Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6247942B2 - Method for producing precast concrete member - Google Patents
[go: Go Back, main page]

JP6247942B2 - Method for producing precast concrete member - Google Patents

Method for producing precast concrete member Download PDF

Info

Publication number
JP6247942B2
JP6247942B2 JP2014010143A JP2014010143A JP6247942B2 JP 6247942 B2 JP6247942 B2 JP 6247942B2 JP 2014010143 A JP2014010143 A JP 2014010143A JP 2014010143 A JP2014010143 A JP 2014010143A JP 6247942 B2 JP6247942 B2 JP 6247942B2
Authority
JP
Japan
Prior art keywords
concrete
curing
precast concrete
strength
sheath tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2014010143A
Other languages
Japanese (ja)
Other versions
JP2015136876A (en
Inventor
健好 是永
健好 是永
佳城 山本
佳城 山本
和正 今井
和正 今井
佐藤 直子
直子 佐藤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2014010143A priority Critical patent/JP6247942B2/en
Publication of JP2015136876A publication Critical patent/JP2015136876A/en
Application granted granted Critical
Publication of JP6247942B2 publication Critical patent/JP6247942B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
  • Curing Cements, Concrete, And Artificial Stone (AREA)

Description

本発明は、プレキャストコンクリート部材の製造方法に関する。 The present invention relates to the production how the precast concrete part.

コンクリートは、強度が増大するほど、水和反応に伴う発熱と自己収縮が大きくなる。
そのため、高強度コンクリートにより構築されるコンクリート部材に鉄筋が配筋されている場合には、鉄筋の拘束によって微細な収縮ひびわれが発生する場合がある。
As the strength of concrete increases, heat generation and self-shrinkage associated with the hydration reaction increase.
Therefore, when a reinforcing bar is arranged on a concrete member constructed of high-strength concrete, a fine shrinkage crack may occur due to the restriction of the reinforcing bar.

このような収縮ひびわれを抑制することを目的として、収縮低減剤や膨張材をコンクリートに添加することにより、コンクリート自体の収縮を低下させる方法がある。
ところが、収縮低減剤や膨張材を使用することは、コスト低減化の妨げとなっていた。
For the purpose of suppressing such shrinkage cracks, there is a method of reducing the shrinkage of the concrete itself by adding a shrinkage reducing agent or an expansion material to the concrete.
However, the use of a shrinkage reducing agent or an expanding material has hindered cost reduction.

そのため、特許文献1には、コンクリートの収縮を拘束する主筋の一部を、軸方向剛性の低いシース管に置き換えて、主筋の拘束力を低減させるとともに、冷却用媒体を循環させるためのシース管をコンクリート部材の断面中央付近に埋設しておき、コンクリートの強度発現時の部材表面と部材内部との温度差を小さくするプレキャスト部材の製造方法が開示されている。   For this reason, in Patent Document 1, a part of the main muscle that restrains the contraction of concrete is replaced with a sheath pipe having low axial rigidity to reduce the restraining force of the main muscle and to circulate the cooling medium. Has been embedded in the vicinity of the center of the cross section of the concrete member, and a method for manufacturing a precast member is disclosed in which the temperature difference between the member surface and the inside of the member when the strength of the concrete is developed is reduced.

特許第4651025号公報Japanese Patent No. 4651025

特許文献1に記載のプレキャスト部材の製造方法を採用した場合であっても、シース管に置き換えられた主筋(鉄筋)以外の主筋(鉄筋)とコンクリートとの間の付着力によって高強度コンクリートの収縮が拘束されるので、主筋周りの微細なひび割れを大幅に減少させることはできない恐れがあった。   Even when the manufacturing method of the precast member described in Patent Document 1 is adopted, the shrinkage of high-strength concrete due to the adhesion between the main reinforcement (rebar) other than the main reinforcement (rebar) replaced with the sheath tube and the concrete As a result, the fine cracks around the main muscles could not be greatly reduced.

本発明は、このような問題点を解決するためになされたものであり、コンクリートの強度発現時に生じる微細なひび割れを大幅に削減することを可能としたプレキャストコンクリート部材の製造方法を提供することを課題とする。 The present invention has been made to solve the above problems, to provide a manufacturing how possible with the precast concrete part to significantly reduce the fine cracks that occur during concrete strength expression Is an issue.

前記課題を解決するために、本発明に係るプレキャストコンクリート部材の製造方法は、型枠にシース管を配管するとともに前記型枠にコンクリートを打設する工程と、前記コンクリートを一次養生する工程と、前記シース管に挿入された緊張材を利用して前記コンクリートの硬化体に圧縮力を導入した状態で前記コンクリートを二次養生する工程と、前記圧縮力を解除する工程と、前記シース管内に鉄筋を配筋するとともに充填材を充填する工程とを備えることを特徴としている。   In order to solve the above problems, a method for producing a precast concrete member according to the present invention includes a step of placing a sheath tube on a mold and placing concrete on the mold, and a step of primarily curing the concrete. A step of secondary curing the concrete in a state where a compressive force is introduced into the hardened body of the concrete using a tension material inserted into the sheath tube, a step of releasing the compressive force, and a reinforcing bar in the sheath tube And a step of filling with a filler.

かかるプレキャストコンクリート部材の製造方法によれば、強度発現が進行している段階でコンクリートの硬化体に圧縮力(プレストレス)を付与することで、緻密なコンクリートが形成される。また、コンクリートに鉄筋が埋設されている場合には、プレストレスによって鉄筋の長さも短くなっているので、埋設された鉄筋がコンクリートの自己収縮を拘束することを抑制できる。そのため、膨張材や収縮低減剤等の混和剤を添加しなくても、あるいは添加量を低減させても、自己収縮に伴う微細なひび割れを大幅に削減することができる。   According to such a method for producing a precast concrete member, a dense concrete is formed by applying a compressive force (prestress) to a hardened concrete at a stage where strength development is progressing. In addition, when a reinforcing bar is embedded in concrete, the length of the reinforcing bar is also shortened by pre-stress, so that the embedded reinforcing bar can be restrained from restraining the self-shrinkage of the concrete. Therefore, even if an admixture such as an expansion material and a shrinkage reducing agent is not added, or even if the addition amount is reduced, fine cracks accompanying self-shrinkage can be greatly reduced.

