Connection structure for new and existing underground structures Download PDF

Info

Publication number
JP6474653B2
JP6474653B2 JP2015050479A JP2015050479A JP6474653B2 JP 6474653 B2 JP6474653 B2 JP 6474653B2 JP 2015050479 A JP2015050479 A JP 2015050479A JP 2015050479 A JP2015050479 A JP 2015050479A JP 6474653 B2 JP6474653 B2 JP 6474653B2
Authority
JP
Japan
Prior art keywords
new
existing underground
existing
anchor
underground structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2015050479A
Other languages
Japanese (ja)
Other versions
JP2016169549A (en
Inventor
貴司 仲山
貴司 仲山
貴士 牛田
貴士 牛田
陽太 富樫
陽太 富樫
真司 焼田
真司 焼田
大 岡本
大 岡本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Railway Technical Research Institute
Original Assignee
Railway Technical Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Railway Technical Research Institute filed Critical Railway Technical Research Institute
Priority to JP2015050479A priority Critical patent/JP6474653B2/en
Publication of JP2016169549A publication Critical patent/JP2016169549A/en
Application granted granted Critical
Publication of JP6474653B2 publication Critical patent/JP6474653B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Description

本発明は、新設・既設地下構造物の接続構造に関するものである。   The present invention relates to a connection structure for new and existing underground structures.

従来、開削トンネルを拡幅する場合は、既設躯体を一部開口して新設躯体を接続することが多い。   Conventionally, when the excavation tunnel is widened, there are many cases where the existing housing is connected by opening a part of the existing housing.

なしNone

なしNone

しかしながら、図3(a)に示す従来構造(1)の重ね継手の場合は、施工性・工期の面では、鉄筋のはつり出しや、既設躯体の仮受けが必要になり、工期が長くなる。既設躯体への影響の面では、既設躯体の断面力増加は中程度であり、旅客への影響の面では、仮受けのための通路占有・必要(大)であり、コスト比較(総合評価)では、△である。   However, in the case of the lap joint of the conventional structure (1) shown in FIG. 3 (a), in terms of workability and construction period, it is necessary to hang up the reinforcing bars and temporarily receive the existing frame, and the construction period becomes long. In terms of the impact on the existing chassis, the increase in the cross-sectional force of the existing chassis is moderate, and in terms of the impact on the passengers, the passage is occupied and necessary (large) for provisional reception, and cost comparison (comprehensive evaluation) Then, Δ.

図3(b)に示す従来構造(2)の水平アンカーの場合は、施工性・工期の面では、鉄筋のはつり出しは不要、既設躯体の仮受けが必要になり、工期はやや長くなる。既設躯体への影響の面では、既設躯体の断面力増加は大であり、旅客への影響の面では、仮受けのための通路占有・必要(大〜中)であり、コスト比較(総合評価)では、△であるといった課題があつた。   In the case of the horizontal anchor of the conventional structure (2) shown in FIG. 3 (b), in terms of workability and construction period, it is not necessary to hang up the reinforcing bar, and a temporary support of the existing frame is required, and the construction period is slightly longer. In terms of the impact on the existing chassis, the increase in the cross-sectional force of the existing chassis is large, and in terms of the impact on the passenger, the passage is occupied and necessary (large to medium) for provisional reception, and cost comparison (comprehensive evaluation ), There was a problem of △.

本発明は、上記状況に鑑みて、工期が短く、既設躯体の断面力増加が小さく、仮受けのための通路占有が不要なコストダウンを図ることができる、新設・既設地下構造物の接続構造を提供することを目的とする。   In view of the above situation, the present invention has a short construction period, a small increase in the cross-sectional force of the existing frame, and a cost reduction that does not require occupation of a passage for temporary support, and a connection structure for newly installed and existing underground structures The purpose is to provide.

本発明は、上記目的を達成するために、
〔1〕新設・既設地下構造物の接続構造において、既設地下構造物(1)と新設・既設地下構造物(2)との接続部(3)に、既設地下構造物(1)と新設・既設地下構造物(2)を接続する水平アンカー(4)と既設地下構造物(1)と新設・既設地下構造物(2)を接続する垂直アンカー(5)十字に配置し、既設地下構造物(1)から上方に突出する垂直アンカー(5)を逆梁である新設側縦断梁(6)で受けて、逆梁である新設側縦断梁(6)で既設地下構造物(1)を抱き込むように構成し、この構成を開削トンネルの切拡げ工事に適用することを特徴とする。
In order to achieve the above object, the present invention provides
[1] In the connection structure between the new and existing underground structure , the existing underground structure (1) and the newly installed and existing underground structure (1) are connected to the connection (3) between the new and existing underground structure (2). The horizontal anchor (4 ) that connects the existing underground structure (2), the existing underground structure (1), and the vertical anchor (5) that connects the new and existing underground structure (2) are arranged in a cross shape. The vertical anchor (5) protruding upward from the object (1) is received by the new vertical beam (6) which is a reverse beam, and the existing underground structure (1) is received by the new vertical beam (6) which is a reverse beam. It is configured to embrace, and this configuration is applied to the expansion work of the open tunnel.

〔2〕上記〔1〕記載の新設・既設地下構造物の接続構造において、線路方向に対しては逆梁である新設側縦断梁(6)の効果によって、線路横断方向に対しては新旧地下構造物が一体となって抵抗することにより、既設地下構造物の断面力の増加を抑制することを特徴とする。 [2] In the connection structure of the new and existing underground structures described in [1] above, the new and old underground underground in the crossing direction of the track due to the effect of the new vertical beam (6) which is a reverse beam in the track direction. It is characterized by suppressing an increase in the cross-sectional force of the existing underground structure by the structure being integrated and resisting.

本発明によれば、工期が短く、既設躯体の断面力増加が小さく、仮受けのための通路占有が不要なコストダウンを図ることができる。   According to the present invention, the construction period is short, the increase in the cross-sectional force of the existing housing is small, and the cost can be reduced without occupying the passage for temporary reception.

本発明の実施例を示す新設・既設地下構造物の接続構造の模式図である。It is a schematic diagram of the connection structure of the new and existing underground structure which shows the Example of this invention. 従来と本発明の実施例を対比した拡幅工事の模式図である。It is the schematic diagram of the widening construction which contrasted the prior art and the Example of this invention. 従来の拡幅工事の新設・既設地下構造物の接続構造と本発明の拡幅工事の新設・既設地下構造物の接続構造の比較を示す図である。It is a figure which shows the comparison of the connection structure of the new installation and existing underground structure of the conventional widening work, and the connection structure of the new installation and existing underground structure of the widening construction of this invention. 本発明の拡幅工事の施工工程図である。It is a construction process figure of the widening construction of this invention. 本発明の拡幅工事のアンカー継手の詳細な模式図である。It is a detailed schematic diagram of the anchor joint of the widening construction of this invention. 本発明の拡幅工事のアンカー継手の曲げ載荷試験の様子を示す図である。It is a figure which shows the mode of the bending loading test of the anchor joint of the widening construction of this invention.

以下、本発明の実施の形態について詳細に説明する。   Hereinafter, embodiments of the present invention will be described in detail.

図1は本発明の実施例を示す新設・既設地下構造物の接続構造の模式図、図2は従来と本発明の実施例を対比した拡幅工事の模式図であり、図2(a)は従来の拡幅工事の図面代用写真、図2(b)は本発明の拡幅工事の図面代用写真である。   FIG. 1 is a schematic diagram of a connection structure of a newly installed / existing underground structure showing an embodiment of the present invention, FIG. 2 is a schematic diagram of widening work comparing the conventional embodiment with the embodiment of the present invention, and FIG. FIG. 2B is a drawing substitute photograph of the widening work of the present invention, and FIG. 2B is a drawing substitute photograph of the widening work of the present invention.

これらの図において、1は既設地下構造物、2は新設・既設地下構造物、この既設地下構造物1と新設・既設地下構造物2との接続部3は水平アンカー4と垂直アンカー5で十字に配置し、逆梁である新設側縦断梁6で受ける。 In these drawings, 1 is an existing underground structure, 2 is a new / existing underground structure, and a connecting portion 3 between the existing underground structure 1 and the new / existing underground structure 2 is a cross formed by a horizontal anchor 4 and a vertical anchor 5. And is received by the newly installed vertical beam 6 which is a reverse beam .

図3は従来の拡幅工事の新設・既設地下構造物の接続構造と本発明の拡幅工事の新設・既設地下構造物の接続構造の比較を示す図である。   FIG. 3 is a diagram showing a comparison between a connection structure of a conventional widening work and a connection structure of an existing underground structure and a connection structure of a new widening work and an existing underground structure of the present invention.

従来の拡幅工事の新設・既設地下構造物の接続構造は、図3(a)および図3(b)に示したような課題を有するのに対して本発明によれば、図3(c)に示すように、施工性・工期の面では、鉄筋のはつり出しや、既設躯体の仮受けが不要になり、工期が短くなる。既設躯体への影響の面では、既設躯体の断面力増加は小であり、旅客への影響の面では、仮受けのための通路占有が不要であり、コスト比較(総合評価)では、10%程度コストを低減できる。   The connection structure of a newly established / existing underground structure in the conventional widening construction has the problems as shown in FIGS. 3 (a) and 3 (b), whereas according to the present invention, FIG. 3 (c) As shown in Fig. 5, in terms of workability and construction period, it is not necessary to hang up the reinforcing bars or temporarily receive the existing frame, which shortens the construction period. In terms of the impact on the existing housing, the increase in the cross-sectional force of the existing housing is small, and in terms of the impact on the passenger, it is not necessary to occupy the passage for temporary reception. The cost can be reduced to some extent.

図4は本発明の拡幅工事の施工工程図である。   FIG. 4 is a construction process diagram of the widening work of the present invention.

図4を参照しながら説明する。   This will be described with reference to FIG.

ステップS1:(1)杭打(夜間)、(2)覆工(夜間)、(3)掘削工、(4)土留支保工を施す。ここで、11は中間支持杭、12は土留支保工である。   Step S1: (1) pile driving (night), (2) lining (night), (3) excavation, (4) earth retaining support. Here, 11 is an intermediate support pile, and 12 is a soil retaining support.

ステップS2:(1)アンカー工を施す。ここで、13はアンカー工である。   Step S2: (1) Anchor work is performed. Here, 13 is an anchor work.

ステップS3:(1)新設躯体築造、(2)埋め戻し、(3)切り梁盛替えを施す。ここで、14は新設躯体築造、15は埋め戻し、16は切り梁盛替えである。   Step S3: (1) Construction of a new frame, (2) Backfilling, (3) Replacement of cut beams. Here, 14 is the construction of a newly-built frame, 15 is backfilling, and 16 is replacement of cut beams.

ステップS4:(1)仮り囲い設置、(2)サポート設置、(3)既設側壁の部分撤去工を施す。ここで、17は仮り囲い設置、18はサポート設置、19は既設側壁の部分撤去工、20はコア削孔である。   Step S4: (1) Temporary fence installation, (2) Support installation, (3) Partial removal of existing side wall. Here, 17 is temporary enclosure installation, 18 is support installation, 19 is the partial removal work of the existing side wall, and 20 is core drilling.

ステップS5:(1)本支柱・基礎設置を施す。ここで、21は本支柱・基礎設置であり、上床版受けH鋼なしである。   Step S5: (1) The main column and foundation are installed. Here, 21 is the main column / foundation installation, and there is no upper-floor plate receiver H steel.

ステップS6:(1)埋め戻しを行う。   Step S6: (1) Perform backfilling.

図5は本発明の拡幅工事のアンカー継手の詳細な模式図、図6はそのアンカー継手の曲げ載荷試験の様子を示す図である。   FIG. 5 is a detailed schematic diagram of an anchor joint for widening work according to the present invention, and FIG. 6 is a diagram showing a bending load test of the anchor joint.

これらの図において、水平アンカー筋23を既設側部材22の中心付近に配置する。新設側縦断梁(逆梁)24に突起部25、補強鉄筋26、鉛直アンカー筋27を配置する。   In these drawings, the horizontal anchor bars 23 are arranged near the center of the existing side member 22. Protruding portions 25, reinforcing reinforcing bars 26, and vertical anchor bars 27 are arranged on the new-side longitudinal beam (reverse beam) 24.

そこで、図6に示すように、新設側縦断梁(逆梁)24の曲げ載荷試験を行う。   Therefore, as shown in FIG. 6, a bending load test of the newly installed vertical beam (reverse beam) 24 is performed.

このように、本発明のアンカー継手によれば、従来の重ね継手と比較して、継ぐ既設側の鉄筋がない場合にも曲げ載荷試験が可能である。また、鉄筋のはつり出し作業が不要である。   Thus, according to the anchor joint of the present invention, a bending load test is possible even when there is no existing reinforcing bar to be joined, as compared with the conventional lap joint. In addition, it is not necessary to lift the reinforcing bars.

なお、本発明は上記実施例に限定されるものではなく、本発明の趣旨に基づき種々の変形が可能であり、これらを本発明の範囲から排除するものではない。   In addition, this invention is not limited to the said Example, Based on the meaning of this invention, a various deformation | transformation is possible and these are not excluded from the scope of the present invention.

本発明の新設・既設地下構造物の接続構造は、工期が短く、既設躯体の断面力増加が小さく、仮受けのための通路占有が不要なコストダウンを図ることができる、新設・既設地下構造物の接続構造として利用可能である。   The new / existing underground structure connecting structure of the present invention has a short construction period, a small increase in the cross-sectional force of the existing frame, and can reduce costs without the need to occupy a passage for temporary support. It can be used as an object connection structure.

1 既設地下構造物
2 新設・既設地下構造物
3 既設地下構造物と新設・既設地下構造物との接続部
4 水平アンカー
5 垂直アンカー
逆梁である新設側縦断梁
11 中間支持杭
12 土留支保工
13 アンカー工
14 新設躯体築造
15 埋め戻し
16 切り梁盛替え
17 仮り囲い設置
18 サポート設置
19 既設側壁の部分撤去工
20 コア削孔
21 本支柱・基礎設置
22 既設側部材
23 水平アンカー筋
24 新設側縦断梁(逆梁)
25 突起部
26 補強鉄筋
27 鉛直アンカー筋
DESCRIPTION OF SYMBOLS 1 Existing underground structure 2 New and existing underground structure 3 Connection part of existing underground structure and new and existing underground structure 4 Horizontal anchor 5 Vertical anchor 6 New side vertical beam 11 which is a reverse beam Intermediate support pile 12 Retaining retaining Construction 13 Anchor construction 14 Construction of new frame 15 Backfilling 16 Replacement of cut beam 17 Temporary enclosure installation 18 Support installation 19 Partial removal of existing side wall 20 Core drilling 21 Main pillar / foundation installation 22 Existing side member 23 Horizontal anchor reinforcement 24 New installation Side longitudinal beam (reverse beam)
25 Protrusions 26 Reinforcement bars 27 Vertical anchor bars

Claims (2)

既設地下構造物(1)と新設・既設地下構造物(2)との接続部(3)に、既設地下構造物(1)と新設・既設地下構造物(2)を接続する水平アンカー(4)と既設地下構造物(1)と新設・既設地下構造物(2)を接続する垂直アンカー(5)十字に配置し、既設地下構造物(1)から上方に突出する垂直アンカー(5)を逆梁である新設側縦断梁(6)で受けて、逆梁である新設側縦断梁(6)で既設地下構造物(1)を抱き込むように構成し、該構成を開削トンネルの切拡げ工事に適用することを特徴とする新設・既設地下構造物の接続構造。 Horizontal anchor (4 ) connecting the existing underground structure (1) and the new / existing underground structure (2) to the connection (3) between the existing underground structure (1) and the new / existing underground structure (2) ) and existing underground construction (1) and the newly-existing underground construction (vertical anchor (5) connecting the 2) arranged in a cross, a vertical anchor projecting existing underground structures from (1) above (5) Is received by the new vertical beam (6) , which is the reverse beam, and the existing underground structure (1) is held by the new vertical beam (6) , which is the reverse beam. Connection structure for new and existing underground structures characterized by application to expansion work. 請求項1記載の新設・既設地下構造物の接続構造において、線路方向に対しては逆梁である新設側縦断梁(6)の効果によって、線路横断方向に対しては新旧地下構造物が一体となって抵抗することにより、既設地下構造物の断面力の増加を抑制することを特徴とする新設・既設地下構造物の接続構造。 In the connection structure of new and existing underground structures according to claim 1, the old and new underground structures are integrated in the cross-track direction due to the effect of the new vertical beam (6) which is a reverse beam in the track direction. Connecting structure of new and existing underground structures characterized by suppressing the increase in cross-sectional force of existing underground structures by resisting.
JP2015050479A 2015-03-13 2015-03-13 Connection structure for new and existing underground structures Expired - Fee Related JP6474653B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015050479A JP6474653B2 (en) 2015-03-13 2015-03-13 Connection structure for new and existing underground structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015050479A JP6474653B2 (en) 2015-03-13 2015-03-13 Connection structure for new and existing underground structures

Publications (2)

Publication Number Publication Date
JP2016169549A JP2016169549A (en) 2016-09-23
JP6474653B2 true JP6474653B2 (en) 2019-02-27

Family

ID=56983354

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015050479A Expired - Fee Related JP6474653B2 (en) 2015-03-13 2015-03-13 Connection structure for new and existing underground structures

Country Status (1)

Country Link
JP (1) JP6474653B2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7356889B2 (en) * 2019-12-13 2023-10-05 株式会社竹中工務店 Construction method of structure
CN111395390A (en) * 2020-03-18 2020-07-10 广州地铁设计研究院股份有限公司 Reinforcement structure and method for connecting joints of existing structure openings and new structures
CN113186940B (en) * 2021-05-26 2025-08-19 华东建筑设计研究院有限公司 Node structure for combining temporary beam and structural beam at position of opening of reverse-acting structure
CN116201177B (en) * 2023-03-14 2025-11-11 中铁第一勘察设计院集团有限公司 Underground engineering reconstruction and expansion interface based on permanent-face combination and construction method thereof

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6044471B2 (en) * 1978-02-06 1985-10-03 大成建設株式会社 Joint structure of old and new concrete structure
JPH09279859A (en) * 1996-04-10 1997-10-28 Shimizu Corp Connection structure between existing building and extension building
JP3888564B2 (en) * 1997-08-28 2007-03-07 株式会社大林組 Construction method of underground structure
JP3371131B2 (en) * 1997-11-21 2003-01-27 コンクリート・コーリング株式会社 Expansion method of reinforced concrete structures
JP3829319B2 (en) * 2001-12-25 2006-10-04 日本サミコン株式会社 Construction method of underground hollow structure and its underground hollow structure
JP4716218B2 (en) * 2005-11-15 2011-07-06 清水建設株式会社 Structure girders, slab structures and additional structures
KR20130006420A (en) * 2010-03-19 2013-01-16 니혼 칸쿄우 세이조우 가부시키 카이샤 Method of constructing underground structure to be newly built

Also Published As

Publication number Publication date
JP2016169549A (en) 2016-09-23

Similar Documents

Publication Publication Date Title
JP6474653B2 (en) Connection structure for new and existing underground structures
JP5285254B2 (en) Rebuilding method
JP4127161B2 (en) Tunnel merge, branch structure
JP2017106266A (en) Concrete reinforcing tool and installation method thereof and concrete reinforcement structure
JP6978894B2 (en) How to build a beam-column joint structure
KR101715359B1 (en) Method of aseismic reinforcement for existing building structure using concrete filled steel tube
KR101098688B1 (en) Reinforced Concrete Frame Structure having High Flexibility in Beam-Column Joint
KR102309544B1 (en) Connecting structure of beam and column of a building and method of manufacturing using the same
KR101664668B1 (en) Structure for connecting earth retaining wall
JP5144182B2 (en) Seismic reinforcement structure and seismic reinforcement method for existing buildings
JP6230272B2 (en) Seismic wall and method of forming the same
KR101519112B1 (en) Reinforcement column and a tunnel for subway utilizing the same
JP2006226054A (en) Seismic reinforcement method for existing buildings with reinforced concrete frame structures
JP2007315136A (en) Foundation structure using existing and new piles
JP5243916B2 (en) Rebuilding method
JP2019027103A (en) Concrete filled steel tube column structure
JP4359570B2 (en) Rebuilding method
JP3981688B2 (en) Joint structure and composite structure of steel beam and reinforced concrete column
JP5252226B2 (en) Building seismic isolation method and seismic isolation building
JP2010019042A (en) Method of repairing existing foundation of wooden building
KR101978766B1 (en) The wall members and underground wall construction method using the same
JP6356398B2 (en) Home structure and foundation construction method for Tomori home
JP2017172278A (en) Earthquake-proof reinforcement structure
JP2017101529A (en) Pca FLOOR SLAB AND INSTALLATION METHOD THEREOF, AND Pca BEARING AND INSTALLATION METHOD THEREOF
JP6862096B2 (en) Variable cross-section beam structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170301

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20171213

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180109

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180208

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20180724

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180907

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20180918

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20181218

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20181220

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190129

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190130

R150 Certificate of patent or registration of utility model

Ref document number: 6474653

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees