JP6617022B2 - Support pile arrival confirmation method of support pile and support pile construction method - Google Patents
Support pile arrival confirmation method of support pile and support pile construction method Download PDFInfo
- Publication number
- JP6617022B2 JP6617022B2 JP2015251062A JP2015251062A JP6617022B2 JP 6617022 B2 JP6617022 B2 JP 6617022B2 JP 2015251062 A JP2015251062 A JP 2015251062A JP 2015251062 A JP2015251062 A JP 2015251062A JP 6617022 B2 JP6617022 B2 JP 6617022B2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- support
- support layer
- elastic wave
- support pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Description
本発明は、支持杭の支持層到達確認方法および支持杭の施工方法に関する。 The present invention relates to a support layer arrival confirmation method for a support pile and a construction method for the support pile.
支持杭は、杭の先端(下端)を支持層に所定長貫入させることで、杭の先端部において支持力を確保して、上部構造物等の上載荷重を支持する。
支持杭の施工管理としては、杭長や支持層到達の確認、杭の建込精度(角度や位置等)の確認、杭径や鉄筋等の品質確認等を行う必要がある。
The support pile secures a supporting force at the tip end portion of the pile by allowing the tip end (lower end) of the pile to penetrate the support layer for a predetermined length, and supports an upper load such as an upper structure.
For the construction management of support piles, it is necessary to confirm pile length and support layer arrival, confirmation of pile construction accuracy (angle, position, etc.), quality confirmation of pile diameter, rebar, etc.
支持杭の杭長は、支持層に到達し得る長さに設定されている。支持層は、予め実施された地盤調査や既往の地盤データ等に基づいて作成された地層断面図から推定する。地層断面図は、局所的に実施したボーリングデータに基づいて作成するのが一般的である。 The pile length of the support pile is set to a length that can reach the support layer. The support layer is estimated from a ground layer cross-sectional view created based on previously conducted ground surveys, existing ground data, or the like. The formation cross section is generally created on the basis of locally performed boring data.
ところが、地層は必ずしも直線ではなく、傾斜や褶曲を伴うことがある。そのため、支持層の実際の位置(深さ)が、地層の傾斜や褶曲によって、地層断面図に示された支持層の位置と異なっている場合がある。支持層の深さが地層断面図と異なっていると、杭を設計通り施工した場合であっても、杭の先端が支持層に到達しないことになる。 However, the strata are not necessarily straight, and may be accompanied by slopes and folds. For this reason, the actual position (depth) of the support layer may differ from the position of the support layer shown in the formation cross-sectional view due to the inclination or folding of the formation. If the depth of the support layer is different from the formation cross section, the tip of the pile will not reach the support layer even if the pile is constructed as designed.
そのため、支持杭の施工は、掘削機のトルクや電流の変化を計測することで、杭の先端が支持層に到達することを確認しながら行うのが一般的である(例えば、特許文献1参照)。 Therefore, the construction of the support pile is generally performed while confirming that the tip of the pile reaches the support layer by measuring changes in the torque and current of the excavator (see, for example, Patent Document 1). ).
地盤内に転石や層厚が薄い岩盤層が介在していると、掘削機のトルクや電流が一時的に上昇してしまい、杭の先端が支持層に到達したと誤認してしまうおそれがある。また、施工記録の記入ミスや紛失等が生じると、杭の先端の支持層への到達が確認できなくなるおそれがある。 If there is a boulder or a bedrock layer with a small layer thickness in the ground, the torque and current of the excavator will rise temporarily, and it may be mistaken for the tip of the pile to reach the support layer. . In addition, if a construction record entry error or loss occurs, the arrival of the pile tip at the support layer may not be confirmed.
このような観点から、本発明は、支持杭の施工をより確実に行うことを可能とした支持杭の支持層到達確認方法および支持杭の施工方法を提案することを課題とする。 From such a viewpoint, an object of the present invention is to propose a support layer arrival confirmation method and a support pile construction method that enable the support pile to be constructed more reliably.
