when constructing a cap, for example, on a fence provided on the exterior of a building.

住宅等の外構に設けられたブロック等からなる塀の上部には、塀の保護や装飾等の目的で塀の上端面を覆うように笠木が配設される。
笠木の配設方法としては、例えば樹脂材料や金属材料、コンクリート等で予め形成された笠木を、ブラケットやセメント等を介して塀の上部に固定して配設する方法や、現場で職人がモルタルにより塀の上部に笠木を形成して配設する方法がある。
ここで、笠木および塀の多様なデザインに対応する場合、職人の手作業により笠木が配設されることが多い。
A headboard is provided on the upper part of the fence made of blocks or the like provided on the exterior of a house or the like so as to cover the upper end surface of the fence for the purpose of protection or decoration of the fence.
As a method for arranging the headboard, for example, a method for placing a headboard made of a resin material, a metal material, concrete, or the like fixed to the upper part of the fence via a bracket, cement, etc. There is a method of forming and arranging a headboard on the upper part of the fence.
Here, in the case of dealing with various designs of the caps and cocoons, the caps are often arranged manually by craftsmen.

職人が手作業により笠木を配設する場合、以下のような流れで施工される。
まず、角材等の幅木を塀の上端面に固定して、笠木形成領域に対応した型枠を形成する。続いて、型枠内にモルタルを充填し、コテ等を用いてモルタルの表面を仕上げる。そして、モルタルが硬化した後、型枠を取り外すことで笠木が形成される。
When the craftsman manually arranges the headboard, the construction is performed as follows.
First, a skirting board such as a square bar is fixed to the upper end surface of the ridge to form a mold corresponding to the headboard formation region. Subsequently, the mold is filled with mortar, and the surface of the mortar is finished using a trowel or the like. And after a mortar hardens | cures, a headboard is formed by removing a formwork.

ところで、降雨時の雨水等は、笠木により誘導されて塀の側面よりも外側において下方に落下するようになっている。このとき、土ほこり等の塵埃を含んだ雨水が塀の側面上を流れて塵埃が塀に対して線状に付着するいわゆる雨垂れが発生し、塀の側面を汚損するおそれがある。   By the way, rain water or the like at the time of rain is guided by the headboard and falls downward on the outer side of the side surface of the kite. At this time, rainwater containing dust such as dirt dust flows on the side surface of the kite, and so-called rain dripping occurs in which the dust adheres linearly to the kite, and the side surface of the kite may be soiled.

このような問題を解決するために、例えば特許文献1には、上面が外側から内側へ向かって斜め下方へ傾斜するとともに、笠木の両端底面部において上方に凹み形成された水切り部を備えた笠木が記載されている。特許文献1によれば、雨水が勢いよく流下しやすくなるとともに、水切り部により塀へ雨水が伝わるのを効果的に阻止できるので、塀の汚損や劣化を効果的に防止できるとされている。   In order to solve such a problem, for example, in Patent Document 1, the top surface is inclined obliquely downward from the outside to the inside, and the headboard is provided with draining portions that are recessed upward at the bottom portions of both ends of the headboard. Is described. According to Patent Document 1, rainwater can easily flow down vigorously, and rainwater can be effectively prevented from being transmitted to the kite by the draining portion, so that the stain and deterioration of the kite can be effectively prevented.

登録実用新案第3094010号公報Registered Utility Model No. 3094010

しかしながら、上述した特許文献1の構成にあっては、凹み形成された水切り部の表面を雨水等が伝搬して塀の側面に到達し、塀の側面上を流れて塀の側面を汚損するおそれがある。また、外側の水切り部にあっては、塀の側面に近接配置されているため、水切り部から下方に落下した雨水等が、地面に到達する前に塀の側面に付着し、塀の側面上を流れて塀の側面を汚損するおそれがある。
さらに、特許文献1に記載の笠木の施工方法については、具体的に開示されていない。とりわけ、特許文献1に記載の笠木を現場で形成する際には、上面が所定の傾斜角度となるように施工する必要があるため、煩雑な工程が必要となるおそれがある。
However, in the configuration of Patent Document 1 described above, rainwater or the like propagates through the surface of the drained portion formed as a recess, reaches the side surface of the kite, and may flow on the side surface of the kite and contaminate the side surface of the kite. There is. In addition, the outer draining portion is disposed close to the side surface of the dredge, so that rainwater or the like that has dropped from the draining portion adheres to the side surface of the dredge before reaching the ground, There is a risk of fouling the side of the fence.
Furthermore, the construction method of the headboard described in Patent Document 1 is not specifically disclosed. In particular, when the headboard described in Patent Document 1 is formed on site, it is necessary to construct the upper surface to have a predetermined inclination angle, which may require a complicated process.

そこで、本発明は、上述した事情に鑑みてなされたものであって、塀の汚損を抑制するとともに、笠木を容易に施工できる笠木施工用部材および笠木施工方法の提供を課題とする。   Then, this invention is made | formed in view of the situation mentioned above, and makes it a subject to provide the member for the headboard construction which can construct the headboard easily, and the method of the headboard construction, while suppressing the fouling of the fence.

上記の課題を解決するため、本発明の笠木施工用部材は、塀の上部の笠木を配設するために、塀本体の上端縁部に対応する延設方向に沿って設置される笠木施工用部材であって、前記延設方向に沿って前記塀本体の上端面に配置され、上方に笠木材料が配設される天板部と、前記天板部から前記塀本体の外側に向かって張り出し形成され、上方に前記笠木材料が配設される笠部と、前記天板部と前記笠部との境界部分において、前記塀本体の側面に沿って下方に向かって立設された側板部と、前記笠部の外側端部から下方に向かって立設された笠側部と、前記笠部の外側端部から上方に向かって立設され、下方から上方に向かって前記塀本体の外側に漸次傾斜する傾斜片を有する壁部と、前記壁部の下方において、前記塀本体の外側に向かって張り出し形成され、上方に前記笠木材料が配設される笠木材料受部と、前記笠側部の下方において、前記延設方向に沿って延在するとともに、下方に向かって立設された主水切り板と、を備え、前記主水切り板は、上方から下方に向かって、前記塀の側面から離れるように外側に傾斜し、前記笠部には、前記延設方向に沿って延在する水返し板が上方に向かって立設され、前記水返し板は、前記塀本体の外側に配置されていることを特徴としている。 In order to solve the above-mentioned problem, the member for constructing a headboard of the present invention is for headboard construction that is installed along the extending direction corresponding to the upper end edge of the main body of the firewood in order to arrange the headwood of the upper part of the firewood. A top plate portion disposed on an upper end surface of the coffin main body along the extending direction and having a headboard material disposed thereon, and projecting from the top plate portion toward the outside of the coffin main body. A cap portion that is formed and on which the cap material is disposed, and a side plate portion that is erected downward along the side surface of the main body at the boundary portion between the top plate portion and the cap portion; A cap side portion erected downward from the outer end portion of the cap portion, and a cap side portion erected upward from the outer end portion of the cap portion, and from the lower portion upward to the outside of the cocoon body A wall portion having an inclined piece that gradually inclines, and toward the outside of the bag body below the wall portion. A headboard material receiving portion that is formed in an overhang and in which the headboard material is disposed above, and a main drainer that extends along the extending direction and extends downward in the lower side of the headside portion. The main draining plate is inclined outward from the side surface of the ridge from the upper side to the lower side, and the water return extending along the extending direction to the cap portion. A plate is erected upward, and the water return plate is disposed on the outside of the main body .

本発明によれば、笠側部の下方において下方に向かって立設された主水切り板を備えているので、笠木材料受部の上方に形成された笠木の側面を下方に向かって流れる雨水が、笠木材料受部の下面を伝搬したあと主水切り板によって下方に誘導されて落下することができる。しかも、主水切り板が上方から下方に向かって、塀の側面から離れるように外側に傾斜しているので、塀の側面から離反するように雨水を落下させることができる。したがって、雨水等によって運ばれた塵埃が塀に対して線状に付着する、いわゆる雨垂れ等の発生を効果的に抑制し、塀の汚損を抑制することができる。
また、天板部と側板部とにより隅部が形成されるので、この隅部と、塀本体の上端縁部とを合わせ、塀本体の上端縁部に沿って天板部を配置することにより、塀本体の上端面において塀本体の上端縁部に沿うように笠木施工用部材を簡単に設置できる。また、塀本体の上端縁部に沿うように笠木施工用部材を設置することにより、笠木施工用部材の壁部によって笠木材料を充填する領域を画成できる。したがって、型枠を設置することなく笠木材料を充填して、笠木を施工できる。さらに、笠木施工用部材は、除去されることなくそのまま笠木材料に埋設されるので、笠木の強度が確保できるとともに、従来のように型枠を取り外す工程が不要となる。したがって、簡単な施工作業で笠木を配設できる。
さらに、水返し板が塀本体の外側に配置されているので、塀本体の外側において、水返し板よりも内側に水分が浸透するのを妨げることができる。これにより、笠木の内部に浸透した水分が、塀本体に到達するのを妨げることができるので、塀本体の腐食を抑制できる。
According to the present invention, since the main draining plate is provided to stand downward below the shade side portion, rainwater flowing downward on the side surface of the shade tree formed above the shade material receiving portion is provided. After propagating through the lower surface of the cap material receiving part, it can be guided downward by the main draining plate and fall down. And since the main draining board inclines outside so that it may leave | separate from the side surface of a ridge toward the downward direction from upper direction, rain water can be dropped so that it may separate from the side surface of a ridge. Accordingly, it is possible to effectively suppress the occurrence of so-called rain dripping, in which dust carried by rainwater or the like adheres linearly to the kite, and can suppress the stain of the kite.
Further, since the corner is formed by the top plate and the side plate, the corner and the upper edge of the heel body are combined, and the top plate is arranged along the upper edge of the heel body. The headboard construction member can be easily installed along the upper edge of the heel body on the upper surface of the heel body. Moreover, the area | region which fills a headboard material with the wall part of a headboard construction member can be demarcated by installing the headboard construction member along the upper end edge part of a coffin main body. Therefore, it is possible to construct the headboard by filling the headboard material without installing a formwork. Furthermore, since the member for constructing the headboard is buried in the headboard material as it is without being removed, the strength of the headboard can be ensured, and the step of removing the formwork as in the prior art becomes unnecessary. Therefore, the headboard can be arranged by a simple construction work.
Furthermore, since the water return plate is disposed outside the main body, it is possible to prevent moisture from penetrating inside the water return plate outside the main body. Thereby, since the water | moisture content which osmose | permeated the inside of the headboard can be prevented from reaching the cocoon body, corrosion of the cocoon body can be suppressed.

また、前記天板部には、貫通孔が形成されていることを特徴としている。   Further, the top plate portion is formed with a through hole.

本発明によれば、接着剤を用いて塀本体の上端面に天板部を配置する際に、貫通孔に接着剤が入り込むので、塀本体の上端面に天板部を強固に固定できる。したがって、笠木施工用部材の脱落を防止して、笠木の施工作業を安定して行うことができる。   According to the present invention, when the top plate portion is disposed on the upper end surface of the bag main body using the adhesive, the adhesive enters the through hole, so that the top plate portion can be firmly fixed to the upper end surface of the main bag body. Therefore, it is possible to prevent the falling of the member for construction of the headboard and stably perform the construction work of the headboard.

また、前記笠部には、前記水返し板と前記壁部との間に、前記笠部を貫通する排水孔が形成されていることを特徴としている。   Further, the cap portion is characterized in that a drainage hole penetrating the cap portion is formed between the water return plate and the wall portion.

本発明によれば、水返し板により浸透が妨げられた水分を排水孔から排出できるので、水分が塀本体に浸透するのを確実に抑制できる。   According to the present invention, the water whose permeation has been hindered by the water return plate can be discharged from the drain hole, so that it is possible to reliably suppress the water from penetrating into the main body.

本発明の笠木施工用部材は、塀の上部の笠木を配設するために、塀本体の上端縁部に対応する延設方向に沿って設置される笠木施工用部材であって、前記延設方向に沿って前記塀本体の上端面に配置され、上方に笠木材料が配設される天板部と、前記天板部から前記塀本体の外側に向かって張り出し形成され、上方に前記笠木材料が配設される笠部と、前記天板部と前記笠部との境界部分において、前記塀本体の側面に沿って下方に向かって立設された側板部と、前記笠部の外側端部から下方に向かって立設された笠側部と、前記笠部の外側端部から上方に向かって立設され、下方から上方に向かって前記塀本体の外側に漸次傾斜する傾斜片を有する壁部と、前記壁部の下方において、前記塀本体の外側に向かって張り出し形成され、上方に前記笠木材料が配設される笠木材料受部と、前記笠側部の下方において、前記延設方向に沿って延在するとともに、下方に向かって立設された主水切り板と、を備え、前記主水切り板は、上方から下方に向かって、前記塀の側面から離れるように外側に傾斜し、前記壁部の端部には、他の前記笠木施工用部材の前記壁部と係止可能な係止部が設けられていることを特徴としている。 The member for constructing a headboard according to the present invention is a member for constructing a headboard that is installed along an extending direction corresponding to an upper edge of the main body of the firewood in order to dispose the headwood of the upper part of the firewood. A top plate portion that is disposed on the upper end surface of the coffin main body along the direction and in which the headboard material is disposed above, and is formed so as to project from the top plate portion toward the outside of the coffin main body, and above the headboard material. A side plate portion erected downward along the side surface of the main body, and an outer end portion of the cap portion at a boundary portion between the top plate portion and the cap portion. A wall having a cap side portion erected downward from the outside, and an inclined piece that is erected upward from the outer end portion of the cap portion and gradually inclines outward from the lower portion to the outer side of the main body. And projecting toward the outside of the bag body at the lower part of the wall part, A headboard material receiving portion in which the headboard material is disposed, and a main drainer plate that extends along the extending direction at the lower side of the headside portion and is erected downward. The main draining plate is inclined outwardly from the upper side to the lower side so as to be separated from the side surface of the ridge , and can be engaged with the wall portion of the other headboard construction member at the end portion of the wall portion. It is characterized in that a simple locking portion is provided .

本発明によれば、塀本体の上端縁部に沿うように笠木施工用部材を設置する際に、複数の笠木施工用部材を互いに係止して連設できる。したがって、笠木施工用部材の大型化を抑制しつつ、複数の笠木施工用部材の壁部によって笠木材料を充填する領域を画成できる。   According to the present invention, when installing the headboard construction member along the upper edge of the ridge body, a plurality of headboard construction members can be locked and connected to each other. Accordingly, it is possible to define a region where the headboard material is filled by the wall portions of the plurality of headboard construction members while suppressing an increase in the size of the headboard construction members.

また、前記笠部における前記主水切り板と前記側板部との間には、前記延設方向に沿って延在する少なくとも一枚の副水切り板が、下方に向かって立設されていることを特徴としている。   Further, between the main draining plate and the side plate portion in the cap portion, at least one sub draining plate extending along the extending direction is provided to stand downward. It is a feature.

本発明によれば、笠部における主水切り板と側板部との間に、少なくとも一枚の副水切り板を備えているので、仮に主水切り板よりも塀の側面側に雨水が回りこんだとしても、副水切り板によって雨水を下方に落下させることができる。したがって、雨水が笠部の下面を伝搬して塀の側面に到達するのを確実に抑制できる。とりわけ、副水切り板が笠部の排水孔よりも塀の側面側に設けられた場合には、排水孔から排水された雨水等が、塀の側面に到達するのを確実に遮断できる。   According to the present invention, since at least one auxiliary draining plate is provided between the main draining plate and the side plate portion in the shade portion, it is assumed that rainwater has flown to the side surface side of the kite than the main draining plate. In addition, rainwater can be dropped downward by the auxiliary draining plate. Therefore, it is possible to reliably suppress rainwater from propagating on the lower surface of the shade and reaching the side surface of the ridge. In particular, when the auxiliary draining plate is provided on the side surface of the dredging rather than the drainage hole of the cap portion, rainwater drained from the drainage hole can be reliably blocked from reaching the side of the dredging.

また、本発明の笠木施工方法は、前記塀本体の上端面に第一の前記笠木施工用部材と、第二の前記笠木施工用部材とを前記延設方向に離間して設置する第一設置工程と、第一の前記笠木施工用部材と、第二の前記笠木施工用部材との離間距離に対応して第三の前記笠木施工用部材を切断する切断工程と、第一の前記笠木施工用部材と、第二の前記笠木施工用部材との間に、切断した第三の前記笠木施工用部材を設置する第二設置工程と、を備えたことを特徴としている。   Further, the method for constructing a headboard of the present invention is a first installation in which the first headboard construction member and the second headboard construction member are spaced apart from each other in the extending direction on an upper end surface of the main body. A step of cutting the third member for constructing a headboard corresponding to a separation distance between the member for constructing the headboard and the second member for constructing the headboard, and the first member for constructing the headboard And a second installation step of installing the third member for constructing the headboard between the member for use and the second member for constructing the headboard.

本発明によれば、第一の笠木施工用部材と、第二の笠木施工用部材との離間距離に対応して第三の笠木施工用部材を切断する切断工程と、第一の笠木施工用部材と、第二の笠木施工用部材との間に、切断した第三の笠木施工用部材を設置する第二設置工程とを備えているので、所定の位置に第一の笠木施工用部材と、第二の笠木施工用部材とを設置しつつ、両笠木施工用部材の間に、第三の笠木施工用部材を精度よく設置できる。したがって、複数の笠木施工用部材を塀本体の上端面に連設して設置する際に、所定の位置に複数の笠木施工用部材を簡単に設置できる。したがって、笠木施工用部材の寸法誤差に起因する、笠木施工用部材の設置位置のズレを防止できるので、笠木を精度よく配設できる。   According to the present invention, the cutting process for cutting the third headboard construction member corresponding to the separation distance between the first headboard construction member and the second headboard construction member, and the first headboard construction Since there is a second installation step for installing the third member for construction of the cut headwood between the member and the member for second headboard construction, the first member for construction of the first headboard at a predetermined position In addition, while installing the second cap construction member, the third cap construction member can be accurately installed between the two cap construction members. Therefore, when installing a plurality of cap construction members in a row on the upper end surface of the main body, the plurality of cap construction members can be easily installed at predetermined positions. Therefore, since the shift of the installation position of the member for construction of the headboard caused by the dimensional error of the member for construction of the headboard can be prevented, the headboard can be arranged with high accuracy.

本発明によれば、笠側部の下方において下方に向かって立設された主水切り板を備えているので、笠木材料受部の上方に形成された笠木の側面を下方に向かって流れる雨水が、笠木材料受部の下面を伝搬したあと主水切り板によって下方に誘導されて落下することができる。しかも、主水切り板が上方から下方に向かって、塀の側面から離れるように外側に傾斜しているので、塀の側面から離反するように雨水を落下させることができる。したがって、雨水等によって運ばれた塵埃が塀に対して線状に付着する、いわゆる雨垂れ等の発生を効果的に抑制し、塀の汚損を抑制することができる。
また、天板部と側板部とにより隅部が形成されるので、この隅部と、塀本体の上端縁部とを合わせ、塀本体の上端縁部に沿って天板部を配置することにより、塀本体の上端面において塀本体の上端縁部に沿うように笠木施工用部材を簡単に設置できる。また、塀本体の上端縁部に沿うように笠木施工用部材を設置することにより、笠木施工用部材の壁部によって笠木材料を充填する領域を画成できる。したがって、型枠を設置することなく笠木材料を充填して、笠木を施工できる。さらに、笠木施工用部材は、除去されることなくそのまま笠木材料に埋設されるので、笠木の強度が確保できるとともに、従来のように型枠を取り外す工程が不要となる。したがって、簡単な施工作業で笠木を配設できる。
According to the present invention, since the main draining plate is provided to stand downward below the shade side portion, rainwater flowing downward on the side surface of the shade tree formed above the shade material receiving portion is provided. After propagating through the lower surface of the cap material receiving part, it can be guided downward by the main draining plate and fall down. And since the main draining board inclines outside so that it may leave | separate from the side surface of a ridge toward the downward direction from upper direction, rain water can be dropped so that it may separate from the side surface of a ridge. Accordingly, it is possible to effectively suppress the occurrence of so-called rain dripping, in which dust carried by rainwater or the like adheres linearly to the kite, and can suppress the stain of the kite.
Further, since the corner is formed by the top plate and the side plate, the corner and the upper edge of the heel body are combined, and the top plate is arranged along the upper edge of the heel body. The headboard construction member can be easily installed along the upper edge of the heel body on the upper surface of the heel body. Moreover, the area | region which fills a headboard material with the wall part of a headboard construction member can be demarcated by installing the headboard construction member along the upper end edge part of a coffin main body. Therefore, it is possible to construct the headboard by filling the headboard material without installing a formwork. Furthermore, since the member for constructing the headboard is buried in the headboard material as it is without being removed, the strength of the headboard can be ensured, and the step of removing the formwork as in the prior art becomes unnecessary. Therefore, the headboard can be arranged by a simple construction work.

笠木を備えた塀の斜視図である。It is a perspective view of a coffin provided with a cap. 図1のA−A線に沿った断面図である。It is sectional drawing along the AA line of FIG. 笠木施工用部材の斜視図である。It is a perspective view of the member for headboard construction. 笠木施工方法のフローチャートである。It is a flowchart of the Kasagi construction method. 笠木施工方法の説明図である。It is explanatory drawing of the headboard construction method. 笠木施工方法の説明図である。It is explanatory drawing of the headboard construction method.

以下に、本発明の実施形態にかかる笠木施工用部材について、図面を用いて説明する。
図1は、本実施形態の笠木施工用部材により施工された笠木5を備えた塀2の斜視図である。なお、以下では、塀2の幅方向を単に幅方向という。また、上下方向は、鉛直上下方向に相当する。
図1に示すように、塀2は、例えば建物1の外構に用いられるものであって、建物1を囲うように設けられている。
Below, the member for headboard construction concerning the embodiment of the present invention is explained using a drawing.
FIG. 1 is a perspective view of a gutter 2 provided with a headboard 5 constructed by the headrest construction member of the present embodiment. Hereinafter, the width direction of the ridge 2 is simply referred to as the width direction. The vertical direction corresponds to the vertical vertical direction.
As shown in FIG. 1, the eaves 2 are used, for example, for the exterior of the building 1 and are provided so as to surround the building 1.

図2は、図1のA−A線に沿った断面図である。
図2に示すように、塀2は、塀本体3と、塀本体3の側面3aを覆って塀2の側面2aを形成する仕上材6と、塀本体3の上部に設置された笠木5とにより構成されている。なお、以下の説明では、塀2の幅方向の中央において塀2に沿う面を仮想面Oとし、塀本体3の側面3aから見て、仮想面O側を内側といい、仮想面Oとは反対側を外側という。
FIG. 2 is a cross-sectional view taken along line AA in FIG.
As shown in FIG. 2, the heel 2 includes a heel body 3, a finishing material 6 that covers the side surface 3 a of the heel body 3 and forms the side surface 2 a of the heel 2, and a headboard 5 that is installed on the top of the heel body 3. It is comprised by. In the following description, a surface along the flange 2 in the center in the width direction of the flange 2 is referred to as a virtual surface O, and the virtual surface O side is referred to as an inner side when viewed from the side surface 3a of the flange body 3. The opposite side is called the outside.

塀本体3は、例えばコンクリート等からなるブロック材を複数積み上げることにより形成される。各ブロック材は、上下方向に連通する不図示の孔部が形成されており、不図示の鉄筋が挿通される。各ブロック材の孔部および各ブロック材の間には、モルタルやセメント等が充填されており、ブロック材、鉄筋および各ブロック材同士がモルタルやセメント等により固定される。
塀本体3の側面3aを覆う仕上材6は、例えばモルタルからなり、吹き付け塗装やコテ等により塗布することで形成される。仕上材6の厚さは、例えば10mm程度であり、後述する笠木施工用部材10の側板部15を埋設しつつ配設される。
The eaves body 3 is formed by stacking a plurality of block materials made of, for example, concrete. Each block member has a hole (not shown) communicating in the vertical direction, and a reinforcing bar (not shown) is inserted therethrough. Between the hole of each block material and each block material, mortar, cement, etc. are filled, and a block material, a reinforcing bar, and each block material are fixed with mortar, cement, etc.
The finishing material 6 that covers the side surface 3a of the ridge body 3 is made of, for example, mortar, and is formed by spray coating or troweling. The thickness of the finishing material 6 is, for example, about 10 mm, and is disposed while embedding a side plate portion 15 of the headboard construction member 10 described later.

笠木5は、塀本体3の上端面3bに設置される一対の笠木施工用部材10と、笠木5の外形を形成するモルタル等の笠木材料8(上部笠木材料8a、側部笠木材料8b)と、により構成されている。上部笠木材料8aにより形成される笠木5の上面は、幅方向の中間部から両外側に向かって、下方に漸次傾斜する傾斜面となっている。なお、笠木5の上面の傾斜角度はわずかであるため、各図では、平坦面として図示している。また、側部笠木材料8bにより形成される笠木5の側面は、垂直面となっている。   The headboard 5 includes a pair of headboard construction members 10 installed on the upper end surface 3 b of the main body 3, a headboard material 8 such as mortar that forms the outer shape of the headboard 5 (upper headboard material 8 a, side headboard material 8 b), , Is configured. The upper surface of the headboard 5 formed of the upper headboard material 8a is an inclined surface that gradually slopes downward from the middle in the width direction toward both outer sides. In addition, since the inclination angle of the upper surface of the headboard 5 is slight, each figure is illustrated as a flat surface. Moreover, the side surface of the headboard 5 formed of the side headboard material 8b is a vertical surface.

笠木施工用部材10は、塀本体3の上部に笠木5を配設するために設置されるものであって、塀本体3の上端面3bの上端縁部3cに沿うように、幅方向の両側に延設されている。なお、以下の説明において、上端縁部3cに対応する笠木施工用部材10の延設される方向を延設方向という。また、一対の笠木施工用部材10は、同一形状をしており、仮想面Oを挟んで対称となるように設置されている。したがって、以下の説明では、一方(図2における右側)の笠木施工用部材10について説明をし、他方(図2における左側)の笠木施工用部材10については説明を省略している。   The headboard construction member 10 is installed in order to dispose the headboard 5 on the upper part of the main body 3, and is arranged on both sides in the width direction so as to extend along the upper end edge 3 c of the upper end surface 3 b of the main body 3. It is extended to. In the following description, the direction in which the headboard construction member 10 corresponding to the upper edge 3c is extended is referred to as the extension direction. Further, the pair of headboard construction members 10 have the same shape, and are installed so as to be symmetric with respect to the virtual plane O. Therefore, in the following description, one (the right side in FIG. 2) headboard construction member 10 is described, and the other (the left side in FIG. 2) headboard construction member 10 is not described.

笠木施工用部材10は、例えばステンレスやアルミニウム等の耐腐食性に優れた金属や樹脂材料等により形成される板状の長尺部材であり、例えば押し出し成型により形成される。笠木施工用部材10は、主に天板部11と、笠部13と、側板部15と、笠側部16と、壁部17と、笠木材料受部19と、水返し板21と、主水切り板23とにより形成されている。以下に、笠木施工用部材10の各部について詳細に説明する。   The headboard construction member 10 is a plate-like long member formed of a metal or a resin material having excellent corrosion resistance such as stainless steel or aluminum, and is formed by, for example, extrusion molding. The headboard construction member 10 mainly includes a top plate portion 11, a cap portion 13, a side plate portion 15, a cap side portion 16, a wall portion 17, a headwood material receiving portion 19, a water return plate 21, It is formed by the draining plate 23. Below, each part of the member 10 for headboard construction is demonstrated in detail.

