JP6493155B2 - Battery controller - Google Patents
[go: Go Back, main page]

JP6493155B2 - Battery controller - Google Patents

Battery controller Download PDF

Info

Publication number
JP6493155B2
JP6493155B2 JP2015209804A JP2015209804A JP6493155B2 JP 6493155 B2 JP6493155 B2 JP 6493155B2 JP 2015209804 A JP2015209804 A JP 2015209804A JP 2015209804 A JP2015209804 A JP 2015209804A JP 6493155 B2 JP6493155 B2 JP 6493155B2
Authority
JP
Japan
Prior art keywords
time
measurement
voltage
current value
current
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2015209804A
Other languages
Japanese (ja)
Other versions
JP2017083227A (en
Inventor
大輝 山口
大輝 山口
義貴 木内
義貴 木内
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Denso Corp
Original Assignee
Denso Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Denso Corp filed Critical Denso Corp
Priority to JP2015209804A priority Critical patent/JP6493155B2/en
Publication of JP2017083227A publication Critical patent/JP2017083227A/en
Application granted granted Critical
Publication of JP6493155B2 publication Critical patent/JP6493155B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E60/00Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02E60/10Energy storage using batteries

Landscapes

  • Measurement Of Current Or Voltage (AREA)
  • Tests Of Electric Status Of Batteries (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)
  • Secondary Cells (AREA)
  • Electric Propulsion And Braking For Vehicles (AREA)

Description

本発明は、電気自動車やハイブリッド自動車等に搭載される充電池(即ち、組電池)を制御する組電池制御装置に関する。   The present invention relates to an assembled battery control device that controls a rechargeable battery (that is, an assembled battery) mounted on an electric vehicle, a hybrid vehicle, or the like.

制御部から独立したものであって一定周期毎に計測した電流値を送信する機能を有する電流計測部を用いながら、充電池の電流値及び電圧値を同時に取得するように構成された装置の一例が、特許文献1に記載されている。この装置では、電流値の計測タイミングに対して、電圧値の計測タイミングのズレが所定範囲内になるように、電圧値の計測タイミングを制御している。   An example of an apparatus configured to simultaneously acquire a current value and a voltage value of a rechargeable battery while using a current measurement unit that is independent of the control unit and has a function of transmitting a current value measured at a certain period. Is described in Patent Document 1. In this apparatus, the voltage value measurement timing is controlled so that the deviation of the voltage value measurement timing is within a predetermined range with respect to the current value measurement timing.

特開2015−68763号公報Japanese Patent Laying-Open No. 2015-68763

しかし、上記構成の場合、電流値の計測結果の受信タイミングを基準とするため、受信間隔を把握するためには、電流値の計測値を2回以上受信する必要があり、電流値と電圧値を同時取得可能になるまでに要する時間が長くなるという問題があった。また、制御部で制御する電圧値の計測タイミングを、制御部から独立している電流計測部の計測タイミングに合わせる構成となるため、制御部または電流計測部が要求する処理周期で電流値や電圧値を揃えられない可能性が生じて、制御が不安定になるおそれがあった。また、電流計測部のクロック精度について、制御部のクロック精度と同じ程度の高精度に設定する必要があるが、製造コストを低減させるために、電流計測部のクロック精度を低精度にしたいという要望がある。   However, in the case of the above configuration, since the reception timing of the current value measurement result is used as a reference, in order to grasp the reception interval, it is necessary to receive the current value measurement value twice or more. There is a problem that it takes a long time to obtain the images simultaneously. Moreover, since the measurement timing of the voltage value controlled by the control unit is configured to match the measurement timing of the current measurement unit independent of the control unit, the current value and voltage are processed in the processing cycle required by the control unit or current measurement unit. There was a possibility that the values could not be aligned, and there was a possibility that the control would become unstable. In addition, the clock accuracy of the current measurement unit needs to be set to the same high accuracy as the clock accuracy of the control unit. However, in order to reduce the manufacturing cost, there is a desire to reduce the clock accuracy of the current measurement unit. There is.

本発明の目的は、電流値と電圧値を同時取得可能になるまでに要する時間を短くすることができ、制御を安定化することができ、また、製造コストを低減させることができる組電池制御装置を提供することにある。   An object of the present invention is to provide a battery pack control capable of shortening the time required until the current value and the voltage value can be acquired simultaneously, stabilizing the control, and reducing the manufacturing cost. To provide an apparatus.

請求項1の発明は、組電池(2)の電流値を計測する電流計測部(3)と、前記電流計測部(3)により計測された電流値を受信する制御部(10)と、前記制御部(10)からの計測指示を受信したときに、前記組電池(2)の電圧値を計測し、計測した電圧値を前記制御部(10)に送信する電圧計測部(9、12)と、前記電流計測部(3)に対して電源を供給するものであって、前記制御部(10)によりオンオフ制御される電源供給スイッチ(11)とを備え、前記制御部(10)は、前記電源供給スイッチ(11)をオンするオンタイミングと、前記電圧計測部(9、12)に対して計測指示を送信する送信タイミングを制御することにより、前記電流計測部(3)による電流値の計測タイミングと前記電圧計測部(9、12)による電圧値の計測タイミングとのズレが所定範囲内になるように制御するものである。   The invention of claim 1 includes a current measurement unit (3) that measures the current value of the assembled battery (2), a control unit (10) that receives the current value measured by the current measurement unit (3), and the When the measurement instruction is received from the control unit (10), the voltage measurement unit (9, 12) measures the voltage value of the assembled battery (2) and transmits the measured voltage value to the control unit (10). And a power supply switch (11) that supplies power to the current measurement unit (3) and is controlled to be turned on / off by the control unit (10), and the control unit (10) includes: By controlling the on timing for turning on the power supply switch (11) and the transmission timing for transmitting a measurement instruction to the voltage measuring unit (9, 12), the current value of the current measuring unit (3) is controlled. Measurement timing and voltage measurement unit (9, 12) Deviation between the timing of measurement of the voltage value by is what controlled to be within a predetermined range.

本発明の第1実施形態を示す電池システムの電気的構成図The electric block diagram of the battery system which shows 1st Embodiment of this invention. メインマイコンと、監視IC群と二次電池群とを示す電気的構成図Electrical configuration diagram showing main microcomputer, monitoring IC group and secondary battery group タイムチャートTime chart フローチャートflowchart 本発明の第2実施形態を示すタイムチャートTime chart showing a second embodiment of the present invention フローチャートflowchart

以下、本発明の第1実施形態について、図1ないし図4を参照して説明する。本実施形態の電池システム1は、例えば電気自動車やハイブリッド自動車等に搭載されるものである。電池システム1は、図1に示すように、二次電池群2と、電流センサ3と、電池ECU4とを備えている。この場合、電流センサ3及び電池ECU4から組電池制御装置が構成されている。二次電池群2は、二次電池(例えばリチウムイオン電池)5を複数個(例えば200〜300個程度)直列接続して構成されている。二次電池群2は、組電池を構成している。   Hereinafter, a first embodiment of the present invention will be described with reference to FIGS. The battery system 1 of the present embodiment is mounted on, for example, an electric vehicle or a hybrid vehicle. As shown in FIG. 1, the battery system 1 includes a secondary battery group 2, a current sensor 3, and a battery ECU 4. In this case, the assembled battery control device is configured by the current sensor 3 and the battery ECU 4. The secondary battery group 2 is configured by connecting a plurality (for example, about 200 to 300) of secondary batteries (for example, lithium ion batteries) 5 in series. The secondary battery group 2 constitutes an assembled battery.

電流センサ3は、二次電池群2に流れる電流値を計測(即ち、検出)するものであり、センサ素子6と、センサ回路7とを有している。電流センサ3は、電流計測部としての機能を有する。センサ素子6は、二次電池群2の正極と図示しない負荷(例えばモータ等)とを接続する配線8に設けられている。センサ回路7は、センサ素子6により計測された電流値の計測信号(即ち、アナログの電圧信号)を入力し、入力した計測信号をAD変換し、AD変換したデジタルの計測信号を設定周期(例えば10msの周期)で電池ECU4へ送信するように構成されている。この構成の場合、センサ回路7とメインマイコン10との間の通信は、一方向通信(即ち、センサ回路7からメインマイコン10へ向けての通信)である。   The current sensor 3 measures (that is, detects) the value of the current flowing through the secondary battery group 2 and includes a sensor element 6 and a sensor circuit 7. The current sensor 3 has a function as a current measurement unit. The sensor element 6 is provided on the wiring 8 that connects the positive electrode of the secondary battery group 2 and a load (not shown) (for example, a motor). The sensor circuit 7 inputs a measurement signal (that is, an analog voltage signal) of a current value measured by the sensor element 6, performs AD conversion on the input measurement signal, and sets a digital measurement signal after AD conversion to a set cycle (for example, It is configured to transmit to the battery ECU 4 at a cycle of 10 ms). In the case of this configuration, communication between the sensor circuit 7 and the main microcomputer 10 is one-way communication (that is, communication from the sensor circuit 7 toward the main microcomputer 10).

電池ECU4は、監視IC群9と、メインマイコン10と、電源供給スイッチ11とを備えている。監視IC群9は、複数個(例えばn個)の監視IC(電圧計測部)12を有している。n個の監視IC12は、二次電池群2をn個の二次電池グループにグループ分けした構成において、各二次電池グループの電圧をそれぞれ計測(即ち、検出または監視)する機能を有する。監視IC群9または監視IC12は、電圧計測部としての機能を有する。尚、各二次電池グループは、二次電池5を例えば12〜24個程度直列接続して構成されている。   The battery ECU 4 includes a monitoring IC group 9, a main microcomputer 10, and a power supply switch 11. The monitoring IC group 9 has a plurality (for example, n) of monitoring ICs (voltage measuring units) 12. The n monitoring ICs 12 have a function of measuring (that is, detecting or monitoring) the voltage of each secondary battery group in a configuration in which the secondary battery group 2 is grouped into n secondary battery groups. The monitoring IC group 9 or the monitoring IC 12 has a function as a voltage measurement unit. Each secondary battery group is configured by connecting, for example, about 12 to 24 secondary batteries 5 in series.

監視IC群9のn個の監視IC12は、図2に示すように、例えばリングバッファ方式でメインマイコン10に接続されている。この場合、メインマイコン10に最も近い1番目の監視IC12は、メインマイコン10から電圧データ取得指示(即ち、計測指示)の情報を受信すると、この電圧データ取得指示の情報を2番目の監視IC12へ送信すると共に、1番目の二次電池グループの電圧を計測開始する。2番目の監視IC12は、1番目の監視IC12から電圧データ取得指示を受信すると、この電圧データ取得指示を3番目の監視IC12へ送信すると共に、2番目の二次電池グループの電圧を計測開始する。以下、3番目以降の監視IC12も、それぞれ同様にして、電圧データ取得指示を次の監視IC12へ送信すると共に、3番目以降の二次電池グループの電圧を計測開始する。   As shown in FIG. 2, n monitoring ICs 12 in the monitoring IC group 9 are connected to the main microcomputer 10 by, for example, a ring buffer method. In this case, when the first monitoring IC 12 closest to the main microcomputer 10 receives the information on the voltage data acquisition instruction (ie, the measurement instruction) from the main microcomputer 10, the information on the voltage data acquisition instruction is sent to the second monitoring IC 12. At the same time as the transmission, the measurement of the voltage of the first secondary battery group is started. When receiving the voltage data acquisition instruction from the first monitoring IC 12, the second monitoring IC 12 transmits this voltage data acquisition instruction to the third monitoring IC 12 and starts measuring the voltage of the second secondary battery group. . Thereafter, the third and subsequent monitoring ICs 12 similarly transmit voltage data acquisition instructions to the next monitoring IC 12 and start measuring the voltages of the third and subsequent secondary battery groups.

尚、図2において、メインマイコン10と1番目の監視IC12との間における電圧データ取得指示を通信するのに要する通信時間tdel、及び、隣接する2個の監視IC12の間における電圧データ取得指示を通信するのに要する通信時間tdelは、数百ns程度の時間である。ここで、メインマイコン10から各監視IC12への通信時間の平均値をtaveとすると、
tave=((n+1)/2)*tdel
となる。
In FIG. 2, the communication time tdel required to communicate the voltage data acquisition instruction between the main microcomputer 10 and the first monitoring IC 12 and the voltage data acquisition instruction between two adjacent monitoring ICs 12 are shown. The communication time tdel required for communication is about several hundred ns. Here, if the average value of the communication time from the main microcomputer 10 to each monitoring IC 12 is tave,
tave = ((n + 1) / 2) * tdel
It becomes.

また、各監視IC12は、各二次電池グループの電圧の計測が完了すると、計測した計測電圧信号(即ち、デジタルデータ)を隣接する監視IC12へ送信する。そして、隣接する監視IC12は、受信した計測電圧信号を更に次の監視IC12へ送信し、n番目の監視IC12は、受信した計測電圧信号をメインマイコン10へ送信するように構成されている。尚、各監視IC12による二次電池グループの電圧を計測完了するまでに要する時間(即ち、計測完了時間)ticは、上記tdelや上記taveに比べて長い時間であり、例えば数ms程度の時間である。   In addition, when the measurement of the voltage of each secondary battery group is completed, each monitoring IC 12 transmits the measured voltage signal (that is, digital data) to the adjacent monitoring IC 12. The adjacent monitoring IC 12 further transmits the received measurement voltage signal to the next monitoring IC 12, and the nth monitoring IC 12 is configured to transmit the received measurement voltage signal to the main microcomputer 10. The time required for completing the measurement of the voltage of the secondary battery group by each monitoring IC 12 (that is, the measurement completion time) tic is longer than tdel and tave, for example, about several ms. is there.

メインマイコン10は、電池ECU4の動作全般を制御するものであり、電流センサ3からの電流計測信号を入力すると共に、監視IC群9のN個の監視IC12からの各計測電圧信号を入力することにより、二次電池群2の状態を検出する機能を有している。メインマイコン10は、制御部としての機能を有する。また、メインマイコン10は、電源供給スイッチ11をオンオフ制御する機能を有する。尚、電源供給スイッチ11は、メインマイコン10に電源を供給する直流電源端子13と、電流センサ3のセンサ回路7に電源を供給する直流電源端子14との間に接続されている。直流電源端子13には、車両に搭載された例えば12Vのバッテリ電源15からの電源が図示しない電源回路を介することにより所定電圧の直流電源が供給されている。この構成の場合、メインマイコン10が電源供給スイッチ11をオンすると、電流センサ3のセンサ回路7に電源が供給され、メインマイコン10が電源供給スイッチ11をオフすると、電流センサ3のセンサ回路7への電源供給が停止されるようになっている。   The main microcomputer 10 controls the overall operation of the battery ECU 4 and inputs current measurement signals from the current sensor 3 and inputs measurement voltage signals from the N monitoring ICs 12 in the monitoring IC group 9. Thus, it has a function of detecting the state of the secondary battery group 2. The main microcomputer 10 has a function as a control unit. Further, the main microcomputer 10 has a function of performing on / off control of the power supply switch 11. The power supply switch 11 is connected between a DC power supply terminal 13 that supplies power to the main microcomputer 10 and a DC power supply terminal 14 that supplies power to the sensor circuit 7 of the current sensor 3. A DC power supply having a predetermined voltage is supplied to the DC power supply terminal 13 by a power supply from, for example, a 12 V battery power supply 15 mounted on the vehicle via a power supply circuit (not shown). In the case of this configuration, when the main microcomputer 10 turns on the power supply switch 11, power is supplied to the sensor circuit 7 of the current sensor 3. When the main microcomputer 10 turns off the power supply switch 11, the sensor circuit 7 of the current sensor 3 is supplied. The power supply is stopped.

また、メインマイコン10は、監視IC群9のn個の監視IC12に電圧データ取得指示の情報を送信する。この場合、n個の監視IC12は、リングバッファ方式でメインマイコン10に接続されていることから、メインマイコン10が1番目の監視IC12に電圧データ取得指示の情報を送信すると、電圧データ取得指示の情報は、1番目の監視IC12から2番目の監視IC12へ、更に、2番目の監視IC12から3番目の監視IC12へ、・・・と順番に送信されていく。   Further, the main microcomputer 10 transmits voltage data acquisition instruction information to n monitoring ICs 12 in the monitoring IC group 9. In this case, since the n monitoring ICs 12 are connected to the main microcomputer 10 by the ring buffer method, when the main microcomputer 10 transmits the voltage data acquisition instruction information to the first monitoring IC 12, the voltage data acquisition instruction is transmitted. Information is sequentially transmitted from the first monitoring IC 12 to the second monitoring IC 12, and further from the second monitoring IC 12 to the third monitoring IC 12.

次に、上記構成の作用、特には、電池ECU4により二次電池群2の電流値と電圧値を同時に計測する制御について図3及び図4を参照して説明する。図3に示すように、メインマイコン10が時刻T1で、マイコンの定時処理として電流及び電圧の計測制御を開始すると、時刻T1から予め設定された時間t1が経過した時点、即ち、時刻T2で、メインマイコン10は電源供給スイッチ11をオンする。   Next, the operation of the above configuration, in particular, the control for simultaneously measuring the current value and the voltage value of the secondary battery group 2 by the battery ECU 4 will be described with reference to FIGS. As shown in FIG. 3, when the main microcomputer 10 starts current and voltage measurement control as timed processing of the microcomputer at time T1, when a preset time t1 has elapsed from time T1, that is, at time T2. The main microcomputer 10 turns on the power supply switch 11.

これにより、時刻T2で、電流センサ3は、電源が供給されることにより、イニシャル処理を開始し、イニシャル処理が完了した後の時点である時刻T3で、電流値の計測結果を取得する。この構成の場合、上記イニシャル処理に要する時間t2(即ち、時刻T2から時刻T3までの時間t2)は、予め設定された設定時間(即ち、第1の設定時間)であることから、メインマイコン10は、電源供給スイッチ11をオンする時点T1を制御することにより、電流値の計測結果を取得する時点T3(即ち、時刻T2+t2)を制御することができる。尚、電流センサ3は、時刻T4で、電流値計測後の後処理を実行し、時刻T5で、計測した電流値の情報をメインマイコン10へ送信する。そして、メインマイコン10は、時刻T5で、電流センサ3から送信された電流値の情報を受信する。   Thus, at time T2, the current sensor 3 starts the initial process when power is supplied, and acquires the current value measurement result at time T3, which is a time point after the initial process is completed. In this configuration, the time t2 required for the initial process (that is, the time t2 from the time T2 to the time T3) is a preset setting time (that is, the first setting time). Can control the time T3 (that is, time T2 + t2) at which the measurement result of the current value is acquired by controlling the time T1 when the power supply switch 11 is turned on. The current sensor 3 performs post-processing after the current value measurement at time T4, and transmits the measured current value information to the main microcomputer 10 at time T5. The main microcomputer 10 receives the current value information transmitted from the current sensor 3 at time T5.

また、メインマイコン10が時刻T10で、電圧データ取得指示の情報を、メインマイコン10に接続された1番目の監視IC12へ送信すると、上記時刻T10から通信時間tdel(即ち、第2の設定時間t3)経過した時点、即ち、時刻T20で、監視IC12は、メインマイコン10から電圧データ取得指示の情報を受信し、二次電池グループの電圧を計測開始する。そして、監視IC12は、上記時刻T20から計測完了時間tic(即ち、第2の設定時間t4)が経過した時点、即ち、時刻T30で、二次電池グループの電圧を計測完了し、電圧値の計測結果を取得する。そして、監視IC12は、時刻T40で、電圧値計測後の後処理を実行し、時刻T50で、計測した電圧値の情報をメインマイコン10へ送信する。そして、メインマイコン10は、時刻T50で、監視IC12から送信された電圧値の情報を受信する。この後、メインマイコン10は、電流センサ3からの電流値の情報と、監視IC12からの電圧値の情報とを受信完了した時点で、例えば時刻T6で、電源供給スイッチ11をオフする。   When the main microcomputer 10 transmits the information on the voltage data acquisition instruction to the first monitoring IC 12 connected to the main microcomputer 10 at time T10, the communication time tdel (that is, the second set time t3) from the time T10. The monitoring IC 12 receives the voltage data acquisition instruction information from the main microcomputer 10 and starts measuring the voltage of the secondary battery group at the elapsed time, that is, at time T20. Then, the monitoring IC 12 completes the measurement of the voltage of the secondary battery group when the measurement completion time tic (that is, the second set time t4) has elapsed from the time T20, that is, at the time T30, and measures the voltage value. Get the result. Then, the monitoring IC 12 executes post-processing after voltage value measurement at time T40, and transmits information on the measured voltage value to the main microcomputer 10 at time T50. The main microcomputer 10 receives the voltage value information transmitted from the monitoring IC 12 at time T50. After that, the main microcomputer 10 turns off the power supply switch 11 at time T6, for example, when reception of the current value information from the current sensor 3 and the voltage value information from the monitoring IC 12 is completed.

尚、電圧データ取得指示の情報を、メインマイコン10に接続された2番目、3番目、・・・の監視IC12へ送信する場合には、時刻T10からの通信時間tdelを、tdel*2、tdel*3、・・・とする。また、電圧データ取得指示の情報を、リングバッファ方式で接続された全て(n個)の監視IC12へ送信する場合には、上記通信時間tdelに代えて、メインマイコン10から各監視IC12への通信時間の平均値である通信時間taveを用いることが好ましい。   If the information on the voltage data acquisition instruction is transmitted to the second, third,... Monitoring ICs 12 connected to the main microcomputer 10, the communication time tdel from the time T10 is set to tdel * 2, tdel. * 3. Further, when the information on the voltage data acquisition instruction is transmitted to all (n) monitoring ICs 12 connected by the ring buffer method, the communication from the main microcomputer 10 to each monitoring IC 12 is performed instead of the communication time tdel. It is preferable to use a communication time tave which is an average value of time.

さて、メインマイコン10によって、二次電池群2の電流値と電圧値を同時に計測するためには、時刻T3と、時刻T30を一致させるように、即ち、ズレが所定範囲内になるように制御すれば良い。即ち、メインマイコン10において、時刻T3(即ち、時刻T2+t2)から、「通信時間tdel+計測完了時間tic」だけ前の時点を計算して求め、この計算した時点を時刻T10と設定する。そして、この設定した時点T10で、メインマイコン10から監視IC12へ電圧データ取得指示の情報を送信するように制御する。これにより、メインマイコン10は、二次電池群2の電流値と電圧値をほぼ同時に計測することができる。尚、n番目の監視IC12で計測する場合には、通信時間tdelの代わりに、通信時間tdel*nを用いて計算し、全ての監視IC12で計測する場合には、通信時間tdelの代わりに、通信時間taveを用いて計算する。   Now, in order to simultaneously measure the current value and the voltage value of the secondary battery group 2 by the main microcomputer 10, control is performed so that the time T3 and the time T30 coincide with each other, that is, the deviation is within a predetermined range. Just do it. That is, the main microcomputer 10 calculates and obtains a time point “communication time tdel + measurement completion time tic” before time T3 (ie, time T2 + t2), and sets this calculated time point as time T10. Then, at this set time T10, control is performed so as to transmit information on a voltage data acquisition instruction from the main microcomputer 10 to the monitoring IC 12. Thereby, the main microcomputer 10 can measure the current value and the voltage value of the secondary battery group 2 almost simultaneously. When measurement is performed by the nth monitoring IC 12, calculation is performed using the communication time tdel * n instead of the communication time tdel. When measurement is performed by all the monitoring ICs 12, instead of the communication time tdel, Calculate using the communication time tave.

また、図3においては、電流センサ3が計測した電流値の情報をメインマイコン10へ送信する時刻T5を、監視IC12が計測した電圧値の情報をメインマイコン10へ送信する時刻T50よりも前になるように制御したが、時刻T5が時刻T50よりも後になるように制御しても良いし、時刻T5と時刻T50がほぼ一致するように制御しても良い。   In FIG. 3, the time T5 when the current value information measured by the current sensor 3 is transmitted to the main microcomputer 10 is set before the time T50 when the voltage value information measured by the monitoring IC 12 is transmitted to the main microcomputer 10. However, the time T5 may be controlled to be later than the time T50, or the time T5 and the time T50 may be substantially matched.

また、図4のフローチャートは、メインマイコン10による二次電池群2の電流値と電圧値を同時に計測する制御の内容を示す。この図4のステップS10では、メインマイコン10は、図3の時刻T2で、電源供給スイッチ11をオンする。続いて、ステップS20へ進み、メインマイコン10は、上記時刻T2、イニシャル処理に要する時間t2とに基づいて時刻T3を算出し、算出したT3と、通信時間tdel(または通信時間tave)と、計測完了時間ticとに基づいて時刻T10を算出する。   Further, the flowchart of FIG. 4 shows the content of the control for simultaneously measuring the current value and the voltage value of the secondary battery group 2 by the main microcomputer 10. In step S10 in FIG. 4, the main microcomputer 10 turns on the power supply switch 11 at time T2 in FIG. Subsequently, the process proceeds to step S20, and the main microcomputer 10 calculates a time T3 based on the time T2 and the time t2 required for the initial process, and calculates the calculated T3 and the communication time tdel (or communication time tave). A time T10 is calculated based on the completion time tic.

そして、ステップS30へ進み、上記算出した時刻T10に達したか否かを判断する。ここで、時刻T10に達したときには、ステップS40へ進み、メインマイコン10は、電圧データ取得指示の情報を監視IC12へ送信する。この後、ステップS50へ進み、時刻T3(即ち、時刻T30)に達すると、電流センサ3が電流値の計測結果を取得し、ほぼ同時に、監視IC12が電圧値の計測結果を取得する。   Then, the process proceeds to step S30, and it is determined whether or not the calculated time T10 has been reached. When the time T10 is reached, the process proceeds to step S40, and the main microcomputer 10 transmits information on the voltage data acquisition instruction to the monitoring IC 12. Thereafter, the process proceeds to step S50, and when time T3 (that is, time T30) is reached, the current sensor 3 acquires the measurement result of the current value, and the monitoring IC 12 acquires the measurement result of the voltage value almost simultaneously.

次いで、ステップS60へ進み、電流センサ3は、時刻T5で、計測した電流値の情報をメインマイコン10へ送信し、メインマイコン10は、電流センサ3から送信された電流値の情報を受信する。また、ステップS70へ進み、監視IC12は、時刻T50で、計測した電圧値の情報をメインマイコン10へ送信し、メインマイコン10は、電流センサ3から送信された電圧値の情報を受信する。尚、ステップS60とステップS70は実行順番が逆であっても良い。   Next, the process proceeds to step S60, and the current sensor 3 transmits the measured current value information to the main microcomputer 10 at time T5, and the main microcomputer 10 receives the current value information transmitted from the current sensor 3. In step S70, the monitoring IC 12 transmits the measured voltage value information to the main microcomputer 10 at time T50, and the main microcomputer 10 receives the voltage value information transmitted from the current sensor 3. Step S60 and step S70 may be executed in reverse order.

このような構成の本実施形態においては、電流センサ3に対して電源を供給するものであってメインマイコン10によりオンオフ制御される電源供給スイッチ1を設け、メインマイコン10によって、電源供給スイッチ11をオンするオンタイミングと、監視IC12に対して計測指示を送信する送信タイミングを制御することにより、電流センサ3による電流値の計測タイミングと監視IC12による電圧値の計測タイミングとのズレが所定範囲内になるように制御した。この構成によれば、電流センサ3への電源供給スイッチ11をオンした後、二次電池群2の電流値と電圧値を同時に計測することができるので、電流値と電圧値を同時取得可能になるまでに要する時間を短くすることができ、制御を安定化することができる。また、上記構成の場合、電流センサ3のセンサ回路7のクロック精度を低精度に構成しても、メインマイコン10の制御に支障はない。尚、上記構成によれば、二次電池群2の電流値と電圧値を同時に計測することにより、二次電池群2の状態、例えば内部抵抗を推定することが可能になる。   In the present embodiment having such a configuration, a power supply switch 1 that supplies power to the current sensor 3 and is controlled to be turned on / off by the main microcomputer 10 is provided, and the power supply switch 11 is set by the main microcomputer 10. By controlling the ON timing to turn on and the transmission timing to transmit a measurement instruction to the monitoring IC 12, the difference between the measurement timing of the current value by the current sensor 3 and the measurement timing of the voltage value by the monitoring IC 12 is within a predetermined range. Controlled to be. According to this configuration, since the current value and voltage value of the secondary battery group 2 can be measured simultaneously after the power supply switch 11 to the current sensor 3 is turned on, the current value and voltage value can be acquired simultaneously. It is possible to shorten the time required until the time is reached and to stabilize the control. In the case of the above configuration, the control of the main microcomputer 10 is not hindered even if the clock accuracy of the sensor circuit 7 of the current sensor 3 is configured to be low accuracy. In addition, according to the said structure, it becomes possible to estimate the state of the secondary battery group 2, for example, internal resistance, by measuring the electric current value and voltage value of the secondary battery group 2 simultaneously.

また、上記実施形態においては、メインマイコン10は、電流値を取得していないときには、電源供給スイッチ11をオフするように制御したので、必要なときだけ電流センサ3を起動させるため、電力消費量を低減することができる。   In the above embodiment, since the main microcomputer 10 controls the power supply switch 11 to be turned off when the current value is not acquired, the current sensor 3 is activated only when necessary. Can be reduced.

また、上記実施形態においては、電流センサ3は、電源供給スイッチ11がオンされて電源が供給された時点から、電流値を計測する時点に到達するまでに要する時間が、第1の設定時間t2であるように構成されているので、電流値及び電圧値を同時に計測したいタイミングに対して、いつ電流センサ3を電源オンすべきかを決定することができる。   In the above-described embodiment, the current sensor 3 has the first set time t2 from the time when the power supply switch 11 is turned on to the time when the current value is measured after the power is supplied. Therefore, it is possible to determine when the current sensor 3 should be turned on with respect to the timing at which the current value and the voltage value are to be measured simultaneously.

また、上記実施形態においては、メインマイコン10が電圧データ取得指示を監視IC12に送信した時点から、監視IC12が電圧データ取得指示を受信した時点までに要する時間が、第2の設定時間t3であるように構成されているので、電流値及び電圧値を同時に計測したいタイミングに対して、いつ監視IC12に対して電圧データ取得指示すべきかを決定することができる。   In the above embodiment, the time required from the time when the main microcomputer 10 transmits the voltage data acquisition instruction to the monitoring IC 12 until the time when the monitoring IC 12 receives the voltage data acquisition instruction is the second set time t3. Thus, it is possible to determine when the voltage data acquisition instruction should be given to the monitoring IC 12 with respect to the timing at which the current value and the voltage value are to be measured simultaneously.

また、上記実施形態においては、監視IC12は、フライングキャパシタ形式で電圧値を計測するように構成され、メインマイコン10から電圧データ取得指示を受信した時点から、電圧値を計測する時点に到達するまでに要する時間が、第3の設定時間t4であるように構成されているので、電流値及び電圧値を同時に計測したいタイミングに対して、いつ監視IC12に対して電圧データ取得指示すべきかを決定することができる。   In the above embodiment, the monitoring IC 12 is configured to measure the voltage value in the flying capacitor format, from the time when the voltage data acquisition instruction is received from the main microcomputer 10 until the time when the voltage value is measured. Is determined to be the third set time t4, so it is determined when the voltage data acquisition instruction should be given to the monitoring IC 12 at the timing at which the current value and the voltage value are to be measured simultaneously. be able to.

また、上記実施形態においては、メインマイコン10は、電源供給スイッチ11をオンした時点から、第1の設定時間t2から第2の設定時間t3及び第3の設定時間t4を引いた時間が経過した時点で、電圧データ取得指示を監視IC12に送信するように制御したので、メインマイコン10によりタイミングを制御して電流値及び電圧値の同時取得が可能になることから、意図したタイミングで二次電池群2の内部抵抗を検出することができる。   In the above embodiment, the main microcomputer 10 has elapsed from the time when the power supply switch 11 is turned on by subtracting the second set time t3 and the third set time t4 from the first set time t2. At this time, since the voltage data acquisition instruction is controlled to be transmitted to the monitoring IC 12, the timing can be controlled by the main microcomputer 10 so that the current value and the voltage value can be acquired at the same time. The internal resistance of group 2 can be detected.

図5及び図6は、本発明の第2実施形態を示すものである。尚、第1実施形態と同一構成には、同一符号を付している。この第2実施形態では、二次電池群2の電流値を計測する制御を設定時間おきに複数回実行し、且つ、各電流値の計測と同時に電圧値を計測する制御を実行している。   5 and 6 show a second embodiment of the present invention. In addition, the same code | symbol is attached | subjected to the same structure as 1st Embodiment. In the second embodiment, the control for measuring the current value of the secondary battery group 2 is executed a plurality of times every set time, and the control for measuring the voltage value is executed simultaneously with the measurement of each current value.

図5において、電源供給スイッチ11をオンしてから二次電池群2の電流値と電圧値を同時に計測する1回目の計測制御までは、即ち、時刻T1から時刻T50までの制御は、第1実施形態と同じである。この後、電流センサ3は、時刻T6で、電流取得前処理を開始し、電流取得前処理が完了した後の時点である時刻T7で、電流値の計測結果を取得する。尚、電流センサ3は、時刻T8で、電流値計測後の後処理を実行し、時刻T9で、計測した電流値の情報をメインマイコン10へ送信する。そして、メインマイコン10は、時刻T9で、電流センサ3から送信された電流値の情報を受信するようになっている。   In FIG. 5, from the time when the power supply switch 11 is turned on until the first measurement control for simultaneously measuring the current value and the voltage value of the secondary battery group 2, the control from the time T1 to the time T50 is the first. This is the same as the embodiment. Thereafter, the current sensor 3 starts current acquisition preprocessing at time T6, and acquires a current value measurement result at time T7, which is a time point after completion of the current acquisition preprocessing. The current sensor 3 executes post-processing after measuring the current value at time T8, and transmits information on the measured current value to the main microcomputer 10 at time T9. The main microcomputer 10 receives information on the current value transmitted from the current sensor 3 at time T9.

ここで、前回、計測した電流値の情報をメインマイコン10へ送信する時刻T5と、今回、計測した電流値の情報をメインマイコン10へ送信する時刻T9との間の時間t5が、前述した設定周期(例えば10msの送信周期)である。即ち、電流センサ3は、上記設定時間t5毎に計測した電流値の情報をメインマイコン10へ送信するように構成されている。   Here, the time t5 between the time T5 when the previously measured current value information is transmitted to the main microcomputer 10 and the time T9 when the currently measured current value information is transmitted to the main microcomputer 10 is set as described above. This is a period (for example, a transmission period of 10 ms). That is, the current sensor 3 is configured to transmit information on the current value measured at each set time t5 to the main microcomputer 10.

そして、この電流センサ3においては、前回、電流値を計測する時刻T3と、今回、電流値を計測する時刻T7との間の時間t6も、上記時間t5、即ち、前述した設定周期(例えば10msの送信周期)と同じである。従って、メインマイコン10は、電圧値を計測する2回目以降の制御においても、電圧データ取得指示の情報を監視IC12へ送信するタイミングを制御することにより、電流値と電圧値を同時に計測することが可能になる。   In the current sensor 3, the time t6 between the time T3 when the current value is measured last time and the time T7 when the current value is measured this time is also the time t5, that is, the set period (for example, 10 ms). Transmission cycle). Therefore, the main microcomputer 10 can simultaneously measure the current value and the voltage value by controlling the timing at which the voltage data acquisition instruction information is transmitted to the monitoring IC 12 in the second and subsequent control for measuring the voltage value. It becomes possible.

具体的には、メインマイコン10において、時刻T7(即ち、時刻T3+t6)から、「通信時間tdel+計測完了時間tic」だけ前の時点を計算して求め、この計算した時点を時刻T60と設定する。そして、この設定した時点T60で、メインマイコン10から監視IC12へ電圧データ取得指示の情報を送信するように制御する。これにより、メインマイコン10は、時刻T80(即ち、時刻T7)で、二次電池群2の電流値と電圧値をほぼ同時に計測することができる。尚、監視IC12は、時刻T90で、電圧値計測後の後処理を実行し、時刻T100で、計測した電圧値の情報をメインマイコン10へ送信する。そして、メインマイコン10は、時刻T100で、監視IC12から送信された電圧値の情報を受信する。   Specifically, the main microcomputer 10 calculates and obtains a time point “communication time tdel + measurement completion time tic” from time T7 (that is, time T3 + t6), and sets this calculated time point as time T60. Then, at this set time T60, control is performed so that information on the voltage data acquisition instruction is transmitted from the main microcomputer 10 to the monitoring IC 12. Thereby, the main microcomputer 10 can measure the current value and voltage value of the secondary battery group 2 almost simultaneously at time T80 (that is, time T7). The monitoring IC 12 executes post-processing after voltage value measurement at time T90, and transmits information on the measured voltage value to the main microcomputer 10 at time T100. The main microcomputer 10 receives the voltage value information transmitted from the monitoring IC 12 at time T100.

この後、メインマイコン10は、3回目以降の電流値と電圧値の同時計測処理について、上述した2回目の同時計測処理と同様にして実行することができる。そして、メインマイコン10は、電流値と電圧値の同時計測処理を予め決められた所定回数実行したら、その時点、即ち、例えば時刻T110で、電源供給スイッチ11をオフするように構成されている。   Thereafter, the main microcomputer 10 can execute the current value and voltage value simultaneous measurement processing for the third and subsequent times in the same manner as the second time simultaneous measurement processing described above. The main microcomputer 10 is configured to turn off the power supply switch 11 at the time, that is, for example, at time T110, when the current value and voltage value simultaneous measurement processing is executed a predetermined number of times.

また、図6のフローチャートは、メインマイコン10による二次電池群2の電流値と電圧値を同時に計測する処理を複数回実行する制御の内容を示す。尚、図6の制御は、電源供給スイッチ11がオンされているときに、設定時間(即ち、設定されたサンプリング間隔)毎に繰り返し実行される。図6のステップS210では、メインマイコン10は、回数カウンタに基づいて初回の測定であるか否か、即ち、回数カウンタが0であるか否かを判断する。ここで、初回の測定であるときには、ステップS220へ進み、メインマイコン10は、図5の時刻T2で、電源供給スイッチ11をオンする。   Moreover, the flowchart of FIG. 6 shows the content of the control which performs the process which measures simultaneously the electric current value and voltage value of the secondary battery group 2 by the main microcomputer 10 several times. Note that the control in FIG. 6 is repeatedly executed at set times (that is, set sampling intervals) when the power supply switch 11 is turned on. In step S <b> 210 of FIG. 6, the main microcomputer 10 determines whether or not the first measurement is based on the number counter, that is, whether or not the number counter is zero. Here, if it is the first measurement, the process proceeds to step S220, and the main microcomputer 10 turns on the power supply switch 11 at time T2 in FIG.

続いて、ステップS230へ進み、メインマイコン10は、各種データ処理を実行し、二次電池群2の電流値と電圧値を同時に計測する1回目の処理を実行する。この場合、図4のステップS20からステップS70の処理を実行する。この後、ステップS240へ進み、メインマイコン10は、回数カウンタをカウントアップする。そして、ステップS250へ進み、メインマイコン10は、回数カウンタに基づいて、電流値と電圧値の同時計測処理が設定された所定回数実行されたか否かを判断する。ここで、電流値と電圧値の同時計測処理が設定された所定回数実行されていないときには、「NO」へ進み、本制御を終了する。   Then, it progresses to step S230 and the main microcomputer 10 performs various data processing, and performs the 1st process which measures the electric current value and voltage value of the secondary battery group 2 simultaneously. In this case, the processing from step S20 to step S70 in FIG. 4 is executed. Thereafter, the process proceeds to step S240, and the main microcomputer 10 counts up the number counter. Then, the process proceeds to step S250, and the main microcomputer 10 determines whether or not the simultaneous measurement process of the current value and the voltage value has been executed a predetermined number of times based on the number counter. Here, when the current value and voltage value simultaneous measurement processing has not been executed a predetermined number of times, the process proceeds to “NO” and the present control is terminated.

また、上記ステップS250において、電流値と電圧値の同時計測処理が設定された所定回数実行されたときには、ステップS260へ進み、メインマイコン10は、例えば図5の時刻T110で、電源供給スイッチ11をオフする。そして、メインマイコン10は、回数カウンタを0クリアし、本制御を終了する。   In step S250, when the current value and voltage value simultaneous measurement processing is executed a predetermined number of times, the process proceeds to step S260, and the main microcomputer 10 turns the power supply switch 11 on, for example, at time T110 in FIG. Turn off. Then, the main microcomputer 10 clears the number counter to 0 and ends this control.

尚、ステップS230において、二次電池群2の電流値と電圧値を同時に計測する2回目以降の処理を実行する場合には、図4のステップS20において、時刻T10の代わりに、時刻T60を算出する処理を実行する。この場合、メインマイコン10は、上述したように、時刻T7(即ち、時刻T3+t5)から、「通信時間tdel+計測完了時間tic」だけ前の時点を計算して求め、この計算した時点を時刻T60と設定する。そして、ステップS30では、時刻T10の代わりに、時刻T60に達したか否かを判断する。この後は、ステップS40からステップS70の処理をほぼ同様に実行する。   In addition, in step S230, when performing the process after the 2nd time which measures the electric current value and voltage value of the secondary battery group 2 simultaneously, time T60 is calculated instead of time T10 in step S20 of FIG. Execute the process. In this case, as described above, the main microcomputer 10 calculates and obtains a time point that is “communication time tdel + measurement completion time tic” from time T7 (that is, time T3 + t5). Set. In step S30, it is determined whether or not time T60 has been reached instead of time T10. Thereafter, the processing from step S40 to step S70 is executed in substantially the same manner.

上述した以外の第2実施形態の構成は、第1実施形態の構成と同じ構成となっている。従って、第2実施形態においても、第1実施形態とほぼ同じ作用効果を得ることができる。尚、電流センサ3のセンサ回路7のクロック精度を低精度に構成しても、電流値を所定回数(例えば数回ないし数十回)程度計測する程度では、電流値測定の間隔である設定周期の誤差が大きくなることはなく、二次電池群2の電流値と電圧値を十分同時に計測することができる。   The configuration of the second embodiment other than that described above is the same as the configuration of the first embodiment. Therefore, in the second embodiment, substantially the same operational effects as in the first embodiment can be obtained. Even if the clock accuracy of the sensor circuit 7 of the current sensor 3 is configured to be low accuracy, a setting cycle that is an interval of current value measurement is sufficient to measure the current value a predetermined number of times (for example, several times to several tens of times). The current value and voltage value of the secondary battery group 2 can be measured sufficiently simultaneously.

また、上記第2実施形態においては、電流値と電圧値の同時計測処理を所定回数実行するように、即ち、ステップS250において回数カウンタに基づいて同時計測処理が所定回数実行されたか否かを判断するように構成したが、これに代えて、電流値と電圧値の同時計測処理の実行開始後の経過時間が予め設定された所定時間に達したか否かを判断するように構成しても良い。この場合、所定時間としては、電流値と電圧値の同時計測処理を例えば所定回数実行するのに必要な時間を適宜設定すれば良い。   In the second embodiment, it is determined whether or not the simultaneous measurement process of the current value and the voltage value is executed a predetermined number of times, that is, whether or not the simultaneous measurement process is executed a predetermined number of times based on the frequency counter in step S250. However, instead of this, it may be configured to determine whether or not the elapsed time after the start of the simultaneous measurement processing of the current value and the voltage value has reached a predetermined time set in advance. good. In this case, as the predetermined time, a time necessary for executing the current value and voltage value simultaneous measurement processing, for example, a predetermined number of times may be appropriately set.

例えば、電流値と電圧値の同時計測処理を1回の実行完了した時点、即ち、図5の時刻T3から経時を開始するタイマを設け、ステップS250において、上記タイマの経時時間が所定時間(即ち、所定回数をnとしたとき、t6*(n−1)よりも長く、且つ、t6*nよりも短く設定された時間)に達したか否かを判断するように構成することが好ましい。尚、t6は例えば10msの時間である。   For example, a timer for starting the lapse of time from the time when the simultaneous measurement processing of the current value and the voltage value is completed once, that is, the time T3 in FIG. 5, is provided. It is preferable to determine whether or not the predetermined number of times has reached n (a time set longer than t6 * (n−1) and shorter than t6 * n). Note that t6 is, for example, a time of 10 ms.

また、タイマの経時開始時点を、1回目の電流値と電圧値の同時計測処理の開始時点、即ち、時刻T2とした場合には、上記所定時間を、所定回数をnとしたとき、(t2+t6*(n−1))よりも長く、且つ、(t2+t6*n)よりも短く設定された時間とすれば良い。この構成の場合、タイマの経時開始時点(即ち、電流値及び電圧値を取得する処理を開始した時点)は、時刻T2でも良いし、時刻T3でも良いし、時刻T5でも良いし、時刻T1でも良いし、他の時刻でも良い。   Further, when the time elapsed start point of the timer is the start point of the first current value and voltage value simultaneous measurement process, that is, time T2, when the predetermined number of times is n, (t2 + t6) The time may be set to be longer than * (n-1)) and shorter than (t2 + t6 * n). In this configuration, the time lapse start time of the timer (that is, the time when the process of acquiring the current value and voltage value is started) may be time T2, time T3, time T5, or time T1. Good, or other times.

図面中、1は電池システム、2は二次電池群(組電池)、3は電流センサ(電流計測部)、4は電池ECU、5は二次電池、9は監視IC群(電圧計測部)、10はメインマイコン(制御部)、11は電源供給スイッチ、12は監視IC(電圧計測部)である。   In the drawings, 1 is a battery system, 2 is a secondary battery group (assembled battery), 3 is a current sensor (current measurement unit), 4 is a battery ECU, 5 is a secondary battery, and 9 is a monitoring IC group (voltage measurement unit). Reference numeral 10 denotes a main microcomputer (control unit), 11 denotes a power supply switch, and 12 denotes a monitoring IC (voltage measurement unit).

Claims (9)

組電池(2)の電流値を計測する電流計測部(3)と、
前記電流計測部(3)により計測された電流値を受信する制御部(10)と、
前記制御部(10)からの計測指示を受信したときに、前記組電池(2)の電圧値を計測し、計測した電圧値を前記制御部(10)に送信する電圧計測部(9、12)と、
前記電流計測部(3)に対して電源を供給するものであって、前記制御部(10)によりオンオフ制御される電源供給スイッチ(11)とを備え、
前記制御部(10)は、前記電源供給スイッチ(11)をオンするオンタイミングと、前記電圧計測部(9、12)に対して計測指示を送信する送信タイミングを制御することにより、前記電流計測部(3)による電流値の計測タイミングと前記電圧計測部(9、12)による電圧値の計測タイミングとのズレが所定範囲内になるように制御する組電池制御装置。
A current measuring unit (3) for measuring a current value of the assembled battery (2);
A control unit (10) for receiving a current value measured by the current measurement unit (3);
When the measurement instruction is received from the control unit (10), the voltage measurement unit (9, 12) measures the voltage value of the assembled battery (2) and transmits the measured voltage value to the control unit (10). )When,
A power supply switch (11) for supplying power to the current measuring unit (3) and controlled to be turned on and off by the control unit (10);
The control unit (10) controls the current measurement by controlling an on timing of turning on the power supply switch (11) and a transmission timing of transmitting a measurement instruction to the voltage measurement unit (9, 12). An assembled battery control device that controls a deviation between a current value measurement timing by the unit (3) and a voltage value measurement timing by the voltage measurement unit (9, 12) to be within a predetermined range.
前記制御部(10)は、電流値を取得していないときには、前記電源供給スイッチ(11)をオフするように制御する請求項1記載の組電池制御装置。   The assembled battery control device according to claim 1, wherein the control unit (10) controls the power supply switch (11) to be turned off when the current value is not acquired. 前記電流計測部(3)は、前記電源供給スイッチ(11)がオンされて電源が供給された時点から、電流値を計測する時点に到達するまでに要する時間が、第1の設定時間であるように構成されている請求項1または2記載の組電池制御装置。   The time required for the current measuring unit (3) to reach the time point at which the current value is measured from when the power supply switch (11) is turned on to supply power is the first set time. The assembled battery control device according to claim 1 or 2, configured as described above. 前記制御部(10)が計測指示を前記電圧計測部(9、12)に送信した時点から、前記電圧計測部(9、12)が前記計測指示を受信した時点までに要する時間が、第2の設定時間であるように構成されている請求項3記載の組電池制御装置。 The time required from the time when the control unit (10) transmits the measurement instruction to the voltage measurement unit (9, 12) until the time when the voltage measurement unit (9, 12) receives the measurement instruction is the second time. 4. The assembled battery control device according to claim 3 , wherein the battery pack control device is configured so as to have a set time. 前記電圧計測部(9、12)は、フライングキャパシタ形式で電圧値を計測するように構成され、前記制御部(10)から計測指示を受信した時点から、電圧値を計測する時点に到達するまでに要する時間が、第3の設定時間であるように構成されている請求項4記載の組電池制御装置。
The voltage measuring unit (9, 12) is configured to measure a voltage value in the form of a flying capacitor, and from the time when a measurement instruction is received from the control unit (10) until the time when the voltage value is measured is reached. The assembled battery control device according to claim 4 , wherein the time required for is configured to be a third set time.
前記制御部(10)は、前記電源供給スイッチ(11)をオンした時点から、前記第1の設定時間から前記第2の設定時間及び前記第3の設定時間を引いた時間が経過した時点で、計測指示を前記電圧計測部(9、12)に送信するように制御する請求項5記載の組電池制御装置。   The control unit (10), when a time obtained by subtracting the second set time and the third set time from the first set time has elapsed from the time when the power supply switch (11) is turned on. The assembled battery control device according to claim 5, wherein control is performed so as to transmit a measurement instruction to the voltage measurement unit (9, 12). 前記電流計測部(3)は、設定周期で電流値を計測して前記制御部(10)に送信するように構成されている請求項1記載の組電池制御装置。   The assembled battery control device according to claim 1, wherein the current measurement unit (3) is configured to measure a current value at a set cycle and transmit the current value to the control unit (10). 前記制御部(10)は、前記組電池(2)の電流値及び電圧値を取得した回数が所定回数に達したときに、前記電源供給スイッチ(11)をオフするように制御する請求項7記載の組電池制御装置。   The said control part (10) is controlled to turn off the said power supply switch (11), when the frequency | count which acquired the electric current value and voltage value of the said assembled battery (2) reaches predetermined number of times. The assembled battery control device described. 前記制御部(10)は、前記組電池(2)の電流値及び電圧値を取得する処理を開始した時点から所定時間が経過したときに、前記電源供給スイッチ(11)をオフするように制御する請求項7記載の組電池制御装置。
The control unit (10) controls the power supply switch (11) to be turned off when a predetermined time has elapsed from the start of the process of acquiring the current value and voltage value of the assembled battery (2). The assembled battery control device according to claim 7.
JP2015209804A 2015-10-26 2015-10-26 Battery controller Active JP6493155B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015209804A JP6493155B2 (en) 2015-10-26 2015-10-26 Battery controller

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015209804A JP6493155B2 (en) 2015-10-26 2015-10-26 Battery controller

Publications (2)

Publication Number Publication Date
JP2017083227A JP2017083227A (en) 2017-05-18
JP6493155B2 true JP6493155B2 (en) 2019-04-03

Family

ID=58712862

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015209804A Active JP6493155B2 (en) 2015-10-26 2015-10-26 Battery controller

Country Status (1)

Country Link
JP (1) JP6493155B2 (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP6639976B2 (en) * 2016-03-23 2020-02-05 Ntn株式会社 Deterioration determination device for secondary battery
JPWO2020084817A1 (en) * 2018-10-26 2021-10-14 住友電気工業株式会社 Battery monitoring system and physical quantity aggregation method
JP7253521B2 (en) * 2020-11-12 2023-04-06 プライムアースEvエナジー株式会社 battery monitoring system
JP7630414B2 (en) * 2021-11-24 2025-02-17 株式会社デンソーテン Battery monitoring system and battery monitoring device
JP7678742B2 (en) * 2021-11-26 2025-05-16 株式会社デンソー Battery Monitoring System

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007078443A (en) * 2005-09-13 2007-03-29 Yazaki Corp Battery state detection device
JP5099085B2 (en) * 2009-07-28 2012-12-12 株式会社デンソー Battery status monitoring device
JP5468846B2 (en) * 2009-08-25 2014-04-09 矢崎総業株式会社 Multi-battery battery status monitoring unit
US9147909B2 (en) * 2011-08-19 2015-09-29 Samsung Sdi Co., Ltd. Battery management system and method for synchronizing voltage and current of battery
JP6156029B2 (en) * 2013-09-30 2017-07-05 株式会社Gsユアサ Status monitoring device and status monitoring method

Also Published As

Publication number Publication date
JP2017083227A (en) 2017-05-18

Similar Documents

Publication Publication Date Title
JP6493155B2 (en) Battery controller
JP6093106B2 (en) Battery voltage detector
CN103094956B (en) For battery balanced apparatus and method
US10393820B2 (en) Secondary battery state detecting device and secondary battery state detecting method
US8648610B2 (en) Signal input circuit and integrated circuit
JP6200359B2 (en) Secondary battery internal temperature estimation device and secondary battery internal temperature estimation method
JP2008286781A (en) Device, method and program for detecting charged state of storage battery
JP5091473B2 (en) Battery pack control method, battery pack control circuit, charging circuit including the battery pack, and battery pack
EP2778701B1 (en) Secondary battery state detection device and secondary battery state detection method
WO2015156360A1 (en) Battery monitoring device
JP2012154641A (en) Battery state monitoring device
JP2012208067A (en) Battery voltage detection device
US20160069964A1 (en) Battery state detection device
JP5653881B2 (en) Secondary battery state detection device and secondary battery state detection method
JP2011027609A (en) System for monitoring state of battery pack
JP2018096803A (en) Internal resistance calculation device, method for calculating internal resistance, and internal resistance calculation program
EP2508905A2 (en) Battery voltage detector
JP2012104989A (en) Communication system
KR20150033081A (en) Current Measurement Apparatus and The Method of Using Temperature Dependent Resistance
US20250123336A1 (en) Battery monitoring system, battery monitoring device, and battery monitoring method
CN108139447A (en) Vehicle, device and method for determining the voltage of a battery in a string of a plurality of series-connected batteries of an electrochemical energy store
JP6156029B2 (en) Status monitoring device and status monitoring method
JP2013085353A (en) Battery monitoring device
JP5817157B2 (en) Secondary battery state determination method, secondary battery system
JP2024061624A (en) Battery monitoring system, battery monitoring device, measuring device, battery monitoring method, and battery monitoring program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180117

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20181122

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20181204

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20190116

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190205

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190218

R151 Written notification of patent or utility model registration

Ref document number: 6493155

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250