JP6372183B2 - Accounting apparatus and program - Google Patents
Accounting apparatus and program Download PDFInfo
- Publication number
- JP6372183B2 JP6372183B2 JP2014125192A JP2014125192A JP6372183B2 JP 6372183 B2 JP6372183 B2 JP 6372183B2 JP 2014125192 A JP2014125192 A JP 2014125192A JP 2014125192 A JP2014125192 A JP 2014125192A JP 6372183 B2 JP6372183 B2 JP 6372183B2
- Authority
- JP
- Japan
- Prior art keywords
- facility
- revenue
- equipment
- unit
- facilities
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
Description
本発明は、会計装置及びプログラムに関する。 The present invention relates to an accounting apparatus and a program.
会社実態を可視化し、経営判断のための情報を提供するため管理会計を行う必要がある。管理会計においてはセグメント別・責任単位別に収支を管理する。責任単位別に収支を管理するためには各責任単位別に計上されている直接費だけでなく、全社的に管理されている人件費や減価償却費等の費用等を適切に責任単位に配分する必要がある。
なお、例えば特許文献1には営業イベントや工事などの業務、部署別の費用等について業務種別や部署階層別の作業単位で配分基準を柔軟に設定する方法について記載されている。
It is necessary to conduct management accounting to visualize the actual state of the company and to provide information for management decisions. In management accounting, balances are managed by segment and unit of responsibility. In order to manage income and expenditure by responsibility unit, it is necessary to appropriately allocate not only the direct costs recorded for each responsibility unit but also personnel expenses, depreciation expenses, etc., managed company-wide to the responsibility unit. There is.
For example,
ところで、電力会社を代表とする社会基盤事業者は、面的に広がる膨大な設備を保有しており、その修繕費や保守費、減価償却費も大きい。財務会計においてはこれらの費用は会計規則に基づき整理されており、その値を責任単位別に配分する場合は、設備数量や作業単位、人数単位で配分することが一般的だった。 By the way, a social infrastructure company represented by an electric power company has a vast amount of facilities that are spread over a wide area, and its repair costs, maintenance costs, and depreciation costs are large. In financial accounting, these expenses are organized according to accounting rules. When assigning these values by responsibility unit, it was common to allocate them by equipment quantity, work unit, or number of people.
しかし、面的に広がる設備の維持や償却においては、設備や地域ごとの特性を反映した配分をしなければ経営管理において適切な資源配分を行うことができない。
ここで、電力流通に対する収入について考える。例えば、地域Aで発電した電力を、地域Bを経由して地域Cに送配電する場合を考えると、地域Cの顧客から得た電気料金は、電力の生産を行った地域Aや、電力の輸送を行った地域Bにも、その貢献度に応じて収入が配分される必要がある。しかし、電力流通における設備の貢献度合いを把握するような指標は無く、各設備を管理する組織に貢献度に応じて収入を公平に配分することは難しいという問題があった。
However, in the maintenance and amortization of facilities that are spread across the board, appropriate resource allocation cannot be performed in business management unless allocation that reflects the characteristics of each facility or region is made.
Here, let us consider the income for power distribution. For example, when considering the case where electric power generated in the region A is transmitted and distributed to the region C via the region B, the electricity charge obtained from the customer in the region C is the region A where the power is produced, Revenue needs to be allocated to the region B that has transported according to the contribution. However, there is no index for grasping the degree of contribution of equipment in power distribution, and there is a problem that it is difficult to distribute income fairly to the organization that manages each equipment according to the degree of contribution.
そこでこの発明は、上述した課題を解決し、電力流通に対する収入を各責任単位へ、その責任単位が管轄する設備の貢献度に応じて配分することができる会計装置及びプログラムを提供することを目的としている。 SUMMARY OF THE INVENTION Accordingly, an object of the present invention is to solve the above-described problems and provide an accounting apparatus and program capable of allocating revenue for power distribution to each responsibility unit according to the degree of contribution of facilities under the responsibility of the responsibility unit. It is said.
本発明の第1態様は、電力供給に係る電力流通事業体の会計情報と、前記電力流通事業体が管轄する複数の設備の特性を示す設備特性情報と、前記電力流通事業体の配下にある各地域に存在する単位組織それぞれの管轄範囲における前記設備ごとの電力流通に対する貢献度を示す地域特性情報と、を取得し、取得した前記設備特性情報と前記地域特性情報とのうち少なくとも一方に基づいて前記電力流通事業体の前記会計情報を前記単位組織のそれぞれに配賦する配賦処理部を備えることを特徴とする会計装置である。 1st aspect of this invention exists in the subordinate of the accounting information of the electric power distribution enterprise which concerns on electric power supply, the equipment characteristic information which shows the characteristic of the some equipment which the said electric power distribution enterprise has jurisdiction, and the said electric power distribution enterprise Based on at least one of the acquired facility characteristic information and the regional characteristic information, the local characteristic information indicating the degree of contribution to the power distribution for each facility in the jurisdiction range of each unit organization existing in each region And an allocation processing unit that allocates the accounting information of the power distribution entity to each of the unit organizations.
また本発明の第2態様においては、前記設備は種類別に、送電設備と、変電設備と、配電設備とに分類され、さらに、送電設備は、送電電圧に応じて系統別に基幹系統送電設備と地域系統送電設備とに分類され、また、変電設備は、受電電圧に応じて系統別に基幹系統変電設備及び地域系統変電設備とに分類され、前記会計情報は、前記設備ごとの取得原価を含み、前記配賦処理部は、前記電力流通事業体の電力流通に対する総収入を所定の方法で按分し前記設備の種類ごとの収入を示す設備種類別収入を算出するとともに、当該設備種類別収入を、前記取得原価の合計に応じて前記種類別、系統別に按分した値のそれぞれを、さらに前記地域特性情報に応じて按分し、その按分した収入を当該地域特性情報に対応する前記単位組織に配分する。 Further, in the second aspect of the present invention, the facilities are classified by type into power transmission facilities, substation facilities, and power distribution facilities, and the power transmission facilities are divided into a main system power transmission facility and a region by system according to the transmission voltage. The power transmission equipment is classified into a grid power transmission facility, and the substation facilities are classified into a main system substation facility and a regional system substation facility according to the received voltage, and the accounting information includes an acquisition cost for each facility, The allocation processing unit distributes the total revenue for the power distribution of the power distribution entity by a predetermined method, calculates the revenue by facility type indicating the revenue for each type of the facility, and calculates the revenue by the facility type, Each of the values distributed by type and system according to the total acquisition cost is further distributed according to the regional characteristic information, and the distributed income is allocated to the unit organization corresponding to the regional characteristic information. .
また本発明の第3態様において前記送電設備は、前記地域特性情報は、前記設備ごとの電力の輸送量及び輸送距離を含み、前記配賦処理部は、前記設備種類別収入のうち前記送電設備に係る設備種類別収入を複数の前記基幹系統送電設備それぞれの取得原価の合計額と複数の前記地域系統送電設備それぞれの取得原価の合計額の比率で按分して前記基幹系統送電設備の収入と前記地域系統送電設備の収入とを算出し、また、設備種類別収入のうち前記変電設備に係る設備種類別収入を複数の前記基幹系統変電設備それぞれの取得原価の合計額と複数の前記地域系統変電設備それぞれの取得原価の合計額の比率で按分して前記基幹系統変電設備の収入と前記地域系統変電設備の収入とを算出し、さらに、前記基幹系統送電設備の収入を前記輸送距離に応じて前記単位組織に配分し、前記地域系統送電設備と前記配電設備の収入を前記輸送量と前記輸送距離を乗じた値に応じて前記単位組織に配分し、前記基幹系統変電設備と前記地域系統変電設備の収入を前記輸送量に応じて前記単位組織に配分する。 Moreover, in the third aspect of the present invention, the power transmission facility includes the region characteristic information including a transport amount and a transport distance of power for each facility, and the allocation processing unit includes the power transmission facility among the revenues according to the facility types. The revenues of each of the plurality of backbone grid transmission facilities are divided by the ratio of the total acquisition cost of each of the plurality of backbone grid transmission facilities and the total acquisition cost of each of the plurality of regional grid transmission facilities, and The revenue of the regional grid transmission facility is calculated, and the revenue by facility type of the revenue by facility type is the total acquisition cost of each of the plurality of backbone grid substations and the plurality of regional grids. Proportionately calculated by the ratio of the total acquisition cost of each substation, calculates the revenue of the main grid substation and the revenue of the regional grid substation, and further transfers the revenue of the main grid transmission facility to the transport Allocate to the unit organization according to separation, distribute the revenue of the regional grid power transmission equipment and the power distribution equipment to the unit organization according to a value obtained by multiplying the transport amount and the transport distance, The revenue of the regional system substation equipment is distributed to the unit organization according to the transport amount.
また本発明の第4態様における前記総収入を設備の種類ごとに按分する所定の方法は、前記配賦処理部が、前記設備特性情報と前記地域特性情報とに基づいて前記設備の種類ごとの料金を算出し、前記電力流通事業体の電力流通に対する総収入を前記設備の種類ごとの料金の比率で按分する方法である。 Moreover, the predetermined method for apportioning the total revenue for each type of equipment in the fourth aspect of the present invention is that the allocation processing unit is configured for each type of equipment based on the equipment characteristic information and the region characteristic information. This is a method of calculating a charge and apportioning the total revenue for the power distribution of the power distribution entity by the ratio of the charge for each type of equipment.
また本発明の第5態様において、前記設備特性情報は、前記設備ごとの料金単価を示す情報を含み、前記配賦処理部は、前記設備の種類ごとの料金のうち前記送電設備の料金を、複数の前記基幹系統送電設備それぞれに係る前記輸送距離に前記料金単価を乗じた値の合計値と、複数の前記地域系統送電設備それぞれに係る前記輸送量と前記輸送距離に前記料金単価を乗じた値の合計値と、を合算して算出し、前記設備の種類ごとの料金のうち前記変電設備の料金を、複数の前記基幹系統変電設備それぞれに係る輸送量に前記料金単価を乗じた値の合計値と、複数の前記地域系統変電設備それぞれに係る輸送量に前記料金単価を乗じた値の合計値と、を合算して算出し、前記設備の種類ごとの料金のうち前記配電設備の料金を、複数の配電設備それぞれに係る前記輸送量と前記輸送距離に前記料金単価を乗じた値を合計して算出する。 Moreover, in the fifth aspect of the present invention, the facility characteristic information includes information indicating a unit price for each facility, and the allocation processing unit calculates a fee for the power transmission facility among fees for each type of facility, The total value of the values obtained by multiplying the transportation distances related to each of the plurality of backbone power transmission facilities by the unit price, and the transportation amount and the transportation distances related to each of the plurality of regional system power transmission facilities are multiplied by the unit price. The total value of the value is calculated by adding together the charges of the substation equipment among the charges for each type of equipment, and the value obtained by multiplying the transportation amount of each of the plurality of backbone system substation facilities by the unit price of the charges. The total value and the total value of the value obtained by multiplying the transportation amount related to each of the plurality of regional grid substation facilities by the unit price of the charge are calculated, and the charge of the distribution facility among the charges for each type of the facility Multiple power distribution facilities Said transport volume and to calculate the transport distance to the sums a value obtained by multiplying the unit price of the respectively.
また本発明の第6態様における前記総収入を設備の種類ごとに按分する所定の方法は、前記配賦処理部が、前記設備の種類ごとの電力流通事業にかかる原価を示す会計情報を取得して合計し、前記電力流通事業体の電力流通に対する総収入を前記設備の種類ごとの原価の合計の比率で按分する方法である。 The predetermined method of apportioning the total revenue for each type of equipment according to the sixth aspect of the present invention is that the allocation processing unit obtains accounting information indicating the cost of the power distribution business for each type of equipment. And totaling the total revenue for the power distribution of the power distribution entity by the ratio of the total cost for each type of equipment.
また本発明の第7態様は、会計装置のコンピュータを、電力供給に係る電力流通事業体の会計情報と、前記電力流通事業体が管轄する複数の設備の特性を示す設備特性情報と、前記電力流通事業体の配下にある各地域に存在する単位組織それぞれの管轄範囲における前記設備ごとの電力流通に対する貢献度を示す地域特性情報と、を取得し、取得した前記設備特性情報と前記地域特性情報とのうち少なくとも一方に基づいて前記電力流通事業体の前記会計情報を前記単位組織のそれぞれに配賦する手段、として機能させるためのプログラムである。 According to a seventh aspect of the present invention, there is provided a computer of an accounting apparatus, wherein accounting information of a power distribution entity related to power supply, facility characteristic information indicating characteristics of a plurality of facilities managed by the power distribution entity, and the power Region characteristic information indicating the degree of contribution to the power distribution for each facility in the jurisdiction range of each unit organization existing in each region under the distribution business entity, and the acquired facility characteristic information and the region characteristic information Is a program for functioning as means for allocating the accounting information of the power distribution business entity to each of the unit organizations based on at least one of the above.
本発明によれば、電力流通に対する収入を各責任単位へ、その責任単位が管轄する設備の貢献度に応じて配分することができるので、電力流通に係る設備への適切な資源配分を行うことができるという効果が得られる。 According to the present invention, since revenue for power distribution can be distributed to each responsibility unit according to the degree of contribution of equipment under the jurisdiction of the responsibility unit, appropriate resource allocation to the power distribution equipment is performed. The effect of being able to be obtained.
<第一の実施形態>
以下、本発明の第一の実施形態による会計装置を図1〜図13を参照して説明する。
図1は、本発明の第一の実施形態による会計装置の一例を示すブロック図である。
この図において、符号1は会計装置を表している。図1に示す通り、会計装置1は、入力受付部10、会計情報取得部11、配賦処理部12、帳票出力部13、記憶部14、制御部15を備えている。会計装置1は、例えばCPU(Central Processing Unit)を備えたPC(パーソナルコンピュータ)やサーバ装置である。会計装置1は、ディスプレイ、キーボード、マウスなどと接続されている。会計装置1は、電力供給を行う電力会社における各種会計情報を集計し、管理会計に必要な各種帳票を責任単位ごとに出力する。責任単位とは、管理会計で定めた目標値などに対して責任を持つ1つの単位組織のことである。本実施形態の電力会社は、複数の事業体に分かれており、各事業体の配下には、階層の上から順に分野、支店、支社などの組織体が存在する。また、以下において責任単位は支社であるとする。
<First embodiment>
Hereinafter, an accounting apparatus according to a first embodiment of the present invention will be described with reference to FIGS.
FIG. 1 is a block diagram showing an example of an accounting apparatus according to the first embodiment of the present invention.
In this figure,
入力受付部10は、ユーザが不図示のキーボードやマウスなどを用いて行った操作の操作情報を受け付ける。
会計情報取得部11は、各種会計情報を取得し、記憶部14に記録する。各種会計情報には、例えば勘定残高情報、給与情報、振替伝票情報、設備投資情報などが含まれる。
配賦処理部12は、記憶部14に記録された会計情報を各責任単位に配賦する処理を行う。
帳票出力部13は、責任単位ごと、あるいは、複数の責任単位を束ねた組織ごとに収支レポートなどの帳票を出力する。
記憶部14は、会計情報取得部11が取得した会計情報、配賦処理部12がどの会計情報をどの責任単位に配賦するかを決定するルールを定義した情報を記憶するテーブル、帳票出力部13が帳票出力時に使用するマスタテーブルなどを記憶している。
制御部15は、ユーザの操作に基づいてアプリケーションプログラムの各種動作の制御を行う。
これら、入力受付部10、会計情報取得部11、配賦処理部12、帳票出力部13、制御部15は、会計装置1の備えるCPUが記憶部14からプログラムを読み出し実行することで備わる機能である。
The
The accounting
The
The
The
The
The
図2は、本発明の第一の実施形態による会計装置に格納されたテーブルの一例である。
図2(a)は、会計情報取得部11が取得して記憶部14に記録する会計情報のデータフォーマットの一例である。「区分」は、計画、実績を区別する情報を格納する項目である。「店所コード」、「箇所コード」は、本実施形態の電力会社における組織体系のうち、ある階層の組織体に割り当てられたコードである。店所は、箇所よりも上位の階層の組織である。「科目コード」、「項コード」は勘定科目を示すコードである。項は、科目のより上位の区分である。「残高」は、当該勘定科目の残高である。「年月」は、残高情報がいつ時点のものであるかを示している。会計情報取得部11は、図2(a)で例示したフォーマットの電子ファイルを取得し、記憶部14に記録する。
FIG. 2 is an example of a table stored in the accounting apparatus according to the first embodiment of the present invention.
FIG. 2A shows an example of the data format of the accounting information acquired by the accounting
図2(b)は、配賦処理部12が会計情報をどの責任単位に配賦するかを決定するために用いる勘定所属マスタテーブルのデータフォーマットの一例である。「店所コード」、「箇所コード」は、図2(a)で説明したとおりある階層の組織に割り当てられたコードである。「事業体コード」、「分野コード」、「責任単位コード」は、管理会計に用いる組織体系の各階層の組織体に割り当てられたコードであり、事業体、分野、責任単位の順に下層の組織を表している。事業体とは、例えば、電力の生産や燃料の調達を行う事業体、電力の流通を行う事業体(電力流通事業体)、顧客へサービスを提供する事業体などである。分野とは、例えば電力流通事業体の場合、送変電や配電である。責任単位とは、例えば各地に存在する支社である。図2(b)の1行目のレコードは、「店所コード=001」、「箇所コード=0011」で計上された会計情報は、管理会計上「事業体コード=01」、「分野コード=011」、「責任単位コード=0111」に対応付けられることを示している。この勘定所属マスタテーブルは、予め記憶部14に記憶されている。
FIG. 2B is an example of a data format of the account affiliation master table used by the
図2(c)は、配賦処理部12が、図2(a)で例示した会計情報に対して配賦処理を行った結果を示すテーブル(配賦後テーブル)の一例である。図2(c)で例示したテーブルには、図2(a)の会計情報に対して「事業体コード」、「分野コード」、「責任単位コード」の項目が付加されている。付加されたこれらのコードは、配賦処理部12が、勘定所属マスタテーブルに基づいて付加した情報である。
FIG. 2C is an example of a table (post-allocation table) indicating a result of the
図3は、本発明の第一の実施形態による会計装置が出力した帳票の一例を示す図である。
図3は、本実施形態の電力会社における電力流通事業体のある責任単位についての収支を表す帳票(収益レポート)である。
図3で例示するとおり、この帳票には、収入及び費用を表す勘定科目ごとに、送電、変電、配電の分野ごとの収入または費用の計画値、実績値の金額が印字され、また、全収入と全費用の差額である利益が印字される。責任者は、この収益レポートを各責任単位の経営に役立てることができる。なお、これら分野ごとの各勘定科目に対する金額は、会計情報取得部11が取得する会計情報に含まれている情報である。
帳票出力部13は、この帳票を例えば月次、四半期ごとにユーザの出力指示に基づいて出力する。帳票出力部13は、この収益レポートを、責任単位ごとだけではなく、分野ごと、事業体ごとに集計した形式でも出力する。なお、本実施形態では責任単位を支社としているが、支社を統括する支店、支社をさらに細分化したグループなどを責任単位とし、より多層的な単位で収益レポートを出力するようにしてもよい。
FIG. 3 is a diagram showing an example of a form output by the accounting apparatus according to the first embodiment of the present invention.
FIG. 3 is a form (revenue report) representing a balance of a responsible unit of a power distribution entity in the power company of this embodiment.
As illustrated in FIG. 3, for each account item representing income and expenses, this form prints the amount of revenue or planned value of actual cost, actual value for each field of power transmission, transformation, and distribution, and total revenue. And the profit, which is the difference between all costs, is printed. The manager can use this revenue report to manage each responsible unit. The amount for each account item in each field is information included in the accounting information acquired by the accounting
The
図4は、本発明の第一の実施形態による会計装置の処理の一例を示すフローチャートである。
図4のフローチャートを用いて、会計装置1における会計情報の取得から収益レポートの出力までの処理について説明する。
前提として、制御部15が、会計情報の取得指示や帳票出力指示を行うメニュー画面のプログラムを記憶部14から読み出して、メニュー画面の画像を会計装置1に接続されたディスプレイに出力しているものとする。なお、メニュー画面には、ユーザが会計情報の取得指示を行う「会計情報取得ボタン」や帳票の出力指示を行う「帳票出力指示ボタン」が表示されているものとする。
FIG. 4 is a flowchart showing an example of processing of the accounting apparatus according to the first embodiment of the present invention.
With reference to the flowchart of FIG. 4, processing from acquisition of accounting information to output of a profit report in the
As a premise, the
まず、ユーザが、会計情報が含まれた電子ファイル(CSVファイルなど)を指定し、「会計情報取得ボタン」を押下する。すると、入力受付部10がその操作情報を取得し、会計情報取得部11に電子ファイルのパス情報と取得指示情報とを出力する。すると、会計情報取得部11は、指定された電子ファイルを読み込み(ステップS1)、会計情報を記憶部14に書き出すとともに、配賦処理部12に配賦処理の指示を行う。配賦処理部12は、会計情報取得部11が記憶部14に書き出した会計情報を1件ずつ読み取り、配賦処理を行う(ステップS2)。具体的には、配賦処理部12は、読み取った会計情報から店所コードと箇所コードを取得し、それらのコードをキーとして勘定所属マスタテーブルを検索する。次に、配賦処理部12は、検索がヒットしたレコードから事業体コード、分野コード、責任単位コードを取得する。次に、配賦処理部12は、取得した事業体コード、分野コード、責任単位コードを読み取った会計情報に付加し、図2(c)で例示した配賦後テーブルに書き出す。
ユーザは、帳票の出力に必要な会計情報が含まれる電子ファイルを取り込むよう取得指示操作を繰り返し、会計情報取得部11は、指定された電子ファイルの内容を記憶部14に書き出す。また、配賦処理部12は、会計情報取得部11が会計情報を取得する度に責任単位コード等を付加し、記憶部14の配賦後テーブルに書き出す。
First, the user designates an electronic file (CSV file or the like) including accounting information, and presses an “accounting information acquisition button”. Then, the
The user repeats the acquisition instruction operation so as to capture an electronic file containing the accounting information necessary for outputting the form, and the accounting
次に、ユーザが出力対象となる年月や責任単位を指定して「帳票出力指示ボタン」を押下する。すると、入力受付部10がその操作情報を取得し、帳票出力部13に指定された年月や責任単位の情報と出力指示情報とを出力する。すると、帳票出力部13は、配賦後テーブルから指定された年月、責任単位コードを持つレコードを読み出して勘定科目ごとに集計する。そして、帳票出力部13は、集計した値を所定の帳票フォーマットで出力する(ステップS3)。なお、集計する単位は責任単位に限らない。事業体別や分野別に集計して帳票出力を行ってもよい。
Next, the user designates the year / month and the responsibility unit to be output, and presses the “form output instruction button”. Then, the
以上が会計情報の取り込みから帳票出力までの処理の概要である。収益や費用がある店所や箇所で計上する場合、それらの会計情報に当該店所コード及び箇所コードに対応付けられた責任単位コードを付して集計を行えば、責任単位における管理会計の情報を得ることができる。しかし、例えば電力流通に対する総収入の場合、電力は複数の責任単位(支社)が管理する送電線などの設備を用いて送電されるため、送電に貢献した各支社に収入を配分しなければならない。このとき配分方法が合理的でないと、責任単位間で不公平が生じたり、あまり使わない設備に過度な配分をしてしまったり、設備の維持に必要な修繕費などが賄えなくなるといった問題が発生する。そこで、本実施形態では、各支社の有する設備の特性や、各支社の管轄する地域に存在する設備の貢献度に応じて合理的に電力流通に対する総収入を配分する方法を提供する。 The above is the outline of processing from accounting information import to form output. When accounting at stores or locations with revenue or expenses, information on management accounting in the unit of responsibility can be obtained by adding the responsible unit code associated with the store code and location code to the accounting information. Can be obtained. However, for example, in the case of the total revenue for power distribution, since power is transmitted using equipment such as transmission lines managed by multiple units of responsibility (branches), revenue must be allocated to each branch that contributed to power transmission. . If the distribution method is not rational at this time, problems such as unfairness among responsible units, excessive allocation to equipment that is not used frequently, and repair costs necessary for maintenance of equipment cannot be provided. Occur. Therefore, this embodiment provides a method for rationally allocating the total revenue for power distribution in accordance with the characteristics of the facilities possessed by each branch office and the contributions of the facilities existing in the area under the jurisdiction of each branch office.
図5は、本発明の第一の実施形態による収入の配分方法を説明するための第一の図である。
図5を用いて電力流通に係る設備の概要について説明する。図5は、電力系統の全体概略を示している。符号21は発電所を示している。符号22は、基幹系統の送電設備を示している。送電設備とは例えば送電線である。基幹系統送電設備22は、例えば275kV以上の電圧で電力を送電する。符号23は、超高圧変電設備を示している。超高圧変電設備23は、基幹系統送電設備22の電圧を地域系統の送電設備で送電できる電圧にまで低下させる。符号24は、地域系統の送電設備を示している。地域系統送電設備24は、例えば66〜154kVの電圧で電力を送電する。符号25は、配電用変電設備を示している。配電用変電設備25は、地域系統の送電線で送電される電力の電圧を例えば6kVに低下させ、地域の配電系統に供給する。符号26は、配電系統の配電設備を示している。配電系統配電設備26は、電力を各需要家に供給する。発電所21で生じた電力は、超高圧変電設備23、配電用変電設備25で電圧を低下させながら、基幹系統送電設備22、地域系統送電設備24、配電系統配電設備26を介して各需要家に供給される。これら設備は、種類別に分類すると変電設備、送電設備、配電設備に分類することができる。また、これら設備は系統別に分類すると、基幹系統、地域系統、配電系統に分類することができる。なお、本実施形態においては、超高圧変電設備23を基幹系統の設備、配電用変電設備25を地域系統の設備として分類することにする。
FIG. 5 is a first diagram for explaining a revenue distribution method according to the first embodiment of the present invention.
The outline | summary of the installation which concerns on electric power distribution is demonstrated using FIG. FIG. 5 shows an overall outline of the power system.
図6は、本発明の第一の実施形態による収入の配分方法を説明するための第二の図である。
図6を用いて各設備に対して付与する料金単価や設定料金について説明する。後述するように各設備に対する料金に応じて、各設備を有する責任単位に収入を配分する。
各設備の設定料金は、送電設備及び配電設備については、送配電した電力量(以下、輸送量)と送配電した距離(以下、輸送距離)と料金単価を乗じた値に設定する。変電設備については、輸送量と料金単価とを乗じた値を設定する。但し、基幹系統の送電及び変電設備の設定料金の算出方法は若干異なる。以下、系統別に設定料金の算出方法について説明する。
FIG. 6 is a second diagram for explaining the revenue distribution method according to the first embodiment of the present invention.
With reference to FIG. 6, the unit price and the set fee to be given to each facility will be described. As described later, according to the charge for each facility, revenue is allocated to the responsible unit having each facility.
The set fee for each facility is set to a value obtained by multiplying the amount of power transmitted / distributed (hereinafter referred to as transport amount), the distance transmitted / distributed (hereinafter referred to as transport distance), and the unit price for power transmission facilities and distribution facilities. For substation facilities, a value obtained by multiplying the transportation volume and the unit price of charges is set. However, the calculation method of the set charges for the transmission and transformation facilities of the main system is slightly different. Hereinafter, a method for calculating the set fee for each system will be described.
まず、基幹系統について説明する。基幹系統は、故障がなく確実に機能することが重要である。また、基幹系統は環状(ループ系統)に構成されていることが多く、実際に電流が流れていないルートでも系統の安定に役立っているため単純に送電した電力量で貢献度を算定するのは適切ではない。そこで、基幹系統の場合は、実際に送電した電力量は考慮せず、設備の規模を基準に料金を設定する。また、基幹系統の設備は、他の設備に比べ扱う電圧が高く且つ高価なので、料金単価を高めに設定する。また、基幹系統の送電設備に対する設定料金は、基幹系統送電設備22の料金単価に輸送距離を乗じた値に設定する。基幹系統の変電設備に対する設定料金は、変電設備の場合、輸送距離を考えないので超高圧変電設備23の料金単価に輸送量として設備の容量を乗じた値を設定料金に設定する。なお、設備の容量とは、実際に超高圧変電設備23を通過した電力量ではなく設備の規模を表す値である。
First, the backbone system will be described. It is important that the backbone system functions without failure. In addition, the backbone system is often configured in a loop (loop system), and it helps to stabilize the system even in routes where no current actually flows. Not appropriate. Therefore, in the case of the backbone system, the amount of power actually transmitted is not taken into consideration, and the fee is set based on the scale of the facility. In addition, the system of the main system is set to a higher unit price because the voltage handled is higher and more expensive than other facilities. Further, the set fee for the power transmission facility of the main system is set to a value obtained by multiplying the unit price of the main system power transmission facility 22 by the transport distance. In the case of substation equipment, the set fee for the main system substation equipment is set to a value obtained by multiplying the unit price of the ultra-high
次に地域系統について説明する。地域系統の場合、料金単価は、各送電設備が扱う電圧に応じて設定する。つまり電圧が高い程、高い単価を設定し、電圧が低い程、安い単価を設定する。電力が高い方が単価が高いのは、電圧が高い方が効率よく多くの電力を送電でき、貢献度が高いからである。また、地域系統の送電設備に対する設定料金は、地域系統送電設備24の電圧に応じた料金単価に輸送量と輸送距離とを乗じた値に設定する。また、地域系統の変電設備に対する設定料金は、変電設備の場合、輸送距離を考えないので配電用変電設備25の受電電圧に応じた料金単価に輸送量(配電用変電設備25を通過した電力量)を乗じた値を設定する。
Next, the regional system will be described. In the case of regional grids, the unit price is set according to the voltage handled by each power transmission facility. That is, a higher unit price is set as the voltage is higher, and a lower unit price is set as the voltage is lower. The higher the electric power, the higher the unit price is because the higher the voltage, the more efficient the electric power can be transmitted and the higher the contribution. In addition, the set fee for the power transmission facility in the regional grid is set to a value obtained by multiplying the unit price according to the voltage of the regional grid
次に配電系統について説明する。配電系統の場合、各配電設備が扱う電圧は一定で料金単価も単一の値を設定する。配電系統の送電設備に対する設定料金は、配電系統配電設備26の料金単価に輸送量と輸送距離とを乗じた値を基準に設定する。
Next, the power distribution system will be described. In the case of a distribution system, the voltage handled by each distribution facility is constant and the unit price is set to a single value. The set fee for the power transmission facility of the distribution system is set based on a value obtained by multiplying the unit price of the distribution
図7は、本発明の第一の実施形態による収入の配分方法を説明するための第三の図である。
図7を用いて、地域系統の送電設備に対する設定料金の計算方法について説明する。図7(a)は、ある送電経路において顧客の需要に応じた電力を送電する状況の一例を示している。この図において、符号31〜35は、それぞれ電力の送電経路を示している。何れの経路も電圧は同じである。従って符号31〜35の輸送経路には、同じ料金単価=Kが設定されている。符号31の輸送距離は全長が5kmで、輸送量は、10MWhであるとする。符号32の輸送距離は全長が10kmで、輸送量は、5MWhであるとする。符号33の輸送距離は全長が20kmで、輸送量は、20MWhであるとする。すると、A線の電力送電に対する設定料金は、以下の式で計算することができる。
A線の設定料金 = K × (5km×10MWh + 10km×5MWh +
20km×20MWh )= K×500MWh・km
FIG. 7 is a third diagram for explaining the revenue distribution method according to the first embodiment of the present invention.
With reference to FIG. 7, a method for calculating the set fee for the power transmission equipment in the regional system will be described. Fig.7 (a) has shown an example of the condition which transmits the electric power according to a customer's demand in a certain power transmission path | route. In this figure, the codes | symbols 31-35 have each shown the power transmission path | route of electric power. Both paths have the same voltage. Therefore, the same unit price = K is set for the
Line A set fee = K x (5 km x 10 MWh + 10 km x 5 MWh +
20km × 20MWh) = K × 500MWh · km
次にB線の電力送電に対する収入を計算する。符号34の輸送距離は全長が5kmで、発電所Gからの輸送量は、5MWhであるとする。符号35の輸送距離は全長が10kmで、輸送量は、2MWhであるとする。すると、B線の設定料金は、以下の式で計算することができる。
B線の設定料金 = K × (5km×|−5MWh| + 10km ×2MWh )= K×45MWh・km
Next, the revenue for power transmission on line B is calculated. The transportation distance of the code |
Setting fee for B line = K x (5 km x | -5 MWh | + 10 km x 2 MWh) = K x 45 MWh · km
図7(b)は、上記のA線における収入をグラフで図示したものである。符号31S〜33Sが示す領域の面積は、それぞれ図7(a)のA線の経路31〜33の収入額に対応している。図7(b)が示すように地域系統の送電設備に対する設定料金は、各領域の面積の和で算出することができる。
また、例えばA線とB線とをそれぞれ異なる責任単位が管理しているような場合、それぞれの責任単位には、A線の設定料金とB線の設定料金との比に応じて収入を配分する。
FIG. 7B is a graph showing the income on line A. The areas of the areas indicated by
Also, for example, when different responsibility units manage the A line and the B line, revenue is allocated to each responsibility unit according to the ratio between the set fee for the A line and the set fee for the B line. To do.
図8は、本発明の第一の実施形態による収入の配分方法を説明するための第四の図である。
図8を用いて、配電系統の送電設備に対する設定料金の計算方法について説明する。図8(a)は、ある配電経路において顧客の需要に応じた電力を配電する状況の一例を示している。この図において、符号36〜37は、それぞれ電力の配電系統を示している。配電系統の場合も地域系統の送電設備と同様に輸送量と輸送距離を乗じた値を基準とする。配電系統の配電線は、配電用変電設備25から多数の需要家まで網状に張り巡らされており、各需要家までの配電線の距離を把握するのは容易ではなく、1つの配電線の距離には、1つの配電系統内(1支社内)における配電線亘長の平均値を用いる。また、どの需要家にどれだけの電力が供給されているかを把握することも容易ではないので、輸送量と輸送距離の関係は反比例する関係にあるとして計算を行う。
FIG. 8 is a fourth diagram for explaining the revenue distribution method according to the first embodiment of the present invention.
With reference to FIG. 8, a method for calculating the set fee for the power transmission facility of the distribution system will be described. Fig.8 (a) has shown an example of the condition which distributes the electric power according to a customer's demand in a certain distribution route. In this figure, the codes | symbols 36-37 have each shown the electric power distribution system. In the case of the distribution system, the value obtained by multiplying the transport amount and the transport distance is used as the standard in the same way as the transmission system of the regional system. The distribution lines of the distribution system are stretched around the network from the
図8(b)は、そのようにして配電電力量と配電線の距離を定めた場合の1本の配電線における輸送量と輸送距離との関係を示すグラフである。配電系統の場合、図8(b)のグラフにおける符号38が示す三角形の面積が1本の配電線あたりの設定料金となる。つまり配電系統の設定料金は、以下の式で算出する。
配電系統の設定料金 = 1/2 × 輸送量 × 輸送距離
例えば、図8(a)で例示した配電系統36と配電系統37の1本の配電線の輸送距離が等しく、輸送量も等しいと仮定すると、配電系統36と配電系統37に対する設定料金は、4:2となり、配電系統36と配電系統37とを管理する責任単位には、4:2の比率で収入を配分する。
FIG. 8B is a graph showing the relationship between the transport amount and transport distance in one distribution line when the distribution power amount and the distance between the distribution lines are determined as described above. In the case of the power distribution system, the area of the triangle indicated by the
Distribution system set charge = 1/2 × transport amount × transport distance For example, it is assumed that the transport distance of one distribution line of
図9は、本発明の第一の実施形態による収入の配分方法を説明するための第五の図である。
図9を用いて、収入の各支社への配分方法について説明する。
まず、顧客から得た託送収入(電力流通に対する総収入)を、設備の種類ごとに按分して設備種類別収入を算出する。按分の方法には、2つの方法が存在する。
1つ目の方法では、顧客から得た託送収入(電力流通に対する総収入)を、設備の種類ごとの設定料金の比率で按分し設備種類別収入を算出する(符号41)。設備の種類ごと系統ごとの設定料金の算出方法は上記のとおりである。これらを設備の種類ごとに合計して設備の種類ごとの設定料金を求める。送電設備の設定料金は、基幹系統送電設備ごとの料金単価に輸送距離を乗じた値を合計した値と、地域系統送電設備ごとの料金単価に輸送量と輸送距離を乗じた値を合計した値を合算して求める。変電設備の設定料金は、基幹系統変電設備ごとの料金単価に輸送量(容量)を乗じた値の合計値と、地域系統変電設備ごとの料金単価と輸送量を乗じた値の合計値を合算して求める。配電設備の設定料金は、配電設備ごとの料金単価に1/2と輸送量と輸送距離とを乗じた値を合計して求める。託送収入を、設備の種類ごとの設定料金の比率で按分した値をそれぞれ送電収入、変電収入、配電収入とする。
2つ目の方法では、顧客から得た託送収入を、設備の種類ごとの費用の計画値の合計で按分し設備種類別収入を算出する(符号41)。この計画値の合計は、図3で例示した帳票における費用に係る勘定科目の計画欄に記載された金額の合計である。費用の計画値とは、託送料金の改定時に算定した電力流通事業にかかる原価であって、減価償却費、人件費、修繕費などが含まれる。2つ目の方法では、設備の種類ごとに原価の合計を算出し、この合計値の比率で按分した値をそれぞれ送電収入、変電収入、配電収入とする。なお、設備の種類ごとの原価(費用の計画値)は、会計情報取得部11が取得し、記憶部14に記録した会計情報に含まれている。
FIG. 9 is a fifth diagram for explaining the revenue distribution method according to the first embodiment of the present invention.
With reference to FIG. 9, a method for distributing revenue to each branch office will be described.
First, the revenue by consignment (total revenue for power distribution) obtained from the customer is apportioned for each type of equipment to calculate the income by equipment type. There are two methods of apportionment.
In the first method, the consignment revenue obtained from the customer (total revenue for power distribution) is prorated by the ratio of the set fee for each type of equipment to calculate the revenue by equipment type (reference numeral 41). The calculation method of the set fee for each system for each type of equipment is as described above. These are totaled for each type of equipment, and a set fee for each type of equipment is obtained. The transmission facility setting fee is the sum of the unit price of each grid transmission facility multiplied by the transport distance, and the sum of the unit price of each regional grid transmission facility multiplied by the transport amount and transport distance. It is calculated by adding together. For the substation setting fee, add the total value of the unit price for each main system substation and the transport amount (capacity), and the total of the unit price for each regional substation and the transport amount. And ask. The set charge for the power distribution equipment is obtained by summing up the unit price for each power distribution equipment multiplied by 1/2, the transport amount and the transport distance. The value that is apportioned by the ratio of the set fee for each type of equipment is assumed to be transmission revenue, substation revenue, and distribution revenue, respectively.
In the second method, consignment revenue obtained from a customer is apportioned by the sum of the planned costs for each type of facility to calculate revenue by facility type (reference numeral 41). The total of the plan values is the sum of the amounts described in the plan column of the account item related to the expense in the form illustrated in FIG. The planned cost is the cost of the power distribution business calculated when the consignment fee is revised, and includes depreciation expenses, personnel expenses, repair expenses, and the like. In the second method, the total cost is calculated for each type of equipment, and values prorated by the ratio of the total value are set as transmission revenue, substation revenue, and distribution revenue, respectively. The cost (planned cost) for each type of equipment is included in the accounting information acquired by the accounting
次に、送電収入及び変電収入を、基幹系統と地域系統に配分する(符号42)。基幹系統と地域系統へ配分するには、各設備の取得原価を用いる。具体的には、送電収入を各基幹系統送電設備の取得原価の合計額と各地域系統送電設備の取得原価の合計額と、の比率で按分して、基幹系統送電設備の収入(基幹送電収入)と地域系統送電設備の収入(地域送電収入)とを算出する。また、変電収入を各基幹系統変電設備の取得原価の合計額と各地域系統変電設備の取得原価の合計額との比率で按分して基幹系統変電設備の収入(基幹変電収入)と地域系統変電設備の収入(地域変電収入)とを算出する。ここで、例えば各設備の簿価ではなく取得原価を用いるのは、簿価を用いると原価償却が進んだ設備の簿価は小さな値となるが、原価償却が進んだ比較的古い設備にこそメンテナンスを必要としコストをかけなければならないのに対し、簿価で按分するとそのような設備に収入が回らず、比較的新しくメンテナンスの必要性が低い設備に対してより多くの収入が配分されることとなり実態と合わないからである。 Next, the power transmission revenue and the substation revenue are allocated to the main system and the regional system (reference numeral 42). In order to allocate to the main system and the regional system, the acquisition cost of each facility is used. Specifically, the transmission revenue is divided by the ratio of the total acquisition cost of each grid transmission facility and the total acquisition cost of each regional grid transmission facility, and the revenue of the grid transmission facility (core transmission revenue) ) And the revenue of regional grid transmission facilities (regional transmission revenue). In addition, the substation revenue is divided by the ratio of the total acquisition cost of each main system substation equipment and the total acquisition cost of each local system substation equipment to the main system substation equipment revenue (main substation revenue) and the local system substation Calculate equipment revenue (regional substation revenue). Here, for example, the acquisition cost is used instead of the book value of each piece of equipment. If the book value is used, the book value of the equipment whose cost depreciation has progressed becomes small, but it is only for the relatively old equipment whose cost depreciation has advanced. While it requires maintenance and costs, apportioning by book value does not generate revenue for such equipment, and more revenue is allocated to relatively new and less maintenance-friendly equipment. This is because it does not match the actual situation.
次に、基幹送電収入、地域送電収入、基幹変電収入、地域変電収入、配電収入のそれぞれを各支社へ配分する(符号43)。まず、基幹送電収入については、支社ごとにその支社の管轄範囲を基幹系統送電設備(送電線)が通過した距離に応じて基幹送電収入を按分する。地域送電収入については、支社ごとにその支社の管轄範囲を地域系統送電設備(送電線)が通過する距離と通過する電力量を積算した値に応じて地域送電収入を按分する。また、基幹変電収入については、支社ごとにその支社の管轄範囲に設置された変電設備の容量に応じて基幹変電収入を按分する。地域変電収入については、支社ごとにその支社の管轄範囲に設置された変電設備を通過する電力量に応じて地域変電収入を按分する。また、配電収入は、各支社における需要電力量と配電設備(配電線)の距離と配電線の本数とを積算した値に応じて配電収入を按分する。 Next, each of the main transmission revenue, regional transmission revenue, basic substation revenue, regional substation revenue, and distribution revenue is distributed to each branch office (reference numeral 43). First, for the main transmission revenue, the main transmission revenue is apportioned for each branch office according to the distance that the main system transmission facility (transmission line) has passed through the branch's jurisdiction range. For regional transmission revenue, the regional transmission revenue is apportioned for each branch office according to the integrated value of the distance that the regional grid transmission facility (transmission line) passes through the jurisdiction range of the branch office. In addition, for the main substation revenue, the main substation revenue is apportioned according to the capacity of the substation equipment installed in the jurisdiction range of each branch office. For regional substation revenue, local substation revenue is apportioned according to the amount of power passing through the substation equipment installed in the jurisdiction of each branch office. In addition, the distribution revenue is apportioned according to a value obtained by integrating the amount of power demand at each branch office, the distance of distribution facilities (distribution lines), and the number of distribution lines.
次に配賦処理部12が、上記の方法によって託送収入を各支社に配分する処理について図10〜図13を用いて説明する。
図10は、本発明の第一の実施形態による収入配分処理の一事例を説明するための図である。図10が示すように支社100の管轄範囲には、基幹系統送電設備51と、超高圧変電設備52と、地域系統送電設備53の一部とが含まれている。支社200の管轄範囲には、地域系統送電設備53の一部と、配電用変電設備54とが含まれている。支社300の管轄範囲には、配電系統配電設備55が含まれている。説明を簡単にするため、これらの支社100〜300と設備51〜55のみが存在するとして収入配分処理の説明を行う。
Next, the
FIG. 10 is a diagram for explaining an example of income distribution processing according to the first embodiment of the present invention. As shown in FIG. 10, the jurisdiction range of the branch office 100 includes a main system
図11は、本発明の第一の実施形態による収入配分処理に用いるテーブルの一例を示す第一の図である。
図11に例示するテーブル(設備特性情報設定テーブル)には、設備ごとにその設備の特性と料金単価、取得原価が設定されている。設備の特性とは、各設備で扱う電圧である。各設備で扱う電圧とは送電設備であれば送電電圧、変電設備であれば受電電圧、配電電圧であれば配電電圧である。各設備の料金単価は、各設備の電圧に応じて、電圧が高い程、高い単価が設定されている。例えば、基幹系統送電設備51の料金単価「X51」と地域系統送電設備53の料金単価「X53」とを比較すると、基幹系統送電設備51の送電電圧の方が高いので「X51」の方が高い金額が設定されている。この設備特性情報設定テーブルは、記憶部14に予め記憶されたテーブルである。
FIG. 11 is a first diagram illustrating an example of a table used for income distribution processing according to the first embodiment of the present invention.
In the table illustrated in FIG. 11 (equipment characteristic information setting table), the characteristics of the equipment, the unit price, and the acquisition cost are set for each equipment. The characteristic of equipment is the voltage handled by each equipment. The voltage handled by each facility is a transmission voltage if it is a power transmission facility, a received voltage if it is a substation facility, and a distribution voltage if it is a distribution voltage. The unit price of each facility is set such that the higher the voltage, the higher the unit price according to the voltage of each facility. For example, comparing the unit price “X 51 ” of the main
図12は、本発明の第一の実施形態による収入配分処理に用いるテーブルの一例を示す第二の図である。
図12に例示するテーブル(地域特性情報設定テーブル)には、支社ごとにその支社の管轄範囲にある設備ごとに電力の輸送量及び輸送距離が設定されている。本実施形態においては、この輸送量と輸送距離が各設備の電力流通に対する貢献度を示す指標となる。図12が示すとおり、基幹系統送電設備51は、支社100の管轄範囲にあり、輸送距離に「M101」が設定されている。基幹系統の設備は、インフラ設備の根幹として確実に機能することが重要であり、従量制の考えを適用するのは馴染まないとの考えにより、実際に送電した電力量は考慮せず、輸送量は設定されていない。基幹系統変電設備52についても同様に、支社100の管轄範囲にあり、輸送量には設備の容量「W52」が設定されている。基幹系統変電設備52についても、従量制に基づいた値(例えば、実際に変電設備を通過した電力量)ではなく設備の規模(kVA)が設定されている。また、変電設備の為、輸送距離は設定されていない。基幹系統送電設備を管轄範囲に有する支社には、輸送距離を乗じた値に応じた収入が配分される。基幹系統の変電設備を管轄範囲に有する支社には、各設備の輸送量に応じた収入が配分される。
FIG. 12 is a second diagram showing an example of a table used for the income distribution process according to the first embodiment of the present invention.
In the table illustrated in FIG. 12 (regional characteristic information setting table), the transport amount and transport distance of electric power are set for each facility in the jurisdiction range of each branch office. In the present embodiment, the transport amount and transport distance serve as an index indicating the degree of contribution of each facility to the power distribution. As shown in FIG. 12, the backbone
次の地域系統送電設備53については、支社100の管轄範囲にある部分と、支社200の管轄範囲にある部分が存在し、地域特性情報設定テーブル中にそれぞれ別のレコードとして記録されている。まず、支社100の管轄範囲にある部分については、輸送量に「P531」、輸送距離に「M102」が設定されている。この輸送量「P531」は、基幹系統設備の場合と異なり、支社100の管轄範囲において計測器で測定した電力量の値である。また、輸送距離「M102」は、地域系統送電設備53が支社100の管轄範囲を通過する距離である。地域系統送電設備53のうち、支社200の管轄範囲にある部分については、輸送量に「P532」、輸送距離に「M201」が設定されている。それぞれの値が示す意味は支社100の場合と同じである。
For the next regional
配電用変電設備54については、支社200の管轄範囲にあり、輸送量には配電用変電設備54を通過した電力量「P54」が設定されている。また、変電設備の為、輸送距離は設定されていない。
配電系統配電設備55については、輸送量に「P55」、輸送距離に「M301」が設定されている。
地域系統送電設備及び配電系統設備を管轄範囲に有する支社には、各設備の輸送量と輸送距離を乗じた値に応じた収入が配分される。また、地域系統の変電設備(配電用変電設備)を管轄範囲に有する支社には、各設備の輸送量に応じた収入が配分される。
なお、この地域特性情報設定テーブルは、記憶部14に予め記憶されたテーブルである。
The
For the power distribution
Revenues corresponding to the value obtained by multiplying the transport amount and transport distance of each facility are allocated to the branch offices that have regional power transmission facilities and distribution system facilities within their jurisdiction. In addition, revenues corresponding to the transportation volume of each facility are allocated to branch offices that have regional substation facilities (distribution substation facilities) within their jurisdiction.
The regional characteristic information setting table is a table stored in advance in the
図13は、本発明の第一の実施形態による収入配分処理の一例を示すフローチャートである。
図13を用いて、図4のフローチャートのステップS2の配賦処理において、託送収入を各責任単位に配分する処理について説明する。なお、説明には、図10〜図12で例示した情報を用いる。
まず、配賦処理部12は、会計情報取得部11が記憶部14に書き出した会計情報を1件ずつ読み取り、託送収入を示す勘定科目が含まれているかどうかを判定する(ステップS11)。託送収入を示す勘定科目が含まれていない場合(ステップS11;No)、このフローチャートの処理は終了する。託送収入を示す勘定科目が含まれている場合(ステップS11;Yes)、配賦処理部12は、その勘定科目の金額について配分処理を行う。
FIG. 13 is a flowchart showing an example of revenue distribution processing according to the first embodiment of the present invention.
With reference to FIG. 13, a description will be given of a process of distributing the consignment revenue to each responsibility unit in the allocation process of step S2 in the flowchart of FIG. In the description, the information illustrated in FIGS. 10 to 12 is used.
First, the
まず、配賦処理部12は、設備特性情報設定テーブルと地域特性情報設定テーブルとを読み込んで設備別収入を算出する(ステップS12)。上述した1つ目の方法で設備種類別収入を算出する場合、具体的には、以下の処理を行う。
(1)設備種類ごとの料金を算出する。
送電設備の料金:C1 = X51× M101 + X53×(P531×M102)+ X53×(P532×M201)
変電設備の料金:C2 = X52×(W52)+ X54×(P54)
配電設備の料金:C3 = X55×(1/2×P55×M301)
(2)設備種類別収入を算出する。
送電収入:I1 = 託送収入 × (C1/(C1+C2+C3))
変電収入:I2 = 託送収入 × (C2/(C1+C2+C3))
配電収入:I3 = 託送収入 × (C3/(C1+C2+C3))
First, the
(1) Calculate the charge for each type of equipment.
Charge of power transmission equipment: C1 = X51 * M101 + X53 * ( P531 * M102 ) + X53 * ( P532 * M201 )
Substation charge: C2 = X52 x ( W52 ) + X54 x ( P54 )
Distribution facility charges: C3 = X55 x (1/2 x P55 x M301 )
(2) Calculate revenue by equipment type.
Power transmission revenue: I1 = consignment revenue × (C1 / (C1 + C2 + C3))
Substation revenue: I2 = Remittance revenue × (C2 / (C1 + C2 + C3))
Distribution revenue: I3 = Procurement revenue × (C3 / (C1 + C2 + C3))
また、上述した2つ目の方法で設備種類別収入を算出する場合、次のように処理する。まず配賦処理部12は、記憶部14に格納された会計情報から、送電設備、変電設備、配電設備それぞれの費用に係る勘定科目の計画値(原価)を読み出し、設備ごとに計画値の合計を算出する。送電設備の費用の計画値合計をD1、変電設備の費用の計画値合計をD2、配電設備の費用の計画値合計をD3とする。配賦処理部12は、設備種類別収入を以下の式から算出する。
送電収入:I1 = 託送収入 × (D1/(D1+D2+D3))
変電収入:I2 = 託送収入 × (D2/(D1+D2+D3))
配電収入:I3 = 託送収入 × (D3/(D1+D2+D3))
Moreover, when calculating the revenue according to equipment type by the second method described above, the following processing is performed. First, the
Power transmission revenue: I1 = consignment revenue × (D1 / (D1 + D2 + D3))
Substation revenue: I2 = consignment revenue × (D2 / (D1 + D2 + D3))
Distribution revenue: I3 = Transportation revenue × (D3 / (D1 + D2 + D3))
次に、配賦処理部12は、設備種類別収入を取得原価で按分する(ステップS13)。
具体的には、配賦処理部12は、送電及び変電に係る設備の取得原価を設備特性情報設定テーブルから読み出す。そして配賦処理部12は、各設備の取得原価を基幹系統と地域系統ごとに合計する。
基幹系統送電設備取得原価=Y51
基幹系統変電設備取得原価=Y52
地域系統送電設備取得原価=Y53
地域系統変電設備取得原価=Y54
そして、配賦処理部12は、送電設備収入I1を基幹系統送電設備取得原価Y51、地域系統送電設備取得原価Y53の比率で按分する。
基幹送電収入:I1B=I1 ×(Y51/(Y51+Y53))
地域送電収入:I1R=I1 ×(Y53/(Y51+Y53))
また、配賦処理部12は、変電設備収入I2を基幹系統変電設備取得原価Y52、地域系統変電設備取得原価Y54の比率で按分する。
基幹変電収入:I2B=I2 ×(Y52/(Y52+Y54))
地域変電収入:I2R=I2 ×(Y54/(Y52+Y54))
Next, the
Specifically, the
Core system transmission equipment acquisition cost = Y 51
Core system substation acquisition cost = Y 52
Local system transmission equipment acquisition cost = Y 53
Regional system substation acquisition cost = Y 54
The
Core transmission revenue: I1 B = I1 × (Y 51 / (Y 51 + Y 53 ))
Further,
次に、配賦処理部12は、設備種類別収入を各支社へ配分する(ステップS14)。
(1)設備ごと地域ごとに按分に用いる基準値を算出する。
基幹系統送電設備51の基準値:J51 = M101
基幹系統変電設備52の基準値:J52 = W52
地域系統送電設備53(支社100分)の基準値:J53(100) = P531×M102
地域系統送電設備53(支社200分)の基準値:J53(200) = P532×M201
配電用変電設備54の基準値:J54 = P54
配電系統配電設備55の基準値:J55 =1/2×P55×M301
なお、この按分に用いる基準値には、さらにそれぞれの設備に対して設定された料金単価を乗算した値を用いてもよい。
(2)設備種類別収入を基準値で按分して支社に配分する。
支社100へ配分する収入金額 = I1B×(J51/J51) +
I2B×(J52/J52) +
I1R×(J53(100)/(J53(100) + J53(200)))
支社200へ配分する収入金額 = I1R×(J53(200)/(J53(100) + J53(200))) + I2R×(J54/J54)
支社300へ配分する収入金額 = I3×(J55/J55)
(3)支社300へ配分する収入金額が決まると、配賦処理部12は、各支社に配分した会計情報を作成し、記憶部14に記録する。例えば、配賦処理部12は、図2(c)で例示したテーブルに新たなレコードを追加し、事業体コード、分野コード、責任単位コードを勘定所属マスタテーブルから取得してそれぞれ、「事業体コード」項目及び「分野コード」項目及び「責任単位コード」項目へ設定し、算出した収入金額を「残高」項目に設定する。なお、「科目コード」、「項コード」、「年月」項目は、託送収入を示す勘定科目が含まれていた会計情報と同じ値でもよい。
Next, the
(1) A reference value used for apportionment is calculated for each facility and each region.
Standard value of mains power transmission equipment 51: J 51 = M 101
Standard value of main system substation equipment 52: J52 = W52
Reference value of regional grid power transmission facility 53 (branch office 100 minutes): J 53 (100) = P 531 × M 102
Reference value of regional grid transmission facility 53 (200 minutes for branch office): J 53 (200) = P 532 × M 201
Standard value of distribution substation 54: J54 = P54
Reference value of distribution system distribution facility 55: J 55 = 1/2 × P 55 × M 301
The reference value used for this apportionment may be a value obtained by multiplying the unit price set for each facility.
(2) Allocate revenue by equipment type according to the standard value and distribute it to branch offices.
Revenue amount allocated to branch office 100 = I1 B × (J 51 / J 51 ) +
I2 B × (J 52 / J 52) +
I1 R x (J 53 (100) / (J 53 (100) + J 53 (200) ))
Revenue amount allocated to branch office 200 = I1 R x (J 53 (200) / (J 53 (100) + J 53 (200) )) + I2 R x (J 54 / J 54 )
Revenue is distributed to the branch office 300 Amount = I3 × (J 55 / J 55)
(3) When the revenue amount to be distributed to the branch office 300 is determined, the
本実施形態によれば、電力流通に対する収入を管理会計上の各責任単位に合理的に配分することができ、効率的な人員や設備の配備を行うことができる。例えば、資源配分の効率化が進むことにより、需要の多い地域により多くの設備を配するなど、実体に即した設備投資を行うことができるようになる。また、各責任単位においても、適切な収入の配分を得ることができるので、安定して電力を供給するために必要な設備の維持・管理を行うことができる。 According to the present embodiment, revenue for power distribution can be rationally distributed to each responsibility unit in management accounting, and efficient personnel and equipment can be deployed. For example, as the efficiency of resource allocation increases, it becomes possible to make capital investments in line with the substance, such as distributing more facilities to areas with high demand. In addition, since each unit of responsibility can obtain an appropriate distribution of income, it is possible to maintain and manage facilities necessary for stably supplying power.
なお、上述の会計装置1は内部にコンピュータを有している。そして、上述した会計装置1の各処理の過程は、プログラムの形式でコンピュータ読み取り可能な記録媒体に記憶されており、このプログラムをコンピュータが読み出して実行することによって、上記処理が行われる。ここでコンピュータ読み取り可能な記録媒体とは、磁気ディスク、光磁気ディスク、CD−ROM、DVD−ROM、半導体メモリ等をいう。また、このコンピュータプログラムを通信回線によってコンピュータに配信し、この配信を受けたコンピュータが当該プログラムを実行するようにしてもよい。
The
また、上記プログラムは、前述した機能の一部を実現するためのものであってもよい。さらに、前述した機能をコンピュータシステムにすでに記録されているプログラムとの組み合わせで実現できるもの、いわゆる差分ファイル(差分プログラム)であってもよい。 The program may be for realizing a part of the functions described above. Furthermore, what can implement | achieve the function mentioned above in combination with the program already recorded on the computer system, what is called a difference file (difference program) may be sufficient.
その他、本発明の趣旨を逸脱しない範囲で、上記した実施の形態における構成要素を周知の構成要素に置き換えることは適宜可能である。また、この発明の技術範囲は上記の実施形態に限られるものではなく、本発明の趣旨を逸脱しない範囲において種々の変更を加えることが可能である。例えば、本実施形態の会計装置1は、1台のコンピュータにより実現されてもよいし、2台以上のコンピュータを有線または無線で接続し、これら複数のコンピュータにより実現されてもよい。
In addition, it is possible to appropriately replace the components in the above-described embodiments with known components without departing from the spirit of the present invention. The technical scope of the present invention is not limited to the above-described embodiment, and various modifications can be made without departing from the spirit of the present invention. For example, the
1・・・会計装置
10・・・入力受付部
11・・・会計情報取得部
12・・・配賦処理部
13・・・帳票出力部
14・・・記憶部
15・・・制御部
DESCRIPTION OF
Claims (7)
を備えることを特徴とする会計装置。 Accounting information of a power distribution entity related to power supply, facility characteristic information indicating characteristics of a plurality of facilities under the jurisdiction of the power distribution entity, and unit organizations existing in each region under the power distribution entity Region characteristic information indicating a degree of contribution to the power distribution for each facility in the jurisdiction range of, and based on at least one of the acquired facility characteristic information and the region characteristic information of the power distribution entity An accounting apparatus comprising: an allocation processing unit that allocates accounting information to each of the unit organizations.
前記会計情報は、前記設備ごとの取得原価を含み、
前記配賦処理部は、前記電力流通事業体の電力流通に対する総収入を所定の方法で按分し前記設備の種類ごとの収入を示す設備種類別収入を算出するとともに、当該設備種類別収入を、前記取得原価の合計に応じて前記種類別、系統別に按分した値のそれぞれを、さらに前記地域特性情報に応じて按分し、その按分した収入を当該地域特性情報に対応する前記単位組織に配分する
ことを特徴とする請求項1に記載の会計装置。 The facilities are classified into transmission facilities, substation facilities, and distribution facilities according to type, and further, the transmission facilities are classified into main system transmission facilities and regional system transmission facilities according to the transmission voltage, The substation facilities are classified into main system substation facilities and regional system substation facilities according to the received voltage.
The accounting information includes an acquisition cost for each facility,
The allocation processing unit distributes the total revenue for the power distribution of the power distribution entity by a predetermined method and calculates the revenue for each facility type indicating the revenue for each type of the facility, and the revenue for each facility type, Each of the values distributed by type and system according to the total acquisition cost is further distributed according to the regional characteristic information, and the distributed income is distributed to the unit organization corresponding to the regional characteristic information. The accounting apparatus according to claim 1.
前記配賦処理部は、前記設備種類別収入のうち前記送電設備に係る設備種類別収入を複数の前記基幹系統送電設備それぞれの取得原価の合計額と複数の前記地域系統送電設備それぞれの取得原価の合計額の比率で按分して前記基幹系統送電設備の収入と前記地域系統送電設備の収入とを算出し、また、設備種類別収入のうち前記変電設備に係る設備種類別収入を複数の前記基幹系統変電設備それぞれの取得原価の合計額と複数の前記地域系統変電設備それぞれの取得原価の合計額の比率で按分して前記基幹系統変電設備の収入と前記地域系統変電設備の収入とを算出し、さらに、前記基幹系統送電設備の収入を前記輸送距離に応じて前記単位組織に配分し、前記地域系統送電設備と前記配電設備の収入を前記輸送量と前記輸送距離を乗じた値に応じて前記単位組織に配分し、前記基幹系統変電設備と前記地域系統変電設備の収入を前記輸送量に応じて前記単位組織に配分する
ことを特徴とする請求項2に記載の会計装置。 The regional characteristic information includes a transportation amount and transportation distance of power for each facility,
The allocation processing unit is configured to calculate the revenue by facility type related to the power transmission facility among the revenue by facility type, and the total acquisition cost of each of the plurality of backbone grid power transmission facilities and the acquisition cost of each of the plurality of regional grid power transmission facilities. The revenue of the basic grid transmission facility and the revenue of the regional grid transmission facility are calculated by proportionally dividing by the ratio of the total amount of the above. The revenue of the main grid substation and the revenue of the local grid substation are calculated by prorated by the ratio of the total acquisition cost of each main grid substation and the total acquisition cost of each of the multiple regional grid substations. Further, the revenue of the backbone grid power transmission facility is distributed to the unit organization according to the transport distance, and the value obtained by multiplying the revenue of the regional grid power transmission facility and the power distribution facility by the transport amount and the transport distance. Depending allocated to the unit tissue, accounting apparatus according to claim 2, the revenue of the bulk power system substation equipment and the local system substation equipment, characterized in that allocated to the unit structure in accordance with the traffic volume.
ことを特徴とする請求項3に記載の会計装置。 In the predetermined method of apportioning the total revenue for each type of equipment, the allocation processing unit calculates a fee for each type of equipment based on the equipment characteristic information and the regional characteristic information, and the power distribution The accounting apparatus according to claim 3, wherein the accounting apparatus is a method that apportions the total revenue for the power distribution of the business entity by the rate of the charge for each type of equipment.
前記配賦処理部は、前記設備の種類ごとの料金のうち前記送電設備の料金を、複数の前記基幹系統送電設備それぞれに係る前記輸送距離に前記料金単価を乗じた値の合計値と、複数の前記地域系統送電設備それぞれに係る前記輸送量と前記輸送距離に前記料金単価を乗じた値の合計値と、を合算して算出し、前記設備の種類ごとの料金のうち前記変電設備の料金を、複数の前記基幹系統変電設備それぞれに係る輸送量に前記料金単価を乗じた値の合計値と、複数の前記地域系統変電設備それぞれに係る輸送量に前記料金単価を乗じた値の合計値と、を合算して算出し、前記設備の種類ごとの料金のうち前記配電設備の料金を、複数の配電設備それぞれに係る前記輸送量と前記輸送距離に前記料金単価を乗じた値を合計して算出する
ことを特徴とする請求項4に記載の会計装置。 The facility characteristic information includes information indicating a unit price for each facility,
The allocation processing unit includes a total value of a value obtained by multiplying a charge for the power transmission equipment among a charge for each type of the equipment, a value obtained by multiplying the transport distance related to each of the plurality of backbone power transmission equipments by the charge unit price, and a plurality of values. The total amount of the transport amount and the transport distance for each of the regional grid power transmission facilities multiplied by the unit price of the charge is calculated, and the charge for the substation equipment among the charges for each type of the equipment A total value of a value obtained by multiplying the transportation amount related to each of the plurality of backbone system substation facilities by the unit price, and a total value of a value obtained by multiplying the transportation amount related to each of the plurality of regional system substation facilities by the unit price of the fee. And the total of the charge for the distribution facility among the charges for each type of the equipment, and the value obtained by multiplying the transport amount and transport distance for each of the plurality of distribution facilities by the charge unit price. Calculated by The accounting apparatus according to claim 4.
ことを特徴とする請求項3に記載の会計装置。 The predetermined method of apportioning the total revenue for each type of equipment is such that the allocation processing unit acquires and totals accounting information indicating the cost of the power distribution business for each type of equipment, and the power distribution business The accounting apparatus according to claim 3, wherein the total revenue for the power distribution of the body is prorated by the ratio of the total cost for each type of the equipment.
電力供給に係る電力流通事業体の会計情報と、前記電力流通事業体が管轄する複数の設備の特性を示す設備特性情報と、前記電力流通事業体の配下にある各地域に存在する単位組織それぞれの管轄範囲における前記設備ごとの電力流通に対する貢献度を示す地域特性情報と、を取得し、取得した前記設備特性情報と前記地域特性情報とのうち少なくとも一方に基づいて前記電力流通事業体の前記会計情報を前記単位組織のそれぞれに配賦する手段、
として機能させるためのプログラム。 Accounting equipment computer,
Accounting information of a power distribution entity related to power supply, facility characteristic information indicating characteristics of a plurality of facilities under the jurisdiction of the power distribution entity, and unit organizations existing in each region under the power distribution entity Region characteristic information indicating a degree of contribution to the power distribution for each facility in the jurisdiction range of, and based on at least one of the acquired facility characteristic information and the region characteristic information of the power distribution entity Means for allocating accounting information to each of the unit organizations;
Program to function as.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2014125192A JP6372183B2 (en) | 2014-06-18 | 2014-06-18 | Accounting apparatus and program |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2014125192A JP6372183B2 (en) | 2014-06-18 | 2014-06-18 | Accounting apparatus and program |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2016004464A JP2016004464A (en) | 2016-01-12 |
| JP6372183B2 true JP6372183B2 (en) | 2018-08-15 |
Family
ID=55223681
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2014125192A Expired - Fee Related JP6372183B2 (en) | 2014-06-18 | 2014-06-18 | Accounting apparatus and program |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6372183B2 (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7334528B2 (en) * | 2019-08-05 | 2023-08-29 | 東京電力ホールディングス株式会社 | Power generation cost calculation server for hydroelectric power station, power generation cost calculation system for hydroelectric power station, and power generation cost calculation method for hydroelectric power station |
Family Cites Families (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4023101B2 (en) * | 2001-04-13 | 2007-12-19 | 株式会社日立製作所 | Electricity supply and demand control method and apparatus |
| JP2002342554A (en) * | 2001-05-18 | 2002-11-29 | Ntt Data Corp | Product development management method and management server |
| JP2003002089A (en) * | 2001-06-21 | 2003-01-08 | Mitsubishi Heavy Ind Ltd | Energy regeneration profit distribution system and its device |
| JP2003143758A (en) * | 2001-11-01 | 2003-05-16 | Hitachi Ltd | Power supply service and power supply system |
| JP3812431B2 (en) * | 2001-12-10 | 2006-08-23 | 株式会社日立製作所 | Distribution efficiency improvement service providing method and distribution efficiency improvement system |
| JP2003271799A (en) * | 2002-03-18 | 2003-09-26 | Tokyo Electric Power Co Inc:The | Power equipment management system |
-
2014
- 2014-06-18 JP JP2014125192A patent/JP6372183B2/en not_active Expired - Fee Related
Also Published As
| Publication number | Publication date |
|---|---|
| JP2016004464A (en) | 2016-01-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Agrell et al. | Regulatory benchmarking: Models, analyses and applications | |
| Kumbhakar et al. | Scale economies, technical change and efficiency in Norwegian electricity distribution, 1998–2010 | |
| Siguenza-Guzman et al. | Using Time-Driven Activity-Based Costing to support library management decisions: A case study for lending and returning processes | |
| Khurana et al. | Beyond crisis: the financial performance of India’s power sector | |
| JP6049799B2 (en) | Management support program | |
| Idowu et al. | Nigeria's electricity power sector reform: an appraisal of unresolved issues | |
| JP2023027740A (en) | Portfolio management system of company | |
| Sony | Lean Six Sigma in the power sector: frog into prince | |
| Sainz et al. | The economic impact of logistics infrastructure: the case of PLAZA–the Zaragoza Logistics Platform | |
| Thakur et al. | A critical review of the franchisee model in the electricity distribution sector in India | |
| CN111476452A (en) | Power transmission and distribution cost collection and allocation method based on direct allocation | |
| Meier | An improved mixed integer program for single allocation hub location problems with stepwise cost function | |
| JP6372183B2 (en) | Accounting apparatus and program | |
| de Araújo Wanderley et al. | Privatisation and electricity sector reforms in Brazil: accounting perspective | |
| Rastani et al. | Capacity selection for hubs and hub links in hub location problems | |
| CN114708012A (en) | Cost analysis method based on power grid monthly electric energy topology | |
| Nagarur et al. | A computer‐based inventory management system for spare parts | |
| JP7471032B1 (en) | Budget preparation system, budget preparation method, budget preparation program | |
| Ferreira et al. | Two-phase optimization approach for maintenance workforce planning in power distribution utilities | |
| Parkan | Performance measurement in government services | |
| Cullmann et al. | No differences in efficiency between public and private utilities | |
| JP2019091165A (en) | Foreign currency conversion device, foreign currency conversion method and foreign currency conversion program | |
| JP2004252710A (en) | Cost profit management system, cost profit management method, cost profit management program | |
| CN113191580A (en) | Method and system for comprehensively evaluating acre area based on enterprise label | |
| Greig et al. | A data map of existing UK data sources related to regional trade |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20170518 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20180531 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180619 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180702 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6372183 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| LAPS | Cancellation because of no payment of annual fees |