なお、前記二次養生は50℃以上の高温養生で行ってもよい。また、前記二次養生を常温で行った後、前記圧縮力を増加させて50℃以上の高温養生により三次養生をさら行ってもよい。   In addition, you may perform the said secondary curing by 50 degreeC or more high temperature curing. Moreover, after performing the said secondary curing at normal temperature, you may increase the said compression force and may perform a tertiary curing further by high temperature curing of 50 degreeC or more.

また、前記プレキャストコンクリート部材の製造方法において、前記硬化体に貫通孔を形成するための内型枠を前記型枠の中心部に配置しておき、前記高温養生時に前記硬化体の外周面および前記貫通孔から加熱すれば、コンクリートの硬化体の外側と内側から加熱することにより効率的に養生することができる。そのため、より緻密で高強度なプレキャストコンクリート部材を製造することが可能となる。   Further, in the method for producing a precast concrete member, an inner mold for forming a through hole in the hardened body is disposed in the center of the mold, and the outer peripheral surface of the hardened body and the If it heats from a through-hole, it can harden | cure efficiently by heating from the outer side and the inner side of the hardening body of concrete. Therefore, it becomes possible to manufacture a dense and high-strength precast concrete member.

本発明のプレキャストコンクリート部材の製造方法によれば、コンクリートの強度発現時に生じる微細なひび割れを大幅に削減あるいは無くすことが可能となる。 According to the manufacturing how the precast concrete part of the present invention, it is possible to significantly reduce or eliminate the fine cracks that occur during the strength of the concrete expression.

(a)は第一の実施形態に係るプレキャストコンクリート部材を示す横断面図、(b)は同縦断面図である。(A) is a cross-sectional view which shows the precast concrete member which concerns on 1st embodiment, (b) is the longitudinal cross-sectional view. (a)〜(c)は第一の実施形態に係るプレキャストコンクリート部材の製造方法の各施工段階を示す横断面図と平面図である。(A)-(c) is a cross-sectional view and a top view which show each construction step of the manufacturing method of the precast concrete member which concerns on 1st embodiment. (a)〜(c)は、第一の実施形態に係るプレキャストコンクリート部材の鉄筋量の決定方法の説明図である。(A)-(c) is explanatory drawing of the determination method of the amount of reinforcing bars of the precast concrete member concerning a first embodiment. (a)および(b)は第二の実施形態に係るプレキャストコンクリート部材の斜視図である。(A) And (b) is a perspective view of the precast concrete member which concerns on 2nd embodiment. プレキャストコンクリート部材の使用例を示す断面図である。It is sectional drawing which shows the usage example of a precast concrete member. (a)は他の形態に係るプレキャストコンクリート部材を示す図であり、(b)は同プレキャストコンクリート部材の他の使用例を示す断面図である。(A) is a figure which shows the precast concrete member which concerns on another form, (b) is sectional drawing which shows the other usage example of the same precast concrete member.

<第一の実施形態>
以下、第一の実施形態のプレキャストコンクリート部材1の製造方法について説明する。
プレキャストコンクリート部材1は、図1の(a)および(b)に示すように、コンクリートの硬化体2と、硬化体2の軸方向に沿って配筋された複数の主筋3,4と、主筋3,4を囲うように配筋された配力筋5,5,…とを備えている。
<First embodiment>
Hereinafter, the manufacturing method of the precast concrete member 1 of 1st embodiment is demonstrated.
As shown in FIGS. 1A and 1B, the precast concrete member 1 includes a hardened concrete body 2, a plurality of main bars 3 and 4 arranged along the axial direction of the hardened body 2, and a main bar. , Which are arranged so as to surround 3, 4.

硬化体2は、いわゆる高強度コンクリート(建築工事標準仕様書・同解説JASS5鉄筋コンクリート工事:日本建築学会では、設計基準強度36N/mm以上)により構成されている。本実施形態では、高強度コンクリートとして、設計基準強度が150N/mm以上の超高強度繊維補強コンクリートを採用する。本明細書での超高強度コンクリートとは、設計基準強度100N/mm以上のコンクリートとする。
なお、硬化体2を構成する高強度コンクリートの種類や設計基準強度は限定されない。
The hardened body 2 is made of so-called high-strength concrete (architecture standard specification / commentary JASS5 reinforced concrete construction: design standard strength of 36 N / mm 2 or more in the Architectural Institute of Japan). In the present embodiment, an ultra-high strength fiber reinforced concrete having a design standard strength of 150 N / mm 2 or more is adopted as the high strength concrete. The ultra-high-strength concrete in this specification is a concrete having a design standard strength of 100 N / mm 2 or more.
In addition, the kind of high-strength concrete which comprises the hardening body 2, and design standard intensity | strength are not limited.

高強度コンクリートは、結合材と、水と、細骨材と、粗骨材と、減水剤と、繊維とを少なくとも含んだ混合体により構成されている。結合材は、少なくともセメントとシリカフュームとを含んでいる。また、圧縮強度や流動性などに悪影響を及ぼさない範囲で高炉スラグ微粉末などの混和材を含んでもよい。   High-strength concrete is composed of a mixture including at least a binder, water, fine aggregate, coarse aggregate, a water reducing agent, and fibers. The binder contains at least cement and silica fume. Further, an admixture such as blast furnace slag fine powder may be included as long as it does not adversely affect the compressive strength and fluidity.

なお、高強度コンクリートの配合は適宜設定すればよい。また、当該高強度コンクリートに使用する繊維は限定されるものではなく、例えば、鋼繊維、ポリプロピレン繊維、ビニロン繊維等の各種繊維、あるいは、これらの繊維の中から複数の繊維を適宜組み合わせたものを使用すればよい。   In addition, what is necessary is just to set the mixing | blending of high strength concrete suitably. Moreover, the fiber used for the high-strength concrete is not limited, for example, various fibers such as steel fiber, polypropylene fiber, and vinylon fiber, or those obtained by appropriately combining a plurality of fibers from these fibers. Use it.

本実施形態では、硬化体2が断面正方形に形成されている場合について説明するが、硬化体2の断面形状は限定されるものではなく、例えば、円形、楕円形、矩形、その他の多角形であってもよい。   In this embodiment, the case where the cured body 2 is formed in a square cross section will be described. However, the cross sectional shape of the cured body 2 is not limited, and may be, for example, a circle, an ellipse, a rectangle, or other polygons. There may be.

硬化体2の断面中心部には、軸方向に沿って、貫通孔6が形成されている。
貫通孔6は、断面円形に形成されている。なお、貫通孔6の断面形状や寸法は限定されるものではなく、プレキャストコンクリート部材1の強度に影響を及ぼすことのない範囲内において適宜設定すればよい。
また、貫通孔6は必要に応じて形成すればよく、省略してもよい。例えば、一辺が300mm以下の正方形断面のコンクリート部材であれば、高温養生時の表面と中心部との温度差が小さくなるので、貫通孔6を形成しなくてもよい。
A through hole 6 is formed in the central portion of the cross section of the cured body 2 along the axial direction.
The through hole 6 has a circular cross section. In addition, the cross-sectional shape and dimension of the through-hole 6 are not limited, and may be appropriately set within a range that does not affect the strength of the precast concrete member 1.
Moreover, what is necessary is just to form the through-hole 6 as needed, and you may abbreviate | omit. For example, in the case of a concrete member having a square cross section with a side of 300 mm or less, the temperature difference between the surface and the center portion at the time of high-temperature curing is small, so the through-hole 6 need not be formed.

図1の(a)に示すように、本実施形態では、プレキャストコンクリート部材1の四つの角部に配筋された4本の主筋3,3,…と、角部以外に配筋された4本の主筋4,4,…との計8本の主筋が配筋されている。
なお、主筋3,4の本数や配置は限定されない。
As shown in FIG. 1 (a), in this embodiment, four main bars 3, 3,... Arranged at the four corners of the precast concrete member 1 and four arranged at the corners other than the corners. A total of 8 main muscles are arranged, including the main muscles 4, 4,.
The number and arrangement of the main bars 3 and 4 are not limited.

8本の主筋のうちの硬化体2の角部に配筋された主筋3は、硬化体2の軸方向に沿って配管されたシース管7と、シース管7内に配設された鉄筋8と、シース管7と鉄筋8との隙間に充填された充填材9とにより構成されている。   Of the eight main bars, the main bar 3 arranged at the corner of the hardened body 2 includes a sheath pipe 7 piped along the axial direction of the hardened body 2 and a reinforcing bar 8 disposed in the sheath pipe 7. And a filler 9 filled in a gap between the sheath tube 7 and the reinforcing bar 8.

シース管7は、硬化体2の長手方向の全長にわたって配管されている。なお、シース管7の内径は、鉄筋8(主筋)の鉄筋径に応じて適宜設定すればよい。   The sheath tube 7 is piped over the entire length of the cured body 2 in the longitudinal direction. In addition, what is necessary is just to set the internal diameter of the sheath pipe | tube 7 suitably according to the reinforcement diameter of the reinforcement 8 (main reinforcement).

鉄筋8は、充填材9を介してシース管7と一体化されている。
鉄筋8を構成する材料は限定されるものではないが、異形鉄筋やネジ鉄筋を使用すればよい。
The reinforcing bar 8 is integrated with the sheath tube 7 via the filler 9.
Although the material which comprises the reinforcement 8 is not limited, What is necessary is just to use a deformed reinforcement and a screw reinforcement.

また、充填材9を構成する材料は限定されるものではないが、例えば、グラウトや無収縮モルタル等のセメント系充填材を使用すればよい。   Moreover, although the material which comprises the filler 9 is not limited, What is necessary is just to use cement type fillers, such as grout and a non-shrink mortar, for example.

角部以外に配筋された主筋4,4,…は、鉄筋(異形鉄筋)からなり直接硬化体2に埋め込まれている。なお、角部以外に配筋された主筋4,4,…は、角部の主筋3と同様に、シース管7と鉄筋8と充填材9とにより構成されたものであってもよい。   The main reinforcing bars 4, 4,... Arranged other than the corners are made of reinforcing bars (deformed reinforcing bars) and are directly embedded in the hardened body 2. The main bars 4, 4,... Arranged other than the corners may be constituted by the sheath tube 7, the reinforcing bars 8, and the filler 9 in the same manner as the corner main bars 3.

プレキャストコンクリート部材の製造方法は、準備打設工程と、一次養生工程と、二次養生工程と、除荷工程と、充填工程とを備えている。   The manufacturing method of a precast concrete member is provided with the preparation casting process, the primary curing process, the secondary curing process, the unloading process, and the filling process.

準備打設工程は、図2の(a)に示すように、硬化体2の型枠10内に、主筋4,4,…および配力筋5,5,…を配筋するとともにシース管7を配管した後、型枠10内にコンクリートを打設する工程である。
このとき、型枠10の中心部に貫通孔6を形成するための内型枠11を配置しておく。
In the preparation placing step, as shown in FIG. 2 (a), the main bars 4, 4,... And the force distribution bars 5, 5,. Is the step of placing concrete in the mold 10 after piping.
At this time, an inner mold 11 for forming the through hole 6 is arranged in the center of the mold 10.

本実施形態では、内型枠11として、シース管を配管しておく。
なお、内型枠11を構成する材料は限定されるものではなく、例えば、養生後に撤去が可能な塩化ビニールパイプ、紙製パイプ等からなる円筒状部材や、高温養生時に溶融する材料等を使用してもよい。
また、コンクリートの打設方法は限定されるものではなく、適宜行えばよい。
In the present embodiment, a sheath tube is piped as the inner mold 11.
In addition, the material which comprises the inner mold 11 is not limited, For example, the cylindrical member which consists of a vinyl chloride pipe which can be removed after curing, a paper pipe, etc., the material which melts at the time of high temperature curing, etc. are used. May be.
Moreover, the concrete placing method is not limited, and may be appropriately performed.

一次養生工程は、型枠10に打設したコンクリートを一次養生する工程である。
一次養生は、型枠10内に打設された高強度コンクリートを、脱型が可能な強度が発現するまで行う。
The primary curing process is a process in which the concrete placed on the mold 10 is primarily cured.
The primary curing is performed on the high-strength concrete placed in the mold 10 until a strength capable of demolding is developed.

本実施形態では、一次養生を常温で行うが、一次養生時の管理方法は限定されるものではない。   In the present embodiment, the primary curing is performed at room temperature, but the management method during the primary curing is not limited.

二次養生工程は、脱型した後、コンクリートの硬化体2に圧縮力を導入した状態でコンクリートを二次養生する工程である。   The secondary curing step is a step of secondarily curing the concrete in a state where a compressive force is introduced into the hardened concrete body 2 after demolding.

硬化体2へ圧縮力を導入する場合には、まず、シース管7に緊張材12を挿入する。
緊張材12の両端は、図2の(b)に示すように、硬化体2の両端面に配置した支圧板13,13に固定する。緊張時の硬化体2のコンクリート強度は、20N/mm以上であればよい。
プレストレスは、緊張時の硬化体2のコンクリート強度に0.45を乗じた値以下(プレストレスコンクリート設計施工規準・同解説:日本建築学会)で、かつ二次養生工程での自己収縮ひずみとプレストレスによる弾性ひずみが同程度になる圧縮力を導入するのが好ましい。
When a compressive force is introduced into the cured body 2, first, the tendon 12 is inserted into the sheath tube 7.
As shown in FIG. 2B, both ends of the tendon 12 are fixed to the bearing plates 13 and 13 disposed on both end surfaces of the cured body 2. The concrete strength of the cured body 2 during tension may be 20 N / mm 2 or more.
Pre-stress is less than the value obtained by multiplying the concrete strength of the hardened body 2 during tension by 0.45 (pre-stress concrete design and construction standards, same explanation: Architectural Institute of Japan) and the self-shrinkage strain in the secondary curing process. It is preferable to introduce a compressive force with which the elastic strain due to prestress is comparable.

本実施形態では、緊張材12として、ネジ鉄筋を採用するが、緊張材12を構成する材料は限定されるものではなく、例えば、PC鋼線、PC鋼より線、PC鋼棒であってもよい。   In the present embodiment, a screw rebar is adopted as the tension member 12, but the material constituting the tension member 12 is not limited. For example, a PC steel wire, a PC steel strand, or a PC steel rod may be used. Good.

緊張材12の端部が支圧板13を貫通した状態で緊張材12に引張力を導入した後、緊張材12の端部にナット14を締着することにより緊張材12を支圧板13に固定する。
そして、緊張材12の引張力を解除することで、プレストレスが支圧板13を介して硬化体2に作用する。
After introducing the tensile force to the tension member 12 with the end of the tension member 12 penetrating the bearing plate 13, the tension member 12 is fixed to the bearing plate 13 by fastening the nut 14 to the end of the tension member 12. To do.
And the pre-stress acts on the hardening body 2 via the bearing plate 13 by canceling the tensile force of the tendon 12.

なお、緊張材12のシース管7へ挿入するタイミングは限定されるものではない。例えば、脱型の前、脱型の後、または、脱型と同時に行ってもよい。   The timing for inserting the tendon 12 into the sheath tube 7 is not limited. For example, it may be performed before demolding, after demolding, or simultaneously with demolding.

本実施形態の二次養生工程では、硬化体2を50℃以上に加熱する、いわゆる加熱養生(高温養生)により硬化体2を養生する。   In the secondary curing process of the present embodiment, the cured body 2 is cured by so-called heat curing (high temperature curing) in which the cured body 2 is heated to 50 ° C. or higher.

本実施形態では、高温養生槽内において、50℃の空気により加熱する。
このとき、図2の(c)に示すように、送風機15を利用して、貫通孔6に高温の空気を送風することで、硬化体2の外周面と貫通孔6から加熱する。
貫通孔6を利用した加熱により、見かけ上の熱の伝達する部材厚が従来の半分程度となるため、効率的な加熱養生が可能となる。
In this embodiment, it heats with 50 degreeC air in a high temperature curing tank.
At this time, as shown in FIG. 2C, the blower 15 is used to blow high temperature air to the through hole 6, thereby heating from the outer peripheral surface of the cured body 2 and the through hole 6.
By heating using the through-hole 6, the apparent thickness of the member that transmits heat is about half that of the conventional one, so that efficient heat curing is possible.

なお、二次養生工程において、貫通孔6内に棒状のヒーターを挿入することで、貫通孔6内から加熱してもよく、二次養生工程における加熱方法は限定されるものではない。   In addition, in a secondary curing process, you may heat from the inside of the through-hole 6 by inserting a rod-shaped heater in the through-hole 6, and the heating method in a secondary curing process is not limited.

二次養生工程による加熱養生が完了することにより、緻密で高強度な硬化体2が完成する。   By completing the heat curing in the secondary curing process, a dense and high-strength cured body 2 is completed.

除荷工程は、緊張材12の緊張力(硬化体2の圧縮力)を解除する工程である。
緊張材12の緊張力(硬化体2の圧縮力)は、緊張材12からナット14を取り外すことにより解除する。
The unloading step is a step of releasing the tension force of the tendon material 12 (compression force of the cured body 2).
The tension force of the tension material 12 (compression force of the cured body 2) is released by removing the nut 14 from the tension material 12.

充填工程は、シース管7内に鉄筋8を配筋するとともに充填材9を充填する工程である。
鉄筋8は、緊張材12として使用したネジ鉄筋をそのまま使用してもよいし、緊張材12をシース管7から抜き出して、新たな鉄筋8を当該シース管7に挿入してもよい。
The filling step is a step of arranging the reinforcing bar 8 in the sheath tube 7 and filling the filler 9.
As the reinforcing bar 8, the screw reinforcing bar used as the tension member 12 may be used as it is, or the tension member 12 may be extracted from the sheath tube 7 and a new reinforcing bar 8 may be inserted into the sheath tube 7.

鉄筋8のシース管7への配筋とともに、充填材9をシース管7内に注入して、シース管7と鉄筋8との隙間を埋める。   Along with the reinforcement of the reinforcing bar 8 to the sheath tube 7, the filler 9 is injected into the sheath tube 7 to fill the gap between the sheath tube 7 and the reinforcing bar 8.

以上、本実施形態のプレキャストコンクリート部材の製造方法によれば、強度発現が進行している段階で硬化体2に圧縮力(プレストレス)を付与することで緻密なコンクリートが形成される。また、主筋4は、プレストレスによって長さが短くなっているので、主筋4がコンクリートの自己収縮を拘束することを抑制できる。そのため、膨張材や収縮低減剤等の混和剤を添加しなくても、あるいは添加量を低減させても、自己収縮に伴う微細なひび割れを大幅に削減することができる。   As mentioned above, according to the manufacturing method of the precast concrete member of this embodiment, dense concrete is formed by giving compressive force (prestress) to the hardening body 2 in the stage where intensity | strength expression is advancing. Moreover, since the length of the main reinforcement 4 is shortened by the prestress, it can suppress that the main reinforcement 4 restrains the self contraction of concrete. Therefore, even if an admixture such as an expansion material and a shrinkage reducing agent is not added, or even if the addition amount is reduced, fine cracks accompanying self-shrinkage can be greatly reduced.

より詳しく説明すると、養生期間中には、コンクリートに生じる自己収縮ひずみと、圧縮力(プレストレス)による弾性ひずみが硬化体2に生じるが、圧縮力による弾性ひずみとクリープひずみは、養生が進行するにつれて、見掛け上コンクリートの自己収縮に移行し(相互干渉)、圧縮力によるひずみが減少していく。また、主筋4,4,…およびシース管7は、圧縮力によってコンクリートと同じひずみを維持しながら縮む。そのため、主筋4やシース管7がコンクリートの収縮ひずみを拘束することはなく、強度発現過程における微細なひび割れが抑制される。   More specifically, during the curing period, self-shrinkage strain generated in the concrete and elastic strain due to compressive force (pre-stress) are generated in the hardened body 2, but the curing progresses due to the elastic strain and creep strain due to the compressive force. As a result, it apparently shifts to self-shrinkage of concrete (mutual interference), and the strain due to compressive force decreases. Further, the main bars 4, 4,... And the sheath tube 7 are shrunk while maintaining the same strain as the concrete by the compressive force. Therefore, the main reinforcement 4 and the sheath tube 7 do not constrain the shrinkage strain of the concrete, and fine cracks in the strength development process are suppressed.

また、コンクリートの硬化体2の外側と内側(貫通孔6の内面)から加熱することにより効率的に養生することができる。そのため、より緻密で高強度なプレキャストコンクリート部材を製造することが可能となる。   Moreover, it can cure efficiently by heating from the outer side and the inner side (the inner surface of the through-hole 6) of the concrete hardened body 2. Therefore, it becomes possible to manufacture a dense and high-strength precast concrete member.

また、硬化体2の養生期間後に鉄筋8をシース管7に挿入するため、養生期間中においては、シース管7に緊張材12を挿入することができ、当該緊張材12によって、養生中の硬化体2にプレストレスを付与することができる。プレストレスを付与した状態で養生した硬化体2は、組織が緻密となる。   Further, since the reinforcing bar 8 is inserted into the sheath tube 7 after the curing period of the hardened body 2, the tension member 12 can be inserted into the sheath tube 7 during the curing period, and the tension member 12 can cure during curing. Prestress can be applied to the body 2. The hardened body 2 cured in a prestressed state has a dense structure.

また、硬化体2をその周囲と中心(貫通孔6)から加熱することが可能となるため、見かけ上の熱の伝達する厚みが従来と比較して半分程度となる。したがって、効率的な加熱養生が可能となる。   Moreover, since it becomes possible to heat the hardening body 2 from the circumference | surroundings and center (through-hole 6), the thickness which apparent heat transfers becomes about a half compared with the past. Therefore, efficient heat curing is possible.

なお、養生完了時にコンクリートの収縮(自己収縮とクリープ)が完全に収束していると仮定すると、残存緊張力がある場合には、コンクリートと主筋4に緊張力による弾性圧縮ひずみ(回復ひずみ)が生じることになるが、養生期間中にコンクリートが収縮し、応力の再配分が生じることから、圧縮力の負担割合は、主筋4の方が大幅に大きくなっている。   Assuming that the shrinkage of the concrete (self-shrinkage and creep) has completely converged upon completion of curing, if there is a residual tension, the elastic and compressive strain (recovery strain) due to the tension is applied to the concrete and the main reinforcement 4 Although it will occur, since the concrete contracts during the curing period and stress is redistributed, the burden ratio of the compressive force is significantly larger in the main reinforcement 4.

したがって、残存緊張力を解除すると、主筋の圧縮ひずみが大きく減少し、コンクリートのひずみは圧縮ひずみから引張ひずみとなり、埋設された主筋4,4,…の量(鉄筋量)によっては、引張ひび割れが生じるおそれがある。そのため、コンクリート(硬化体2)に鉄筋(主筋4)を直接埋設する場合には、その鉄筋量を適切に管理する必要がある。
そのため、以下に、鉄筋量の決定方法について、図3を参照して説明する。
Therefore, when the residual tension is released, the compressive strain of the main bars is greatly reduced, the strain of the concrete changes from the compressive strain to the tensile strain, and depending on the amount of the main bars 4, 4,. May occur. Therefore, when the reinforcing bar (main reinforcing bar 4) is directly embedded in the concrete (hardened body 2), it is necessary to appropriately manage the amount of the reinforcing bar.
Therefore, below, the determination method of the amount of reinforcing bars is demonstrated with reference to FIG.

本説明では、図3の(a)に示すように、プレキャストコンクリート部材1の一端を固定端とし、他端を自由端として、埋設する主筋4,4,…とコンクリート(硬化体2)との付着を除去した状態で、コンクリート打設、高温養生を行うものとする。   In this description, as shown in FIG. 3A, one end of the precast concrete member 1 is a fixed end and the other end is a free end, and the main bars 4, 4,. Concrete removal and high temperature curing shall be performed with the adhesion removed.

この状態で、コンクリートに強度が発現すると、図3の(b)に示すように、コンクリートの自己収縮により硬化体2が縮む(縮み量L)。この状態から主筋4,4,…を硬化体2の端面まで押し込んだ後、主筋とコンクリートとの付着を復活させた状態(図3の(c)参照)が、除荷工程後の状態と等価となる。   In this state, when strength develops in the concrete, as shown in FIG. 3B, the hardened body 2 shrinks due to self-shrinkage of the concrete (shrink amount L). After pushing the main bars 4, 4,... To the end surface of the cured body 2 from this state, the state where the adhesion between the main bars and the concrete is restored (see FIG. 3C) is equivalent to the state after the unloading process. It becomes.

このとき、硬化体2には、引張応力(σ)が生じ、主筋4,4,…には圧縮応力(σ)が作用する。
硬化体2の引張合力(=Ac・σ、ここで、Acは主筋を除く硬化体の断面積である)と主筋4の圧縮合力(=ΣAs・σ、ここでAsは全主筋の断面積である)は釣り合っており、この状態でのコンクリートの引張応力σが製造完了時のコンクリートの引張強度以下であれば、プレキャストコンクリート部材1にはひび割れが生じないことになる。
At this time, tensile stress ( c σ t ) is generated in the cured body 2, and compressive stress ( s σ c ) acts on the main bars 4, 4,.
Tensile force of the cured body 2 (= Ac · c σ t , where Ac is the cross-sectional area of the cured body excluding the main muscle) and compression force of the main muscle 4 (= ΣAs · s σ c , where As is the total main muscle If the tensile stress c σ t of the concrete in this state is equal to or lower than the tensile strength of the concrete at the completion of production, the precast concrete member 1 will not be cracked.

コンクリートの自己収縮ひずみ(拘束なしの材料試験値)、コンクリートの材料特性値(ヤング係数、引張強度)、プレキャストコンクリート部材1のコンクリート部の断面積、主筋4のヤング係数を既知の値として、埋設する主筋4の量を変化させながら、コンクリートの引張応力σがコンクリートの引張強度を超えない鉄筋量を収束計算によって算出する。なお、コンクリートの材料特性値は、事前に同様のコンクリート供試体による試験値を用いればよい。
このように、適正な鉄筋量は、コンクリートの材料特性によって異なる。例えば、鋼繊維を混入した繊維補強コンクリートは、引張強度が増大するため、埋設する主筋4の量を増加させることができる。
Embedded with self-shrinking strain of concrete (unconstrained material test value), concrete material property values (Young's modulus, tensile strength), cross-sectional area of concrete part of precast concrete member 1 and Young's modulus of main reinforcement 4 as known values While changing the amount of the main reinforcing bars 4, the amount of reinforcing bars in which the tensile stress c σ t of the concrete does not exceed the tensile strength of the concrete is calculated by convergence calculation. In addition, what is necessary is just to use the test value by the same concrete specimen beforehand for the material characteristic value of concrete.
Thus, the appropriate amount of reinforcing bars varies depending on the material properties of the concrete. For example, the fiber reinforced concrete mixed with steel fibers has an increased tensile strength, so that the amount of the main reinforcement 4 to be embedded can be increased.

<第二の実施形態>
第二の実施形態のプレキャストコンクリート部材1は、図4の(a)および(b)に示すように、コンクリートの硬化体2と、硬化体2の軸方向に沿って配筋された複数の主筋3の全てが、硬化体2の軸方向に沿って配管されたシース管7と、シース管7内に配設された鉄筋8と、シース管7と鉄筋8との隙間に充填された充填材9とにより構成されている点で、第一の実施形態のプレキャストコンクリート部材1と異なっている。
<Second Embodiment>
As shown in FIGS. 4A and 4B, the precast concrete member 1 of the second embodiment includes a hardened concrete body 2 and a plurality of main bars arranged along the axial direction of the hardened body 2. 3, a sheath tube 7 piped along the axial direction of the cured body 2, a reinforcing bar 8 disposed in the sheath tube 7, and a filler filled in a gap between the sheath tube 7 and the reinforcing bar 8. 9 is different from the precast concrete member 1 of the first embodiment.

硬化体2、主筋3および配力筋5の詳細は、第一の実施形態で示した内容と同様なため、詳細な説明は省略する。   Since the details of the hardened body 2, the main muscle 3 and the distribution bar 5 are the same as the contents shown in the first embodiment, the detailed description is omitted.

第二の実施形態のプレキャストコンクリート部材の製造方法は、準備・打設工程と、一次養生工程と、二次養生工程と、三次養生と、除荷工程と、充填工程とを備えている。
なお、準備・打設工程、一次養生工程、除荷工程および充填工程の詳細は、第一の実施形態で示した内容と同様なため、詳細な説明は省略する。
The manufacturing method of the precast concrete member of 2nd embodiment is equipped with the preparation and placement process, the primary curing process, the secondary curing process, the tertiary curing process, the unloading process, and the filling process.
The details of the preparation / placement process, the primary curing process, the unloading process, and the filling process are the same as the contents shown in the first embodiment, and a detailed description thereof will be omitted.

二次養生工程は、脱型した後、コンクリートの硬化体2に圧縮力を導入した状態でコンクリートを二次養生する工程である。
本実施形態では、二次養生を常温で行う。この他の二次養生の詳細は、第一の実施形態で示した内容と同様なため、詳細な説明は省略する。
The secondary curing step is a step of secondarily curing the concrete in a state where a compressive force is introduced into the hardened concrete body 2 after demolding.
In this embodiment, secondary curing is performed at room temperature. Since the details of the other secondary curing are the same as the contents shown in the first embodiment, the detailed description is omitted.

三次養生工程は、緊張材12に付与する緊張力を二次養生工程の終了時よりも増加させた上で、50℃以上の高温養生により三次養生を行う工程である。
三次養生工程は二次養生を常温で行った後に行う。
本実施形態では、高温養生槽内において、50℃の空気により加熱する。
The tertiary curing process is a process of performing tertiary curing by high-temperature curing at 50 ° C. or higher after increasing the tension applied to the tendon material 12 from the end of the secondary curing process.
The tertiary curing process is performed after the secondary curing is performed at room temperature.
In this embodiment, it heats with 50 degreeC air in a high temperature curing tank.

高温養生では、送風機を利用して、貫通孔6に高温の空気を送風する。こうすると、硬化体2の外周面と貫通孔6の内面から硬化体2が加熱される。
これにより、見かけ上の熱の伝達する部材厚が従来の半分程度となるため、効率的な加熱養生が可能となる。なお、硬化体2の加熱方法は限定されない。
In high temperature curing, high temperature air is blown into the through hole 6 using a blower. If it carries out like this, the hardening body 2 will be heated from the outer peripheral surface of the hardening body 2, and the inner surface of the through-hole 6. FIG.
As a result, the apparent thickness of the member to which heat is transmitted is about half that of the prior art, so that efficient heat curing is possible. In addition, the heating method of the hardening body 2 is not limited.

三次養生工程による加熱養生が完了すると、緻密で高強度な硬化体2が完成する。   When the heat curing in the tertiary curing process is completed, a dense and high-strength cured body 2 is completed.

本実施形態のプレキャストコンクリート部材の製造方法によれば、硬化体2に生じる微細なひび割れを大幅に削減あるいは無くすことができるとともに、緻密なコンクリートを製造することができる。その理由は、次の通りである。   According to the method for producing a precast concrete member of the present embodiment, fine cracks generated in the cured body 2 can be greatly reduced or eliminated, and dense concrete can be produced. The reason is as follows.

まず、シース管7の軸方向剛性が鉄筋に比べて極めて小さいので、シース管7によるコンクリートの拘束力は無視し得る程度に小さく、したがって、シース管7の周囲に微細なひび割れが生じにくい。   First, since the axial rigidity of the sheath tube 7 is extremely smaller than that of the reinforcing bar, the restraining force of the concrete by the sheath tube 7 is negligibly small. Therefore, fine cracks are unlikely to occur around the sheath tube 7.

次に、コンクリートの養生時に硬化体2に圧縮力が付与されているため、高温養生中の水和反応に伴うクリープによって生じた微細なコンクリートの損傷が随時修復されることになり、緻密なコンクリートとなる。
なお、養生時に緊張材12に付与する緊張力は、強度発現過程におけるコンクリートの想定縮み量(500〜1500μ程度)以上のひずみが生じる程度とする。
Next, since compressive force is applied to the hardened body 2 during the curing of the concrete, the fine concrete damage caused by the creep accompanying the hydration reaction during the high temperature curing is repaired as needed, and the dense concrete It becomes.
In addition, the tension | tensile_strength force provided to the tension material 12 at the time of curing is made into the grade which the distortion more than the assumption shrinkage | contraction amount (about 500-1500 micrometers) of the concrete in an intensity | strength expression process arises.

本実施形態では、2段階の緊張力導入方式(常温養生初期に比較的小さな緊張力を導入しておき、高温養生前にその時点のコンクリート強度に見合った緊張力に過緊張(常温時の2倍程度の緊張力を付与)する方式)を採用しているため、合理的に高品質なプレキャストコンクリート部材1を製造することができる。   In this embodiment, a two-stage tension force introduction method (a relatively small tension force is introduced at the beginning of normal temperature curing, and over tension (2 at normal temperature is applied to the tension force corresponding to the concrete strength at that time). Since a method of imparting about twice the tension force) is employed, a reasonably high-quality precast concrete member 1 can be manufactured.

なお、硬化体2に作用させた圧縮力(緊張材12に付与した緊張力)を解除すると、残存緊張力と養生完了時のコンクリートのヤング係数によって求まる弾性圧縮ひずみ(回復クリープ)が消失する。一方、養生時の強度発現によるコンクリートの自己収縮およびクリープによる圧縮ひずみは、ほぼ収束した状態となる(非回復プリープ)。そのため、非回復クリープひずみ分だけコンクリートが押し固められ、その結果、コンクリートが緻密になる。   When the compressive force applied to the hardened body 2 (tensile force applied to the tension material 12) is released, the elastic compressive strain (recovery creep) determined by the residual tensile force and the Young's modulus of the concrete at the completion of curing disappears. On the other hand, the self-shrinkage of concrete due to strength development during curing and the compressive strain due to creep are almost converged (non-recovery prep). Therefore, the concrete is compacted by the non-recovery creep strain, and as a result, the concrete becomes dense.

例えば、Fc200以上の高強度コンクリートの場合、高温養生前の常温時にコンクリート強度が100N/mmを超える場合があるが、その場合には、より大きい圧縮力を硬化体2に導入することができ、高温養生後には大きな非回復ひずみが生じるため、コンクリートがより緻密になる。 For example, in the case of high-strength concrete of Fc 200 or higher, the concrete strength may exceed 100 N / mm 2 at room temperature before high-temperature curing. In that case, a larger compressive force can be introduced into the hardened body 2. After the high temperature curing, a large non-recovery strain occurs, and the concrete becomes denser.

この他の第二の実施形態のプレキャストコンクリート部材の製造方法およびプレキャストコンクリート部材1による作用効果は、第一の実施形態で示した内容と同様なため、詳細な説明は省略する。   Since the effects of the precast concrete member manufacturing method and the precast concrete member 1 according to the other second embodiment are the same as the contents shown in the first embodiment, detailed description thereof is omitted.

以上、本発明の実施形態について説明した。しかし、本発明は、前述の各実施形態に限られず、前記の各構成要素については、本発明の趣旨を逸脱しない範囲で、適宜変更が可能である。   The embodiment of the present invention has been described above. However, the present invention is not limited to the above-described embodiments, and the above-described constituent elements can be appropriately changed without departing from the spirit of the present invention.

例えば、プレキャストコンクリート部材1の用途は限定されるものではない。
プレキャストコンクリート部材1は、図5に示すように、柱に適用してもよい。この場合、シース管7内への充填材9の注入は、目地材16の注入と同時に行ってもよい。
また、鉄筋8を硬化体2の端面から突出させておき、これを他の構造体(例えば基礎17)との接合部における接合筋として使用してもよい。
For example, the use of the precast concrete member 1 is not limited.
The precast concrete member 1 may be applied to a pillar as shown in FIG. In this case, the filling material 9 may be injected into the sheath tube 7 simultaneously with the injection of the joint material 16.
Further, the reinforcing bar 8 may be protruded from the end face of the hardened body 2, and this may be used as a joining bar in a joint portion with another structure (for example, the foundation 17).

また、プレキャストコンクリート部材1は、図6に示すように、扁平断面に形成して、梁に適用してもよい。なお、鉄筋8の端部を硬化体2の端面から突出させておけば、他の部位と接合筋として使用することができる。   Moreover, as shown in FIG. 6, the precast concrete member 1 may be formed in a flat cross section and applied to a beam. In addition, if the edge part of the reinforcing bar 8 is made to protrude from the end surface of the hardening body 2, it can be used as another part and a joining bar.

また、図6の(b)に示すように、複数のプレキャストコンクリート部材1,1,1同士を連結して長大スパン梁を形成してもよい。プレキャストコンクリート部材1同士の接合方法は限定されないが、例えば、圧着接合目地により接合すればよい。   Further, as shown in FIG. 6B, a plurality of precast concrete members 1, 1, 1 may be connected to form a long span beam. Although the joining method of the precast concrete members 1 is not limited, For example, what is necessary is just to join by a crimping joint.

前記各実施形態では、緊張材にネジ鉄筋を使用して、緊張後、プレキャストコンクリート部材の主筋に転用する場合について説明したが、主筋8は、シース管7から緊張材を撤去した後に、新たに配筋してもよい。   In each of the above-described embodiments, the case where the thread reinforcement is used as the tension member and is diverted to the main reinforcement of the precast concrete member after the tension has been described, but the main reinforcement 8 is newly added after the tension member is removed from the sheath tube 7. You may arrange the bars.

高温養生時に、断面中心部に形成された貫通孔に送気する場合について説明したが、主筋用に配管したシース管7に送気してもよい。   Although the case where air is supplied to the through hole formed in the center of the cross section during high temperature curing has been described, air may be supplied to the sheath tube 7 piped for the main muscle.

1 プレキャストコンクリート部材
2 硬化体
3 主筋
4 主筋
5 配力筋
6 貫通孔
7 シース管
8 鉄筋
9 充填材
10 型枠
11 内型枠
12 緊張材
13 支圧板
14 ナット
15 送風機
DESCRIPTION OF SYMBOLS 1 Precast concrete member 2 Hardened body 3 Main reinforcement 4 Main reinforcement 5 Distributing reinforcement 6 Through-hole 7 Sheath tube 8 Reinforcement 9 Filler 10 Mold 11 Inner mold 12 Tension 13 Supporting plate 14 Nut 15 Blower

Claims (4)

型枠にシース管を配管するとともに前記型枠にコンクリートを打設する工程と、
前記コンクリートを一次養生する工程と、
前記シース管に挿入された緊張材を利用して前記コンクリートの硬化体に圧縮力を導入した状態で前記コンクリートを二次養生する工程と、
前記圧縮力を解除する工程と、
前記シース管内に鉄筋を配筋するとともに充填材を充填する工程と、を備えることを特徴とする、プレキャストコンクリート部材の製造方法。
Placing a sheath tube on the mold and placing concrete on the mold;
A step of primarily curing the concrete;
Secondary curing of the concrete in a state where a compressive force is introduced into the hardened body of the concrete using a tendon inserted into the sheath tube;
Releasing the compression force;
A method of manufacturing a precast concrete member, comprising: arranging reinforcing bars in the sheath tube and filling a filler.
前記二次養生を50℃以上の高温養生で行うことを特徴とする、請求項1に記載のプレキャストコンクリート部材の製造方法。   The method for producing a precast concrete member according to claim 1, wherein the secondary curing is performed at a high temperature curing of 50 ° C or higher. 前記二次養生を常温で行った後、前記圧縮力を増加させて50℃以上の高温養生により三次養生を行う工程をさらに備えることを特徴とする、請求項1に記載のプレキャストコンクリート部材の製造方法。   2. The production of the precast concrete member according to claim 1, further comprising a step of performing tertiary curing by high temperature curing at 50 ° C. or more after increasing the compressive force after performing the secondary curing at normal temperature. Method. 前記硬化体に貫通孔を形成するための内型枠を前記型枠の中心部に配置しておき、
前記高温養生時に前記硬化体の外周面および前記貫通孔から加熱することを特徴とする、請求項2または請求項3に記載のプレキャストコンクリート部材の製造方法。
An inner mold for forming a through hole in the cured body is disposed in the center of the mold,
The method for producing a precast concrete member according to claim 2 or 3, wherein heating is performed from an outer peripheral surface of the cured body and the through hole during the high temperature curing.
JP2014010143A 2014-01-23 2014-01-23 Method for producing precast concrete member Expired - Fee Related JP6247942B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014010143A JP6247942B2 (en) 2014-01-23 2014-01-23 Method for producing precast concrete member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014010143A JP6247942B2 (en) 2014-01-23 2014-01-23 Method for producing precast concrete member

Publications (2)

Publication Number Publication Date
JP2015136876A JP2015136876A (en) 2015-07-30
JP6247942B2 true JP6247942B2 (en) 2017-12-13

Family

ID=53768214

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014010143A Expired - Fee Related JP6247942B2 (en) 2014-01-23 2014-01-23 Method for producing precast concrete member

Country Status (1)

Country Link
JP (1) JP6247942B2 (en)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH076293B2 (en) * 1985-10-21 1995-01-30 東急建設株式会社 Prestressed construction method
JP2000327450A (en) * 1999-05-12 2000-11-28 Shimizu Corp Concrete casting method
JP4651025B2 (en) * 2006-03-06 2011-03-16 株式会社フジタ Precast reinforced concrete member and manufacturing method thereof

Also Published As

Publication number Publication date
JP2015136876A (en) 2015-07-30

Similar Documents

Publication Publication Date Title
Wang et al. Push-out tests of demountable headed stud shear connectors in steel-UHPC composite structures
Chen et al. Use of high strength strain-hardening cementitious composites for flexural repair of concrete structures with significant steel corrosion
CN105378129B (en) Method for producing prestressed concrete structures by means of profiles made of shape memory alloys and structures built according to this method
Holmes et al. Active confinement of weakened concrete columns
CN106013615B (en) A self-stressed concrete composite column confined by FRP tubes
CN110359379A (en) Damaged bridge pier mixed reinforcement structure based on marmem and carbon cloth
JP6255206B2 (en) Construction method of reinforcement structure
CN114809295B (en) A multi-core pressure-formed steel tube concrete composite component and its manufacturing method
Wang et al. Flexural behavior of composite beams with textile reinforced concrete (TRC) permanent formwork considering interface characteristics
JP6802219B2 (en) Construction method of precast concrete members and joint structure of precast concrete members
Arowojolu et al. Plastic hinge relocation in exterior reinforced beam–column joint and compliance issues to seismic design guidelines—A review
JP5261418B2 (en) Method for manufacturing prestressed concrete member
JP6247942B2 (en) Method for producing precast concrete member
Shim et al. Experimental tests for improving buildability of construction methods for high‐strength concrete columns in high‐rise buildings
JP2011094476A (en) Method for manufacturing reinforced concrete member
JP2018080460A (en) Connecting structure and connecting method
CN115198883A (en) SMA-ECC composite reinforced RC frame structure and construction method thereof
CN201184019Y (en) Reinforcing bar anti-dew fixed body
CN110005130A (en) A kind of slow-bonding prestressed tendon beam top pull-up tension component and its construction technology
CN106049687A (en) Spatial sandwich joint for improving anti-seismic performance through casing pipes and construction method
CN112538820B (en) Shrinkage weak constraint connection structure of steel-ultra-high performance concrete combined bridge deck and construction method
CN110027109A (en) A method of avoiding UHPC structural elements shrinkage cracking in knot hard process
JP2021055531A (en) Floor slab joint structure
CN110056131B (en) Composite steel pipe concrete structure and manufacturing method thereof
JP2020133260A (en) Joining structure of concrete slab and joining method of concrete slab

Legal Events

Date Code Title Description
RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20160506

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160823

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20170801

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170728

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20170914

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20171114

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20171120

R150 Certificate of patent or registration of utility model

Ref document number: 6247942

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees