JP6715079B2 - Building connection structure - Google Patents
[go: Go Back, main page]

JP6715079B2 - Building connection structure - Google Patents

Building connection structure Download PDF

Info

Publication number
JP6715079B2
JP6715079B2 JP2016100859A JP2016100859A JP6715079B2 JP 6715079 B2 JP6715079 B2 JP 6715079B2 JP 2016100859 A JP2016100859 A JP 2016100859A JP 2016100859 A JP2016100859 A JP 2016100859A JP 6715079 B2 JP6715079 B2 JP 6715079B2
Authority
JP
Japan
Prior art keywords
ridge
building
floor material
floor
connection structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2016100859A
Other languages
Japanese (ja)
Other versions
JP2017206893A (en
Inventor
達夫 ▲高▼橋
達夫 ▲高▼橋
めぐみ 鍋谷
めぐみ 鍋谷
俊洋 藤井
俊洋 藤井
俊彦 衣川
俊彦 衣川
達彦 前田
達彦 前田
将児 爰野
将児 爰野
健太 市倉
健太 市倉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Takenaka Corp
Original Assignee
Takenaka Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Takenaka Corp filed Critical Takenaka Corp
Priority to JP2016100859A priority Critical patent/JP6715079B2/en
Publication of JP2017206893A publication Critical patent/JP2017206893A/en
Application granted granted Critical
Publication of JP6715079B2 publication Critical patent/JP6715079B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Building Environments (AREA)

Description

本発明は、建物の接続構造に関する。 The present invention relates to a connection structure for buildings.

下記特許文献1のエキスパンションジョイントでは、2構造物(建物A、B)間に跨るように1枚の可動板(床材)を設置し、地震によって各構造物が変位した際には、可動板が各構造物に対してスライドすることにより、2構造物間の相対変位を吸収している。 In the expansion joint of Patent Document 1 below, one movable plate (floor material) is installed so as to straddle two structures (buildings A and B), and when each structure is displaced by an earthquake, the movable plate is moved. Slides on each structure to absorb the relative displacement between the two structures.

特開2004−44205号公報JP, 2004-44205, A

しかし、上記特許文献1では2構造物間に1枚の可動板(床材)しか架け渡されていないため、各構造物間に生じる大きな変位を吸収するためには、可動板を大きくする必要がある。可動板を大きくすると重量が大きくなるので、地震時に可動板がスライドし難くなるなど、動作が不安定になる。 However, in Patent Document 1 described above, since only one movable plate (floor member) is bridged between two structures, it is necessary to enlarge the movable plate in order to absorb a large displacement generated between each structure. There is. If the movable plate is made larger, the weight becomes heavier, which makes it difficult to slide the movable plate during an earthquake, resulting in unstable operation.

本発明は上記事実を考慮して、大きな床材を用いずに建物の大きな変位を吸収できる建物の接続構造を提供することを目的とする。 The present invention has been made in view of the above circumstances, and an object thereof is to provide a connection structure for a building that can absorb a large displacement of the building without using a large floor material.

請求項1に記載の建物の接続構造は、間を空けて対向配置された2つの棟と、前記棟の間に架け渡され、前記棟に対してスライド及び回動可能に連結された複数の連結手段と、前記棟の間に配置され、複数の前記連結手段に支持されると共に前記複数の連結手段に回動可能に連結された梁材と、一方の前記棟と前記梁材との間に、及び他方の前記棟と前記梁材との間に架け渡され、一端部が前記梁材の長手方向へスライド可能に支持され、他端部が前記棟にスライド可能に支持された一対の床材と、を有し、
前記連結手段は、前記棟のスラブに固定された固定軸に対して長手方向に形成された長溝部がスライド及び回動可能に連結された複数の連結梁を備えている。
The connection structure for a building according to claim 1, wherein a plurality of ridges arranged to face each other with a space therebetween, and a plurality of bridges bridged between the ridges and slidably and rotatably connected to the ridge. Between the connecting means and the ridge, a beam member supported by the plurality of connecting means and rotatably connected to the plurality of connecting means, and between one of the ridge and the beam member And between the other ridge and the beam, and a pair of one end slidably supported in the longitudinal direction of the beam and the other end slidably supported by the ridge. possess and floor covering, the,
The connecting means includes a plurality of connecting beams in which long groove portions formed in a longitudinal direction with respect to a fixed shaft fixed to the slab of the ridge are slidably and rotatably connected.

請求項1に記載の建物の接続構造によると、2つの棟は、間を空けて対向配置されているので、地震時には独立して変位する。2つの棟の間には連結手段が架け渡されているが、連結手段は棟に対してスライド及び回動可能に連結されているので、棟は連結手段に拘束されず損傷しない。 According to the building connection structure of the first aspect, since the two buildings are opposed to each other with a space therebetween, they are independently displaced during an earthquake. Although the connecting means is bridged between the two buildings, the connecting means is slidably and rotatably connected to the building, so that the building is not restricted by the connecting means and is not damaged.

また、棟の間には梁材が配置され、この梁材は複数の連結手段によって支持され、連結手段に回動可能に連結されている。このため、地震時に各棟が変位しても、梁材は各棟の間に保持される。 Further, a beam member is arranged between the ridges, and the beam member is supported by a plurality of connecting means and is rotatably connected to the connecting means. Therefore, even if each building is displaced during an earthquake, the beam material is retained between the buildings.

さらに、この梁材と一方の棟及びこの梁材と他方の棟との間にはそれぞれ床材が架け渡されている。この床材は、各棟に対してスライド可能に支持されているので、2つの棟が対向面を接離させる方向へ変位した場合、各棟が床材に対してスライドし、棟の変位を吸収することができる。すなわち、2枚の床材によって2つの棟の相対変位を吸収することができる。このため、1枚の床材を2つの棟に架け渡す場合と比較して、大きな床材を用いずに建物の大きな変位を吸収できる。 Further, floor materials are bridged between this beam and one ridge and between this beam and the other ridge. Since this floor material is slidably supported in each building, when the two buildings are displaced in the direction to bring the facing surfaces into contact with each other, each building slides with respect to the floor material and the displacement of the building is prevented. Can be absorbed. That is, the relative displacement of the two buildings can be absorbed by the two floor materials. Therefore, compared with the case where one floor material is bridged over two buildings, a large displacement of the building can be absorbed without using a large floor material.

また、この床材は梁材の長手方向へスライド可能に支持されているので、2つの棟が、対向面がずれる方向(対向面に沿った方向)へ変位した場合、それぞれの床材が梁材の長手方向へ互いに異なる方向へずれる。すなわち、2枚の床材によって2つの棟の相対変位を吸収することができる。このため、1枚の床材を2つの棟に架け渡し2つの棟の相対変位を吸収する場合と比較して、床材1枚当たりのずれ量すなわち変位吸収量が約半分となる。したがって床材は、2つの棟の対向面がずれる方向の大きな変位を吸収することができる。 In addition, since this floor material is slidably supported in the longitudinal direction of the beam material, when the two ridges are displaced in the direction in which the facing surfaces are displaced (the direction along the facing surface), each floor material is It shifts in different directions in the longitudinal direction of the material. That is, the relative displacement of the two buildings can be absorbed by the two floor materials. For this reason, the amount of displacement per floor material, that is, the amount of displacement absorption, is about half compared to the case where one floor material is bridged over two buildings and the relative displacement of the two buildings is absorbed. Therefore, the floor material can absorb a large displacement in the direction in which the opposing surfaces of the two buildings are displaced.

請求項2に記載の建物の接続構造は、前記連結手段は、前記スラブに延設され前記スラブの対向面と平行に配置された長溝部に両端部に設けられた可動軸がスライド及び回動可能に連結された複数の連結梁をさらに備えている。 Connecting the building structure according to claim 2, wherein the connecting means, said slab extending to opposite surfaces parallel to disposed long groove provided at both ends to the movable shaft slide and rotation of said slab It further comprises a plurality of connecting beams that are connected as possible.

請求項2に記載の建物の接続構造によると、各棟のスラブに延設された長溝部には、第1連結梁の端部の可動軸がスライド及び回動可能に連結されている。このため、2棟が対向面を接離させる方向へ変位した場合、第1連結梁が2棟の変位に追随してスライドおよび回動する。この第1連結梁は複数設けられており、これらの第1連結梁に1本の梁材が回動可能に連結されている。このため、第1連結梁がスライドおよび回動しても、梁材は各棟に対しては移動せず、2棟の間に保持される。 According to the building connection structure of the second aspect, the movable shaft at the end of the first connecting beam is slidably and rotatably connected to the long groove portion extended to the slab of each ridge. Therefore, when the two buildings are displaced in the direction in which the facing surfaces are brought into contact with each other, the first connecting beam slides and rotates following the displacement of the two buildings. A plurality of the first connecting beams are provided, and one beam member is rotatably connected to the first connecting beams. Therefore, even if the first connecting beam slides and rotates, the beam member does not move with respect to each building and is held between the two buildings.

また、各棟のスラブに固定された固定軸には、第2連結梁の長溝部がスライド及び回動可能に連結されている。このため、2棟がそれぞれ対向面がずれる方向へ変位した場合、第2連結梁が、2棟の固定軸を結ぶ直線に沿うようにスライド及び回動する。このとき第2連結梁に梁材が回動可能に連結された連結位置は、2棟の固定軸の間に配置されるので、梁材は変位した2棟の間に保持される。 The long groove portion of the second connecting beam is slidably and rotatably connected to the fixed shaft fixed to the slab of each building. Therefore, when the two buildings are displaced in the directions in which the facing surfaces are displaced from each other, the second connecting beam slides and rotates along the straight line connecting the fixed axes of the two buildings. At this time, since the connecting position where the beam member is rotatably connected to the second connecting beam is arranged between the fixed shafts of the two buildings, the beam material is held between the two displaced buildings.

したがって、梁材は常に2棟の間の所定の位置に配置される。このため、床材を確実に支持することができる。 Therefore, the beam member is always arranged in a predetermined position between the two buildings. Therefore, the floor material can be reliably supported.

請求項3に記載の建物の接続構造は、前記梁材の端部には間柱が立設され、前記間柱には平常時に一方の前記棟と前記間柱との間を覆う第1壁パネルが取付けられ、他方の前記棟には平常時に他方の前記棟と前記間柱との間を覆う第2壁パネルが取付けられている。 In the connection structure for a building according to claim 3, a stud is erected at an end portion of the beam member, and a first wall panel that covers between the one ridge and the stud is attached to the stud at normal times. A second wall panel that covers a space between the other ridge and the studs is normally attached to the other ridge.

請求項3に記載の建物の接続構造によると、2棟の間の壁パネルが、第1壁パネルと第2壁パネルによって構成されている。このため、2棟の間の壁パネルを1枚で構成する場合と比較して、パネル1枚あたりの重量が小さく支持機構を簡易にすることができる。また、パネル1枚あたりの面積が小さく風圧による影響を受けにくい。 According to the building connection structure of the third aspect, the wall panel between the two buildings is constituted by the first wall panel and the second wall panel. Therefore, the weight per panel is small and the support mechanism can be simplified as compared with the case where the wall panel between the two buildings is composed of one sheet. In addition, the area per panel is small and it is not easily affected by wind pressure.

請求項4に記載の建物の接続構造は、一方の前記床材の端部と他方の前記床材の端部とを梁材の長手方向にスライド可能に連結するジョイント部と、前記梁材の長手方向に沿って延設された板材と、前記ジョイント部に形成され前記板材と係合する係合部と、を備えた床材落下防止機構を有する。 The connection structure for a building according to claim 4, wherein a joint portion that slidably connects one end of the floor material and the other end of the floor material in the longitudinal direction of the beam, and the beam The floor material fall prevention mechanism includes a plate member extending along the longitudinal direction and an engaging portion formed in the joint portion and engaging with the plate member.

請求項4に記載の建物の接続構造によると、梁材の板材と床材のジョイント部に形成された係合部が係合する。これにより、一方及び他方の床材は梁材の長手方向に沿ってスライドする。また、これらの床材同士の間に隙間が生じることを抑制でき、これらの床材が梁材から脱落することを抑制できる。 According to the building connection structure of the fourth aspect, the engaging portion formed in the joint portion of the plate member of the beam and the floor member is engaged. As a result, the one and the other floor materials slide along the longitudinal direction of the beam material. Further, it is possible to prevent a gap from being generated between the floor materials, and it is possible to suppress the floor materials from falling off from the beam material.

本発明に係る建物の接続構造によると、大きな床材を用いずに建物の大きな変位を吸収できる。 According to the building connection structure of the present invention, a large displacement of the building can be absorbed without using a large floor material.

(A)は本発明の実施形態に係る建物の接続構造における第2連結梁を示した立断面図であり、(B)は(A)のB−B線断面図である。(A) is a vertical cross-sectional view showing a second connecting beam in the building connection structure according to the embodiment of the present invention, and (B) is a cross-sectional view taken along line BB of (A). (A)は本発明の実施形態に係る建物の接続構造における第1連結梁を示した立断面図であり、(B)は(A)のB−B線断面図である。(A) is a vertical cross-sectional view showing a first connecting beam in the building connection structure according to the embodiment of the present invention, and (B) is a cross-sectional view taken along line BB of (A). 本発明の実施形態に係る建物の接続構造における受梁と床材との接合構造を示した部分断面図である。FIG. 3 is a partial cross-sectional view showing a joint structure between a beam and a floor material in the connection structure for a building according to the embodiment of the present invention. 本発明の実施形態に係る建物の接続構造が適用される2棟の平常時における状態を示した平面図である。It is a top view showing the state at the time of normal of two buildings to which the connection structure of a building concerning an embodiment of the present invention is applied. 本発明の実施形態に係る建物の接続構造が適用される2棟が互いに離れる方向に変位した場合における状態を示した平面図である。FIG. 3 is a plan view showing a state in which two buildings to which the building connection structure according to the embodiment of the present invention is applied are displaced in directions away from each other. 本発明の実施形態に係る建物の接続構造が適用される2棟が互いに近づく方向に変位した場合における状態を示した平面図である。FIG. 3 is a plan view showing a state in which two buildings to which the building connection structure according to the embodiment of the present invention is applied are displaced in directions toward each other. 本発明の実施形態に係る建物の接続構造が適用される2棟が互いにずれる方向に変位した場合における状態を示した平面図である。FIG. 3 is a plan view showing a state in which two buildings to which the building connection structure according to the embodiment of the present invention is applied are displaced in directions displaced from each other. (A)は本発明の実施形態に係る建物の接続構造が適用される2棟が何れも免震構造とされた例を示す立面図であり、(B)は免震構造とされた2棟が地震により互いに変位した状態を示す立面図であり、(C)は2棟のうち一方が免震構造とされ他方が非免震構造とされた例を示す立面図であり、(D)は免震構造とされた1棟が地震により変位した状態を示す立面図である。(A) is an elevation view showing an example in which two buildings to which the building connection structure according to the embodiment of the present invention is applied are both seismic isolated structures, and (B) is a seismic isolated structure It is an elevation view showing a state where the buildings are displaced from each other due to an earthquake, and (C) is an elevation view showing an example in which one of the two buildings has a base-isolated structure and the other has a non-isolated structure, D) is an elevation view showing a state in which one building having a seismic isolation structure is displaced by an earthquake.

(棟)
図1(A)に示すように、本実施形態の建物の接続構造は、棟12、22が互いに間を開けて対向配置された建物10に適用される。棟12の外周部には、棟12と棟22との対向面に平行な大梁14が延設されており、大梁14の上部にはスペーサー16を介してスラブ18が載置されている。同様に棟22の外周部には、棟12と棟22との対向面に平行な大梁24が延設されており、大梁24の上部には、スペーサー26を介してスラブ28が載置されている。
(Building)
As shown in FIG. 1A, the building connection structure according to the present embodiment is applied to a building 10 in which ridges 12 and 22 are arranged to face each other with a space therebetween. On the outer periphery of the ridge 12, a large beam 14 extending in parallel to the facing surfaces of the ridge 12 and the ridge 22 is provided, and a slab 18 is placed on the upper part of the large beam 14 via a spacer 16. Similarly, on the outer periphery of the ridge 22, a large beam 24 parallel to the facing surfaces of the ridge 12 and the ridge 22 is extended, and a slab 28 is placed on the upper part of the large beam 24 via a spacer 26. There is.

スペーサー16は上プレート16Aと、下プレート16Bと、上プレート16A及び下プレート16Bを連結する円筒状の固定軸16Cとを備えている。同様にスペーサー26は上プレート26Aと、下プレート26Bと、上プレート26A及び下プレート26Bを連結する円筒状の固定軸26Cとを備えている。 The spacer 16 includes an upper plate 16A, a lower plate 16B, and a cylindrical fixed shaft 16C connecting the upper plate 16A and the lower plate 16B. Similarly, the spacer 26 includes an upper plate 26A, a lower plate 26B, and a cylindrical fixed shaft 26C connecting the upper plate 26A and the lower plate 26B.

(連結梁)
図4に示すように、棟12の大梁14と棟22の大梁24には、第1連結梁30及び第2連結梁32がそれぞれ複数架け渡されている。なお、図4において大梁14、24は、その他の構成をわかりやすくするため、適宜省略して示されている。
(Connecting beam)
As shown in FIG. 4, a plurality of first connecting beams 30 and a plurality of second connecting beams 32 are bridged over the large beam 14 of the ridge 12 and the large beam 24 of the ridge 22, respectively. It should be noted that in FIG. 4, the girders 14 and 24 are appropriately omitted in order to facilitate understanding of other configurations.

図2(A)、(B)に示すように、第1連結梁30はウェブが対向するように間隔をあけて配置されたチャンネル材30A、30Bと、チャンネル材30A、30Bの端部が接合された2枚のエンドプレート30Cと、エンドプレート30Cよりも材軸方向内側の部分でチャンネル材30A、30Bに接合された可動軸30Dと、を含んで構成されている。なお、チャンネル材30A、30Bは、アングル材や鋼管などとしてもよい。また、エンドプレート30Cは必ずしも必要ではなく、チャンネル材30A、30Bの間に可動軸30Dが固定された形状を保持することができれば、適宜別の部材(例えばボルト及びナット、各種形鋼や折板等)でチャンネル材30A、30Bを固定したり、あるいは省略することができる。 As shown in FIGS. 2(A) and 2(B), the first connecting beam 30 joins the channel members 30A and 30B arranged at intervals so that the webs face each other and the ends of the channel members 30A and 30B. It is configured to include two end plates 30C that are formed and a movable shaft 30D that is joined to the channel members 30A and 30B at a portion inside the end plate 30C in the material axis direction. The channel members 30A and 30B may be angle members or steel pipes. In addition, the end plate 30C is not always necessary, and another member (for example, a bolt and a nut, various shaped steels or folded plates) can be appropriately used as long as the shape in which the movable shaft 30D is fixed between the channel members 30A and 30B can be maintained. Etc., the channel members 30A and 30B can be fixed or omitted.

図2(A)に示すように、可動軸30Dは第1連結梁30の上下方向に突出した円柱状の部材であり、一方の可動軸30Dは下端部が大梁14から張り出したブラケット14Bに溶接されたレール14Aに係合し、可動軸30Dの上端部がスラブ18の下面に埋設されたレール18Aに係合している。レール14Aとレール18Aは平面位置が略一致したチャンネル材であり、大梁14の延設方向に沿って配置されている。 As shown in FIG. 2A, the movable shaft 30D is a columnar member protruding in the vertical direction of the first connecting beam 30, and one movable shaft 30D is welded to the bracket 14B whose lower end portion projects from the girder 14. The upper end of the movable shaft 30D is engaged with the rail 18A embedded in the lower surface of the slab 18. The rails 14A and the rails 18A are channel materials whose planar positions are substantially the same, and are arranged along the extending direction of the girder 14.

同様に他方の可動軸30Dは下端部が大梁24から持ち出したブラケットに溶接されたレール24Aに係合し、上端部がスラブ28の下面に埋設されたレール28Aに係合している。レール24Aとレール28Aは平面位置が略一致したチャンネル材であり、大梁24の延設方向に沿って配置されている。 Similarly, the other movable shaft 30D has a lower end engaged with a rail 24A welded to a bracket carried out from the girder 24, and an upper end engaged with a rail 28A embedded in the lower surface of the slab 28. The rails 24A and the rails 28A are channel materials whose planar positions are substantially the same, and are arranged along the extending direction of the girder 24.

これにより、第1連結梁30の端部に形成された可動軸30Dは、棟12、22の対向面と平行にスライド及び回動可能とされている。なお、レール18A、28Aは本発明における長溝部の一例であり、図4に示すように、可動軸30Dのスライド範囲は棟12、22の想定される変位を吸収できる大きさとされている。 As a result, the movable shaft 30D formed at the end of the first connecting beam 30 is slidable and rotatable parallel to the facing surfaces of the ridges 12 and 22. The rails 18A and 28A are examples of the long groove portion in the present invention, and as shown in FIG. 4, the sliding range of the movable shaft 30D has a size capable of absorbing the expected displacement of the ridges 12 and 22.

なお、図4に示すように、第1連結梁30は後述する受梁40の長手方向に沿って複数設けられ、隣接する第1連結梁30同士は受梁40の長手方向に対して傾斜する角度が異なるように配置されているが、本発明の実施形態はこれに限らない。例えば柱などの躯体などとの干渉を考慮して、隣接する第1連結梁30同士が受梁40の長手方向に対して傾斜する角度が等しくなる(第1連結梁30同士が平行になる)ように配置してもよい。 As shown in FIG. 4, a plurality of first connecting beams 30 are provided along the longitudinal direction of the receiving beam 40 described later, and the adjacent first connecting beams 30 are inclined with respect to the longitudinal direction of the receiving beam 40. Although arranged so that the angles are different, the embodiment of the present invention is not limited to this. For example, in consideration of interference with a skeleton such as a pillar, the angles of inclination of the adjacent first connecting beams 30 with respect to the longitudinal direction of the receiving beam 40 become equal (the first connecting beams 30 become parallel to each other). You may arrange so.

図1(A)、(B)に示すように、第2連結梁32はウェブが対向するように間隔をあけて配置されたチャンネル材32A、32Bと、チャンネル材32A、32Bの端部が接合された2枚のエンドプレート32Cによって構成されている。 As shown in FIGS. 1(A) and 1(B), the second connecting beam 32 joins the channel members 32A and 32B arranged at intervals so that the webs face each other and the ends of the channel members 32A and 32B. The two end plates 32C are formed.

図1(B)に示すように、第2連結梁32は、大梁14に載置されたスペーサー16の固定軸16Cを、チャンネル材32Aのウェブとチャンネル材32Bのウェブの間に形成された長溝部で挟み込むようにして配置されている。固定軸16Cと第2連結梁32とは互いに接合されていない。同様に第2連結梁32は、大梁24に載置されたスペーサー26の固定軸26Cを、チャンネル材32Aのウェブとチャンネル材32Bのウェブの間に形成された長溝部で挟み込むようにして配置されている。固定軸26Cと第2連結梁32とは互いに接合されていない。 As shown in FIG. 1(B), in the second connecting beam 32, the fixed shaft 16C of the spacer 16 mounted on the girder 14 is formed between the web of the channel material 32A and the web of the channel material 32B. It is arranged so as to be sandwiched between the grooves. The fixed shaft 16C and the second connecting beam 32 are not joined to each other. Similarly, the second connecting beam 32 is arranged such that the fixed shaft 26C of the spacer 26 placed on the girder 24 is sandwiched by the long groove portion formed between the web of the channel material 32A and the web of the channel material 32B. ing. The fixed shaft 26C and the second connecting beam 32 are not joined to each other.

これにより、第2連結梁32は固定軸16Cと固定軸26Cとを通る直線上をスライド可能とされている。また、第2連結梁32は固定軸16Cと固定軸26Cとを軸として回動可能とされている。 Thereby, the second connecting beam 32 can be slid on a straight line passing through the fixed shaft 16C and the fixed shaft 26C. The second connecting beam 32 is rotatable about the fixed shaft 16C and the fixed shaft 26C.

このため、例えば棟12、22が互いに離れる方向に変位した場合、棟12の固定軸16C、棟22の固定軸26Cは、第2連結梁32に沿ってスライドする。また、棟12、22が互いにずれる方向に変位した場合、固定軸16C、26Cの移動に伴って、第2連結梁32は回動する。 Therefore, for example, when the ridges 12 and 22 are displaced in a direction away from each other, the fixed shaft 16C of the ridge 12 and the fixed shaft 26C of the ridge 22 slide along the second connecting beam 32. Further, when the ridges 12 and 22 are displaced in a direction in which they are displaced from each other, the second connecting beam 32 rotates as the fixed shafts 16C and 26C move.

なお、図4に示すように、第2連結梁32は受梁40の長手方向に沿って複数設けられ、平常時においては互いに平行に配置されている。つまり、隣接するスペーサー16同士の間隔と隣接するスペーサー26同士の間隔とが等しく形成され、スペーサー16の固定軸16Cとスペーサー26の固定軸26Cとを繋ぐ複数の第2連結梁32がそれぞれ、棟12に対する角度が等しく、かつ棟22に対する角度が等しく配置されている。なお、図4において第2連結梁32は2本配置されているが、3本以上配置されていてもよい。また、エンドプレート32Cは必ずしも必要ではなく、チャンネル材32A、32Bの間で固定軸16Cと固定軸26Cとがスライド及び回動できれば、適宜別の部材(例えばボルト及びナット、各種形鋼や折板等)でチャンネル材32A、32Bを固定したり、あるいは省略することができる。 As shown in FIG. 4, the plurality of second connecting beams 32 are provided along the longitudinal direction of the receiving beam 40 and are arranged in parallel with each other in normal times. That is, the interval between the adjacent spacers 16 is equal to the interval between the adjacent spacers 26, and the plurality of second connecting beams 32 connecting the fixed shaft 16C of the spacer 16 and the fixed shaft 26C of the spacer 26 are respectively formed. The angle with respect to 12 is equal, and the angle with respect to the ridge 22 is arranged equally. Although two second connecting beams 32 are arranged in FIG. 4, three or more second connecting beams 32 may be arranged. Further, the end plate 32C is not always necessary, and if the fixed shaft 16C and the fixed shaft 26C can slide and rotate between the channel members 32A and 32B, other members (for example, bolts and nuts, various shaped steels and folded plates) can be appropriately used. Etc., the channel members 32A, 32B can be fixed or omitted.

(受梁)
図4に示すように、棟12と棟22との間には、平常時において棟12と棟22との対向面に対して平行にH形鋼の受梁40が配置されている。受梁40は本発明における梁材の一例であり、棟12と棟22との空間の中央部に配置されている。
(Receiving beam)
As shown in FIG. 4, an H-shaped steel receiving beam 40 is arranged between the ridge 12 and the ridge 22 in parallel with the facing surfaces of the ridge 12 and the ridge 22 in normal times. The receiving beam 40 is an example of a beam member in the present invention, and is arranged in the center of the space between the ridge 12 and the ridge 22.

図1(A)、図2(A)に示すように、受梁40は、支持脚42を介して第1連結梁30及び第2連結梁32に載置されている。支持脚42の下端部からは回転軸44が下向きに突出しており、第1連結梁30のチャンネル材30A、30Bの間及び第2連結梁32のチャンネル材32A、30Bの間を貫通している。 As shown in FIGS. 1A and 2A, the receiving beam 40 is mounted on the first connecting beam 30 and the second connecting beam 32 via the support legs 42. A rotation shaft 44 projects downward from the lower end of the support leg 42 and penetrates between the channel members 30A and 30B of the first connecting beam 30 and between the channel members 32A and 30B of the second connecting beam 32. ..

なお、本実施形態において受梁40は第1連結梁30及び第2連結梁32の双方に載置されているが、本発明の実施形態はこれに限らない。例えば受梁40は第2連結梁32に載置して、第1連結梁30は受梁40から吊下げて支持する構成としてもよい。あるいは例えば受梁40は第1連結梁30に載置して、第2連結梁32を受梁40から吊下げて支持する構成とすることもできる。すなわち、受梁40は第1連結梁30及び第2連結梁32の少なくとも一方に支持させればよい。 Although the receiving beam 40 is placed on both the first connecting beam 30 and the second connecting beam 32 in the present embodiment, the embodiment of the present invention is not limited to this. For example, the receiving beam 40 may be placed on the second connecting beam 32, and the first connecting beam 30 may be suspended from the receiving beam 40 and supported. Alternatively, for example, the receiving beam 40 may be placed on the first connecting beam 30 and the second connecting beam 32 may be suspended from the receiving beam 40 and supported. That is, the receiving beam 40 may be supported by at least one of the first connecting beam 30 and the second connecting beam 32.

図2(A)に示すように、第1連結梁30において回転軸44が貫通する位置は、第1連結梁30の材軸方向の中心と略一致しており、チャンネル材30A、30B間には回転軸44の位置がずれないように、振れ止め30Eが接合されている。これにより、第1連結梁30は回転軸44を中心に回動可能とされている。 As shown in FIG. 2A, the position where the rotary shaft 44 penetrates in the first connecting beam 30 is substantially coincident with the center of the first connecting beam 30 in the material axis direction, and is between the channel members 30A and 30B. The steady rest 30E is joined so that the position of the rotary shaft 44 does not shift. As a result, the first connecting beam 30 is rotatable about the rotation shaft 44.

同様に図1(A)に示すように、第2連結梁32において回転軸44が貫通する位置は、第2連結梁32の材軸方向の中心と略一致しており、チャンネル材32A、32B間には回転軸44の位置がずれないように、振れ止め32Eが接合されている。これにより、第2連結梁32は回転軸44を中心に回動可能とされている。なお、第2連結梁32の振れ止め32Eは必ずしも必要ではなく、回転軸44は第2連結梁32の材軸方向の中心とずれた位置に配置してもよい。 Similarly, as shown in FIG. 1(A), the position where the rotary shaft 44 penetrates in the second connection beam 32 is substantially coincident with the center of the second connection beam 32 in the material axis direction, and the channel members 32A, 32B. A steady rest 32E is joined between them so that the position of the rotary shaft 44 does not shift. As a result, the second connecting beam 32 is rotatable about the rotation shaft 44. The steady rest 32E of the second connecting beam 32 is not always necessary, and the rotation shaft 44 may be arranged at a position deviated from the center of the second connecting beam 32 in the material axis direction.

(床材)
図1(A)に示すように、棟12と受梁40との間には床材52が架け渡され、棟22と受梁40との間には床材54が架け渡されている。
(Floor material)
As shown in FIG. 1(A), a floor material 52 is bridged between the ridge 12 and the receiving beam 40, and a floor material 54 is bridged between the ridge 22 and the receiving beam 40.

床材52の端部52Aは、棟12のスラブ18の外周部に形成された凹部18Bに載せ掛けられており、上方から床プレート19によって被覆されている。同様に、床材54の端部54Aは、棟22のスラブ28の外周部に形成された凹部28Bに載せ掛けられており、上方から床プレート29によって被覆されている。床プレート19、29はそれぞれスラブ18、28に固定されており、地震時には棟12、22に追随して動く。このため床プレート19、29は棟12、22に対しては動かないので、床プレート19、29の上部には床仕上げ材が適宜敷設することができる。 An end portion 52A of the floor member 52 is placed on a recess 18B formed on the outer peripheral portion of the slab 18 of the ridge 12, and is covered with a floor plate 19 from above. Similarly, the end portion 54A of the floor material 54 is placed on the recess 28B formed in the outer peripheral portion of the slab 28 of the ridge 22, and is covered with the floor plate 29 from above. Floor plates 19 and 29 are fixed to slabs 18 and 28, respectively, and follow the ridges 12 and 22 during an earthquake. Therefore, since the floor plates 19 and 29 do not move with respect to the ridges 12 and 22, floor finishing materials can be appropriately laid on the floor plates 19 and 29.

なお、平常時において床材52がスラブ18に載せ掛けられている幅L1は、固定軸16Cの中心から第2連結梁32のエンドプレート32Cまでの距離L2よりも大きく形成されている。これにより、棟12、22が互いに離れる方向に変位した際に、床材52がスラブ18から脱落することが抑制されている。床材54とスラブ28についても同様である。 In addition, the width L1 on which the floor material 52 is placed on the slab 18 in a normal state is formed to be larger than the distance L2 from the center of the fixed shaft 16C to the end plate 32C of the second connecting beam 32. This prevents the floor material 52 from falling off the slab 18 when the ridges 12 and 22 are displaced in a direction away from each other. The same applies to the floor material 54 and the slab 28.

(床材落下防止機構)
図3に示すように、床材52の端部52B、床材54の端部54Bには、床材52と床材54とを接合するジョイント部56が形成されている。
(Floor material fall prevention mechanism)
As shown in FIG. 3, a joint portion 56 that joins the floor material 52 and the floor material 54 is formed at the end portion 52B of the floor material 52 and the end portion 54B of the floor material 54.

ジョイント部56は、床材52の端部52Bに接合された溝形鋼56Aと、床材54の端部54Bに接合された溝形鋼56Bとが互いに係合することにより形成されている。これにより、床材52と床材54とは、互いに離れる方向(図3に矢印Hで示す方向)へ移動することが規制されている。 The joint portion 56 is formed by engaging the channel steel 56A joined to the end portion 52B of the floor member 52 and the channel steel 56B joined to the end portion 54B of the floor member 54 with each other. As a result, the floor material 52 and the floor material 54 are restricted from moving in the direction away from each other (the direction indicated by the arrow H in FIG. 3).

また、溝形鋼56Aと溝形鋼56Bとの間の隙間には係合溝56Cが形成され、係合溝56Cには、受梁40の上フランジから突出し、受梁40の長手方向に沿って延設された板材46が挿入されている。これにより床材52と床材54とは、受梁40の長手方向に沿ってスライド可能とされている。また、床材52と床材54とのジョイント部56が、受梁40の上部に保持されている。 Further, an engagement groove 56C is formed in a gap between the channel steel 56A and the channel steel 56B, and the engagement groove 56C projects from the upper flange of the receiving beam 40 and extends in the longitudinal direction of the receiving beam 40. The plate member 46 that has been extended is inserted. As a result, the floor material 52 and the floor material 54 are slidable along the longitudinal direction of the receiving beam 40. A joint portion 56 of the floor material 52 and the floor material 54 is held on the upper portion of the receiving beam 40.

(壁パネル)
図4に示すように、受梁40の端部には間柱60が立設されている。間柱60の上端部は受梁40と平行に延設された図示しない梁材によって繋がれており、間柱60は棟12及び棟22とは構造的に切り離されている。
(Wall panel)
As shown in FIG. 4, a stud 60 is provided upright at the end of the receiving beam 40. The upper end of the stud 60 is connected by a beam member (not shown) extending in parallel with the receiving beam 40, and the stud 60 is structurally separated from the ridges 12 and 22.

間柱60と棟12との間は、壁パネル62によって覆われている。壁パネル62の一端は、ヒンジ62Aによって間柱60に固定されており、他端は非固定とされている。このため、壁パネル62は図4に破線で示すようにヒンジ62Aを中心として回動可能とされている。 The space between the stud 60 and the ridge 12 is covered by a wall panel 62. One end of the wall panel 62 is fixed to the stud 60 by a hinge 62A, and the other end is not fixed. Therefore, the wall panel 62 is rotatable around the hinge 62A as shown by the broken line in FIG.

また、間柱60と棟22との間は、壁パネル64によって覆われている。壁パネル64の一端は、ヒンジ64Aによって棟22の外壁に固定されており、他端は非固定とされている。このため、壁パネル64は図4に破線で示すようにヒンジ64Aを中心として回動可能とされている。 The space between the stud 60 and the ridge 22 is covered by a wall panel 64. One end of the wall panel 64 is fixed to the outer wall of the ridge 22 by a hinge 64A, and the other end is not fixed. Therefore, the wall panel 64 is rotatable around the hinge 64A as shown by the broken line in FIG.

また、間柱60と棟12との間、間柱60と棟22との間にはそれぞれ、壁パネル62、64の内側に防水シート66が設けられており、屋外から棟12、22が連結された建物10の内部へ雨水が浸入することを抑制している。防水シート66は平常時においてたるみを持たせて設置されており、棟12、22が互いに離れる方向に変位した際や、ずれる方向に変位した場合にも破断しにくい。 Further, a waterproof sheet 66 is provided inside the wall panels 62 and 64 between the stud 60 and the ridge 12, and between the stud 60 and the ridge 22, respectively, and the ridges 12 and 22 are connected from the outside. Rainwater is prevented from entering the inside of the building 10. The waterproof sheet 66 is installed with a slack in normal times, and is unlikely to break when the ridges 12 and 22 are displaced in a direction away from each other or displaced from each other.

なお、本実施形態においては、壁パネル62は間柱60に固定され壁パネル64は棟22の外壁に固定されているが、本発明の実施形態はこれに限らない。例えば壁パネル62を棟12の外壁に固定したり、壁パネル64を間柱60に固定してもよい。すなわち、棟12と棟22との間の隙間を覆う壁パネルが2分割されていればよい。このようにすることで、壁パネル1枚当たりの重量が小さくなるので、大きなスパンの隙間を壁パネルで覆うことができる。 Although the wall panel 62 is fixed to the stud 60 and the wall panel 64 is fixed to the outer wall of the ridge 22 in the present embodiment, the embodiment of the present invention is not limited to this. For example, the wall panel 62 may be fixed to the outer wall of the ridge 12, or the wall panel 64 may be fixed to the stud 60. That is, the wall panel that covers the gap between the ridge 12 and the ridge 22 may be divided into two. By doing so, the weight per wall panel is reduced, so that a gap with a large span can be covered with the wall panel.

また、本実施形態において間柱60は受梁40の端部に立設されているが、本発明の実施形態はこれに限らない。例えば受梁40の端部に代えて、又は受梁40の端部に加えて、端部以外の場所に間柱を設置してもよい。この場合、該間柱と、棟12、22の内壁との間に内壁用の壁パネルを設置することで、棟12、22の内壁を、地震時の変位に追随させることができる。 Further, in the present embodiment, the studs 60 are erected on the end portions of the receiving beams 40, but the embodiment of the present invention is not limited to this. For example, instead of the end portion of the receiving beam 40 or in addition to the end portion of the receiving beam 40, the studs may be installed at a place other than the end portion. In this case, by installing a wall panel for the inner wall between the stud and the inner walls of the ridges 12 and 22, the inner walls of the ridges 12 and 22 can follow the displacement during an earthquake.

(下床材)
図1(A)に示すように、床材52、54の下方には、下床材70が設けられている。下床材70の端部70Aは受梁40に接合され、端部70Bはスラブ18、28に形成されたスリット18C、28Cにスライド可能に挿入されている。下床材70は受梁40の端部にのみ接合されており、図4に示すように、端部70Bが端部70Aよりも短い台形状とされている。なお、図4〜図7において下床材70は床材52の下方のみに描かれているが、図1(A)に示すように、床材54の下方にも設けられている。
(Lower floor material)
As shown in FIG. 1A, a lower floor material 70 is provided below the floor materials 52 and 54. An end portion 70A of the lower floor material 70 is joined to the receiving beam 40, and an end portion 70B is slidably inserted into slits 18C and 28C formed in the slabs 18 and 28. The lower floor material 70 is joined only to the end portion of the receiving beam 40, and as shown in FIG. 4, the end portion 70B has a trapezoidal shape shorter than the end portion 70A. Although the lower floor material 70 is depicted only below the floor material 52 in FIGS. 4 to 7, it is also provided below the floor material 54 as shown in FIG.

(作用・効果)
本実施形態の建物の接続構造によると、図4に矢印で示すように、第1連結梁30は回転軸44を中心に回動可能とされている(矢印M1)。さらに、第1連結梁30の端部に形成された可動軸30Dは、レール18A、28Aに沿って、棟12、22の対向面と平行にスライド可能とされている(矢印N1)。
(Action/effect)
According to the building connection structure of the present embodiment, as shown by the arrow in FIG. 4, the first connecting beam 30 is rotatable about the rotation shaft 44 (arrow M1). Further, the movable shaft 30D formed at the end of the first connecting beam 30 is slidable along the rails 18A and 28A in parallel with the facing surfaces of the ridges 12 and 22 (arrow N1).

また、第2連結梁32は回転軸44を中心に回動可能とされている(矢印M2)。さらに、固定軸16C、26Cは、第2連結梁32に沿ってスライド可能とされている(矢印N2)。 Further, the second connecting beam 32 is rotatable about the rotation shaft 44 (arrow M2). Further, the fixed shafts 16C and 26C are slidable along the second connecting beam 32 (arrow N2).

なお、図4における矢印M1、M2の方向は第1連結梁30、32の回動方向の一例であり、それぞれ逆向きにも回動可能である。同様に矢印N1、N2の方向は可動軸30D、固定軸16C、26Cのスライド方向の一例であり、それぞれ任意の方向にスライド可能である。第1連結梁30、32は、このような回動機構、スライド機構を備えることにより、棟12、22が互いに離れる方向、近づく方向、ずれる方向の何れの方向に相対変位した場合においても、当該変位に追随して変形することができる。 The directions of the arrows M1 and M2 in FIG. 4 are examples of the rotation directions of the first connection beams 30 and 32, and the first connection beams 30 and 32 can also rotate in opposite directions. Similarly, the directions of the arrows N1 and N2 are an example of the sliding directions of the movable shaft 30D and the fixed shafts 16C and 26C, and they can be slid in arbitrary directions. Since the first connecting beams 30 and 32 are provided with such a rotating mechanism and a sliding mechanism, even when the ridges 12 and 22 are displaced relative to each other in a direction in which they move away from each other, a direction in which they approach, or a direction in which they shift. It can be deformed following displacement.

図4には、地震力が作用していない平常時の状態が示されているが、建物10に地震による水平力が作用して、棟12、22がそれぞれ互いに離れる方向に相対変位した場合、棟12、22の位置関係は図5に示す状態になる。 FIG. 4 shows a normal state in which no seismic force is applied, but when horizontal force due to an earthquake acts on the building 10 and the buildings 12 and 22 are displaced relative to each other, The positional relationship between the ridges 12 and 22 is as shown in FIG.

つまり、図4に示す状態から、第1連結梁30の両端部の可動軸30Dがレール18Aに沿ってスライドし、第1連結梁30が受梁40の回転軸44を中心に回動し、また、棟12、22の固定軸16C、26Cが第2連結梁32に沿ってスライドして、図5に示す状態になる。このとき、回転軸44は第1連結梁30の材軸方向の中心に配置されているため、受梁40は棟12と棟22との隙間の中心に保持される。 That is, from the state shown in FIG. 4, the movable shafts 30D at both ends of the first connection beam 30 slide along the rails 18A, and the first connection beam 30 rotates about the rotation shaft 44 of the receiving beam 40. In addition, the fixed shafts 16C and 26C of the ridges 12 and 22 slide along the second connecting beam 32 to be in the state shown in FIG. At this time, since the rotating shaft 44 is arranged at the center of the first connecting beam 30 in the material axis direction, the receiving beam 40 is held at the center of the gap between the ridge 12 and the ridge 22.

これにより、受梁40と棟12に架け渡された床材52と、受梁40と棟22に架け渡された床材54とがそれぞれ、棟12と棟22に対してスライドし、棟12と棟22の変位を吸収する。 As a result, the floor member 52 spanning the receiving beam 40 and the ridge 12 and the floor member 54 spanning the receiving beam 40 and the ridge 22 slide with respect to the ridge 12 and the ridge 22, respectively. And absorbs the displacement of the ridge 22.

したがって、本実施形態の建物の接続構造は、受梁40を設けず1枚の床材で2棟間の相対変位を吸収する従来のエキスパンションジョイントと比較して、床材のサイズを小さくすることができる。 Therefore, the building connection structure of the present embodiment is to reduce the size of the floor material as compared with the conventional expansion joint in which the receiving beam 40 is not provided and the relative displacement between the two buildings is absorbed by one floor material. You can

次に、図4に示す状態から、建物10に地震による水平力が作用して、棟12、22がそれぞれ互いに近づく方向に相対変位した場合、棟12、22の位置関係は図6に示す状態になる。 Next, from the state shown in FIG. 4, when the horizontal force due to the earthquake acts on the building 10 and the buildings 12, 22 are relatively displaced in the directions toward each other, the positional relationship between the buildings 12, 22 is as shown in FIG. become.

つまり、図4に示す状態から、第1連結梁30の両端部の可動軸30Dがレール18A、28Aに沿ってスライドし、第1連結梁30が受梁40の回転軸44を中心に回動し、また、棟12、22の固定軸16C、26Cが第2連結梁32に沿ってスライドして、図6に示す状態になる。このとき、回転軸44は、第1連結梁30の材軸方向の中心に配置されているため、受梁40は棟12と棟22との隙間の中心に保持される。 That is, from the state shown in FIG. 4, the movable shafts 30D at both ends of the first connecting beam 30 slide along the rails 18A and 28A, and the first connecting beam 30 rotates about the rotation shaft 44 of the receiving beam 40. In addition, the fixed shafts 16C and 26C of the ridges 12 and 22 slide along the second connecting beam 32 to be in the state shown in FIG. At this time, since the rotating shaft 44 is arranged at the center of the first connecting beam 30 in the material axis direction, the receiving beam 40 is held at the center of the gap between the ridges 12 and 22.

これにより、受梁40と棟12に架け渡された床材52と、受梁40と棟22に架け渡された床材54とがそれぞれ、棟12と棟22に対してスライドし、棟12と棟22の変位を吸収する。 As a result, the floor member 52 spanning the receiving beam 40 and the ridge 12 and the floor member 54 spanning the receiving beam 40 and the ridge 22 slide with respect to the ridge 12 and the ridge 22, respectively. And absorbs the displacement of the ridge 22.

なお、図8(A)に示すように、本実施形態において棟12と棟22とは、互いに免震支承で支持された免震構造とされている。このため図8(C)に示すような一方の棟のみが免震構造とされている場合や、何れの棟も免震構造とされてない場合と比較して、地震時における棟12と棟22との相対的な変位が大きい。 As shown in FIG. 8A, in this embodiment, the ridge 12 and the ridge 22 have a seismic isolation structure in which they are supported by seismic isolation bearings. Therefore, as compared with the case where only one of the buildings has the seismic isolation structure as shown in FIG. 8C, or the case where neither of the buildings has the seismic isolation structure, the buildings 12 and 12 at the time of the earthquake The relative displacement with 22 is large.

すなわち、図8(B)に示す棟12と棟22とが互いに近づく方向に変位したときの変位量は、図8(D)に示す免震構造の棟と非免震構造の棟とが互いに近づく方向に変位したときの変位量よりも大きい。 That is, the displacement amount when the ridge 12 and the ridge 22 shown in FIG. 8B are displaced toward each other, the displacement amount of the seismic isolation structure and the non-seismic isolation structure shown in FIG. It is larger than the amount of displacement when it is displaced in the approaching direction.

本実施形態の建物の接続構造では、受梁40(図4等参照)を設けることにより、棟12と棟22とを繋ぐ床材1枚当たりが吸収する変位量を小さくしている。このため、受梁40を設けず1枚の床材で2棟間の相対変位を吸収する従来のエキスパンションジョイントと比較して、床材のサイズを小さくすることができる。 In the structure for connecting buildings according to the present embodiment, the receiving beams 40 (see FIG. 4 and the like) are provided to reduce the amount of displacement absorbed by each floor material that connects the ridge 12 and the ridge 22. Therefore, the size of the floor material can be reduced as compared with the conventional expansion joint in which the receiving beam 40 is not provided and the relative displacement between the two buildings is absorbed by one floor material.

なお、本実施形態の建物の免震構造が適用される建物10の棟12、22は何れも免震構造とされているが、何れか一方を非免震構造としてもよいし、双方を非免震構造としてもよい。また、本実施形態の建物の免震構造は、建物10の下階部分に適用してもよいし、上階部分に適用してもよい。あるいは下階部分から上階部分の各階に適用してもよい。 Although the ridges 12 and 22 of the building 10 to which the seismic isolation structure of the building of the present embodiment is applied are both seismic isolation structures, either one may be a non-seismic isolation structure, or both may be non-seismic isolation structures. It may have a seismic isolation structure. Further, the seismic isolation structure of the building of the present embodiment may be applied to the lower floor portion of the building 10 or to the upper floor portion thereof. Alternatively, it may be applied to each floor from the lower floor to the upper floor.

次に、図4に示す状態から、建物10に地震による水平力が作用して、棟12、22がそれぞれ互いにずれる方向(受梁40の長手方向)に相対変位した場合、棟12、22の位置関係は図7に示す状態になる。 Next, from the state shown in FIG. 4, when a horizontal force due to an earthquake acts on the building 10 and the buildings 12, 22 are displaced relative to each other in the directions (longitudinal direction of the receiving beam 40), the buildings 12, 22 The positional relationship is as shown in FIG.

つまり、図4に示す状態から、第1連結梁30の両端部の可動軸30Dがレール18A、28Aに沿ってスライドし、第2連結梁32が受梁40の回転軸44を中心に回動し、棟12、22の固定軸16C、26Cが第2連結梁32に沿ってスライドして、図7に示す状態になる。このとき、回転軸44は、第1連結梁30の材軸方向の中心に配置されているため、受梁40は棟12と棟22との空間の中央部に保持される。 That is, from the state shown in FIG. 4, the movable shafts 30D at both ends of the first connecting beam 30 slide along the rails 18A and 28A, and the second connecting beam 32 rotates about the rotation shaft 44 of the receiving beam 40. Then, the fixed shafts 16C and 26C of the ridges 12 and 22 slide along the second connecting beam 32 to be in the state shown in FIG. At this time, since the rotating shaft 44 is arranged at the center of the first connecting beam 30 in the material axis direction, the receiving beam 40 is held in the center of the space between the ridges 12 and 22.

また、受梁40が棟12と棟22との空間の中央部に保持されるため、受梁40の回転軸44から棟12の固定軸16Cまでの第2連結梁32に沿った距離と、回転軸44から棟22の固定軸26Cまでの第2連結梁32に沿った距離とが等しく保持される。したがって、回転軸44から固定軸16Cまでの受梁40の長手方向に沿った距離と、回転軸44から固定軸26Cまでの受梁40の長手方向に沿った距離とが等しく保持される。このため、棟12と受梁40との相対位置のずれ量と、棟22と受梁40との相対位置のずれ量が等しく保持される。 Further, since the receiving beam 40 is held in the central portion of the space between the ridge 12 and the ridge 22, the distance along the second connecting beam 32 from the rotation shaft 44 of the receiving beam 40 to the fixed shaft 16C of the ridge 12, The distance along the second connecting beam 32 from the rotary shaft 44 to the fixed shaft 26C of the ridge 22 is kept equal. Therefore, the distance along the longitudinal direction of the receiving beam 40 from the rotating shaft 44 to the fixed shaft 16C and the distance along the longitudinal direction of the receiving beam 40 from the rotating shaft 44 to the fixed shaft 26C are held equal. Therefore, the amount of displacement of the relative position between the ridge 12 and the receiving beam 40 and the amount of displacement of the relative position between the ridge 22 and the receiving beam 40 are held equal.

これにより、受梁40と棟12に架け渡された床材52と、受梁40と棟22に架け渡された床材54とがそれぞれ、受梁40の上で受梁40の長手方向へスライドし、棟12と棟22の変位を吸収する。このとき吸収する変位量(棟12と棟22とが互いにずれる方向の変位量)δ3は、棟12と棟22との相対変位量(δ3+δ3)の半分となる。 As a result, the floor member 52 spanning the receiving beam 40 and the ridge 12, and the floor member 54 spanning the receiving beam 40 and the ridge 22, respectively, on the receiving beam 40 in the longitudinal direction of the receiving beam 40. Slide to absorb the displacement of the ridges 12 and 22. The displacement amount (displacement amount in the direction in which the ridge 12 and the ridge 22 are displaced from each other) δ3 at this time is half of the relative displacement amount (δ3+δ3) between the ridge 12 and the ridge 22.

したがって、本実施形態の建物の接続構造は、受梁40を設けず1枚の床材で2棟間の相対変位を吸収する必要がある従来のエキスパンションジョイントと比較して、大きな変位を吸収することができる。 Therefore, the connection structure of the building of the present embodiment absorbs a large displacement as compared with the conventional expansion joint in which the receiving beam 40 is not provided and the relative displacement between the two buildings needs to be absorbed by one floor material. be able to.

なお、本実施形態においては、第1連結梁30の材軸方向の中心に受梁40の回転軸44が配置され、受梁40が棟12と棟22との隙間の中心に保持されているが、本発明の実施形態はこれに限らない。例えば第1連結梁30の材軸方向の中心以外の位置に受梁40の回転軸44を配置してもよい。この場合、一方の可動軸30Dから回転軸44までの距離と他方の可動軸30Dから回転軸44までの距離との比に応じて、受梁40が保持される位置が決まる。回転軸44をこのように配置することで、隣接する2棟の変位が異なる場合に、これらの変位を効率よく吸収することができる。 In the present embodiment, the rotation shaft 44 of the receiving beam 40 is arranged at the center of the first connecting beam 30 in the material axis direction, and the receiving beam 40 is held at the center of the gap between the ridge 12 and the ridge 22. However, the embodiment of the present invention is not limited to this. For example, the rotation shaft 44 of the receiving beam 40 may be arranged at a position other than the center of the first connecting beam 30 in the material axis direction. In this case, the position where the receiving beam 40 is held is determined according to the ratio of the distance from the one movable shaft 30D to the rotating shaft 44 and the distance from the other movable shaft 30D to the rotating shaft 44. By arranging the rotating shaft 44 in this way, when the adjacent two buildings have different displacements, these displacements can be efficiently absorbed.

また、受梁40の端部には、下床材70が接合されている。このため、棟12と棟22とが互いにずれる方向に変位することにより、例えば床材52が受梁40の長手方向に沿って受梁40の端部から離れる方向へスライドした場合においても、床材52の幅方向(受梁40の長手方向)の端部に発生する隙間の下部に下床材70を位置させることができる。同様に、例えば床材54が受梁40の長手方向に沿って受梁40の端部から離れる方向へスライドした場合においても、床材54の幅方向の端部に発生する隙間の下部に下床材70を位置させることができる。 A lower floor material 70 is joined to the end of the receiving beam 40. Therefore, even if the floor material 52 slides in the direction away from the end of the beam girder 40 along the longitudinal direction of the beam girder 40, for example, by displacing the ridge 12 and the ridge 22 from each other, the floor The lower floor material 70 can be positioned below the gap generated at the end of the material 52 in the width direction (longitudinal direction of the receiving beam 40). Similarly, for example, even when the floor material 54 slides along the longitudinal direction of the receiving beam 40 in the direction away from the end portion of the receiving beam 40, the floor material 54 falls below the gap generated at the widthwise end portion of the receiving beam 40. The flooring 70 can be located.

さらに、下床材70の端部70Bが、受梁40に接合される端部70Aよりも短く形成されているので、棟12、22の端部に配置された上下階を貫通する柱との干渉を避けることができる。 Furthermore, since the end portion 70B of the lower floor material 70 is formed shorter than the end portion 70A joined to the receiving beam 40, the end portion 70B of the lower floor member 70 and the pillar extending through the upper and lower floors arranged at the end portions of the ridges 12 and 22. Interference can be avoided.

なお、本実施形態においては、受梁40の端部に下床材70が接合されているが、本発明の実施形態はこれに限らない。例えば下床材70に代えて床材52、54の端部に手摺などを設けてもよい。 In addition, in this embodiment, the lower floor material 70 is joined to the end portion of the receiving beam 40, but the embodiment of the present invention is not limited to this. For example, instead of the lower floor material 70, handrails or the like may be provided at the ends of the floor materials 52 and 54.

12、22 棟
16C、26C 固定軸
18、28 スラブ
18A、28A レール(長溝部)
30 第1連結梁
30D 可動軸
32 第2連結梁
40 受梁(梁材)
46 板材
52、54 床材
56 ジョイント部
56C 係合溝
60 間柱
62 壁パネル(第1壁パネル)
64 壁パネル(第2壁パネル)
12, 22 Building 16C, 26C Fixed shaft 18, 28 Slab 18A, 28A Rail (long groove part)
30 first connecting beam 30D movable shaft 32 second connecting beam 40 receiving beam (beam member)
46 plate materials 52, 54 floor material 56 joint portion 56C engaging groove 60 stud 62 wall panel (first wall panel)
64 wall panel (2nd wall panel)

Claims (4)

間を空けて対向配置された2つの棟と、
前記棟の間に架け渡され、前記棟に対してスライド及び回動可能に連結された複数の連結手段と、
前記棟の間に配置され、複数の前記連結手段に支持されると共に前記複数の連結手段に回動可能に連結された梁材と、
一方の前記棟と前記梁材との間に、及び他方の前記棟と前記梁材との間に架け渡され、一端部が前記梁材の長手方向へスライド可能に支持され、他端部が前記棟にスライド可能に支持された一対の床材と、
を有し、
前記連結手段は、前記棟のスラブに固定された固定軸に対して長手方向に形成された長溝部がスライド及び回動可能に連結された複数の連結梁を備えている、
建物の接続構造。
Two buildings facing each other with a space in between,
A plurality of connecting means bridged between the ridges and slidably and rotatably connected to the ridges;
A beam member disposed between the ridges, supported by the plurality of connecting means and rotatably connected to the plurality of connecting means,
The bridge is bridged between the one ridge and the beam, and the other ridge and the beam, and one end is slidably supported in the longitudinal direction of the beam and the other end is A pair of floor materials slidably supported on the ridge,
Have a,
The connecting means includes a plurality of connecting beams in which long groove portions formed in a longitudinal direction with respect to a fixed shaft fixed to the slab of the ridge are connected so as to be slidable and rotatable.
Building connection structure.
前記連結手段は、前記スラブに延設され前記スラブの対向面と平行に配置された長溝部に両端部に設けられた可動軸がスライド及び回動可能に連結された複数の連結梁をさらに備えている、請求項1に記載の建物の接続構造。 It said connecting means further comprises a plurality of connecting beams movable shaft provided at both ends in the long groove disposed parallel to the facing surface of the slab extending in the slab is slidably coupled to and rotated The building connection structure according to claim 1. 前記梁材の端部には間柱が立設され、前記間柱には平常時に一方の前記棟と前記間柱との間を覆う第1壁パネルが取付けられ、他方の前記棟には平常時に他方の前記棟と前記間柱との間を覆う第2壁パネルが取付けられている、請求項1又は請求項2に記載の建物の接続構造。 A stud is erected at the end of the beam member, a first wall panel covering between the one ridge and the stud is attached to the stud in a normal state, and the other ridge is attached to the other ridge in a normal state in the other ridge. The connection structure for a building according to claim 1 or 2, wherein a second wall panel that covers between the ridge and the stud is attached. 一方の前記床材の端部と他方の前記床材の端部とを梁材の長手方向にスライド可能に連結するジョイント部と、
前記梁材の長手方向に沿って延設された板材と、
前記ジョイント部に形成され前記板材と係合する係合溝と、
を備えた床材落下防止機構を有する、請求項1〜3の何れか1項に記載の建物の接続構造。
A joint portion that slidably connects one end of the floor material and the other end of the floor material in the longitudinal direction of the beam material,
A plate member extended along the longitudinal direction of the beam member,
An engagement groove formed in the joint portion and engaged with the plate member,
The connection structure for a building according to any one of claims 1 to 3, further comprising a floor material fall prevention mechanism including:
JP2016100859A 2016-05-19 2016-05-19 Building connection structure Active JP6715079B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016100859A JP6715079B2 (en) 2016-05-19 2016-05-19 Building connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016100859A JP6715079B2 (en) 2016-05-19 2016-05-19 Building connection structure

Publications (2)

Publication Number Publication Date
JP2017206893A JP2017206893A (en) 2017-11-24
JP6715079B2 true JP6715079B2 (en) 2020-07-01

Family

ID=60416394

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016100859A Active JP6715079B2 (en) 2016-05-19 2016-05-19 Building connection structure

Country Status (1)

Country Link
JP (1) JP6715079B2 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7339816B2 (en) * 2019-09-02 2023-09-06 株式会社竹中工務店 Expansion joint floor structure

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4557082A (en) * 1984-05-17 1985-12-10 Metalines, Inc. Wide extension expansion joint assembly
JP3116001B2 (en) * 1996-08-30 2000-12-11 ドーエイ外装有限会社 Telescopic floor
JP3408204B2 (en) * 1999-07-21 2003-05-19 ドーエイ外装有限会社 Covering device for ceiling etc.

Also Published As

Publication number Publication date
JP2017206893A (en) 2017-11-24

Similar Documents

Publication Publication Date Title
US9045894B2 (en) Center-supported wall panel
JP4729055B2 (en) Unit building connection structure and unit building
JP6715079B2 (en) Building connection structure
JP5059687B2 (en) Building seismic control structure
JP5903232B2 (en) Unit building connection structure and unit building
JP6690150B2 (en) Beam-column structure of plate-like apartment house
JP6019176B2 (en) Unit building connection structure and unit building
JP6138437B2 (en) Unit building
WO2017081498A1 (en) Lattice girder shaped with u profile braced with t steel elements or angle steel elements, and wall structure without thermal bridge created with this lattice girder
JP7783394B1 (en) Root wrapping
JP2011236700A (en) Projection part connection structure of building
JP6630052B2 (en) building
JP7410731B2 (en) Sound insulation structure in buildings
JP2009019409A (en) Unit building
JP2011185019A (en) Building and building unit
JP5532289B2 (en) Expansion joint floor structure
JP6535272B2 (en) Roof structure of the building
JP7747543B2 (en) balcony
JP7456884B2 (en) How to build a building
JP5661421B2 (en) Wall support structure
JP7139783B2 (en) Steel staircase and construction method of steel staircase
JP6377912B2 (en) Building
JP6974006B2 (en) building
JP4371538B2 (en) Base-isolated building structure
JP2025071679A (en) Building structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190325

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200122

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200204

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200312

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200602

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200608

R150 Certificate of patent or registration of utility model

Ref document number: 6715079

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150