Deprecated: The each() function is deprecated. This message will be suppressed on further calls in /home/zhenxiangba/zhenxiangba.com/public_html/phproxy-improved-master/index.php on line 456
JP6400403B2 - Contract power selection device, contract power selection method, and contract power selection program - Google Patents
[go: Go Back, main page]

JP6400403B2 - Contract power selection device, contract power selection method, and contract power selection program - Google Patents

Contract power selection device, contract power selection method, and contract power selection program Download PDF

Info

Publication number
JP6400403B2
JP6400403B2 JP2014186550A JP2014186550A JP6400403B2 JP 6400403 B2 JP6400403 B2 JP 6400403B2 JP 2014186550 A JP2014186550 A JP 2014186550A JP 2014186550 A JP2014186550 A JP 2014186550A JP 6400403 B2 JP6400403 B2 JP 6400403B2
Authority
JP
Japan
Prior art keywords
power
contract
contract power
demand
fuel cell
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2014186550A
Other languages
Japanese (ja)
Other versions
JP2016059249A (en
Inventor
酢山 明弘
明弘 酢山
恭介 片山
恭介 片山
清高 松江
清高 松江
和人 久保田
和人 久保田
明弘 長岩
明弘 長岩
卓久 和田
卓久 和田
博司 平
博司 平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Toshiba Infrastructure Systems and Solutions Corp
Original Assignee
Toshiba Corp
Toshiba Infrastructure Systems and Solutions Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Toshiba Infrastructure Systems and Solutions Corp filed Critical Toshiba Corp
Priority to JP2014186550A priority Critical patent/JP6400403B2/en
Publication of JP2016059249A publication Critical patent/JP2016059249A/en
Application granted granted Critical
Publication of JP6400403B2 publication Critical patent/JP6400403B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/50Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

本発明の実施形態は、契約電力選択装置、契約電力選択方法、及び、契約電力選択プログラムに関する。   Embodiments described herein relate generally to a contract power selection device, a contract power selection method, and a contract power selection program.

電力の小売の自由化が検討されている。しかしながら、従来の技術では、電力の小売の自由化に対応して電気料金を安くすることができない場合があった。   Liberalization of electricity retail is under consideration. However, in the conventional technology, there are cases where it is not possible to reduce the electricity bill in response to the liberalization of retail electricity.

特開平06−276681号公報Japanese Patent Laid-Open No. 06-276681 特開2004−112869号公報JP 2004-112869 A 特開2011−83084号公報JP 2011-83084 A 特開2011−200040号公報JP 2011-200040 A

本発明が解決しようとする課題は、電気料金を安くする契約電力を選択することができる契約電力選択装置、契約電力選択方法、及び、契約電力選択プログラムを提供することである。   The problem to be solved by the present invention is to provide a contract power selection device, a contract power selection method, and a contract power selection program that can select contract power that reduces the electricity bill.

実施形態の契約電力選択装置は、算出部と、選択部とを持つ。算出部は、対象施設における電力の使用態様と、購入電力の上限を表す契約電力とに基づいて、契約電力に応じて定まる基本料金を含む電気料金を、複数の契約電力について算出する。選択部は、算出された電気料金に基づいて、複数の契約電力から、電気料金が相対的に安い契約電力を選択する。   The contract power selection apparatus according to the embodiment includes a calculation unit and a selection unit. The calculation unit calculates, for a plurality of contract powers, an electricity charge including a basic charge determined according to the contract power based on the usage mode of power in the target facility and the contract power indicating the upper limit of the purchased power. The selection unit selects contract electric power with a relatively low electric charge from a plurality of contract electric power based on the calculated electric charge.

実施形態における、契約電力選択システムの図。The figure of the contract electric power selection system in an embodiment. 実施形態における、制御対象の図。The figure of the controlled object in an embodiment. 実施形態における、算出部と選択部の動作を示す図。The figure which shows operation | movement of the calculation part and selection part in embodiment. 実施形態における、算出部と制御部の動作を示す図。The figure which shows operation | movement of the calculation part and control part in embodiment. 実施形態における、遺伝的アルゴリズムで使用される個体の図。The figure of the individual used by the genetic algorithm in an embodiment. 実施形態における、遺伝的アルゴリズムを示す図。The figure which shows the genetic algorithm in embodiment.

以下、実施形態の契約電力選択装置、契約電力選択方法、及び、契約電力選択プログラムを、図面を参照して説明する。
図1は、実施形態における、契約電力選択システム1の図である。契約電力選択システム1は、対象施設100と、契約電力選択装置200とを備える。対象施設100は、複数でもよい。契約電力選択装置200は、複数でもよい。
Hereinafter, a contract power selection apparatus, a contract power selection method, and a contract power selection program according to an embodiment will be described with reference to the drawings.
FIG. 1 is a diagram of a contract power selection system 1 in the embodiment. The contract power selection system 1 includes a target facility 100 and a contract power selection device 200. There may be a plurality of target facilities 100. The contract power selection apparatus 200 may be plural.

対象施設100は、制御対象を備える施設である。制御対象は、契約電力選択装置200が制御する対象である。対象施設100は、例えば、住宅である。対象施設100は、集合住宅でもよい。対象施設100が住宅である場合、契約電力選択システム1は、ホーム・エネルギー・マネジメント・システム(HEMS : Home Energy Management System)である。   The target facility 100 is a facility that includes a control target. The control target is a target controlled by the contract power selection apparatus 200. The target facility 100 is, for example, a house. The target facility 100 may be a housing complex. When the target facility 100 is a house, the contract power selection system 1 is a home energy management system (HEMS).

図1では、対象施設100は、電力量計101と、分電盤102と、空調機器103と、照明機器104と、蓄電池105と、PCS106(Power Conditioning System:パワー・コンディショニング・システム)と、太陽光発電装置107(PV : Photovoltaics)と、PCS108と、燃料電池109(FC : Fuel Cell)と、PCS110と、ゲートウェイ111と、端末Tとを備える。以下、空調機器103と照明機器104を、まとめて「負荷LD」という。  In FIG. 1, the target facility 100 includes a watt-hour meter 101, a distribution board 102, an air conditioner 103, a lighting device 104, a storage battery 105, a PCS 106 (Power Conditioning System), A photovoltaic power generation apparatus 107 (PV: Photovoltaics), a PCS 108, a fuel cell 109 (FC: Fuel Cell), a PCS 110, a gateway 111, and a terminal T are provided. Hereinafter, the air conditioner 103 and the lighting device 104 are collectively referred to as “load LD”.

電力量計101は、ゲートウェイ111を介して、電力量の情報をデータベース300に出力する。ゲートウェイ111は、対象施設100が住宅である場合、ホームゲートウェイである。ゲートウェイ111は、対象施設100が集合住宅である場合、マンション・エネルギー・マネジメント・システム(MEMS: Mansion Energy Management System)のローカルネットワークのゲートウェイである。   The watt hour meter 101 outputs information on the amount of power to the database 300 via the gateway 111. The gateway 111 is a home gateway when the target facility 100 is a house. The gateway 111 is a gateway of a local network of an apartment energy management system (MEMS) when the target facility 100 is an apartment house.

分電盤102は、ゲートウェイ111を介して、負荷LDの稼働状態の情報をデータベース300に出力する。
空調機器103は、ゲートウェイ111を介して、空調機器103の稼働状態の情報をデータベース300に出力する。照明機器104は、ゲートウェイ111を介して、照明機器104の稼働状態の情報をデータベース300に出力する。
The distribution board 102 outputs information on the operating state of the load LD to the database 300 via the gateway 111.
The air conditioner 103 outputs information on the operating state of the air conditioner 103 to the database 300 via the gateway 111. The lighting device 104 outputs information on the operating state of the lighting device 104 to the database 300 via the gateway 111.

蓄電池105は、PCS106とゲートウェイ111を介して、蓄電池105の稼働状態の情報をデータベース300に出力する。太陽光発電装置107は、PCS108とゲートウェイ111を介して、太陽光発電装置107の稼働状態の情報をデータベース300に出力する。燃料電池109は、PCS110とゲートウェイ111を介して、燃料電池109の稼働状態の情報をデータベース300に出力する。   The storage battery 105 outputs information on the operating state of the storage battery 105 to the database 300 via the PCS 106 and the gateway 111. The solar power generation device 107 outputs information on the operating state of the solar power generation device 107 to the database 300 via the PCS 108 and the gateway 111. The fuel cell 109 outputs information on the operating state of the fuel cell 109 to the database 300 via the PCS 110 and the gateway 111.

端末Tは、利用者U(需要家)による操作に応じて動作する。端末Tは、ゲートウェイ111を介して、操作履歴情報をデータベース300に出力する。端末Tは、ゲートウェイ111を介さずに、操作履歴情報をデータベース300に出力してもよい。端末Tは、例えば、携帯情報機器やパーソナルコンピュータである。   The terminal T operates in response to an operation by the user U (customer). The terminal T outputs the operation history information to the database 300 via the gateway 111. The terminal T may output the operation history information to the database 300 without going through the gateway 111. The terminal T is, for example, a portable information device or a personal computer.

データベース300は、対象施設100の電力需要情報と、消費電力情報と、給湯需要情報と、負荷LDなどの稼動状態情報と、蓄電池105の充電残量情報及び充放電電力情報と、太陽光発電装置107の発電量情報と、燃料電池109から給湯される貯湯槽の貯湯量情報とを、ゲートウェイ111を介して取得する。   The database 300 includes power demand information of the target facility 100, power consumption information, hot water supply demand information, operating state information such as a load LD, remaining charge information and charge / discharge power information of the storage battery 105, and a solar power generation device. The power generation amount information 107 and the hot water storage amount information of the hot water tank supplied from the fuel cell 109 are acquired via the gateway 111.

データベース300は、対象施設100の電力需要情報と、消費電力情報と、給湯需要情報と、負荷LDなどの稼動状態情報と、蓄電池105の充電残量情報及び充放電電力情報と、太陽光発電装置107の発電量情報と、燃料電池109から給湯される貯湯槽の貯湯量情報とを記憶する。   The database 300 includes power demand information of the target facility 100, power consumption information, hot water supply demand information, operating state information such as a load LD, remaining charge information and charge / discharge power information of the storage battery 105, and a solar power generation device. The power generation amount information 107 and the hot water storage amount information of the hot water tank supplied from the fuel cell 109 are stored.

データベース300は、契約電力情報を記憶する。契約電力情報は、対象施設100における電力の使用態様に応じて所定期間に購入される電力の上限を表す情報である。この所定期間(時間スロット)は、30分間でもよいし、30分間よりも短い時間(瞬時)でもよい。契約電力は、電力で表現されてもよいし、電圧値や電流値で表現されてもよい。データベース300は、クラウドシステムによって、複数のサーバ装置に分散されてもよい。例えば、データベース300は、対象施設100ごとに、複数のサーバ装置に分散されてもよい。   The database 300 stores contract power information. The contract power information is information representing the upper limit of power purchased in a predetermined period according to the usage mode of power in the target facility 100. The predetermined period (time slot) may be 30 minutes, or may be shorter (instantaneous) than 30 minutes. The contract power may be expressed as power, or may be expressed as a voltage value or a current value. The database 300 may be distributed to a plurality of server devices by a cloud system. For example, the database 300 may be distributed to a plurality of server devices for each target facility 100.

電気料金データベース400は、電力小売業者A1が提示した電気料金表を記憶する。電気料金データベース400は、更に多くの電力小売業者について、複数の電気料金表を記憶してもよい。電気料金表は、電力小売業者ごとの電気料金のプランを含む。電気料金のプランは、例えば、所定期間ごとの購入電力の電気料金の単価によって表される。例えば、電気料金のプランは、30分間ごとの購入電力の電気料金の単価によって表される。電気料金表は、リレーショナルデータベースでもよい。電気料金表は、1日から数か月に一度のタイミングで、変更されてもよい。   The electricity rate database 400 stores an electricity rate table presented by the power retailer A1. The electricity rate database 400 may store a plurality of electricity rate tables for more power retailers. The electricity tariff includes an electricity tariff plan for each power retailer. The plan for the electricity charge is represented by, for example, the unit price of the electricity charge for the purchased power every predetermined period. For example, an electricity bill plan is represented by the unit price of purchased electricity for every 30 minutes. The electricity tariff may be a relational database. The electricity tariff may be changed once a day to several months.

契約電力選択装置200は、予測部201と、記憶部202と、算出部203と、選択部204と、インタフェース205と、制御部206とを備える。   The contract power selection apparatus 200 includes a prediction unit 201, a storage unit 202, a calculation unit 203, a selection unit 204, an interface 205, and a control unit 206.

予測部201は、対象施設100の電力需要情報と、消費電力情報と、給湯需要情報と、負荷LDなどの稼動状態情報と、蓄電池105の充電残量情報及び充放電電力情報と、太陽光発電装置107の発電量情報と、燃料電池109から排熱を取得する貯湯槽の貯湯量情報を、データベース300から取得する。予測部201は、天気予報情報を気象会社500から取得する。   The prediction unit 201 includes power demand information of the target facility 100, power consumption information, hot water supply demand information, operating state information such as the load LD, remaining charge information and charge / discharge power information of the storage battery 105, and solar power generation. The power generation amount information of the apparatus 107 and the hot water storage amount information of the hot water tank that acquires the exhaust heat from the fuel cell 109 are acquired from the database 300. The prediction unit 201 acquires weather forecast information from the weather company 500.

予測部201は、対象施設100における、対象日の電力の需要を予測する。対象日は、購入電力のピークを算出する日(算出日)である。予測部201は、対象日の電力の需要を、1日に複数回予測してもよい。予測部201は、例えば、天気予報情報と、過去の電力の需要と、ニューラルネットワークとに基づいて、対象日の電力の需要を予測する。予測部201は、例えば、複数の対象施設100(需要家)について過去の電力の需要をグループ化し、グループごとの平均な需要変動モデルに基づいて、対象日の電力の需要を予測してもよい。   The prediction unit 201 predicts the power demand on the target facility 100 in the target facility 100. The target date is a date (calculation date) for calculating the peak of purchased power. The prediction unit 201 may predict the power demand on the target day multiple times a day. The prediction unit 201 predicts the power demand on the target day based on, for example, weather forecast information, past power demand, and a neural network. For example, the prediction unit 201 may group past power demands for a plurality of target facilities 100 (customers), and predict power demand on the target date based on an average demand fluctuation model for each group. .

予測部201は、対象施設100における、対象日の給湯の需要を予測する。予測部201は、対象日の給湯の需要を、1日に複数回予測してもよい。予測部201は、例えば、カレンダ情報に基づいて、対象日の給湯の需要を予測する。   The prediction unit 201 predicts the demand for hot water supply on the target day in the target facility 100. The prediction unit 201 may predict the demand for hot water supply on the target day multiple times a day. The prediction unit 201 predicts the demand for hot water supply on the target day based on, for example, calendar information.

予測部201は、対象施設100における、対象日の太陽光発電装置107の発電量を予測する。予測部201は、例えば、過去の異なる時刻における、太陽光発電装置107の発電量の統計的相関に基づいて、対象日の太陽光発電装置107の発電量を予測する。予測部201は、例えば、過去の異なる設置位置における、太陽光発電装置107の発電量の統計的相関に基づいて、対象日の太陽光発電装置107の発電量を予測してもよい。   The prediction unit 201 predicts the power generation amount of the solar power generation device 107 on the target day in the target facility 100. For example, the prediction unit 201 predicts the power generation amount of the solar power generation device 107 on the target day based on the statistical correlation of the power generation amount of the solar power generation device 107 at different past times. For example, the prediction unit 201 may predict the power generation amount of the solar power generation device 107 on the target day based on the statistical correlation of the power generation amount of the solar power generation device 107 at different installation positions in the past.

記憶部202は、契約電力算出期間を表す情報を記憶する。契約電力算出期間は、対象日を含む期間である。記憶部202は、対象施設100における制御対象のモデル情報(制約条件)を記憶する。制御対象のモデル情報は、制御対象の構成要素への入力情報と、この構成要素からの出力情報との関係を表す情報である。また、制御対象のモデル情報は、制御対象の構成要素からの出力情報と、他の構成要素への入力情報との関係を表す情報である。制御対象のモデル情報は、数式で表現されてもよい。   The storage unit 202 stores information representing the contract power calculation period. The contract power calculation period is a period including the target date. The storage unit 202 stores model information (constraint conditions) of a control target in the target facility 100. The model information of the control target is information representing the relationship between the input information to the component to be controlled and the output information from this component. The model information to be controlled is information representing the relationship between the output information from the component to be controlled and the input information to other components. The model information to be controlled may be expressed by a mathematical formula.

図2は、実施形態における、制御対象の図である。図2では、制御対象の構成要素は、電力系統PWと、燃料電池ユニットFUと、蓄電池105と、PCS106と、太陽光発電装置107と、PCS108と、負荷LDとである。燃料電池ユニットFUは、燃料電池109と、PCS110と、補助ボイラ114と、逆潮防止ヒータ112と、貯湯槽113とを備える。   FIG. 2 is a diagram of a control target in the embodiment. In FIG. 2, the components to be controlled are the power system PW, the fuel cell unit FU, the storage battery 105, the PCS 106, the solar power generation device 107, the PCS 108, and the load LD. The fuel cell unit FU includes a fuel cell 109, a PCS 110, an auxiliary boiler 114, a backflow prevention heater 112, and a hot water tank 113.

tは、時刻[h]を表す変数である。F(t)は、ガス供給量[kcal/h]を表す変数である。FFC(t)は、燃料電池109へのガス供給量[kcal/h]を表す変数である。F(t)は、補助ボイラ114へのガス供給量[kcal/h]を表す変数である。 t is a variable representing time [h]. F (t) is a variable representing the gas supply amount [kcal / h]. F FC (t) is a variable representing the gas supply amount [kcal / h] to the fuel cell 109. F B (t) is a variable representing the gas supply amount [kcal / h] to the auxiliary boiler 114.

(t)は、電力系統PWからの購入電力[kW]を表す変数である。P(t)は、負値である場合、売電電力[kW]を表す変数である。PPV(t)は、太陽光発電装置107の発電量[kW]を表す変数である。S(t)は、蓄電池105の充電残量[kWh]を表す変数である。PSB(t)は、蓄電池105の充電電力[kW]を表す変数である。PSB(t)は、負値である場合、放電電力[kW]を表す変数である。P(t)は、負荷LDの電力需要[kW]を表す変数である。 P C (t) is a variable representing purchased power [kW] from the power system PW. P C (t) is a variable representing the power selling power [kW] when it is a negative value. P PV (t) is a variable representing the power generation amount [kW] of the solar power generation device 107. S (t) is a variable that represents the remaining charge [kWh] of the storage battery 105. P SB (t) is a variable representing charging power [kW] of the storage battery 105. P SB (t) is a variable representing discharge power [kW] when it is a negative value. P D (t) is a variable representing the power demand [kW] of the load LD.

FC(t)は、燃料電池109の発電量の有効電力[kW]を表す変数である。P(t)は、逆潮防止ヒータ112の消費電力[kW]を表す変数である。Φ(t)は、逆潮防止ヒータ112の発熱量[kcal/h]を表す変数である。ΦFC(t)は、燃料電池109の排熱量[kcal/h]を表す変数である。H(t)は、貯湯槽113の貯湯量[kcal]を表す変数である。ΦST(t)は、貯湯槽113からの給湯量[kcal/h]を表す変数である。Φ(t)は、補助ボイラ114からの給湯量[kcal/h]を表す変数である。Φ(t)は、給湯需要[kcal/h]を表す変数である。 P FC (t) is a variable representing the effective power [kW] of the power generation amount of the fuel cell 109. P H (t) is a variable representing the power consumption [kW] of the backflow prevention heater 112. Φ H (t) is a variable representing the calorific value [kcal / h] of the backflow prevention heater 112. Φ FC (t) is a variable representing the amount of exhaust heat [kcal / h] of the fuel cell 109. H (t) is a variable representing the hot water storage amount [kcal] of the hot water storage tank 113. Φ ST (t) is a variable representing the hot water supply amount [kcal / h] from the hot water storage tank 113. Φ B (t) is a variable representing the hot water supply amount [kcal / h] from the auxiliary boiler 114. Φ D (t) is a variable representing hot water supply demand [kcal / h].

制御対象のモデル情報(制約条件)は、式(1)〜式(9)で表される。ガス供給量F(t)は、太陽光発電装置107への供給FFC(t)と、補助ボイラ114への供給F(t)とに分けられる。 The model information (constraint condition) to be controlled is expressed by Expression (1) to Expression (9). The gas supply amount F (t) is divided into a supply F FC (t) to the solar power generation device 107 and a supply F B (t) to the auxiliary boiler 114.

F(t)=FFC(t)+F(t) …(1) F (t) = F FC (t) + F B (t) (1)

燃料電池109は、ガス供給量FFC(t)に応じて、PCS110を介して発電量PFC(t)を配電線LNに出力する。式(2)において、aは、燃料電池109の効率から決まる係数である。bは、燃料電池109の効率から決まる係数である。 The fuel cell 109 outputs the power generation amount P FC (t) to the distribution line LN via the PCS 110 according to the gas supply amount F FC (t). In equation (2), a is a coefficient determined from the efficiency of the fuel cell 109. b is a coefficient determined from the efficiency of the fuel cell 109.

FC(t)=aFFC(t)+b …(2) P FC (t) = aF FC (t) + b (2)

燃料電池109は、ガス供給量FFC(t)に応じて発熱し、排熱量ΦFC(t)を貯湯槽113に供給する。式(3)において、αは、燃料電池109の効率から決まる係数である。βは、燃料電池109の効率から決まる係数である。 The fuel cell 109 generates heat according to the gas supply amount F FC (t), and supplies the exhaust heat amount Φ FC (t) to the hot water storage tank 113. In Expression (3), α is a coefficient determined from the efficiency of the fuel cell 109. β is a coefficient determined from the efficiency of the fuel cell 109.

ΦFC(t)=αFFC(t)+β …(3) Φ FC (t) = αF FC (t) + β (3)

逆潮防止ヒータ112は、消費電力P(t)に応じて発熱し、発熱量Φ(t)を貯湯槽113に供給する。逆潮防止ヒータ112は、燃料電池109の発電量PFC(t)が電力系統PWに逆潮流しないようにすることができる。補助ボイラ114は、貯湯槽113からの給湯量ΦST(t)に、給湯量Φ(t)を加えて、給湯需要Φ(t)とする。 The backflow prevention heater 112 generates heat according to the power consumption P H (t) and supplies the heat generation amount Φ H (t) to the hot water tank 113. The backflow prevention heater 112 can prevent the power generation amount P FC (t) of the fuel cell 109 from flowing back into the power system PW. The auxiliary boiler 114 adds the hot water supply amount Φ B (t) to the hot water supply amount Φ ST (t) from the hot water storage tank 113 to obtain the hot water supply demand Φ D (t).

式(4)に示すように、貯湯槽113は、燃料電池109の排熱量ΦFC(t)と、逆潮防止ヒータ112の発熱量Φ(t)と給湯ΦST(t)に応じて、貯湯量H(t)を増減させる。貯湯効率rは、放熱などで失われる熱量に応じて定まる。算出部203は、貯湯槽113の過去の貯湯量に基づいて、式(4)に示すように、貯湯槽113の将来の貯湯量を算出する。 As shown in the equation (4), the hot water storage tank 113 corresponds to the exhaust heat amount Φ FC (t) of the fuel cell 109, the heat generation amount Φ H (t) of the backflow prevention heater 112, and the hot water supply Φ ST (t). The hot water storage amount H (t) is increased or decreased. The hot water storage efficiency r is determined according to the amount of heat lost due to heat dissipation or the like. The calculation unit 203 calculates the future hot water storage amount of the hot water storage tank 113 based on the past hot water storage amount of the hot water storage tank 113 as shown in Expression (4).

rH(t−1)+ΦFC(t)+Φ(t)=H(t)+ΦST(t) …(4) rH (t−1) + Φ FC (t) + Φ H (t) = H (t) + Φ ST (t) (4)

貯湯槽113には、容量の制約が設けられている。Hminは、貯湯槽113の容量の下限値である。Hmaxは、貯湯槽113の容量の上限値である。 The hot water storage tank 113 has a capacity restriction. H min is a lower limit value of the capacity of the hot water tank 113. H max is an upper limit value of the capacity of the hot water tank 113.

min(t)≦H(t)≦Hmax(t) …(5) H min (t) ≦ H (t) ≦ H max (t) (5)

蓄電池105は、PCS106によって充放電が制御される。蓄電池105は、PCS106を介して、負荷LDに充電電力PSB(t)を供給する。蓄電池105の充電残量S(t)は、蓄電池105の充電電力PSB(t)に応じて増減する。電力の需給のバランスは、式(6)で表される。 Charging / discharging of the storage battery 105 is controlled by the PCS 106. The storage battery 105 supplies charging power P SB (t) to the load LD via the PCS 106. The remaining charge S (t) of the storage battery 105 increases or decreases according to the charge power P SB (t) of the storage battery 105. The balance between supply and demand of electric power is expressed by equation (6).

(t)+PPV(t)+PFC(t)+PSB(t)=P(t)+P(t) …(6) P C (t) + P PV (t) + P FC (t) + P SB (t) = P D (t) + P H (t) (6)

燃料電池109へのガス供給量PFC(t)と、蓄電池105の充電電力PSB(t)と、負荷LDの電力需要P(t)と、逆潮防止ヒータ112の消費電力P(t)との関係は、式(7)と式(8)で表される。 Gas supply amount P FC (t) to the fuel cell 109, charging power P SB (t) of the storage battery 105, power demand P D (t) of the load LD, and power consumption P H ( The relationship with t) is expressed by equations (7) and (8).

FC(t)+PSB(t)≦P(t)+P(t) …(7) P FC (t) + P SB (t) ≦ P D (t) + P H (t) (7)

(t)≦PFC(t) …(8) P H (t) ≦ P FC (t) (8)

蓄電池105の容量の制約条件は、式(9)で表される。Sminは、蓄電池105の容量の下限値である。Smaxは、蓄電池105の容量の上限値である。 The constraint condition of the capacity of the storage battery 105 is expressed by Expression (9). S min is a lower limit value of the capacity of the storage battery 105. S max is an upper limit value of the capacity of the storage battery 105.

min(t)≦S(t)≦Smax(t) …(9) S min (t) ≦ S (t) ≦ S max (t) (9)

図1に戻り、契約電力選択システム1の説明を続ける。算出部203は、契約電力情報をデータベース300から取得する。算出部203は、対象施設における電力の使用態様と、契約電力情報とに基づいて、複数の契約電力について電気料金を算出する。電気料金は、基本料金と、従量制料金とを含む。基本料金は、契約電力に応じて定められる固定料金である。基本料金は、所定期間ごとに定められてもよい。例えば、基本料金は、30分ごとに定められてもよい。従量制料金は、所定期間に購入される電力と、購入電力の電気料金の単価とに応じて定まる。例えば、従量制料金は、30分間に購入される電力と、その30分間の購入電力の電気料金とに応じて定まる。   Returning to FIG. 1, the description of the contract power selection system 1 will be continued. The calculation unit 203 acquires contract power information from the database 300. The calculation unit 203 calculates an electricity rate for a plurality of contracted powers based on the usage mode of power in the target facility and the contracted power information. Electricity charges include basic charges and pay-as-you-go charges. The basic charge is a fixed charge determined according to the contract power. The basic fee may be determined every predetermined period. For example, the basic fee may be set every 30 minutes. The metered rate is determined according to the power purchased during a predetermined period and the unit price of the purchased electricity. For example, the pay-per-use charge is determined according to the power purchased for 30 minutes and the electricity charge for the purchased power for 30 minutes.

算出部203は、購入電力のピークを契約電力以下とする条件下で、電気料金が安くなるように、電力需要に基づいて、燃料電池109の発電量PFC(t)のスケジュール(計画)と、蓄電池105の充放電の電力量PSB(t)のスケジュールとを算出する。算出部203は、給湯需要と、太陽光発電装置107の発電量と、購入電力の電気料金の単価と、ガス料金の単価と、太陽光発電装置107の発電量の買取価格との少なくとも一つに基づいて、電気料金が安くなるように、燃料電池109の発電量PFC(t)のスケジュールと、蓄電池105の充放電の電力量PSB(t)のスケジュールとを算出してもよい。 The calculation unit 203 calculates the schedule (plan) of the power generation amount P FC (t) of the fuel cell 109 based on the power demand so that the electricity bill is reduced under the condition that the peak of purchased power is equal to or less than the contract power. Then, a schedule of the charge / discharge power amount P SB (t) of the storage battery 105 is calculated. The calculation unit 203 includes at least one of hot water supply demand, the power generation amount of the solar power generation device 107, the unit price of purchased electricity, the unit price of the gas rate, and the purchase price of the power generation amount of the solar power generation device 107. Based on the above, the schedule of the power generation amount P FC (t) of the fuel cell 109 and the schedule of the charge / discharge power amount P SB (t) of the storage battery 105 may be calculated so that the electricity rate is reduced.

算出部203は、例えば、遺伝的アルゴリズムによって、燃料電池109の発電量PFC(t)のスケジュールと、蓄電池105の充放電の電力量PSB(t)のスケジュールとを算出する。なお、算出部203は、遺伝的アルゴリズム以外によって、燃料電池109の発電量PFC(t)のスケジュールと、蓄電池105の充放電の電力量PSB(t)のスケジュールとを算出してもよい。 For example, the calculation unit 203 calculates the schedule of the power generation amount P FC (t) of the fuel cell 109 and the schedule of the charge / discharge power amount P SB (t) of the storage battery 105 by a genetic algorithm. Note that the calculation unit 203 may calculate the schedule of the power generation amount P FC (t) of the fuel cell 109 and the schedule of the charge / discharge power amount P SB (t) of the storage battery 105 by a method other than the genetic algorithm. .

算出部203は、電力の需要の予測に基づいて、契約電力ごとに電気料金を算出してもよい。算出部203は、給湯の需要の予測に基づいて、契約電力ごとに電気料金を算出してもよい。つまり、算出部203は、電力の需要の予測と、給湯の需要の予測と、太陽光発電装置107の発電量の予測との少なくとも一つに基づいて、蓄電池105の充放電のスケジュールを算出してもよい。算出部203は、最適スケジューリングを表す情報を、選択部204に通知する。最適スケジューリングとは、例えば、電気料金が最も安くなるスケジューリングである。   The calculation unit 203 may calculate an electricity rate for each contract power based on the prediction of power demand. The calculation unit 203 may calculate an electricity bill for each contracted power based on the prediction of the demand for hot water supply. That is, the calculation unit 203 calculates the charging / discharging schedule of the storage battery 105 based on at least one of prediction of power demand, prediction of demand for hot water supply, and prediction of power generation amount of the solar power generation device 107. May be. The calculation unit 203 notifies the selection unit 204 of information indicating optimal scheduling. Optimal scheduling is, for example, scheduling that provides the lowest price for electricity.

算出部203は、電力の需要の予測と、給湯の需要の予測と、太陽光発電装置107の発電量の予測との少なくとも一つに基づいて、燃料電池109の充放電のスケジュールを算出してもよい。算出部203は、電力の需要の予測と、給湯の需要の予測と、太陽光発電装置107の発電量の予測との少なくとも一つに基づいて、電力系統PWから購入する電力量を算出してもよい。算出部203は、電力の需要の予測と、給湯の需要の予測と、太陽光発電装置107の発電量の予測との少なくとも一つに基づいて、電力系統PWに売電する電力量を算出してもよい。   The calculation unit 203 calculates a charge / discharge schedule of the fuel cell 109 based on at least one of prediction of power demand, prediction of demand for hot water supply, and prediction of power generation amount of the solar power generation device 107. Also good. The calculation unit 203 calculates the amount of power to be purchased from the power system PW based on at least one of prediction of power demand, prediction of demand for hot water supply, and prediction of power generation amount of the solar power generation device 107. Also good. The calculation unit 203 calculates the amount of power to be sold to the power system PW based on at least one of prediction of power demand, prediction of demand for hot water supply, and prediction of power generation amount of the solar power generation device 107. May be.

選択部204は、データベース300に記憶されている契約電力情報から、電気料金が相対的に安い契約電力を選択する。選択部204は、算出部203により算出された最適なスケジューリングを表す情報に基づいて、複数の契約電力から、最適な契約電力を選択する。最適な契約電力とは、例えば、電気料金が最も安くなる契約電力である。   The selection unit 204 selects contract power with a relatively low electricity rate from the contract power information stored in the database 300. The selection unit 204 selects the optimum contract power from a plurality of contract powers based on the information indicating the optimum scheduling calculated by the calculation unit 203. The optimum contract power is, for example, contract power at which the electricity rate is the cheapest.

インタフェース205は、各種情報を選択部204から取得する。各種情報は、例えば、選択部204が選択した契約電力を表す情報である。各種情報は、例えば、電気料金データベース400に記憶されている電気料金表を表す情報でもよい。各種情報は、例えば、蓄電池105の充放電のスケジュールを表す情報や、燃料電池109の発電のスケジュールを表す情報でもよい。インタフェース205は、各種情報を利用者Uに提示する。インタフェース205は、例えば、表示装置である。   The interface 205 acquires various information from the selection unit 204. The various information is, for example, information representing contract power selected by the selection unit 204. The various types of information may be, for example, information representing an electricity bill stored in the electricity bill database 400. The various information may be, for example, information indicating a charging / discharging schedule of the storage battery 105 or information indicating a power generation schedule of the fuel cell 109. The interface 205 presents various information to the user U. The interface 205 is a display device, for example.

インタフェース205は、利用者Uによる操作を受け付ける。インタフェース205は、例えば、タッチパネルやキーボードなどである。インタフェース205は、利用者Uが電力小売業者と契約する契約電力を指定する操作を受け付ける。インタフェース205は、電気料金表を使用する制御の実行を許可する操作を受け付ける。インタフェース205は、利用者Uが所望するスケジュールを算出部203が算出できるように、スケジュールの修正情報を受け付ける。   The interface 205 receives an operation by the user U. The interface 205 is, for example, a touch panel or a keyboard. The interface 205 accepts an operation for designating contract power with which the user U contracts with a power retailer. The interface 205 accepts an operation that permits execution of control using the electricity rate table. The interface 205 receives schedule correction information so that the calculation unit 203 can calculate a schedule desired by the user U.

制御部206は、選択部204により選択された契約電力に基づいて、購入電力のピークを契約電力以下とするように、対象施設100の電力の使用態様を制御する。つまり、制御部206は、算出部203により算出されたスケジュールに基づいて、運転指示又は停止指示と出力目標値とを、ゲートウェイ111を介して、対象施設100における制御対象に出力する。制御対象は、例えば、蓄電池105と、太陽光発電装置107と、燃料電池109とである。出力目標値は、有効電力又は無効電力のいずれで表されてもよい。制御部206は、運転指示又は停止指示と出力目標値とを、一定の時間周期で出力してもよい。   Based on the contract power selected by the selection unit 204, the control unit 206 controls the power usage mode of the target facility 100 so that the peak of purchased power is equal to or less than the contract power. That is, the control unit 206 outputs the driving instruction or the stop instruction and the output target value to the control target in the target facility 100 via the gateway 111 based on the schedule calculated by the calculation unit 203. Control targets are, for example, the storage battery 105, the solar power generation device 107, and the fuel cell 109. The output target value may be represented by either active power or reactive power. The control unit 206 may output the operation instruction or the stop instruction and the output target value at a constant time period.

図3は、実施形態における、算出部203と選択部204の動作を示す図である。算出部203と選択部204は、例えば、1日から数か月に一度のタイミングで、図3に示す動作を実行する。算出部203と選択部204は、利用者Uによる操作に基づくタイミングで、図3に示す動作を実行してもよい。   FIG. 3 is a diagram illustrating operations of the calculation unit 203 and the selection unit 204 in the embodiment. For example, the calculation unit 203 and the selection unit 204 execute the operation illustrated in FIG. 3 at a timing of once every several months. The calculation unit 203 and the selection unit 204 may execute the operation illustrated in FIG. 3 at a timing based on an operation by the user U.

算出部203は、契約電力算出期間を表す情報を、記憶部202から取得する。算出部203は、契約電力算出期間の初日を、算出日と定める(ステップS101)。
算出部203は、電気料金表を電気料金データベース400から取得する。算出部203は、契約電力情報をデータベース300から取得する(ステップS102)。
The calculation unit 203 acquires information representing the contract power calculation period from the storage unit 202. The calculation unit 203 determines the first day of the contract power calculation period as the calculation date (step S101).
The calculation unit 203 acquires an electricity rate table from the electricity rate database 400. The calculation unit 203 acquires the contract power information from the database 300 (step S102).

算出部203は、所定期間の電気料金を算出する(ステップS103)。
算出部203は、電力需要情報と、給湯需要情報と、太陽光発電装置107の発電量情報(実績データ)とを、日付ごとに取得する(ステップS104)。
算出部203は、最適スケジューリングを実行する(ステップS105)。
算出部203は、最適スケジューリングを実行した所定期間(時間スロット)について、購入電力のピークを算出する(ステップS106)。
The calculation unit 203 calculates an electricity bill for a predetermined period (step S103).
The calculation unit 203 acquires power demand information, hot water supply demand information, and power generation amount information (actual data) of the solar power generation device 107 for each date (step S104).
The calculation unit 203 performs optimal scheduling (step S105).
The calculation unit 203 calculates the peak of purchased power for a predetermined period (time slot) in which optimal scheduling has been executed (step S106).

算出部203は、算出日が契約電力算出期間内であるか否かを判定する(ステップS107)。
算出日が契約電力算出期間内でない場合(ステップS107:NO)、選択部204は、電気料金が最も安くなる契約電力を選択する(ステップS108)。
The calculation unit 203 determines whether the calculation date is within the contract power calculation period (step S107).
When the calculation date is not within the contract power calculation period (step S107: NO), the selection unit 204 selects the contract power that provides the lowest electricity bill (step S108).

インタフェース205は、選択部204により選択された契約電力を表す情報を、利用者Uに提示する(ステップS109)。利用者Uは、電力小売業者A1電力を購入する手続きを、提示された契約電力を参考にして行うことができる。
ステップS107において、算出日が契約電力算出期間内である場合(ステップS107:YES)、算出部203は、翌日を算出日と定める。
The interface 205 presents information representing the contract power selected by the selection unit 204 to the user U (step S109). The user U can perform the procedure for purchasing the power retailer A1 power with reference to the presented contract power.
In step S107, when the calculation date is within the contract power calculation period (step S107: YES), the calculation unit 203 determines the next day as the calculation date.

図4は、実施形態における、算出部203と制御部206の動作を示す図である。算出部203と制御部206は、図4に示す動作を、例えば、1日から数か月に一度のタイミングで実行する。算出部203と選択部204は、電力需要情報と、給湯需要情報と、太陽光発電装置107の発電量情報が予測されたタイミングで、図3に示す動作を実行する。   FIG. 4 is a diagram illustrating operations of the calculation unit 203 and the control unit 206 in the embodiment. The calculation unit 203 and the control unit 206 perform the operation shown in FIG. 4 at a timing of once every day to several months, for example. The calculation unit 203 and the selection unit 204 execute the operation illustrated in FIG. 3 at the timing when the power demand information, the hot water supply demand information, and the power generation amount information of the solar power generation device 107 are predicted.

算出部203は、電力需要情報と、給湯需要情報と、太陽光発電装置107の発電量情報(実績データ)とを、日付ごとに取得する(ステップS201)。
予測部201は、対象日の電力の需要と、対象日の電力の需要と、対象日の太陽光発電装置107の発電量とを予測する(ステップS202)。
The calculation unit 203 acquires power demand information, hot water supply demand information, and power generation amount information (actual data) of the solar power generation device 107 for each date (step S201).
The prediction unit 201 predicts the power demand on the target day, the power demand on the target day, and the power generation amount of the solar power generation device 107 on the target day (step S202).

算出部203は、最適スケジューリングを実行する。例えば、算出部203は、購入電力のピークを契約電力以下としたまま、電気料金が安くなるように、燃料電池109の発電量PFC(t)のスケジュールと、蓄電池105の充放電の電力量PSB(t)のスケジュールとを算出する。また、例えば、算出部203は、発電量の買い取り額が高くなるように、燃料電池109の発電量PFC(t)のスケジュールと、蓄電池105の充放電の電力量PSB(t)のスケジュールとを算出する(ステップS203)。 The calculation unit 203 performs optimal scheduling. For example, the calculation unit 203 sets the schedule of the power generation amount P FC (t) of the fuel cell 109 and the charge / discharge power amount of the storage battery 105 so that the electricity rate is reduced while keeping the peak of purchased power below the contract power. The schedule of P SB (t) is calculated. Further, for example, the calculation unit 203 schedules the power generation amount P FC (t) of the fuel cell 109 and the charge / discharge power amount P SB (t) of the storage battery 105 so that the purchase amount of the power generation becomes high. Are calculated (step S203).

インタフェース205は、蓄電池105の充放電のスケジュールを提示する。インタフェース205は、燃料電池109の発電のスケジュールを提示する(ステップS204)。利用者Uは、蓄電池105の充放電のスケジュールと、燃料電池109の発電のスケジュールと確認することができる。   The interface 205 presents a charging / discharging schedule of the storage battery 105. The interface 205 presents a power generation schedule of the fuel cell 109 (step S204). The user U can confirm the charge / discharge schedule of the storage battery 105 and the power generation schedule of the fuel cell 109.

制御部206は、スケジュールの実行を利用者Uが許可したか否かを判定する(ステップS205)。スケジュールの実行を利用者Uが許可していない場合(ステップS205:NO)、制御部206は、ステップS201に処理を戻す。スケジュールの実行を利用者Uが許可した場合(ステップS205:YES)、制御部206は、算出部203により算出されたスケジュールに基づいて、運転指示又は停止指示と出力目標値とを、ゲートウェイ111を介して、対象施設100における制御対象に出力する。運転指示は、例えば、充放電の指示、発電の指示である(ステップS206)。制御部206は、運転指示又は停止指示と出力目標値とを、一定の時間周期で出力してもよい。   The control unit 206 determines whether or not the user U has permitted execution of the schedule (step S205). When the user U does not permit execution of the schedule (step S205: NO), the control unit 206 returns the process to step S201. When the user U permits execution of the schedule (step S205: YES), the control unit 206 sends the driving instruction or stop instruction and the output target value to the gateway 111 based on the schedule calculated by the calculation unit 203. To the control target in the target facility 100. The operation instruction is, for example, a charge / discharge instruction or a power generation instruction (step S206). The control unit 206 may output the operation instruction or the stop instruction and the output target value at a constant time period.

ステップS202とステップS203とにより、契約電力選択装置200は、まとまった期間における、電力需要と給湯需要と太陽光発電装置107の発電量との各予測に基づいて、電力の需要及び供給のスケジュールを立てることができる。   By step S202 and step S203, the contract power selection apparatus 200 sets the power demand and supply schedule based on the predictions of the power demand, the hot water supply demand, and the power generation amount of the solar power generation apparatus 107 in a set period. Can stand.

図5は、実施形態における、遺伝的アルゴリズムで使用される個体の図である。算出部203は、遺伝的アルゴリズムによって、燃料電池109の発電量PFC(t)のスケジュールと、蓄電池105の充放電の電力量PSB(t)のスケジュールとを算出してもよい。遺伝的アルゴリズムで使用される遺伝子は、燃料電池109の稼働状態SP(t)と、燃料電池109の発電量PFC(t)と、蓄電池105の充放電の電力量PSB(t)とである。稼働状態SP(t)は、値1である場合、運転している状態を表す。稼働状態SP(t)は、値0である場合、停止している状態を表す。遺伝的アルゴリズムで使用される個体は、蓄電池105の1日分の運転のスケジュールと、燃料電池109の1日分の運転のスケジュールとである。複数の個体は、遺伝的アルゴリズムでは、母集団(世代)を形成する。 FIG. 5 is a diagram of individuals used in the genetic algorithm in the embodiment. The calculation unit 203 may calculate the schedule of the power generation amount P FC (t) of the fuel cell 109 and the schedule of the charge / discharge power amount P SB (t) of the storage battery 105 by a genetic algorithm. The genes used in the genetic algorithm include the operating state SP C (t) of the fuel cell 109, the power generation amount P FC (t) of the fuel cell 109, and the charge / discharge power amount P SB (t) of the storage battery 105. It is. If the operating state SP C (t) is 1, the operating state SP C (t) represents the operating state. The operating state SP C (t) indicates a stopped state when the value is 0. The individuals used in the genetic algorithm are the daily operation schedule of the storage battery 105 and the daily operation schedule of the fuel cell 109. A plurality of individuals form a population (generation) in the genetic algorithm.

制御対象のモデル情報(制約条件)は、式(10)〜式(12)で表される。式(10)は、適合度を表す。適合度は、遺伝的アルゴリズムによって最大化される。   The model information (constraint condition) to be controlled is expressed by Expression (10) to Expression (12). Equation (10) represents the fitness. The fitness is maximized by a genetic algorithm.

Figure 0006400403
Figure 0006400403

Fitは、光熱費の収支の評価関数(適合度)である。適合度は、例えば、1日あたりの光熱費の収支Cを変数とする単調増加関数f(C)(正値)に、制御対象が不連続に稼働されることによるコスト「g(PFC, PSB)」(正値)を加算した値の逆数である。加算した値を逆数とした理由は、対象施設100の電力需要を太陽光発電装置107の発電量が大きく上回る場合に、光熱費の収支Cが負となる可能性があるためである。つまり、加算した値を逆数にする理由は、単調増加関数f(C)が減少するに従い、適合度Fitを増加させるためである。 Fit is an evaluation function (fitness) of the utility bill. The degree of conformity is, for example, the cost “g (P FC ,) due to discontinuous operation of the controlled object in a monotonically increasing function f (C) (positive value) with the balance C of the utility cost per day as a variable. P SB ) ”(positive value) is the reciprocal of the added value. The reason why the added value is the reciprocal is that, when the power generation amount of the photovoltaic power generation apparatus 107 greatly exceeds the power demand of the target facility 100, the balance C of the utility cost may be negative. That is, the reason why the added value is the reciprocal is to increase the fitness Fit as the monotonically increasing function f (C) decreases.

光熱費は、太陽光発電装置107の発電量の買い取りの単価と、従量制料金の単価とに応じて定まる。1日あたりの光熱費の収支Cは、式(11)で表される。   The utility cost is determined according to the unit price for purchasing the amount of power generated by the solar power generation apparatus 107 and the unit price for the metered rate. The balance C of the utility cost per day is expressed by equation (11).

Figure 0006400403
Figure 0006400403

は、P(t)が正値である場合、電気料金の単価[円/kWh]である。Cは、P(t)が値0以下である場合、太陽光発電装置107が発電した電力の買い取り単価[円/kWh]である。Cは、ガス料金の単価[円/kcal]である。 CE is the unit price [yen / kWh] of the electricity rate when P C (t) is a positive value. CE is the unit price [yen / kWh] for purchasing power generated by the solar power generation device 107 when P C (t) is 0 or less. CF is a unit price [yen / kcal] of the gas rate.

制御対象が不連続に稼働されることによるコスト「g(PFC, PSB)」は、式(12)で表される。式(12)の右辺は、燃料電池109及び蓄電池105の出力変化を表す。コストは、出力変化が小さいほど少ない。 The cost “g (P FC , P SB )” due to the discontinuous operation of the control target is expressed by Expression (12). The right side of Expression (12) represents the output change of the fuel cell 109 and the storage battery 105. The cost is lower as the output change is smaller.

g(PFC, PSB)=w|PFC(t)−PFC(t−1)|+w|PSB(t)−PSB(t−1)| …(12) g (P FC , P SB ) = w 1 | P FC (t) −P FC (t−1) | + w 2 | P SB (t) −P SB (t−1) | (12)

「|PFC(t)−PFC(t−1)|」は、時刻tにおける燃料電池109の発電量と、時刻(t−1)における燃料電池109の発電量との階差の絶対値を表す。w1は、重み係数である。「|PSB(t)−PSB(t−1)|」は、時刻tにおける蓄電池105の充放電量と、時刻(t−1)における蓄電池105の充放電量との階差の絶対値を表す。w2は、重み係数である。 “| P FC (t) −P FC (t−1) |” is the absolute value of the difference between the power generation amount of the fuel cell 109 at time t and the power generation amount of the fuel cell 109 at time (t−1). Represents. w1 is a weighting coefficient. “| P SB (t) −P SB (t−1) |” is the absolute value of the difference between the charge / discharge amount of the storage battery 105 at time t and the charge / discharge amount of the storage battery 105 at time (t−1). Represents. w2 is a weighting coefficient.

算出部203は、電力需要と、給湯需要と、太陽光発電装置107の発電量と、電気料金の単価と、ガス料金の単価と、太陽光発電装置107が発電した電力の買い取り単価とに基づいて、突然変異、交叉、淘汰などの遺伝的アルゴリズムを繰り返す。   The calculation unit 203 is based on the electric power demand, the hot water supply demand, the power generation amount of the solar power generation device 107, the unit price of the electricity rate, the unit price of the gas rate, and the unit price for purchasing the power generated by the solar power generation device 107. Repeat genetic algorithms such as mutation, crossover, and selection.

算出部203は、光熱費の収支Cのうち、購入電力の電気料金が安くなるように、燃料電池109の発電量の有効電力PFC(t)と、燃料電池109の発電量の無効電力QFC(t)と、蓄電池105の充電電力PSB(t)とを算出する。また、算出部203は、光熱費の収支Cのうち、発電量の買い取り額が高くなるように、燃料電池109の発電量の有効電力PFC(t)と、燃料電池109の発電量の無効電力QFC(t)と、蓄電池105の充電電力PSB(t)とを算出する。 The calculation unit 203 includes the active power P FC (t) of the power generation amount of the fuel cell 109 and the reactive power Q of the power generation amount of the fuel cell 109 so that the electricity bill of purchased power is reduced in the utility bill C. FC (t) and charging power P SB (t) of the storage battery 105 are calculated. In addition, the calculation unit 203 calculates the effective power P FC (t) of the power generation amount of the fuel cell 109 and the invalidity of the power generation amount of the fuel cell 109 so that the purchase amount of the power generation amount in the utility bill C is high. Electric power Q FC (t) and charging power P SB (t) of storage battery 105 are calculated.

図6は、実施形態における、遺伝的アルゴリズムを示す図である。
算出部203は、初期の個体群を生成する。算出部203は、制約条件を満足するn個の個体を、ランダムに発生させる。算出部203は、制約条件を満足するn個の個体を、過去の実績値に基づいて発生させてもよい。算出部203は、制約条件を個体が満足していない場合、制約条件を満足するように遺伝子をビット反転させる(ステップS301)。
FIG. 6 is a diagram illustrating a genetic algorithm in the embodiment.
The calculation unit 203 generates an initial population. The calculation unit 203 randomly generates n individuals that satisfy the constraint conditions. The calculation unit 203 may generate n individuals that satisfy the constraint conditions based on past performance values. If the individual does not satisfy the constraint condition, the calculation unit 203 bit-inverts the gene so that the constraint condition is satisfied (step S301).

算出部203は、各個体の適合度と、それらの各個体の属する世代における適合度の平均(以下、「平均適合度」という。)とを算出する(ステップS302)。
算出部203は、算出した平均適応度がその世代から前の2世代の平均適応度よりも所定値ε以下であるか否かを判定する。また、算出部203は、世代数が最大世代数以上であるか否かを判定する(ステップS303)。
The calculation unit 203 calculates the fitness of each individual and the average of the fitness in the generation to which each individual belongs (hereinafter referred to as “average fitness”) (step S302).
The calculation unit 203 determines whether or not the calculated average fitness is equal to or less than a predetermined value ε than the average fitness of the two previous generations from that generation. Further, the calculation unit 203 determines whether or not the number of generations is equal to or greater than the maximum number of generations (step S303).

算出した平均適応度がその世代から前の2世代の平均適応度よりも所定値ε以下である場合、又は、世代数が最大世代数以上である場合(ステップS303:YES)、算出部203は、遺伝的アルゴリズムによる判定結果を、制御部206に出力する。判定結果は、燃料電池109の発電量PFC(t)のスケジュールと、蓄電池105の充放電の電力量PSB(t)のスケジュールとを表す(ステップS304)。 When the calculated average fitness is a predetermined value ε or less than the average fitness of the two previous generations from that generation, or when the number of generations is the maximum number of generations or more (step S303: YES), the calculation unit 203 The determination result by the genetic algorithm is output to the control unit 206. The determination result represents the schedule of the power generation amount P FC (t) of the fuel cell 109 and the schedule of the charge / discharge power amount P SB (t) of the storage battery 105 (step S304).

算出した平均適応度がその世代から前の2世代の平均適応度よりも所定値ε以下でない場合、かつ、世代数が最大世代数以上でない場合(ステップS303:NO)、算出部203は、制約条件を満足しない個体を淘汰する。また、算出部203は、個体の個数が所定数以上となった場合、個体の個数がその所定数未満になるまで、適合度の低い個体を淘汰する(ステップS305)。   When the calculated average fitness is not less than or equal to the predetermined value ε than the average fitness of the two previous generations, and when the number of generations is not equal to or greater than the maximum number of generations (step S303: NO), the calculation unit 203 Indulge individuals that do not meet the conditions. In addition, when the number of individuals is equal to or greater than the predetermined number, the calculation unit 203 selects an individual having a low fitness level until the number of individuals is less than the predetermined number (step S305).

算出部203は、個体の個数が予め定められた数未満となった場合、適合度の高い個体を増殖させる(ステップS306)。
算出部203は、全ての個体の数に対する所定割合(交叉率)の個体に対して、個体同士をランダムにペアリングする。算出部203は、ペアリングさせた個体同士に交叉処理を施す。交叉処理は、ペアリングさせた個体同士ごとに遺伝子をランダムに選んで、一点交叉させる処理である(ステップS307)。
When the number of individuals becomes less than a predetermined number, the calculation unit 203 causes the individuals with high fitness to proliferate (step S306).
The calculation unit 203 randomly pairs individuals with respect to individuals having a predetermined ratio (crossover rate) with respect to the number of all individuals. The calculation unit 203 performs a crossover process on the paired individuals. The crossover process is a process of randomly selecting a gene for each paired individual and performing a single point crossover (step S307).

算出部203は、全ての個体の数に対する所定割合(突然変異率)の個体をランダムに選ぶ。算出部203は、選んだ個体の遺伝子をランダムに選ぶ。算出部203は、選んだ個体に突然変異処理を施す。突然変異処理は、選んだ遺伝子をビット反転させる処理である(ステップS308)。
算出部203は、世代数を1世代だけ増加させる(ステップS309)。算出部203は、ステップS302に処理を戻す。
The calculation unit 203 randomly selects individuals having a predetermined ratio (mutation rate) with respect to the number of all individuals. The calculation unit 203 selects a gene of the selected individual at random. The calculation unit 203 performs a mutation process on the selected individual. The mutation process is a process of inverting the bit of the selected gene (step S308).
The calculation unit 203 increases the number of generations by one generation (step S309). The calculation unit 203 returns the process to step S302.

以上のように、実施形態に係る契約電力選択装置200は、算出部203と、選択部204とを持つ。算出部203は、対象施設100における電力の使用態様と、購入電力の上限を表す契約電力とに基づいて、契約電力に応じて定まる基本料金を含む電気料金を、複数の契約電力について算出する。選択部204は、算出された電気料金に基づいて、複数の契約電力から、電気料金が相対的に安い契約電力を選択する。   As described above, the contract power selection apparatus 200 according to the embodiment includes the calculation unit 203 and the selection unit 204. The calculation unit 203 calculates, for a plurality of contract powers, an electricity charge including a basic charge determined according to the contract power, based on the power usage in the target facility 100 and the contract power representing the upper limit of the purchased power. The selection unit 204 selects contract electric power with a relatively low electric charge from a plurality of contract electric power based on the calculated electric charge.

実施形態に係る契約電力選択方法は、契約電力選択装置200における契約電力選択方法であって、算出するステップと、選択するステップとを含む。算出するステップでは、算出部203は、対象施設100における電力の使用態様と、購入電力の上限を表す契約電力とに基づいて、契約電力に応じて定まる基本料金を含む電気料金を、複数の契約電力について算出する。選択するステップでは、選択部204は、算出された電気料金に基づいて、複数の契約電力から、電気料金が相対的に安い契約電力を選択する。   The contract power selection method according to the embodiment is a contract power selection method in the contract power selection apparatus 200, and includes a calculation step and a selection step. In the calculating step, the calculation unit 203 calculates an electric charge including a basic charge determined according to the contract electric power based on the usage mode of the electric power in the target facility 100 and the contract electric power indicating the upper limit of the purchased electric power to a plurality of contracts. Calculate for power. In the selecting step, the selection unit 204 selects contract power with a relatively low power charge from a plurality of contract power based on the calculated power charge.

実施形態に係る契約電力選択プログラムは、算出する手順と、選択する手順とを、コンピュータに実行させる。算出する手順では、コンピュータは、対象施設100における電力の使用態様と、購入電力の上限を表す契約電力とに基づいて、契約電力に応じて定まる基本料金を含む電気料金を、複数の契約電力について算出する。選択する手順では、コンピュータは、算出された電気料金に基づいて、複数の契約電力から、電気料金が相対的に安い契約電力を選択する。   The contract power selection program according to the embodiment causes a computer to execute a calculation procedure and a selection procedure. In the calculation procedure, the computer calculates an electric charge including a basic charge determined according to the contract power for a plurality of contract power based on the usage mode of power in the target facility 100 and the contract power indicating the upper limit of the purchased power. calculate. In the selecting procedure, the computer selects contract power with a relatively low electricity price from a plurality of contract power based on the calculated electricity price.

この構成において、選択部204は、算出された電気料金に基づいて、複数の契約電力から、電気料金が相対的に安い契約電力を選択する。これにより、契約電力選択装置200は、電気料金を安くする契約電力を選択することができる。   In this configuration, the selection unit 204 selects contract electric power with a relatively low electric charge from a plurality of contract electric power based on the calculated electric charge. Thereby, the contract power selection apparatus 200 can select the contract power that reduces the electricity bill.

従来では、電気料金を定めるための契約電力は、定数と見なされていた。つまり、従来では、電気料金を定めるための契約電力は、評価関数の変数ではなかった。実施形態に係る契約電力選択装置200によって、利用者Uは、煩わしい手順を踏むことなく、光熱費を削減することができる。また、利用者Uは、契約電力選択装置200が電力の取引を実行することにより、さらに安い購入電力の電気料金の単価で、電力を購入することができる。   Conventionally, the contract power for determining the electricity rate was regarded as a constant. That is, conventionally, the contract power for determining the electricity rate has not been a variable of the evaluation function. With the contract power selection apparatus 200 according to the embodiment, the user U can reduce the utility cost without taking a troublesome procedure. Moreover, the user U can purchase electric power with the unit price of the electric charge of cheaper purchased electric power, when the contract electric power selection apparatus 200 performs electric power transaction.

予測部201は、対象施設100における電力の需要を予測する。算出部203は、電力の需要の予測に基づいて、契約電力ごとに電気料金を算出する。予測部201は、天気予報に基づいて、電力の需要を予測してもよい。予測部201は、対象施設100における給湯の需要を予測してもよい。算出部203は、給湯の需要の予測に基づいて、契約電力ごとに電気料金を算出してもよい。制御部206は、購入電力を契約電力以下とするように、電力の使用態様を制御する。インタフェース205は、選択された契約電力を提示する。   The prediction unit 201 predicts the power demand in the target facility 100. The calculation unit 203 calculates an electricity bill for each contracted power based on the prediction of power demand. The prediction unit 201 may predict the demand for power based on the weather forecast. The prediction unit 201 may predict the demand for hot water supply in the target facility 100. The calculation unit 203 may calculate an electricity bill for each contracted power based on the prediction of the demand for hot water supply. The control unit 206 controls the usage mode of power so that the purchased power is less than or equal to the contract power. The interface 205 presents the selected contract power.

以上説明した少なくともひとつの実施形態によれば、算出された電気料金に基づいて、複数の契約電力から、電気料金が相対的に安い契約電力を選択する選択部204を持つことにより、電気料金を安くする契約電力を選択することができる。   According to at least one embodiment described above, by having the selection unit 204 that selects contract power with relatively low electricity charges from a plurality of contract electricity based on the calculated electricity charges, Contract power to be reduced can be selected.

以上、本発明のいくつかの実施形態を説明したが、これらの実施形態は、例として提示したものであり、発明の範囲を限定することは意図していない。これら実施形態は、その他の様々な形態で実施されることが可能であり、発明の要旨を逸脱しない範囲で、種々の省略、置き換え、変更を行うことができる。これら実施形態やその変形は、発明の範囲や要旨に含まれると同様に、特許請求の範囲に記載された発明とその均等の範囲に含まれるものである。   As mentioned above, although some embodiment of this invention was described, these embodiment is shown as an example and is not intending limiting the range of invention. These embodiments can be implemented in various other forms, and various omissions, replacements, and changes can be made without departing from the spirit of the invention. These embodiments and their modifications are included in the scope and gist of the invention, and are also included in the invention described in the claims and the equivalents thereof.

1…契約電力選択システム、100…対象施設、101…電力量計、102…分電盤、103…空調機器、104…照明機器、105…蓄電池、106…PCS、107…太陽光発電装置、108…PCS、109…燃料電池、110…PCS、111…ゲートウェイ、112…逆潮防止ヒータ、113…貯湯槽、114…補助ボイラ、200…契約電力選択装置、201…予測部、202…記憶部、203…算出部、204…選択部、205…インタフェース、206…制御部、300…データベース、400…電気料金データベース、500…気象会社、600…ガス会社、700…卸電力市場、A1…電力小売業者、FU…燃料電池ユニット、LD…負荷、LN…配電線、PT…受電点、PW…電力系統、T…端末、U…利用者 DESCRIPTION OF SYMBOLS 1 ... Contract electric power selection system, 100 ... Target facility, 101 ... Electricity meter, 102 ... Distribution board, 103 ... Air conditioning equipment, 104 ... Illumination equipment, 105 ... Storage battery, 106 ... PCS, 107 ... Solar power generation device, 108 DESCRIPTION OF SYMBOLS ... PCS, 109 ... Fuel cell, 110 ... PCS, 111 ... Gateway, 112 ... Backflow prevention heater, 113 ... Hot water storage tank, 114 ... Auxiliary boiler, 200 ... Contract power selection device, 201 ... Prediction unit, 202 ... Storage unit, DESCRIPTION OF SYMBOLS 203 ... Calculation part 204 ... Selection part 205 ... Interface, 206 ... Control part, 300 ... Database, 400 ... Electricity rate database, 500 ... Meteorological company, 600 ... Gas company, 700 ... Wholesale electric power market, A1 ... Electric power retailer , FU ... Fuel cell unit, LD ... Load, LN ... Distribution line, PT ... Power receiving point, PW ... Power system, T ... Terminal, U ... User

Claims (7)

燃料電池又は蓄電池を備える対象施設における電力の使用態様と、購入電力の上限を表す契約電力とに基づいて、前記契約電力に応じて定まる基本料金を含む電気料金を、複数の前記契約電力について算出する算出部と、
算出された前記電気料金に基づいて、前記複数の契約電力から、前記電気料金が相対的に安い前記契約電力を選択する選択部と、
前記対象施設における前記電力の需要を予測する予測部と、を備え、
前記算出部は、前記契約電力ごとの前記電気料金が最も安くなるように、前記燃料電池又は前記蓄電池の制御のスケジュールを前記電力の需要の予測に基づいて前記契約電力ごとに算出する契約電力選択装置。
Based on usage of power in a target facility equipped with a fuel cell or storage battery and contract power representing the upper limit of purchased power, an electricity charge including a basic charge determined according to the contract power is calculated for a plurality of the contract power A calculating unit to
Based on the calculated electricity price, a selection unit that selects the contracted power at which the electricity price is relatively cheap from the plurality of contracted powers;
A prediction unit for predicting the demand for the electric power in the target facility,
The calculating unit is configured such that the electricity charge per contract power is the cheapest, the fuel cell or contract power you calculate a schedule for control of the battery for each of the contract demand, based on the predicted demand of the power Selection device.
前記予測部は、天気予報に基づいて、前記電力の需要を予測する、請求項に記載の契約電力選択装置。 The contract power selection apparatus according to claim 1 , wherein the prediction unit predicts a demand for the power based on a weather forecast. 前記予測部は、前記対象施設における給湯の需要を予測し、
前記算出部は、前記給湯の需要の予測に基づいて、前記契約電力ごとに前記電気料金を算出する、請求項1又は請求項2に記載の契約電力選択装置。
The prediction unit predicts demand for hot water supply in the target facility,
The contract power selection apparatus according to claim 1 , wherein the calculation unit calculates the electricity rate for each contract power based on a prediction of demand for the hot water supply.
前記購入電力を前記契約電力以下とするように、前記電力の使用態様を制御する制御部
を更に備える、請求項1から請求項のいずれか一項に記載の契約電力選択装置。
The contract power selection apparatus according to any one of claims 1 to 3 , further comprising a control unit that controls a usage mode of the power so that the purchased power is equal to or less than the contract power.
選択された前記契約電力を提示するインタフェース
を更に備える、請求項1から請求項のいずれか一項に記載の契約電力選択装置。
The contract power selection apparatus according to any one of claims 1 to 4 , further comprising an interface that presents the selected contract power.
契約電力選択装置における契約電力選択方法であって、
燃料電池又は蓄電池を備える対象施設における電力の使用態様と、購入電力の上限を表す契約電力とに基づいて、前記契約電力に応じて定まる基本料金を含む電気料金を、複数の前記契約電力について算出するステップと、
算出された前記電気料金に基づいて、前記複数の契約電力から、前記電気料金が相対的に安い前記契約電力を選択するステップと、
前記対象施設における前記電力の需要を予測するステップと、を含み、
前記算出するステップでは、前記契約電力ごとの前記電気料金が最も安くなるように、前記燃料電池又は前記蓄電池の制御のスケジュールを前記電力の需要の予測に基づいて前記契約電力ごとに算出する契約電力選択方法。
A contract power selection method in the contract power selection device,
Based on usage of power in a target facility equipped with a fuel cell or storage battery and contract power representing the upper limit of purchased power, an electricity charge including a basic charge determined according to the contract power is calculated for a plurality of the contract power And steps to
Selecting the contract power with a relatively low power price from the plurality of contract power based on the calculated power price;
Predicting the demand for the power at the target facility,
In the calculating step, the contract power for calculating the schedule of control of the fuel cell or the storage battery for each contract power based on the prediction of the demand for the power so that the electricity charge for each contract power is the lowest. Selection method.
コンピュータに、
燃料電池又は蓄電池を備える対象施設における電力の使用態様と、購入電力の上限を表す契約電力とに基づいて、前記契約電力に応じて定まる基本料金を含む電気料金を、複数の前記契約電力について算出する手順と、
算出された前記電気料金に基づいて、前記複数の契約電力から、前記電気料金が相対的に安い前記契約電力を選択する手順と、
前記対象施設における前記電力の需要を予測する手順と、を実行させ、
前記算出する手順では、前記契約電力ごとの前記電気料金が最も安くなるように、前記燃料電池又は前記蓄電池の制御のスケジュールを前記電力の需要の予測に基づいて前記契約電力ごとに算出させるための契約電力選択プログラム。
On the computer,
Based on usage of power in a target facility equipped with a fuel cell or storage battery and contract power representing the upper limit of purchased power, an electricity charge including a basic charge determined according to the contract power is calculated for a plurality of the contract power And the steps to
A step of selecting the contract power with a relatively low power charge from the plurality of contract power based on the calculated power charge;
Predicting the power demand at the target facility, and
In the calculating procedure, a schedule for controlling the fuel cell or the storage battery is calculated for each contract power based on a prediction of the demand for the power so that the electricity charge for each contract power is the lowest . Contract power selection program.
JP2014186550A 2014-09-12 2014-09-12 Contract power selection device, contract power selection method, and contract power selection program Expired - Fee Related JP6400403B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014186550A JP6400403B2 (en) 2014-09-12 2014-09-12 Contract power selection device, contract power selection method, and contract power selection program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014186550A JP6400403B2 (en) 2014-09-12 2014-09-12 Contract power selection device, contract power selection method, and contract power selection program

Publications (2)

Publication Number Publication Date
JP2016059249A JP2016059249A (en) 2016-04-21
JP6400403B2 true JP6400403B2 (en) 2018-10-03

Family

ID=55757564

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014186550A Expired - Fee Related JP6400403B2 (en) 2014-09-12 2014-09-12 Contract power selection device, contract power selection method, and contract power selection program

Country Status (1)

Country Link
JP (1) JP6400403B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7475954B2 (en) * 2020-05-11 2024-04-30 株式会社日立製作所 Photovoltaic power generation system with storage battery and control method thereof
WO2025183108A1 (en) * 2024-02-29 2025-09-04 パナソニックIpマネジメント株式会社 Power supply system and method for operating same

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3302081B2 (en) * 1993-03-23 2002-07-15 北陸電力株式会社 Power demand forecasting device
JP2002288319A (en) * 2001-03-26 2002-10-04 Hitachi Ltd Driving control support service system
JP2003324846A (en) * 2002-04-26 2003-11-14 Rengo Co Ltd Method for selecting electricity charge contract system and system for supporting selection
JP4025157B2 (en) * 2002-09-13 2007-12-19 株式会社東芝 Power demand forecasting system
JP3910540B2 (en) * 2003-01-10 2007-04-25 株式会社日立製作所 Power charge system selection support method, power consumption improvement support method, power charge system selection support device, and power consumption improvement support device
US8600556B2 (en) * 2009-06-22 2013-12-03 Johnson Controls Technology Company Smart building manager
JP5466911B2 (en) * 2009-10-05 2014-04-09 パナソニック株式会社 Power supply system and control device for power supply system
JP5606114B2 (en) * 2010-03-19 2014-10-15 株式会社東芝 Power generation amount prediction device, prediction method, and prediction program
WO2014076785A1 (en) * 2012-11-14 2014-05-22 中国電力株式会社 Dynamic pricing support device, dynamic pricing support method and program

Also Published As

Publication number Publication date
JP2016059249A (en) 2016-04-21

Similar Documents

Publication Publication Date Title
JP6009976B2 (en) Energy management system, energy management method, program, and server
CN103493326B (en) Power control system
Zhu et al. The case for efficient renewable energy management in smart homes
US9824409B2 (en) Energy management system, server, energy management method, and storage medium
EP2953230A1 (en) Energy management system, energy management method, program and server
JP6042184B2 (en) Energy management system, energy management method, program, server device, and local server
JP6592454B2 (en) Power control system, power control method and program
JP5921390B2 (en) Energy management system, energy management method, program, and server device
JP5934396B2 (en) Power control system
WO2014136362A1 (en) Energy management system, energy management method, and program
CN111404153A (en) Construction method of energy hub planning model considering renewable energy and demand response
JP2017229233A (en) Energy management system, energy management method, program, server, and client device
JPWO2016166836A1 (en) Device management apparatus, device management system, device management method and program
JP2016021084A (en) Electricity charge menu selection system, electricity charge menu selection method, and electricity charge menu selection program
JP6400403B2 (en) Contract power selection device, contract power selection method, and contract power selection program
JP5969365B2 (en) Power control system
JP6394211B2 (en) Power control apparatus, power control method, program, and power control system
JP2020028146A (en) Power management device and program
JP7604856B2 (en) Information processing device, power supply system operation method and program
WO2025181766A1 (en) System for grouping energy installations into flexibility assets

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170308

A711 Notification of change in applicant

Free format text: JAPANESE INTERMEDIATE CODE: A711

Effective date: 20170911

Free format text: JAPANESE INTERMEDIATE CODE: A712

Effective date: 20170911

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180129

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180206

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180406

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180807

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180905

R150 Certificate of patent or registration of utility model

Ref document number: 6400403

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees