Joint structure of old and new concrete structure

Info

Publication number
JPS6044471B2
JPS6044471B2 JP1148678A JP1148678A JPS6044471B2 JP S6044471 B2 JPS6044471 B2 JP S6044471B2 JP 1148678 A JP1148678 A JP 1148678A JP 1148678 A JP1148678 A JP 1148678A JP S6044471 B2 JPS6044471 B2 JP S6044471B2
Authority
JP
Japan
Prior art keywords
steel rod
new
concrete
concrete structure
insertion hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
JP1148678A
Other languages
Japanese (ja)
Other versions
JPS54104618A (en
Inventor
壮一 河村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP1148678A priority Critical patent/JPS6044471B2/en
Publication of JPS54104618A publication Critical patent/JPS54104618A/en
Publication of JPS6044471B2 publication Critical patent/JPS6044471B2/en
Expired legal-status Critical Current

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Description

【発明の詳細な説明】 既存のコンクリート構造物の改修において、コンクリー
ト構造部、特に壁を増設する場合、既存部分と増設部分
とを接合する一方法として、既存部分に穿設した孔にホ
ールインアンカー等の商品名で知られている埋込ボルト
セットを設置して増設部のコンクリートを打設し、既存
部分と増設部分との間の剪断力の伝達を図る方法がある
[Detailed Description of the Invention] When adding a concrete structure part, especially a wall, in the renovation of an existing concrete structure, one method of joining the existing part and the added part is to insert a hole into a hole drilled in the existing part. There is a method of installing a set of embedded bolts, known by trade names such as Anchor, and pouring concrete for the extension to transfer shear force between the existing part and the extension.

しかしながら前記埋込ボルトセットに或る程度以上の力
を加えた場合、加工部分で破壊を生じ易く、而も剪断力
を伝達するためには、現在一般に使用されている埋込ボ
ルトセット程度の加工は必要としない。而も加工を施し
た専用の金具を使用しているため、設置費用が割高にな
る等、従来の埋込ボルトセットを使用した方法には種々
の欠陥があつた。本発明はこのような欠陥を除去するた
めに提案されたものであつて、オープンフレームの既設
コンクリート構造部における同構造部内に増設されるコ
ンクリート壁よりなる新設コンクリート構造部に対する
接合面に穿設された鋼桿挿入孔内に、鋼桿を同挿入孔内
壁面との間に空隙が存するように、且つその一部が前記
新設構造部内に突出するように挿入され、前記鋼桿が前
記既設並に新設コンクリート構造部に跨架されたことを
特徴とする新旧コンクリート構造部の接合構造に係るも
のである。
However, if a force exceeding a certain level is applied to the embedded bolt set, it is likely that the machined part will break, and in order to transmit the shearing force, it is necessary to process the embedded bolt set as much as the currently commonly used embedded bolt set. is not required. However, since special metal fittings that have been processed are used, the installation cost is relatively high, and the conventional method using an embedded bolt set has various drawbacks. The present invention was proposed in order to eliminate such defects, and the present invention has been proposed in order to eliminate such defects. The steel rod is inserted into the existing steel rod insertion hole so that a gap exists between it and the inner wall surface of the insertion hole, and a part of the steel rod protrudes into the new structure, and the steel rod is inserted into the existing steel rod insertion hole. This relates to a joint structure between old and new concrete structures, which is characterized by being straddled over a new concrete structure.

本発明においては前記したように、棒鋼、鋼管の如き鋼
桿をオープンフレームよりなる既設のコンクリート構造
部における同構造部内に増設されるコンクリート壁より
なる新設コンクリート構造部に対する接合面に穿設され
た鋼桿挿入孔内に、その一部が増設部に突出するように
挿入したのち増設部のコンクリートを打設し、前記鋼桿
を介して新旧コンクリート部を一体に接合するようにし
たものであり、鋼桿には従来の埋込ボルトセット”の如
く螺糸部や楔挿入部の如き加工部分がなく、従つてこの
ような加工部の存在に基く局部的な応力集中やそれに基
く破裂が生じ難く、信頼度の高い施工が可能となるもの
であり、また前記したように本発明において使用される
鋼桿には前述の如−き加工部がないので、材料価格が低
廉であり、また既設のコンクリート構造部に設けた鋼桿
挿入孔に対する挿入作業が極めて容易であり、労務費の
節減と工期の縮減が可能となる。
In the present invention, as described above, a steel rod such as a steel bar or a steel pipe is drilled at the joint surface of an existing concrete structure consisting of an open frame to a new concrete structure consisting of a concrete wall to be added within the same structure. A steel rod is inserted into the insertion hole so that a part thereof protrudes into the extension part, and then concrete for the extension part is poured, and the old and new concrete parts are joined together through the steel rod. Unlike conventional embedded bolt sets, the steel rod does not have any machined parts such as threaded parts or wedge insertion parts, and the presence of such machined parts can cause local stress concentration and rupture. It is difficult and highly reliable to perform construction, and as mentioned above, the steel rod used in the present invention does not have any processed parts as described above, so the material cost is low and it can be used in existing construction. The insertion work into the steel rod insertion hole provided in the concrete structure is extremely easy, making it possible to save labor costs and shorten the construction period.

更にまた本発明によれば、前記鋼桿と挿入孔との間に空
隙が設けられているので、両者の空隙の大きさを調整す
ることによつて新旧両コンクリート構造部の剛性を調節
することがてきる等、本発明は多くの利点を有するもの
である。以下本発明を図示の実施例について説明する。
Furthermore, according to the present invention, since a gap is provided between the steel rod and the insertion hole, the rigidity of both the old and new concrete structures can be adjusted by adjusting the size of the gap between the two. The present invention has many advantages, such as improved performance. The present invention will be described below with reference to the illustrated embodiments.

第1図に示すように、既設のコンクリート構造部Aの接
合面に鋼桿挿入孔1を穿設したのち、同挿入孔1に棒鋼
または鋼管よりなる鋼桿2を、その一部が増設されるべ
きコンクリート構造部内に突出する如く挿入し、而るの
ち前記構造部Aの接合面にコンクリートを打設して増設
部のコンクリート構造部Bを施工し、両構造部A,Bに
跨つて鋼桿2を埋設し、同鋼桿2を介して前記両構造部
A,Bを一体に接合するものである。なお前記鋼桿2と
しては一般棒鋼、鋼管の他、異形棒鋼を使用してもよい
。第2図は本発明の他の実施例を示し、鋼桿2の先端に
L型の折曲部2αを曲成して、前記両構造部A,Bをよ
り剛固に接合するものである。
As shown in Figure 1, after drilling a steel rod insertion hole 1 in the joint surface of the existing concrete structure A, a steel rod 2 made of a steel bar or steel pipe is partially added to the insertion hole 1. Then, concrete is poured on the joint surface of the structure A to construct the concrete structure B of the extension, and the steel is inserted over both structures A and B. A rod 2 is buried, and the two structural parts A and B are integrally joined via the steel rod 2. As the steel rod 2, a deformed steel bar may be used in addition to a general steel bar and a steel pipe. FIG. 2 shows another embodiment of the present invention, in which an L-shaped bent portion 2α is formed at the tip of the steel rod 2 to more firmly connect the structural portions A and B. .

また前記両構造部A,Bは第1図及び第2図に示すよう
に、互いに密着していても、或いは第3図に示すように
密着していなくてもよい。更に前記鋼桿2及びその挿入
孔1は、前記構造5部Aの接合面に対して前記各実施例
におけるように直交していても、或いは第4図に示すよ
うに斜交してもよい。更にまた前記鋼桿2は前記構造部
Aの鋼桿挿入孔1に密嵌しても、(第5図参照)セメン
トペー.スト3等を介して密着しても、(第6図参照)
或いは両者1,2間に空隙を残置してもよい。
Further, the structural parts A and B may be in close contact with each other as shown in FIGS. 1 and 2, or may not be in close contact with each other as shown in FIG. 3. Further, the steel rod 2 and its insertion hole 1 may be perpendicular to the joint surface of the structure 5 A as in each of the above embodiments, or may be oblique as shown in FIG. . Furthermore, even if the steel rod 2 is tightly fitted into the steel rod insertion hole 1 of the structural part A (see FIG. 5), the cement page. Even if they come into close contact through the striker 3, etc. (see Figure 6)
Alternatively, a gap may be left between both 1 and 2.

(第7図参照)第8図は既存の鉄筋コンクリート造のオ
ープンフレーム内に新らたに鉄筋コンクリート壁を増設
する場合の実施例を示し、既存の柱α1及び梁α2の各
対向面に設けた鋼桿挿入孔1に鋼桿2を、その一部が前
記柱a1及び?2の外側に突出する如く挿入し、前記各
柱α1梁α2間のスペースにコンクリートを打設し、前
記鋼桿2を介して前記柱α1梁α2と一体化された鉄筋
コンクリート壁Cを施工するものである。
(See Figure 7) Figure 8 shows an example of adding a new reinforced concrete wall within an existing reinforced concrete open frame. A steel rod 2 is inserted into the rod insertion hole 1, a part of which is connected to the pillars a1 and ? 2, and concrete is poured into the space between each of the columns α1 and beams α2, and a reinforced concrete wall C is constructed which is integrated with the columns α1 and beams α2 via the steel rods 2. It is.

なお梁α2の下部の挿入鋼桿2が鉄筋コンクリート壁C
を打設する以前に落下するのを防止するために、鋼桿2
を前記壁Cの鉄筋に結束するか、或いは鋼桿挿入孔1に
密着する径の銅桿2を叩き込むとよい。
In addition, the inserted steel rod 2 at the bottom of the beam α2 is connected to the reinforced concrete wall C.
In order to prevent the steel rod from falling before pouring, install the steel rod 2.
It is preferable to tie them to the reinforcing bars of the wall C, or to hammer in a copper rod 2 having a diameter that fits tightly into the steel rod insertion hole 1.

以上本発明を実施例について説明したが、本発明は勿論
このような実施例にだけ局限されるも省ではなく、本発
明の精神を逸脱しない範囲内で種種の設計の改変を施し
うるものであり、打設したコンクリートの膨脹により鋼
桿が押されて既設部分にクラックが入らぬように挿入し
た鋼桿先端と既設部分との間に空隙部を設けておいた方
がよい。
Although the present invention has been described above with reference to embodiments, the present invention is of course limited to such embodiments, but is not limited to such embodiments, and the design can be modified in various ways without departing from the spirit of the invention. However, it is better to create a gap between the tip of the inserted steel rod and the existing part to prevent the steel rod from being pushed by the expansion of the poured concrete and causing cracks in the existing part.

【図面の簡単な説明】[Brief explanation of drawings]

第1図乃至第7図は夫々本発明に係る新旧コンクリート
構造部の接合構造の各実施例を示す縦断面図、第8図は
本発明を既設の鉄筋コンクリート造オープンフレーム内
に鉄筋コンクリート壁を増設する場合に適用した実施例
を示す正面図である。 A・・・・・・既設のコンクリート構造部、B・・・・
・・増設部のコンクリート構造部、1・・・・・・鋼桿
挿入孔、2・・・鋼桿。
Figures 1 to 7 are longitudinal cross-sectional views showing respective examples of joint structures for old and new concrete structures according to the present invention, and Figure 8 is a diagram showing the present invention in which a reinforced concrete wall is added to an existing reinforced concrete open frame. FIG. 3 is a front view showing an example applied to a case. A: Existing concrete structure, B:
... Concrete structure of the extension part, 1... Steel rod insertion hole, 2... Steel rod.

Claims (1)

【特許請求の範囲】[Claims] 1 オープンフレームの既設コンクリート構造部におけ
る同構造部内に増設されるコンクリート壁によりなる新
設コンクリート構造部に対する接合面に穿設された鋼桿
挿入孔内に、鋼桿を同挿入孔内壁面との間に空隙が存す
るように、且つその一部が前記新設構造部内に突出する
ように挿入され、前記鋼桿が前記既設並に新設コンクリ
ート構造部に跨架されたことを特徴とする新旧コンクリ
ート構造部の接合構造。
1. Insert a steel rod into a steel rod insertion hole drilled at the joint surface of an existing open frame concrete structure with a new concrete structure consisting of a concrete wall that will be added to the same structure, and between it and the inner wall surface of the insertion hole. A new and old concrete structure, characterized in that the steel rod is inserted so that a gap exists in the new structure and a part thereof protrudes into the new structure, and the steel rod is straddled over the existing and new concrete structure. joint structure.
JP1148678A 1978-02-06 1978-02-06 Joint structure of old and new concrete structure Expired JPS6044471B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP1148678A JPS6044471B2 (en) 1978-02-06 1978-02-06 Joint structure of old and new concrete structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP1148678A JPS6044471B2 (en) 1978-02-06 1978-02-06 Joint structure of old and new concrete structure

Publications (2)

Publication Number Publication Date
JPS54104618A JPS54104618A (en) 1979-08-17
JPS6044471B2 true JPS6044471B2 (en) 1985-10-03

Family

ID=11779368

Family Applications (1)

Application Number Title Priority Date Filing Date
JP1148678A Expired JPS6044471B2 (en) 1978-02-06 1978-02-06 Joint structure of old and new concrete structure

Country Status (1)

Country Link
JP (1) JPS6044471B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP5920774B2 (en) * 2012-03-19 2016-05-18 国立大学法人横浜国立大学 Bonding method and structure of old and new concrete
JP6474653B2 (en) * 2015-03-13 2019-02-27 公益財団法人鉄道総合技術研究所 Connection structure for new and existing underground structures

Also Published As

Publication number Publication date
JPS54104618A (en) 1979-08-17

Similar Documents

Publication Publication Date Title
KR20070083474A (en) Shear force reinforcement structure and shear force reinforcement member
JPS60501015A (en) Concrete-filled structural tubes with cantilevers, especially for balcony floors
JP2002332750A (en) Aseismic reinforcing structure for reinforced concrete support column
JPH08291631A (en) Reinforcing method of concrete structure with steel plate
JPS6044471B2 (en) Joint structure of old and new concrete structure
JP2568951B2 (en) Connection between reinforced concrete columns and steel beams
JPS6047140A (en) Steel plate concrete structure
JP2000038803A (en) Structure for preventing slippage of both members in composite structure of steel plate and concrete and its construction method
JP2001317215A (en) Seismic retrofitting method for existing buildings
JP3549753B2 (en) Girder structure of steel-concrete composite truss structure
JPH0642039A (en) Joining method of end of precast concrete beam to precast concrete girder, and joining construction thereof
JPH11236713A (en) Column and pile joint method and joint structure
JPH07247556A (en) Fixing structure of column base in steel column member
KR200245405Y1 (en) Couplers for Steel Pipe Piles
JPH07292857A (en) Pc member with irregular-shaped steel pipe for joint, and connecting method thereof
JP4006689B2 (en) Core material for underground pit and soil cement column wall using soil cement column wall
JPS59192145A (en) Fixing of iron pillar
JP2713119B2 (en) Connection structure of precast coated steel tube concrete column and precast beam
JPH10237860A (en) How to join underground diaphragm walls
JP2775224B2 (en) Underground diaphragm wall joint structure
JP3220702B2 (en) Post-installed anchor
JP2973985B2 (en) RC column and steel beam joint structure
JPS61229070A (en) Connection of reinforced concrete structure
JPH0474520B2 (en)
JP2001262707A (en) Joint structure between reinforced concrete columns and steel beams