前記課題を解決するための本発明の支持杭の支持層到達確認方法は、支持層内に設定された起振点において弾性波を発生させ、前記起振点から平面的に離れた位置に形成された杭に設けた受信器によって前記弾性波を受信し、前記受信器によって受信した前記弾性波の到達時間または振幅によって前記杭の先端が支持層に到達しているか否かを確認することを特徴としている。 The method for confirming the arrival of a support layer of a support pile according to the present invention for solving the above-mentioned problem is that an elastic wave is generated at an excitation point set in the support layer, and is formed at a position apart from the excitation point in a plane. Receiving the elastic wave by a receiver provided on the pile, and confirming whether the tip of the pile has reached the support layer by the arrival time or amplitude of the elastic wave received by the receiver. It is a feature.
前記支持杭の支持層到達確認方法によれば、支持層を伝播した弾性波を受信することで、支持杭が支持層に到達したか否かを確認することができる。支持層を伝播する弾性波は、軟弱層を伝播する弾性波に比べて、到達時間が早く、また、振幅が大きく低下することなく伝達される。受信器によって受信した弾性波の到達時間や振幅を確認することで、支持杭の先端が支持層に到達したことを確認することができる。 According to the support layer arrival confirmation method of the support pile, it is possible to confirm whether or not the support pile has reached the support layer by receiving the elastic wave propagated through the support layer. The elastic wave propagating through the support layer is transmitted faster than the elastic wave propagating through the soft layer, and the amplitude is not greatly reduced. By confirming the arrival time and amplitude of the elastic wave received by the receiver, it can be confirmed that the tip of the support pile has reached the support layer.
弾性波を、支持層に到達している他の杭の先端から発振すれば、起振点を設けるためのボーリング孔等を施工する必要がないため効率的である。
また、前記弾性波を複数の杭に設けられた受信器によって受信すれば、複数の杭について、支持層への到達の確認を一度に行うことができるため、効率的である。
If the elastic wave is oscillated from the tip of another pile reaching the support layer, it is efficient because it is not necessary to construct a boring hole or the like for providing an oscillation point.
Moreover, if the said elastic wave is received by the receiver provided in the several pile, since the arrival to a support layer can be confirmed at once about several pile, it is efficient.
また、本発明の支持杭の施工方法は、地盤に杭を設置する杭設置工程と、支持層内に設けられた起振点において弾性波を発生させるとともに、前記杭に設けられた受信器によって前記弾性波を受信する計測工程と、前記受信器によって受信した前記弾性波の到達時間または振幅によって前記杭の先端が支持層に到達したか否かを確認する確認工程とを備えるものであって、前記確認工程において、前記杭の先端が支持層に到達したことが確認された場合は当該杭の圧入または打ち込みを終了し、前記杭の先端が支持層に到達していないことが確認された場合は当該杭をさらに圧入または打ち込むことを特徴としている。 Moreover, the construction method of the support pile according to the present invention includes a pile installation step of installing the pile on the ground, and an elastic wave is generated at an excitation point provided in the support layer, and a receiver provided in the pile. A measuring step for receiving the elastic wave, and a confirmation step for checking whether or not the tip of the pile has reached the support layer based on the arrival time or amplitude of the elastic wave received by the receiver. In the confirmation step, when it is confirmed that the tip of the pile has reached the support layer, the press-fitting or driving of the pile is finished, and it is confirmed that the tip of the pile has not reached the support layer. In some cases, the stake is further press-fitted or driven.
かかる支持杭の施工方法によれば、支持層を伝播させた弾性波を確認することで、杭の先端が支持層に到達したことを確認しているため、信頼性の高い施工が可能である。 According to the construction method of the support pile, since it is confirmed that the tip of the pile has reached the support layer by confirming the elastic wave propagated through the support layer, highly reliable construction is possible. .
本発明の支持杭の支持層到達確認方法および支持杭の施工方法によれば、支持杭の施工をより確実に行うことができる。 According to the support layer arrival confirmation method and the support pile construction method of the present invention, the support pile can be constructed more reliably.
本発明の実施形態では、図1に示すように、複数の支持杭1,1,…を有する建物Bについて、支持杭1の支持層G1への到達を確認しながら杭基礎の施工を行う場合について説明する。本実施形態では、図2に示すように、所定の間隔をあけて並設された5本の支持杭1,1,…が5列(計25本)配設された杭基礎を構築する場合について説明する。なお、杭基礎における支持杭1の本数や配置等は限定されるものではない。ここで、本明細書おける支持層2は、N値が50を超える硬質な地層をいう。
In embodiment of this invention, as shown in FIG. 1, about the building B which has several support piles 1, 1, ..., when performing a pile foundation construction, confirming the arrival to the support layer G1 of the support pile 1 Will be described. In this embodiment, as shown in FIG. 2, when constructing a pile foundation in which five support piles 1, 1,... Arranged in parallel at a predetermined interval are arranged in five rows (25 in total). Will be described. In addition, the number, arrangement | positioning, etc. of the support pile 1 in a pile foundation are not limited. Here, the
本実施形態の支持杭の施工方法は、杭設置工程と、計測工程と、確認工程とを備えている。
杭設置工程は、地盤G1,G2に支持杭1を設置する工程である。本実施形態では、プレボーリング工法によって、支持杭1を施工する場合について説明する。支持杭1は、オーガーによって地盤G1,G2を掘削することにより所定の深さの掘削孔を形成した後、この掘削孔に既成杭を挿入し、掘削孔の内壁と既成杭の外面との隙間に充填材を充填することにより施工する。なお、既成杭は、掘削孔に挿入した後、最後に掘削孔の底部に圧入または打ち込む。本実施形態では、既成杭として、中空の既成杭を使用する。
The construction method of the support pile of this embodiment is provided with the pile installation process, the measurement process, and the confirmation process.
A pile installation process is a process of installing the support pile 1 in the ground G1, G2. This embodiment demonstrates the case where the support pile 1 is constructed by a pre-boring method. The support pile 1 is formed by excavating the ground G1 and G2 with an auger to form an excavation hole having a predetermined depth, and then inserting the existing pile into the excavation hole, and a gap between the inner wall of the excavation hole and the outer surface of the existing pile. It is constructed by filling the material with filler. In addition, after inserting an existing pile into a drilling hole, it finally press-fits or drives in to the bottom part of a drilling hole. In this embodiment, a hollow ready-made pile is used as the ready-made pile.
なお、支持杭1の施工方式はプレボーリング工法に限定されるものではなく、例えば、鋼管ソイルセメント工法等の他の埋め込み杭工法や、油圧ハンマ(バイブロハンマ)工法等の打ち込み杭工法を採用してもよい。 In addition, the construction method of the support pile 1 is not limited to the pre-boring method. For example, another embedded pile method such as a steel pipe soil cement method or a driven pile method such as a hydraulic hammer method is adopted. Also good.
計測工程は、図3に示すように、支持層G1内に設けられた起振点2において弾性波を発生させるとともに、支持杭1に設けられた受信器3によって弾性波を受信する工程である。
本実施形態では、図2に示すように、杭群の中心に配設された支持杭1(以下、「起振杭11」という)の下端(底部)に起振器2を設置し、この起振器2によって支持層内で弾性波を発生させる。ここで、起振器2の構成は限定されるものではない。例えば、錘を落下させることにより振動を発生されるものや、回転時のブレを利用して振動を発生させるものを使用すればよい。
As shown in FIG. 3, the measurement step is a step of generating an elastic wave at the
In this embodiment, as shown in FIG. 2, the