図3は、笠木施工用部材10の斜視図である。なお、図3では、笠木材料8および塀2を二点鎖線で図示している。
天板部11は、平板状に形成されており、塀本体3の上端縁部3cに対応する延設方向沿って塀本体3の上端面3bに延設されている。図3に示すように、天板部11の上面には、凹凸が形成されており、断面視で例えば略波型形状に形成されている。また、天板部11の内側端部は、上方に立ち上がるように形成されている。このように、天板部11の上面を略波型形状に形成するとともに、天板部11の内側端部を上方に立ち上がるように形成することで、天板部11の上面の表面積を増加させることができる。これにより、天板部11の上方に上部笠木材料8aを配設したときに、天板部11の上面と上部笠木材料8aとの密着面積を増大させることができる。したがって、上部笠木材料8aが固化したときに、天板部11と上部笠木材料8aとが互いに良好に密着できる。
FIG. 3 is a perspective view of the headboard construction member 10. In addition, in FIG. 3, the headboard material 8 and the ridge 2 are shown with the dashed-two dotted line.
The top plate portion 11 is formed in a flat plate shape, and extends on the upper end surface 3 b of the heel body 3 along the extending direction corresponding to the upper edge portion 3 c of the heel body 3. As shown in FIG. 3, the top surface of the top plate portion 11 is uneven, and is formed in, for example, a substantially wave shape in a cross-sectional view. Moreover, the inner side edge part of the top-plate part 11 is formed so that it may stand up. Thus, while forming the upper surface of the top plate part 11 in a substantially wave shape, the surface area of the upper surface of the top plate part 11 is increased by forming the inner end of the top plate part 11 so as to rise upward. be able to. Thereby, when the upper headboard material 8a is disposed above the top plate portion 11, the contact area between the upper surface of the top plate portion 11 and the upper headboard material 8a can be increased. Therefore, when the upper headboard material 8a is solidified, the top plate portion 11 and the upper headboard material 8a can be in good contact with each other.

また、天板部11には、複数の貫通孔11aが形成されている。貫通孔11aは、例えば延設方向に沿って等間隔に、かつ幅方向に2列に並んで設けられている。貫通孔11aを設けることにより、例えばコンクリートボンド等の接着剤を用いて塀本体3の上端面3bに天板部11を配置する際に、貫通孔11aに接着剤が入り込むので、塀本体3の上端面3bに天板部11を強固に固定できる。したがって、笠木施工用部材10の脱落を防止して、笠木5の施工作業を安定して行うことができる。   The top plate portion 11 has a plurality of through holes 11a. The through holes 11a are provided, for example, at equal intervals along the extending direction and in two rows in the width direction. By providing the through-hole 11a, for example, when the top plate portion 11 is disposed on the upper end surface 3b of the heel body 3 using an adhesive such as concrete bond, the adhesive enters the through-hole 11a. The top plate portion 11 can be firmly fixed to the upper end surface 3b. Therefore, it is possible to prevent the falling member 10 of the headboard construction from falling off and stably perform the construction work of the headboard 5.

笠部13は、天板部11から塀本体3の外側に向かって張り出し形成されている。笠部13の上面には、天板部11の上面と同様に凹凸が形成されており、断面視で例えば略波型形状に形成されている。笠部13の上方には、上部笠木材料8aが配設される。
また、笠部13には、上下方向に貫通する排水孔13aが複数形成されている。排水孔13aは、例えば延設方向を長軸方向とし、幅方向を短軸方向とする長円形状に形成されている。排水孔13aを設けることにより、笠木材料8に浸透した水分を排出できるようになっている。
The shade portion 13 is formed so as to project from the top plate portion 11 toward the outside of the bag main body 3. Concavities and convexities are formed on the top surface of the shade portion 13 in the same manner as the top surface of the top plate portion 11, and are formed in, for example, a substantially wave shape in a cross-sectional view. An upper head material 8a is disposed above the head portion 13.
Further, the cap portion 13 is formed with a plurality of drain holes 13a penetrating in the vertical direction. For example, the drain hole 13a is formed in an oval shape in which the extending direction is the major axis direction and the width direction is the minor axis direction. By providing the drain hole 13a, the water that has permeated the headboard material 8 can be discharged.

図2に示すように、側板部15は、天板部11と笠部13との境界部分において、塀本体3の側面3aに沿って下方に向かって立設されている。天板部11と側板部15との間に形成される隅部は、略直角に形成されている。この隅部と、塀本体3の上端縁部3cとを合わせて位置決めしつつ、笠木施工用部材10を配設している。側板部15は、塀本体3に塗布される仕上材6に埋設されて固定される。
笠側部16は、笠部13の外側端部から下方に向かって立設されている。笠側部16は、笠部13と側板部15とともに、下方に開口を有する凹部10aを形成している。この凹部10aにより、雨水等が笠側部16および笠部13を伝搬して塀2に到達するのを抑制している。
As shown in FIG. 2, the side plate portion 15 is erected downward along the side surface 3 a of the basket main body 3 at the boundary portion between the top plate portion 11 and the shade portion 13. The corner formed between the top plate portion 11 and the side plate portion 15 is formed at a substantially right angle. The headboard construction member 10 is disposed while positioning the corner and the upper edge 3c of the main body 3 together. The side plate portion 15 is embedded and fixed in the finishing material 6 applied to the ridge body 3.
The shade side portion 16 is erected downward from the outer end portion of the shade portion 13. The shade side part 16 forms the recessed part 10a which has an opening below with the shade part 13 and the side plate part 15. The concave portion 10a prevents rainwater or the like from propagating through the shade side portion 16 and the shade portion 13 and reaching the ridge 2.

また、側板部15と笠側部16との間には、笠部13の下面から下方に向かって、マーク板14が立設されている。マーク板14は、塀本体3の側面3aに仕上材6を塗布する際の目印として機能する。具体的には、マーク板14の外側面と面一となるように、塀本体3の側面3aに仕上材6を塗布することにより、仕上材6の厚さの目印とすることができる。   A mark plate 14 is erected between the side plate portion 15 and the shade side portion 16 from the lower surface of the shade portion 13 downward. The mark plate 14 functions as a mark when the finishing material 6 is applied to the side surface 3a of the main body 3. Specifically, by applying the finishing material 6 to the side surface 3a of the main body 3 so as to be flush with the outer side surface of the mark plate 14, a mark for the thickness of the finishing material 6 can be obtained.

壁部17は、基端部が笠部13の外側端部から上方に向かって垂直方向に立設されており、先端部が下方から上方に向かって塀本体3の外側に漸次傾斜する傾斜片17aとなっている。壁部17の傾斜片17aにおける先端部17bは、例えば断面視でT字形状に形成されるとともに、先端面が外側に膨出した凸曲面状に形成されている。
図3に示すように、傾斜片17aには、貫通孔17cが形成されている。貫通孔17cは、例えば延設方向に沿って等間隔に、かつ幅方向に2列に並んで設けられている。貫通孔17cを形成することにより、笠木施工用部材10に笠木材料8を充填した際に、貫通孔17cに笠木材料8が食い込むので、笠木材料8が固化した後に壁部17から剥離するのを抑制できる。
The wall portion 17 has a base end portion standing in a vertical direction upward from the outer end portion of the shade portion 13, and an inclined piece whose tip end portion gradually inclines outward from the lower portion toward the upper side of the bag body 3. 17a. The tip portion 17b of the inclined piece 17a of the wall portion 17 is formed in, for example, a T-shape in a cross-sectional view, and is formed in a convex curved shape whose tip surface bulges outward.
As shown in FIG. 3, a through hole 17c is formed in the inclined piece 17a. The through holes 17c are provided, for example, at equal intervals along the extending direction and in two rows in the width direction. By forming the through-hole 17c, when the headboard construction member 10 is filled with the headboard material 8, the headboard material 8 bites into the through-hole 17c, so that the headboard material 8 is separated from the wall portion 17 after solidifying. Can be suppressed.

壁部17の端部には、クリップ25(請求項の「係止部」に相当。)が設けられている。クリップ25は、例えば樹脂材料等により形成された板状部材であり、延設方向を長軸方向とする長円形状に形成されている。クリップ25の長手方向の両端には、例えば壁部17の傾斜片17aに形成された貫通孔17cに係止可能な不図示の爪部を有している。クリップ25は、一方の爪部が一の笠木施工用部材10における壁部17の貫通孔17cに係止され、他方の爪部が他の笠木施工用部材10における壁部17の貫通孔17cに係止されることにより、一の笠木施工用部材10と他の笠木施工用部材10とを接続する。   A clip 25 (corresponding to “locking portion” in the claims) is provided at an end of the wall portion 17. The clip 25 is a plate-like member formed of, for example, a resin material, and is formed in an oval shape with the extending direction as the major axis direction. At both ends in the longitudinal direction of the clip 25, for example, a claw portion (not shown) that can be locked in a through hole 17 c formed in the inclined piece 17 a of the wall portion 17 is provided. One end of the clip 25 is locked to the through-hole 17c of the wall portion 17 of the one member 10 for constructing the headboard, and the other pawl portion is connected to the through-hole 17c of the wall portion 17 of the other member 10 for constructing the headboard. By being locked, one head member 10 and another member 10 are connected.

クリップ25は、壁部17の内側主面および外側主面の少なくともいずれか一方の主面に設けられる。とりわけ、クリップ25は、壁部17の外側主面に設けられるのが好ましい。クリップ25を壁部17の外側主面に設けることにより、笠木5の施工時において、複数の笠木施工用部材10の壁部17よりも内側の領域に上部笠木材料8aを充填したときであっても、笠木施工用部材10が外側に脱落するのを防止できる。したがって、笠木5の施工作業を安定して行うことができる。   The clip 25 is provided on at least one of the inner main surface and the outer main surface of the wall portion 17. In particular, the clip 25 is preferably provided on the outer main surface of the wall portion 17. By providing the clip 25 on the outer main surface of the wall portion 17, when the headboard 5 is constructed, the upper headboard material 8a is filled in the region inside the wall portion 17 of the plurality of headboard construction members 10. Moreover, it can prevent that the member 10 for a cap construction is dropped out. Therefore, the construction work of the headboard 5 can be performed stably.

図2に示すように、笠木材料受部19は、壁部17の下方において、塀本体3の外側に向かって、水平方向に沿うように張り出し形成されている。笠木材料受部19は、笠側部16の下端部から幅方向における壁部17の張り出し位置と略同一の位置まで、水平方向に張り出し形成されている。壁部17と笠木材料受部19との間には、笠木5を形成する側部笠木材料8bが充填される。
笠木材料受部19の外側端部は、上方に突出した鉤部19aとなっている。鉤部19aは断面視でクランク形状に形成されている。鉤部19aは、施工後の側部笠木材料8bに埋設されることにより、側部笠木材料8bが固化した後に、側部笠木材料8bが笠木材料受部19から剥離するのを抑制している。
As shown in FIG. 2, the headboard material receiving portion 19 is formed so as to extend along the horizontal direction toward the outside of the main body 3 below the wall portion 17. The headboard material receiving portion 19 is formed so as to protrude in the horizontal direction from the lower end portion of the cap side portion 16 to a position substantially the same as the position of the wall portion 17 in the width direction. Between the wall portion 17 and the headboard material receiving portion 19, the side headboard material 8 b that forms the headboard 5 is filled.
The outer end portion of the cap material receiving portion 19 is a flange portion 19a protruding upward. The flange portion 19a is formed in a crank shape in a sectional view. The eaves part 19a is embedded in the side headboard material 8b after construction, thereby suppressing the side headboard material 8b from being peeled off from the headboard material receiving part 19 after the side headboard material 8b is solidified. .

水返し板21は、延設方向に沿って延在するとともに、天板部11と笠部13との境界部分において上方に向かって立設されている。水返し板21の先端部は、外側に屈曲形成されている。水返し板21は、例えば笠木材料8と壁部17との間等から笠木5の内部に浸透した水分が、水返し板21よりも内側に浸透するのを抑制している。これにより、笠木5の内部に浸透した水分が、塀本体3に到達するのを妨げている。
ここで、前述した排水孔13aは、水返し板21と壁部17との間であって、水返し板21よりも外側に設けられている。これにより、水返し板21により内側への浸透が妨げられた水分は、排水孔13aから排出される。
The water return plate 21 extends along the extending direction and is erected upward at a boundary portion between the top plate portion 11 and the shade portion 13. The tip of the water return plate 21 is bent outward. The water turnover plate 21 suppresses, for example, moisture that has permeated into the headboard 5 from between the headboard material 8 and the wall portion 17 and the like from the water turnover plate 21. Thereby, the water | moisture content which osmose | permeated the inside of the coping 5 has prevented reaching to the coffin main body 3. FIG.
Here, the drain hole 13 a described above is provided between the water return plate 21 and the wall portion 17 and outside the water return plate 21. Thereby, the water | moisture content which the penetration | infiltration to the inner side was prevented by the water return board 21 is discharged | emitted from the drainage hole 13a.

主水切り板23は、笠側部16の下方において、延設方向に沿って延在するとともに、下方に向かって立設されている。主水切り板23は、上方から下方に向かって、塀2の側面2aから離れるように外側に傾斜している。主水切り板23の垂直方向に対する傾斜角度は、例えば45°程度に設定されている。主水切り板23は、基端側から先端側に向かって、板厚が漸次狭くなるように形成されている。主水切り板23は、雨水等が笠木5の側面および笠木材料受部19の下面を伝搬して、塀2の側面2aに流れるのを遮断するとともに、遮断した雨水等を下方に滴下している。   The main draining plate 23 extends along the extending direction below the shade side portion 16 and is erected downward. The main draining plate 23 is inclined outward from the upper side to the lower side so as to be separated from the side surface 2a of the heel 2. The inclination angle of the main draining plate 23 with respect to the vertical direction is set to about 45 °, for example. The main draining plate 23 is formed so that the plate thickness gradually decreases from the proximal end side toward the distal end side. The main draining plate 23 blocks rainwater and the like from propagating along the side surface of the headboard 5 and the lower surface of the headboard material receiving portion 19 and flowing to the side surface 2a of the heel 2 and dropping the blocked rainwater and the like downward. .

主水切り板23と側板部15との間であって、マーク板14よりも外側には、副水切り板24が一枚設けられている。副水切り板24は、主水切り板23により遮断できなかった雨水等が塀2に伝搬するのを遮断している。また、本実施形態の副水切り板24は、笠部13の排水孔13aよりも塀2の側面2a側に設けられている。これにより、副水切り板24は、水返し板21により堰き止められて排水孔13aから排水された雨水等が、塀2に伝搬するのを遮断している。
副水切り板24の先端部24aは、上方から下方に向かって塀2から漸次離れる傾斜面となっている。したがって、副水切り板24は、先端部24aのうち塀2から離間した位置において、雨水等を落下させることができる。
One sub draining plate 24 is provided between the main draining plate 23 and the side plate portion 15 and outside the mark plate 14. The auxiliary draining plate 24 blocks rainwater or the like that could not be blocked by the main draining plate 23 from propagating to the fence 2. Further, the sub draining plate 24 of the present embodiment is provided on the side surface 2 a side of the ridge 2 with respect to the drain hole 13 a of the cap portion 13. As a result, the sub draining plate 24 blocks the propagation of rainwater or the like drained from the drain hole 13 a by being dammed by the water return plate 21 to the dredger 2.
The front end portion 24a of the auxiliary draining plate 24 is an inclined surface that gradually separates from the flange 2 from the upper side to the lower side. Therefore, the sub draining plate 24 can drop rainwater or the like at a position away from the ridge 2 in the tip portion 24a.

(笠木施工方法)
図4は、笠木施工方法のフローチャートである。
次に、上記のように形成された本実施形態の笠木施工用部材10を用いた笠木施工方法について説明をする。
図4に示すように、笠木施工用部材10を用いた笠木施工方法は、笠木施工用部材設置工程S101と、笠木材料充填工程S103と、整形工程S105とを備えている。以下に、各工程について説明する。
(Kasagi construction method)
FIG. 4 is a flowchart of the headboard construction method.
Next, a method for constructing a headboard using the headboard construction member 10 of the present embodiment formed as described above will be described.
As shown in FIG. 4, the method for constructing a headboard using the headboard construction member 10 includes a headboard construction member installation step S101, a headwood material filling step S103, and a shaping step S105. Below, each process is demonstrated.

図5および図6は、笠木施工方法の説明図である。
笠木施工用部材設置工程S101は、第一設置工程S101Aと、切断工程S101Bと、第二設置工程S101Cとを備えている。
まず、図5に示すように、第一設置工程S101Aを行う。第一設置工程S101Aでは、塀本体3の上端面3bに第一の笠木施工用部材10Aと、第二の笠木施工用部材10Bとを延設方向に離間して設置する。このとき、例えばコンクリートボンド等の接着剤を用いて、塀本体3の上端面3bに第一の笠木施工用部材10Aおよび第二の笠木施工用部材10Bの天板部11(図2参照)を接着することにより、第一の笠木施工用部材10Aと第二の笠木施工用部材10Bとを設置する。
5 and 6 are explanatory diagrams of the coping construction method.
Head member construction member installation process S101 is provided with 1st installation process S101A, cutting process S101B, and 2nd installation process S101C.
First, as shown in FIG. 5, the first installation step S101A is performed. In the first installation step S101A, the first headboard construction member 10A and the second headboard construction member 10B are installed on the upper end surface 3b of the rod main body 3 separately in the extending direction. At this time, for example, by using an adhesive such as a concrete bond, the top board portion 11 (see FIG. 2) of the first headboard construction member 10A and the second headboard construction member 10B is formed on the upper end surface 3b of the main body 3. By bonding, the first cap construction member 10A and the second cap construction member 10B are installed.

続いて、切断工程S101Bを行う。切断工程S101Bでは、第一の笠木施工用部材10Aと、第二の笠木施工用部材10Bとの離間距離Dに対応して第三の笠木施工用部材10Cを切断する。これにより、長さDを有する第三の笠木施工用部材10Cを得ることができる。なお、図5においては、第三の笠木施工用部材10Cの切断位置を破線で図示している。   Subsequently, the cutting step S101B is performed. In the cutting step S101B, the third headboard construction member 10C is cut corresponding to the distance D between the first headboard construction member 10A and the second headboard construction member 10B. Thereby, the member 10C for 3rd headboard construction which has length D can be obtained. In addition, in FIG. 5, the cutting position of the member 10C for 3rd headrest construction is shown with the broken line.

続いて、図6に示すように、第二設置工程S101Cを行う。第二設置工程S101Cでは、第一の笠木施工用部材10Aと、第二の笠木施工用部材10Bとの間に、切断した第三の笠木施工用部材10Cを設置する。第二設置工程S101Cでは、接着剤を用いて、塀本体3の上端面3bに第三の笠木施工用部材10Cの天板部11(図2参照)を接着するとともに、クリップ25により、第一の笠木施工用部材10Aおよび第二の笠木施工用部材10Bに第三の笠木施工用部材10Cを係止する。   Then, as shown in FIG. 6, 2nd installation process S101C is performed. In the second installation step S101C, the cut third cap construction member 10C is installed between the first cap construction member 10A and the second cap construction member 10B. In the second installation step S101C, the top plate portion 11 (see FIG. 2) of the third coping member 10C is bonded to the upper end surface 3b of the eaves body 3 using an adhesive, and the clip 25 is used to The third cap member 10C and the second cap member 10B are engaged with the third cap member 10C.

続いて、笠木材料充填工程S103を行う。笠木材料充填工程S103は、上部笠木材料充填工程S103Aと、側部笠木材料充填工程S103Bとを備えている。
まず、上部笠木材料充填工程S103Aを行う。上部笠木材料充填工程S103Aでは、複数の笠木施工用部材10の壁部17により画成された充填領域に、上部笠木材料8a(図2参照)を充填する。
続いて、側部笠木材料充填工程S103Bを行う。側部笠木材料充填工程S103Bでは、複数の笠木施工用部材10の壁部17と、笠木材料受部19との間に、側部笠木材料8b(図2参照)を充填する。
ここで、笠木材料充填工程S103では、上部笠木材料充填工程S103Aを行った後で側部笠木材料充填工程S103Bを行う。仮に、側部笠木材料充填工程S103Bを先に行った場合には、側部笠木材料8b(図2参照)の重量により、笠木施工用部材10が塀本体3の上端部から脱落するおそれがあるためである。
Subsequently, a cap material filling step S103 is performed. The headboard material filling step S103 includes an upper headwood material filling step S103A and a side headwood material filling step S103B.
First, the upper headwood material filling step S103A is performed. In the upper headwood material filling step S103A, the upper headwood material 8a (see FIG. 2) is filled into the filling region defined by the wall portions 17 of the plurality of headboard construction members 10.
Subsequently, the side headwood material filling step S103B is performed. In the side headwood material filling step S103B, the side headwood material 8b (see FIG. 2) is filled between the wall portion 17 of the plurality of headboard construction members 10 and the headboard material receiving portion 19.
Here, in the headwood material filling step S103, the side headwood material filling step S103B is performed after the upper headwood material filling step S103A. If the side headwood material filling step S103B is performed first, the headboard construction member 10 may drop from the upper end of the main body 3 due to the weight of the side headstock material 8b (see FIG. 2). Because.

続いて、整形工程S105を行う。整形工程S105では、充填された上部笠木材料8a(図2参照)の上面をコテ等で均して笠木5の上面を形成する。このとき、複数の笠木施工用部材10の壁部17の先端部17bにコテを当接させて移動させる。これにより、充填された上部笠木材料8aの上面は、複数の壁部17の先端部17bを接続して形成される仮想面に沿って平坦に形成される(図2参照)。
また、充填された側部笠木材料8b(図2参照)の側面をコテ等で均して笠木5の側面を形成する。このとき、複数の笠木施工用部材10の壁部17の先端部17bおよび笠木材料受部19の鉤部19aの先端部にコテを当接させて移動させる。これにより、充填された側部笠木材料8bの側面は、複数の笠木施工用部材10の壁部17の先端部および笠木材料受部19の鉤部19aの先端部を接続して形成される仮想面に沿って平坦に形成される(図2参照)。
そして、複数の笠木施工用部材10を埋設した状態で、上部笠木材料8aおよび側部笠木材料8bが固化することにより、笠木5が形成される。
Subsequently, a shaping step S105 is performed. In the shaping step S105, the upper surface of the upper headboard material 8a (see FIG. 2) filled is leveled with a trowel or the like to form the upper surface of the headboard 5. At this time, the iron is brought into contact with the distal end portion 17b of the wall portion 17 of the plurality of headboard construction members 10 and moved. Thereby, the upper surface of the filled upper headstock material 8a is formed flat along a virtual surface formed by connecting the tip portions 17b of the plurality of wall portions 17 (see FIG. 2).
Further, the side surface of the filled side portion head material 8b (see FIG. 2) is leveled with a trowel or the like to form the side surface of the head member 5. At this time, the iron is brought into contact with the distal end portion 17b of the wall portion 17 of the plurality of head member construction members 10 and the distal end portion of the flange portion 19a of the head member receiving portion 19 and moved. Thereby, the side surface of the filled side headstock material 8b is formed by connecting the front ends of the wall portions 17 of the plurality of headboard construction members 10 and the front ends of the collar portions 19a of the headboard material receiving portions 19. It is formed flat along the surface (see FIG. 2).
Then, in a state where a plurality of headstock construction members 10 are embedded, the headboard material 8a and the side headboard material 8b are solidified, whereby the headboard 5 is formed.

本実施形態によれば、笠側部16の下方において下方に向かって立設された主水切り板23を備えているので、笠木材料受部19の上方に形成された笠木5の側面を下方に向かって流れる雨水が、笠木材料受部19の下面を伝搬したあと主水切り板23によって下方に誘導されて落下することができる。しかも、主水切り板23が上方から下方に向かって、塀2の側面2aから離れるように外側に傾斜しているので、塀2の側面2aから離反するように雨水を落下させることができる。したがって、雨水等によって運ばれた塵埃が塀2に対して線状に付着する、いわゆる雨垂れ等の発生を効果的に抑制し、塀2の汚損を抑制することができる。
また、天板部11と側板部15とにより隅部が形成されるので、この隅部と、塀本体3の上端縁部3cとを合わせ、塀本体3の上端縁部3cに沿って天板部11を配置することにより、塀本体3の上端面3bにおいて塀本体の上端縁部3cに沿うように笠木施工用部材10を簡単に設置できる。また、塀本体3の上端縁部3cに沿うように笠木施工用部材10を設置することにより、笠木施工用部材10の壁部17によって笠木材料8を充填する領域を画成できる。したがって、型枠を設置することなく笠木材料8を充填して、笠木を施工できる。さらに、笠木施工用部材10は、除去されることなくそのまま笠木材料8に埋設されるので、笠木5の強度が確保できるとともに、従来のように型枠を取り外す工程が不要となる。したがって、簡単な施工作業で笠木5を配設できる。
According to the present embodiment, since the main draining plate 23 is erected downward below the shade side portion 16, the side surface of the shade 5 formed above the shade material receiving portion 19 is directed downward. The rainwater that flows toward the head can be dropped by being guided downward by the main draining plate 23 after propagating through the lower surface of the headboard material receiving portion 19. And since the main draining board 23 inclines outside so that it may leave | separate from the side surface 2a of the eaves 2 toward the downward direction from the upper direction, rain water can be dropped so that it may separate from the side surface 2a of the eaves 2. Therefore, it is possible to effectively suppress the occurrence of so-called rain dripping or the like, in which dust carried by rainwater or the like adheres linearly to the ridge 2, and can suppress the contamination of the ridge 2.
Further, since the corner portion is formed by the top plate portion 11 and the side plate portion 15, the corner portion and the upper end edge portion 3 c of the heel body 3 are combined, and the top plate is formed along the upper end edge portion 3 c of the heel body 3. By arranging the portion 11, the headboard construction member 10 can be easily installed along the upper edge 3 c of the heel body on the upper end surface 3 b of the heel body 3. In addition, by installing the headboard construction member 10 along the upper edge 3c of the main body 3, it is possible to define a region where the headboard material 8 is filled by the wall portion 17 of the headboard construction member 10. Therefore, the headboard material 8 can be filled and the headboard can be constructed without installing a formwork. Furthermore, since the headboard construction member 10 is buried in the headboard material 8 as it is without being removed, the strength of the headboard 5 can be secured, and the conventional process of removing the formwork becomes unnecessary. Therefore, the headboard 5 can be disposed by a simple construction work.

また、天板部11に貫通孔11aを設けることにより、接着剤を用いて塀本体3の上端面3bに天板部11を配置する際に、貫通孔11aに接着剤が入り込むので、塀本体3の上端面3bに天板部11を強固に固定できる。したがって、笠木施工用部材10の脱落を防止して、笠木5の施工作業を安定して行うことができる。   Further, by providing the through hole 11a in the top plate part 11, when the top plate part 11 is arranged on the upper end surface 3b of the bag main body 3 using an adhesive, the adhesive enters the through hole 11a. The top plate portion 11 can be firmly fixed to the upper end surface 3b of 3. Therefore, it is possible to prevent the falling member 10 of the headboard construction from falling off and stably perform the construction work of the headboard 5.

また、水返し板21が塀本体3の外側に配置されているので、塀本体3の外側において、水返し板21よりも内側に水分が浸透するのを妨げることができる。これにより、笠木5の内部に浸透した水分が、塀本体3に到達するのを妨げることができるので、塀本体3の腐食を抑制できる。   In addition, since the water return plate 21 is disposed outside the jar body 3, it is possible to prevent moisture from penetrating inside the water return plate 21 outside the jar body 3. Thereby, since the water | moisture content which osmose | permeated the inside of the headboard 5 can be prevented from reaching the cocoon main body 3, corrosion of the cocoon main body 3 can be suppressed.

また、水返し板21により浸透が妨げられた水分を排水孔13aから排出できるので、水分が塀本体3に浸透するのを確実に抑制できる。   Moreover, since the water whose permeation was prevented by the water return plate 21 can be discharged from the drain hole 13a, it is possible to reliably suppress the water from penetrating into the main body 3.

また、壁部17の端部に他の笠木施工用部材10の壁部17と係止可能なクリップ25を設けることにより、塀本体3の上端縁部3cに沿うように笠木施工用部材10を設置する際に、複数の笠木施工用部材10を互いに係止して連設できる。したがって、笠木施工用部材10の大型化を抑制しつつ、複数の笠木施工用部材10の壁部17によって笠木材料8を充填する領域を画成できる。   In addition, by providing a clip 25 that can be locked to the wall portion 17 of the other headboard construction member 10 at the end portion of the wall portion 17, the headboard construction member 10 can be moved along the upper edge 3 c of the main body 3. At the time of installation, a plurality of headboard construction members 10 can be locked to each other. Therefore, it is possible to define a region where the headboard material 8 is filled by the wall portions 17 of the plurality of headboard construction members 10 while suppressing an increase in the size of the headboard construction member 10.

また、笠部13における主水切り板23と側板部15との間に、副水切り板24を備えているので、仮に主水切り板23よりも塀2の側面2a側に雨水が回りこんだとしても、副水切り板24によって雨水を下方に落下させることができる。したがって、雨水が笠部13の下面を伝搬して塀2の側面に到達するのを確実に抑制できる。とりわけ、本実施形態の副水切り板24は、笠部13の排水孔13aよりも塀2の側面2a側に設けられているので、水返し板21により堰き止められて排水孔13aから排水された雨水等が、塀2の側面2aに到達するのを確実に遮断できる。   In addition, since the auxiliary draining plate 24 is provided between the main draining plate 23 and the side plate portion 15 in the shade portion 13, even if rainwater circulates to the side surface 2 a side of the basket 2 from the main draining plate 23. The rainwater can be dropped downward by the auxiliary draining plate 24. Therefore, it is possible to reliably suppress the rainwater from propagating on the lower surface of the shade portion 13 and reaching the side surface of the ridge 2. In particular, since the auxiliary draining plate 24 of the present embodiment is provided on the side surface 2a side of the trough 2 with respect to the drainage hole 13a of the cap portion 13, it is dammed by the water return plate 21 and drained from the drainage hole 13a. Rainwater or the like can be reliably blocked from reaching the side surface 2a of the gutter 2.

また、第一の笠木施工用部材10Aと、第二の笠木施工用部材10Bとの離間距離Dに対応して第三の笠木施工用部材10Cを切断する切断工程S101Bと、第一の笠木施工用部材10Aと、第二の笠木施工用部材10Bとの間に、切断した第三の笠木施工用部材10Cを設置する第二設置工程S101Cとを備えているので、所定の位置に第一の笠木施工用部材10Aと、第二の笠木施工用部材10Bとを設置しつつ、両笠木施工用部材10A,10Bの間に、第三の笠木施工用部材10Cを精度よく設置できる。したがって、複数の笠木施工用部材10を塀本体3の上端面3bに連設して設置する際に、所定の位置に複数の笠木施工用部材10を簡単に設置できる。したがって、笠木施工用部材10の寸法誤差に起因する、笠木施工用部材10の設置位置のズレを防止できるので、笠木5を精度よく配設できる。   In addition, a cutting step S101B for cutting the third cap construction member 10C corresponding to the separation distance D between the first cap construction member 10A and the second cap construction member 10B, and the first cap construction Since the second installation step S101C for installing the cut third headboard construction member 10C is provided between the member 10A for construction and the second headboard construction member 10B, the first part is placed at a predetermined position. While installing the headboard construction member 10A and the second headboard construction member 10B, the third headboard construction member 10C can be accurately placed between the two headboard construction members 10A and 10B. Therefore, when a plurality of headstock construction members 10 are installed to be connected to the upper end surface 3b of the main body 3, the plurality of headboard construction members 10 can be easily installed at predetermined positions. Therefore, since the shift of the installation position of the member 100 for construction of the head due to the dimensional error of the member 10 for construction of the head can be prevented, the headstock 5 can be arranged with high accuracy.

なお、この発明の技術範囲は上記実施の形態に限られるものではなく、本発明の趣旨を逸脱しない範囲において種々の変更を加えることが可能である。   The technical scope of the present invention is not limited to the above embodiment, and various modifications can be made without departing from the spirit of the present invention.

各実施形態では、笠木材料8としてモルタルを用いていた。しかし、笠木材料8はモルタルに限られず、例えばコンクリートや樹脂材料等であってもよい。   In each embodiment, mortar is used as the headboard material 8. However, the headboard material 8 is not limited to mortar, and may be, for example, concrete or resin material.

実施形態では、塀本体3の外側の上端縁部3cに沿って笠木施工用部材10を直線状に設置していたが、例えば塀本体3の長手方向の端部における塀本体3の上端縁部3cに沿って、U字形状に笠木施工用部材10を設置してもよい(図5における塀本体3の長手方向の端部に設置された笠木施工用部材10を参照。)。
また、塀2が屈曲している場合についても同様に、屈曲した塀本体3の上端縁部3cに沿って、塀本体3の内側隅部(入隅)および外側角部(出隅)に笠木施工用部材10を設置してもよい。
In the embodiment, the headboard construction member 10 is installed in a straight line along the upper end edge 3c on the outer side of the main body 3. For example, the upper end edge of the main body 3 at the end in the longitudinal direction of the main body 3 is used. The headboard construction member 10 may be installed in a U shape along 3c (refer to the headboard construction member 10 installed at the longitudinal end of the main body 3 in FIG. 5).
Similarly, in the case where the heel 2 is bent, the headboard 3 is placed at the inner corner (entrance corner) and the outer corner (outer corner) of the heel body 3 along the upper edge 3c of the bent heel body 3. You may install the member 10 for construction.

笠木施工用部材10の形状や材質等は、実施形態に限定されない。また、実施形態では、複数の笠木施工用部材10を連設していたが、複数の笠木施工用部材10を一体成形してもよい。
また、仕上材6により塀本体3の側面3aを覆って塀2を形成していたが、仕上材6により塀本体3の側面3aを覆うことなく塀2を形成してもよい。この場合は、塀本体3の側面3aが塀2の側面2aに相当する。
また、実施形態では、副水切り板24を一枚形成していたが、枚数は一枚に限られることはなく、複数枚であってもよい。
The shape, material, and the like of the member for constructing the headboard 10 are not limited to the embodiment. Further, in the embodiment, the plurality of headboard construction members 10 are provided continuously, but the plurality of headboard construction members 10 may be integrally formed.
Further, the side face 3 a of the heel body 3 is covered with the finishing material 6 to form the heel 2, but the heel 2 may be formed without covering the side face 3 a of the heel body 3 with the finishing material 6. In this case, the side surface 3 a of the heel body 3 corresponds to the side surface 2 a of the heel 2.
In the embodiment, one sub draining plate 24 is formed. However, the number of sub drainage plates 24 is not limited to one, and a plurality of sub draining plates 24 may be used.

その他、本発明の趣旨を逸脱しない範囲で、上記した実施の形態における構成要素を周知の構成要素に置き換えることは適宜可能である。   In addition, it is possible to appropriately replace the components in the above-described embodiments with known components without departing from the spirit of the present invention.

3 塀本体
3b 上端面
3c 上端縁部
5 笠木
8 笠木材料
10 笠木施工用部材
10A 第一の笠木施工用部材
10B 第二の笠木施工用部材
10C 第三の笠木施工用部材
11 天板部
11a 貫通孔
13 笠部
13a 排水孔
15 側板部
16 笠側部
17 壁部
17a 傾斜片
19 笠木材料受部
21 水返し板
23 主水切り板
24 副水切り板
25 クリップ(係止部)
S101A 第一設置工程
S101B 切断工程
S101C 第二設置工程
3 Hail body 3b Upper end surface 3c Upper end edge portion 5 Coping 8 Coping material 10 Coping construction member 10A First coping construction member 10B Second coping construction member 10C Third coping construction member 11 Top plate portion 11a Through Hole 13 Shade portion 13a Drain hole 15 Side plate portion 16 Shade side portion 17 Wall portion 17a Inclined piece 19 Coping material receiving portion 21 Water return plate 23 Main drainer plate 24 Sub drainage plate 25 Clip (locking portion)
S101A First installation step S101B Cutting step S101C Second installation step

Claims (6)

塀の上部の笠木を配設するために、塀本体の上端縁部に対応する延設方向に沿って設置される笠木施工用部材であって、
前記延設方向に沿って前記塀本体の上端面に配置され、上方に笠木材料が配設される天板部と、
前記天板部から前記塀本体の外側に向かって張り出し形成され、上方に前記笠木材料が配設される笠部と、
前記天板部と前記笠部との境界部分において、前記塀本体の側面に沿って下方に向かって立設された側板部と、
前記笠部の外側端部から下方に向かって立設された笠側部と、
前記笠部の外側端部から上方に向かって立設され、下方から上方に向かって前記塀本体の外側に漸次傾斜する傾斜片を有する壁部と、
前記壁部の下方において、前記塀本体の外側に向かって張り出し形成され、上方に前記笠木材料が配設される笠木材料受部と、
前記笠側部の下方において、前記延設方向に沿って延在するとともに、下方に向かって立設された主水切り板と、
を備え、
前記主水切り板は、上方から下方に向かって、前記塀の側面から離れるように外側に傾斜し
前記笠部には、前記延設方向に沿って延在する水返し板が上方に向かって立設され、
前記水返し板は、前記塀本体の外側に配置されていることを特徴とする笠木施工用部材。
In order to dispose the headboard of the upper part of the coffin, it is a member for coping construction that is installed along the extending direction corresponding to the upper edge of the main body of the coffin,
A top plate portion that is disposed on the upper end surface of the bag main body along the extending direction and in which the headboard material is disposed above,
A cap portion that is formed to project outward from the top plate portion toward the outside of the main body, and on which the cap material is disposed,
At the boundary portion between the top plate portion and the cap portion, a side plate portion erected downward along the side surface of the main body,
A cap side portion erected downward from the outer end portion of the cap portion;
A wall portion that has an inclined piece that is erected upward from an outer end portion of the cap portion and gradually inclines outward from the lower portion toward the upper side from the lower portion;
Below the wall portion, a headboard material receiving portion that is formed to protrude toward the outer side of the main body and the headboard material is disposed above,
Under the shade side portion, extending along the extending direction, and a main draining plate erected downward,
With
The main draining plate is inclined outward from the upper side to the lower side, away from the side surface of the ridge ,
In the cap portion, a water return plate extending along the extending direction is erected upward,
The member for constructing a headboard characterized in that the water return plate is disposed outside the main body of the paddle.
請求項に記載の笠木施工用部材であって、
前記笠部には、前記水返し板と前記壁部との間に、前記笠部を貫通する排水孔が形成されていることを特徴とする笠木施工用部材。
It is a member for headboard construction according to claim 1 ,
The cap member is provided with a drainage hole penetrating the cap portion between the water return plate and the wall portion.
塀の上部の笠木を配設するために、塀本体の上端縁部に対応する延設方向に沿って設置される笠木施工用部材であって、
前記延設方向に沿って前記塀本体の上端面に配置され、上方に笠木材料が配設される天板部と、
前記天板部から前記塀本体の外側に向かって張り出し形成され、上方に前記笠木材料が配設される笠部と、
前記天板部と前記笠部との境界部分において、前記塀本体の側面に沿って下方に向かって立設された側板部と、
前記笠部の外側端部から下方に向かって立設された笠側部と、
前記笠部の外側端部から上方に向かって立設され、下方から上方に向かって前記塀本体の外側に漸次傾斜する傾斜片を有する壁部と、
前記壁部の下方において、前記塀本体の外側に向かって張り出し形成され、上方に前記笠木材料が配設される笠木材料受部と、
前記笠側部の下方において、前記延設方向に沿って延在するとともに、下方に向かって立設された主水切り板と、
を備え、
前記主水切り板は、上方から下方に向かって、前記塀の側面から離れるように外側に傾斜し
前記壁部の端部には、他の前記笠木施工用部材の前記壁部と係止可能な係止部が設けられていることを特徴とする笠木施工用部材。
In order to dispose the headboard of the upper part of the coffin, it is a member for coping construction that is installed along the extending direction corresponding to the upper edge of the main body of the coffin,
A top plate portion that is disposed on the upper end surface of the bag main body along the extending direction and in which the headboard material is disposed above,
A cap portion that is formed to project outward from the top plate portion toward the outside of the main body, and on which the cap material is disposed,
At the boundary portion between the top plate portion and the cap portion, a side plate portion erected downward along the side surface of the main body,
A cap side portion erected downward from the outer end portion of the cap portion;
A wall portion that has an inclined piece that is erected upward from an outer end portion of the cap portion and gradually inclines outward from the lower portion toward the upper side from the lower portion;
Below the wall portion, a headboard material receiving portion that is formed to protrude toward the outer side of the main body and the headboard material is disposed above,
Under the shade side portion, extending along the extending direction, and a main draining plate erected downward,
With
The main draining plate is inclined outward from the upper side to the lower side, away from the side surface of the ridge ,
An end portion of the wall portion is provided with a locking portion that can be locked with the wall portion of the other headrest construction member.
請求項1から3のいずれか1項に記載の笠木施工用部材であって、
前記天板部には、貫通孔が形成されていることを特徴とする笠木施工用部材。
It is a member for headboard construction given in any 1 paragraph of Claims 1-3,
A headboard construction member, wherein a through hole is formed in the top plate portion.
請求項1からのいずれか1項に記載の笠木施工用部材であって、
前記笠部における前記主水切り板と前記側板部との間には、前記延設方向に沿って延在する少なくとも一枚の副水切り板が、下方に向かって立設されていることを特徴とする笠木施工用部材。
It is a member for headboard construction given in any 1 paragraph of Claims 1-4 ,
Between the main draining plate and the side plate portion in the cap portion, at least one auxiliary draining plate extending along the extending direction is erected downward. A member for the construction of a cap.
請求項1から5のいずれか1項に記載の笠木施工用部材を複数用いた笠木施工方法であって、
前記塀本体の上端面に第一の前記笠木施工用部材と、第二の前記笠木施工用部材とを前記延設方向に離間して設置する第一設置工程と、
第一の前記笠木施工用部材と、第二の前記笠木施工用部材との離間距離に対応して第三の前記笠木施工用部材を切断する切断工程と、
第一の前記笠木施工用部材と、第二の前記笠木施工用部材との間に、切断した第三の前記笠木施工用部材を設置する第二設置工程と、
を備えたことを特徴とする笠木施工方法。
A method for constructing a headboard using a plurality of members for headboard construction according to any one of claims 1 to 5 ,
A first installation step of installing the first cap member construction member and the second cap member construction member on the upper end surface of the saddle main body apart from each other in the extending direction;
A cutting step of cutting the third member for constructing a headboard corresponding to a separation distance between the member for constructing the first member and the second member for constructing a headboard;
A second installation step of installing the third member for constructing the headboard between the first member for constructing the headboard and the second member for constructing the headboard;
A method for constructing a headboard characterized by comprising:
JP2013080781A 2013-04-08 2013-04-08 Headboard construction member and headboard construction method Expired - Fee Related JP6232675B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2013080781A JP6232675B2 (en) 2013-04-08 2013-04-08 Headboard construction member and headboard construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2013080781A JP6232675B2 (en) 2013-04-08 2013-04-08 Headboard construction member and headboard construction method

Publications (2)

Publication Number Publication Date
JP2014202015A JP2014202015A (en) 2014-10-27
JP6232675B2 true JP6232675B2 (en) 2017-11-22

Family

ID=52352700

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2013080781A Expired - Fee Related JP6232675B2 (en) 2013-04-08 2013-04-08 Headboard construction member and headboard construction method

Country Status (1)

Country Link
JP (1) JP6232675B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109209011A (en) * 2018-09-14 2019-01-15 上海建工二建集团有限公司 Prefabricated enclosing wall coping and manufacturing and construction method thereof
CN116044245B (en) * 2022-12-02 2024-01-05 国网江苏省电力有限公司连云港供电分公司 Prefabricated enclosing wall capping and construction method for power substation

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5622545Y2 (en) * 1976-10-13 1981-05-27
JPS55170338U (en) * 1979-05-25 1980-12-06
JP2006299555A (en) * 2005-04-18 2006-11-02 Sakamoto Sangyo Kk Structural body using water draining-off member
JP5933184B2 (en) * 2011-03-29 2016-06-08 住友林業株式会社 Kasagi construction materials

Also Published As

Publication number Publication date
JP2014202015A (en) 2014-10-27

Similar Documents

Publication Publication Date Title
CN106906962B (en) A kind of building roof parapet flashing construction technology
US20120180296A1 (en) Trench Drain System and Method of Installation on Level Floor Surface, Particulary for Shower Rooms
CN111074951A (en) Post-cast strip structure and construction process thereof
CN110387782B (en) Curb of assembled self-drainage asphalt pavement and construction method thereof
KR101747821B1 (en) construction equipment for drainage way and construction method for drainage way
JP6232675B2 (en) Headboard construction member and headboard construction method
JP7180003B2 (en) LEAK PREVENTION Drain trap having joint reinforcing member and construction method thereof
US7670080B2 (en) Catch basin system
JP5068569B2 (en) Drainage structure and drainage structure construction method
KR20140139217A (en) Concrete protection wall with linear drainage functions and construction method thereof
JP6910797B2 (en) Eaves drainage structure
JP5933184B2 (en) Kasagi construction materials
CN206233564U (en) Drop plate formwork erection structure
KR101012480B1 (en) Underground Parking Drainage Structure
US20070214732A1 (en) Catch Basin System
JP2000226936A (en) Execution member for horizontal slit
JP6233951B2 (en) Kasagi drainer
KR20190142922A (en) L-type side gutter for a road and constructing method therefor
JP5342773B2 (en) Forming form for waterproofing treatment and end treatment structure of waterproofing layer using it
CN214785258U (en) Moisture-proof brick
JP5707551B2 (en) Drained structure of reinforced concrete
JP5166225B2 (en) Driving form for fixing the floor of the floating formwork and construction method of the edge treatment structure of the waterproof layer using it
KR100953033B1 (en) Drainage trench unit
JP6856186B2 (en) Drainer
CN119393158A (en) A cable trench and side trench construction method and secondary lining device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160301

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20161226

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170131

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170403

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170926

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20171006

R150 Certificate of patent or registration of utility model

Ref document number: 6232675

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees