Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6316786B2 - Power supply control unit and power supply system - Google Patents
[go: Go Back, main page]

JP6316786B2 - Power supply control unit and power supply system - Google Patents

Power supply control unit and power supply system Download PDF

Info

Publication number
JP6316786B2
JP6316786B2 JP2015190921A JP2015190921A JP6316786B2 JP 6316786 B2 JP6316786 B2 JP 6316786B2 JP 2015190921 A JP2015190921 A JP 2015190921A JP 2015190921 A JP2015190921 A JP 2015190921A JP 6316786 B2 JP6316786 B2 JP 6316786B2
Authority
JP
Japan
Prior art keywords
power
load
power generation
control unit
storage battery
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015190921A
Other languages
Japanese (ja)
Other versions
JP2017070034A (en
Inventor
秀正 伊藤
秀正 伊藤
Original Assignee
株式会社スマートパワーサービス
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 株式会社スマートパワーサービス filed Critical 株式会社スマートパワーサービス
Priority to JP2015190921A priority Critical patent/JP6316786B2/en
Publication of JP2017070034A publication Critical patent/JP2017070034A/en
Application granted granted Critical
Publication of JP6316786B2 publication Critical patent/JP6316786B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B10/00Integration of renewable energy sources in buildings
    • Y02B10/70Hybrid systems, e.g. uninterruptible or back-up power supplies integrating renewable energies

Landscapes

  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Stand-By Power Supply Arrangements (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Description

この発明は、集合住宅の共用部に電力供給を行う電力供給制御ユニットおよび電力供給システムに関するものである。   The present invention relates to a power supply control unit and a power supply system for supplying power to a common part of an apartment house.

従来より、マンション等の集合住宅に、太陽光発電装置等の発電装置を設けて電力を蓄電池に蓄電し、集合住宅の共用部にその蓄電池から電力を供給する電力供給システムが提案されている(例えば、特許文献1参照)。   Conventionally, a power supply system has been proposed in which a power generation device such as a solar power generation device is provided in an apartment house such as an apartment to store electric power in a storage battery, and electric power is supplied from the storage battery to a common part of the apartment house ( For example, see Patent Document 1).

特開2001−103676号公報JP 2001-103676 A

しかしながら、例えば特許文献1に示すような従来の電力供給システムでは、太陽光発電装置は集合住宅の屋根全面に設置されるほど大規模なものでコストがかかり、かつ、蓄電池に蓄えられる電力量も大きく売電できるほどのものであり、あまり節電の効果が期待できるものではなかった。   However, in the conventional power supply system as shown in Patent Document 1, for example, the photovoltaic power generation device is so large that it is installed on the entire roof surface of the apartment house, which is costly, and the amount of power stored in the storage battery is also large. It was so large that it could sell electricity and was not expected to have much power saving effect.

また、災害時等の停電発生時のことは考慮されておらず、夜間等で太陽光発電装置による発電や蓄電を行うことができない期間が長かった場合、蓄電池に蓄えられている電力量がなくなってしまったらそれで終わりだったため、住民が安全に避難することができるように共用部の照明装置が継続して作動するかどうかわからない、という課題もあった。   In addition, when power outages such as disasters are not taken into account, if there is a long period of time during which it is not possible to generate or store electricity using a solar power generation device at night, the amount of power stored in the storage battery is lost When it was done, it was over, so there was a problem that it was not known whether the lighting equipment in the common area would continue to operate so that residents could evacuate safely.

この発明は、上記のような課題を解決するためになされたものであり、防災を目的とし、災害時等の停電発生時に、住民が安全に避難するのに必要な電力を蓄電システムから効率的かつ継続的に供給できるよう、集合住宅の共用部に電力供給を行う電力供給制御ユニットおよびその電力供給制御ユニットを使用した電力供給システムを提供することを目的とする。   The present invention has been made to solve the above-described problems, and is intended for disaster prevention, and efficiently generates power necessary for residents to evacuate safely from a power storage system when a power outage occurs during a disaster or the like. It is another object of the present invention to provide a power supply control unit that supplies power to a common part of an apartment house and a power supply system that uses the power supply control unit so that it can be supplied continuously.

上記目的を達成するため、この発明は、集合住宅において、当該集合住宅に設置された発電装置および蓄電池を有する蓄電システムにより発電および蓄電された電力のみによって、前記集合住宅の共用部の照明装置に電力供給を行う電力供給制御ユニットであって、前記蓄電システムから、前記発電装置が発電した発電量を取得する発電量取得部と、前記蓄電システムから、前記蓄電池に蓄電されている蓄電池残量を取得する蓄電池残量取得部と、前記集合住宅が停電中か否かという情報を取得する系統連携状態取得部と、前記集合住宅の共用部の照明装置に電力供給を行う各負荷系統に関する情報として、少なくとも前記各負荷系統の消費電力目安量と、前記各負荷系統の通常運転時と停電時の開閉制御スケジュールとが記憶されている各負荷系統データ記憶部と、前記各負荷系統の開閉制御を行う特定負荷開閉制御部とを備え、前記特定負荷開閉制御部は、前記発電量取得部が取得した発電量に基づいた発電量予測値を算出し、当該算出した前記発電量予測値と、前記蓄電池残量取得部が取得した蓄電池残量と、前記系統連携状態取得部が取得した前記集合住宅が停電中か否かという情報と、前記各負荷系統データ記憶部に記憶されている前記各負荷系統の消費電力目安量と通常運転時と停電時の開閉制御スケジュールとに基づいて、通常運転時であっても停電時であっても前記蓄電システムにより発電および蓄電された電力のみによって前記集合住宅の共用部の照明装置への電力供給を継続的に行うことができるように前記各負荷系統の開閉制御を行うことを特徴とする。 In order to achieve the above object, the present invention provides a lighting device for a common part of an apartment house only in electric power generated and stored by an electricity storage system having a power generator and a storage battery installed in the apartment house. A power supply control unit that supplies power, a power generation amount acquisition unit that acquires a power generation amount generated by the power generation device from the power storage system, and a storage battery remaining amount stored in the storage battery from the power storage system. As information about each load system for supplying power to the storage battery remaining amount acquisition unit to be acquired, a system linkage state acquisition unit to acquire information on whether or not the apartment house is in a power outage, and a lighting device of the shared part of the apartment house each at least the power measure of the load system, and the open-close control schedule of power failure and normal operation of the load system is stored A load system data storage unit and a specific load switching control unit that performs switching control of each load system, wherein the specific load switching control unit is a power generation amount prediction value based on the power generation amount acquired by the power generation amount acquisition unit The calculated power generation amount predicted value, the storage battery remaining amount acquired by the storage battery remaining amount acquisition unit, and information on whether or not the apartment house acquired by the grid cooperation state acquisition unit is in a power outage, on the basis of the opening and closing control schedule of power failure and power recommended dose and normal operation of the respective load lines stored in each load system data storage unit, even during a power failure even during normal operation The load system is controlled to be opened and closed so that power can be continuously supplied to the lighting device of the common part of the apartment house only by the power generated and stored by the power storage system.

この発明の電力供給制御ユニットまたはその電力供給制御ユニットを使用した電力供給システムによれば、通常運転時であっても停電時であっても蓄電システムにより発電および蓄電された電力のみによって集合住宅の共用部の照明装置への電力供給を継続的に行うことができるように、きめ細かく各負荷系統の開閉制御を行うので、災害時等の停電発生時であっても、住民が安全に避難するのに必要な電力を蓄電システムから効率的かつ継続的に供給することができる。 According to the power supply control unit or the power supply system using the power supply control unit of the present invention, the collective housing can be used only by the power generated and stored by the power storage system during normal operation or power outage . Since each load system is controlled finely so that power can be supplied continuously to the lighting equipment in the common area, residents can evacuate safely even when a power outage occurs during a disaster, etc. Can be efficiently and continuously supplied from the power storage system.

実施の形態1における電力供給システムの概略構成を示すシステム構成図である。1 is a system configuration diagram illustrating a schematic configuration of a power supply system according to Embodiment 1. FIG. 実施の形態1における電力供給制御ユニットの機能構成を示す機能ブロック図である。2 is a functional block diagram showing a functional configuration of a power supply control unit in Embodiment 1. FIG. 実施の形態1における電力供給制御ユニットの動作を示すフローチャートである。3 is a flowchart showing the operation of the power supply control unit in the first embodiment. 実施の形態1における各負荷系統データ記憶部に記憶されている各負荷系統の様々な情報の一例を示す表である。4 is a table showing an example of various information of each load system stored in each load system data storage unit in the first embodiment. 実施の形態1における各負荷系統データ記憶部に記憶されている各負荷系統の開閉制御スケジュールの一例を示すグラフである。4 is a graph showing an example of an open / close control schedule for each load system stored in each load system data storage unit in the first embodiment. 実施の形態1における各負荷系統に接続されている機器の消費電力目安量と数量を示す表である。4 is a table showing a power consumption guide amount and quantity of devices connected to each load system in the first embodiment. 実施の形態2における電力供給制御ユニットの機能構成を示す機能ブロック図である。6 is a functional block diagram showing a functional configuration of a power supply control unit in a second embodiment. FIG. 実施の形態3における電力供給システムの概略構成を示すシステム構成図である。FIG. 10 is a system configuration diagram showing a schematic configuration of a power supply system in a third embodiment. 実施の形態3における電力供給制御ユニットおよびセンタークラウドの機能構成を示す機能ブロック図である。FIG. 10 is a functional block diagram illustrating functional configurations of a power supply control unit and a center cloud in a third embodiment. 実施の形態3における電力供給制御ユニットの動作を示すフローチャートである。10 is a flowchart showing the operation of the power supply control unit in the third embodiment. 実施の形態3におけるセンタークラウドの動作を示すフローチャートである。10 is a flowchart showing the operation of the center cloud in the third embodiment.

以下、この発明の実施の形態について、図面を参照しながら詳細に説明する。
実施の形態1.
図1は、この発明の実施の形態1における電力供給システムの概略構成を示すシステム構成図である。この電力供給システムは、防災を目的とし、マンション等の集合住宅において、災害等の停電発生時にその集合住宅の共用部に対して必要な電力を効率的かつ継続的に供給するものであり、共用部の特定負荷について系統電力を使用せず、太陽エネルギー等の発電装置からの発電のみで運用することが可能な自家発電システムである。
Hereinafter, embodiments of the present invention will be described in detail with reference to the drawings.
Embodiment 1 FIG.
1 is a system configuration diagram showing a schematic configuration of a power supply system according to Embodiment 1 of the present invention. This power supply system is intended for disaster prevention, and in an apartment house such as a condominium, it efficiently and continuously supplies the necessary power to the common part of the apartment house when a power failure such as a disaster occurs. It is a private power generation system that can be operated only by power generation from a power generation device such as solar energy without using grid power for a specific load of the unit.

また、この集合住宅の共用部に電力供給を行う負荷系統は8つ(負荷1〜負荷8)にわかれているものとし、分電盤10は、負荷1〜負荷8の各負荷系統への電力供給の分岐を行うものである。なお、負荷1〜負荷8の具体例については、後述する図4〜図6において説明する。   Moreover, the load system which supplies electric power to the common part of this apartment house shall be divided into eight (load 1-load 8), and the distribution board 10 is the electric power to each load system of load 1-load 8. The supply is branched. Note that specific examples of the loads 1 to 8 will be described with reference to FIGS.

また、この集合住宅には太陽光パネル等の自然エネルギーを利用した発電装置21と、それにより発電された電力を蓄電する蓄電池22が設けられている。この実施の形態1では、発電装置21は太陽光パネルを用いた太陽光発電装置であり、この発電装置21と、この発電装置21により発電された電力を蓄電する蓄電池22と、これらの情報(例えば、発電量、蓄電池残量、充放電量など)を取得するコントローラ23とにより、自家発電システムである蓄電システム20が構成されている。なお、自家発電システムとしては、太陽光発電に限らず、風力発電やバイオマスによる発電など、他の自然エネルギーを用いるものであってもよい。   In addition, the apartment house is provided with a power generation device 21 that uses natural energy such as a solar panel and a storage battery 22 that stores electric power generated by the power generation device 21. In the first embodiment, the power generation device 21 is a solar power generation device using a solar panel, and this power generation device 21, a storage battery 22 that stores the power generated by the power generation device 21, and the information ( For example, a power storage system 20 that is a private power generation system is configured by a controller 23 that acquires a power generation amount, a remaining amount of storage battery, a charge / discharge amount, and the like. Note that the in-house power generation system is not limited to solar power generation, and may use other natural energy such as wind power generation or power generation using biomass.

そして、この蓄電システム20により発電および蓄電された電力のみによって、この集合住宅の共用部への電力供給を継続的に行うことができるように、負荷1〜負荷8の各負荷系統の開閉制御を行う電力供給制御ユニット30を備えている。また、蓄電システム20と電力供給制御ユニット30は、ルータ40を介して接続されている。   And the opening / closing control of each load system of the loads 1 to 8 is performed so that the power supply to the common part of the apartment house can be continuously performed only by the power generated and stored by the power storage system 20. A power supply control unit 30 is provided. The power storage system 20 and the power supply control unit 30 are connected via a router 40.

そして、通常運転時(停電時ではない場合)にも、蓄電システム20により発電および蓄電された電力のみによって集合住宅の共用部への電力供給を継続的に行っている。これは、集合住宅の共用部における照明装置をすべてLED照明にすることにより、消費電力(放電量)が大幅に削減できることにより実現可能となったものである。すなわち、この集合住宅の共用部における照明装置は、すべてLED照明である。   Further, even during normal operation (not during a power failure), power is continuously supplied to the common part of the apartment house only by the power generated and stored by the power storage system 20. This can be realized by making the lighting devices in the common part of the apartment house all LED lighting so that the power consumption (discharge amount) can be greatly reduced. That is, the illumination devices in the common part of this apartment house are all LED lighting.

図2は、実施の形態1における電力供給制御ユニット30の機能構成を示す機能ブロック図である。
この電力供給制御ユニット30は、ルータ40を介して接続されている蓄電システム20のコントローラ23から、発電装置21が発電した発電量を取得する発電量取得部31、蓄電池22に蓄えられている電力量(蓄電池残量)を取得する蓄電池残量取得部32、を備えるとともに、集合住宅が停電中か否かという情報を取得する系統連携状態取得部33と、集合住宅の共用部に電力共有を行う各負荷系統に関する情報として、少なくとも負荷1〜負荷8の各負荷系統の消費電力目安量と、各負荷系統の開閉制御スケジュールとが記憶されている各負荷系統データ記憶部34と、負荷1〜負荷8の各負荷系統の開閉制御を行う特定負荷開閉制御部35を備えている。
FIG. 2 is a functional block diagram illustrating a functional configuration of the power supply control unit 30 according to the first embodiment.
The power supply control unit 30 includes a power generation amount acquisition unit 31 that acquires the power generation amount generated by the power generation device 21 from the controller 23 of the power storage system 20 connected via the router 40, and the power stored in the storage battery 22. A storage battery remaining amount acquisition unit 32 that acquires the amount (remaining battery remaining amount) is provided, and a system linkage state acquisition unit 33 that acquires information on whether the apartment house is in a power outage and power sharing to the shared part of the apartment house As information about each load system to be performed, each load system data storage unit 34 storing at least the estimated power consumption amount of each load system of loads 1 to 8 and the switching control schedule of each load system, and loads 1 to 1 are stored. A specific load switching control unit 35 that performs switching control of each load system of the load 8 is provided.

ここで、この実施の形態1では、系統連携状態取得部33は、蓄電システム20から集合住宅が停電中か否かという情報を取得するものとして説明する。これは、系統連携、つまり、電力会社からの電力供給を受けているか、自立運転、つまり、電力会社からの電力供給が停止しているかを、蓄電システム20が検知することができるからである。すなわち、停電発生は、系統連携状態が系統連携から自立運転に変わったことにより検知でき、停電復旧は、系統連携状態が自立運転から系統連携に変わったことにより検知することができる。   Here, in this Embodiment 1, the grid cooperation state acquisition part 33 demonstrates as what acquires the information of whether the housing complex is during a power failure from the electrical storage system 20. FIG. This is because the power storage system 20 can detect system cooperation, that is, receiving power supply from the power company, or autonomous operation, that is, whether power supply from the power company is stopped. That is, the occurrence of a power failure can be detected when the grid linkage state is changed from grid linkage to independent operation, and the power failure recovery can be detected when the grid linkage state is changed from autonomous mode to grid linkage.

なお、電力供給制御ユニット30が停電発生/復旧検知機能を有している場合には、図2における蓄電システム20のコントローラ23から系統連携状態取得部33への矢印は不要となり、直接、停電発生および停電復旧を検知することができるので、集合住宅が停電中か否かという情報を取得することができる。
また、電力供給制御ユニット30は、蓄電システム20から取得した情報をバッファーしておく記憶部(図示せず)を内部に備えているものとする。
If the power supply control unit 30 has a power failure occurrence / recovery detection function, the arrow from the controller 23 of the power storage system 20 to the grid linkage state acquisition unit 33 in FIG. Since it is possible to detect a power failure recovery, it is possible to acquire information on whether or not the apartment house is in a power failure.
The power supply control unit 30 is assumed to include a storage unit (not shown) that buffers information acquired from the power storage system 20.

この特定負荷開閉制御部35における開閉制御の方法については後述するが、これらの構成により、この電力供給制御ユニット30を介して、集合住宅に設置された発電装置21の発電量や、蓄電池22に蓄えられている蓄電池残量を取得して、集合住宅の共用部に電力供給を行う各負荷系統の消費電力を自動制御し、停電時にその集合住宅に最も適した電力の使用を継続的にサポートすることができる。   The method of opening / closing control in the specific load opening / closing control unit 35 will be described later. With these configurations, the power generation amount of the power generation device 21 installed in the apartment house and the storage battery 22 are connected via the power supply control unit 30. Acquires the remaining amount of stored battery and automatically controls the power consumption of each load system that supplies power to the common part of the apartment house, and continuously supports the use of the power most suitable for that apartment house during a power outage can do.

図3は、実施の形態1における電力供給制御ユニット30の動作を示すフローチャートである。
まず初めに、発電量取得部31が、蓄電システム20から発電装置21が発電した発電量を取得する(ステップST1)。また、蓄電池残量取得部32が、蓄電システム20から蓄電池22に蓄えられている電力量(蓄電池残量)を取得する(ステップST2)。
FIG. 3 is a flowchart showing the operation of the power supply control unit 30 in the first embodiment.
First, the power generation amount acquisition unit 31 acquires the power generation amount generated by the power generation device 21 from the power storage system 20 (step ST1). Moreover, the storage battery remaining amount acquisition part 32 acquires the electric energy (storage battery remaining amount) stored in the storage battery 22 from the electrical storage system 20 (step ST2).

さらに、系統連携状態取得部33が、蓄電システム20から集合住宅が停電中か否かという情報を取得する(ステップST3)。
なお、ステップST1〜ステップST3の動作については、ほぼ同時に行われる処理であり、いずれのステップが先に行われても構わない。また、これら情報を取得する動作については、例えば10分ごとや15分ごとなど、周期的に行うものとすればよい。
Furthermore, the grid cooperation state acquisition unit 33 acquires information indicating whether the apartment house is in a power failure from the power storage system 20 (step ST3).
Note that the operations of step ST1 to step ST3 are processes performed almost simultaneously, and any of the steps may be performed first. Moreover, what is necessary is just to perform periodically the operation | movement which acquires such information, for example every 10 minutes or every 15 minutes.

そして、特定負荷開閉制御部35が、発電量取得部31が取得した発電量に基づいて、発電量予測値を算出する(ステップST4)。この発電量予測値については、例えば、直前までの発電量の推移と、前日同時刻の発電量とに基づいて、算出すればよい。例えば、午前8時時点で当日の午前中の発電量予測値を算出したり、今後10時間(午前8時時点であれば夕方6時まで)の発電量予測値を算出したり、また、午前8時時点で当日の午前中の発電量予測値を算出し、正午の時点で午後の発電量予測値を算出するようにしてもよい。   Then, the specific load switching control unit 35 calculates a power generation amount prediction value based on the power generation amount acquired by the power generation amount acquisition unit 31 (step ST4). The predicted power generation amount may be calculated based on, for example, the transition of the power generation amount until immediately before and the power generation amount at the same time on the previous day. For example, calculate the predicted power generation amount in the morning of the day at 8:00 am, calculate the predicted power generation amount for the next 10 hours (until 6:00 in the evening if it is 8:00 am), The predicted power generation amount in the morning of the day may be calculated at 8:00, and the predicted power generation amount in the afternoon may be calculated at noon.

なお、電力供給制御ユニット30が気象情報取得部(図示せず)も備えている場合には、当日の天気予報から、例えば午前8時時点で午前中の発電量予測値を計算し、正午の時点で午後の発電量予測値を計算するようにすれば、より正確な発電力予測値を算出することが可能である。   If the power supply control unit 30 is also provided with a weather information acquisition unit (not shown), the power generation amount predicted value in the morning is calculated from the weather forecast on that day, for example, at 8:00 am, and the noon If the power generation amount predicted value in the afternoon is calculated at the time, a more accurate power generation predicted value can be calculated.

その後、算出した発電量予測値と、蓄電池残量取得部32が取得した蓄電池残量と、系統連携状態取得部33が取得した集合住宅が停電中か否かという情報と、各負荷系統データ記憶部34に記憶されている各負荷系統の消費電力目安量と開閉制御スケジュールとに基づいて、負荷1〜負荷8の各負荷系統に対してどのように開閉を行えばよいかを決定して各負荷系統の開閉制御を行う(ステップST5)。   After that, the calculated power generation amount predicted value, the storage battery remaining amount acquired by the storage battery remaining amount acquisition unit 32, the information on whether the apartment house acquired by the system linkage state acquisition unit 33 is in a power failure, and each load system data storage Based on the power consumption guideline amount of each load system and the switching control schedule stored in the unit 34, it is determined how to open / close each load system of the loads 1 to 8. Open / close control of the load system is performed (step ST5).

ここで、ステップST5における、特定負荷開閉制御部35が開閉制御を行う方法について、具体例を挙げて説明する。
この実施の形態1では、集合住宅の共用部に電力供給を行う負荷系統は8つあるものとして、すなわち、負荷1〜負荷8として説明しており、例えば、エントランスの照明、駐車場の照明、通路の照明、エレベータ前の照明、階段の照明、非常口の照明、集会所の照明等、管理人室の照明等の負荷系統にわかれている(図4参照)。
Here, the method in which the specific load switching control unit 35 performs the switching control in step ST5 will be described with a specific example.
In this Embodiment 1, it has demonstrated as the load system which supplies electric power to the common part of an apartment house, ie, the load 1-load 8, for example, illumination of an entrance, illumination of a parking lot, It is divided into load systems such as aisle lighting, corridor lighting, stairway lighting, emergency exit lighting, meetinghouse lighting, etc. (see FIG. 4).

図4は、実施の形態1における各負荷系統データ記憶部34に記憶されている各負荷系統の様々な情報の一例を示す表である。ここでは、負荷1〜負荷8の各負荷系統の重要度レベル、場所、主な使用機器、1時間あたりの消費電力目安量、負荷系統を開(ON)にする時間帯が記憶されているものとする。そして、前述のステップST5では、各負荷系統データ記憶部34に記憶されている、この図4や後述する図5、図6等に示すような負荷1〜負荷8の各負荷系統の消費電力目安量を使用するものとする。   FIG. 4 is a table showing an example of various information of each load system stored in each load system data storage unit 34 in the first embodiment. Here, the importance level of each load system of load 1 to load 8, location, main equipment used, estimated amount of power consumption per hour, and time zone when the load system is opened (ON) are stored. And And in above-mentioned step ST5, the power consumption standard of each load system | strain of load 1-load 8 as shown in this FIG. 4, FIG. 5, FIG. 6, etc. which are memorize | stored in each load system data storage part 34 is mentioned. The amount shall be used.

また、図5は、実施の形態1における各負荷系統データ記憶部34に記憶されている各負荷系統の開閉制御スケジュールの一例を示すグラフである。図5(a)は、平常時の運用スケジュールであり、図5(b)は、停電時の運用スケジュールを示している。ここでは、負荷1〜負荷8の各負荷系統について、午前5時〜明くる日の午前4時までの1日分について15分ごとに、開(ON)にするか否かの運用スケジュールを、開(ON)にする時間帯を斜線で示すことにより表している。また、1時間ごとの合計の消費電力目安量と、各負荷系統ごとの1日分の消費電力目安量と、全体の合計消費電力目安量も示している。   FIG. 5 is a graph showing an example of an open / close control schedule for each load system stored in each load system data storage unit 34 in the first embodiment. FIG. 5A shows a normal operation schedule, and FIG. 5B shows an operation schedule during a power failure. Here, for each load system of loads 1 to 8, an operation schedule for whether to open (ON) every 15 minutes for one day from 5:00 am to 4:00 am on the next day is opened ( ON) is represented by hatching. In addition, a total power consumption guide amount for every hour, a power consumption guide amount for one day for each load system, and a total power consumption guide amount for the whole are also shown.

例えば、平常時に、午前8時の時点で、そこから5時間(午前中)運用するための開閉制御を決定する場合、図5(a)に示す開閉制御スケジュールから、5時間(午前8時〜12時の間)このスケジュールどおりに運用するために必要な消費電力量は、0.5kWh(0.1+0.1+0.1+0.1+0.1=0.5)となることがわかる。   For example, when determining the opening / closing control to operate for 5 hours (morning) from 8 am in the normal time, from the opening / closing control schedule shown in FIG. It can be seen that the amount of power consumed to operate according to this schedule is 0.5 kWh (0.1 + 0.1 + 0.1 + 0.1 + 0.1 = 0.5).

ここで、この実施の形態1における蓄電システム20においては、蓄電池22に充電可能なフル蓄電池残量が4kWであるものとする。
そして、午前8時の時点での蓄電池残量が2kWh(フル状態4kWhの50%)であり、キープ残量が20%に設定されていると仮定する。この際、0.8kWhは必ず残しておくとすると、使用可能な残量は1.2kWhとなる。
Here, in the electrical storage system 20 in this Embodiment 1, the full storage battery residual amount which can be charged to the storage battery 22 shall be 4 kW.
Assume that the remaining amount of storage battery at 2 am is 2 kWh (50% of the full state 4 kWh) and the remaining amount of keep is set to 20%. At this time, if 0.8 kWh is always left, the usable remaining amount is 1.2 kWh.

この場合、そこから5時間の蓄電システム20における発電量が仮にゼロであったとしても、このまま放電し続けても午前中3時間の消費電力量を賄うことが可能なため、各負荷系統の開閉制御スケジュールどおり運用して問題ないと判断し、開閉制御スケジュールどおり運用する。   In this case, even if the power generation amount in the power storage system 20 for five hours is zero, it is possible to cover the power consumption for three hours in the morning even if the discharge is continued as it is. Operate according to the control schedule, determine that there is no problem, and operate according to the switching control schedule.

また、仮に午前8時の時点での蓄電池残量が1.2kWh(フル状態4kWhの30%)であり、キープ残量が20%に設定されていると仮定する。この際、0.8kWhは必ず残しておくとすると、使用可能な残量は0.4kWhとなる。   Further, it is assumed that the storage battery remaining amount at 8:00 am is 1.2 kWh (30% of the full state 4 kWh) and the remaining remaining amount is set to 20%. At this time, if 0.8 kWh is always left, the usable remaining amount is 0.4 kWh.

この場合には、そこから5時間(午前中)の蓄電システム20における発電量が仮にゼロであった場合には、このまま放電し続けると午前中5時間の消費電力量を賄うことはできないが、前述のとおり、発電量取得部31が取得した発電量に基づいて、すなわち、例えば直前までの発電量の推移と、前日同時刻の発電量とに基づいて、午前中5時間の発電量予測値が0.5kWであると算出された場合には、各負荷系統の開閉制御スケジュールどおり運用して問題ないと判断し、開閉制御スケジュールどおり運用する。   In this case, if the power generation amount in the power storage system 20 for 5 hours (in the morning) is zero, if it continues to be discharged as it is, the power consumption for 5 hours in the morning cannot be covered. As described above, based on the power generation amount acquired by the power generation amount acquisition unit 31, that is, based on the power generation amount up to the previous time and the power generation amount at the same time on the previous day, for example, the predicted power generation amount for 5 hours in the morning Is calculated to be 0.5 kW, it is determined that there is no problem in operating according to the switching control schedule of each load system, and it is operated according to the switching control schedule.

また、例えば、午後5時に停電を感知した際に、そこから12時間運用するための開閉制御を決定する場合、図5(b)に示す開閉制御スケジュールから、その12時間(17時〜午前4時の間)このスケジュールどおりに運用するために必要な消費電力量は、4.205kWhとなることがわかる。   Further, for example, when a power failure is detected at 5 pm, when opening / closing control for operation for 12 hours is determined from the opening / closing control schedule shown in FIG. It can be seen that the power consumption required to operate according to this schedule is 4.205 kWh.

一方、午後5時の時点での蓄電池残量が3.8kWh(フル状態4kWhの80%)であり、キープ残量が20%に設定されていると仮定する。この際、0.8kWhは必ず残しておくとすると、使用可能な残量は2.4kWhとなる。   On the other hand, it is assumed that the remaining battery level at 5:00 p.m. is 3.8 kWh (80% of the full state 4 kWh) and the remaining remaining capacity is set to 20%. At this time, if 0.8 kWh is always left, the usable remaining amount is 2.4 kWh.

この場合、そこから12時間(夜間)の蓄電システム20における発電量予測値は、直前までの発電量の推移と、前日同時刻の発電量とに基づいて、ゼロであると算出されるので、そこから発電が見込めない12時間運用するためには、1時間ごとの消費電力量が0.2kWh以下となるよう制御する必要があるため、各負荷系統のうち、重要度レベルの低い特定負荷を閉じる(OFFにする)といった開閉制御を行う。   In this case, the power generation amount prediction value in the power storage system 20 for 12 hours (nighttime) is calculated to be zero based on the transition of the power generation amount until immediately before and the power generation amount at the same time on the previous day. In order to operate for 12 hours when power generation cannot be expected from that, it is necessary to control the power consumption per hour to be 0.2 kWh or less. Open / close control such as closing (turning OFF) is performed.

図4および図5によれば、重要度レベルがもっとも高い負荷1のエントランスは、1時間の消費電力目安量が0.1kWh、2番目に高い負荷6の非常口は0.03kWh、3番目に高い負荷5の階段は0.05kWh、4番目に高い負荷3の通路は0.035kWhであるので、ここまでで0.215kWhである。   According to FIGS. 4 and 5, the load 1 entrance with the highest importance level has an hourly power consumption target amount of 0.1 kWh, the second highest load 6 emergency exit has 0.03 kWh, and the third highest The load 5 staircase is 0.05 kWh, and the fourth highest load 3 path is 0.035 kWh, so it is 0.215 kWh so far.

ここで、重要度レベルが4番目に高い負荷3の通路については、消費電力が小さめの照明装置をところどころに配置して、照明を間引いて点灯させることができるようにさらに3系統にわかれており、負荷3−1は0.02kWh、負荷3−2は0.01kWh、負荷3−3は0.005kWhであるので、負荷3−1のみを開とすれば、そこまででちょうど0.2kWhである。   Here, the passage of load 3 with the fourth highest importance level is divided into three systems so that lighting devices with lower power consumption can be arranged in some places so that lighting can be thinned out. The load 3-1 is 0.02 kWh, the load 3-2 is 0.01 kWh, and the load 3-3 is 0.005 kWh. If only the load 3-1 is opened, the load is just 0.2 kWh. is there.

図6は、実施の形態1における各負荷系統に接続されている機器の消費電力目安量と数量を示す表である。この図6に示すとおり、負荷2の駐車場も、さらに2系統にわかれており、負荷2−1は10W×2個=20W、負荷2−2は20W×5個=100Wであるため、消費電力目安量は図4に示すように120Wとなる。また、負荷3の通路については、負荷3−1が10W×2個=20W、負荷3−2が5W×2個=10W、負荷3−3が2.5W×2個=5Wであるため、消費電力目安量は図4に示すように35Wとなる。   FIG. 6 is a table showing the estimated power consumption and quantity of devices connected to each load system in the first embodiment. As shown in FIG. 6, the parking lot of load 2 is further divided into two systems, load 2-1 is 10 W × 2 = 20 W, and load 2-2 is 20 W × 5 = 100 W. The power standard amount is 120 W as shown in FIG. Moreover, about the path | route of the load 3, since the load 3-1 is 10Wx2 = 20W, the load 3-2 is 5Wx2 = 10W, and the load 3-3 is 2.5Wx2 = 5W, The estimated power consumption is 35 W as shown in FIG.

したがって、停電時の午後5時から12時間は、基本的には、負荷1,5,6のみを開とし、負荷3については、負荷3−1のみ開、負荷3−2と負荷3−3は閉、負荷2,4,7,8は閉とする、といった開閉制御を行う。これにより、1時間ごとの消費電力量が0.2kWh以下となるよう制御することができる。   Therefore, for 12 hours from 5:00 pm at the time of a power failure, basically, only the loads 1, 5 and 6 are opened, and for the load 3, only the load 3-1 is opened, the load 3-2 and the load 3-3. Is opened and closed, and loads 2, 4, 7, and 8 are closed. Thereby, it can control so that the electric energy consumption for every hour may be 0.2 kWh or less.

ただし、19時台は、負荷6の非常口は30分のみ開とする運用スケジュールであるため、0.015kWh余裕があるので、その時間帯は、負荷3−2および負荷3−3も開として運用することができる。   However, at 19 o'clock, since the emergency exit of load 6 is open only for 30 minutes, there is a margin of 0.015 kWh, so during that time period, load 3-2 and load 3-3 are also open. can do.

また、18時台は、重要度レベルがもっとも高い負荷1のエントランスの消費電力目安量が0.1kWh、2番目に高い負荷6の非常口は0(ゼロ)、3番目に高い負荷5の階段は30分だけなので0.025kWh、4番目に高い負荷3の通路も30分だけなので0.0175kWhとなり、ここまでで0.1425kWhであるため、0.0575kWh余裕がある。そこで、5番目に高い負荷4のエレベータ前を開としてもまだ余裕があるので負荷4は開とし、6番目に高い負荷7の集会所を開とする余裕はないので、負荷7については閉とする。   In addition, at 18:00, the power consumption standard amount of the entrance of the load 1 with the highest importance level is 0.1 kWh, the emergency exit of the second highest load 6 is 0 (zero), and the staircase of the third highest load 5 is Since it is only 30 minutes, 0.025 kWh, and the fourth highest load 3 passage is only 30 minutes, so it is 0.0175 kWh, and so far it is 0.1425 kWh, so there is a margin of 0.0575 kWh. Therefore, even if the front of the elevator with the fifth highest load 4 is opened, there is still room, so the load 4 is open, and there is no room for opening the meeting place with the sixth highest load 7, so the load 7 is closed. To do.

さらに、17時台は、負荷1を30分のみと、負荷7だけを開とする運用スケジュールであり、重要度レベルが高い負荷1のエントランスの消費電力目安量が30分で0.05kWh、負荷7の集会所の消費電力目安量が0.12kWhであるので、この1時間の消費電力目安量は0.2kWh以下であるから、図5(b)に示すスケジュールどおり運用するよう制御する。   Furthermore, the 17:00 range is an operation schedule in which the load 1 is only 30 minutes and only the load 7 is open. The estimated power consumption amount of the entrance of the load 1 having a high importance level is 0.05 kWh in 30 minutes. 7 is 0.12 kWh, and the one-hour power consumption is 0.2 kWh or less, so control is performed so as to operate according to the schedule shown in FIG.

すなわち、災害時等の停電発生時であって避難が必要な場合には、安全を確保しつつ住民が階段を降りて避難することができるよう、階段照明は優先したり、通路の照明については間引いても問題ないため通路照明については一部間引いたり、といったきめ細かい制御を行うことができる。   In other words, when a power outage such as a disaster occurs and evacuation is required, priority is given to stair lighting so that residents can evacuate by going down the stairs while ensuring safety. Since there is no problem even if thinning is performed, it is possible to perform fine control such as partially thinning the passage lighting.

なお、停電中の運用スケジュールにしたがって電力供給を行っている途中で停電が復旧したことを検知した場合には、開閉制御スケジュールを図5(a)に示す平常時の運用スケジュールに切り替えて各負荷系統の開閉制御を行うことは、言うまでもない。   When it is detected that the power failure has been restored during the power supply according to the operation schedule during the power failure, the switching control schedule is switched to the normal operation schedule shown in FIG. It goes without saying that the opening and closing control of the system is performed.

このように、蓄電システム20の発電量予測値、蓄電池残量、集合住宅が停電中か否かという情報、および、各負荷系統の消費電力目安量と開閉制御スケジュールに基づいて、1時間ごとに使用される電力(放電量)が何W以内となるように制御すればよいかを計算し、図4および図5に示す各負荷系統の消費電力目安量と開閉制御スケジュールとに基づいて、その計算された数値以内の放電量におさまるように、きめ細かく各負荷系統の開閉制御を行うことにより、災害時等の停電発生時であって避難が必要な場合であっても、住民が安全に避難するのに必要な電力を蓄電システム20から効率的かつ継続的に供給することができる。   As described above, based on the predicted power generation amount of the power storage system 20, the remaining amount of the storage battery, whether or not the apartment house is in a power failure, and the estimated power consumption of each load system and the switching control schedule every hour. Calculate how much power (discharge amount) should be controlled to be used, and based on the estimated power consumption and switching control schedule of each load system shown in FIG. 4 and FIG. By finely controlling the opening and closing of each load system so that the discharge amount is within the calculated value, residents can evacuate safely even if a power outage such as a disaster occurs and evacuation is necessary. It is possible to efficiently and continuously supply the electric power necessary for this from the power storage system 20.

すなわち、災害時等の停電発生時であって避難が必要な場合であっても、蓄電システム20により発電および蓄電された電力のみによって、集合住宅の共用部において重要度レベルの高いエントランス、非常口、階段、通路といった場所への電力供給を継続的に行うことができるので、住民が安全に避難するのに最低限必要な電力が効率的かつ継続的に供給され、住民は安全に避難することができる。   That is, even in the event of a power outage such as a disaster and when evacuation is necessary, only the power generated and stored by the power storage system 20 is used for the entrance, emergency exit, Since power can be continuously supplied to places such as stairs and passageways, the minimum power required for residents to evacuate safely is supplied efficiently and continuously, and residents can evacuate safely. it can.

以上のように、この実施の形態1によれば、蓄電システム20から取得した発電量、蓄電池残量、集合住宅が停電中か否かという情報、および、各負荷系統の消費電力目安量と、通常運転時と停電時の開閉制御スケジュールに基づいて、通常運転時であっても停電時であっても蓄電システム20により発電および蓄電された電力のみによって集合住宅の共用部の照明装置への電力供給を継続的に行うことができるように、きめ細かく各負荷系統の開閉制御を行うので、災害時等の停電発生時であっても、住民が安全に避難するのに必要な電力を蓄電システム20から効率的かつ継続的に供給することができる。 As described above, according to the first embodiment, the power generation amount acquired from the power storage system 20, the remaining amount of storage battery, information on whether the apartment house is in a power failure, and the estimated power consumption amount of each load system , Based on the open / close control schedule at the time of normal operation and power failure , the power to the lighting device of the common part of the apartment house is generated only by the power generated and stored by the power storage system 20 during normal operation and at the time of power failure Since each load system is finely controlled so that it can be continuously supplied, the power storage system 20 supplies the power necessary for residents to evacuate safely even when a power outage occurs during a disaster or the like. Can be supplied efficiently and continuously.

実施の形態2.
この発明の実施の形態2における電力供給システムの概略構成を示すシステム構成図は、実施の形態1における図1と同じであるので、図示および説明を省略する。
図7は、実施の形態2における電力供給制御ユニット130の機能構成を示す機能ブロック図である。この図7に示すように、実施の形態2の電力供給制御ユニット130は、図2に示す実施の形態1における電力供給制御ユニット30と比較すると、蓄電池運転モード制御部136を備えている点においてのみ異なっている。なお、実施の形態1で説明したものと同様の構成には、同一の符号を付して重複した説明を省略する。
Embodiment 2. FIG.
Since the system configuration diagram showing the schematic configuration of the power supply system according to the second embodiment of the present invention is the same as that of FIG. 1 according to the first embodiment, illustration and description thereof are omitted.
FIG. 7 is a functional block diagram showing a functional configuration of the power supply control unit 130 in the second embodiment. As shown in FIG. 7, the power supply control unit 130 according to the second embodiment is provided with a storage battery operation mode control unit 136 as compared with the power supply control unit 30 according to the first embodiment shown in FIG. Only different. In addition, the same code | symbol is attached | subjected to the structure similar to what was demonstrated in Embodiment 1, and the overlapping description is abbreviate | omitted.

すなわち、この実施の形態2では、電力供給制御ユニット130が、特定負荷開閉制御に加え、蓄電システム20の蓄電池22の運転モード制御も行うものである。
蓄電池運転モード制御部136は、蓄電システム20における蓄電池22の運転モードが「充電」「放電」「待機」のいずれのモードであるかを、蓄電システム20のコントローラ23を介して取得するとともに、特定負荷開閉制御部135からの指示により、蓄電池22の運転モード切替指令を蓄電システム20のコントローラ23に対して行う。
That is, in the second embodiment, the power supply control unit 130 performs the operation mode control of the storage battery 22 of the power storage system 20 in addition to the specific load opening / closing control.
The storage battery operation mode control unit 136 acquires, through the controller 23 of the power storage system 20, whether the operation mode of the storage battery 22 in the power storage system 20 is “charging”, “discharge”, or “standby”, and specifies In response to an instruction from the load switching control unit 135, an operation mode switching command for the storage battery 22 is given to the controller 23 of the power storage system 20.

この場合、この電力供給制御ユニット130の動作を示すフローチャートとしては、実施の形態1における図3に示すフローチャートのステップST3とステップST4の間に、「蓄電池運転モード制御部136が、蓄電システム20から蓄電池22の運転モードを取得する」というステップが追加になる。   In this case, as a flowchart showing the operation of the power supply control unit 130, the “storage battery operation mode control unit 136 is connected from the power storage system 20 between step ST3 and step ST4 of the flowchart shown in FIG. The step of “obtaining the operation mode of the storage battery 22” is added.

また、図3に示すフローチャートのステップST5の処理内容が、「算出した発電量予測値と、蓄電池残量取得部32が取得した蓄電池残量と、系統連携状態取得部33が取得した集合住宅が停電中か否かという情報と、蓄電池運転モード制御部136が取得した蓄電池の運転モードと、各負荷系統データ記憶部34に記憶されている各負荷系統の消費電力目安量と開閉制御スケジュールとに基づいて、負荷1〜負荷8の各負荷系統に対してどのように開閉を行えばよいか、および、蓄電池運転モード切替指示を決定して、各負荷系統の開閉制御、および、蓄電池の運転モード切替制御の指令を行う」に変更となる。   Moreover, the processing content of step ST5 of the flowchart shown in FIG. 3 is “the calculated power generation amount predicted value, the storage battery remaining amount acquired by the storage battery remaining amount acquisition unit 32, and the apartment house acquired by the system linkage state acquisition unit 33. Information on whether or not a power failure is occurring, the operation mode of the storage battery acquired by the storage battery operation mode control unit 136, the estimated power consumption amount of each load system and the switching control schedule stored in each load system data storage unit 34 On the basis of how to open / close each load system of load 1 to load 8, and to determine the storage battery operation mode switching instruction, and to control the switching of each load system and the operation mode of the storage battery It is changed to “command switching control”.

これにより、実施の形態1では、発電量予測値が蓄電池残量を超える場合には、特定負荷の開閉制御を行うことにより電力を継続的に供給していたが、この実施の形態2では、例えば、特定負荷の開閉制御は変更せずに、蓄電池運転モードを充電に切り替えて、蓄電池残量が50%になった時点で放電に切り替える、という運用により、集合住宅の共用部に必要な電力を蓄電システム20から効率的かつ継続的に供給することができる。   As a result, in the first embodiment, when the predicted power generation amount exceeds the remaining battery capacity, power is continuously supplied by performing opening / closing control of the specific load, but in this second embodiment, For example, by changing the storage battery operation mode to charging without changing the opening / closing control of a specific load, and switching to discharging when the remaining amount of the storage battery reaches 50%, the power required for the common part of the apartment house Can be efficiently and continuously supplied from the power storage system 20.

以上のように、この実施の形態2によれば、蓄電システム20から取得した発電量、蓄電池残量、集合住宅が停電中か否かという情報、蓄電池運転モード、および、各負荷系統の消費電力目安量と、通常運転時と停電時の開閉制御スケジュールに基づいて、通常運転時であっても停電時であっても蓄電システム20により発電および蓄電された電力のみによって集合住宅の共用部の照明装置への電力供給を継続的に行うことができるように、きめ細かく各負荷系統の開閉制御および蓄電池の運転モード切替制御を行うので、災害時等の停電発生時であっても、住民が安全に避難するのに必要な電力を蓄電システム20から効率的かつ継続的に供給することができる。 As described above, according to the second embodiment, the power generation amount acquired from the power storage system 20, the remaining amount of the storage battery, information on whether the apartment house is in a power failure, the storage battery operation mode, and the power consumption of each load system Based on the reference amount and the open / close control schedule at the time of normal operation and power failure , the lighting of the common part of the apartment house only by the power generated and stored by the power storage system 20 during normal operation or at the time of power failure In order to continuously supply power to the equipment , detailed switching control of each load system and operation mode switching control of the storage battery are performed, so that residents can safely operate even in the event of a power failure such as a disaster. Electric power necessary for evacuation can be efficiently and continuously supplied from the power storage system 20.

実施の形態3.
図8は、この発明の実施の形態3における電力供給システムの概略構成を示すシステム構成図である。この電力供給システム200は、実施の形態1,2における電力供給システムと同様に、防災を目的とし、マンション等の集合住宅において、災害等の停電発生時にその集合住宅の共用部に対して必要な電力を効率的かつ継続的に供給するものであり、共用部の特定負荷について系統電力を使用せず、太陽エネルギー等の発電装置からの発電のみで運用することが可能な自家発電システムである。なお、実施の形態1,2で説明したものと同様の構成には、同一の符号を付して重複した説明を省略する。
Embodiment 3 FIG.
FIG. 8 is a system configuration diagram showing a schematic configuration of the power supply system according to Embodiment 3 of the present invention. Similar to the power supply systems in the first and second embodiments, this power supply system 200 is intended for disaster prevention, and is necessary for a common part of the apartment house when a power outage such as a disaster occurs in an apartment house such as a condominium. It is an in-house power generation system that supplies power efficiently and continuously, and that can be operated only by power generation from a power generation device such as solar energy, without using system power for a specific load of a shared section. In addition, the same code | symbol is attached | subjected to the structure similar to what was demonstrated in Embodiment 1, 2, and the overlapping description is abbreviate | omitted.

また、この集合住宅には太陽光パネル等の自然エネルギーを利用した発電装置21と、それにより発電された電力を蓄電する蓄電池22が設けられている。この実施の形態3においても、発電装置21は太陽光パネルを用いた太陽光発電装置であり、この発電装置21と、この発電装置21により発電された電力を蓄電する蓄電池22と、これらの情報(例えば、発電量、蓄電池残量、充放電量など)を取得するコントローラ23とにより、自家発電システムである蓄電システム20が構成されている。なお、自家発電システムとしては、太陽光発電に限らず、風力発電やバイオマスによる発電など、他の自然エネルギーを用いるものであってもよい。   In addition, the apartment house is provided with a power generation device 21 that uses natural energy such as a solar panel and a storage battery 22 that stores electric power generated by the power generation device 21. Also in the third embodiment, the power generation device 21 is a solar power generation device using a solar panel, the power generation device 21, the storage battery 22 that stores the power generated by the power generation device 21, and the information thereof. The power storage system 20 that is a private power generation system is configured by the controller 23 that acquires (for example, the power generation amount, the remaining amount of storage battery, and the charge / discharge amount). Note that the in-house power generation system is not limited to solar power generation, and may use other natural energy such as wind power generation or power generation using biomass.

そして、この蓄電システム20により発電および蓄電された電力のみによって、この集合住宅の共用部への電力供給を継続的に行うことができるように、負荷1〜負荷8の各負荷系統の開閉制御を行う電力供給制御ユニット230を備えている。また、蓄電システム20と電力供給制御ユニット230は、ルータ240を介して接続されている。   And the opening / closing control of each load system of the loads 1 to 8 is performed so that the power supply to the common part of the apartment house can be continuously performed only by the power generated and stored by the power storage system 20. A power supply control unit 230 is provided. The power storage system 20 and the power supply control unit 230 are connected via a router 240.

そして、通常運転時(停電時ではない場合)にも、その蓄電システム20により発電および蓄電された電力のみによって集合住宅の共用部への電力供給を継続的に行っている。これは、集合住宅の共用部における照明装置をすべてLED照明にすることにより、消費電力(放電量)が大幅に削減できることにより実現可能となったものである。すなわち、この集合住宅の共用部における照明装置は、すべてLED照明である。   Even during normal operation (not during a power failure), power is continuously supplied to the common part of the apartment house only by the power generated and stored by the power storage system 20. This can be realized by making the lighting devices in the common part of the apartment house all LED lighting so that the power consumption (discharge amount) can be greatly reduced. That is, the illumination devices in the common part of this apartment house are all LED lighting.

また、実施の形態1,2においては、集合住宅の共用部に電力供給を行う各負荷系統の開閉制御を、その集合住宅に設置された電力供給制御ユニット30,130により行っていたが、この実施の形態3では、ルータ240を介してインターネット経由で接続可能なセンタークラウド250が、すべての情報を取得して、制御指令を決定し、電力供給制御ユニット230に対して指示を行うものである。   In the first and second embodiments, the open / close control of each load system that supplies power to the common part of the apartment house is performed by the power supply control units 30 and 130 installed in the apartment house. In the third embodiment, the center cloud 250 connectable via the Internet via the router 240 acquires all information, determines a control command, and gives an instruction to the power supply control unit 230. .

そして、電力供給制御ユニット230、および、センタークラウド250により、電力供給システム200が構成されている。さらに、遠隔にある監視センターの遠隔監視センター装置260から、センタークラウド250と情報のやりとりを行ったり指示操作を行うことが可能であり、これによって、遠隔にある監視センターから、集合住宅の電力供給制御ユニット230を経由して、蓄電システム20の様々な状態を監視したり、必要に応じて、集合住宅の共用部に電力を供給する各負荷系統の開閉指示を、遠隔にある監視センターから手動で行うことも可能となる。   The power supply system 200 is configured by the power supply control unit 230 and the center cloud 250. Furthermore, it is possible to exchange information with the center cloud 250 or perform an instruction operation from the remote monitoring center device 260 of the remote monitoring center, and thereby supply power to the apartment house from the remote monitoring center. Via the control unit 230, various states of the power storage system 20 are monitored, and if necessary, an instruction to open and close each load system that supplies power to the common part of the apartment is manually provided from a remote monitoring center. It is also possible to do this.

図9は、実施の形態3における電力供給制御ユニット230およびセンタークラウド250の機能構成を示す機能ブロック図である。
この実施の形態3における電力供給制御ユニット230は、ルータ240を介して接続されている蓄電システム20のコントローラ23から、発電装置21が発電した発電量を取得する発電量取得部31、蓄電池22に蓄えられている電力量(蓄電池残量)を取得する蓄電池残量取得部32を備えるとともに、集合住宅が停電中か否かという情報を取得する系統連携状態取得部33と、負荷1〜負荷8の各負荷系統の開閉制御を行う特定負荷開閉制御部235と、実施の形態2と同様に蓄電システム20の蓄電池22の運転モード制御も行う蓄電池運転モード制御部136を備えている。なお、実施の形態1と同様に、蓄電池運転モード制御部136を備えない構成としてもよい。
FIG. 9 is a functional block diagram showing functional configurations of the power supply control unit 230 and the center cloud 250 in the third embodiment.
The power supply control unit 230 in the third embodiment includes a power generation amount acquisition unit 31 that acquires the power generation amount generated by the power generation device 21 from the controller 23 of the power storage system 20 connected via the router 240, and the storage battery 22. A grid connection state acquisition unit 33 that acquires information indicating whether the apartment house is in a power failure, and a load 1 to a load 8, as well as a storage battery remaining amount acquisition unit 32 that acquires the amount of stored power (storage battery remaining amount). A specific load switching control unit 235 that performs switching control of each load system, and a storage battery operation mode control unit 136 that performs operation mode control of the storage battery 22 of the power storage system 20 as in the second embodiment. As in the first embodiment, the storage battery operation mode control unit 136 may not be provided.

また、インターネットを介して、この集合住宅に関するデータを保持するとともに、この集合住宅の共用部に電力供給を行う各負荷系統の開閉制御の指令決定を行うセンタークラウド250と通信を行うことができる通信部237を備えており、この通信部237は、発電量取得部31が取得した発電量、蓄電池残量取得部32が取得した蓄電池残量、系統連携状態取得部33が取得した停電中か否かという情報をセンタークラウド250に送信したり、センタークラウド250が決定した開閉制御指令を取得したりする機能を備えている。
なお、電力供給制御ユニット230は、蓄電システム20から取得した情報をバッファーしておく記憶部(図示せず)を内部に備えているものとする。
In addition, communication that can communicate with the center cloud 250 that holds data regarding the apartment house and determines the opening / closing control of each load system that supplies power to the common part of the apartment house via the Internet. The communication unit 237 includes the power generation amount acquired by the power generation amount acquisition unit 31, the storage battery residual amount acquired by the storage battery residual amount acquisition unit 32, and whether or not the power outage acquired by the system linkage state acquisition unit 33 is in progress. This function is provided with a function of transmitting such information to the center cloud 250 and acquiring an opening / closing control command determined by the center cloud 250.
It is assumed that the power supply control unit 230 includes a storage unit (not shown) that buffers information acquired from the power storage system 20.

センタークラウド250は、電力供給制御ユニット230の通信部237を介して、インターネット経由で情報の送受信を行う通信制御部251、通信制御部251が取得した発電装置21の発電量から将来的な(例えば、実施の形態1で説明したのと同様に、これから5時間や、これから12時間などの一定期間の)発電量予測値を算出する発電量予測部252、発電量予測部252が算出した発電量予測値と、通信制御部251が取得した蓄電池22の蓄電池残量、集合住宅が停電中か否かという情報、および、各負荷系統データ記憶部254に記憶されている各負荷系統の消費電力目安量とに基づいて、負荷1〜負荷8の各負荷系統の開閉制御指令を決定する特定負荷開閉指令決定部253を備えている。   The center cloud 250 uses a communication control unit 251 that transmits and receives information via the Internet via the communication unit 237 of the power supply control unit 230, and determines the future (for example, the power generation amount of the power generation device 21 acquired by the communication control unit 251 (for example, As described in the first embodiment, the power generation amount prediction unit 252 for calculating the power generation amount prediction value for a certain period of time such as 5 hours or 12 hours from now on, and the power generation amount calculated by the power generation amount prediction unit 252 The predicted value, the remaining battery level of the storage battery 22 acquired by the communication control unit 251, information on whether or not the apartment house is undergoing a power failure, and the power consumption standard for each load system stored in each load system data storage unit 254 A specific load switching command determining unit 253 that determines switching control commands for each load system of the loads 1 to 8 based on the amount is provided.

ここで、発電量予測部252は、電力供給制御ユニット230から取得した蓄電システム20の発電量に基づいて発電量予測値を算出する。
また、図9に示すように、気象情報取得部255を備えるようにしてもよく、この場合には、発電量予測部252は、通信制御部251が取得した発電量と、気象情報取得部255が取得した気象予報情報とに基づいて、将来的な(例えば、これから5時間や、これから12時間などの一定期間の)発電量予測値をより正確に算出することができる。
なお、センタークラウド250も、電力供給制御ユニット230から取得した情報をバッファーしておく記憶部(図示せず)を内部に備えているものとする。
Here, the power generation amount prediction unit 252 calculates a power generation amount prediction value based on the power generation amount of the power storage system 20 acquired from the power supply control unit 230.
In addition, as shown in FIG. 9, a weather information acquisition unit 255 may be provided. In this case, the power generation amount prediction unit 252 includes the power generation amount acquired by the communication control unit 251 and the weather information acquisition unit 255. Can be calculated more accurately based on the weather forecast information acquired by the future (for example, for a fixed period such as 5 hours from now or 12 hours from now).
The center cloud 250 also includes a storage unit (not shown) for buffering information acquired from the power supply control unit 230.

そして、特定負荷開閉指令決定部253は、当該発電量予測値と、電力供給制御ユニット230から取得した蓄電池残量と、停電中か否かという情報と、各負荷系統データ記憶部254に記憶されている各負荷系統の1時間当たりの消費電力目安量と開閉制御スケジュールとに基づいて、集合住宅の共用部に対して効果的な電力供給を行うことができるよう、負荷1〜負荷8の各負荷系統の開閉制御を行うための開閉制御指令を決定したり、実施の形態2で説明したのと同様に、開閉制御に代えて、蓄電池22の運転モードを切り替える運転モード制御指令を決定する。   The specific load switching command determination unit 253 is stored in the load generation data storage unit 254 and the predicted power generation amount, the remaining amount of storage battery acquired from the power supply control unit 230, whether or not a power failure occurs. Based on the estimated power consumption per hour of each load system and the switching control schedule, each of the loads 1 to 8 can be effectively supplied to the common part of the apartment house. An open / close control command for performing open / close control of the load system is determined, or, as described in the second embodiment, an operation mode control command for switching the operation mode of the storage battery 22 is determined instead of the open / close control.

これにより、センタークラウド250において、その集合住宅における自家発電システムである蓄電システム20の発電量、蓄電池22に蓄えられている電力量(蓄電池残量)、その集合住宅が停電中か否かという情報、および、その集合住宅の共用部に電力供給を行う負荷1〜負荷8の各負荷系統の1時間あたりの消費電力目安量と開閉制御スケジュールを取得して、負荷1〜負荷8の各負荷系統の開閉制御指令および蓄電池運転モード制御指令を行うことができる。   Thereby, in the center cloud 250, the amount of power generated by the power storage system 20 that is a private power generation system in the apartment house, the amount of power stored in the storage battery 22 (remaining battery capacity), and whether the apartment house is in a power outage , And an estimated amount of power consumption per hour for each load system of load 1 to load 8 that supplies power to the common part of the apartment house, and an open / close control schedule, and each load system of load 1 to load 8 Open / close control command and storage battery operation mode control command can be performed.

そして、遠隔地にある監視センターの遠隔監視センター装置260も、インターネットでセンタークラウド250と接続可能であるから、集合住宅から遠隔にある監視センターにおいて、センタークラウド250経由で、電力供給制御ユニット230を介して、集合住宅に設置された発電装置21の発電量や、蓄電池22に蓄えられている蓄電池残量、蓄電池22の運転モード、集合住宅が停電中か否かという情報を監視することで、集合住宅の共用部に電力供給を行う各負荷系統の消費電力を、監視センターよりセンタークラウド250経由で電力供給制御ユニット230を介して自動制御し、停電時にその集合住宅に最も適した電力の使用をサポートすることができる。   Since the remote monitoring center device 260 of the remote monitoring center can also be connected to the center cloud 250 via the Internet, the power supply control unit 230 is connected via the center cloud 250 in the monitoring center remote from the apartment house. By monitoring the amount of power generated by the power generation device 21 installed in the apartment house, the remaining amount of storage battery stored in the storage battery 22, the operation mode of the storage battery 22, and whether the apartment house is in a power outage, The power consumption of each load system that supplies power to the common part of the apartment is automatically controlled from the monitoring center via the center cloud 250 via the power supply control unit 230, and the most suitable power for the apartment is used during a power failure Can support.

図10は、実施の形態3における電力供給制御ユニット230の動作を示すフローチャートである。また、図11は、実施の形態3におけるセンタークラウド250の動作を示すフローチャートである。   FIG. 10 is a flowchart showing the operation of the power supply control unit 230 in the third embodiment. FIG. 11 is a flowchart showing the operation of the center cloud 250 in the third embodiment.

まず初めに、電力供給制御ユニット230において、発電量取得部31が、蓄電システム20から発電装置21が発電した発電量を取得する(ステップST11)。また、蓄電池残量取得部32が、蓄電システム20から蓄電池22に蓄えられている電力量(蓄電池残量)を取得する(ステップST12)。   First, in the power supply control unit 230, the power generation amount acquisition unit 31 acquires the power generation amount generated by the power generation device 21 from the power storage system 20 (step ST11). Moreover, the storage battery remaining amount acquisition part 32 acquires the electric energy (storage battery remaining amount) stored in the storage battery 22 from the electrical storage system 20 (step ST12).

さらに、系統連携状態取得部33が、蓄電システム20から集合住宅が停電中か否かという情報を取得する(ステップST13)。
なお、ステップST11〜ステップST13の動作については、ほぼ同時に行われる処理であり、いずれのステップが先に行われても構わない。
また、蓄電池運転モード制御部136が、蓄電システム20から蓄電池22の運転モードを取得する(ステップST14)。
Furthermore, the grid cooperation state acquisition unit 33 acquires information indicating whether or not the apartment house is in a power outage from the power storage system 20 (step ST13).
Note that the operations in steps ST11 to ST13 are processes performed almost simultaneously, and any of the steps may be performed first.
Moreover, the storage battery operation mode control part 136 acquires the operation mode of the storage battery 22 from the electrical storage system 20 (step ST14).

なお、これら情報を取得する動作については、例えば10分ごとや15分ごとなど、周期的に行うものとすればよい。
そして、ステップST11〜ST14で取得された発電量、蓄電池残量、停電中か否かという情報、蓄電池の運転モードを、通信部237を介して、センタークラウド250に送信する(ステップST15)。
In addition, what is necessary is just to perform periodically about the operation | movement which acquires such information, for example every 10 minutes or every 15 minutes.
And the electric power generation amount acquired by step ST11-ST14, the information of the remaining amount of a storage battery, whether it is during a power failure, and the operation mode of a storage battery are transmitted to the center cloud 250 via the communication part 237 (step ST15).

ここで、センタークラウド250では、通信制御部251が、発電装置21が発電した発電量、蓄電池22に蓄えられている電力量(蓄電池残量)、集合住宅が停電中か否かという情報、および、蓄電池22の運転モードを取得すると(ステップST21のYESの場合)、発電量予測部252が、取得された発電量に基づいて、発電量予測値を算出する(ステップST22)。   Here, in the center cloud 250, the communication control unit 251 has the power generation amount generated by the power generation device 21, the amount of power stored in the storage battery 22 (remaining storage battery amount), information on whether the apartment house is in a power failure, and When the operation mode of the storage battery 22 is acquired (in the case of YES in step ST21), the power generation amount prediction unit 252 calculates a power generation amount prediction value based on the acquired power generation amount (step ST22).

なお、前述のとおり、センタークラウド250が気象情報取得部255も備えている場合には、発電量予測部252は、取得された発電量と、気象情報取得部255が取得した気象予報情報とに基づいて、発電量予測値を算出する。   As described above, when the center cloud 250 also includes the weather information acquisition unit 255, the power generation amount prediction unit 252 includes the acquired power generation amount and the weather forecast information acquired by the weather information acquisition unit 255. Based on this, a power generation amount prediction value is calculated.

次に、特定負荷開閉指令決定部253が、発電量予測部252が算出した発電量予測値と、通信制御部251が取得した蓄電池残量と蓄電池の運転モードと、各負荷系統データ記憶部254に記憶されている各負荷系統の消費電力目安量と開閉制御スケジュールとに基づいて、負荷1〜負荷8の各負荷系統に対してどのように開閉を行えばよいかという各負荷系統の開閉制御指令および蓄電池の運転モード切替制御指令を決定する(ステップST23)。   Next, the specific load switching command determination unit 253 calculates the power generation amount predicted value calculated by the power generation amount prediction unit 252, the storage battery remaining amount acquired by the communication control unit 251, the operation mode of the storage battery, and each load system data storage unit 254. The switching control of each load system such as how to open / close each load system of load 1 to load 8 based on the power consumption reference amount and the switching control schedule stored in the load system A command and a storage battery operation mode switching control command are determined (step ST23).

なお、この開閉制御指令の決定の仕方については、実施の形態1において図4〜6を用いて説明した特定負荷開閉制御部35における決定方法と同様であるので、ここでは説明を省略する。また、開閉制御指令だけでなく蓄電池の運転モード切替制御指令を行う方法については、実施の形態2において説明した内容と同様であるので、ここでは説明を省略する。   The method for determining the opening / closing control command is the same as the determining method in the specific load opening / closing control unit 35 described in Embodiment 1 with reference to FIGS. In addition, the method for performing not only the opening / closing control command but also the operation mode switching control command for the storage battery is the same as the content described in the second embodiment, and thus the description thereof is omitted here.

そして、特定負荷開閉指令決定部253により決定された各負荷系統の開閉制御指令、および、蓄電池運転モードの切替制御指令を通信制御部251が受け取って、インターネット経由で、電力供給制御ユニット230の通信部237へ送信する(ステップST24)。   The communication control unit 251 receives the switching control command for each load system determined by the specific load switching command determination unit 253 and the switching control command for the storage battery operation mode, and communicates with the power supply control unit 230 via the Internet. It transmits to the part 237 (step ST24).

一方、電力供給制御ユニット230の通信部237は、センタークラウド250から各負荷系統の開閉制御指令、および、蓄電池運転モードの切替制御指令を取得すると(ステップST16のYESの場合)、特定負荷開閉制御部235が、その開閉制御指令にしたがって負荷1〜負荷8の各負荷系統の開閉制御を行うとともに、蓄電池運転モード制御部136が、その切替制御指令にしたがって蓄電池22の運転モードの切替制御を行う(ステップST17)。   On the other hand, when the communication unit 237 of the power supply control unit 230 acquires the switching control command for each load system and the switching control command for the storage battery operation mode from the center cloud 250 (YES in step ST16), the specific load switching control is performed. The unit 235 performs switching control of each load system of the loads 1 to 8 according to the switching control command, and the storage battery operation mode control unit 136 performs switching control of the operation mode of the storage battery 22 according to the switching control command. (Step ST17).

このように、この実施の形態3では、センタークラウド250において常に遠隔地の集合住宅における蓄電システム20の発電量、蓄電池残量、蓄電池の運転モード、および、集合住宅が停電中か否かという情報を把握することができ、集合住宅に設置された電力供給制御ユニット230と、インターネット経由で接続されるセンタークラウド250とによる電力供給システム200によって、実施の形態1,2と同様に、集合住宅の各負荷系統の開閉制御を行うことができる。   As described above, in the third embodiment, in the center cloud 250, information on the amount of power generated by the power storage system 20 in the remote apartment house, the remaining amount of storage battery, the operation mode of the storage battery, and whether the apartment house is in a power outage or not. As in the first and second embodiments, the power supply system 200 using the power supply control unit 230 installed in the apartment house and the center cloud 250 connected via the Internet can Open / close control of each load system can be performed.

さらに、センタークラウド250を介して、集合住宅から遠隔にある監視センターと常時接続していることにより、様々な効果が期待できる。
例えば、太陽光エネルギー、蓄電エネルギーを活用することにより、系統電力の使用を節電し、電力需要のピークシフトやピークカットが可能である。
また、災害等による停電発生時には、太陽光発電の発電量、蓄電池の蓄電量、充放電量、蓄電池残量、災害レベルによる停電の長期化等を総合的に判断し、特定負荷の消費電力を管理することができる。これにより、例えば給水施設やエレベータなどの重要な設備に、電力を優先的に回すことが可能になる。
Furthermore, various effects can be expected by being always connected to the monitoring center remote from the apartment house via the center cloud 250.
For example, by using solar energy and power storage energy, it is possible to save the use of system power and to shift or cut the peak of power demand.
In addition, in the event of a power outage due to a disaster, etc., comprehensively determine the amount of power generated by solar power generation, the amount of electricity stored in the storage battery, the amount of charge / discharge, the remaining amount of storage battery, the length of power outage due to the disaster level, etc. Can be managed. Thereby, for example, it becomes possible to preferentially turn electric power to important facilities such as water supply facilities and elevators.

さらに、太陽光パネルの発電状態を管理することにより、発電量が減れば太陽光パネルの保守管理が必要であると判断し、作業員を現場に派遣して、太陽光パネルの保守管理を速やかに行うことができる、という効果もある。   Furthermore, by managing the power generation status of the solar panels, it is judged that maintenance management of the solar panels is necessary if the amount of power generation is reduced, and workers are dispatched to the site for quick maintenance management of the solar panels. There is also an effect that can be performed.

以上のように、この実施の形態3によれば、実施の形態1,2と同様に、蓄電システム20から取得した発電量、蓄電池残量、集合住宅が停電中か否かという情報、蓄電池運転モード、および、各負荷系統の消費電力目安量と、通常運転時と停電時の開閉制御スケジュールに基づいて、通常運転時であっても停電時であっても蓄電システム20により発電および蓄電された電力のみによって集合住宅の共用部の照明装置への電力供給を継続的に行うことができるように、きめ細かく各負荷系統の開閉制御および蓄電池の運転モード切替制御を行うので、災害時等の停電発生時であっても、住民が安全に避難するのに必要な電力を蓄電システム20から効率的かつ継続的に供給することができる。 As described above, according to the third embodiment, as in the first and second embodiments, the power generation amount acquired from the power storage system 20, the remaining amount of the storage battery, information on whether the apartment house is in a power failure, the storage battery operation Based on the mode, the estimated amount of power consumption of each load system, and the switching control schedule at the time of normal operation and power failure, the power storage system 20 generates and stores power even during normal operation or power failure A power outage occurs during a disaster, etc., because the power system is finely controlled to open and close each load system and to control the operation mode of the storage battery so that power can be continuously supplied to the lighting equipment in the common area of the apartment house. Even at times, the electric power necessary for the residents to evacuate safely can be supplied efficiently and continuously from the power storage system 20.

また、集合住宅から離れた遠隔地にある監視センターにおける遠隔監視センター装置260も、インターネット経由でセンタークラウド250と接続可能であり、センタークラウド250では災害情報や停電情報なども取得できるので、集合住宅の蓄電システム20により発電および蓄電された電力に応じた各負荷系統の開閉制御を、集合住宅から離れた遠隔地にある監視センターにおいて行うことにより、災害レベルによる停電の長期化等を総合的に判断し、特定負荷の消費電力を管理することができる。さらに、太陽光パネルの発電状態を管理することにより、発電量が減れば作業員を現場に派遣して、太陽光パネルの保守管理を速やかに行うことができる、という効果もある。   In addition, the remote monitoring center device 260 at a remote monitoring center away from the housing complex can be connected to the center cloud 250 via the Internet, and the center cloud 250 can also acquire disaster information, power outage information, etc. By performing open / close control of each load system according to the power generated and stored by the power storage system 20 at a remote monitoring center away from the housing complex, it is possible to increase the length of power outages due to disaster levels, etc. It is possible to determine and manage the power consumption of a specific load. Furthermore, by managing the power generation state of the solar panel, there is an effect that if the amount of power generation is reduced, a worker can be dispatched to the site and the maintenance management of the solar panel can be performed promptly.

なお、実施の形態1〜3のいずれにおいても、電力供給制御ユニット30,130,230が、蓄電池22に蓄電された(充電された)電力量と使用された(放電された)電力量を取得する充放電量取得部(図示せず)を備えるようにして、運用記録として充放電量(充電量や放電量)もデータに残すようにすることも可能である。このようにすれば、この記録されたデータから、例えば過去1日分の充放電量がわかるので、これにより各負荷系統のより詳細な開閉制御スケジュールをたてることや、さらにきめ細かい各負荷系統の開閉制御を行うことも可能となる。   In any of the first to third embodiments, the power supply control units 30, 130, and 230 obtain the amount of power stored (charged) in the storage battery 22 and the amount of power used (discharged). It is also possible to include a charge / discharge amount acquisition unit (not shown) to perform and record the charge / discharge amount (charge amount or discharge amount) in the data as an operation record. In this way, from this recorded data, for example, the charge / discharge amount for the past day can be found, so that a more detailed switching control schedule for each load system can be established, and more detailed each load system can be determined. It is also possible to perform opening / closing control.

なお、本願発明はその発明の範囲内において、各実施の形態の自由な組み合わせ、あるいは各実施の形態の任意の構成要素の変形、もしくは各実施の形態において任意の構成要素の省略が可能である。   In the present invention, within the scope of the invention, any combination of the embodiments, or any modification of any component in each embodiment, or omission of any component in each embodiment is possible. .

1〜8 集合住宅の共用部の負荷系統
10 分電盤
20 蓄電システム
21 発電装置
22 蓄電池
23 蓄電システム20のコントローラ
30,130,230 電力供給制御ユニット
31 発電量取得部
32 蓄電池残量取得部
33 系統連携状態取得部
34,254 各負荷系統データ記憶部
35,135,235 特定負荷開閉制御部
40,240 ルータ
136 蓄電池運転モード制御部
200 電力供給システム
237 通信部
250 センタークラウド
251 通信制御部
252 発電量予測部
253 特定負荷開閉指令決定部
255 気象情報取得部
260 遠隔監視センター装置
1-8 Load system of common part of apartment house 10 Distribution board 20 Power storage system 21 Power generation device 22 Storage battery 23 Controller 30, 130, 230 of power storage system 20 Power supply control unit 31 Power generation amount acquisition unit 32 Storage battery remaining amount acquisition unit 33 System linkage state acquisition unit 34, 254 Each load system data storage unit 35, 135, 235 Specific load switching control unit 40, 240 Router 136 Storage battery operation mode control unit 200 Power supply system 237 Communication unit 250 Center cloud 251 Communication control unit 252 Power generation Quantity prediction unit 253 Specific load switching command determination unit 255 Weather information acquisition unit 260 Remote monitoring center device

Claims (2)

集合住宅において、当該集合住宅に設置された発電装置および蓄電池を有する蓄電システムにより発電および蓄電された電力のみによって、前記集合住宅の共用部の照明装置に電力供給を行う電力供給制御ユニットであって、
前記蓄電システムから、前記発電装置が発電した発電量を取得する発電量取得部と、
前記蓄電システムから、前記蓄電池に蓄電されている蓄電池残量を取得する蓄電池残量取得部と、
前記集合住宅が停電中か否かという情報を取得する系統連携状態取得部と、
前記集合住宅の共用部の照明装置に電力供給を行う各負荷系統に関する情報として、少なくとも前記各負荷系統の消費電力目安量と、前記各負荷系統の通常運転時と停電時の開閉制御スケジュールが記憶されている各負荷系統データ記憶部と、
前記各負荷系統の開閉制御を行う特定負荷開閉制御部と
を備え、
前記特定負荷開閉制御部は、前記発電量取得部が取得した発電量に基づいて発電量予測値を算出し、当該算出した前記発電量予測値と、前記蓄電池残量取得部が取得した蓄電池残量と、前記系統連携状態取得部が取得した前記集合住宅が停電中か否かという情報と、前記各負荷系統データ記憶部に記憶されている前記各負荷系統の消費電力目安量と通常運転時と停電時の開閉制御スケジュールとに基づいて、通常運転時であっても停電時であっても前記蓄電システムにより発電および蓄電された電力のみによって前記集合住宅の共用部の照明装置への電力供給を継続的に行うことができるように前記各負荷系統の開閉制御を行う
ことを特徴とする電力供給制御ユニット。
In the apartment house, a power supply control unit that supplies power to the lighting device of the common part of the apartment house only by the electric power generated and stored by the power storage system having the power generator and the storage battery installed in the apartment house. ,
From the power storage system, a power generation amount acquisition unit that acquires a power generation amount generated by the power generation device;
From the power storage system, a storage battery remaining amount acquisition unit that acquires the remaining amount of storage battery stored in the storage battery;
A grid cooperation state acquisition unit for acquiring information on whether the apartment house is in a power failure; and
As information about each load system that supplies power to the lighting device of the common part of the apartment house, at least a reference amount of power consumption of each load system, and a switching control schedule during normal operation and power failure of each load system are stored. Each load system data storage unit,
A specific load switching control unit that performs switching control of each load system,
The specific load switching control unit calculates a power generation amount prediction value based on the power generation amount acquired by the power generation amount acquisition unit, and the calculated power generation amount prediction value and the storage battery remaining amount acquired by the storage battery remaining amount acquisition unit. Information on whether or not the apartment house acquired by the grid linkage state acquisition unit is in a power outage, the estimated power consumption amount of each load system stored in each load system data storage unit, and during normal operation Power supply to the lighting device of the common part of the apartment house only by the power generated and stored by the power storage system , whether during normal operation or during a power failure , based on the open / close control schedule at the time of a power failure The power supply control unit is characterized in that open / close control of each of the load systems is performed so that the power can be continuously performed.
集合住宅において、当該集合住宅に設置され、前記集合住宅の共用部の照明装置に電力供給を行う電力供給制御ユニットと、当該電力供給制御ユニットとインターネット経由で接続可能なセンタークラウドと、により構成される電力供給システムであって、
前記電力供給制御ユニットは、
前記集合住宅に設置された発電装置および蓄電池を有する蓄電システムから、前記発電装置が発電した発電量を取得する発電量取得部と、
前記蓄電システムから、前記蓄電池に蓄電されている蓄電池残量を取得する蓄電池残量取得部と、
前記集合住宅が停電中か否かという情報を取得する系統連携状態取得部と、
前記集合住宅の共用部の照明装置に電力供給を行う各負荷系統の開閉制御を行う特定負荷開閉制御部と、
前記センタークラウドと情報の送受信が可能な通信部と
を備え、
前記センタークラウドは、
前記電力供給制御ユニットと情報の送受信が可能な通信制御部と、
前記通信制御部を介して前記発電量取得部が取得した発電量に基づいて発電量予測値を算出する発電量予測部と、
前記各負荷系統に関する情報として、少なくとも前記各負荷系統の消費電力目安量と、前記各負荷系統の通常運転時と停電時の開閉制御スケジュールとが記憶されている各負荷系統データ記憶部と、
前記各負荷系統の開閉制御指令を決定する特定負荷開閉指令決定部と、
を備え、
前記電力供給制御ユニットの通信部は、前記発電量取得部が取得した発電量と、前記蓄電池残量取得部が取得した蓄電池残量と、前記系統連携状態取得部が取得した前記集合住宅が停電中か否かという情報を、前記センタークラウドへ送信し、
前記センタークラウドの特定負荷開閉指令決定部は、前記発電量予測部が算出した前記発電量予測値と、前記電力供給制御ユニットから送信されて取得した蓄電池残量と前記集合住宅が停電中か否かという情報と、前記各負荷系統データ記憶部に記憶されている前記各負荷系統の消費電力目安量と通常運転時と停電時の開閉制御スケジュールとに基づいて、通常運転時であっても停電時であっても前記蓄電システムにより発電および蓄電された電力のみによって前記集合住宅の共用部の照明装置への電力供給を継続的に行うことができるように前記各負荷系統の開閉制御指令を決定して、前記通信制御部を介して前記電力供給制御ユニットに対して指示を行い、
前記電力供給制御ユニットの特定負荷開閉制御部が、前記通信部を介して前記センタークラウドから前記各負荷系統の開閉制御指令を取得すると、前記取得した開閉制御指令にしたがって前記各負荷系統の開閉制御を行う
ことを特徴とする電力供給システム。
In an apartment house, it is configured by a power supply control unit that is installed in the apartment house and supplies power to the lighting device of the common part of the apartment house, and a center cloud that can be connected to the power supply control unit via the Internet. A power supply system,
The power supply control unit includes:
A power generation amount acquisition unit that acquires a power generation amount generated by the power generation device from a power storage system having a power generation device and a storage battery installed in the apartment house;
From the power storage system, a storage battery remaining amount acquisition unit that acquires the remaining amount of storage battery stored in the storage battery;
A grid cooperation state acquisition unit for acquiring information on whether the apartment house is in a power failure; and
A specific load switching control unit that performs switching control of each load system that supplies power to the lighting device of the common part of the apartment house;
A communication unit capable of transmitting and receiving information to and from the center cloud,
The center cloud is
A communication control unit capable of transmitting and receiving information to and from the power supply control unit;
A power generation amount prediction unit that calculates a power generation amount prediction value based on the power generation amount acquired by the power generation amount acquisition unit via the communication control unit;
Each load system data storage unit storing at least a power consumption reference amount of each load system, and a switching control schedule at the time of normal operation and power failure of each load system, as information on each load system,
A specific load switching command determining unit that determines a switching control command for each load system;
With
The communication unit of the power supply control unit includes the power generation amount acquired by the power generation amount acquisition unit, the storage battery residual amount acquired by the storage battery residual amount acquisition unit, and the collective housing acquired by the grid cooperation state acquisition unit Send information to the center cloud whether or not
The specific load opening / closing command determination unit of the center cloud is configured to determine whether the power generation amount predicted value calculated by the power generation amount prediction unit, the remaining amount of storage battery acquired and transmitted from the power supply control unit, and whether the apartment house is in a power outage. On the basis of the above information, the estimated power consumption amount of each load system stored in each load system data storage unit, and the switching control schedule at the time of normal operation and power failure , even during normal operation Even when the power is generated and stored by the power storage system, the switching control command for each load system is determined so that power can be continuously supplied to the lighting device of the common part of the apartment house. Then, an instruction is given to the power supply control unit via the communication control unit,
When the specific load switching control unit of the power supply control unit acquires the switching control command of each load system from the center cloud via the communication unit, the switching control of each load system according to the acquired switching control command A power supply system characterized by
JP2015190921A 2015-09-29 2015-09-29 Power supply control unit and power supply system Active JP6316786B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015190921A JP6316786B2 (en) 2015-09-29 2015-09-29 Power supply control unit and power supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015190921A JP6316786B2 (en) 2015-09-29 2015-09-29 Power supply control unit and power supply system

Publications (2)

Publication Number Publication Date
JP2017070034A JP2017070034A (en) 2017-04-06
JP6316786B2 true JP6316786B2 (en) 2018-04-25

Family

ID=58495486

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015190921A Active JP6316786B2 (en) 2015-09-29 2015-09-29 Power supply control unit and power supply system

Country Status (1)

Country Link
JP (1) JP6316786B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7631814B2 (en) * 2021-01-12 2025-02-19 オムロン株式会社 Power supply system and method for restoring power during power outage
JP7746104B2 (en) * 2021-10-05 2025-09-30 東京瓦斯株式会社 Electrical Supply System

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5847599B2 (en) * 2012-01-19 2016-01-27 株式会社東芝 Power supply system, control device, and program
JP2015037354A (en) * 2013-08-12 2015-02-23 株式会社Ihi Power supply apparatus for shared portion of multiple dwelling house

Also Published As

Publication number Publication date
JP2017070034A (en) 2017-04-06

Similar Documents

Publication Publication Date Title
JP4606389B2 (en) Distributed generator control system
US10320195B2 (en) Distributing power between data centers
US9620990B2 (en) Electricity supply management device
JP5837322B2 (en) Control device, power control system, and power control method
US8942855B2 (en) Power distribution system
US20120235625A1 (en) Energy storage system
KR100987562B1 (en) DC power supply and management system for home and its method
JP5729764B2 (en) Apartment house power system and control device
US20110264276A1 (en) Interconnected electrical network and building management system and method of operation
JP2011130649A (en) Electric power supply system
JP2015037354A (en) Power supply apparatus for shared portion of multiple dwelling house
CN104126260B (en) Electric power distribution methods in electric power distribution system and source of demand in source of demand
JP6592360B2 (en) Power management method
CN110036562A (en) Automatic and mobile devices for generating, storing and distributing electricity
JP5656792B2 (en) Power interchange system, demand control device, demand control method and program
JP6316786B2 (en) Power supply control unit and power supply system
JP5780989B2 (en) Equipment controller and distributed power supply system
JP6187920B2 (en) Power supply control device and power distribution system
JP2012151977A (en) Load leveling system
JP2012253842A (en) Power supply system
KR101718210B1 (en) Method and system for managing electric power
JP6587465B2 (en) Power supply system
KR102877666B1 (en) Smart automatic transfer power switch system and method
KR102937811B1 (en) Dc switching energy storage device control system using artificial intelligence-based weather forecasting and the method of thereof
JP2013027127A (en) Method of repairing existing construction and power control method in repair building, and power control panel used for the methods

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170220

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20171011

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20171208

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180327

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180328

R150 Certificate of patent or registration of utility model

Ref document number: 6316786

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350