なお、起振杭11(起振器2を設置する支持杭1)は、先端が支持層G1に到達しているものである必要がある。そのため、本実施形態では、事前の地質調査(ボーリング)が実施された位置に最も近く、支持層G1の位置(深さ)が把握されている位置に形成された支持杭1を起振杭11とする。
In addition, the vibration pile 11 (support pile 1 in which the
受信器3は、図3(a)に示すように、起振器2が設けられた起振杭11以外の支持杭1(以下、「受信杭12」という)の上端部に設けておく。受信器3は、起振杭11において発生させた弾性波を受信する。なお、弾性波の受信は、受信杭12毎に受信してもよいし、複数の支持杭1に受信器3を設置しておいた状態で、起振器2によって発信された弾性波を複数本の受信杭12よって一度に受信してもよい。
As shown in FIG. 3A, the
弾性波は、図3(a)に示すように、支持層G1と支持杭1(受信杭12)とを通過するルートa、起振器3から地盤G1,G2内を斜めに通過するルートb、および、起振杭11と地表面とを通過するルートcによって伝播されるものと予想される。ここで、支持層以外の地盤(以下、「軟弱層G2」という)は、支持層G1やコンクリート(支持杭1)等に比べて弾性波速度が小さい。例えば、N値2の砂質土の弾性波は約70m/s、N値5の粘性土の弾性波は約140m/sと推定することができる。一方、支持層G1の弾性波は約300m/s、コンクリートの弾性波は1000m/s以上と推定することができる。したがって、支持層G1を通過するルートaによって伝播された弾性波が最も早く受信される。
そのため、計測工程では、受信器3によって計測された弾性波のデータのうち、最も早く到達した弾性波を保存する。
As shown in FIG. 3 (a), the elastic wave has a route a passing through the support layer G1 and the support pile 1 (reception pile 12), and a route b passing through the ground G1 and G2 obliquely from the
Therefore, in the measurement process, the elastic wave that reaches the earliest among the elastic wave data measured by the
なお、図3(b)に示すように、起振点(起振器2)を支持杭1の頭部に設定した場合は、弾性波は、起振杭11から地盤を通過した後受信杭12を通過するルートdと、地表面を通過するルートeとが予想される。このとき、支持杭1の杭長が長い場合には、地表面を通過するルートeの伝播速度の方がルートdの伝播速度よりも早い場合がある。そのため、起振器2と受信器3との両方を支持杭1の頭部に設定すると、ルートdを伝播した弾性波とルートeを伝播した弾性波とを見分けることが難しい。したがって、起振点は、支持杭1(起振杭12)の下端に設定するのが望ましい。
In addition, as shown in FIG.3 (b), when setting an exciting point (exciter 2) to the head of the support pile 1, an elastic wave is a receiving pile after passing the ground from the exciting pile 11. A route d passing through 12 and a route e passing through the ground surface are expected. At this time, when the pile length of the support pile 1 is long, the propagation speed of the route e passing through the ground surface may be faster than the propagation speed of the route d. Therefore, if both the
確認工程は、受信器3によって受信した弾性波の到達時間によって支持杭1(受信杭12)の先端が支持層G1に到達したか否かを確認する工程である。
図4に示すように、支持層G1に傾斜や褶曲があることで、支持層G1に到達していない支持杭1は、弾性波wが軟弱層G2を通過することにより、支持層G1に到達している支持杭1と比べて、弾性波wの到達時間tが遅くなる。そのため、弾性波wの到達時間tを確認することで、支持杭1の先端が支持層G1に到達したか否かを確認することができる。
The confirmation step is a step of confirming whether or not the tip of the support pile 1 (reception pile 12) has reached the support layer G1 based on the arrival time of the elastic wave received by the
As shown in FIG. 4, the support pile 1 that has not reached the support layer G1 reaches the support layer G1 when the elastic wave w passes through the soft layer G2 because the support layer G1 has an inclination or a curvature. The arrival time t of the elastic wave w is delayed as compared with the supporting pile 1 that is doing. Therefore, by confirming the arrival time t of the elastic wave w, it is possible to confirm whether or not the tip of the support pile 1 has reached the support layer G1.
支持層G1の弾性波速度を、地質調査結果等によって予め把握している場合には、弾性波wの到達時間tと起振点(起振杭11)から受信器3までの水平距離Lとによって算出した弾性波速度と、支持層G1の弾性波速度とを比較することで、受信杭12の先端が支持層G1に到達しているか否かを確認する。
When the elastic wave velocity of the support layer G1 is grasped in advance based on the geological survey result or the like, the arrival time t of the elastic wave w and the horizontal distance L from the excitation point (excitation pile 11) to the
支持層G1の弾性波速度が不明の場合は、図5に示すように、弾性波の到達時間tと、起振器2から受信器3までの水平距離Lとの関係をグラフ化(プロット)することにより、各受信杭12の先端が支持層G1に到達したことを確認する。
When the elastic wave velocity of the support layer G1 is unknown, as shown in FIG. 5, the relationship between the arrival time t of the elastic wave and the horizontal distance L from the
支持層G1に到達した受信杭12に受信器3が設けられていれば、弾性波wの到達時間tと水平距離Lとの関係が、一定の範囲内に収まる。一方、受信杭12が支持層G2に到達していない場合には、弾性波wの到達時間tと水平距離Lとの関係が、一定の範囲内から外れる。そのため、複数の支持杭1の計測結果をグラフにまとめた結果、弾性波wの到達時間tと水平距離Lとの関係が、一定の範囲から外れる杭は、支持層G1に到達していないと判断する。
If the
なお、グラフには、起振器2から受信器3までの弾性波wの総到達時間t0の測定値から支持杭1の伝播時間t1を差し引いた値(到達時間t)をプロットする。これは、支持層G1の深さが同一ではなく、支持杭1同士の杭長が異なっている場合に、杭長の違いによって到達時間tに影響が及ぶことを無くすためである。支持層G1の土質が均一の場合、支持層G1の伝播時間(弾性波の到達時間t)と距離Lとの関係は直線関係になるため、異常値を発見しやすくなる。
In the graph, a value (arrival time t) obtained by subtracting the propagation time t 1 of the support pile 1 from the measured value of the total arrival time t 0 of the elastic wave w from the
なお、支持層G1となり得る地層には亀裂がある場合があるため、支持層G1は必ずしも均一ではない。そのため、支持杭1の支持層G1への到達の有無は、不均一性を考慮して判断する必要がある。
不均一性の判断は、ほぼ同一距離にある複数の受信杭12によって測定した弾性波の到達時間tを比較することにより行う。複数の到達時間tに比較して、突出した異常値を除いたデータの中から限値と下限値を設定し、この上限値と下限値との範囲内を正常範囲に設定する。一方、正常範囲を外れた値は、異常値と認定する。
In addition, since the formation which can become the support layer G1 may have a crack, the support layer G1 is not necessarily uniform. Therefore, it is necessary to determine whether or not the support pile 1 has reached the support layer G1 in consideration of non-uniformity.
The determination of the non-uniformity is made by comparing the arrival times t of the elastic waves measured by the plurality of receiving piles 12 at substantially the same distance. The limit value and the lower limit value are set from the data excluding the protruding abnormal values compared to the plurality of arrival times t, and the range between the upper limit value and the lower limit value is set as the normal range. On the other hand, a value outside the normal range is recognized as an abnormal value.
本実施形態では、まず、中心の支持杭1(起振杭11)から水平距離Lが最も離れた支持杭1(角部の支持杭1,1,…)への弾性波wの到達時間tと水平距離Lとの関係により、グラフを作成する。4本の支持杭1,1,…の計測結果をプロットしたら、異常値の有無を確認する。次に、各プロットにより上限値と下限値を設定し、原点(0,0)から上限値および下限値まで直線を引き、正常範囲を設定する。なお、異常値が発見された場合は、この値(異常値)を除外する。 In this embodiment, first, the arrival time t of the elastic wave w from the central support pile 1 (vibration pile 11) to the support pile 1 (the support piles 1, 1,. And a horizontal distance L, a graph is created. When the measurement results of the four support piles 1, 1,... Are plotted, the presence or absence of abnormal values is confirmed. Next, an upper limit value and a lower limit value are set by each plot, and a normal range is set by drawing a straight line from the origin (0, 0) to the upper limit value and the lower limit value. When an abnormal value is found, this value (abnormal value) is excluded.
以後、その他の受信杭12の測定結果をプロットし、正常範囲内であることを確認する。支持層G1の傾斜や褶曲によって支持杭1の先端が支持層G1に到達していない場合には、弾性波の到達時間tが遅れるため、プロットが正常範囲から外れた位置となる。 Thereafter, the measurement results of the other receiving piles 12 are plotted to confirm that they are within the normal range. When the tip of the support pile 1 does not reach the support layer G1 due to the inclination or bending of the support layer G1, since the arrival time t of the elastic wave is delayed, the plot is out of the normal range.
確認工程において、支持層G1に到達していないと判断された支持杭1(正常範囲から外れた支持杭1)は、支持杭1をさらに圧入または打ち込む。一方、支持層G1に到達していると判断された支持杭1は、既成杭の外面と掘削孔の内壁面との隙間に充填材を充填して、支持杭1の施工を完了させる。 In the confirmation step, the support pile 1 determined to have not reached the support layer G1 (the support pile 1 outside the normal range) further press-fits or drives in the support pile 1. On the other hand, the support pile 1 determined to have reached the support layer G1 is filled with a filler in the gap between the outer surface of the existing pile and the inner wall surface of the excavation hole, and the construction of the support pile 1 is completed.
なお、確認工程では、必要に応じて弾性波の振幅の大きさによって、支持杭1の支持層G1への到達の有無を確認する。
S波は、含水比を多量に含む粘性土等で減衰する。そのため、軟弱層G2が粘性土のケースや、支持層G1が風化して軟弱層化している場合は、弾性波の振幅を小さくすると、軟弱層G2(軟弱層化した支持層)中で減衰し、弾性波が伝播しなくなる。そのため、弾性波の振幅の大きさによって、軟弱層G2の介在を把握することができる。
In the confirmation process, whether or not the support pile 1 has reached the support layer G1 is confirmed by the magnitude of the amplitude of the elastic wave as necessary.
The S wave is attenuated by viscous soil containing a large amount of water content. Therefore, in the case where the soft layer G2 is a viscous soil or the support layer G1 is weathered and softened, if the amplitude of the elastic wave is reduced, the soft layer G2 is attenuated in the soft layer G2 (softened support layer). The elastic wave will not propagate. Therefore, the intervention of the soft layer G2 can be grasped by the magnitude of the amplitude of the elastic wave.
本実施形態によれば、支持層G1を伝播した弾性波wを受信することで、支持杭1の先端が支持層G1に到達したか否かを短時間で確認することができる。そのため、支持杭1の施工を効率的かつ確実に行うことができる。 According to this embodiment, it is possible to confirm in a short time whether or not the tip of the support pile 1 has reached the support layer G1 by receiving the elastic wave w propagated through the support layer G1. Therefore, the construction of the support pile 1 can be performed efficiently and reliably.
また、支持層G1の弾性波速度が不明な場合であっても、測定結果に基づいて作成した弾性波wの到達時間tと水平距離Lとの関係によって、支持杭1の先端が支持層G1に到達したか否かを確認することができる。
また、各支持杭1について支持層G1の到達を確認することで、支持層G1の三次元的な形状(地層の傾斜や風化の進捗度等)を把握することができる。
Even if the elastic wave velocity of the support layer G1 is unknown, the tip of the support pile 1 is supported by the support layer G1 depending on the relationship between the arrival time t of the elastic wave w created based on the measurement result and the horizontal distance L. It is possible to confirm whether or not
Further, by confirming the arrival of the support layer G1 for each support pile 1, it is possible to grasp the three-dimensional shape of the support layer G1 (the inclination of the formation, the progress of weathering, etc.).
以上、本発明に係る実施形態について説明した。しかし、本発明は、前述の実施形態に限られず、前記の各構成要素については、本発明の趣旨を逸脱しない範囲で、適宜変更が可能である。
前記実施形態では、弾性波の到達時間と振幅の大きさにより、支持杭1が支持層G1へ到達したか否かを確認したが、弾性波の到達時間または振幅の大きさのいずれか一方によって、支持杭1の支持層G1への到達を確認してもよい。
The embodiment according to the present invention has been described above. However, the present invention is not limited to the above-described embodiment, and the above-described components can be appropriately changed without departing from the spirit of the present invention.
In the above embodiment, whether or not the support pile 1 has reached the support layer G1 is confirmed based on the arrival time and the amplitude of the elastic wave, but depending on either the arrival time or the amplitude of the elastic wave. The arrival of the support pile 1 to the support layer G1 may be confirmed.
前記実施形態では、複数の支持杭を施工した後に、支持杭の支持層到達確認を行う場合について説明したが、支持層到達確認を行うタイミングは、これに限定されない。例えば、支持杭1を施工するたびに行ってもよい。すなわち、1の支持杭1の支持層への到達が確認されて、施工を完了させてから、次の支持杭1の施工を開始してもよい。 Although the said embodiment demonstrated the case where the support layer arrival confirmation of a support pile was performed after constructing a some support pile, the timing which performs a support layer arrival confirmation is not limited to this. For example, it may be performed every time the support pile 1 is constructed. That is, after the arrival of one support pile 1 to the support layer is confirmed and the construction is completed, the construction of the next support pile 1 may be started.
前記実施形態では、複数の支持杭1のうち、中心に配設された支持杭1を起振杭11として、下端に起振器2を設けたが、起振器2の設置個所はこれに限定されない。例えば、地盤に形成したボーリング孔に設けてもよい。
また、起振点(ボーリング孔等)は、支持杭施工箇所のエリア外に設定してもよい。
In the said embodiment, although the support pile 1 arrange | positioned in the center among the several support piles 1 was used as the vibration pile 11, the
Moreover, you may set an oscillation point (boring hole etc.) outside the area of a support pile construction location.
また、計測工程では、支持杭1の杭打ち止め管理時に生じる振動(弾性波)を、他の支持杭1(受信杭12)に設けた受信器によって測定してもよい。こうすることで、起振器2の使用に要する手間や費用を省略することができる。
Moreover, in a measurement process, you may measure the vibration (elastic wave) which arises at the time of pile stop management of the support pile 1 with the receiver provided in the other support pile 1 (reception pile 12). By carrying out like this, the effort and expense which are required for use of the
現場打ち杭の支持層到達確認を行う場合には、起振杭11の中心部に予め鋼管等を設けておくことで、中空の支持杭1を形成しておき、この鋼管を利用して起振器2を起振杭11の下端に設ければよい。
When confirming the arrival of the support layer of the cast-in-place pile, a hollow support pile 1 is formed by providing a steel pipe or the like in advance in the center of the vibration-generating pile 11, and the steel pipe is used to start the pile. The
また、オールケーシング工法において、本発明の支持杭の支持層到達確認方法を適用する場合には、ケーシング(鋼管)を地中に圧入した状態で、計測工程および確認工程を実施すればよい。 Moreover, in the all casing method, when the support layer arrival confirmation method of the support pile of the present invention is applied, the measurement process and the confirmation process may be performed in a state where the casing (steel pipe) is press-fitted into the ground.
1 支持杭(杭)
11 起振杭
12 受信杭
2 起振器
3 受信器
G1 支持層
G2 軟弱層
1 Support pile (pile)
DESCRIPTION OF SYMBOLS 11 Excitation pile 12
Claims (4)
前記起振点から平面視で離れた位置に形成された杭に設けた受信器によって前記弾性波を受信し、
前記受信器によって受信した前記弾性波の到達時間または振幅によって前記杭の先端が支持層に到達しているか否かを確認することを特徴とする、支持杭の支持層到達確認方法。 Generate elastic waves at the excitation point set in the support layer,
The elastic wave is received by a receiver provided on a pile formed at a position away from the excitation point in plan view,
A support layer arrival confirmation method for a support pile, wherein it is confirmed whether or not the tip of the pile has reached the support layer based on the arrival time or amplitude of the elastic wave received by the receiver.
支持層内に設けられた起振点において弾性波を発生させるとともに、前記杭に設けられた受信器によって前記弾性波を受信する計測工程と、
前記受信器によって受信した前記弾性波の到達時間または振幅によって前記杭の先端が支持層に到達したか否かを確認する確認工程と、を備える支持杭の施工方法であって、
前記確認工程において、前記杭の先端が支持層に到達したことが確認された場合は当該杭の圧入または打ち込みを終了し、前記杭の先端が支持層に到達していないことが確認された場合は当該杭をさらに圧入または打ち込むことを特徴とする、支持杭の施工方法。 Pile installation process to install piles on the ground,
A measurement step of generating an elastic wave at an excitation point provided in the support layer and receiving the elastic wave by a receiver provided in the pile,
A confirmation step of confirming whether or not the tip of the pile has reached the support layer by the arrival time or amplitude of the elastic wave received by the receiver, and a construction method of the support pile comprising:
In the confirmation step, when it is confirmed that the tip of the pile has reached the support layer, the press-fitting or driving of the pile is finished, and it is confirmed that the tip of the pile has not reached the support layer Is a method for constructing a support pile, wherein the pile is further press-fitted or driven.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015251062A JP6617022B2 (en) | 2015-12-24 | 2015-12-24 | Support pile arrival confirmation method of support pile and support pile construction method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2015251062A JP6617022B2 (en) | 2015-12-24 | 2015-12-24 | Support pile arrival confirmation method of support pile and support pile construction method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JP2017115397A JP2017115397A (en) | 2017-06-29 |
| JP6617022B2 true JP6617022B2 (en) | 2019-12-04 |
Family
ID=59231464
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2015251062A Active JP6617022B2 (en) | 2015-12-24 | 2015-12-24 | Support pile arrival confirmation method of support pile and support pile construction method |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP6617022B2 (en) |
Families Citing this family (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP7025220B2 (en) * | 2018-01-17 | 2022-02-24 | 道三 市原 | Vibration device |
| JP7134750B2 (en) * | 2018-07-04 | 2022-09-12 | 鹿島建設株式会社 | Investigation and reinforcement method of existing piles |
| JP7095188B1 (en) | 2022-01-06 | 2022-07-04 | 若築建設株式会社 | Bottoming judgment system and bottoming judgment method |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2003149215A (en) * | 2002-09-18 | 2003-05-21 | Token Koei:Kk | Soil strength measuring method and measuring apparatus thereof |
| JP4066196B2 (en) * | 2005-02-17 | 2008-03-26 | オリエンタル白石株式会社 | Construction method of foundation using calcareous ground as support layer |
| JP5062574B2 (en) * | 2008-08-05 | 2012-10-31 | 清水建設株式会社 | In-situ gel time estimation method for ground injection chemical |
| JP5249874B2 (en) * | 2009-08-07 | 2013-07-31 | 大成建設株式会社 | Ground evaluation apparatus and ground evaluation method |
| JP5484165B2 (en) * | 2010-04-09 | 2014-05-07 | 公益財団法人鉄道総合技術研究所 | Pile quality control method |
| JP4960492B2 (en) * | 2010-12-06 | 2012-06-27 | 新日本製鐵株式会社 | Foundation structure and construction method of foundation structure |
| JP2013087572A (en) * | 2011-10-21 | 2013-05-13 | Railway Technical Research Institute | Effect confirmation method for chemical injected ground |
-
2015
- 2015-12-24 JP JP2015251062A patent/JP6617022B2/en active Active
Also Published As
| Publication number | Publication date |
|---|---|
| JP2017115397A (en) | 2017-06-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6762800B2 (en) | Reinforcement method and structure of existing pile foundation | |
| JP6617022B2 (en) | Support pile arrival confirmation method of support pile and support pile construction method | |
| JP6296867B2 (en) | Installation method of stratified settlement meter and stratified settlement measurement system | |
| CN107503361A (en) | A kind of rock slope with along layer near cut soft layer stress monitoring and surrounding rock consolidation method | |
| JP2009174178A (en) | Construction method of underground structure | |
| Lande et al. | Effects of drilling for tieback anchors on surrounding ground: Results from field tests | |
| KR101674656B1 (en) | CIP retaining wall with steel tube | |
| JP5062574B2 (en) | In-situ gel time estimation method for ground injection chemical | |
| JP2017172115A (en) | Ground evaluation system, precast pile with acceleration sensor | |
| JP7134750B2 (en) | Investigation and reinforcement method of existing piles | |
| JP2018024985A (en) | Pile performance evaluation method | |
| JP2010031568A (en) | Aseismatic reinforcing construction method for existing foundation and aseismatic reinforcing structure of existing foundation | |
| JP5075094B2 (en) | Construction method and foundation structure of foundation structure in structure | |
| KR20200004615A (en) | Construction method for underground wall | |
| JP5484165B2 (en) | Pile quality control method | |
| JP7039418B2 (en) | Anchor selection method and anchor construction method | |
| WO2021211065A1 (en) | Pile installation system and method | |
| CN106592654A (en) | Monitoring method for perpendicularity of steel pipe pile | |
| JP2009162034A (en) | Construction method for structure foundation | |
| JP5584373B1 (en) | Sheet pile placing method | |
| Rashidyan et al. | Exploratory study of nondestructive parallel seismic testing challenges in estimating the depth of unknown wood bridge foundations | |
| JP7132012B2 (en) | Ground improvement foundation structure | |
| Gupta et al. | NDT techniques for determining depth of foundations | |
| JP2017180050A (en) | Ground evaluation device and ground evaluation method | |
| Halcomb et al. | High Strain Dynamic Testing of SPIN FIN™ Piles |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20181130 |
|
| A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20190924 |
|
| TRDD | Decision of grant or rejection written | ||
| A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20191105 |
|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20191111 |
|
| R150 | Certificate of patent or registration of utility model |
Ref document number: 6617022 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |