Prestressed construction method

Info

Publication number
JPH076293B2
JPH076293B2 JP60233317A JP23331785A JPH076293B2 JP H076293 B2 JPH076293 B2 JP H076293B2 JP 60233317 A JP60233317 A JP 60233317A JP 23331785 A JP23331785 A JP 23331785A JP H076293 B2 JPH076293 B2 JP H076293B2
Authority
JP
Japan
Prior art keywords
concrete
strength
stress
prestress
prestressed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP60233317A
Other languages
Japanese (ja)
Other versions
JPS6294656A (en
Inventor
俊彦 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tokyu Construction Co Ltd
Original Assignee
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tokyu Construction Co Ltd filed Critical Tokyu Construction Co Ltd
Priority to JP60233317A priority Critical patent/JPH076293B2/en
Publication of JPS6294656A publication Critical patent/JPS6294656A/en
Publication of JPH076293B2 publication Critical patent/JPH076293B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Rod-Shaped Construction Members (AREA)
  • Bridges Or Land Bridges (AREA)
  • Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)

Description

【発明の詳細な説明】 〈産業上の利用分野〉 本発明は、プレストレス構造物の施工方法に関するもの
である。
DETAILED DESCRIPTION OF THE INVENTION <Industrial Application Field> The present invention relates to a method for constructing a prestressed structure.

〈従来の技術〉 プレストレスコンクリートとは、荷重が加わることによ
ってコンクリート部材に発生する応力を打ち消すよう
に、あらかじめ応力に相当する圧縮力を与えておく方式
のコンクリートである。
<Prior Art> Prestressed concrete is a type of concrete in which a compressive force corresponding to the stress is applied in advance so as to cancel the stress generated in the concrete member by applying a load.

プレストレスコンクリートにおいては、プレストレスを
導入する時期は、コンクリートの圧縮強度が設計強度の
85%程度に達してからとされている。
For prestressed concrete, the compressive strength of the concrete is
It is said to have reached about 85%.

その理由は、85%程度に達する以前に一度にプレストレ
スを導入すると、次のような欠陥が生じるからと考えら
れていた。
It was thought that the reason for this was that if prestressing was introduced at a time before reaching about 85%, the following defects would occur.

(1) クリープが過大に発生してしまう。(1) Creep occurs excessively.

(2) 導入部のコンクリートが破壊してしまう。(2) The concrete in the introduction part will be destroyed.

(3) 85%程度に達する以前にプレストレスを導入し
た場合の短期、長期的性状が不明である。
(3) The short-term and long-term properties when prestress is introduced before reaching 85% are unknown.

〈本発明が解決しようとする問題点〉 圧縮強度が設計強度の85%程度に達してから、プレスト
レスを導入するという従来の方法では次のような問題点
が存在する。
<Problems to be Solved by the Present Invention> The conventional method of introducing prestress after the compressive strength reaches about 85% of the design strength has the following problems.

〈イ〉 コンクリートを支持する型枠、支保工の設置期
間が長くなる。
<a> The installation period for the formwork and supporting structure that supports concrete will be extended.

そのため、例えば建設工事においては少なくとも2層分
の型枠、支保工を必要とする。
Therefore, for example, construction work requires at least two layers of formwork and support work.

〈ロ〉 プレストレス導入までに長時間養生しておくこ
とによって、加工荷重等によりコンクリート部材にひび
割れが発生する可能性が大きい。
<B> By pre-stressing for a long time before the introduction of stress, it is highly possible that cracks will occur in the concrete member due to processing loads.

〈本発明の目的〉 本発明は以上の点に鑑みて成されたもので、その目的と
するところは工期の短縮と施工の経済性が図れる、プレ
ストレス構造物の施工方法を提供することにある。
<Purpose of the present invention> The present invention has been made in view of the above points, and an object of the present invention is to provide a method for constructing a prestressed structure, which can shorten the construction period and achieve economical construction. is there.

〈本発明の構成〉 〈イ〉 若材令時の鉄筋コンクリートの特性 従来から、コンクリートのテストピースを対象とした材
令ごとの強度変化、その他の実験は無数に行われてい
る。
<Structure of the Present Invention><a> Characteristics of Reinforced Concrete at Young Age In the past, countless experiments have been conducted on the strength change of each age of a concrete test piece.

しかし、製品としての鉄筋コンクリートの材令と特性の
関係はほとんど研究されていない。
However, the relationship between the age and properties of reinforced concrete as a product has not been studied.

本発明者はこの点に着目して、材令と振動数(剛性)と
の関係を求める実験をくり返したところ、第1図のよう
な結果を得た。
Focusing on this point, the present inventor repeated the experiment for obtaining the relationship between the age and the frequency (rigidity), and obtained the result as shown in FIG.

この結果、若材令のコンクリートに載荷しても、載荷が
早すぎるということによって特性が低下することはな
く、それ以降も材令と共に剛性は順調に増加しているこ
とが初めてわかった。
As a result, it was found for the first time that the properties did not deteriorate even when loaded on young concrete, because the loading was too early, and thereafter the rigidity increased steadily with age.

〈ロ〉 緊張力の導入 そこで、コンクリート構造物にプレストレスを導入する
時期についてつぎのような結論に達した。
<B> Introduction of tension force Therefore, the following conclusions were reached regarding the time to introduce prestress to the concrete structure.

(1) コンクリート打設後は、いつからプレストレス
を導入してもよい。
(1) The prestress may be introduced anytime after the concrete is poured.

(2) 導入の最も早い時期は、コンクリート自体が型
枠による支持がなくともその形状を維持できる強度を発
現したときからである。
(2) The earliest period of introduction is when the concrete itself develops the strength capable of maintaining its shape without being supported by the formwork.

〈ハ〉 導入方法 基本的に上記した時期に、一回にプレストレスを導入す
ることを基本とする。
<C> Introduction method Basically, the prestress is introduced once at the above-mentioned time.

尚、複数のPC鋼線を使用したコンクリート構造物の場合
には、つぎのような導入方法を採用する場合もある。
In the case of a concrete structure using a plurality of PC steel wires, the following introducing method may be adopted.

(1) PC鋼線の数本おきに、最終時の緊張力を導入す
る方法 (2) すべてのPC鋼線に最終緊張力の数十%の力を導
入する方法 (3) 上記の(1)と(2)とを組み合わせた方法で
あって、少数本のPC鋼線に対し、最終緊張力の数割の力
を導入する方法 〈ニ〉 割裂防止対策 前記したように、コンクリート自体が型枠による形状の
維持がなくとも、その形状を保つことができるようにな
ったら、その時の強度に応じてプレストレスを導入する
が、この時にPC鋼線のアンカー側や引張側に集中した外
力が加わることがある。
(1) Method of introducing final tension to every few PC steel wires (2) Method of introducing tens of percent of final tension to all PC steel wires (3) Above (1) ) And (2) are combined, and a method in which a few tenths of the final tension force is introduced to a small number of PC steel wires <D> Countermeasures against splitting As mentioned above, the concrete itself is If the shape can be maintained even if the shape is not maintained by the frame, prestress is introduced according to the strength at that time, but at this time the external force concentrated on the anchor side and the tension side of the PC steel wire is applied. May join.

そのため、局部的な割裂や圧壊が発生することが考えら
れる。
Therefore, local splitting or crushing may occur.

こうした現象の発生を避けるためには、外力を広い面積
の鋼製支持板などで受けて分散すればよい。
In order to avoid such a phenomenon, an external force may be received and dispersed by a steel support plate having a large area.

〈ホ〉 他の実施例 第2図に示すようにコンクリート構造物が鉄筋コンクリ
ート構造物1において、シースを介して埋め込んだPC鋼
線2にプレストレスを1回で導入することも可能であ
る。
<E> Other Embodiments As shown in FIG. 2, in a reinforced concrete structure 1 in which a concrete structure is used, prestressing can be introduced into the PC steel wire 2 embedded via a sheath once.

この場合には、プレストレスは仮設として利用する。In this case, prestress is used as a temporary structure.

その結果、鉄筋コンクリートとしての強度が出る前に、
プレストレスによってコンクリートの形状が維持され、
さらにその上面に加わる作業荷重に耐えることができる
ようになる。
As a result, before the strength as reinforced concrete comes out,
Prestress maintains the shape of the concrete,
Furthermore, it becomes possible to bear the work load applied to the upper surface.

〈本発明の効果〉 本発明は以上説明したようになるから次の効果を得るこ
とができる。
<Effects of the Present Invention> Since the present invention is as described above, the following effects can be obtained.

〈イ〉 プレストレスの導入により、コンクリートが未
硬化ながらコンクリート構造物の形状を確実に維持でき
る。
<a> By introducing prestress, the shape of the concrete structure can be reliably maintained while the concrete has not yet hardened.

しかも施工時の荷重(上層階のコンクリート型枠、支保
工の重量など)を確実に支承することができる。
Moreover, it is possible to reliably support the load during construction (concrete formwork on the upper floors, weight of supporting work, etc.).

そのため早期に脱型できるから、型枠や支保工等の仮
設部材の使用数が少なくて済む。
Therefore, it is possible to remove the mold early, so it is possible to temporarily remove formwork and support work.
The number of installation members used is small.

〈ロ〉 水和作用が盛んに進行している最中にコンクリ
ートに圧縮力を加えるため、高強度のコンクリートが得
られる。
<B> High-strength concrete can be obtained because compressive force is applied to concrete while hydration is actively progressing.

〈ハ〉 構造物が鉄筋コンクリート製である場合は、鉄
筋コンクリートとしての強度が出る前にプレストレスに
よって構造物の形状を維持できるから、プレストレスを
仮設として利用することができる。
<C> When the structure is made of reinforced concrete, the shape of the structure can be maintained by prestressing before the strength of the reinforced concrete appears, and thus prestressing can be used as a temporary structure.

【図面の簡単な説明】[Brief description of drawings]

第1図:鉄筋コンクリート部材の材令と剛性との関係の
説明図 第2図:プレストレスを仮設として利用する場合の説明
Fig. 1: Explanatory diagram of the relationship between the age and rigidity of reinforced concrete members Fig. 2: Explanatory diagram when prestress is used as a temporary structure

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】コンクリート構造物中に位置させたアンボ
ンドタイプのPC鋼線に緊張力を与えてコンクリート構造
物にプレストレスを導入する方法において、 打設したコンクリートが構造物の形状を維持可能な程度
の強度を発現したら脱型すると共に、 未硬化のコンクリートを対象にして予備的にプレストレ
スを導入し、 その後、経時的に増強するコンクリートの圧縮強度に応
じて増大させたプレストレスを複数回に亘って導入する
ことを特徴とする、 プレストレス構造物の施工方法、
1. A method of applying pre-stress to a concrete structure by applying a tension force to an unbonded PC steel wire positioned in the concrete structure, in which concrete placed can maintain the shape of the structure. When a certain level of strength is developed, the mold is demolded, pre-stress is preliminarily introduced to the uncured concrete, and then the pre-stress increased in accordance with the compressive strength of the concrete that increases over time is applied multiple times. A method of constructing a prestressed structure, characterized by being introduced over
JP60233317A 1985-10-21 1985-10-21 Prestressed construction method Expired - Fee Related JPH076293B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP60233317A JPH076293B2 (en) 1985-10-21 1985-10-21 Prestressed construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP60233317A JPH076293B2 (en) 1985-10-21 1985-10-21 Prestressed construction method

Publications (2)

Publication Number Publication Date
JPS6294656A JPS6294656A (en) 1987-05-01
JPH076293B2 true JPH076293B2 (en) 1995-01-30

Family

ID=16953234

Family Applications (1)

Application Number Title Priority Date Filing Date
JP60233317A Expired - Fee Related JPH076293B2 (en) 1985-10-21 1985-10-21 Prestressed construction method

Country Status (1)

Country Link
JP (1) JPH076293B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6247942B2 (en) * 2014-01-23 2017-12-13 大成建設株式会社 Method for producing precast concrete member

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5282921A (en) * 1975-12-29 1977-07-11 Hokuriku Concrete Kogyo Postttension prestressed concrete method

Also Published As

Publication number Publication date
JPS6294656A (en) 1987-05-01

Similar Documents

Publication Publication Date Title
US2510958A (en) Composite floor of metal and concrete
KR100500156B1 (en) Prestress composite beam and method of manufacturing the same
US3260024A (en) Prestressed girder
JPH076293B2 (en) Prestressed construction method
JPS6145042A (en) Mold frame for casting concrete
JPH0520817Y2 (en)
SU1728383A1 (en) Foundation underpinning method
US2035977A (en) Reenforced concrete structural member
JPH0571745B2 (en)
US3327028A (en) Method of making composite metal and concrete structures
JPH0426483Y2 (en)
US4023318A (en) Concrete structures
JPH0571746B2 (en)
JPH06146472A (en) Precast ferro-concrete beam
JPS5830988B2 (en) How to reinforce existing reinforced concrete floor slabs
US3173193A (en) Method of manufacturing a lattice girder
JPH0441733B2 (en)
JPS6059383B2 (en) Construction method for steel reinforced concrete structures
JPH01158146A (en) Method of torus-reinforced thin precast floor board driving formwork construction
JP3028993B2 (en) Flat slab construction method
GB2197360A (en) Prestressed concrete articles
SU49135A1 (en) The method of manufacturing reinforced concrete beams and the message to the reinforcement of its preliminary stresses
JPS586002B2 (en) Deck pouring method for arch type and suspension type bridges
SU1025830A1 (en) Prestressed composite metal truss
JPH04222741A (en) Half precast concrete beam

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees